METHOD STATEMENT
Project
REVIEWER /
REV DATE STATUS REVISION DETAILS APPROVER
Table of Contents
1. INTRODUCTION
2. SCOPE
3. REFERENCES
4. RESPONSIBILITIES / SUPERVISION
5. RESOUCES
5.1 TOOLS AND EQUIPMENTS
5.2 PERSONNEL
6. QUALITY ASSURANCE/CONTROL
7. PROCEDURE
8. HEALTH AND SAFETY
9. DISTRIBUTION
10. INSPECTION TEST & PLAN (I.T.P)
1. INTRODUCTION
2. SCOPE:
3. REFERENCES:
Project Specifications
Project Quality Plan
4. RESPONSIBILITIES / SUPERVISION:
the backfilling works are trained and certified in equipment operation and
safety procedures as per the project safety plan, and all the personal on
site are using the required Personal Protective Equipment’s like –
Helmet, Gloves, Shoes.
5. RESOURCES:
5.2 Personnel
Construction Manager
Site Engineers
Surveyor
QA/QC Engineers
Safety Officer
Site Foreman
Operators
Laborer’s
6. QUALITY ASSURANCE/CONTROL:
QA/QC Engineer should verify the work has been carried out as per approved
shop drawings and Inspection Request to be raised for the Backfilling and the
required tests.
However, the following points shall be ensured, in particular;
7. PROCEDURE:
A. Site Preparation
Identify the areas requiring backfilling as per the project drawings and
specifications.
Verify the type and quality of backfill material specified in the project
documents.
Ensure that the backfill material is free from organic matter, debris or
contaminants.
C. Backfilling process
B. Traffic Management
C. Equipment Operation
9. DISTRIBUTION:
Copies of this method statement will also be issued to the following for
information/ action/comments: -
Project Manager
Construction Manager
Site Engineer
HSE Manager
QA/QC Manager