0% found this document useful (0 votes)
12 views1 page

FORM 5-Completion Certificate For Layout Sub Division Project

Completed certificate form v

Uploaded by

essaki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views1 page

FORM 5-Completion Certificate For Layout Sub Division Project

Completed certificate form v

Uploaded by

essaki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Form-5

Certificate by Architect /Engineer/ Licensed Surveyor

(See Regulation 7(b))

(Certificate for the purpose of completion of Layout/ Sub-Division Project)

Address of the Project: _____________________________________________________


_________________________________________________________________________
____________________________________________________________________________

Dated:__________________________

____________________ (Name of the Promoter)

____________________ (Address of the Promoter)

Subject: Certificate for _____________________ (Name of the Project)

Ref: ________________________________ (PRERA Registration Number)

Sir,
I _____________ (name of the Architect/Licensed Surveyor) having License
No.__________________ had undertaken assignment as an Architect/Licensed Surveyor for
the assessment and verification of development of work done at _________________ (name of
the project) situated on the Plot bearing Survey No./Plot no. ___________ demarcated by its
boundaries (latitude and longitude of the end points) to the North___________to the South
________________to the East ______________ to the West, and measuring ________ sq.mts
being developed by [Promoter’s Name]________________.

Based on site inspection carried out by me with respect to each of the plot(s) of the
aforesaid Layout/Sub-Division Project, I certify that as on date of this certificate, the
project has been developed and completed in all respects as per the Plotting layout plan
sanctioned by (Name of the sanctioned authority) vide Planning Permission
No_________ dated___________ including all amenities and facilities as committed by
the promoter to the allottes/Development charges have been paid to the local body for
the provision of amenities/facilities to a tune of Rs._____________vide Chellan/DD
No.__________ dated _________. The land portion related to road/open space has also
been gifted to the local body as per gilt deed_________dated___________.

Yours Faithfully,

Stamp, Signature and Name (IN BLOCK LETTERS) of Architect/ Licensed Surveyor with
(Reg. License No_______________________)
Enclosed: Photographs of all sides of site

You might also like