0% found this document useful (0 votes)
49 views22 pages

Loading and Unloading Sheet

Uploaded by

naveenkaushan005
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views22 pages

Loading and Unloading Sheet

Uploaded by

naveenkaushan005
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Rehabilitation and Improvement of Welimada-Kerlklees Road

(From 0+000 To 17+000km)

SUMMARY

Up to 31st July.
No. Description BOQ Amount (Rs)
2019 (IPA 05)

1 Preliminary and General 1A 17,500,000.00 15,240,000.00

1B 6,000,000.00 1,330,000.00

2 Site Clearing 12,965,550.00 13,353,007.20

3 Earthworks 89,359,058.75 46,106,321.95

4 Sub Base, Base & Shoulders 252,203,900.00 13,575,412.50

5 Surface Application 298,648,350.00 1,307,124.00

6 Culverts and Other Structures 219,766,852.50 30,682,691.00

7 Drainage Construction 488,957,625.00 35,051,064.07

8 Incidental Construction 114,314,037.50 -

9 Maintenance of Roads 22,522,500.00 815,208.55

10 Provisional Sum - Item 14,625,000.00 -

11 Day Works 3,095,868.75 -

Bridge 1/1 28,922,400.00 -

Bridge 2/5 16,706,560.00 -

Bridge 7/7 16,706,560.00 5,458,558.01

Variation 22,376,799.06

Sub Total 1 : 1,602,294,262.50 185,296,186.33


Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

ITEM NO BOQ
DESCRIPTION UNIT QUANTITY
Bill Pay RATE AMOUNT

BILL No.1 : PRELIMINARY

BILL No.1A : PRELIMINARY GENERAL


1 108.1(1) Allow for cost of providing Performance Security L.S Item Allow 6,000,000.00
2 108.2(1) Allow for the cost of providing insurances L.S Item Allow 4,000,000.00
3 108.3(1) Mobilization of Contractor's facilities and plant / Equipment L.S Item Allow 6,000,000.00
4 108.3(2) De-Mobilization of Contractor's facilities and plant / Equipment L.S Item Allow 1,500,000.00
Bill No.1A Carried to Summary 17,500,000.00
BILL No.1B : PRELIMINARY GENERAL
1 103(1) Traffic safety and control month 24.00 250,000.00 6,000,000.00
2 108(1)3 Maintenance of site establishment and site management for the Contractor month 24.00 -
Provide adequate environment protection and safety precautions during
3 108(1)4
construction and implement EMP and prepare monthly report
month 24.00 -
Bill No.1B Carried to Summary 6,000,000.00
BILL No.2 : SITE CLEARING
CLEARING AND GRUBBING
1 201(1) Clearing and grubbing sq.m 68,000.00 84.50 5,746,000.00
Remove trees : - -
2 201(2) - Girth 600 to 1,200 mm nr 34.00 9,750.00 331,500.00
3 201(3) - Girth 1,200 to 2,000 mm nr 17.00 19,500.00 331,500.00
4 201(4) - Girth over 2000 mm nr 10.00 48,750.00 487,500.00
Remove Branches : - -
5 201(5) - Girth 300 to 600 mm nr 75.00 3,250.00 243,750.00
6 201(6) - Girth 600 to 1,200 mm nr 20.00 6,500.00 130,000.00
7 201(7) - Girth over 1,200 mm nr 10.00 9,750.00 97,500.00
Remove Stumps : - -
8 201(8) - Girth 300 to 600 mm nr 25.00 6,500.00 162,500.00
9 201(9) - Girth 600 to 1,200 mm nr 10.00 9,750.00 97,500.00
10 201(10) - Girth over 1,200 mm nr 10.00 16,250.00 162,500.00
2.2 REMOVAL OF STRUCTURES & OBSTRUCTIONS - -
11 202(1) Dismantle & remove brick masonry structures - -
(Provisional Quantity) m3 515.00 2,600.00 1,339,000.00
12 202(2) Dismantle & remove Random Rubble masonry structures - -
(Provisional Quantity) m3 800.00 3,250.00 2,600,000.00
13 202(3) Dismantle & remove concrete structures - -
(Provisional Quantity) m3 100.00 5,850.00 585,000.00
14 202(4) Dismantle & remove Dress stone mosonary structures - -
(Provisional Quantity) m3 180.00 3,250.00 585,000.00
15 202(5) Remove fencing (Provisional Quantity) m 85.00 780.00 66,300.00
Bill No.2 Carried to Summary 12,965,550.00
BILL No.3 : EARTH WORKS
3.1 ROADWAY EXCAVATION
1 301(1) Roadway excavation , soil suitable for fill m3 13,400.00 975.00 13,065,000.00
2 301(2) Roadway excavation , boulders ( Provisionl Quantity) m3 90.00 4,225.00 380,250.00
3 301(3) Roadway excavation, hard rock (Provisionl Quantity) m3 500.00 5,200.00 2,600,000.00
4 301(4) Roadway excavation, unsuitable soil m3 770.00 1,560.00 1,201,200.00
5 301(5) Roadway excavation sub grade replacement m3 80.00 1,852.50 148,200.00
6 301(6) Road Pavement Excavation m3 6,115.00 1,950.00 11,924,250.00
7 301(7) Prepare subgrade in cut areas sq.m 34,255.00 94.25 3,228,533.75
8 301(8) Roadway Excavation, soft rock m3 1,020.00 2,275.00 2,320,500.00
3.2 STRUCTURE EXCAVATION AND BACKFILL -
9 302(1) Excavation for structures & backfill in suitable soil m3 2,000.00 1,950.00 3,900,000.00
10 302(2) Excavation for structures, unsuitable soil and backfill with suitable material m3 4,430.00 2,600.00 11,518,000.00
11 302(3) Excavaion in boulders for structures m 3
1,050.00 4,550.00 4,777,500.00
12 302(4) Excavation in hard rock for structures m3 670.00 5,850.00 3,919,500.00
13 302(5) Excavation and backfill for structures in marshy soil m3 260.00 4,875.00 1,267,500.00
3.3 EMBANKMENT CONSTRUCTION -
14 304(1) Trim, level and compact Original ground sq.m 1,700.00 84.50 143,650.00
15 304(2) Embankment construction, Type 1 m3 850.00 2,080.00 1,768,000.00
16 304(3) Embankment construction, Type 2 m3 3,400.00 1,495.00 5,083,000.00
17 304(4)a Boulder packing for soft ground treatment m3 102.00 2,600.00 265,200.00
18 304(4)b Boulder packing for soft ground treatment(available rock) m3 102.00 1,950.00 198,900.00
19 304(6) Embankment construction, Type 2 with available suitable soil m3 3,400.00 1,170.00 3,978,000.00
3.4 CHANNEL EXCAVATION -
20 307(1) Channel excavation, suitable soil m3 9,525.00 1,365.00 13,001,625.00
21 307(3) Channel excavation, hard rock (Provisionl Quantity) m3 495.00 6,500.00 3,217,500.00
22 307(4) Channel excavation, unsuitable soil m3 495.00 1,950.00 965,250.00
23 1710(1) Provide and place geotextile sq.m 1,000.00 487.50 487,500.00
Bill No.3 Carried to Summary : 89,359,058.75
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

ITEM NO BOQ
DESCRIPTION UNIT QUANTITY
Bill Pay RATE AMOUNT

BILL No.4 : SUB BASE, BASES AND SHOULDERS


4.1 GRANULAR PAVEMENT
1 401(1) Sub base as compacted in position m3 1,050.00 2,535.00 2,661,750.00
2 405(1) Dense graded aggregate base m3 42,840.00 5,525.00 236,691,000.00
3 408(1) Scarify and Remove existing bitumen layer sq.m 16,320.00 195.00 3,182,400.00
4.2 SHOULDERS -
4 409(1) Earthen shoulder as compacted in position m3 4,250.00 2,275.00 9,668,750.00
Bill No. 4 Carried to Summary 252,203,900.00
BILL No.5 : SURFACE APPLICATION AND SURFACINGS
5.1 PRIME COAT AND TACK COAT
1 501(1) Bituminous Prime Coat using MC30 at 1 litre per m2 sq.m 130,900.00 175.50 22,972,950.00
2 502(1) Bituminous Tack Coat (Cationic Emulsion grade CRS1 at 0.3 litre/m2) sq.m 130,900.00 78.00 10,210,200.00
5.2 BITUMINOUS SURFACING -
3 506(1) Asphalt concrete in wearing course 50mm compacted thickness sq.m 142,800.00 1,859.00 265,465,200.00
5 506(2) Asphalt concrete in Binder Course MT - -
Bill No. 5 Carried to Summary 298,648,350.00
BILL No.6 : CULVERTS AND OTHER STRUCTURES

6.1 Box Culverts


1 201(1) Clearing and grubbing sq.m 349.84 84.50 29,561.48
2 302(1) Excavation for structures & backfill in suitable soil m3 138.00 1,950.00 269,100.00
3 302(3) Excavaion in boulders for structures m3 15.00 4,550.00 68,250.00
4 302(4) Excavation in hard rock for structures m3 136.00 5,850.00 795,600.00
5 1001(1) Grade C 15 Concrete m3 14.00 17,550.00 245,700.00
6 1001(2) Grade C 20 Concrete m3 160.00 18,525.00 2,964,000.00
7 1001(3) Grade C 25 Concrete m3 22.00 19,500.00 429,000.00
8 1002(1) Tor Steel reinforcement kg 2,250.72 172.25 387,686.52
9 1006(1A) Random rubble masonry m3 9.00 9,100.00 81,900.00
10 1006(2) Plastering 1.3 cement sand mix ,16mm thick sqm 9.00 975.00 8,775.00
11 1008(1) Formwork smooth finish sqm 250.00 1,690.00 422,500.00
12 1008(2) Formwork rough finish sqm 50.00 1,430.00 71,500.00
13 705(1) 100mm crushed stone back fill material m3 30.50 5,382.00 164,151.00
14 705(2) 75mm thick 37.5mm maximum size crushed stone - filter material m3 4.00 5,330.00 21,320.00
15 706(1A) Weep hole, 75mm dia. PVC pipe (Type 600) m 30.00 975.00 29,250.00
16 1002(4) 20mm Diameter900mm mild Steel Dowels kg 128.00 487.50 62,400.00
6.2 Hume pipe Culvert - -
17 1001(1)a Grade C 15 Concrete m3 40.00 17,225.00 689,000.00
18 1001(3)a Grade C 25 Concrete m3 150.00 19,175.00 2,876,250.00
19 1001(1)b Grade C 15 Concrete m3 460.00 17,225.00 7,923,500.00
20 1001(2)a Grade C 20 Concrete m3 850.00 18,200.00 15,470,000.00
21 1008(1)a Formwork smooth finish sqm 2,310.00 1,625.00 3,753,750.00
22 1008(2)a Formwork rough finish sqm 1,650.00 1,430.00 2,359,500.00
23 705(1)a 100mm crushed stone back fill material m3 420.00 5,382.00 2,260,440.00
24 705(2)a 75mm thick 37.5mm maximum size crushed stone - filter material m3 14.00 5,330.00 74,620.00
25 808(1) Guard stones ( Road way, Culverts, Causeway and Bridges) nr 372.00 5,850.00 2,176,200.00
26 1002(1)a Tor Steel reinforcement kg 260,000.00 165.75 43,095,000.00
27 707(3) Supplying, laying & jointing 900mm dia. hume pipe. m 910.00 21,125.00 19,223,750.00
6.3: Construction of Retaining Wall -
30 1008(1)b Formwork smooth finish sq.m 7,800.00 1,625.00 12,675,000.00
31 1008(2)b Formwork rough finish sq.m 2,575.00 1,300.00 3,347,500.00
32 1002(1)b Tor Steel reinforcement kg 210,058.00 165.75 34,817,113.50
33 1001(1)c Grade C 15 Concrete m3 665.00 17,225.00 11,454,625.00
34 1001(3)b Grade C 25 Concrete m3 1,400.00 18,200.00 25,480,000.00
Forming weep holes using P.V.C pipes of inernal dia. not less than75 mm.
35 706(1A) m 1,050.00 975.00 1,023,750.00
36 705(1)b 100mm crushed stone back fill material nr 1,280.00 5,382.00 6,888,960.00
37 705(2)b 75mm thick 37.5mm maximum size crushed stone - filter material nr 270.00 5,460.00 1,474,200.00
Construction of gabion wall using 150-225 mm rubble for Gabion and
38 805(1) Retaining wall m3 1,215.00 11,700.00 14,215,500.00
Supplying & laying Geotextile including transport (155 GSM, 1.5 mm thk)
39 1710(1) sq.m 5,000.00 487.50 2,437,500.00
Bill No. 6 Carried to Summary : 219,766,852.50
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

ITEM NO BOQ
DESCRIPTION UNIT QUANTITY
Bill Pay RATE AMOUNT

BILL NO: 7. DRAINAGE CONSTRUCTIONS


Concrete
1 1001(1)d Grade C 15 m3 1,185.00 17,550.00 20,796,750.00
2 1001(3)c Grade C 25 m3 17,400.00 18,850.00 327,990,000.00
3 1006(1A)a Random rubble masonry m3 310.00 8,450.00 2,619,500.00
4 1006(2) plasering 1.3 cement sand mix ,16mm thick m 2,000.00 1,040.00 2,080,000.00
Precast Concrete cover slab - -
5 701(6) 650 x 650 x 50mm for bridge duct sq.m 265.00 3,250.00 861,250.00
6 701(4) 800 x 600 x 125mm for drain sq.m 2,800.00 7,800.00 21,840,000.00
7 701(7) 1000 x 450 x 150mm Gr.25 concrete sq.m 350.00 9,425.00 3,298,750.00
8 701 (8) 1000 x 450 x 125mm Gr.25 concrete sq.m 350.00 10,725.00 3,753,750.00
9 1002(1)c Tor - Steel reaiforcement kg 208,300.00 178.75 37,233,625.00
10
Bill 1008(1)c Formwork smoth finish sq.m 19,200.00 1,690.00 32,448,000.00
No.7
11 1008(2)c Formwork rough finish sq.m 25,200.00 1,430.00 36,036,000.00
Carri
488,957,625.00
ed to
Sum
BILL No.8 : INCIDENTAL WORKS
mary
8.1 TOP SOILING
1 801(1) Furnish, Spread and compact top soil sq.m 3,400.00 195.00 663,000.00
8.2 GRASSING - -
2 802(1) Grass sodding sq.m 3,400.00 585.00 1,989,000.00
8.3 RIP RAP PROTECTION FOR EMBANKMENT SLOPES - -
3 804(1) Dumped Rip Rap m3 125.00 6,500.00 812,500.00
8.4 PAVED SIDE WALKS - -
4 806(1) Precast concrete slab ( 450x450x50mm ) paving sq.m 2,150.00 2,925.00 6,288,750.00
8.5 PRE CAST CONCRETE KERBS AND CHANNELS - -
5 807(1) Standard kerb m 1,300.00 2,437.50 3,168,750.00
6 807(2) Flat /Edge Kerb m 200.00 2,600.00 520,000.00
7 808(2) Single Beam Crash barrier(W Beam Galvanized steel) m 5,350.00 13,000.00 69,550,000.00
8 409(1) Earth compacted in position m3 500.00 1,170.00 585,000.00
8.6 FENCING - -
9 809(1) Standard type pedestrian guard fence m 500.00 10,400.00 5,200,000.00
8.7 ROAD MARKING - -
Center line : - -
10 810(1) Continuous sq.m 750.00 1,625.00 1,218,750.00
Edge line : - -
11 810(3) Continuous sq.m 2,572.00 1,625.00 4,179,500.00
12 810(4) Pedestrian crossing sq.m 800.00 1,625.00 1,300,000.00
13 810(5) Road Studs nr 2,825.00 1,397.50 3,947,937.50
8.8 ROAD SIGNS - -
Reflective road sign : - -
14 811(1) Single pole, sign area up to 0.5m2 nr 260.00 13,000.00 3,380,000.00
15 811(3) Chevron warning sign nr 425.00 16,250.00 6,906,250.00
8.9 CONCRETE KERB INLETS - -
16 813(1) Kerb inlet nr 200.00 9,100.00 1,820,000.00
8.10 KILOMETRE POSTS - -
17 815(1) Provide ,Install and paint new kilometre post nr 17.00 7,800.00 132,600.00
18 815(4) Provide ,Install and paint new boundary markers nr 680.00 3,900.00 2,652,000.00
Bill No. 8 Carried to Summary 114,314,037.50
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

ITEM NO BOQ
DESCRIPTION UNIT QUANTITY
Bill Pay RATE AMOUNT

BILL No.9 : MAINTENANCE OF ROAD


MAINTENANCE OF CARRIAGEWAY
Filling pot-holes and patch repairs with Asphalt concreteCold mix (MC30),
1 1101(1)
20mm & less in depth
sq.m 7,500.00 780.00 5,850,000.00
Filling pot-holes and patch repairs with Asphalt concrete Cold mix (MC30),
2 1101(2)
75mm & less in depth
sq.m 6,000.00 1,560.00 9,360,000.00
Filling pot holes and patch repairs with Asphalt concrete Cold mix (MC30),
3 1101(3)
deeper than 75mm
sq.m 4,500.00 1,625.00 7,312,500.00
Bill No. 9 Carried to Summary 22,522,500.00
BILL NO.A :VARIATION WORKS
2 1001(2)b Grade C 20 Concrete for lined drain ( Provisional Quantity ) m3 3,600.00 18,852.00 67,867,200.00
Steel Dowels for Bridge Kg 1,625.00 390 633,750.00
Steel Dowels for Retaining walls Kg 1,625.00 1200 1,950,000.00
Excavation for structures, unsuitable soil and backfill with suitable material Cu.m 1,200.00 5850 7,020,000.00

Bill No. 11 Carried to Summary 77,470,950.00


BILL No.10 : PROVISIONAL SUMS
1 103(2) Temporary by-passes for culverts, bridges and other structures PS 5,200,000.00
2 117.1 Diversion, protection or removal of utility services PS 6,500,000.00
Allow for Contractor's overheads and profit for above Provisional Sum items. % 18,000,000.00 25% 2,925,000.00
Bill No. 11 Carried to Summary 14,625,000.00
BILL No.11 : SCHEDULE OF DAY WORKS RATES
11.1 LABOUR DAY WORKS
All Quantities are Provisional
1 Unskilled labour Days 100.00 1,023.75 102,375.00
2 Semi skilled labour Days 100.00 1,205.75 120,575.00
3 Skilled labour Days 30.00 1,274.00 38,220.00
4 Operator Days 50.00 1,365.00 68,250.00
Labour Day works forwarded to Total 329,420.00

11.2 EQUIPMENT DAY WORKS


1 Loader Backhoe hrs 75.00 1,342.25 100,668.75
2 Vibrating rollar hrs 25.00 2,730.00 68,250.00
3 Vibrating Rammer hrs 25.00 364.00 9,100.00
4 Excavator hrs 30.00 2,275.00 68,250.00
5 Tractor and trailer hrs 50.00 682.50 34,125.00
6 Concrete Mixer hrs 15.00 2,047.50 30,712.50
7 Poker Vibrator hrs 10.00 273.00 2,730.00
8 Water Pump hrs 75.00 273.00 20,475.00
9 Tipper Truck hrs 200.00 796.25 159,250.00
10 Wheel Loader hrs 3.00 2,275.00 6,825.00
11 Water bowser hrs 25.00 1,137.50 28,437.50
Equipment Day works forwarded to Total 528,823.75

11.3 MATERIAL DAY WORKS


1 Cement ordinary 50 kg 30.00 650.00 19,500.00
2 Bituminous Emulsion CSS - 1 Lit. 50.00 84.50 4,225.00
3 Reinforcement in bars Grade 460 kg 2,500.00 175.50 438,750.00
4 Aggregate for concrete(19mm) Cu.m. 9.00 4,225.00 38,025.00
5 Agregate base Course Cu.m. 30.00 5,200.00 156,000.00
6 River Sand Cu.m. 25.00 2,925.00 73,125.00
7 Rubble Cu.m. 100.00 5,200.00 520,000.00
8 Plywood (15mm) Sqm. 100.00 1,755.00 175,500.00
9 Asphalt Concrete binder material Mt 50.00 16,250.00 812,500.00
Bill No. 11 Carried to Summary 2,237,625.00
Bill No. 11 Carried to Summary 3,095,868.75
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

ITEM NO BOQ
DESCRIPTION UNIT QUANTITY
Bill Pay RATE AMOUNT

6.1 Bridge 1/1 ( 16.5 m Span) ON WELIMADA- KIRKLEES ROA


Foundation & Sub Structure
Abutment & Wing walls
Concrete :
1 1001(1)e Grade C 15Concrete m3 620.00 18,200.00 11,284,000.00
2 1001(3)c Grade C 25Concrete m3 120.00 20,150.00 2,418,000.00
3 1002(1)d Tor Steel reinforcement kg 3,100.00 178.75 554,125.00
Formwork - -
4 1008(1)d Formwork smooth finish m2 580.00 1,690.00 980,200.00
5 1008(2)d Formwork rough finish m2 350.00 1,430.00 500,500.00
6 705(1)c 100mm crushed stone back fill material m3 50.00 5,362.50 268,125.00
7 705(2)c 37.5mm maximum size crushed stone - filter material m3 20.00 5,850.00 117,000.00
8 707(8) Saturated Sand Fill m3 3.00 5,200.00 15,600.00
9 706(1) Weep hole, 75mm dia. PVC pipe (Type 600) m 240.00 1,137.50 273,000.00
10 1002(4) 20mm Diameter mild Steel Dowels kg 300.00 975.00 292,500.00
Super Structure - -
Concrete : - -
11 1001(4) Grade C 30 Concrete m3 20.00 21,450.00 429,000.00
12 1001(5) Grade C 40 Concrete m3 100.00 22,750.00 2,275,000.00
13 1003(1A) Precast PSC Beams 16.5m long supplied Nos 17.00 292,500.00 4,972,500.00
14 1003(2A) Precast PSC Beams 16.5m long launched Nos 17.00 130,000.00 2,210,000.00
15 Polythene displacers 230mm Dia. Filled with saw dust L.m 250.00 325.00 81,250.00
16 1002(1)e Tor Steel reinforcement kg 2,400.00 178.75 429,000.00
17 1002(3) Mild Steel reinforcement kg 700.00 169.00 118,300.00
Formwork - -
18 1008(1)e Formwork smooth finish m2 100.00 1,690.00 169,000.00
19 814(1) Hand Rails and uprights m 34.00 9,750.00 331,500.00
20 814(2) End pilasters Nos 4.00 65,000.00 260,000.00
21 807(4) Bridge kerbs m 34.00 4,550.00 154,700.00
22 807(3) Drop kerb m 34.00 3,250.00 110,500.00
23 1010(1) 75x12mm Hard Rubber Bearing pads m 16.00 11,505.00 184,080.00
24 1009(1B) MS angle Iron expansion joint m 16.00 7,670.00 122,720.00
25 706(2) 110mm dia Type 400 pvc pipes as rain water outlets m 30.00 1,560.00 46,800.00
26 804(1) Dumped rip-rap m3 50.00 6,500.00 325,000.00
Bridge 1/1 Carried to Summary 28,922,400.00
6.2 Bridge at 2/5 ( 6m Span) ON WELIMADA- KIRKLEES ROAD
Foundation & Sub Structure
Abutment & Wing walls
Concrete :
27 1001(1)f Grade C 15Concrete m3 400.00 18,200.00 7,280,000.00
28 1001(3)d Grade C 25Concrete m3 95.00 20,150.00 1,914,250.00
29 1002(1)f Tor Steel reinforcement kg 1,800.00 178.75 321,750.00
Formwork - -
30 1008(1)f Formwork smooth finish m2 105.00 1,690.00 177,450.00
31 1008(2)f Formwork rough finish m2 335.50 1,430.00 479,765.00
32 705(1)d 100mm crushed stone back fill material m3 120.00 5,362.50 643,500.00
33 705(2)d 37.5mm maximum size crushed stone - filter material m3 55.00 5,850.00 321,750.00
34 707(8) Saturated Sand Fill m3 10.00 5,200.00 52,000.00
35 706(1) Weep hole, 75mm dia. PVC pipe (Type 600) m 98.00 1,137.50 111,475.00
36 1002(2) 20mm Diameter mild Steel Dowels kg 180.00 975.00 175,500.00
Super Structure - -
Concrete : - -
36 1001(4)a Grade C 30 Concrete m3 8.00 21,450.00 171,600.00
37 1001(5)a Grade C 40 Concrete m3 45.00 22,750.00 1,023,750.00
38 1003(1) Precast PSC Beams 6m long supplied Nos 17.00 78,000.00 1,326,000.00
39 1003(2) Precast PSC Beams 6m long launched Nos 17.00 58,500.00 994,500.00
40 Polythene displacers 230mm Dia. Filled with saw dust L.m 110.00 325.00 35,750.00
41 1002(1)g Tor Steel reinforcement kg 1,000.00 178.75 178,750.00
42 1002(3)a Mild Steel reinforcement kg 300.00 169.00 50,700.00
43 1006(1) Random rubble masonry m3 - -
Formwork - -
44 1008(1)g Formwork smooth finish m2 35.00 1,690.00 59,150.00
45 814(1) Hand Rails and uprights m 16.00 9,750.00 156,000.00
46 814(2) End pilasters Nos 4.00 65,000.00 260,000.00
47 807(4) Bridge kerbs m 28.00 4,550.00 127,400.00
48 807(3) Drop kerb m 28.00 3,250.00 91,000.00
49 1010(1) 75x12mm Hard Rubber Bearing pads m 16.00 11,505.00 184,080.00
50 1009(1A) Reinforced Elastomeric expansion joint m 16.00 14,625.00 234,000.00
51 1009(1B) MS angle Iron expansion joint m 16.00 7,670.00 122,720.00
52 706(2) 110mm dia Type 400 pvc pipes as rain water outlets m 12.00 1,560.00 18,720.00
53 804(1) Dumped rip-rap m3 30.00 6,500.00 195,000.00
Bridge at 2/5 Carried to Summary 16,706,560.00
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

ITEM NO BOQ
DESCRIPTION UNIT QUANTITY
Bill Pay RATE AMOUNT

6.3 6.3 Bridge at 7/7 ( 6m Span) ON WELIMADA- KIRKLEES ROAD


Foundation & Sub Structure
Abutment & Wing walls
Concrete :
54 1001(1)g Grade C 15Concrete m3 400.00 18,200.00 7,280,000.00
55 1001(3)e Grade C 25Concrete m3 95.00 20,150.00 1,914,250.00
56 1002(1)h Tor Steel reinforcement kg 1,800.00 178.75 321,750.00
Formwork - -
57 1008(1)h Formwork smooth finish m2 105.00 1,690.00 177,450.00
58 1008(2)h Formwork rough finish m2 335.50 1,430.00 479,765.00
59 705(1)e 100mm crushed stone back fill material m3 120.00 5,362.50 643,500.00
60 705(2)e 37.5mm maximum size crushed stone - filter material m3 55.00 5,850.00 321,750.00
61 1005(11) Saturated Sand Fill m3 10.00 5,200.00 52,000.00
62 706(1) Weep hole, 75mm dia. PVC pipe (Type 600) m 98.00 1,137.50 111,475.00
63 1002(4) 20mm Diameter mild Steel Dowels kg 180.00 975.00 175,500.00
Super Structure - -
Concrete : - -
64 1001(4)b Grade C 30 Concrete m3 8.00 21,450.00 171,600.00
65 1001(5)b Grade C 40 Concrete m3 45.00 22,750.00 1,023,750.00
66 1003(1F) Precast PSC Beams 6m long supplied Nos 17.00 78,000.00 1,326,000.00
67 1003(2F) Precast PSC Beams 6m long launched Nos 17.00 58,500.00 994,500.00
68 Polythene displacers 230mm Dia. Filled with saw dust L.m 110.00 325.00 35,750.00
69 1002(1)i Tor Steel reinforcement kg 1,000.00 178.75 178,750.00
70 1002(3)b Mild Steel reinforcement kg 300.00 169.00 50,700.00
Formwork - -
71 1008(1)i Formwork smooth finish m2 35.00 1,690.00 59,150.00
72 814(1) Hand Rails and uprights m 16.00 9,750.00 156,000.00
73 814(2) End pilasters Nos 4.00 65,000.00 260,000.00
74 807(4) Bridge kerbs m 28.00 4,550.00 127,400.00
75 807(3) Drop kerb m 28.00 3,250.00 91,000.00
76 1010(1) 75x12mm Hard Rubber Bearing pads m 16.00 11,505.00 184,080.00
77 1009(1A) Reinforced Elastomeric Expansion joint m 16.00 14,625.00 234,000.00
78 1009(1B) MS angle Iron expansion joint m 16.00 7,670.00 122,720.00
79 706(2) 110mm dia Type 400 pvc pipes as rain water outlets m 12.00 1,560.00 18,720.00
80 804(1) Dumped rip-rap m3 30.00 6,500.00 195,000.00
Bridge at 7/7 Carried to Summary 16,706,560.00
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

Up to 31st July 2019 (IPA 05)

Qty AMOUNT

1.00 6,000,000.00
0.81 3,240,000.00
1.00 6,000,000.00

15,240,000.00

5.32 1,330,000.00

1,330,000.00

50,238.60 4,245,161.70
-
124.40 1,212,900.00
122.60 2,390,700.00
38.20 1,862,250.00
-
15.00 48,750.00
40.00 260,000.00
2.00 19,500.00
-
-
8.00 78,000.00
4.00 65,000.00
-
-
2.70 7,020.00
-
131.54 427,505.00
-
343.88 2,011,698.00
-
205.17 666,802.50
74.00 57,720.00
13,353,007.20

1,647.30 1,606,117.50
38.95 164,563.75
78.95 410,540.00
17,474.68 27,260,500.80
9.82 18,191.55
311.50 607,425.00
9,894.00 932,509.50
1,691.65 3,848,503.75
-
-
1,695.66 4,408,716.00
-
-
-
-
-
2,733.42 5,685,513.60
715.10 1,069,074.50
36.41 94,666.00
-
-
-
-
-
-
-
46,106,321.95
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

Up to 31st July 2019 (IPA 05)

Qty AMOUNT

1,621.60 4,110,756.00
1,713.06 9,464,656.50
-
-
-
13,575,412.50
-
-
7,448.00 1,307,124.00
-
-
-
-
1,307,124.00
-
-
-
-
-
-
62.90 1,103,895.00
-
52.16 1,017,120.00
2,787.14 480,084.00
-
-
136.16 230,110.40
202.43 289,474.90
-
-
28.70 27,982.50
86.33 42,084.41
-
6.94 119,541.50
45.50 872,462.50
122.94 2,117,641.50
-
116.75 189,718.75
329.50 471,185.00
15.13 81,429.66
3.65 19,454.50
-
940.20 155,838.81
116.15 2,453,668.75
-
584.10 949,162.50
1,111.06 1,444,378.00
8,058.89 1,335,761.02
704.73 12,138,974.25
257.51 4,686,682.00
169.40 165,165.00
46.62 250,908.84
7.32 39,967.20
-

-
30,682,691.00
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

Up to 31st July 2019 (IPA 05)

Qty AMOUNT

174.88 3,069,144.00
-
-
-
-
-
-
-
-
62,987.82 11,259,072.47
5,910.64 9,988,981.60
7,506.20 10,733,866.00
35,051,064.07

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

Up to 31st July 2019 (IPA 05)

Qty AMOUNT

34.17 26,652.60

180.62 281,767.20

311.87 506,788.75
815,208.55

1,134.58 21,389,102.16
-
455.652 546,782.40
75.37 440,914.50

22,376,799.06

-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

Up to 31st July 2019 (IPA 05)

Qty AMOUNT

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Rehabilitation and Improvements of Welimada - Kerlklees Road ( From 0+000km to 17+000km Bill Of Quantities

Up to 31st July 2019 (IPA 05)

Qty AMOUNT

26.61 484,302.00
-
-
-
-
148.76 212,726.80
-
-
-
-
-
-
-
85.51 1,834,189.50
-
-
-
-
15,257.40 2,727,260.61
-
-
118.39 200,079.10
-
-
-
-
-
-
-
-
-
5,458,558.01
Material loading sheet
Date:…………………..…………………… Stock Pile No:……………...…...…. Discription:…………………...……...……………
Receiving Qty Dri/ Offi/
No. Vehicle No Road Time Dri/Name
Inchage Name Cube Signature Signature
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Material unloading sheet
Date:…………………………………… Stock Pile No:……………...……. Discription:…………………...………………

No. Vehicle No Road Invoice No. Time Qty Dri/Name Dri/ Offi/
Cube Signature Signature

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Date:……………...……..……….. Material loading Lory sheet Vehicle No:…………..……………...…….
Description:………………………………………. Issued Officer Name:……………………..………..……………….
Issued Driver Received Officer
No. Stock Road Qty Issued Officer Received Location
Pile No No Cube Time Signature Time
Name Signature Name Signature

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Remove ABC
Date:…………………..……………………
Stock Pile No:……………...…...…. Road No:…………………...……...……………
No. Vehicle No Loading Inchage Location Qty Cube Receiving Offi/
Name Of/ Name Signature
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Date:……………...……..………. Material loading Lory sheet Vehicle No:…………..……………...…
Description:………………………………………. Issued Officer Name:……………………..………..………………
Issued Driver
No. Road Qty Issued Officer Received Location
No Cube Time Signature Time
Name Signature

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
ehicle No:…………..……………...…….
:……………………..………..……………….
Received Officer

Name Signature

You might also like