1 HDT'
1 HDT'
DIAGNOSTICS − ENGINE
DI322−02
CIRCUIT DESCRIPTION
When the ignition switch is turned ON, battery positive voltage is applied to the coil, closing the contacts of
the ECD main relay (Marking: ECD) and supplying power to the terminal +B of the engine ECU.
WIRING DIAGRAM
Engine ECU
Cowl Side J/B LH B−R (LHD)
12 IGN 21 14
1 2D B−R B−R IGSW
2B E19
(RHD) B B (RHD)
J/26 J/C
B−R
Ignition Switch
2
6 7 W−R W−R
IG1
W−R
14
BR E1
E17
A
B
J7 J/C
ED (LHD)
EC (RHD)
B05265
INSPECTION PROCEDURE
ON PREPARATION:
E1 +B (a) Remove the glove compartment door.
(b) Turn the ignition switch ON.
CHECK:
Measure voltage between terminals +B and E1 of engine ECU.
OK:
Voltage: 9 − 14 V
(−) (+)
A04962
NG
2 Check for open in harness and connector between terminal E1 of engine ECU
and body ground (See page IN−19).
OK
OK
PREPARATION:
Remove the ECD fuse from the engine room J/B.
CHECK:
Check continuity of ECD fuse.
OK:
Continuity
OK
5 Check for open in harness and connector between engine ECU and ECD main
relay (Marking: ECD), ECD main relay and battery (See page IN−19).
OK
ON PREPARATION:
E1 IGSW (a) Remove the glove compartment door.
(b) Turn the ignition switch ON.
CHECK:
Measure voltage between terminals IGSW and E1 of engine
ECU.
OK:
(−) (+) Voltage : 9 − 14 V
A04963
OK Go to step 9.
NG
OK
8 Check for open in harness and connector between ignition switch and engine
ECU (See page IN−19).
OK
9 Check voltage between terminal MREL of engine ECU and body ground.
ON PREPARATION:
MREL
(a) Remove the glove compartment door.
(b) Turn the ignition switch ON.
CHECK:
Measure voltage between terminal MREL of engine ECU and
body ground.
OK:
(−) (+)
Voltage: 9 − 14 V
A04964
NG
Check for open in harness and connector between engine ECU and ECD main relay (Marking:
ECD), ECD main relay and body ground (See page IN−19).