0% found this document useful (0 votes)
26 views2 pages

Renovation Samplec

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views2 pages

Renovation Samplec

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Pro Bids Sample

Renovation PROJECT NAME

ITEM # DESCRIPTION QTY. FT QTY. W/ FT UNIT UNIT COST ITEM COST TRADE COST

GENERAL $ -
1 Permit 1 0% 1 ls
2 Supervision 1 0% 1 ls
3 Final cleanup 1 0% 1 ls
DEMOLITION $ -
4 Remove existing walls 369 0% 369 sf
5 Remove existing doors 15 0% 15 lf
6 Remove existing bath sink 5 0% 5 lf
7 Remove existing Shelves 48 0% 49 lf
8 Remove existing shower 2 0% 2 sf
9 Remove existing stair handrail 70 0% 70 lf
10 Remove existing window 1 0% 1 lf
WOOD, PLASTIC & COMPOSITES $ -
11 Stair wooden railing 16 5% 18 lf
12 Wooden stairs 15 0% 15 ea
OPENINGS $ -
Doors
13 6'-0"x6'-8" solid core wood door paint 1 0% 1 ea
14 3'-0"x6'-8"solid core wood frame exterior door 2 0% 2 ea
15 3'-0"x6'-8"solid core wood frame exterior door 1 0% 1 ea
16 3'-0"x6'-8"solid core wood door&metal frame interior 10 0% 10 ea
door
17 3'-0"x6'-8"solid core wood door&metal frame interior 3 0% 3 ea
door
18 3'-0"x6'-8"solid core wood door&metal frame interior 4 0% 4 ea
door
Windows
19 New windows 4 0% 4 ea
FINISHES $ -
Ceiling
20 C-1 gyp.bd..,painted ceiling 2,189 10% 2,408 sf
21 C-2 Moisture resistant gyp,bd painted 978 10% 1,076 sf
Walls
22 2x4 new built wall 2,490 10% 2,740 sf
23 2x6 new built wall 65 10% 72 sf
Flooring
24 F-1 laminate wood 2,596 10% 2,856 sf
25 F-2 tile -non-slip floor 543 10% 598 sf
Wall finishes
26 T-1 base 36"ht.wainscot trim&crown molding 868 10% 955 lf
Paint
27 Paint on walls 6,962 10% 7,659 sf
28 Paint on ceiling 2,189 10% 2,408 sf
29 Paint on railng 45 10% 50 lf
FURNISHINGS $ -
30 Shelves 12 10% 13 lf
31 Desk 4 10% 5 lf
32 Countertops 17 10% 19 lf
33 Vanitry 22 10% 25 lf
FIXTURES & APPLIANCES $ -
34 Emergancy lighting 11 0% 11 ea
35 Bath sink 20 0% 20 ea
36 Cooking range 1 0% 1 ea
37 Dish washer 1 0% 1 ea
38 Dryer 1 0% 1 ea
39 Refrigretar 1 0% 1 ea
40 Oven 1 0% 1 ea
41 Washer 1 0% 1 ea
42 Water closet 5 0% 5 ea
43 Fire extinguisher 1 0% 1 ea
44 Emergancy exit sign 8 0% 8 ea
MISC $ -
45 42" masonry fireplace with raised hearth & chimney 1 0% 1 ea

46 Chimney cap 1 0% 1 ea
SUB TOTAL $ - $ -
INSURANCE 3% $ - $ -
OVERHEAD AND PROFIT 22% $ - $ -
TOTAL BASE BID $ - $ -