Renovation Samplec
Renovation Samplec
ITEM # DESCRIPTION QTY. FT QTY. W/ FT UNIT UNIT COST ITEM COST TRADE COST
GENERAL $ -
1 Permit 1 0% 1 ls
2 Supervision 1 0% 1 ls
3 Final cleanup 1 0% 1 ls
DEMOLITION $ -
4 Remove existing walls 369 0% 369 sf
5 Remove existing doors 15 0% 15 lf
6 Remove existing bath sink 5 0% 5 lf
7 Remove existing Shelves 48 0% 49 lf
8 Remove existing shower 2 0% 2 sf
9 Remove existing stair handrail 70 0% 70 lf
10 Remove existing window 1 0% 1 lf
WOOD, PLASTIC & COMPOSITES $ -
11 Stair wooden railing 16 5% 18 lf
12 Wooden stairs 15 0% 15 ea
OPENINGS $ -
Doors
13 6'-0"x6'-8" solid core wood door paint 1 0% 1 ea
14 3'-0"x6'-8"solid core wood frame exterior door 2 0% 2 ea
15 3'-0"x6'-8"solid core wood frame exterior door 1 0% 1 ea
16 3'-0"x6'-8"solid core wood door&metal frame interior 10 0% 10 ea
door
17 3'-0"x6'-8"solid core wood door&metal frame interior 3 0% 3 ea
door
18 3'-0"x6'-8"solid core wood door&metal frame interior 4 0% 4 ea
door
Windows
19 New windows 4 0% 4 ea
FINISHES $ -
Ceiling
20 C-1 gyp.bd..,painted ceiling 2,189 10% 2,408 sf
21 C-2 Moisture resistant gyp,bd painted 978 10% 1,076 sf
Walls
22 2x4 new built wall 2,490 10% 2,740 sf
23 2x6 new built wall 65 10% 72 sf
Flooring
24 F-1 laminate wood 2,596 10% 2,856 sf
25 F-2 tile -non-slip floor 543 10% 598 sf
Wall finishes
26 T-1 base 36"ht.wainscot trim&crown molding 868 10% 955 lf
Paint
27 Paint on walls 6,962 10% 7,659 sf
28 Paint on ceiling 2,189 10% 2,408 sf
29 Paint on railng 45 10% 50 lf
FURNISHINGS $ -
30 Shelves 12 10% 13 lf
31 Desk 4 10% 5 lf
32 Countertops 17 10% 19 lf
33 Vanitry 22 10% 25 lf
FIXTURES & APPLIANCES $ -
34 Emergancy lighting 11 0% 11 ea
35 Bath sink 20 0% 20 ea
36 Cooking range 1 0% 1 ea
37 Dish washer 1 0% 1 ea
38 Dryer 1 0% 1 ea
39 Refrigretar 1 0% 1 ea
40 Oven 1 0% 1 ea
41 Washer 1 0% 1 ea
42 Water closet 5 0% 5 ea
43 Fire extinguisher 1 0% 1 ea
44 Emergancy exit sign 8 0% 8 ea
MISC $ -
45 42" masonry fireplace with raised hearth & chimney 1 0% 1 ea
46 Chimney cap 1 0% 1 ea
SUB TOTAL $ - $ -
INSURANCE 3% $ - $ -
OVERHEAD AND PROFIT 22% $ - $ -
TOTAL BASE BID $ - $ -
1 of 1