0% found this document useful (0 votes)
56 views3 pages

ST 10

Uploaded by

arishabh711
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views3 pages

ST 10

Uploaded by

arishabh711
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Experiment-10

Aim: Study of Any Test Management Tool (Test Director)

Test Director is a global test management solution which provides communication, organization,
documentation and structure to the testing project.
Test Director is used for

Mapping Requirements to User acceptance test cases Test


Planning by placing all the test cases and scripts in it.
Manual testing by defining test steps and procedures
Test Execution status
Defect Management

The Test Director Testing Process

Test Director offers an organized framework for testing applications before they are deployed.
Since test plans evolve with new or modified application requirements, you need a central data
repository for organizing and managing the testing process. Test Director guides through the
requirements specification, test planning, test execution, and defect tracking phases of the testing
process The Test Director testing process includes four phases:

Specifying Requirements

Requirements are linked to tests and defects to provide complete traceability and aid the
decision-making process
See what percent of requirements are covered by tests

Each requirement in the tree is described in detail, and can include any relevant
attachments. The QA tester assigns the requirement a priority level which is taken into
consideration when the test team creates the test plan

Import from Microsoft Word or thirdparty RM tool

Name: AKASH CHAURASIYA Roll no: 2104220130005


Planning Tests

The Test Plan Manager enables to divide application according to functionality. Application can
be divided into units, or subjects, by creating a test plan tree.

Define subjects according to:


oApplication functionality-such as editing, file operations, and reporting
oType of testing-such as functional, user interface, performance, and load

As the tests are also linked to defects, this helps ensure compliance with testing requirements
throughout the testing process
Running Tests

As the application constantly changes, using test lab, run manual and automated tests in the
project in order to locate defects and assess quality.
By creating test sets and choosing which tests to include in each set, test suite can be
created. A test set is a group of tests in a Test Director project database designed to achieve
specific testing goals.
Tests can be run manually or scheduled to run automatically based on application dependencies.

Tracking Defects

Locating and repairing application defects efficiently is essential to the testing process. Defects
can be detected and added during all stages of the testing process. In this phase you perform the
following tasks:
This tool features a sophisticated mechanism for tracking software defects, enabling Testing
Team and the project Team to monitor defects closely from initial detection until
resolution

By linking Test Director to e-mail system, defect tracking information can be shared by
all Development and Management Teams, Testing and Wipro Software Quality
Assurance personnel

System Requirements for Test Director

Server System configuration: 128 MB of RAM, 500 MB of free disk space, Win NT server, Win
2K server, IIS 5.0, MSAccess/Oracle 7.x,8.x,9/MS SQL Server Client System configuration: 64
MB of RAM, 10 MB of free disk space, Win 95/98/NT/2K/XP, IE 5, Netscape 4.7

Name: AKASH CHAURASIYA Roll no: 2104220130005

You might also like