0% found this document useful (0 votes)
33 views6 pages

Daily Work Review

Uploaded by

FARAZ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views6 pages

Daily Work Review

Uploaded by

FARAZ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Date

1-Dec-24
2-Dec-24

Follow-up to Rajkumar for PRN Follow-Up to Chandrasheker


3-Dec-24
Jaipur Project Sir For Sophos

4-Dec-24 Attend Meeting (NCC) Attend Meeting (Amrit 2.0)

Follow-Up to Shivam for Viduit Follow-Up to Deepak Jain for


5-Dec-24
jain (Aligarh project) PRN Report Work

Follow-Up to Deepak Jain for solved Callibration for Radha


6-Dec-24
PRN Report Work Mukut oht (PRN project)

Follow-Up to Deepak Jain for


7-Dec-24 BALAWALA SCADA WORK
PRN Report Work
8-Dec-24
PLAN FOR PLC PANEL
Follow-Up to Deepak Jain for
9-Dec-24 SHIIFTING WORK (SHIV
PRN Report Work
VIHAR)
Follow-Up to Deepak Jain for AMARWASI SITE PLC &
10-Dec-24
PRN Report Work MODEM CONFIGURATION
Follow-Up to Shivam for
Follow-Up to Deepak Jain for
11-Dec-24 Amrit 2.0 modem
PRN Report Work
configuration

FLOWMETER WIRE TESTING FLOWMETER WIRE TESTING


12-Dec-24
WORK (SUMER NAGAR VIHAR) WORK (WESTWAY HIEGHTS)

FLOWMETER WIRE TESTING


13-Dec-24 Attend Meeting (IHP)
WORK (WESTWAY HIEGHTS)

14-Dec-24 IHP OFFICE SUNDAR NAGAR OHT WORK

15-Dec-24 SUNDAY

Follow-Up to Shivam for


16-Dec-24 Garakota Scada work Amrit 2.0 modem
configuration

Follow-Up to Deepak Jain for


17-Dec-24 Follow-Up to Adopt Cable
PRN Report Work
Follow-Up to Deepak Jain for Follow-Up to Mritunjay for
18-Dec-24
PRN Report Work Amrit 2.0 modem config.

Follow-up to Rajkumar for PRN Follow-Up to Deepak Jain for


19-Dec-24
Jaipur Project PRN Report Work
Follow-Up to Mritunjay for
20-Dec-24 Attend meeting at noida office
Amrit 2.0 modem config.
Follow-Up to Mritunjay for Follow-up to Rajkumar for
21-Dec-24
Amrit 2.0 modem config. PRN Jaipur Project

Inlet flow meter display PLC programming at


22-Dec-24
installation work at keshopura keshopura

Inlet flow meter display


PLC programming at Swarn
23-Dec-24 installation work at Swarn
Vihar
Vihar
Keshopura Scada work for PRN Swarn Vihar Scada work for
24-Dec-24
Jaipur PRN Jaipur
25-Dec-24 Planing for Actuator wiring jaipur to jahazpur

26-Dec-24 Jahazpur Scada work garakota scada work

27-Dec-24 Jahazpur Scada work


28-Dec-24 Jahazpur Scada work jahazpur to jaipur
29-Dec-24 Planing for Actuator wiring Actuator wiring testing
30-Dec-24 Planing for Actuator wiring Actuator wiring testing
31-Dec-24
Daily Work Report

Technical Discussion With Mr


Follow-Up to Deepak Jain for PRN Follow-Up to Prashant for NCC
Shivam Panday & Mr Amulya For
Report Work Scada Work
Bricks Machine

Follow-Up to Shivam for Amrit 2.0 Follow-up to Chandrashekhar Sir


Garakota Matrial Arrangenet
modem configuration for sophos configuration

Static IP configuration for solved Callibration for Nidhi Power issue at sundar nagar
Varanasi Tubewell Vihar oht (PRN project) oht(PRN Project)

Solved Callibration for Rangoli solved Callibration for Bajri Follow-Up to Prashant for Port
Garden oht (PRN project) Mandi oht (PRN project) Forwarding PRN Sophos

VARDHMAN SAROVER SCADA


WORK
jaipur to jahazpur via bus

MODEM & SOPHOS JALAMPURA SITE PLC


Attend Meeting (IHP)
CONFIGURATION (6 NO) CONFIGURATION

KHAJOORI SITE PLC & MODEM


GARAKOTA SCADA WORK
CONFIGURATION
PLAN FOR FLOWMETER WIRE
KISHANGARH SITE PLC & MODEM
TESTING WORK (SUMER NAGAR JAHAZPUR TO JAIPUR BY BUS
CONFIGURATION
VIHAR)

Follow-Up to Shivam for Amrit 2.0 Follow-Up to Deepak Jain for


IHP OFFICE
modem configuration PRN Report Work

INLET FLOWMETER CONNECT TO


PLC & SCADA WORK (WESTWAY
HIEGHTS)
CONFIGURE STATIC IP AT
JAIPUR TO LUCKNOW
BALAWALA SCADA
SUNDAY

Plan for Shiv Vihar OHT WORK


Attend Meeting (IHP)
(PLC Panel & Junction Box)

GARAKOTA INTAKWELL
Attend Meeting WITH CLIENT AT
TROBLESHOOTING , TPLINK
MAHANAGAR
ANTENNA FAULTY
Maintain Excel Sheet of Work Maintain Excel Sheet of Work
Garakota Indawar

lucknow to noida office

Follow-up to Rajkumar for PRN Follow-Up to Deepak Jain for Follow-up to Purchase for EMF
Jaipur Project PRN Report Work cable
Follow-Up to Deepak Jain for PRN
Report Work

HMI programming at keshopura

HMI programming at Swarn Vihar

jaipur to jahazpur
support to akash for tplink
configuration
support to vinit saini for amrit 2.0
jahazpur to jaipur
sumer nagar actutor wiring work
sundar nagar actutor wiring work JAIPUR TO LUCKNOW
Moradabad PLC
Programming Noide to Jaipur by train
Support

Meeting With Design Panel for Karol


Dhirendra Saini(IHP Sahab OHT automation
office) 2hr work

Attend Meeting
(IHP)

PANDER SITE PLC Follow-Up to Shivam for


CONFIGURATION Viduit jain (Aligarh project)