Technologies used for Sediment Control: How are they Tested and How do they Perform ..................... 14
Use of Geotextile Filtration Fabric with Skimmers for Stormwater Quality .............................................. 23
Case Histories
Reinforcement Over Soft Soils with High Strength Geogrids, Case Studies .............................................. 35
The Economics of Open Top Reservoirs and Floating Covers .................................................................... 44
Water-filled Barrier Walls for Stormwater and Sediment Control on Steep Slopes .................................. 51
Renewing the Maerkle Reservoir for the City of Carlsbad with Advanced Floating Cover Technology .. 133
Environmental 1
Dipole Measurement Density and Dipole Spacing for Electrical Leak Location ...................................... 144
Evolution in Geosynthetics Starts with Utilizing Technology ................................................................... 156
High Density Polyethylene (HDPE) Lined Produced/Flow-back Water Evaporation and Recycling Ponds
.................................................................................................................................................................. 164
i
Environmental 2
Hydraulic Conductivity of Bentonite-Polymer Geosynthetic Clay Liners to Coal Combustion Product
Leachates ................................................................................................................................................. 173
New Geomembranes for Challenging Containment Applications - Formulations for Site Specific
Chemistry and Environmental Conditions ............................................................................................... 181
Erosion Solutions 1
Creating a Soft, Green, Living Shoreline Using Sand Filled Composite Geotextile Tubes and Native Species
of Vegetation ............................................................................................................................................ 203
Engineered Geotextile Solutions for Inland Waterway Erosion Protection ............................................. 214
The Use of Geotextile Tubes to Protect the Historic Lighthouse located on the Delaware Bay ............. 220
Erosion Solutions 2
25m3 Geotextile Bags and Geotextile Tubes used to protect a 42” Pipeline against Scouring, 30m Deep
on the Sea Bed, Coveñas, Colombia, S.A .................................................................................................. 229
Natural Sand Accumulation with Submersible Geotextile Geometries ................................................... 234
Geosynthetic Barriers
Hydraulic Conductivity of Bentonite-Polymer Composite Geosynthetic Clay Liners Permeated with
Bauxite Liquor .......................................................................................................................................... 254
The Fundamentals of Geomembrane Seaming and Weld Quality .......................................................... 261
Using Bentonite-Polymer Composite Geosynthetic Clay Liners to Contain Coal Combustion Product
Leachates ................................................................................................................................................. 274
ii
Designing Geotextiles for Filtration: A Review of the State of the Practice, Development of Design
Standard ISO 18228-3 ............................................................................................................................... 325
Interface Shear Testing: Specifying, Review and Available ASTM References ........................................ 335
Laboratory Mechanical Property Testing for Turf Reinforcement Mats ................................................. 341
Geosynthetics in Pavement
Asphalt Strain Response of Geosynthetic-Reinforced Asphalt Overlays under Static Plate Loads ......... 350
Evaluation of Bond Strength, Permeability, and Recyclability of Geosynthetic Products ....................... 362
Feasibility of Measuring the Performance of Pavement Interlayers Using Full-Scale Rolling Wheel Load
Testing Device .......................................................................................................................................... 374
Large-Scale Laboratory Box Testing as a Performance Test for Geosynthetic Base Reinforcement in
Pavement Applications ............................................................................................................................ 386
Ground Improvement
GRS Abutments
Innovative Applications 1
Geosynthetic Portable Coffer Dams for Civil Construction Applications ................................................. 475
High Strength Polymeric Geocell-Reinforced Railway Line Repair in Degraded Permafrost Condition .. 483
Prediction Models for Deformation and Punching Shear Resistance of Geogrid-Reinforced Working
Platforms Under Tracked Plant ................................................................................................................ 505
Innovative Applications 2
Landfill Closure with Engineered Turf Cover ............................................................................................ 517
Numerical Modeling on the Use of Geotextiles to Reinforce Buried HDPE Pipes Subjected to Localized
Ground Subsidence .................................................................................................................................. 529
iii
The Effectiveness of Geosynthetic Protection of Buried Pipes from Static Loads based on Pipe Stiffness
.................................................................................................................................................................. 539
Lightweight Backfill
Effects of Geofoam Geometry and Location on Vertical Stresses on Buried Culverts during Construction
and under Surface Loading ...................................................................................................................... 549
Reduction of Lateral Earth Pressures behind Retaining Walls Using EPS and Geosynthetic Reinforcement
.................................................................................................................................................................. 561
Ultra-lightweight Foamed Glass Aggregate as MSE Wall Backfill: Properties and Case Studies ............. 570
Roadways 1
Depth of Influence of a Wicking Geotextile below the Flexible Pavement Constructed over Expansive
Subgrade .................................................................................................................................................. 583
In Situ Assessment of Geogrid Stabilized Flexible Pavement Using Automated Plate Load Testing ....... 595
Unpaved Access Road Utilizing Polymeric Geocell Reinforcement over High Water Bearing Muskeg ... 606
Roadways 2
Load-carrying GMSE Bridge Abutments: Lessons learned from field monitoring evaluations ................ 662
Load-carrying GRS Bridge Abutments: Lessons learned from numerical evaluations ............................. 671
Simplified Method for Calculating Vertical Stresses in Limited-Space Geosynthetic-Reinforced Soil Walls
.................................................................................................................................................................. 702
iv
Foreword to Technical Paper Sessions
The Geosynthetics 2021 Conference was held virtually for the first time on February 22-25, 2021. Co-
located with the IECA Annual Conference and Expo, the Geosynthetics 2021 conference was hosted by
the Geosynthetic Materials Association (GMA), a division of Industrial Fabrics Association International
(IFAI), and supported by the North American chapter of the International Geosynthetics Society under
the auspices of the International Geosynthetics Society.
The conference proceedings consist of 70 technical papers presented in 18 technical sessions during the
4-day conference. These papers represent the forefront of geosynthetics in research, engineering
applications, and testing to advance the resilience, durability, and protection of our infrastructure.
Paper topics include a variety of aspects: advancements in sediment control, environmental
applications, erosion solutions, geosynthetic barriers, geosynthetic clay liners, geosynthetic testing and
properties, geosynthetics in pavements and roadways, ground improvement, geosynthetic reinforced
soil abutments, lightweight backfill, walls, embankments and slopes, and case histories. Each paper was
peer-reviewed by a minimum of two independent reviewers.
The Technical Co-Chairs sincerely appreciate and thank the Conference Organizing committee, led by
Committee Chair Prof. Jie Han, the Technical Program committee, authors, session chairs, and reviewers
who contributed their valuable time and effort, resulting in the production of these proceedings.
In addition to the technical sessions, the conference program included a welcome plenary session, 6
panel discussions, 10 special sessions, 6 short courses, 2 engineering business sessions, and the Koerner
Award Lecture, all of which focused on a variety of leading topics on geosynthetics engineering and
education.
The Technical Co-Chairs also thank the efforts of these other contributors, the Koerner Lecturer, plenary
speakers, panel and round-table discussion chairs, and IFAI members for organizing and contributing to
the outreach and interaction on important topics within the geosynthetics community.
Lastly, Technical Co-Chairs thank Ms. Barbara J. Connett and Ms. Megan M. Firl of IFAI for their
experience and commitment in planning and organizing a successful conference. This conference would
not have been possible without their dedication and guidance.
v
GEOSYNTHETIC ADVANCEMENTS IN SEDIMENT CONTROL
TECHNOLOGIES – Socks and Wattles: An Evolving Technology
Introduction
Erosion and sediment control technologies have evolved significantly over the last two decades.
While erosion control is commonly considered prevention and sediment control considered
treatment, in reality sediment control technologies have been developed and designed to be used
in a wide variety of applications - and the sock and wattle technologies have become the most
versatile. Leading applications include perimeter control, inlet protection, check dam, slope
interruption, sediment trap, and various on-site treatment practices. Unique to the sock and
wattle family of technologies is they typically use a variety of fill materials, some designed for
filtration, some for deposition, but are typically based on material availability, quality, and cost.
Typical fill materials include coarse compost, wood mulch, straw, excelsior wood fiber, and coir.
Each of these fill materials utilize a knitted or extruded mesh containment system to hold the fill
material and allow for easy product manufacture, transport, job-site delivery, and installation.
The most common mesh materials are polypropylene and HDPE, with a variety of denier, tensile
strength, and mesh opening sizes based on the use and application. More recently, new mesh
materials developed from bioplastics and biodegradable materials have entered into the market,
mostly due to demand from state and federal agencies. Most performance testing and research
has focused on the whole product rather than exclusively on the mesh or fill media, and in
particular on compost filter socks, straw wattles, and silt fence as the three industry leading
sediment control technologies. Research also suggests these mesh containment systems not only
make transport, handling, and installation easier and more cost-effective, it also reduces overall
material cost and improves performance.
Several studies have compared the performance of these technologies. The first study was
conducted at San Diego State University in San Diego, CA (Table 1). The second study was
conducted by the USDA Agricultural Research Service in Beltsville, MD (Table 2). The third
study was conducted by the University of Georgia in Athens, GA (Figure 1). The final study was
conducted by TRI Environmental in Anderson, SC (Table 3).
The first study, conducted at San Diego State University, utilized a modified ASTM D6459 test
method. The sediment control barriers were installed on a loamy sand soil at the base of a 3:1
slope with an exposed soil and drainage of area of 2 meters wide by 8 meters long. The design
storm used a Norton Ladder Rainfall Simulator developed by the USDA ARS National Soil
Erosion Research Laboratory and was programmed for an intensity and duration of 2 in (5
cm)/20 minutes followed by 4 in (10 cm)/30 minutes. Average peak runoff rate exposed to the
Table 1: Compost filter sock and straw wattle sediment removal efficiency performance.
Total Sediment
Removal Rate
The second study was conducted at the USDA ARS, Environmental Quality Lab in Beltsville,
MD. Sediment control barriers were installed at the base of soil plots with sandy loam soil,
utilizing three replicates per treatment on a 5:1 slope. Rainfall intensity was 3.1 in/hr of
simulated rainfall intensity for a duration of 30 min. Average runoff sediment concentrations on
the bare soil test plots were 100,000 mg/L.
Table 2: Compost filter sock and silt fence sediment removal efficiency performance.
67% 52%
Silt Fence
The third study was conducted at the University of Georgia, in Athens, GA. For this study
sediment control barriers were installed at the base of field test plots, 1 meter wide by 5 meters
long. Rainfall simulation (Norton Rainfall Simulator with 4 variable speed V-jet oscillating
nozzles obtained from the USDA ARS National Soil Erosion Research Lab) was used to produce
a standard storm intensity of 12.5 cm (5.0 in)/hr for a duration of 3 hrs and total rainfall of 37.5
cm (15.0 in). This is greater than the 1-hour storm event for a 100-year return and similar to a
24-hr 10-yr return for North Georgia. Site soil was classified as an eroded Pacolet Clay Loam to
Sandy Clay Loam and has a soil erodibility factor (K value) of approximately 0.36. The testing
area was cleared of vegetation and graded to a 10% slope exposing the subsoil (B horizon) to
simulate construction site conditions. Each sediment control barrier was tested in triplicate.
90
80 8" Compost
Filter Sock
70
60 12" Compost
Filter Sock
50
40 Mulch Filter
Berm
30
20 Straw Bale
10
0
Sediment Barrier
The final study was conducted by TRI Environmental in Anderson, SC. Similarly, each
sediment control barrier was installed at the base of the slope, and each was tested in triplicate.
This method utilized a modified ASTM D6459, which included 3:1 slopes, a sandy clay soil, and
test plots measuring 27 ft long x 8 ft wide. Simulated rainfall was produced by simulators
arranged around the perimeter of each test slope. Each simulator had four sprinkler heads atop a
15-ft riser pipe. The target rainfall intensities were 2, 4, and 6 in/hr and were applied in
sequence, each for 20 minutes duration.
While most research has centered on the performance of these technologies anecdotal field
evidence shows that by containing the material in a cylindrical sock or wattle performance is
increased (Figure 1) and fill material volume is significantly reduced compared to installation of
the same material in a berm design configuration. Fill material is typically the most expensive
and heaviest fraction of the product, therefore even small reductions can lead to significant
savings in raw material cost and transportation. Additionally, the mesh containment system
allows these technologies to be pre-manufactured at central locations and sold through
distribution hubs or direct shipped, taking advantage of existing distribution channels.
While HDPE and polypropylene materials have historically been the geotextile mesh
containment systems of choice for these technologies, recent trends toward stronger and more
flexible materials have found transportation and regulatory agencies specifying a knitted
polypropylene with mesh opening sizes between 1/16 and 3/8 in. This mesh combines high
tensile strength, durability on soil and pavement, and effective filler material containment
without blinding from sediment. Opening sizes greater than 3/8 in are ineffective at containing
the filler material, while opening sizes less than 1/16 in will restrict water flow and blind with
sediment, thereby not allowing the organic filler material to filter the storm water and drastically
decreasing the performance and design capacity of the technology as a whole. Note in Table 3
the significant reduction in performance when a mesh with opening sizes less than 1/16 in is
utilized (12 in Off Spec Compost Sock) relative to a compost sock that utilizes the correct
geotextile mesh (12 in Compost Sock).
Finally, in response to state and federal agency requests and trends in green building and
infrastructure a new generation of biodegradable bioplastics and natural fiber mesh materials
have entered the industry and are also utilized by these technologies. Common materials include
jute, cotton, and wood fiber, with wood fiber providing the most tensile strength and field
functional longevity among the group. It is anticipated that the specification and use of these
materials will grown drastically in next several years.
Conclusions
Studies show compost filter socks and wattles can be very effective erosion and sediment control
best management practices. While straw wattles are generally less expensive, compost filter
socks are typically more versatile, higher performance, more environmentally sustainable, and
have a lower total cost of ownership. Performance values very greatly between these
technologies, however, the geotextile and natural mesh materials utilized to contain their
respective filler materials has allowed them to be easily manufactured, shipped, and installed –
making these technologies some of the most widely use in the erosion and sediment control
industry today.
ABSTRACT
To be effective, sediment retention devices (SRDs) must provide the desired balance between
flow rate and filtration efficiency. A sizable database of both bench-scale (ASTM D5141) and
large-scale (ASTM D7351) test results related to toe-of-slope applications is presented on a
variety of SRDs. This data is analyzed to determine product category-specific performance, and
guidance is provided on SRD selection based on the desired balance between flow rate and
sediment retention during construction operations.
INTRODUCTION
Sediment retention devices (SRDs) include silt fence, wattles, filter logs, compost socks, and
various types of storm water inlet protectors, and are a widely used BMP to provide sediment
filtration in stormwater runoff while allowing water passage. SRDs are frequently selected
without knowing if the device can be expected to be sufficiently effective in providing the
desired balance between flow rate and filtration efficiency. A sizable database of objective
performance data has been developed based on recognized standard ASTM test procedures. The
database includes data determined using both the bench-scale standard test method, ASTM D
5141, “Standard Test Method for Determining Filtering Efficiency and Flow Rate of the
Filtration Component of a Sediment Retention Device Using Site-Specific Soil”, and the large-
scale standard test method ASTM D 7351, “Standard Test Method for Determination of
Sediment Retention Device Effectiveness in Sheet Flow Applications.” These test methods
quantify both the sediment removal efficiency and the associated flow rate of an SRD, so that the
potential for either excessive sediment loss or the back-up of runoff can be assessed.
While sediment ponds have been widely studied and have generally accepted quantitative design
procedures, this is not the case for most other BMPs, including sediment retention devices
(SRDs). SRDs include silt fence, wattles, filter logs, compost socks, compost and earth berms,
as well as various types of storm water inlet protectors. SRDs offer the potential to prevent
water pollution without the large area requirement and safety concerns of a sediment pond.
Unfortunately, SRDs are frequently selected without a quantitative means of knowing if the
device can be expected to perform sufficiently. Without standardized test procedures there is no
generally recognized way for specifiers/designers to verify marketing claims or one-time field
trials, or for innovators to reliably test new products. Standardized testing procedures also assist
the users of SRDs in establishing improved construction specifications. Owners and contractors
can save money by installing the correct SRD for the expected site conditions. And, product
manufacturers have a clear, generally recognized methodology for establishing product
capabilities.
Summary of Test Method ASTM D5141. Test method ASTM D5141 quantifies the ability of
an SRD to retain eroded sediments carried by flowing water under bench-scale conditions. In the
test method, sediment-laden water of a known concentration and sediment type is allowed to
flow up to and through the filtration component of an SRD. The filtration component of an SRD
is often the geotextile or fabric portion of the SRD. However, some SRDs, such as composts
socks, utilize both a geotextile mesh and a compost filtration component encased within the
geotextile component. The filtration component of an SRD should not be confused with the
structural component(s) of an SRD. Examples of structural SRD components include; T-Posts in
a silt fence system, metal grate insert of an inlet filter system, and wooden stakes used in a
compost sock installation.
At a minimum, the effluent water and associated sediment passing through the SRD is
measured and compared to the influent, or delivered, water and associated sediment to quantify
the effectiveness of the SRD in retaining sediments while allowing water seepage. This test
method may also assist in identifying physical attributes of SRDs, such as apparent opening size,
permeability, or tensile strength that contribute to an SRD’s ability to capture sediment while
allowing water seepage, and it is useful for comparison of products. As discussed above, since
the effectiveness of SRDs can also be installation dependent, this test method may not be
completely indicative of product performance.
D5141 Apparatus and Procedures. The test apparatus used in ASTM D5141 can
accommodate a vertical SRD, such as a silt fence or wattle, or a horizontal SRD, such as an inlet
filter. The full test apparatus is shown in Figure 1. The typical setup for silt fence testing is
shown.
After positioning the SRD and ensuring that it is sealed around the edges, sediment-laden
runoff is created by combining water and soil in the upstream mixing tank and agitating for one
minute prior to initiation of the test. In the test method it is prescribed that 50 L (13.3 Gal) of
water and 0.15 kg (0.33 Lb) of the prescribed soil should be mixed and introduced to the
upstream face of the SRD. The soil can be either site-specific, or a default silty clay. The silty
clay soil prescribed in the standard test method shall conform to the target gradation shown in
Table 1, and shall have a PI ≤ 15. During the test, the sediment-laden flow passing thru the
installed SRD is collected, and the total time required for the entire influent volume to pass
through the SRD is recorded. After the completion of the test, vacuum-assisted filtration of the
collected effluent seepage is used to obtain the mass of the sediment that was able to pass
Figure 1. ASTM D 5141 Test Setup Figure 2. ASTM D 7351 Test Setup
Summary of Test Method ASTM D7351. ASTM D7351 is a standard full-scale performance
test commonly used to characterize installed SRD system performance, including sediment and
flow retention, and structural behavior under hydraulic loading. Sediment-laden water is allowed
to flow up to and through an installed SRD. At a minimum, the amount of sediment-laden flow
and associated sediment passing thru the SRD is measured. The measurement of flow (seepage)
and sediment that passes through the SRD subtracted from the amount in the upstream flow, and
then divided by the amount in the upstream flow, is used to quantify the water retention
percentage and filtration effectiveness percentage of the SRD under full-scale conditions.
This test method may also assist in identifying physical attributes of the SRD system that
contribute to their sediment control performance, and it is useful for comparison of different
SRDs and their unique installation requirements. In contrast to ASTM D5141, D7351 evaluates
the “as installed” SRD system performance. This is an important difference in the test methods.
As an example, a silt fence system with a low flow, high sediment retention filtration component
would require robust post size and frequent post spacing as the filtration component will retain a
high volume, and consequently, high weight of water that may break posts of weaker
construction or less frequent spacing. In another example, a compost filter sock installed with a
3” installation trench may provide better soil retention than a compost filter sock with no
installation trench. Since the effectiveness of SRDs is installation dependent, this test method is
indicative of actual field performance when installed with the appropriate techniques.
Geosynthetics Conference 2021 ©Industrial Fabrics Association International 7
Figure 3. ASTM D 7351 Apparatus Schematic
D7351 Apparatus and Procedures. The test method is commonly executed using the following
equipment:
The mixing and collection tanks are separated by areas, or zones, as shown in Figure 3. A
non-permeable slope surface immediately below the mixer discharge spreads the initial discharge
and provides a retention zone above the installation zone. The installation zone is comprised of
prepared soil subgrade to allow full-scale installation of the SRD to be tested. The area below
the installation zone is non-permeable to facilitate efficient transmission of runoff passing the
SRD to the collection tank.
D5141 and D7351 testing are most commonly used by various state Departments of
Transportation (DOTs) to confirm that SRDs conform to state specifications for sediment
removal and sustained seepage. DOT projects are typically linear, requiring the extensive use of
toe-of-slope SRDs, such as silt fence, wattles, and compost socks. As a result, DOTs must often
be mindful of excessive ponding behind SRDs caused by sediment build-up on SRDs that might
cause a safety hazard on adjacent roadways. As noted earlier, D5141 effectively quantifies the
sediment removal effectiveness and the associated sustained seepage of the filtration component
of an SRD, while D7351 quantifies the balance of sediment removal and sustained seepage for
the installed SRD system.
10
Slurry Water Flow Rate, gpm/ft2
0.1
0.01
0.001
30 40 50 60 70 80 90 100
Filtration Efficiency, %
Discussion of D5141 Data. Figure 4 shows a clear delineation between product types and their
relative performance in both filtration efficiency and flow rate. This data is comprised of six
nominal categories of products tested using ASTM D5141. The nominal categories, as identified
by the authors, and the number of tested products are as follows:
Sprague and Sprague (2020) discussed the data from all this testing for each category of
products. Their primary findings included:
Woven Slit Film Geotextile Silt Fence: This category of filtration component provides
excellent filtration efficiency across all tested products. All of the 32 tested products provided
greater than 80% filtration efficiency, and the majority of the tested products providing greater
than 90% filtration efficiency. However, this category of product is also the category with the
lowest flow rate, in general. These results point to a critical issue: excessive ponding. Excessive
ponding may be an acceptable risk when slit film fabric is used to protect sensitive water bodies,
but may be an unnecessary risk along roadways when excessive ponding could lead to road way
flooding and potential risk to motorists. It must be noted as well, that slit film fabrics when
deployed as two dimensional silt fences, must be adequately supported by robust posts with
frequent post spacing to reduce the risk of fence failure due to the load associated with high
volume ponding.
Woven Monofilament Geotextile Silt Fence: This product category provides moderate filtration
efficiency, providing between 65% and 85% filtration efficiency and moderately high, yet
relatively uniform, flow rate.
This product category may be exceptionally valuable to designers in areas where the risk of
excessive ponding and road way flooding would lead to unnecessary motorist risk, but where
downstream impairment is of relatively low risk.
Nonwoven Geotextile Silt Fence: This product category, in general, provides excellent filtration
efficiency, with all tested products providing greater than 95% filtration efficiency and
moderately high, yet uniform, flow rate. Nonwoven fabrics are commonly utilized for filtration,
because they are able to retain very fine soil particles while maintaining higher flow
characteristics than a comparable woven product.
Nonwoven Composite Geotextile Silt Fence: Aside from the two noticeable outliers, this
product category provides excellent filtration efficiency with all products providing greater than
90% filtration efficiency and high flow rate. In contrast to the nonwoven geotextile silt fence
Three Dimensional Filter Socks and Fibrous Wattles: This product category provides
moderately high filtration efficiency with all tested products providing greater than 80%
filtration efficiency and excellent flow rate. Three dimensional filter socks and fibrous wattles
are generally composed of either a geosynthetic fabric or mesh filled with compost, rock, straw,
or other agricultural or synthetic media. This product type typically provides a much lower
vertical profile. This lower vertical profile will lead to more frequent maintenance/clean-out
requirements to avoid over-topping and lack of product efficacy.
Proprietary Woven Geotextile Silt Fence: This product category provides poor filtration
efficiency, but high flow rate – by design. The target use is for special conditions such as a
prefilter or as a filter to prevent trash migration without runoff impoundment.
1.00
0.10
0.01
80.0 90.0 100.0
Sediment Retention Efficiency, %
ASTM D7351 Test Data. Figure 5 presents results of D7351 testing of a range of SRD types
commonly used in linear, toe-of-slope applications. SRDs tested include both woven slit film
and specialty high-flow woven silt fence, along with various socks/wattles. Typically, the results
from D7351 testing are presented as efficiencies: Water Retention Efficiency vs. Sediment
Retention Efficiency. But, the data has been recalculated and presented in Figure 5 in the same
Discussion of D7351 Data. ASTM D7351 was used for the evaluation of twelve unique two
dimensional silt fence SRD products and ten unique three dimensional sock/wattle SRD products
in this research. All of the products were subjected to the theoretical thirty minute peak
discharge of a design storm event as prescribed in the standard calculated using the Modified
Universal Soil Loss Equation (MUSLE). The resulting influent sediment concentration is
prescribed at approximately 6%, and the soil type used in this research was Loam with a PI ≤ 8.
Sprague and Sprague (2020) discussed the data from this testing. While observing that there was
a clear delineation in performance between the two dimensional and three dimensional SRD
products, their primary findings included:
Two dimensional SRD products: These products provide consistently high sediment retention
efficiency. However, performance in terms or water retention efficiency, ranges greatly, from 7%
water retention effectiveness to 98% water retention effectiveness over the course of the design
storm. This is most likely a result of the material characteristics of the tested product similarly to
the product categories tested in the ASTM D5141 testing program described above.
Three dimensional SRD products: All three dimensional products provided high sediment
retention efficiency, with performance ranging from 88%-98% efficiency. However, as a
product category, and as opposed to two dimensional SRDs, three dimensional SRDs as a
product category have a consistently high flow capacity. But caution is in order, in contrast to
two dimensional SRDs which are typically installed with a six inch burial trench sealing the
fabric to the soil surface, three dimensional SRDs are often installed in a shallow installation
trench or laid directly on the soil surface. This lack of a sealing burial trench allows water to
more freely seep under the installed three dimensional SRD, further relying on the unit weight
per length of the product to seal against the soil surface and slow seepage. A light- weight three
dimensional SRD of a given nominal height/diameter may not provide the performance of a
heavy weight three dimensional SRD of a similar nominal height/diameter owing to the lighter-
weight SRD’s buoyancy when ponding runoff.
D5141 vs. D7351. Figure 6 presents combines Figures 4 and 5 into a single chart in order to
better see the relationship between bench-scale and large-scale test results. Although the exact
same products were rarely used in both tests, similar products were included in both and can
provide a reasonable comparison between the test results. The solid data points (filled square,
circle, and diamond) are from large-scale (D7351) testing and relate most closely to the same
open data points (unfilled square, circle, and diamond) which are from bench-scale (D5141)
testing of similar products. It is quite clear when comparing data from D5141 to D7351 for
similar product categories (slit film woven vs. std woven silt fence; monofilament woven vs.
high-flow woven silt fence; and socks/wattles vs. sock-wattle) that in all cases large-scale testing
produced lower slurry water flow rates and higher filtration efficiency. This makes sense when it
is considered that the D7351 testing is done with a higher sediment concentration (6% vs. 0.3%)
providing much more sediment to deposit on and in front of the device, enhancing removal but
reducing seepage. Additionally, in large-scale “as installed” testing of silt fence, the ponding on
the fence leads to the fence stretching between support posts. This creates a “belly” in the fabric
which causes the silt fence weave to tighten like a “Chinese finger trap” which also reduces
seepage.
10
Slurry Water Flow Rate, gpm/ft2
0.1
0.01
70 80 90 100
Filtration Efficiency, %
CONCLUSIONS
This paper has presented substantial data, via two standardized test methods, on the performance
of both SRD filtration components and “as installed” SRD systems. Yet to be invented is the
SRD that has 100% seepage and 100% sediment retention. Typically, when sediment retention,
a.k.a. filtration efficiency, is increased, loss of seepage, or retention efficiency, also increases.
Test results show that both ASTM D5141 and D7351 are able to differentiate between SRD
types used in toe-of-slope applications. There are clear performance differences, using both
methods, when evaluating filtration components and installed systems. Additionally, test results
show that when full-scale, construction-phase conditions are simulated, the more accurate
performance characteristics are the higher filtration efficiencies and lower flow rates resulting
from large-scale (D7351) testing.
REFERENCES
ASTM D5141, “Standard Test Method for Determining Filtering Efficiency and Flow Rate of
the Filtration Component of a Sediment Retention Device”. ASTM, Conshohocken, PA.
ASTM D7351, “Standard Test Method for Determination of Sediment Retention Device
Effectiveness in Sheet Flow Applications”. ASTM, Conshohocken, PA.
Sprague, J.E., and Sprague, C.J. (2020), “Comparative Analysis of the Flow and Filtration
Capabilities of Sediment Retention Devices (SRDs)”, Conf. L, International Erosion Control
Assoc., Raleigh, NC.
ABSTRACT
Construction sites around the world rely on sediment barrier technologies to intercept, treat, and
effectively discharge stormwater emanating from land disturbing activities. Silt fence systems
are often selected as the perimeter control of choice due to their economics, ease of installation,
and published performance capabilities. Silt fence systems are temporary sediment barrier
practices constructed by attaching a geotextile fabric (non-woven or woven) to support posts
(wood or steel) and the ground surface via trenching or mechanical slicing. Historically, silt
fence performance capabilities have been identified using standardized ASTM testing
methodologies. While these testing strategies provide data for performance analyses, research
efforts have identified several short comings associated with these standardized testing practices.
The aim of this study was to address these short comings and develop improved testing
methodologies to facilitate comprehensive sediment barrier performance analyses and
comparisons. This study introduces two state-of-the-art testing methodologies (i.e., small-scale
and large-scale) for determining performance capabilities of silt fence systems, as well as other
innovative sediment barrier practices used within the construction industry. Testing apparatus
designs and performance results are summarized to illustrate how these testing innovations
advance the overall body of knowledge within the field of erosion and sediment control.
INTRODUCTION
Sediment barriers (SBs) are sediment control practices typically installed along the perimeter of
construction sites that are intended to intercept, capture, and temporarily contain sheet to shallow
concentrated flows prior to site discharge. SBs are categorized as sediment retention devices
(SRDs) due to the removal of sediment primarily through sedimentation and, to a lesser degree,
filtration (ASTM Standard D7351 2013, Barrett et al. 1998). SB practices primarily reduce
eroded soil transport through impounding stormwater runoff upstream of the practice and
allowing for suspended particles to settle. Sediment capture is also achieved when flow passes
through the SB and particles become lodged within the porous medium; however, this method of
sediment removal is commonly less effective. The filtration efficiency of SB material is based
upon, and is limited by, the size of the pore passages often resulting in small soil particles
passing through void spaces within the material medium (Barrett et al. 1998). In addition, the
flow-through capacity of materials degrade over time as pores become clogged with sediment,
thereby increasing impoundment potential (Haan et al. 1994).
Silt fence SBs essentially consist of a geotextile supported vertically by wooden or steel
posts. Geotextiles used in silt fence applications generally fall into one of two categories, woven
and nonwoven. Silt fences are available as pre-assembled systems ready for jobsite installation
OBJECTIVES
The objectives of this paper are to: (1) provided a brief overview of ASTM testing methods used
to quantify SB performance; (2) present innovative advancements in small- and large-scale SB
testing methodologies that yield results based on geographical location; and (3) summarize major
findings from small- and large-scale performance evaluations of SB practices. The overall aim
of this paper is to introduce readers to new and innovative SB testing strategies that have been
shown to produce performance results linked to sediment and hydrological loading conditions for
a specific geographical climate zone.
Currently, ASTM recognizes two standards for testing SB performance: (1) ASTM D5141,
Standard Test Method for Determining Filtering Efficiency and Flow Rate of the Filtration
Component for a Sediment Retention Device (SRD) [aka: small scale] and (2) ASTM D7351,
Standard Test Method for Determination of Sediment Retention Device (SRD) Effectiveness in
Sheet Flow Applications [aka: large scale]. Performance results emanating from these tests have
been widely accepted within industry and are often used by Departments of Transportation when
evaluating SBs for inclusion on their approved products list.
ASTM D5141 (2011) describes the procedures for conducting small-scale flume experiments to
determine sediment removal efficiency and flow through rates of geotextile fabrics. The
development of this test method was a direct result of the work done by Wyant (1981), where he
evaluated multiple nonwoven geotextile fabrics within a laboratory setting. The test apparatus
developed consists of a 49.2 in. (125 cm) long by 33.5 in. (85 cm) wide flume with an 8% slope.
Sediment-laden flow is introduced using a 19.8 gallon (75 L) container equipped with a
mechanical stirrer to facilitate soil suspension. Wyant (1981) observed average sediment
removal efficiencies of 92% for silty soil and 97% for sandy soil and flow rates ranging from
0.0004 to 3.5 m3/m2/min (0.0013 to 11.5 ft3/ft2/min). Henry and Hunnewell (1995) also used this
standard test method to evaluate nonwoven polyester and polypropylene geotextiles using
dredged sediment that mainly consisted of silt and clay. Results indicated sediment removal
efficiencies of 45.5% and 72.8%, respectively, and flow rates ranging from 0.063 to 0.026
m3/m2/min (0.206 to 0.085 ft3/ft2/min). Risse et al. (2008) performed sediment removal tests on
two silt fence geotextiles using the standard test method, as well as a modified version. The
modified version increased the slope of the flume from 8% to 58% to produce increased
hydraulic head on the geotextile. This testing method allows for the evaluation of geotextile
performance properties under sediment-laden flows. Nonetheless, it does not provide a means
ASTM D7351 (2019) describes the procedure for conducting a full-scale experiment and
quantifying a SRB’s ability to retain soil eroded by sheet flow conditions. Sediment-laden flow
is generated by mixing 5,005 lb. (2,270 kg) of water and 300 lb. (136 kg) of sediment within a
tank equipped with an internal agitator. The tank is positioned on a scale and the weight of the
tank is monitored at regular intervals while discharging sediment-laden water at a constant flow
rate of 176.8 lb./min (80 kg/min) during a 30-minute test. Test conditions are designed to
simulate the peak 30 minutes of a 10-yr, 6-hr storm event in the mid-Atlantic region that
produces 4 in. (10.1 cm) of rainfall. The flow and sediment load were determined by assuming
25% of the rainfall from the 10-yr, 6-hr storm occurs in the peak 30 minutes of the storm event
and that 50% of the precipitation infiltrates into the ground. The associated sediment load
resulting from erosion was calculated using the Modified Universal Soil Loss Equation
(MUSLE) (Williams and Berndt 1977), which allows the calculation of a storm specific quantity
of sediment yield. The sediment-laden flow is directed down an impervious 3H:1V slope to the
20 ft (6 m) wide impervious test area where the SRD is installed. The flow passing through the
SRD is collected and directed toward a collection tank where effluent weight is measured using a
scale. Bottle grab samples are also taken, typically every 5 minutes. Though the tanks provide a
measurement of the amount of sediment-laden runoff discharged and collected, the flow rate for
the 30-minute test is limited by the capacity of the tank. In addition, the scales only provide the
total weight of sediment-laden water and do not have the ability to differentiate between the
composition of sediment and water.
Through research efforts at the Auburn University – Erosion and Sediment Control Testing
Facility (AU-ESCTF), two (small and large scale) innovative SB testing apparatuses and
methodologies have been developed.
Small-Scale Testing
The small-scale SB testing apparatus was designed to evaluate geotextiles installed as perimeter
control practices. The apparatus was constructed out of lumber and plywood with overall
dimensions of 4 ft (1.2 m) wide, 16 ft (4.9 m) long, and height of 3 ft (0.9). The profile of the
apparatus consists of a 3H:1V slope that transitions to a 1% slope, which mimics typical slopes
associated with highway construction projects. When evaluating geotextiles using ASTM
D5141, geotextiles are installed at the toe of an 8% slope, which limits the installations
stormwater storage capacity due to the close proximity to the slope. To increase storage
capabilities, geotextiles were installed 6 ft (1.8 m) from the toe of the 3H:1V slope within the
small-scale testing apparatus. Flow is directed into the apparatus via an 8 ft (2.4 m) plywood
sheet with 2 by 6 in. (5 by 15 cm) lumber borders that transition inflow form shallow
concentrated to sheet flow.
Water introduction into the apparatus was designed to facilitate accurate flow rate
monitoring throughout testing while also providing a means for easy flow rate adjustments. To
achieve the desired flow control necessary during testing, a four-stage process was implemented.
The setup consisted of a submersible 2 in. (5 cm) pump, a 300-gallon (1,135 L) equalizing tank,
a 90° v-notch discharge weir plate for controlling apparatus inflow, and two 4 in. (10 cm)
discharge valves for controlling flow exiting the bottom of the tank. The submersible pump
transported water from the onsite supply pond into the equalizing tank located upstream of the
test apparatus. As water filled the tank and began to flow across the weir plate, discharge gate
valves were adjusted until the desired water level within the tank was achieved. A custom scale
and pressure head tube apparatus were installed adjacent to the tank to monitor water levels. The
scale provided a correlation between water depth flowing across the weir plate and flow rate
entering the apparatus. This method of water introduction and monitoring allows for a wide
range of flow rates, which may vary based on regional rainfall events.
Sediment metering was achieved by manually feeding soil into the soil/water mixing
trough built on the plywood flow introduction sheet. To maintain a consistent rate throughout
testing, 5-gallon (3.79 L) buckets were pre-filled with the exact amount of soil to be introduced
over a 2 minutes duration. Workers would monitor a stopwatch while feeding soil from the
buckets into the system so that one bucket of soil would be emptied every 2 minutes. Workers
would position themselves beside the flow introduction sheet so that at the end of every 2-minute
cycle, a new bucket of soil could be easily place over the mixing trough and soil feeding could
continue without interruption. A mechanical means of soil introduction was available; however,
soil texture caused particles to bridge together preventing soil from flowing from the hopper into
the mechanical auger at a consistent rate. Figure 1 illustrates the newly developed small-scale
testing apparatus.
The developed small-scale testing methodology sought to improve the standard ASTM
testing methodology by incorporating realistic runoff conditions intercepted by silt fence
practices installed in the field as opposed to a one-size-fits-all approach. While ASTM D5141
indicates that soil used during testing should be representative of the site location in which the
geotextile will be implemented, it fails to address changes in hydraulic and sediment loads based
upon site location. One unique element that distinguishes the newly developed methodology
from that of ASTM D5141 is that it incorporates regionally specific hydraulic and sediment
loads resulting from the peak 30 minutes of a 2-yr, 24-hr design storm. An additional
enhancement of the presented methodology is the incorporation of time variable reporting of
effluent flow rates and filtering efficiencies over the course of an experiment. The nominal
filtering efficiency and flow rate determined using ASTM D5141 does not indicate geotextile
performance variations over time. These shortcomings can be attributed to the rapid introduction
of sediment-laden flow into the testing apparatus and the limited duration of time in which data
can be collected. The presented methodology addresses these limitations by introducing flow for
30 minutes and continually collecting data during the 90-minute dewatering period. This allows
variations in performance to be identified, as well as the times in which these changes occur.
Results obtained using the developed methodology allow for enhanced data analyses and
improved characterization of in-field geotextile performance.
The large-scale SB testing apparatus was designed to evaluate various SB practices (e.g., silt
fence, wattles, erosion tubes, etc.) when subjected to sheet flow runoff. The apparatus was
constructed out of concrete, masonry block, and steel. The apparatus consisted of an impervious
3H:1V slope 20 ft (6.1 m) wide by 20 ft (6.1 m) long that transitioned to an earthen area
(compacted bare soil) 20 ft (6.1 m) wide by 12 ft (3.7 m) long. SB practices were installed 6 ft
(1.8 m) downstream of the slope transition, in the earthen test area, as they would be installed on
a construction site. A concrete catch basin was installed downstream of the earthen test area to
collection sediment-laden flow passing through SB practices during testing.
Simulated flow was introduced to the system with a 3 in. (7.62 cm) trash pump that draws
water from an on-site supply pond. Water was pumped into a 300-gallon (1,135 L) water
equilibrium tank that uses a series of valves and orifices to control flow over a calibrated weir
prior to entering a mixing trough. The calibrated weir is monitored with a pressure tube that
indicates flow rate across the weir. Adjustments to weir flow rates are accomplished via water
tank discharge lines fitted with gate valves. The weir discharges into a mixing trough where
sediment is introduced at a controlled rate and mixed with highly turbulent flowing water.
RESULTS SUMMARY
Small-Scale Results
Under the developed small-scale testing regime, performance evaluations were conducted
on two nonwoven geotextiles, three woven geotextiles, and a stacked sandbag installation. Data
collection included: impoundment depth, sediment retention weights, and grab samples for water
quality analyses. Each of these parameters were subsequently used to evaluate the performance
capabilities of each material evaluated. Effluent flow rates observed during the test period for
nonwoven geotextiles were on average 43% lower than woven materials, which resulted in
extensive retention times for nonwoven materials. Sediment retention results indicated that on
average nonwoven geotextiles (e.g., 97%) outperform woven geotextiles (e.g., 91%). Water
quality analyses suggest that the primary means for turbidity reduction is sedimentation during
the test period (e.g., 46%) and filtration during dewatering (e.g., 19%). This suggests that having
adequate stormwater storage upstream of an installation is important to dissipate inflow energy,
promote sedimentation, and minimize resuspension of particles. Finally, an evaluation of
stacked sandbags established that performance capabilities of three-dimensional SB products can
be determined using the small-scale SB testing apparatus. Detailed analyses associated with
these results is presented in Whitman et al. 2019(a). Table 1 provides a summary of results.
Using the large-scale testing apparatus, performance evaluations were conducted on multiple silt
fence installation modifications, as well as several manufactured sediment barrier practices. Silt
fence results suggest that T-post size, T-post spacing, fence height, and geotextile entrenchment
method play a significant roll in silt fence performance. Evaluations of manufactured sediment
barrier practices suggest that practices which achieve impoundment depths between 1 and 1.5 ft
(0.3 and 0.46 m) achieve sediment capture rates of at least 90% and reduce impoundment surface
turbidity up to 60% when compared to turbidity along the bottom of the impoundment. Detailed
analyses associated with these SB practices are presented in Whitman et al. 2018 and Whitman et
al. 2019(b). Table 2 provides a summary of sediment retention results.
CONCLUSION
The objectives of this paper were to (1) describe standardized testing methodologies used to
evaluate SB practices, (2) discuss research efforts that have focused on improving standardized
testing methodologies, and (3) present a brief summary of results obtained through these research
efforts. Collectively, each of the research efforts discussed will provide improved SB practices
that are designed, implemented, and installed correctly on construction sites. Ultimately, this
study will provide engineers, stormwater professionals, and researchers with a comprehensive
view of the efforts undertaken over the past few years to improve construction site stormwater
management practices.
REFERENCES
ASTM International. (2011). “Standard test method for determining filtering efficiency and flow
rate of the filtration component for a sediment retention device.” ASTM D5141 - 11,
West Conshohocken, PA, USA.
ASTM International. (2019). “Standard test method for determination of sediment retention
device effectiveness in sheet flow applications.” ASTM D7351 - 13. West Conshohocken,
PA, USA.
Barrett, M. E., Malina, J. F., Jr., and Charbeneau, R. J. (1998). “An Evaluation of Geotextiles for
Temporary Sediment Control.” Water Environment Research, Vol. 70, No. 3, 283-290.
Haan, C. T., Barfield, B. J., and Hayes, J. C. (1994).“Design Hydrology and Sedimentology for
Small Catchments.” Academic Press, San Diego, CA.
Henry, K. S., and Hunnewell, S. T. (1995). “Silt Fence Testing for Eagle River Flats Dredging.”
Special Report 95-27 U.S. Army Corps of Engineers Cold Regions Research &
Engineering Laboratory. NTIS, Springfiled, Virginia 22161.
Risse, L. M., Thompson, S. A., Governo, J. and Harris, K. (2008). “Testing of new silt fence
materials: a case study of a belted strand retention fence.” Journal of Soil and Water
Conservation, Vol. 63, No. 5, 265-273.
Williams, J. R., and Berndt, H. D. (1977). “Sediment yield prediction based on watershed
hydrology.” Trans. ASAE, Vol. 20, No. 6, 1100-1104.
Whitman, J.B., Zech, W.C., and Donald, W.N. (2019) (a). “Improvements in Small-Scale
Standardized Testing of Geotextiles used in Silt Fence Applications”, Geotextiles and
Geomembranes, Vol. 47, No. 5, pp. 598-609. doi: 10.1016/j.geotexmem.2019.04.002
Whitman, J.B., Zech, W.C., and Donald, W.N. (2019) (b). “Full-Scale Performance Evaluation
of Innovative and Manufactured Sediment Barrier Practices”, Transportation Research
Record: Journal of the Transportation Research Board, Vol. 2673, No. 8, 284-297. doi:
10.1177/0361198119827905
Whitman, J.B., Zech, W.C., Donald, W.N., and LaMondia, J. (2018). “Full-Scale Performance
Evaluation of Various Wire-Backed Nonwoven Silt Fence Installation Configurations”,
Transportation Research Record: Journal of the Transportation Research Board, Vol.
2672, No. 39, 68-78. doi: 10.1177/0361198118758029
Wyant, D. C. (1981). “Evaluation of Filter Fabrics for use as Silt Fence.” Transportation
Research Record: Journal of the Transportation Research Board, No. 832, 6-12.
ABSTRACT
Skimmers have become common for use in sediment basins during construction but rarely remain
in the basin once construction is complete. This paper will focus on research underway to use
geotextiles as filtration media in conjunction with skimmers in order to meet post construction
water quality requirements for stormwater basins.
Stormwater basins are typically designed to detain water and use settling of pollutants as the
primary means of providing water quality. However, this has several flaws. The settling only
occurs when there is a large enough rain event to partially fill the basin, therefore, smaller storm
events receive little, if any, treatment. Holding the water quality volume for an extended time
requires the pond volume to be increased. In addition, each rain event has potential to cause
pollutants to be re-suspended and possibly discharged from the basin.
The use of skimmers with filtration media may solve many of these issues and provide treatment
of 100% of the runoff for any storm event up to the water quality storm, as well as treating a
substantial amount of runoff from larger storms. This paper includes the results of recent testing
of several different filtration media materials and configurations, combined with a skimmer.
BACKGROUND
Stormwater Management has evolved significantly over the past 50 years and has seen a much
greater emphasis on stormwater quality in the past few decades. Most stormwater programs began
as part of the 1972 Federal Clean Water Act that created the National Pollutant Discharge
Elimination System (NPDES) Permit program. The NPDES program authorizes to state
governments by EPA to regulate and address point sources that discharge pollutants to waters of
the United States and has taken a phased approach.
The EPA typically issues a Construction General Permit (CGP) to the state, which expires after
five years and must be renewed. As stormwater management has continued to evolve, so have the
permit requirements. Since passing of the Clean Water Act and implementation of the Phase 1
and Phase 2 NPDES Programs (Tables 1 and 2), stormwater management requirements have seen
many changes. In most areas the initial focus was on sediment control during construction and
stormwater quantity management for new developments, typically including requirements to
manage the 2-year and 10-year storm events. There were little to no requirements for post-
construction water quality. This resulted in construction of many stormwater ponds and other
facilities that aid in flood control but provide minimal water quality benefit.
In the past 10 to 15 years, we have seen a much greater focus on stormwater quality. For example,
South Carolina passed the SC Water Pollution Control Permits Regulation in 2008, which
significantly increased the requirements for post-construction stormwater quality. Many other
states have passed similar regulations. It is interesting to note that the specific regulations vary
widely from state to state and even among MS4s within the same state, and just as important is the
actual enforcement of these regulations, which has even greater variation. This is reflective of the
differences in climate, rainfall and soil types across the United States.
Another example of evolution in stormwater management is that in 2013 when South Carolina
renewed their CGP, it added a requirement for Water Surface Dewatering that states: “When
discharging from sediment basins and similar impoundments, utilize outlet structures that only
withdraw water from near the surface of the basin or impoundment, unless infeasible. This outlet
structure should be capable of conveying the flow for the 10-year, 24 storm event.”
Over 30 other states have added similar language to their CGPs over the past 10 years. The most
common way to meet this requirement is through the use of a floating pond skimmer. There are
many variations of skimmers that include several by manufacturers that are designed to meet this
requirement. These include the Faircloth skimmer, the ESC skimmer, the IAS skimmer and the
Marlee Float skimmer. As the use of skimmers becomes more accepted across the country there
are sure to be more types become available.
The primary purpose of the skimmer is to be used during construction when the sediment pollution
loads are the highest. By withdrawing from the surface of the basin, it releases cleaner water (not
necessarily clean water) from the highest portion of the water column and allows time for sediment
to settle to the bottom of the basin. This method of dewatering the sediment basins has been
widely recognized to greatly increase sediment trapping efficiency over the old methods of
draining the basin from the bottom, which releases the muddiest water. Research suggests that a
The Concept. With the increased use and acceptance of floating skimmers to increase sediment
trapping efficiency during construction, it would seem natural to apply the same logic for post
construction. Afterall, one of the primary means of meeting water quality requirements through
the use of dry, wet or extended detention basins is to detain the water quality volume for a period
of time, which in theory, will allow pollutants that are typically attached to sediment particles to
settle to the bottom of the basin before being discharged. Therefore, discharging from the bottom
of the basin would naturally release more of these pollutants compared to use of a surface
withdrawal system. Use of a floating skimmer to aid in meeting post-construction requirements
would seem to be a natural progression in the evolution of stormwater management.
There are many flaws with using extended detention time as a means of water quality. Designs
are based on a water quality storm event or specified runoff volume. This is typically assumed to
be 1 in. of runoff from the area draining to the pond. Designs typically assume this volume arrives
instantly and an orifice is sized to release this volume over 24 to 48 hours. This design has several
flaws, including:
• The actual runoff volume will often arrive over an extended period of time. This will
result in much less to no ponding and, therefore, little to no settling time.
• Smaller storm events magnify this issue and often flow straight through the pond with very
little ponding or detention time.
• The volume-based design requires pond sizes to increase and take up more area on the site
or require larger underground detention volume. This reduces developable area or
significantly increases the cost for underground systems.
The Challenges. Sediment and pollutant loads are very different during construction versus post-
construction. During construction, the typical standard is to retain 80% to 85% of the anticipated
sediment load, which can be more than 100 times greater than post-construction. Sediment yield
during construction can range from 40 to 400 tons per acre per year, compared to a sediment load
of 600 pounds per acre per year, which is a recognized standard for post-construction conditions
assuming the site is reasonably stabilized. In addition, there are many other pollutants of concern
that may need to be considered in the post-construction conditions, such as hydrocarbons, metals,
bacteria and/or nutrients (phosphorous & nitrogen). Meeting an 80% or more trapping efficiency
for the post-construction sediment loads can be much more difficult and expensive to achieve than
during construction. In addition, removal of other pollutants, especially those that are in a
dissolved state, often require additional treatment methods.
The primary challenge is meeting the filtration requirements needed to meet the post-construction
trapping efficiency requirements. To be acceptable for post-construction use, MS4s typically
require that the device function for at least one year. This is also part of the NJCAT Certification
protocols. If the filtration media is going to clog or blind off too quickly, then it will not be a
good choice for post-construction use. It is critical to select a filtration media system that has the
proper balance of staged filtration to insure adequate life of the device for the specific site. It must
also be understood there will be a need to periodically change the filtration media, typically
annually, and to monitor the pond to confirm it is functioning properly, which should be part of
every pond maintenance plan. This can be burdensome if the pond has above average debris,
trash or pollutant load, however, the intent is to catch as much of this as possible to prevent it from
being released downstream.
Testing Protocol. Over the past two plus years, Rymar has been conducting research to develop
a combination of filtration media and skimmer system to meet NJCAT protocols for filtration for
post-construction requirements. The research is focused on development of a system to meet the
“New Jersey Department of Environmental Protection Laboratory Protocol to Assess Total
Suspended Solids Removal by a Filtration Manufactured Treatment Device” (January 25, 2013).
This protocol defines the pollutant loading requirements, testing procedures, scaling of Filtration
Manufactured Treatment Devices (MTDs), and establishment of Maximum Allowable Inflow
Drainage Area.
Testing Results. Rymar has completed several iterations of both controlled testing and field
testing, often with surprising outcomes. The initial concept was to use a woven geotextile material
(Belton PD-1198) with an AOS of 45 and flow rate of 22 gpm/sf to create a skirt around the
skimmer (Figures 1, 2 & 3). The skirt was drawn together below the skimmer to minimize flow
that could reach the skimmer without going through the fabric. There was also a slight opening
for the skimmer barrel. We quickly realized that the flow rate through this type of fabric was not
sufficient and the material would blind much too quickly.
The next prototype had a different type of woven geotextile (Trace Linq GTF-400EO) with a larger
opening size of 40 AOS and flow rate of 145gpm/sf (Figures 4 & 5) The total surface area of the
fabric was designed to provide a total flow rate of nearly 10 times that of the skimmer. Initial
testing was better, with an improved flow rate, but after limited testing it was determined this
material would also blind too quickly.
Figure 5.
Skimmer with Geotextile Skirt
The next prototype tested used several different non-woven geotextile fabrics. These included
ADSORB-it filter fabric by Stormwater BMP Products, Ultra-X-Tex fabric by Ultratech
International and Siltron by MKB.
To improve flow, the bottom of the fabric was opened and slits were cut in the side walls of the
fabric to provide improved flow rates (Figure 8). This helped improve flow significantly.
However, after being in the basin for about 3 months significant vegetation started to grow in and
on the filter fabric (Figure 9).
The fabric was removed, and it was noted that the roots of the grasses were growing in and
Testing revealed that although the flow rates of many of fabrics had been tested per ASTM D-
4491 to have water flow rates of over 100 gpm/sf, this was not applicable to using the skimmer to
pull water through the fabric and the actual flow rates were substantially less. Based upon initial
results, it was determined that larger surface area of fabric was needed in order to provide sufficient
flow to the skimmer. A “basket” was constructed that would surround the skimmer and provide a
larger diameter and therefore greater surface area of the geotextile fabric (Figure 11). This also
allowed a two-stage system to be used. Initial trials used the non-woven Ultra-X-Tex on the
outside of the filter (which included slits to allow for higher flow) and a lighter weight Mirafi
140NL on the inside of the filter (Figure 12).
Figure 11. Skimmer Basket with Outer Figure 12. Skimmer Basket with Outer
Layer X-Tex & Inner Layer Mirafi Layer X-Tex & Inner Layer Mirafi
When tested, the performance was noticeably better than previous trials. After several runs the
suction of the skimmer began to pull the Mirafi fabric into the middle and flow rate began to
diminished. When the outer fabric was removed, there was obvious build up on the inner layer
(Figure 13). The latest prototype includes a staged filtration system with higher flow materials.
The outer layer was constructed of strips of a combination of the ADSORB-it fabric and Ultra-X-
Two layers of Blocksom Inlet Filter material were installed in an offset manner to allow flow
through and around them. An outer layer was positioned with a 2” opening at the bottom and an
inner layer was positioned with a 2” opening at the top. The inner layer also covered the bottom
of the basket wall (Figure 15). Water could flow through the material or enter at bottom and flow
up to the top of the second layer to enter the skimmer area.
The bottom of the basket was a solid section of the Ultra-X-Tex material. There is a 6” wide
opening to allow the skimmer barrel to pivot as the skimmer floats up and down. This area was
closed with a filter sock material (Figure 16).
Testing of this version was significantly better than previous prototypes. Flow was maintained
relatively well. A 4” Marlee Float skimmer with 4” orifice (max flow rate of +/- 0.4 cfs) was
used in testing (Figures 17 & 18). A flow meter is attached to a weir tank just outside of the test
tank and the flow rates were very similar to the skimmer without the filtration basket
configuration
Figure 17. Skimmer Testing in Test Tank Figure 18. Skimmer Testing in Test Tank
The water in the weir tank was noticeably clearer than in the test tank (Figure 19). The test tank
contained a significant amount of algae and none was noticed in the weir tank. (Note the dark areas
in the weir tank photo are paint chips and not debris)
During testing food coloring was added to the water to gauge flow through the fabric and suction
levels. Drops of food coloring were placed around the entire basket (Figure 20). Flow was not
Figure 19. Effluent in Weir Tank Figure 20. Flow Testing with Food
Coloring
During the end of the first run, as the water level was approximately 2’ in the tank, it was noticeable
that the basket was floating slightly. More research is required to determine the reason; however,
the prototype basket was made of HDPE and the final version is most likely to be stainless steel.
The additional weight should easily overcome the minimal buoyancy of the fabric and frame.
Upon completion of two runs, the filter basket was removed from the tank and the outer layer of
fabric was removed. There was some algae and debris on the inner Blocksom fabric, but it was
minimal and had not caused any significant blinding (Figures 21 & 22).
CONCLUSIONS
Further research is required to confirm the proper materials to achieve a balanced staged filtration
system. This will likely include research on additional stages of filtration, as well as additional
material combinations to achieve the desired TSS removal efficiency and obtain a minimum of
one-year life cycle for the filtration media under “average” conditions.
The difference in flow rate achieved through the fabrics created by the suction of the skimmer
versus what was achieved per ASTM D-4491 is a significant challenge. A target flow rate
provided by the fabric was initially ten times that of the skimmer, to allow for substantial blinding
before there would be a noticeable flow rate decrease. This has proved to be a flawed assumption
that will have to be addressed during further testing.
Although the research conducted by Rymar to date has not included testing for other pollutants,
several of the materials utilized in the prototypes have been tested for removal of hydrocarbons,
metals and bacteria and this will be the logical next step in the evolution of this system.
ABSTRACT
Construction of embankments or any kind of structure over soft foundation soils can be very
challenging for engineers. Soft soils present very low shear strength, excessive differential
settlements, poor bearing capacity, surface instability associated with sinkhole development and
require special construction practices. Traditional construction methods used in fine grained
saturated soils such as removal and replacement of soft soil, pre-loading the site to reduce
settlements and achieve higher strength or stabilize the soil by injecting additives, can be expensive
and time-consuming. An alternative, more cost-effective solution is the use of high strength
geogrids placed directly onto soft soils at the base of the embankment. Such application of a
geogrid is often called Basal Reinforcement. The combination of high strength geogrids and
granular fill material is also called Reinforced Granular Mattress (RGM), it creates an adhesive
interface with the soft soil, and a stiff platform ensuring a uniform distribution of loads onto soft
soil. The RGM promotes the distribution of loads and minimize differential settlements. In some
cases, when primary and secondary settlements need to be controlled, rigid intrusions are
commonly installed to provide support and settlement control by transferring the load to a stiffer
foundation. In these cases, a load transfer platform designed with one or multiple layers of high
strength geogrids can be considered to redistribute uniformly the loads to the piles and optimize
the design. This paper presents recent case studies of basal reinforcement over piles, and weak
foundations.
INTRODUCTION
Construction over soft foundation soils is usually associated with poor bearing capacity, excessive
differential settlements, and lateral sliding instability. Furthermore, the presence of poor ground
conditions in a construction site is historically the most frequent cause of long construction
durations.
There are several alternatives that can be employed to achieve project objectives in these
conditions. Common primary functions of these alternatives are to increase shear strength and
bearing resistance, increase density and drainage, and provide lateral stability. (Schaefer et al.,
2017). These alternatives include: (1) bypassing the poor ground through relocation of the project
to a more suitable site or through the use of a deep foundation; (2) removing and replacing the
unsuitable soils; (3) designing the planned structure to accommodate the poor/marginal ground; or
(4) modifying (improving) the existing soils, either in-place or by removal, treatment and
replacement of the existing soils; (ASCE 1978; Mitchell 1981).
Typical ground improvement techniques include: prefabricated vertical drains and
accelerated consolidation, lightweight fills, deep compaction, aggregate columns, column
supported embankments, soil mixing, grouting, pavement support stabilization and reinforced soil
structures (FHWA – Ground Modification Methods – Reference Manual). Each ground
improvement technique has inherent limitations on their applicability as related to the type of soil,
The stability of an embankment built over soft soil is primarily governed by the shearing resistance
of the foundation, and the construction of the embankment itself is influenced by the bearing
capacity of the soft foundation soil. A geosynthetic reinforcement may be placed at foundation
level to prevent shear failure both in the embankment fill and in the foundation soil. It is crucial to
highlight that the stability of an embankment on soft soil is most critical during construction,
because the relatively low permeability of the soft foundation does not allow full consolidation in
the normal time scale of construction. At the end of construction, even if the embankment loading
has been applied the gain in shearing resistance of the foundation due to consolidation might be
insufficient for stability. Once consolidation has occurred due to the weight of the embankment,
the improvement in shearing resistance and the increased bearing capacity in the foundation soil
should usually remove the need for the reinforcement to improve stability. Therefore, during the
period between the end of construction and complete consolidation of the soft foundation, the main
strength requirement of the reinforcement should be that at any instant in time the factored
reinforcement design strength equals or exceeds the design load.
The design approach for basal reinforcement over soft soils is to verify the potential mode
of failure for the following ultimate limit states: local stability of embankment fill, rotational
stability of the embankment, lateral sliding of the embankment, foundation extrusion stability,
overall stability (see Figure 1). Although a geosynthetic reinforcement may change the stress
distribution leading to a possible reduction in differential settlements, total foundation settlement
is not directly affected by a geosynthetic reinforcement layer. Nevertheless, the embankment
settlements need to be checked since it may lead to excessive geosynthetic strain levels resulting
in an increase in tensile strain and load.
The Port of Guaymas, located on the northwest coast of Mexico in the Gulf of California, is one
of the most important ports in Mexico from both commercial and touristic point of view. It
manages the shipment of agricultural and mineral bulk, fluids, and general cargo. It is an important
hub for commercial relations between Mexico and the southern part of US, moving up to 3 million
tons of minerals like copper, steel, bauxite, etc. In recent years, the port storage area has been
experiencing significant settlements due to the increase of loads managed in this area and the poor
conditions of the foundation soil.
The Port Authority (API Guaymas) decided on a major renovation of the area to build new
concrete pavement over the whole storage area using a Reinforced Granular Mattress (RGM) with
high strength geogrids as a basal reinforcement solution. High strength geogrids are spaced out
within layers of granular material to create an adhesive interface between the soft soil and the
granular fill, and a stiff platform ensuring a uniform distribution of loads onto soft soil. The Port
Authority chose this solution because of its advantages compared to traditional solutions: easy and
fast installation, more cost-effective application, and excellent performance.
The development of the port took place through subsequent stages of land reclamation from
the sea, causing the foundation soil to be saturated and very soft. In fact, the geotechnical
investigation carried out over the project area of 7,654 yd2 (6400 m2) showed a 46 ft (14 m) deep
layer of soft soil characterized by grey-green silty sands and dark brown sandy clays with high
plasticity. The total tensile strength of geogrids required to support the load of the RGM self-
weight and the overload of the minerals dumped in the area for a total uniform load of 9,398psf
(450 kPa) was calculated using the design method for embankments on soft soils included in the
British Standard BS 8006:2010. This method considers both short and long-term tensile strength
of the geogrid: hence the resulting ultimate tensile strength already considers all the reduction
factors for tensile creep, installation damage, and environmental degradation.
The detailed design of geogrid reinforcement was carried out using the Geogrid Design
method (Rimoldi and Scotto, 2012; Rimoldi and Simons, 2013). This method, based on elastic
multi-layer analysis, allows to introduce different geogrid layers at different elevations, and to set
the design strain for each geogrid. Given the RGM thickness and considering separately the effect
of the static loads and the instant effect of dynamic loads, it is possible to calculate the distribution
of the horizontal tensile forces in the whole RGM structure and select the appropriate geogrid for
each layer based on a limit state criterion. In this case, restriction of the deformation was chosen
as limit state criterion, so the geogrid strain was limited to a maximum of 5%, as suggested by
practical experience as well as by the British Standard BS 8006:2010.
The geogrids used in the RGM were high strength uniaxial geogrids characterized by a high
tenacity polyester core covered in polyethylene resistant to physical, chemical and biological
conditions found in reinforced soil structures. The RGM layout consisted of a 3.28 ft (1 m) thick
aggregate layer with two sets of transversally installed high strength uniaxial geogrids (see Figure
2).
(a) (b)
Figure 4. Laying down of fill material (a) and view of completed storage area (b).
When time constraint is a critical aspect of the project, and primary and secondary settlements
need to be controlled, rigid intrusions (i.e. piles, columns) are commonly installed to provide
support and settlement control by transferring the load through the soft compressible soil layer to
a stiffer foundation. Many different types of columns can be used, including stone columns, vibro-
concrete columns, deep-mixing method columns, driven piles, and auger piles (Collin, 2004,
Collin et al., 2005). Probably the most critical aspect when designing column supported structures
is that the load must be transferred effectively to the columns to prevent punching of the columns
into the soil structure, this would lead to severe differential settlements in the surface of the
structure. The spacing between piles is therefore a crucial design aspect to develop an efficient soil
arching.
A load transfer platform (LTP) or a bridging layer is commonly installed immediately
above the columns to help transfer the load from the soil structure to the columns. The goal of the
geosynthetic reinforcement is to span across pile caps carrying all or a portion of the load and
transferring it to the columns. By doing so, spacing between piles can be significantly increased
and piles caps size can be decreased. In addition, the reinforcement can be used to counteract the
horizontal thrust of the embankment fill, eliminating the need of raking piles along the extremities
of the foundation.
(a) (b)
Figure 5. Basic layout of (a) the rigid beam design approach and (b) catenary design
approach.
The design of the geosynthetic reinforcement over piles includes calculating the vertical
stresses on the geosynthetic reinforcement and its strain and tension. Several models have been
developed to calculate the vertical stresses and several others to calculate the strain and required
strength in the geosynthetics. Sloan, 2011 summarizes twelve different arching theories to directly
calculate the vertical stress and three analysis methods to calculate the strain and tension in the
geosynthetic. Each column supported embankment analyses procedure is categorized based on
preliminary ratings for the appropriate use of performance criteria/indicators, subsurface
conditions, loading conditions, material characteristics, construction techniques and geometry.
Given the extent of the analysis’s methods available, their complexity and the scope of this paper,
design methods will not be discussed in detail herein.
Each day close to 50,000 motorists pass through the Telegraph Road Interchange along the integral
I-95/495 Capital Beltway in between Virginia and Maryland. In early 2008, extensive upgrades to
the interchange began as part of a multi-year project tied to the final phase of the Woodrow Wilson
Bridge project. Roughly $235 million was dedicated to the interchange’s improvement.
(a) (b)
Figure 6. Geogrid installation (a) and laying down of fill material (b).
CONCLUSIONS
Basal reinforcement over soft soils has been used for several years as a practical and economical
alternative to traditional ground improvement techniques. One or multiple layers of geosynthetic
reinforcement can be installed directly between the embankment fill and the soft foundation soils
to increase the design safety factor, bridge sinkholes or span between piles to redistribute the loads
and increase pile spacing. Design methods are available nationally and internationally to properly
identify the required tension and subsequently the design strain. Two case studies have been
presented that showcase the successful use of geosynthetic reinforcement over soft soil, and rigid
intrusions. In order to guarantee the required design life, installation of the geosynthetic
reinforcement should be carefully carried out, preparing a flat surface clear of sharp objects,
REFERENCES
1
Layfield USA Corp. 10038 Marathon Parkway, Lakeside, CA 92040, USA;
[email protected]
2
Layfield USA Corp. 10038 Marathon Parkway, Lakeside, CA 92040, USA;
[email protected]
ABSTRACT
Open top reservoirs have been used for thousands of years for the storage of water for municipal,
natural resource and agriculture applications. While these reservoirs are still presently utilized,
restrictions have been instituted over time to regulate protection of these water storages. As a
result, geosynthetic floating covers have been developed as a method of providing protection to
meet these regulations. Floating covers are designed to eliminate water loss from evaporation and
to protect the water source from dirt, debris and other contamination sources. Floating covers have
consistently demonstrated their ability to be a long-term solution and are increasing being used as
an economical method to protect water supplies. This paper will cover the history and performance
of geosynthetic floating covers over time, as well as their economic advantage compared to other
common below and above ground structural alternatives. Lastly, this paper will highlight the long
history of chlorosulfonated polyethylene (CSPE) as the primary material for floating covers in
potable water storage resulting from its outstanding UV performance and chemical resistance to
chlorine and other disinfectants used in water treatment. With over forty years of documented use,
CSPE has proven to be one of the best performing materials for floating covers and geomembranes
in long term potable water storage applications.
.
Figure 1. Ramona Water District. CSPE Tension Cable Systems installed in 2020
INTRODUCTION
Open top reservoirs have been used for thousands of years for various water storage applications,
with the oldest known reservoir in the world being the Jawa Dam in present-day Jordan. It was
built in about 3000 BCE to store water for irrigation (National Encyclopedia 2011). Today, open
top reservoirs are still frequently used worldwide for many applications including potable,
reclaimed, recycled and wastewater storage. These reservoirs are often lined with a geomembrane
water proofing barrier to prevent seepage. A geomembrane is a low permeability synthetic
membrane liner or barrier used to control fluid migration in an earthen containment project,
structure or system. Uncovered water reservoirs are often impacted by evaporation, which can be
substantial in hotter, arid climates. Geosynthetic floating covers are an excellent method of
protecting large volumes of water from evaporation. Additionally, floating covers can help to
reduce odors while preventing dirt and debris from contaminating the water being stored. An
example of a floating cover is shown in Figure 1 and 2 above.
Reservoirs with geomembrane floating covers are an economical method of storing larger volumes
of water. For example, in 2009 an 18-acre, 244 million-gallon, (923 ML) water reservoir designed
with a geomembrane liner and floating cover was completed for the Upper Chiquita Reservoir
(Figure 3) owned by the Santa Margarita Water District in Southern California, USA (Mills and
Falk, 2013). The overall cost of the Upper Chiquita project including the construction of the
earthen dam, installation of the liner and floating cover was approximately $53 million US dollars
and took 1.5 years to complete. Based on the cost to construct the reservoir, the average price per
gallon of water was $0.22 USD.
In comparison, the Kelly Butte reservoir in East Portland, Oregon, USA (Figure 4) was
completed around the same time period. The Kelly Butte project involved the replacement of two
older 10 million-gallon covered storage reservoirs. The original reservoirs, covered by a steel
enclosure, were replaced with two 12.5 million-gallon (47.3 ML) storage reservoirs covered by a
Another economical advantage of floating covers is evaporation control. In many hot arid
regions of the Southern United States evaporation rates can reach 90” annually. The cost of water
in these regions can also be very high, making water losses expensive. This has applications in
particular in West Texas where upstream oil and gas producers require large volumes of water for
hydraulic fracturing. In the Permian Basin region producers have reported water costs ranging
from $0.50 to $1.00 USD per barrel ($42 USD per gallon) (Fraser and Killian 2015). For the
hydraulic fracturing process, this water is stored in frac water pits or structural above ground
storage tanks. These frac pits or tanks can incorporate the use of floating covers to eliminate all
evaporation loss. Figure 5 shows a 250,000 ft2 (23,200 m2) frac pond reservoir with a floating
cover installed in West Texas in 2014. The producer was losing the equivalent of 13 million
gallons annually at an estimated cost of $310,000. The floating cover in this project was supplied
and installed for $325,000 and eliminated all evaporation, providing a return on investment period
of approximately 13 months. A total of 8 of these floating covers were installed for the operator
in this region.
Chlorosulfonated polyethylene (CSPE) was first introduced in the United States in the 1970’s as a
geomembrane material for water and wastewater containment applications. Initial applications
included potable water and wastewater storage for municipalities and tailings ponds for the mining
sector. The first floating covers on record using CSPE were installed in the late 1970’s in Southern
California for municipal potable water storage (Fraser, et al, 2017). The covers were designed and
used for evaporation control as well as to prevent dirt and debris from contaminating the water
storage supply.
CSPE has many advantages over other commonly specified materials. CSPE is
manufactured as a thermoplastic material that will vulcanize over time, becoming a thermoset
material capable of surviving thermally stressful, high-temperature environments and UV
exposure. When formulated and calendared into a lining grade material, it provides outstanding
UV resistance and weathering properties allowing it to be used for long term exposed containment
applications. It also demonstrates slow reduction of its mechanical and endurance properties over
time. The material’s unique cross-linking properties provide exceptional resistance to several
chemicals used as disinfectants in municipal water treatment including chlorine, sodium
hypochlorite and chloramines, which act as accelerators in breaking down the antioxidant packages
of many geomembranes, resulting in environmental stress cracking that causes premature material
failure in other geomembrane materials (Mills 2011). CSPE also has a low coefficient of thermal
expansion and contraction, providing excellent dimensional stability and lay-flat characteristics in
the field. Expansion and contraction problems caused by temperature changes are virtually
nonexistent.
CSPE’s synthetic rubber properties also provide it with a unique combination of flexibility
and durability. In floating cover applications, CSPE is flexible enough to be factory fabricated in
large prefabricated panels that can be folded, rolled, and transported efficiently to a containment
project site. These larger prefabricated panels are unrolled into position and field welded on site
significantly reducing installation time and construction costs. It also provides consistent seam
integrity and liner quality by using shop seams. CSPE is produced in accordance to the
Geosynthetic Research Institute GM 28 standards (GRI GM 28).
The following section highlights two projects where CSPE floating covers have been installed in
hotter, dryer climates for potable water storage and protection. These profiles demonstrate the
unique ability of CSPE to withstand weathering and UV exposure as well as common water
treatment chemicals.
San Juan Water District’s Hinkle Reservoir (Figure 6) had a 45 mil (1.14 mm) CSPE liner and
floating cover installed in 1980. The water district chose a floating cover based on the substantial
cost savings versus other storage options. When the reservoir was initially constructed,
alternatives such as steel and concrete tanks were considered. After evaluating the costs of each
option, the CSPE liner and floating cover system was approximately 60% to 80% less than
alternative storage systems considered. This also factored in lifecycle cost for maintenance and
servicing. As a result, a CSPE floating cover was selected and installed as one of the first-
generation larger scale floating covers at the time. The is located north east of Sacramento, CA,
spanning 5.7 hectares (14 acres) in a region is known for hot, arid summers and high UV exposure.
The winters are typically a bit cooler, wet, and partly cloudy. Over the course of the year, average
temperature can vary from 4°C to 40°C (35°F to 104°F).
The reservoir is currently scheduled to have a new liner and cover installed over the next
couple of years. At that time the original installed liner and cover materials will have been in
Los Angeles Department of Water & Power (LADWP) Upper Stone Canyon
• Beverly Hills, CA
• Upper Stone Canyon Reservoir
• 139 Million Gallon (526 ML) Capacity
• Potable Water Storage
The Upper Stone Canyon reservoir is owned and operated by Los Angeles Department of Water
& Power (LADWP). In 2019 a new 700,000 ft2 (65,000 m2) floating cover was installed as part
of an initiative to protect and preserve the city’s drinking water supplies. This 139 million-gallon-
reservoir was first constructed in 1954 for water storage in the Bel Air, CA region. The reservoir
provides water to approximately 450,000 residents in the areas of West Los Angeles, Pacific
Palisades, Marina Del Rey, and the UCLA campus. The large reservoir was covered to comply
with State and Federal laws. The cover material installed was 45 mil CSPE manufactured with a
distinctive green color to better match the surrounding environment. Beverly Hills, CA is a warm
Mediterranean climate known for its dry, arid summers and high UV exposure. Prior to
construction, LADWP conducted an environmental impact assessment to investigate the impact of
different methods to cover the Upper Stone Canyon Reservoir (Los Angeles Department of Water
& Power, 2011). The two main options considered were a concrete roof and a geomembrane
floating cover. Looking at the overall cost of the concrete roof option, the LADWP estimated a
$140 million expenditure over a 60-year life cycle. Also noted in this study was that most of that
cost would be the up-front capital for construction. The construction timeline was estimated to be
4-5 years. The floating cover option was estimated to be $35 million in overall costs and would
only take an estimate 1.5 years to complete installation. The estimated lifespan of a floating cover
is in excess of 30 years (Fraser 2019) and even with scheduled cover replacements would still be
CONCLUSION
This paper points out the several cost advantages of using open top reservoirs combined with a
geosynthetic floating covers compared to structural above ground steel tanks or underground
concrete clearwells water storage systems. Floating covers are able to provide the same coverage
of traditional water storage methods at a fraction of the costs. Floating covers have consistently
demonstrated their ability to perform as long-term exposed covers and are increasing being used
as an economical method to protect valuable water supplies
REFERENCES
Mills A., and Falk S (2013). Upper Chiquita Reservoir Floating Cover and Liner, Geosynthetics
2013, IFAI, Long Beach CA, USA.
Fraser, B, and Killian B (2015). Emerging Applications for Evaporation Control Covers,
Geosynthetics 2015, Portland, OR, USA.
Fraser, B., Roades, S, Neal, M., and Gersch, Alex (2019). CSPE Performance & History in long
term Potable Water Storage Applications, Geosynthetics 2019, IFAI Houston, Texas, USA
Mills, A. (2011) The effects of chlorine on very low-density thermoplastic olefins, Geofrontiers
2011, IFAI, Dallas TX, USA.
GRI-GM 28. Standard Specification for Test Methods, Test Properties, and Testing Frequencies
for Reinforced Chlorosulfonated Polyethylene (CSPE-R) Geomembranes, Geosynthetics Research
Institute, Geosynthetic Institute, Folsom, PA, USA
Upper Stone Canyon Reservoir Water Quality Improvement Project. Los Angeles Department of
Water and Power, 2011, Upper Stone Canyon Reservoir Water Quality Improvement Project,
www.ladwp.com/cs/idcplg?IdcService=GET_FILE&dDocName=QOELLADWP006808&Revis
ionSelectionMethod=LatestReleased.
ABSTRACT
The use of water-filled barrier walls for stormwater and sediment control was evaluated for a
hillside construction project in Northern California. Water-filled barrier walls were configured
along one of the project’s exposed hillsides to create a series of nine temporary detention basins.
The water-filled barrier walls were evaluated for ease of deployment, construction practicability,
and stability for varying slope conditions, surface placement types, and configurations. When
properly anchored, the water-filled barrier wall basins detained large volumes of sediment and
stormwater along the steep hillside.
INTRODUCTION
A low density polyethylene (LDPE) barrier wall product called “Muscle Wall” was evaluated for
its use in stormwater and sediment control on steep slopes. The barrier walls are approximately 4
feet in height, 6 feet in length, 2.5 feet in base width, 0.7 feet in top width, and 120 pounds in
weight. The barrier walls are interlocked, secured to each other using ratchet tie down straps, filled
with water, and wrapped with a plastic or geotextile liner to produce a linear barrier system. An
image of two interlocked barrier walls without ratchet tie down straps or liner is shown in Figure
1.
The barrier wall product was evaluated for ease of deployment, construction practicability,
and stability for varying slope conditions, surface placement types, and configurations during the
2018-19 winter season at a construction project site in Northern California. Northern California
has a climate characterized by moist mild winters and dry summers, with a majority of rainfall
METHODS
Shipping and Storage. Approximately 4,000 linear feet (LF) of the barrier wall product was
ordered for the project site. The barrier walls, plastic liner, ratchet tie-down straps, and liner clips
were shipped to the project site on seven truck trailers (approximately 95 barrier walls per truck
trailer). Each pallet of the barrier wall product was observed to take up an approximately 8 feet by
6 feet footprint, and contained 12 barrier wall segments as shown in Figure 2. The barrier wall
product pallets were removed from the truck trailer using a forklift and stored on the project site
prior to deployment.
Figure 3. Aerial view (left) and side view (right) of the barrier wall basin locations.
Table 1 summarizes each barrier wall basin’s length, cross slope (defined as the average
slope perpendicular to the basin length), and surface placement type. Barrier walls that crossed
active haul roads were not filled with water to allow for rapid removal during non-storm
conditions. All barrier walls that were not located across an active haul road were filled completely
with water to increase stability. In addition, all barrier walls were wrapped with plastic to limit
seepage beneath the base and connection points of the barrier wall basins. The bottom area of the
basins was left unlined to promote infiltration and reduce the need for pumping.
Deployment. The nine barrier wall basins were deployed intermittently from the end of November
2018 through mid-December 2018, based on the project schedule and contractor’s availability. In
locations where the barrier wall basins were to be placed on soil, grading was performed to provide
a level surface for the barrier walls. A level surface was preferred in order to limit seepage under
the barrier walls and to increase stability. According to the contractor, it took approximately 9
hours to install 500 LF of the barrier wall product, which included the time to grade a level surface,
place the barrier walls, connect the barriers with straps, fill the barriers with water, wrap the
barriers with plastic lining, and secure the plastic lining with clips. When the barrier walls were
placed on a paved surface where grading a level surface was not necessary, the installation process
took about 5 hours for 500 LF.
FINDINGS
During the study period between December 2018 and March 2019, the site received approximately
19 inches of rain. The largest storm occurred between February 13 and February 15, and produced
approximately 4 inches of rain over the course of three days. Other storms during the study period
generally produced between 1 and 3 inches of rain over the course of 2 to 4 days. Even though the
design rainfall depth was exceeded during multiple storms, the downslope basin (MW-4) that
collected a majority of the site’s stormwater did not overtop due to the pumping and trucking
operation.
When each barrier wall basin was properly anchored, the series of basins successfully
detained and controlled the hillside’s turbid stormwater. The velocity of stormwater was not
measured during storm events, but it is assumed that the average velocity along the hillside was
reduced, as stormwater was brought to a halt approximately every 150 feet. Turbidity of
stormwater entering and exiting the barrier wall basins was not measured, but as expected due to
site sediment’s high fines content, turbidity did not visually appear to decrease upon exiting the
basins. An individual breakdown of each barrier wall basin’s performance is discussed below.
MW-1. Basin MW-1 was located at the toe of the hillside along a concrete sidewalk with a cross
slope of approximately 10 percent. All barrier walls were filled with water. Basin MW-1 held back
large volumes of sediment during the study period, with the contractor removing built-up sediment
with an excavator following storms as needed. Turbid water was observed seeping from the bottom
of the basin at a low flowrate during storms. This water was routed using sand bags into a
traditional excavated sediment basin further downstream to prevent discharge from the site.
Figure 4. MW-2 initial configuration (left) and performance after first storm (right).
Figure 5. MW-2 revised configuration (left) and performance after subsequent storms
(right).
MW-3. Basin MW-3 was located across an asphalt concrete haul road with a cross slope of
approximately 18 percent. The initial configuration (Figure 6, left) was composed of four unfilled
barrier walls (red) anchored by three water-filled barrier walls (blue) on each end. One 90-degree
corner wall was used to assist in forming the basin. After the first storm, the basin slid and multiple
barrier walls disconnected from each other due to sediment impact and buildup (Figure 6, right).
After this storm, three additional water-filled barrier walls were added on each end of the basin
(Figure 7, left). Following this addition, Basin MW-3 remained stable during subsequent storm
events (Figure 7, right).
Figure 7. MW-3 revised configuration (left) and performance after subsequent storms
(right).
MW-4. Basin MW-4 was placed on fairly level compacted soil with all barrier walls filled with
water. In addition, an approximately 4-feet-deep sediment basin was excavated on the interior of
the barrier wall basin. The barrier wall product and excavated sediment basin combination
increased the storage depth to approximately 7.5 feet. Figure 8 shows a conceptual detail of the
combined basin system. With the plastic liner overlapping the barrier walls and extending down
the 2:1 sediment basin side slopes, water was unable to seep under the barrier walls. Water
discharging from Basin MW-5 (upslope) through seepage or overtopping would make its way to
Basin MW-4, where it would then be pumped into water trucks after filling up during storm events.
MW-5. Basin MW-5 was placed on fairly level compacted soil with all barrier walls filled with
water. Basin MW-5 was effective at slowing stormwater runoff and trapping entrained sediment;
once volumetric capacity was reached during a rain event, stormwater would both overtop and
seep under the barrier walls down gradient to Basin MW-4 (Figure 9). Stormwater was able to
seep under the barrier walls of MW-5 since the plastic liner did not continue along the interior of
the basin like Basin MW-4. In addition, irregularities in the ground surface created small gaps for
water to flow through. The turbidity of water leaving the basin appeared similar to that of water
entering the basin. Basin MW-5 did not experience any lapses in stability, even when overtopped
by stormwater and impacted by sediment buildup.
MW-6. Basin MW-6 was located across an asphalt concrete haul road with a cross slope of
approximately 15 percent. Unlike Basins MW-2 and MW-3, which made use of corner walls, Basin
MW-6 had enough width across the haul road to form a semi-circular basin without using corner
walls; the connection joints between barrier walls allowed for a deflection of approximately 11
degrees between each wall. Five barrier walls located across the haul road were not filled with
water. Like Basin MW-5, Basin MW-6 did not experience any lapses in stability while at capacity
with stormwater and entrained sediment (Figure 10). Stormwater was observed to seep under the
barrier walls during storm events; the turbidity of water leaving the basin appeared similar to that
of water entering the basin.
MW-7. Basin MW-7 was located across an asphalt concrete haul road with a cross slope of
approximately 13 percent. The initial configuration was composed of five unfilled barrier walls
anchored by six water-filled barrier walls on one end and four water-filled barrier walls on the
other end. Two 90-degree corner walls were used to assist in forming the basin. After the first
storm, the basin did not slide (like Basins MW-2 and MW-3), but the empty barrier walls rotated
outward. After this storm, the five previously empty barrier walls were filled with water. Following
this reconfiguration, Basin MW-7 remained stable during subsequent storm events.
MW-8. Basin MW-8 was located across a compacted soil haul road with a cross slope of
approximately five percent. Like the other basins located across haul roads, five middle barrier
walls were not filled with water. Figure 11 below depicts the empty barrier walls set aside during
dry weather so that the haul road could be used. Because Basin MW-8 was the furthest upslope
basin, it collected the least amount of stormwater runoff and never filled to capacity. However, it
succeeded as a check dam for slowing water flow and detaining entrained sediment.
Figure 11: Empty barrier walls set aside for haul road use.
MW-9. Basin MW-9 was located across a compacted soil haul road with a cross slope of
approximately 10 percent. Five barrier walls in the middle of the basin were not filled with
water, and the basin utilized two corner walls to assist in forming the basin. Basin MW-9 often
filled to capacity with water during storms, and accumulated sediment throughout the study
period (Figure 12). Over the duration of the study period, Basin MW-9 did not experience any
lapses in stability while at capacity with water and sediment. The turbidity of water leaving the
basin through overtopping and seepage appeared similar to that of water entering the basin.
DISCUSSION
The barrier wall basins that had initial stability issues (Basins MW-2, MW-3, and MW-7) were
each installed on slopes greater than or equal to 10 percent, placed on asphalt concrete, contained
empty barrier walls, and utilized corner walls. While Basin MW-6 was on a slope greater than 10
percent, placed on asphalt concrete, and contained empty barrier walls, it did not experience
stability issues. It appears the lack of corner walls in the configuration may have increased the
basin’s stability. In general, stress tends to concentrate over sharp changes in geometry (Dundurs
and Lee, 1972). It was observed that for basins where barrier walls came apart or rotated out of
place (Basins MW-2, MW-3, and MW-7), a corner wall was the weak point.
While Basin MW-9 was located on a slope of approximately 10 percent, contained empty
barrier walls, and utilized corner walls, it did not experience stability issues. The compacted soil
on which it was placed may have been the reason for its increased stability compared to other
similar basin configurations that were installed on asphalt concrete; the coefficient of friction
between plastic and soil is generally higher than that of plastic and asphalt concrete. In addition,
As expected, sliding factor of safety decreases with increasing slope grade, and is slightly
greater for a soil surface. The results generally align with field observations, where some barrier
walls showed signs of instability on slope grades exceeding 10 percent. To increase barrier wall
stability on slope grades exceeding 10 percent, water-filled barrier walls or k-rail can be placed
behind and perpendicular to the barrier wall basin. For horseshoe shaped basins, additional water-
filled anchor walls can be placed on each end. If enough water-filled anchor walls are used, some
barrier walls in the center of the basin can even be left unfilled, as exemplified by Basins MW-2
and MW-3. Basin MW-2 was on a slope of approximately 10 percent, and was initially unstable
with a ratio of water-filled to unfilled barrier walls of 1.5:1; however, Basin MW-2 remained stable
with a ratio of water-filled to unfilled barrier walls of 2.5:1. Basin MW-3 was on a slope of
approximately 18 percent, and was initially unstable with a ratio of water-filled to unfilled barrier
walls of 1.5:1; however, Basin MW-3 remained stable with a ratio of water-filled to unfilled barrier
walls of 3:1. Table 4 provides recommended “rule of thumb” ratios of water-filled to unfilled
barrier walls to improve basin stability for various slope grades.
Table 4. Ratios of water-filled to unfilled barrier walls for various slope grades.
Slope (%) Ratio of water-filled to unfilled barrier walls
0-5 2:1
5-10 2.5:1
10-15 3:1
15+ Fill all barrier walls
Figure 13. Rendering of the discharge port (left) and photograph of the discharge port
(right).
The barrier wall product provides an alternative to traditional barrier BMPs such as
sandbags and k-rail. Compared to a sandbag barrier of the same height, the United States Army
Corps of Engineers (USACE) concluded the barrier wall product was over 25 times quicker to
construct, had four times less seepage, and remained undamaged by waves, overtopping, debris
impact, and riverine current (Ramos-Santiago, Blades, and Gutshall, 2020). One 4-foot-tall barrier
wall is equivalent to approximately 470 sand bags. Compared to a typical 10-feet-long, 2.7-feet-
tall, 4,000-pound section of k-rail, a 6-feet-long, 4-feet-tall, 120-pound barrier wall (when unfilled)
is easier and greener to deploy because it does not require heavy machinery. Once filled with water,
the barrier wall weighs approximately 1,400 pounds.
CONCLUSION
The use of water-filled barrier walls for stormwater and sediment control was largely effective for
the hillside construction project in Northern California. The series of nine temporary detention
basins created by the barrier walls held back large volumes of turbid stormwater and transported
sediment, and reduced the velocity of stormwater as it made its way down the hillside. Given
enough water-filled “anchor” walls, the basins remained stable for various configurations and on
slopes of varying steepness and surface type.
REFERENCES
Dundurs, J. and Lee, M.S. (1972). Stress concentration at a sharp edge in contact problems, Journal
of Elasticity, 2: 109–112.
Ramos-Santiago, E., Blades, C., and Gutshall, J.D. (2020). Evaluation of 4-Foot Muscle Wall
Flood Fighting Barrier, Engineer Research and Development Center, United State Army Corps
of Engineers: 1 –53.
United States Department of Agriculture (2010). Time of Concentration, Part 630 Hydrology
National Engineering Handbook, 210-VI-NEH: 15-8.
Matthew P. Kemnitz
ABSTRACT
This technical paper will discuss the results from two different types of leak location surveys on a
large project near Greeley, Colorado. A bare liner survey as well as a soil survey were completed
on the primary fabricated geomembrane of a cell over seven million square feet in size. These
surveys began in August of 2018 and were completed in May 2019 over five separate
mobilizations. In particular, the paper will discuss what type of damage was found during each
type of leak location survey and where specifically it was found, for example seam welds,
extrusion welds or on the panels. On this project a majority of the seams were factory fabricated
under ideal conditions and therefore resulted in fewer defects. What can we learn from this project
and how many other leaks could be avoided? With the ideal outcome of zero leaks let us learn
from this project to know what can be done not only to avoid making leaks in the field during
construction, but also to ensure the potential for leaks is diminished before the liner ever arrives at
the site. This coupled with a thorough leak location survey will result in an exceptional liner
system that will hold water and deliver on its intended purpose.
INTRODUCTION
The 70 Ranch Reservoir located in Colorado was lined with 7,350,000 square feet of 45-mil
reinforced polyethylene. The 4H:1V slopes are lined from the bottom up with a prepared subgrade,
an 8-oz nonwoven geotextile with the 45-mil RPE on top. The floor of the reservoir was lined
from the bottom up with a prepared subgrade, an 8-oz nonwoven geotextile and a 30-mil RPE with
approximately 1.5 feet of soil cover placed on top. The project specifications for this project
required the reservoir to be leak tested using both the bare liner survey (ASTM D7002) method as
well as the soil survey (ASTM D7007) method. The bare liner survey was to be used on the slopes
of the reservoir while the soil survey was to be performed on the floor areas as well as the benches
on the slopes.
The first mobilization took place on August 23rd through 29th of 2018. The slopes were tested
prior to the deployment of the geotextile. Twenty-four leaks were found during this mobilization
in a total of eleven separate areas. Figure 1 shows the area that was leak tested on this initial
mobilization. The size of leaks found ranged from a 16-foot tear to a 1/32-inch pinhole. Table 1
lists the leaks that were found, their location as well as a description. Twenty-three of the leaks
were found using the soil survey method and one leak was found using the bare liner survey
method. All of these leaks were found on the panels and none of them were found on seams or
welds.
11 9 feet south of seam S1 and S2 and 57 feet east of tie in 1/32-inch pinhole on panel
at tow. Found during bare liner survey of slope
The second mobilization took place on September 24th through 27th of 2018. Twenty leaks were
found during this mobilization. Figure 1 shows the area that was leak tested on the second
mobilization. The floor area of the soil survey from the first area was retaken on this trip due to a
condition of compromised isolation on the first mobilization. Leak number 16 was the only leak
that was found in the previously surveyed area from the first mobilization, it was a 1/16-inch hole
on a panel. It is from this example that we see how isolation of the perimeter affects the sensitivity
of the leak location survey. It is also just as important to expose any leaks as they are found so
they do not mask smaller leaks in the area. The size of leaks found ranged from a 6-foot tear to a
1/16-inch hole. Table 2 lists the leaks that were found, their location as well as a description. All
of these leaks were found using the soil survey method. All of these leaks were found on the
panels and none of them were found on seams or welds. From this mobilization moving forward
electrical isolation of the reservoir was exceptional and allowed the leak location survey to be
performed with great sensitivity and accuracy.
1 Floor of area – 80 feet from east tow – exposed 3-foot by 5-inch tear on panel
2 Floor of area – 80 feet from east tow – exposed 8-inch by 12-inch tear on panel
3 Floor of area – 80 feet from east tow – exposed 5-inch by 4-inch tear on panel
4 Floor of area – 80 feet from east tow – exposed Three 2-inch tears on panel
5 Floor of area – 80 feet from east tow – exposed 1/2-inch hole on panel
6 Floor of area – 80 feet from east tow – exposed 3-foot by 4-foot tear on panel
8 Floor of area – 80 feet from east tow – exposed 6-inch tear on panel
9 Floor of area – 70 feet from east tow – exposed 2-foot by 3-foot tear on panel
10 Floor of area – 70 feet from east tow – exposed 3-foot by 4-inch tear on panel
11 Floor of area – 70 feet from east tow – exposed Multiple ½-inch tears on panel
12 Floor of area – 70 feet from east tow – exposed 2-foot by 3-foot tear on panel
13 Floor of area – 70 feet from east tow – exposed 2-foot by 6-inch tear on panel
14 Floor of area – 70 feet from east tow – exposed 6-foot by 4-inch tear on panel
15 Floor of area – 70 feet from east tow – exposed 5-inch linear cut on panel
The third mobilization took place on November 13th through 19th of 2018. Eleven leaks were
found during this mobilization. Figure 1 shows the area that was leak tested on the third
mobilization. The size of leaks found ranged from a 3-inch tear to a 1/16-inch hole. All of these
leaks were found using the soil survey method with one of them being on the side slope bench and
the remainder on the floor of the reservoir. All of these leaks were found on the panels and none
of them were found on seams or welds.
1 Approximately 500 feet from the toe of the east side slope 0.50-inch hole
2 Approximately 440 feet from the toe of the east side slope 3.00-inch tear
3 Approximately 360 feet from the toe of the east side slope 0.75-inch hole
4 Approximately 200 feet from the toe of the east side slope Two 0.13-inch holes
5 Approximately 45 feet from the toe of the east side slope 1.00-inch hole
6 Approximately 370 feet from the toe of the east side slope 0.06-inch hole
7 Approximately 80 feet from the toe of the east side slope Four 0.06-inch holes
The fourth mobilization took place on April 1st through 16th of 2019. Approximately 4,020,000
square feet were surveyed on this trip. Sixteen leaks were found in the soil-covered area during
this mobilization and six leaks were found in the bare geomembrane of the slopes. Figure 4 shows
the area that was leak tested on the fourth mobilization. The size of leaks found ranged from a 3-
foot tear to a 1/16-inch hole. All of these leaks were found on the panels and none of them were
found on seams or welds. The leaks from this mobilization are spread out in all area of the floor
as well as opposite side slopes. This helps to know that isolation is good and the flow of current
throughout the entire cell is consistent.
1 Approximately 843 feet from the toe of the east side 5-inch tear
slope and 24 feet from the toe of the south side slope
2 Approximately 615 feet from the toe of the east side 0.75-inch hole
slope and 922 feet from the toe of the south side slope
3 Approximately 1300 feet from the toe of the east side 0.50-inch tear
slope and 1000 feet from the toe of the south side slope
4 Approximately 1325 feet from the toe of the east side 3-foot by 2-foot tear
slope and 880 feet from the toe of the south side slope
5 Approximately 945 feet from the toe of the east side 5-foot tear
slope and 1745 feet from the toe of the south side slope
6 Approximately 1292 feet from the toe of the east side 4-foot by 2-foot tear
slope and 640 feet from the toe of the south side slope
7 Approximately 1215 feet from the toe of the east side 10-inch tear
slope and 2210 feet from the toe of the south side slope
8 Approximately 730 feet from the toe of the east side Three 1-inch holes
slope and 2915 feet from the toe of the south side slope
9 Approximately 770 feet from the toe of the east side 1-inch tear
slope and 2920 feet from the toe of the south side slope
10 Approximately 770 feet from the toe of the east side 5-inch tear
slope and 3173 feet from the toe of the south side slope
11 Approximately 1100 feet from the toe of the east side 13-inch tear
slope and 2905 feet from the toe of the south side slope
12 Approximately 1290 feet from the toe of the east side 0.13-inch tear
slope and 3180 feet from the toe of the south side slope
13 Approximately 1050 feet from the toe of the east side 1-inch tear
slope and 3333 feet from the toe of the south side slope
14 Approximately 970 feet from the toe of the east side 6-inch tear
slope and 3330 feet from the toe of the south side slope
The fifth and final mobilization took place on May 1st through 10th of 2019. Approximately
1,710,000 square feet were surveyed on this trip. Thirteen leaks were found in the soil-covered
area during this mobilization and one leak was found in the bare geomembrane of the slopes.
Figure 5 shows the area that was leak tested on the fifth mobilization. The size of leaks found
ranged from a 4-foot tear to a pin hole. All of these leaks were found on the panels and none of
them were found on seams or welds. Once again notice how the leaks are spread out all over the
floor area showing how consistent the data is all over the survey area.
1 Approximately 260 feet from the toe of the west side slope 2.75-inch hole
2 Approximately 185 feet from the toe of the west side slope 2-foot tear
3 Approximately 95 feet from the toe of the west side slope 4-foot tear
4 Approximately 90 feet from the toe of the west side slope 8-inch tear
5 Approximately 91 feet from the toe of the west side slope 6-inch tear
6 Approximately 35 feet from the toe of the north side slope 0.13-inch holes
7 Approximately 65 feet from the toe of the north side slope 1-inch tear
8 Approximately 30 feet from the toe of the north side slope Three pin holes
9 Approximately 45 feet from the toe of the north side slope 2-inch tear
10 Approximately 75 feet from the toe of the north side slope 2.75-inch tear
11 Approximately 40 feet from the toe of the north side slope 1-inch tear
CONCLUSION
In conclusion a total of 91 leaks were located and repaired at the 70 Ranch Dam & Reservoir in
Colorado. Figure 6 shows the entire area and the locations of the leaks found. Table 6 shows the
breakdown of each mobilization and how many leaks were found for each different type of survey
and the area covered.
The bare liner survey covers every square inch of liner that is exposed resulting in 100% of the
liner being surveyed and tested for leaks. For the soil survey it was taken with a data density of
1,540 data points or readings per acre. We removed about 75 percent of our data to represent
what type of leaks and size of leaks would have been found if we had not taken the data at the
higher density, but instead interpreted the data at a much lower 400 data point per acre. This would
have resulted in ten of the leaks being missed. Taking data is easy and fast, but taking good data
takes a little more time, but if the ultimate goal is a zero-leak installation than the answer is in the
details of the data. This coupled with isolation and site preparation is key.
1 23 1 270,000
2 20 0 350,000
3 11 0 1,000,000
4 16 6 4,020,000
5 13 1 1,710,000
Totals 83 8 7,350,000
It is important to mention once more that none of the leaks found were on any of the seams that
were factory fabricated. The damage that occurred on this site was not due to the fabrication of
the seams. Most of the larger leaks found are due to machine damage and the remainder of the
leaks located are from some other type of damage that is typical to the installation process. The
number of defects per acre for this installation are at 0.54leaks/acre or 1.33 leaks/hectare which is
much less than reported by Giroud (2016) of about 5 to 6 leaks per hectare. This is another example
of the quality of all parties involved on this installation. It is pleasing to know that not only were
leaks located but leaks of all sizes were found in a consistent manner to help ensure the best
possible outcome for this site. Since filing, the reservoir has served its purpose without any
evidence of leakage: this is a testament to a ton of focus and cooperation by the Owner,
Engineers, Contractors, and many technical evaluators to achieve this exceptional outcome.
REFERENCES
Giroud, J.P., (2016), Leakage Control Using Geomembrane Liners, Geosynthetics International,
5th Victor de Mello Lecture, J. Soils and Rocks, Brazilian Society for Soil Mechanics and
Geotechnical Engineering, 39(3): 213-235.
Stark, T.D., Hernandez, M.A., and Rohe, D.S., Geomembrane Factory and Field Thermally
Welded Geomembrane Seams Comparison, Geotextiles and Geomembranes Journal, 48(4),
August, 2020, 454-467.
ABSTRACT
The largest prefabricated scrim reinforced polypropylene (fPP-R) geomembrane lined raw water
reservoir in North America was recently completed east of Greely, Colorado. At over 170 acres
(7.5 mm sq. ft.), 45 ft depth with an embankment dam and designed to impound over 5500 acre
ft of water, the primary seepage barrier was designed with large prefabricated fPP-R panels
consisting of 30 mil bottom liner and 45 mil side slope liner. Geotechnically, the site was
located in highly porous sands and bedrock and required a cost-effective seepage barrier. The
slopes were designed at 4:1 with a 20 ft wide soil covered bench positioned at mid slope. Upper
slope section was protected with rock filled geocell and protection geotextiles to resist wave and
ice damage and the lower slope below the soil covered bench and operating water level was left
exposed. The bottom was fully lined with large prefabricated 30 mil fPP-R panels and then
overlaid with 12-inch minimum sandy soils carefully placed with LGP equipment. This paper
will provide design and construction details associated with using cost effective large area
prefabricated fPP-R panels, reduction in wrinkling for soil cover operations, efficient
construction sequencing, reduction in site install time, QC testing and the implementation of
ELLS for final CQA acceptance.
INTRODUCTION
Irrigation water in the Western United States has always been a major concern for farming and
ranching, especially in drought years. Water can be both scarce and expensive and planning for
future water storage and accessibility based on projected use is of paramount importance for
irrigation districts. These considerations were of particular interest to the United Water
Conservation District (UWCD) when planning for storage and future use of water in Weld
County, Colorado. To this end and as part of the overall water use plan, investigation, and
selection of a site for a storage reservoir was initiated in 2012. Based on feasibility studies and
access to off season stream water, a site was selected east of Kersey, Colorado at a location
known as 70 Ranch.
The 70 Ranch Reservoir property site encompasses approximately 250 acres and is located in the
northwest corner of the intersection of SH 34 and Weld County Road (WCR) 69 just east of
Kersey, Colorado. The site is located just south of the South Platte River and off stream surface
water access to the reservoir site was available and sufficient for storage.
Site investigations as well as the preliminary design for the reservoir was begun in 2013. Site
geology and geotechnical investigation was completed in 2014 and design alternatives for the
reservoir were provided by the design enineer (ref 1)
GEOTECHNICAL CONSIDERATIONS AND ALTERNATIVES
Based on evaluation of the above design and construction considerations, the geomembrane
material options were narrowed to the following characteristics:
o Base polymer longevity exposed > 20 years life with warranty
o Scrim reinforced for high puncture, tear resistance, tensile strength as well as
stability in temperature extremes
o Factory fabrication into large custom panels using thermal fusion welds
o Minimization of field seaming by using efficient and high quality factory
fabrication and thermal fusion seams QC tested and accepted in the factory.
o Minimum thickness of 45 mil on slopes
o Minimum thickness of 30 mil on bottom in consideration of a fully protected liner
system, little or no subsidence and large flat surface area.
o Efficient thermal fusion welding and NDT testing for field seams
o High resistance to creasing and wrinkling for panel factory fabrication and
shipping/storage
o Little or no wrinkling during installation to provide efficient soil cover operation
o Testing by ELLS for final installation QC
Geomembrane material options selected for lining system design included the following:
o 45 and 30 mil scrim reinforced Polyethylene (RPE)
Figure 2. North End of reservoir showing from top to bottom – Geocell, 2 inch stone infill,
soil covered bench, lower exposed section and finished bottom soil cover
Figure 4. Photo showing cover soil placement by GPS guided LGP dozer and tracked
skidsteer. Note minimal wrinkling or waves during placement
ABSTRACT
As part of FGI´s Technical Track, this document analyzes the advantages of using international
specifications in PVC fabricated geomembrane for Latinamerica´s mining industry. The most
significant Lithium natural resource in Latinamerica is called the Lithium triangle. It is located in
three countries, Chile, Bolivia and Argentina. The natural resource, the brines, are located in
extreme climates classified as desertic areas. The technique to extract the lithium salt is called open
sky mining. Huge areas are covered by geomembranes and filled with brine, which, thanks to the
climate environment, promotes the salt crystallization process. This paper shows the typical
situations the project owners face to decide the geomembrane´s technical properties to reach the
best performance from the technical and financial view. The article analyzes climate condition
influence and how it affects the PVC geomembrane performance since the storage until the covered
pond is in service. Finally, the paper examines two relevant properties which come from two
international specifications for PVC geomembrane. Both of them are used in buried applications.
Density and average molecular weight are the additional properties connected with one of the
requirements to avoid wrinkles and possible fractures under the “Salar's” arid climate.
INTRODUCTION
In the last ten years, electronic devices came into our lives and will remain for many years. It is
the case with cell phones, cameras, laptops, tablets, and electric vehicles' launch. The last one to
join as a real option for a clean energy type. Behind this technological change is lithium, one of
the raw materials present in the different batteries. However, batteries' applications are just one of
numerous uses lithium has: it is used in aircraft aluminum alloys due to its low density; lithium
soaps are used as a grease lubricant additive to improve thermal resistance (Stwertka, A., 1998).
Lithium carbonate is used in pharmaceutical drugs for neurologic treatments. (Gray, T., 2009).
The review "Litio en Argentina" (Lopez, A., et al., 2019) regarding the state of lithium in this
country points out that prices have changed dramatically from the last ten years, reaching almost
USD 10/kg in 2017, and expected world demand can be around 425000 ton in 2025.
This element is found in some ores, including spodumene and amblygonite, and in nature
in underground brines (Stwertka, A., 1998, De la Hoz, M., et al., 2013). The formation of those
brines comes to a place when some geographic variables are joined along time (Bradley, D., et al.,
2013). One of those variables, the arid climate, is useful for extracting the Lithium Carbonate,
based on brine's evaporation in big pools covered by a PVC geomembrane, which has shown an
excellent performance along time. Photo 1 shows a typical view of this kind of pond. These are
built in the “Salares”, where the brines are located underground. Once the infrastructure is finished
Photo 1. Open sky mining: typical view for a covered pond with PVC geomembrane
Batteries, electric cars, and energy storage systems have made lithium a critical and essential
element in our daily lives. Lithium is one of the most important metals of the 21st century,
generating massive interest in the world´s population, and creates excellent expectations regarding
its future. Every time consumers want faster, lighter, and long-lasting products, the tech industry
hears what the market is asking for and is giving the customers just what they need. Lithium mines
in Latin America are located in Chile, Bolivia, and Argentina,, countries with more than half of
the world´s lithium reserves (De la Hoz, M, et al., 2013).
With a global demand that far exceeds current production, the lithium business expansion
is assured in the short and medium run. A tendency reports by one of the most relevant digital
newspapers in Chile, -“El Mostrador, August 27th, 2020” -, says: “The international demand of
the mineral can be close to 300,000 tons of lithium in 2019, so the expected growth of the demand
before the pandemic was to get 1,793,000 Tons to 2030”
The constant technological advances and the concern for new kinds of energies to replace
oil are pushing the industries into the lithium batteries option. As a sustainable solution, with the
lowest CO2 emissions and the most prolonged performance, this is something to massify electric
cars in the future. Another technologic industry focusing on personal items is consolidated:
watches, cellphones, laptops, cordless tools, even for medical purposes, where the lithium batteries
offer the customers the most extended performance with lighter products.
After exploration studies from different underground lithium´s deposits have been made,
the infrastructure of evaporation ponds covered by the PVC geomembrane is built. The brine is
pumped to the pools to promote fractioned crystallization by the wind and sun action (Berube, D.,
et al., 2007). This evaporation process can take several months to obtain a concentrated brine in
lithium salts, purified and dried in another chemical plant.
The impact of the PVC geomembrane technical specification is enormous, considering the
projects' investment and narrow schedules. Brine leakages in any crystallization step or, in the
Part of the process where engineers, project owners, manufacturers, and constructors need to face
is selecting the proper material to do the job of containing the brine along the evaporation cycle.
But this part is not easy, and every actor in the project will confront some of the above challenges:
The PVC geomembrane performance will be one of the concerns because if it fails, it can
cause an enormous loss of money in the global project expectations. At this point, the project
owner should balance the available resources and the price of the defined geosynthetic system.
PVC geomembrane cost depends strongly on its composition. The density gives an idea of it, and
allows to predict a relationship with the possible performance in field, located in an arid area. This
topic will be analyzed later.
Groundwater brine deposits are a result of a group of geographic events, across time, sharing the
same area: the presence of closed basins, where water could not flow to the ocean or rivers, rocks
The studies carried out in the United States by USGS (Bradley, D., et al, 2013), showed
that climate is between semi-arid and hyper-arid type, being the typical the arid one. In terms of
geography classification, the climate is based on temperatures, wind speed, elevation, which gives
an idea for the UV-Index and precipitation, among others (Christopherson, R., 1994). Based on
Weather Atlas (https://www.weather-atlas.com/en/bolivia/uyuni-climate#temperature,
https://www.weather-atlas.com/de/argentinien/san-salvador-de-jujuy-, https://www.weather-
atlas.com/en/chile/san-pedro-de-atacama-climate#temperature, 2020), and Meteoblue
(https://www.meteoblue.com/es/tiempo/historyclimate/weatherarchive/san-pedro-de-
atacama_chile, https://www.meteoblue.com/es/tiempo/historyclimate/weatherarchive/uyuni_boli
via, https://www.meteoblue.com/es/tiempo/historyclimate/weatherarchive/san_salvador_de_juju
y-uy-argentina, 2020), Table 1 summarizes some characteristics for locations close to the Atacama
“Salares” in Chile, Uyuni in Bolivia, and Jujuy in Argentina:
Table 1. Some climate characteristics for places near three Southamerican “Salares”
Precipitation:
It is very low, especially in the middle of the year. This kind of places normally show higher
evaporation rates than precipitation level. Because of the low level of precipitation in Atacama
Salar, there are no expected failures in the geomembrane. In contrast, situation can be different por
Uyuni and Jujuy Salares.
Wind velocities:
It is quite important to promote water evaporation, but unfortunately, also promotes plasticizer
loss, which represents a risk for the geomembrane's performance. If the plasticizer level decreases
extremely fast because of the high wind speed, the elongation will do the same, and the
geomembrane will fracture easily.
High UV-index:
Depending on the area, it can range from 6 to 12, quite high, which should be relevant to the PVC
geomembrane design to avoid a lack of properties once the geomembrane has been installed and
previous to the filled.
Once the environmental conditions are exposed, it is important to analyze the different behaviors
the PVC geomembrane can show because of the cold arid climate's relevant variables. For better
understanding, it is exposed in three scenarios: when the geomembrane is still in storage -probably
near to the ponds-, then when it is already installed, and finally, when it is ready in service:
In storage:
In order to save installation time and have seams with optimal control of variables -seaming
temperature and pressure, time of contact-, the rolls are normally delivered in big rolls, which can
weigh around 2.5 ton depending on dimensions, being 3000 kg the typical weight. The packaging
of the rolls should protect the external winding turns of UV degradation.
The roll has numerous folds and, therefore, a lot of wrinkles. So, the pressure onto the film
is high, especially in the external inferior winding turns. When the temperature goes up, the film
turns softer and tries to dilate in the transverse direction and contract in the machine direction.
After cooling, the geomembrane should accommodate again, but with minimum internal
tensions in the best condition. At this point the dimensional stability of the geomembrane is quite
important . If the film shrinks a lot, internal tension can occur.
If the temperature decreases at night, the geomembrane's flexibility should allow the
folding and wrinkled areas to keep the film intact without promoting any fracture or any weakness,
particularly in wrinkles (Rowe, K., 2018). The lowest the temperature at night, the highest
performance requirement of the geomembrane. In this first situation, dimensional stability,
Installed:
Once the pool has been covered but is not yet filled, the changes in temperature, the UV energy,
and the winds start to influence the performance of the geomembrane.
A wrinkle-free surface is desirable and even more, after day/night cycles. If all the original
wrinkles present in the big-roll disappear, it is a good starting for the geomembrane (Berube, D.,
et al. 2007). The geomembrane must adapt to the surface in the ideal situation. It is quite important
to obtain good contact with the soil, which helps with the slope's stability (Stark, T., 2018). This
behavior depends on the quality process and its composition. It is optimum for the geomembrane
to act as an elastic rubber: when the film is heated up-with sun light-, it elongates, but when the
tension disappears -at night-, the film recovers the initial length. If the geomembrane can
accommodate its service life will be longer of. Density, elongation, tensile strength, tear strength,
impact resistance at low temperature, and volatile loss are important properties to analyze at this
second stage (FGI 9119, 2019, ASTM D7176, 2018).
Some wrinkles come not only from the folding but from some deviations in the initial
profile in the calendering process. Wrinkles from strong camber are not easy to disappear once the
geomembrane´s temperature increases (https://e2techtextiles.com/performance-benefits-of-
factory-fabricated-geomembrane-liners/R&D, 2020). This is one of the reasons FGI technical
committee decided to enclose the camber as a control property in the last version (FGI
Specification 9119).
Degradation of the PVC membrane is nowadays successfully controlled under the right
composition and process, but it affects the product's cost. If the PVC is not protected enough, the
geomembrane will lose its mechanical properties faster under arid climate, especially mechanical
properties critical at anchorage points and slopes (Stark, T., 2018). The owner of the project
understands this risk very well. So, as soon as possible, the pool is covered with different materials
to protect the membrane surface (Berube, D., et al., 2007). Nevertheless, the PVC geomembrane
manufacturer should warranty a minimum time without relevant changes in the mechanical
properties, so the protection against UV light degradation of the geomembrane is one of the
relevant design parameters. The highest the uncovered time the pool, the highest the protection
against UV degradation.
Another characteristic of the arid climate is wind speed. Table 1 shows that all the three
“Salares” have high wind speeds in common, being a minimum value of 20 km/h. Once the
geomembrane is deployed on to the soil, it reaches the maximum exposed area. The volume of air
delivered by strong air currents promotes a significant risk in the geomembrane: loss of plasticizer.
The quality calender process is relevant to delay this loss, but composition plays a big important
role in keeping the geomembrane's initial properties. So, the formulator should be sure that at the
levels of speed that winds at the “Salares” have, the composition will not change in the time the
geomembrane has not been covered yet. When the PVC geomembrane loses some part of
plasticizer, mechanical properties such as tensile strength, tear, and puncture resistance increase,
but flexibility goes down. This situation can be a big risk when the geomembranes' temperature
goes down because the impact resistance can be reduced, and depending on the temperature,
In service:
After the pool is checked under different methods for leaks detection, -being air channel method
very useful for the efficiency and simple to qualify the seams-, the pool is covered with different
materials and then is filled with the selected brine. The UV degradation is not now a risk, neither
the wind speed. Mechanical properties as tear, tensil, puncture, and hydrostatic resistance,
particularly in seams or near them, will permanently work to have the PVC geomembrane's optimal
performance. The pressure the brine acts onto the watertight system is tremendous because of the
brine density, being a typical value of 1220 kg/m3 (Garcés, I., 2000, estimated).
The geomembrane's chemical resistance is also another issue, but depending on the pond
design, contact is not always direct. Nevertheless, the PVC geomembrane should offer very good
chemical resistance for water, and of course, salt solutions. A low water extraction loss value can
complement a quality index for this stage.
If the geomembrane could successfully pass the previous steps: storage and installing, its
properties will offer a long expectance life superior to 20 years.
As it has been exposed, some properties in the PVC geomembrane have a strong influence on its
performance in arid climates. One of the most relevant is perhaps, the capacity the PVC
geomembrane has to disappear wrinkles from folding and also, to accommodate without tensions
once the cycle warm-cool is presented (Rowe, K., 2018). In a certain way, this capacity can be a
resilience of the geomembrane like an elastomer has. Also, the importance of having flexibility at
low temperatures was exposed to both storage and installation. The plasticized PVC resin gives
this performance, but unfortunately, one of the typical components in the formulation can
negatively influence reaching the behavior mentioned above.
A basic property gives a previous idea of the cost and quality the project owner expects to
receive from the PVC geomembrane: it is the density. FGI Spec, 9119 (effective since September
2019), gives the density a typical value of 1200 kg/m3.
This value comes from the density of components in the PVC film. The PVC resin has a
density of 1400 kg/m3, and plasticizers have densities from 960 to 980 kg/m3. It is known to obtain
flexibility at low temperatures, elongations -with a minimum decrease in tensile and tear forces-,
is necessary to add between 30 to 35 % w/w of plasticizers. Due to the low density of plasticizers,
the compound's density decreases to values around 1220 kg/m3. But density can be superior to this
value, even more than 1300 kg/m3 depending on other raw materials. Some minerals -with
densities higher than PVC resin-, could be present in the film for different reasons. One of them is
to occupy more volume in the final film. Then, the cost of PVC formulation decreases.
Unfortunately, minerals cannot act as an elastic material inside of the PVC resin. The result is that
the geomembrane can partially lose resilience. Some properties can be altered and represent severe
risks for leaks, mainly in the storage and uncovered installation steps in arid climates. PVC
Using a plasticizer average molecular weight of 410 g/mol, minimum in the formulation,
helps to maintain the mechanical properties being the resilience, and impact resistance at low
temperature, perhaps the most relevant to achieve the expected performance in the field. The
highest the molecular weight of the plasticizer, the lowest its volatility, the highest probability to
keep flexibility at typical environmental temperatures in “Salares”, in the day/night cycle.
Another interesting spec introduced in the last version is the control of the lay-flat of the
calender rolls, camber mentioned before. To have a good lay flat is important to avoid wrinkles
along the seams, so suppliers who can comply with this spec will also contribute to having very
flat covered pools for the sky-mining process, wrinkles free.
The general mechanical properties specified in both international specs, ASTM D7176 and
FGI Spec 9119, give reliability for projects owners, installers, and PVC fabricated geomembrane
manufacturers on the historical data that Universities and industries have collected for more than
20 years.
CONCLUSIONS
Using international standards to specify the mining projects is the first step to reducing the human
staff's weaknesses in the mining companies, who extract the lithium from brines and transform it
into lithium carbonate in arid climates.
The FGI Spec 9119 joins a group of relevant properties for the PVC geomembrane, which values
are proven to be enough to comply with the performance lithium project owners need to have for
a good startup of the crystallization mining process for lithium extraction in brines.
Even the geomembrane cost can be high complying FGI Spec 9119; it can be lower than the cost
of any delay at the starting of the evaporation process.
REFERENCES
ABSTRACT
Because the cost of installation and third-party construction quality assurance (CQA) of a
geomembrane for a containment system can be comparable to the cost of the geomembrane itself,
field installation and CQA must be understood and optimized to obtain the most benefit for the
owner and not to slow overall construction. This paper describes a cost comparison
calculator/spreadsheet that can be used to estimate the installation and CQA cost difference
between factory and field fabricated geomembranes. The cost comparison includes the shorter site
time, less field CQA, seaming, sampling, and testing, reduced installation crew expenses, such as,
lodging and per diem, and quicker installation using factory fabricated geomembranes. The cost
comparison for a 0.9 hectare (2.3 acre) pond is presented to illustrate the 65% lower costs
associated with a factory fabricated geomembrane, which also results in a higher quality
installation because most of the seams are completed in the climate controlled and clean factory
setting.
INTRODUCTION
Factory welded seams have been long presumed to be of higher quality, less variability, and higher
predictability than field welded seams due to the controlled and consistent indoor conditions, e.g.,
little dirt and moisture in the seam, no wind or significant ambient temperature changes in the
factory, more rested technicians, and no changes in cloud cover. These factory constants result in
a larger and more constant “welding window” than in the field. For thermally welded seams, higher
quality means factory welded seams exhibit higher and more consistent seam strengths than field
welded seams and less variability.
Stark et al. (2020) show a unique comparison of geomembrane factory and field welded
thermal seams for a large off-stream water reservoir project. The results of this comparison show
that factory welded seams are about 10% stronger than field seams in shear and about 9% stronger
in peel strength at yield. More importantly, these higher strengths resulted in 100% of the factory
welded seams passing the project seam strength requirements (Stark et al., 2020). Conversely,
about 25% of the field welded seams did not pass the specified field seam shear strength
requirement, which caused significant delays, patching, scheduling, and other construction issues.
The use of a factory fabricated geomembrane resulted in improved quality of the completed
geomembrane and protection of the prepared subgrade because a larger area could be covered
quicker to minimize environmental degradation.
The use of factory fabricated geomembranes can reduce the amount of field seams by as
much as 85% over a geomembrane that is completely field fabricated, which reduces installation
The cost comparison includes the shorter site time, less field seaming and testing, reduced
installation crew expenses, such as, lodging and per diem, and quicker installation using factory
fabricated geomembranes. The cost comparison for a 9.3 hectare (23 acre) pond is presented to
illustrate the significantly reduced costs with a factory fabricated geomembrane, which also results
in a higher quality installation because most of the seams are completed in the factory.
Figure 1 presents the opening screen of the cost comparison calculator/spreadsheet, which
estimates the installation costs for a factory fabricated geomembrane. Figure 2 presents the second
worksheet of the cost comparison calculator/spreadsheet, which estimates the installation costs for
a field fabricated geomembrane. Figure 3 presents the third worksheet of the cost comparison
calculator/spreadsheet, which provides a direct comparison of the total installation costs, e.g.,
labor, equipment lodging, per diem, mobilization, etc., for the factory (Figure 1) and field (Figure
2) fabrications and the time required for installation.
• Deployment/shape factor” depends on the geometry of the area to be lined and ranges from
0.75 for a site with only slopes, e.g., a side hill fill, to 1.25 for a site that is all flat with only
a small berm around the perimeter.
• “Panel width” and “Panel length” are specified by the geomembrane fabricator, depending
on the geomembrane type to be used and allowable shipping weight,
• “Length of Tie-in Seam” is the welded connection to the existing geomembrane panel or
geomembrane,
• “Average seam welding speed” is the speed of the primary seam wedge welder in feet per
minute or meters per minute is SI units are used, which can be estimated or assumed based
on prior projects,
• “Hours per day” is the time of work that crews will be on site per day, e.g., 8 hours,
• “Set up time” is the number of days required to set up all of the installation equipment and
crews depending on the length of the project,
• “Extra hours per day” is the time corresponding to the hours worked out of the “Hours per
day” time,
• “Number of details” is the number of pipe penetrations through the geomembrane needed
in the project, which require additional time besides geomembrane installation,
• “Time per detail” is the time needed for each detail in the project,
• “Travel time to site” is determined and entered by the user depending on the crew being
mobilized,
• “Training days pre-start” is the site specific safety training days needed before
geomembrane installation can begin,
• For labor, the number of “Supervisors”, “Quality Control (QC) technicians”, “Welding
technicians”, and “Laborers” are specified, and can be varied for a sensitivity analysis by
the user,
• For tools and equipment, the number of “Trucks”, “Generators”, “Wedge Welders”, “Large
loader”, “Small loader”, and “Other tools & Equipment” are specified, and can be varied
for a sensitivity analysis, by the user, and
• “Hotel rooms/lodging”, “Per diems”, and “Mobilization” depend on the labor specified
above and can be varied for a sensitivity analysis.
Factory Project Total Cost $ 33,514.17 i.e. $ 0.034 per sq. ft.
Field Project Total Cost $ 97,034.91 i.e. $ 0.097 per sq. ft.
• The number of factory fabricated panels and field fabricated rolls is calculated by dividing
the area of the project by the area of the panels and rolls, i.e., roll width multiplied by the
roll length,
• “Feet of basic seam” is obtained by dividing the area of the project by panel and roll width
for factory and field fabricated geomembranes, respectively,
• “Feet of cross seam” is calculated by dividing the “Feet of Basic Seam” by the panel and
roll length for factory and field fabricated geomembranes, respectively,
• The “Total Seam Length” is the sum of the “Feet of Basic Seam” and “Feet of Cross
Seam”,
• “Seaming time” represents the number of days required for seaming assuming standard
Construction Quality Control (CQC) and using two (2) times the actual welding time, i.e.,
dividing by the actual time by 50%, to reflect delays caused by the CQC process for both
factory and field fabricated geomembranes,
• “Deployment time” is the days required to deploy and ballast the geomembrane panels and
rolls for factory and field fabricated geomembranes, respectively,
• “Detail time” is the number of days added to complete the details or pipe penetrations in
the project. This value is obtained by multiplying the number of details by the time that it
takes to complete one (1) detail divided by the hours worked per day,
• “Total days on site” is the summation of the “Set up time”, “Seaming time”, “Deployment
time”, and “Details time”,
• “Days total” for the project is the total number of days on site mentioned above and travel
time to and from the site and number or training days required prior to starting the project,
• “Non-Work days” represent Sundays, holidays, and delays caused by rain or inclement
weather in which work cannot be performed but the installation personnel are still
mobilized,
• Costs for laborers are obtained by the following multiplication of factors:
unit cost per hour * hours per day worked * number of laborers required * total time
needed for the project. This is usually a big cost difference between factory and field
fabricated geomembranes because in the factory setting non-union labor can be used while
in the field union labor is usually required, which results in a higher unit cost per hour. Of
course, if the factory workers are unionized the costs will be similar unless there are
different hourly rates.
• Extra hours cost for laborers consists of the same calculation as shown above but for extra
hour above the normal day for the “cost of laborers” and the unit cost per hour is 50%
higher than normal because it is considered to be overtime.
• Number of hours for each laborer type, i.e., man-hours, is obtained by multiplying:
hours worked per day * total days worked * number of laborers in question.
Figure 3 presents the third worksheet of the cost comparison calculator/spreadsheet that
provides a direct comparison of the total installation costs, e.g., labor, equipment lodging, per
diem, mobilization, etc., for the factory (Figure 1) and field (Figure 2) fabrications. The cost
comparison for a 9.3 hectare (23 acre) pond in Figure 3 shows that geomembrane fabrication and
installation will be 65% less for the factory fabricated geomembrane than the field fabricated
geomembrane, i.e., $97,034 v. $33,513. More importantly, the use factory fabricated
geomembrane panels will result in a 10.4 days fewer days on site, which will accelerate the overall
construction schedule. This will also make the geomembrane installation more modular and more
predictable so the other contractors can better plan and complete their work. It is easy to use this
calculator to quickly conduct parametric cost comparisons by varying different parameters, such
as, number of penetrations/details, installation rate, and different unit costs, for factory and field
geomembrane fabrication.
Figure 4 presents a graphical comparison of the installation costs and time between factory
and field fabricated geomembranes. The bar chart in Figure 4 clearly shows the largest cost is the
Labor Total or the total labor cost. This is due to the longer site time and higher rate usually
required by field personnel versus factory personnel because field personnel are usually unionized.
More importantly, the comparison of the histograms clearly shows the difference in time required
for deployment between factory fabricated geomembrane panels (7 days) and field fabricated rolls
(17.4 days).
Time comparison
Field Factory
Time (days)
Days total 14.4 5.0
Non work days 3.0 2.0
Mobilization
"INSTALLATION ITEM"
Per diem
Hotel rooms
Equipment Total
Figure 4. Comparison of costs and installation time between factory and field fabricated
geomembranes.
A cost comparison calculator is described herein that can be used to quickly assess the significant
cost savings created by factory fabricating geomembrane panels and installing them compared to
field cutting, sizing, and seaming all of the required geomembrane rolls. The calculator is easy to
use so parametric studies using different field installation costs can be quickly performed to assess
the benefit of different labor rates, number of days on site, and equipment. For the hypothetical
9.3 hectare (23 acre) pond used herein, a factory fabricated geomembrane is 65% less than a field
fabricated geomembrane, i.e., $97,034 v. $33,513. More importantly, the use of factory welded
seams are of higher quality, less variability, and higher predictability than field welded seams due
to the controlled and consistent indoor conditions, e.g., little dirt and moisture in the seam, no wind
or significant ambient temperature changes in the factory, more rested technicians, and no changes
in cloud cover. Stark et al. (2020) show that factory welded seams are about 10% stronger than
field seams in shear and about 9% stronger in peel strength at yield.
REFERENCES
Stark, T.D., Hernandez, M.A., and Rohe, D.S. (2020). “Geomembrane Factory and Field Thermally
Welded Seams Comparison,” J. Geotextiles and Geomembranes, Elsevier, 48, 454-467.
1
Inland Tarp & Liner, LLC –1600 N Main St, Fostoria, OH 44830; e-mail: [email protected]
ABSTRACT
Over the past 20 years as hydraulic fracking rules and regulations have become more stringent and
Oil and Gas (O&G) producers more concerned with environmental stewardship. The need for
quality factory-fabricated liners for the above ground storage tank (AST) market has become a
critical part of the fracking infrastructure. As most O&G service companies and producers prefer
not to field-fabricate tank liners, liner design and appropriate materials consideration ensure safe
and compliant installation as well as performance of the products. This technical paper addresses
the historical differences between a “bucket liner” and a flat or “tapered” liner as well as the
considerations of the appropriate liner material and the associated density, and chemical
compatibility issues associated with the AST and fracking (Frac) tanks in general as evolved over
years of collaborative efforts across the industry.
BACKGROUND
For hundreds of years, man has been storing water in tanks, with most early tanks made from clays,
cement, and soils. Around 1850, wood and varying metals such as copper, as seen in Figure 1,
began to be used in oil and gas.
Figure 1. Wooden oil tank near Odessa, Texas. Source Ron MacKenzie
Around the late 1800’s in the United States, and in response to the need for a growing O&G
industry, more modern tanks were made with steel and concrete. Outside of the manufacturing and
construction process, very little has changed with these tanks since. They contain walls, a floor,
and sometimes a cover. While tanks may vary in size, composition and requirements for chemical
compatibility, they are time-consuming installations for often permanent storage needs. To create
temporary storage and minimize the footprint associated with permanent tanks, the O&G industry
came up with Frac tanks and AST’s in the early 2000’s.
Unique to AST tanks is they only have a wall designed into the structure. AST tanks, as
pertaining to the O&G drilling portion of the industry are merely a steel wall, typically around 12’
Figure 2. Typical wall section for AST, photo courtesy Western Tank and Lining
Based on the permanent nature of the tank and liner in this configuration, settling and/or
movement of the liner is not as concerning. However, the most significant risk associated with this
configuration and radial weld is no bridging or voids away from the interior wall and floor
transition thus creating a load point or possible failure issue.
While these liners provide a uniform and clean fit to the tank, the liners must be installed
by qualified technicians as the radial weld, extrusion and subsequent capping patching and testing
are crucial to a quality and compliant installation. This brings us to tapered liners.
A tapered liner is a flat sheet made with staggered liner panels to create a diameter large
enough to fit an AST floor, wall and overlap (Figure 4).
In the above example, a 12’ tall, 200’ diameter tank requires a tapered liner of 232’. This
is 200‘for the floor, 24’ total for the 2 walls and 8‘excess to allow 4’ over the back of the tank all
around.
A typical installation requires the liner to be stretched out on the ground folded back in on
the AST perimeter as the AST walls are installed and secured around it. The liner is then unfolded
back up and over the AST walls allowing the excess material to be draped along the walls vertically
and evenly around the inside of the tank. In most applications clamps are put on the top ring of the
tank to secure the liner and/or the excess material over the tank and secured below the top edge
with straps or a large cable. The most significant advantage of these liners is there is no one single
radial field weld, a potential point of failure, as the liners are factory-welded and folded into one
single piece, significantly reducing risks associated with field fabrication. However, challenges
and careful considerations remain.
During installation of the tapered liner, it is imperative that the wrinkles along the walls
are installed uniformly around the interior of the tank. Also, with a typical AST containing no hard
tank bottom, the tapered tank liner’s integrity is contingent on a properly prepared and compacted
subgrade. With the tapered liner being anchored at the top, any movement of the liner or settling
of the subgrade can lead to failures of the liner at the point of the wall transition to the ground, or
“failure load point” as pictured in Figure 5.
To minimize risk of a failure load point, after the tapered liner is unfolded inside the AST,
1-2’ of water is added to achieve the correct load point before clamping at the top of the tank.
Lessons learned also include the necessity for doing the AST, tapered liner installation, and filling
with intended liquid within a short time span. Empty tanks are susceptible to shifting of the liner
due to wind, thermal expansion and contraction and are rarely ever realigned prior to introduction
of product or fluids, lending to increased risk of liner and project integrity. Fortunately, years of
trial and error have led most producers and installers to enact procedures that have product put in
the tank prior to any clamping or locking of the liner and failures from tension to the liner have
become almost nonexistent.
CONCLUSION
While the AST market has significantly evolved over the last 20 years, it is partnerships between
the O & G producers, tank installers, factory liner fabricators and liner manufacturers working
together that has made the “Frac” containment a safe and environmentally sound market it is
today. By eliminating the need for field fabrication, solving field and weather issues, to
simplifying the design to allow for factory fabricated and tested tapered liners to go in round tanks.
Significant vetting of the chemical compatibility liner needs for the short-term containment and
advent of better LLDPE resins, as well as training installers on proper procedures, the industry has
done an excellent job of providing a safe and sound solution.
ABSTRACT
During planning for a quadrennial plant shut down, a global mining and mineral processing client
was grappling with the significant challenge of managing 15ML (4 million gallons) of process
liquor containing around 1,500 tonnes (1,655 tons) of Nickel at an Australian refinery. The client
recognized unless the process liquor could be stored on site, the mineral laden liquor would need
to be pumped along 7.5km (4.7 miles) of pipework through the community to existing evaporation
ponds. Once co-mingled with the liquor in the evaporation ponds, the liquor would be too
contaminated to process. The client required a storage solution with minimal land usage and no
excavation to meet the state EPA requirements for protection of groundwater, flora and fauna. This
made a very difficult project. This paper discusses the various storage options considered and the
innovative solution adopted using large precast above ground open top tanks incorporating double
lined geomembrane containment systems with integral leak detection.
INTRODUCTION
During planning for a quadrennial plant shut down, a global mining and mineral processing client
was grappling with the significant challenge of managing 15ML (4 million gallons) of process
liquor containing around 1,500 tonnes (1,655 tons) of Nickel at an Australian refinery. The client
recognized unless the process liquor could be stored on site, the mineral laden liquor would need
to be pumped along 7.5km (4.7 miles) of pipework through the community to existing evaporation
ponds. Once co-mingled with the liquor in the evaporation ponds, the liquor would be too
contaminated to process, and the nickel would be lost representing a significant cost to the business
of approximately AUD $3 Million. Additionally, the site had ongoing issues with regard to water
balancing and managing liquor inventories, particularly when principal pipelines and storage
vessels were offline for inspection, maintenance and repairs.
The client’s facility was located in an industrial area with very limited land available for
construction of a suitable storage. Furthermore, groundwater was only 2.1m (7’) below natural
ground level and the area adjoined the local catchment area. The state EPA regulations required a
minimum 2.0m (6’6”) clear zone to minimise potential ground water contamination and the site
was built on a sandy substrate. In addition to these challenges, the area was also home to
endangered bird and rare vegetation species eliminating any possibility of land clearing.
The project timetable was very restricted with feasibility assessment, design, construction and
commissioning all required to be completed within six months to meet the client’s shutdown
commencement date.
Alternative storage options considered included structural steel tank/s, cut and fill earth bank
storage, off site storage, bladders etc. Multiple orthodox structural steel storage tanks would be
necessary to provide sufficient capacity and due to the sandy substrate conditions on site would
require extensive site works to provide adequate foundational requirements. The option would
require significant capital expenditure with considerable engineering and procurement lead times.
It was immediately apparent that a compacted clay lined storage solution was not acceptable as no
suitable clay material was available creating an unacceptable contamination risk and would create
a significant legacy issue at the site. Geosynthetic lined solutions were the only options considered
acceptable. Geomembrane lined earth bank storages have wide acceptance in the industry,
however in this particular application, it was recognised there were a number of notable issues. As
ground water was only 2.1m (7’) below natural ground level and the state EPA regulations required
a minimum 2.0m (6’6”) clear zone, a cut and fill construction method was not an option, requiring
importation of suitable fill material resulting in significant logistical challenges and potential
disruption and vehicle congestion in the local area. It was further noted that to achieve acceptable
bank stability the internal and external batter slopes would take up significant area on a site and
would require land clearing of an area of site that had already been revegetated to restore valuable
habitat that had already been lost. Self supporting geosynthetic storage bladders also had similar
challenges. The number of bladders required to achieve the storage volume was high and the
corresponding lay down area required was substantial.
OPERATING CONDITIONS
The weather for the region can be categorised as Mediterranean hot summer climate with
maximum temperatures exceeding 46oC being recorded and very high solar exposure of up to
29MJ/m2 and associated UV radiation typical of this latitude in Australia (refer Table 1. Regional
Climate Statistics).
After reviewing the design brief, the tank contractor and geomembrane manufacturer developed a
suitable solution using innovative large precast above ground open top tanks incorporating double
lined geomembrane (GMB) containment systems with integral leak detection. The tank
construction uses an engineered modular concrete vertical wall panel, restrained by use of a series
of post tensioned steel cables.
The tank lining system comprises a proprietary polyethylene primary and secondary liners
with a leak detection system. Further risk mitigation was achieved by using a geosynthetic clay
liner (GCL) as a tertiary containment.
The modular tank system chosen has proven very successful in the Australian coal seam gas
industry. One of the key features of this tank design is the significant reduction in earthworks
compared to a construction of a traditional storage pond. The modular storage tanks are installed
on compacted ground unlike in traditional tanks, which require a concrete ring beam. Key benefits
of the design include:
• An engineered wall structure - Reduced risk of failure vs traditional earthen embankment
structures, i.e. No vegetation damage, no animal damage (to embankments and liner), no rat
holing, no risk of embankment fill liquefaction (during seismic events) and no erosion by
rain or wind.
• Modular tank structure can accommodate some level of localised settlement and ground
movement unlike traditional tank designs.
• Triple geosynthetic liner system with leak detection – any breach in the primary GMB liner
would be contained by the secondary GMB liner and any breach of the full GMB lining
system will be contained by the GCL and clearly visible with flow from under the walls, as
opposed to embankment where leaks are undetectable until contaminated groundwater is
detected in a monitoring bore
The design saved a volume of 19,000m3 (24,900yd3) of fill that was required to form the
embankments and reduced the required land area by half. Cost analysis also determined the
geosynthetic cost was for the modular tank system was half that of the earth bank storage option.
Figure 1. Traditional Storage pond onsite Figure 2. Two Modular Storage Tanks.
with above ground embankment.
The ground water table at the site is shallow at 2.1m (7’) depth. A loss of containment
would prove disastrous and likely contaminate the groundwater. The tank design incorporated a
leak detection system, consisting of a primary geomembrane liner, a non-woven geotextile
separation layer and a secondary geomembrane liner incorporating a drainage sump. Any liquid
detected in the secondary liner sump activates a return pump and triggers an alarm in the plant
control room to alert the operator in the event of a leak. The return pump maintains a zero head
pressure on the secondary liner. For additional redundancy a tertiary geosynthetic clay liner (GCL)
was included in the design under the tank liner system. A water filled ballast system was
incorporated into the design to retain geomembrane liner system in position until the tank entered
into service.
While a number of alternate geomembrane material options demonstrate the required resistance to
the process liquor, a combination of factors made geomembrane material selection critically
important. In addition to the required chemical resistance, the primary geomembrane liner material
needed to have excellent resistance to UV radiation, be flexible for ease of installation in a tank
structure, have high puncture resistance, tolerant to folding and wrinkles, and ability to tolerate
elevated ambient and operating temperatures.
A selection process using a decision making and risk assessment matrix was used to
determine suitable materials. The material evaluation included analysis of test results for UV
weathering, oxidation induction time (OIT and HP-OIT), tensile strength and elongation, notched
constant tensile load stress crack resistance, truncated cone testing and axi-symmetric break
resistance strain (multiaxial tensile) tests. It was evident a highly fortified polyolefin was required.
The geomembrane manufacturer’s 1.00mm thick Enviro Liner 6000 geomembrane, a proprietary
polyethylene material was selected as having the best combination of properties to achieve the
required performance. During the development of the geomembrane, considerable long-term
It was decided to use the same geomembrane material for both the primary and secondary
liners to provide installation flexibility, reduce logistical and material handling requirements and
to maximise material utilisation (minimal wastage).
The leak detection system incorporated a geotextile separation layer to provide rapid
transmissivity of any leakage in the primary liner to the leak detection sump. A non-woven
conductive geotextile was selected with appropriate chemical resistance to the process liquor. By
using a conductive geotextile, the primary liner could be spark tested after installation providing
additional quality assurance capability prior to commissioning and hand-over to the client.
The design of the containment system included water filled ballast system to keep the liner system
in position after installation prior to the tank being placed into service. The material selected for
the ballasting system was a thin film polyethylene blown tubing utilising a similar stabilisation
package as used in the primary liner.
OPERATONAL FLEXIBILITY
With a storage solution determined it became apparent to the client that additional operational
flexibility could be realised. While the focus had been on achieving a 15ML storage solution for
the planned shut down it was recognised the tanks would be capable of alleviating other operational
issues at the plant. While the region is classified as Mediterranean hot summer climate, during
winter storms the site has experienced incidents of stormwater flooding. The state regulatory
authority had previously identified storm water management as an issue due to the lack of a facility
to receive stormwater that needed to be addressed. Of particular concern was the risk surface
contamination could escape the site boundary during wet weather events. During normal plant
operation when not required to store process liquor the storage tanks can be converted to storm
water storage, which can be used internally in the plant for refinery water balancing, potentially
saving up the 15ML of municipal supplied water.
During the evaluation stage the client inspected several sites interstate to review similar
installations and undertook detailed structural, integrity and environmental analysis, prior to
making the required submissions to the state environmental and regulatory authorities for approval.
The authorities were sufficiently impressed with the innovative solution that a contingent of 8
regulators made an extraordinary site visit to witness the site during construction to educate
themselves in the understanding of the design and the high level of quality assurance and quality
control measures being adopted on the geomembrane liners. The project also demonstrated to the
authorities the client was making pro-active improvements to their operations with a high degree
of focus on minimising their environmental impact.
Due to the tight timeline and desire to minimise construction time on site, both the primary
and secondary liners were prefabricated into large panels in a factory environment before being
deployed on site in a number of hours. The entire construction period for both tanks, including
civil earthworks, was completed in less than 3 weeks with the tanks tested and commissioned
before the required date and have been in incident free operation since.
ACKNOWLEDGEMENTS
Barry, S.; Avey, P.; Tunney, P.; Ormsby, J.; Jeffries, N.; Concept Environmental Services Pty.
Ltd.
REFERENCES
ABSTRACT
This paper describes a leakage rate calculator/spreadsheet that can be used to estimate and contrast
the leakage for different containment facilities or ponds when using a compacted soil liner,
geomembrane, or composite liner system and the money lost for each scenario given a particular
water cost per volume. This calculator also estimates the leakage if wrinkles are present in the
overlying geomembrane. These wrinkles increase the area over which leakage can occur because
the leakage area is no longer the area of the geomembrane defect. The leakage area is increased
even further if the wrinkles are interconnected across the containment area. The leakage rate with
and without wrinkles is estimated using poor and good intimate contact (Giroud, 2016) and
different types of geomembranes. It is anticipated that this calculator/spreadsheet can be used to
facilitate selection of the containment system and geomembrane type to minimize leakage to the
environment.
INTRODUCTION
Initially containment systems could consist of only a compacted soil liner (CSL) without a
geomembrane. However, early studies by Kirk Brown and his colleagues (Brown and Anderson,
1980; Brown et al., 1983 and 1984) showed that some contaminants caused micro and macro
changes in the CSL that could lead to an increase in hydraulic conductivity and additional
contaminant transport or leakage. This resulted in the U.S. Environmental Protection Agency
(USEPA) requiring a geomembrane to be placed over a CSL so the CSL would only be subjected
to the contaminants at the location of geomembrane defects, if any. The resulting containment
system is termed a composite liner system (CLS) and consists of a geomembrane in intimate
contact with the underlying CSL (RCRA, 1988) so leakage only occurs over the area of the
geomembrane defects. More recently, the required thickness of the CSL can be reduced or the CSL
can be replaced with a geosynthetics clay liner (GCL).
Without a geomembrane the seepage or leakage through a CSL is estimated using Darcy’s
law:
where Q is the seepage or leakage through the CSL in Length (L)3/second, e.g., m3/sec, ALeakage is
the area of leakage, e.g., m2, which is the entire containment area without a geomembrane, kCSL is
the hydraulic conductivity of the CSL in L/second, e.g., m/sec, and i is the hydraulic gradient
GEOMEMBRANE DEFECTS
The requirement of intimate contact is important because Giroud and Bonaparte (1989a) state that:
“All liners leak” so reducing the area of leakage is important. Giroud (2016) revisits the frequency
of GM holes per unit area after providing some guidelines in Giroud and Bonaparte (1989a and b).
For example, Giroud and Touze-Foltz (2003) conclude that: (i) with construction quality assurance
(CQA), the number of holes after installation is 1 to 5 holes per hectare but they are generally
small and (ii) after soil placement above the geomembrane, the number of holes varies from 1 to
20 per hectare but these holes can be large. The area of the defects with good CQA range from 1
to 10 mm2 and is important because the area of defects is used to calculate the leakage rate in
Equation (2). If the defect occurs during soil placement, the area of the GM defects is much greater
than 1 to 10 mm2.
Giroud (2016) concludes that even with good CQA, 5 to 6 holes per hectare are typical
after GM installation with good CQA. With limited CQA, i.e., limited to an engineer spot-checking
the work performed by the geomembrane installer, a frequency of 25 holes per hectare or more is
possible. Giroud (2016) presents the following equation for calculating the rate of leakage through
a GM hole with an area (adefect) in a composite liner system:
hw−GM 0.1
0.95
where:
Q = seepage or leakage through one (1) geomembrane defect with an area a, e.g., m3/sec,
adefect = area of GM defect, e.g., m2,
tCSL = thickness of the CSL, e.g., m,
hw-GM = hydraulic head on GM, e.g., m, and Subpart D regulation limit is 0.3 m, and
kCSL = hydraulic conductivity of CSL, e.g., m/sec.
Equation (2) is used in the calculator to estimate the leakage through a composite liner
system with a GM defect. The area of the GM defect can refer to one defect or the total number of
defects times the typical area of the defects. For example, if there are ten (10) GM defects with an
area of 10 mm2 each, the total defect area is 100 mm2 (10*10 mm2) or 0.1 m2. Just a GM can be
simulated in the calculator by assigning a high value of hydraulic conductivity to the underlying
CSL, e.g., kCSL = 1x10-1 m/second, so flow can occur quickly through the GM defect.
Field observations (see Figure 1) and prior studies (e.g., Giroud and Peggs 1990; Koerner et al.
1999) show that unreinforced high density polyethylene (HDPE) GMs are prone to significant
thermally-induced wrinkles due to the high coefficient of thermal expansion and bending
modulus of the GM.
Figure 1. Aerial photo showing connected wrinkles at Queens University Test Site
(photo from Rowe, 2012).
Rowe (2012) presents the following equation to predict the amount of leakage through a hole in a
GM coincident with (or adjacent to) a wrinkle using the variables shown in Figure 2:
h
QWrinkle LWrinkle 2* b * kCSL + 2* ( kCSL * tCSL *θ ) * d
0.5
= (3)
tCSL
where:
QWrinkle = seepage or leakage through one (1) GM defect coincident with a wrinkle, e.g., m3/sec,
LWrinkle = length of the connected wrinkle, e.g., m,
bWrinkle = one-half (1/2) the wrinkle width (see Fig. 2), e.g., m,
= transmissivity or flow between GM and CSL/GCL, e.g., m2/sec,
tCSL = thickness of the CSL, e.g., m,
hd = head loss across composite liner system (see Fig. 2 where hd = (hw + HL + HA –ha)),
e.g., m, and
kCSL = hydraulic conductivity of CSL, e.g., m/sec.
In Equation (3), the quantity 2 x bWrinkle is the width of the wrinkle (see Figure 2), which is
the dimension that is typically measured in the field. The other important parameter for estimating
the leakage with a GM wrinkle is the transmissivity or flow between the GM and underlying CSL
or GCL (). Rowe (1998) provides the following guidelines for selecting the value of
transmissivity when GM wrinkles are present:
• Good intimate contact between the GM and CSL with as few wrinkles as possible and a
smooth subgrade surface, = 1.6x10-8 m2/second and
• Poor intimate contact between the GM and CSL with a number of wrinkles and a rough
subgrade surface, = 1.0x10-7 m2/second.
Equation (3) is used in the calculator to estimate the leakage through a composite liner
system with a wrinkle coincident or adjacent to the GM defect. A typical wrinkle width and length
is included in the calculator for four different unreinforced GMs, which are defined below. The
calculator is being expanded to include reinforced GMs that exhibit much greater dimensional
stability and smaller winkles than unreinforced GMs. The calculator can be used to show that the
presence of a wrinkle results in 100 to 1,000 times more leakage than for just a GM defect with
the GM being in intimate contact with a CSL or GCL. The greater leakage rates calculated with a
coincident wrinkle are in better agreement with field measured leakage through composite liner
systems (Rowe, 2012), which confirms the importance of reducing wrinkles and complying with
RCRA (1988) requirement of the geomembrane being in intimate contact with the CSL or GCL.
LEAKAGE CALCULATOR
This section describes the calculator/spreadsheet that can be used to estimate the leakage rate and
money loss by leakage from a pond when it is lined with a CSL, GM, and/or a single composite
*Compacted soil hydraulic conductivty is 1x10-7 cm/sec based on Subtitles D and C landfill requirements
**Geomembrane hydraulic conductivty ranges from 1x10-10 to 1x10-14 cm/sec for typical products based on vapor transmission testing
Figure 3. Step One input parameters for the GM leakage calculator for a CSL, GM,
and a composite liner system.
Figure 4 presents Step Two (2) of the GM leakage calculator, which involves entering the
hydraulic conductivity and thickness of the CSL and GM. In addition, the number of GM defects
and level of intimate contact with the CSL anticipated for the GM are entered depending on the
level of CQA. In this section, typical wrinkle dimensions are included for unreinforced High
Density Polyethylene (HDPE), Linear Low Density Polyethylene (LLDPE), Polyvinyl Chloride
(PVC), and flexible polypropylene (fPP) but these values can be changed by the user. In this
section the head loss anticipated across the CSL is entered along with the transmissivity between
the GM and the underlying CSL or GCL (). Using this information, the calculator estimates the
leakage for a CSL, GM without defects, GM with defects, the four (4) unreinforced GMs with
defects and wrinkles, and a composite liner system.
Figure 4. Step Two input parameters and the calculated values of leakage for a CSL,
GM, and a composite liner system.
In particular, Step Two (2) has three major subdivisions that group the parameters to
characterize pond geometry and various properties of the CSL and GM (see Figure 4):
Figure 5 presents Step Three (3) of the GM leakage calculator, which involves calculating
the values of leakage rates for a CSL and GM in cm3/second and gallons/day (not pictured) for
different pond depths with a sideslope of 3H:1V. Figure 6 presents the final step of the calculator,
Step Four (4), in which the leakage rate and the money lost for both CSL and GM based liner
systems are tabulated for an easy comparison and plotting.
Figure 7 presents a graph of pond volume in cubic meters versus total leakage in cm3/sec
for a CSL and GM. This plot shows that even with considering defects in the GM, the leakage is
significantly less than that of just a CSL because of the large seepage area. In fact, the leakage
with just a GM is so low that the trend line plots at essentially zero (0).
Figure 7. Plot of pond volume versus total leakage with 3H:1V sideslopes for a CSL
and GM.
SUMMARY
A leakage calculator is described herein that can be used to quickly estimate the leakage rates for
a CSL, GM, and composite liner system. The calculator uses Darcy’s Law to calculate the leakage
rate for a CSL, which results in the highest leakage because the entire area of the containment
facility that is exposed to liquid is used in the calculation. The leakage equation from Giroud
(2018) is used to estimate leakage through a geomembrane with defects and good and poor contact
with the underlying subgrade. Geomembrane wrinkles are considered in the leakage rate
calculation via the equation by Rowe (2012) and typical wrinkle dimensions for unreinforced
geomembranes that are included in the calculator based on field observations. The results for a
hypothetical pond show that even with defects and wrinkles, the geomembrane lined pond still
yields significantly lower leakage than a CSL lined pond.
REFERENCES
Brown, K.W. and Anderson, D.C. (1980). "Effect of Organic Chemicals on Clay Liner
Permeability: A Review of Literature. In Disposal of Hazardous Waste," Proceedings of Sixth
Annual Research Symposium, EPA - 60019 -80 -010, Chicago, Illinois, March 17 - 20.
Brown, K.W., Green, J., and Thomas, J. (1983). "The Influence of Selected Organic Liquids on
the Permeability of Clay Liners. Land Disposal of Hazardous Waste," Proceedings of Ninth
Annual Research Symposium, EPA - 60019 - 83 - 018, Ft. Mitchell, Kentucky, May 2 - 4.
Brown, K.W., Thomas, J.C., and Green, J.W. (1984). "Permeability of Compacted Soils to
Solvents Mixtures and Petroleum Products In Land Disposal of Hazardous Waste," Proceedings
of the Tenth Annual Research Symposium, EPA - 60019 - 84 - 007, Ft. Mitchell, Kentucky, April
3 - 5.
Giroud, J.P. (2016) Leakage Control Using Geomembrane Liners. Geosynthetics International,
5th Victor de Mello Lecture, J. Soils and Rocks, Brazilian Society for Soil Mechanics and
Geotechnical Engineering, 39(3): 213-235.
http://victorfbdemello.com.br/arquivos/Lectures/Giroud-de-Mello-Lecture-Paper.pdf
Giroud, J.P. and Bonaparte, R. (1989a) Leakage through liners constructed with geomembranes,
Part I: Geomembrane liners. Geotextiles and Geomembranes Journal, 8(1):27-67.
Giroud, J.P. and Peggs, I.D. (1990). Geomembrane construction quality assurance. In Waste
containment systems: construction, regulation and performance. Geotechnical Special
Publication No. 26. Edited by R. Bonaparte. American Society of Civil Engineers, New York.
pp. 190–225.
Koerner, G.R., Eith, A.W., and Tanese, M. (1999). Properties of exhumed HDPE fieldwaves.
Geotextiles and Geomembranes, 17(4): 247–261. doi:10.1016/S0266-1144(98)00024-7.
Resource Conservation and Recovery Act (RCRA), (1988). Code of Federal Regulations (CFR)
parts 239 through 282, CHAPTER 4 SUBPART D DESIGN CRITERIA
https://archive.epa.gov/epawaste/nonhaz/municipal/web/pdf/subpartd.pdf
Rowe, R.K. (1998). Geosynthetics and the minimization of contaminant migration through
barrier systems beneath solid waste. In Proceedings of the 6th International Conference on
Geosynthetics, Atlanta, Ga., 25–29 March 1998. Edited by R.K. Rowe. Industrial Fabrics
Association International, St. Paul, Minn. Vol. 1, pp. 27–103.
Rowe, R.K. (2012) Short- and long-term leakage through composite liners. The 7th Arthur
Casagrande Lecture. Canadian Geotechnical Journal, 49:141-169.
ABSTRACT
Maerkle Reservoir is the primary potable water storage reservoir for the City of Carlsbad and
provides 10-day operational storage. Carlsbad Municipal Water District (CMWD) is a subsidiary
of the City of Carlsbad. Maerkle reservoir was originally constructed in the early 1960s as an
earthen, open-air reservoir. In 2019, CMWD decided to replace the existing floating cover and
incorporate industry advancements. The 20-year old floating cover was at the end of its useful
material life.
CMWD retained Hilts Consulting Group to provide engineering design services, and
Raven Engineered Films / Raven CLI Construction for installation services of the Maerkle
geomembrane floating cover. Jobsite challenges included an expedited installation schedule while
still providing a high-quality, cost-effective solution. The short installation schedule was
addressed through the effective use of large factory fabricated panels to increase quality and save
time and costs. The unique reservoir geometry with varying slopes provided some design
challenges. The design work had to be completed while the reservoir was in-service without the
benefit of knowing the reservoir geometry below water level. The reservoir geometry was later
verified during construction and the initial design adjusted to actual site conditions.
This project was highly challenging to bring in on time and within budget. Still, through
massive teamwork and creative thinking, the collective team overcame obstacles to successful
completion. Ultimately CMWD received a high-quality advanced floating cover system to meet
their budget and effectively protect one of our most precious resources; clean drinking water.
INTRODUCTION
Carlsbad Municipal Water District (CMWD) is a subsidiary to the City of Carlsbad, California.
CMWD purchases potable water through the San Diego County Water Authority (SDCWA) via
four metered connections. Water is imported from the Colorado River via the Metropolitan Water
District of Southern California. Maerkle Reservoir is the primary water storage reservoir for the
City of Carlsbad and provides 10-day operational storage. The capacity is approximately 741
million liters (196 million gallons), with a 69,000 square meters (17-acre) horizontal surface and
18.3-meter (60-foot) maximum water depth. Additional onsite storage is available from an
adjacent 38 million liter (10 million gallon) buried concrete tank.
Maerkle Reservoir was originally constructed in the early 1960s as a potable water open-
air reservoir with earthen side slopes and floor and meandering shorelines. The reservoir was
PROJECT DESCRIPTION
The Maerkle Reservoir is formed by an earthen dam on the south end and graded earthen side
slopes on the other reservoir sides. Maerkle Reservoir has a potable water storage capacity of
approximately 741 million liters (196 million gallons) with a horizontal surface area defined by
the top of slope across 69,000 square meters (17 acres). The reservoir shape is unique, with eight
straight tangent sections and eight curves. The interior earthen side slopes vary throughout the
reservoir ranging from 2½: 1 to 4½: 1. The reservoir interior is over 19.2 meter (63 feet) high with
a maximum water depth of 18.3 meter (60 feet), the reservoir floor slopes with a 3 meter (10-foot)
height differential. The top of the slope is defined with a cast-in-place concrete ringwall and an
asphalt paved perimeter road. Site drainage is provided by catch basins and storm drainpipes
located on the reservoir east and west sides.
The reservoir has a single 107 centimeter (42 inch) buried inlet pipe, which terminates in
the reservoir floor with an upturned pipe located in a cast-in-place concrete inlet structure covered
with a stainless steel grillage cage. The reservoir outlet consists of a single 76 centimeter (30 inch)
buried pipeline with three cast-in-place concrete outlet structures covered with stainless steel
grillage cages and located along the reservoir interior slope. Within each concrete outlet structure,
there is a 76 centimeter (30-inch) valve to control outlet flows and regulate the depth of water
introduced into the water distribution system. A cast-in-place concrete overflow structure is
located near the top of the slope discharges into a concrete channel. The overflow structure
opening is covered with a stainless steel grillage cage.
The reservoir normal operating ranges vary between 7.3 meter to 11.3 meter (24 feet to 37
feet) in water depth. During winter outages for water system maintenance periods, the reservoir
will operate at a maximum water depth of 17.7 meter to 18.3 meter (58 feet to 60 feet).
DESIGN
Rainwater Removal. The floating cover rainwater removal system was scoped and sized based
on two storm-level designs. The first design was based on pumping capacity to remove a 10-year
storm, a 24-hour duration 48 hours after the start of the storm. The second design was based on a
25-year storm, a 24-hour duration 72 hours after the start of the storm. Pump redundancy was
provided by assuming that one pump may be out of service at any given time. A total of four 5-
horsepower submersible pumps were provided. The submersible pumps are located in perforated
Remote Water Quality Sampling. Previous practice for CMWD personnel to obtain water quality
samples involved walking on the floating cover and manually obtaining water samples through
floating cover access hatches. The new floating cover system provides updated remote water
quality sampling directly through sampling pumps incorporated at identified hatch locations with
flexible tubing installed from the sampling pump to a sample station port located at the top of the
slope. Water quality samples can now be conveniently obtained by site personnel at the reservoir
perimeter road without entering onto the floating cover.
Outlet Valves & HPU replacement. The older existing pneumatic actuated outlet valves were
replaced with new hydraulic operated butterfly valves with submersible actuators. The hydraulic
system utilizes food-grade oil to operate the valve actuators. The valve actuators are controlled by
a hydraulic power unit located at the top of slope. Stainless steel hydraulic tubing was installed,
and the system is pressurized.
Electrical Modifications. The electrical modifications included upgrading the reservoir area
electrical system capacity and infrastructure to power the new advanced floating cover rainwater
removal pumps. The new pump size was significantly increased in scale, horsepower, and pump
capacity from the previous floating cover pumps. The older 120/240 volt transformer/panel was
replaced with a new 480 volt, 3-phase electrical distribution system.
Storm Drain Laterals. Four new buried PVC pipe laterals were installed in the reservoir perimeter
road to accommodate the rainwater removal pump discharge at the top of the slope perimeter
ringwall, and rainwater was conveyed to existing storm drainpipes.
Future Mixer Provisions. Updated provisions were incorporated in the floating cover access
hatches, and electrical modifications were made to accommodate up to six submersible electrical
mixers. This update was done to allow for future water quality enhancements by reducing stagnant
zones and creating a more uniform distribution of disinfectant throughout the water.
CONSTRUCTION
Material Procurement. With a project of this magnitude, procuring the critical path items in a
timely manner was crucial to the construction project's success. The CSPE floating cover material
and outlet valve components were the largest obstacles to overcome for the Maerkle floating cover
construction — it took a highly-collaborative effort to ensure items were submitted, approved, and
ordered within the milestone dates of the project. The complex floating cover design required the
use of advanced accessories and hardware with extended delivery dates, Hilts Consulting Group
worked closely with Raven to ensure the team maintained on top of the procurement process and
that items were reviewed weekly with the Maerkle team and tracked closely through completion
to align with the delivery and installation dates of the cover material.
Fabrication. Fabrication played a vital role in this project for several reasons. The CSPE material
chosen for this project is manufactured in rolls that are 155 centimeters (61 inches) wide. By
Installation. As the General Contractor of this project, the installation contractor regularly
coordinated with all of the project subcontractors to ensure a smooth installation of work to be
done. Starting with the interior fence removal for better site access to allow for demo of the
existing floating cover. The installation contractor then coordinated with their subcontractors to
remove existing asphalt for new storm drain connections and new electrical trenches for the
upgraded electrical system (see figure 4). The installation contractor began deploying the chafer
(see figure 3) after the electrical trenches were backfilled and followed the electricians around the
reservoir, working together to keep production levels high. Upon completion of the chafer,
deployment of the actual floating cover prefabricated panels began (see figure 5). Both the chafer
and the floating cover panel deployments went very smoothly due to the cost-effective use of the
large prefabricated factory panels provided by the fabrication team (see figure 6). Finally, the
floating cover system was closed up; however, it needed to be cut open again to reinstall the valves
and actuators due to delays of the advanced valves and actuators. Upon the final closing of the
floating cover, the interior fence was reinstalled around the reservoir, and the electrical and storm
drain trenches were all tested for compaction, and new asphalt was placed as applicable (see figure
10).
Outlet Valves & HPU. Although the outlet valves and hydraulic power unit (HPU) were
fabricated and managed domestically, the actuators needed for the project were manufactured in
Italy, posing some coordination and timing issues for the project completion. Due to the timing,
being faced with seemingly unreachable goals for overseas shipments, the installation contractor
and the Maerkle construction team had to perform many workarounds to accommodate the timing
issues and keep the project moving forward. However, with the assistance of subcontractors
Rotork and Henry Pratt, the General Contractor was able to get all the valves, actuators, and HPU
to site and installed meeting a firm Division Safety of Dams (DSOD) inspection date. With only
a few minor issues during the installation process, the system worked flawlessly during the initial
start-up and was an excellent addition to the upgraded Maerkle Reservoir project.
Construction Start-up. The reservoir disinfection and fill phase started in late January 2020. The
reservoir was disinfected following American Water Works Association (AWWA) Standard
C652, Method 3, which consisted of filling the reservoir to 5% of reservoir volume with potable
water and an available chlorine concentration of not less than 50 ppm. A target 60 ppm chlorine
residual was established for the initial fill. A licensed specialty contractor was used to perform
reservoir start-up disinfection by injecting a liquid chlorine solution into the reservoir inlet pipe at
a rate dependent on the solution chlorine concentration, reservoir water inflow rate, and desired
target chlorine residual. The reservoir water chlorine concentration was monitored every couple
of hours at various access hatches located in the floating cover. The water/chorine fill proceeded
continuously at a reduced flow rate for approximately 30 hours until it obtained the 5% reservoir
LESSONS LEARNED
Floating cover designs are typically performed while a reservoir is in service. Accurate as-built
drawings and underwater dive inspection photos and videos are essential to document and verify
actual existing conditions. Best practices show, and not unique to this project, the information
shown on as-built drawings may not always be accurate as a single resource. Existing conditions
should always be documented and reviewed by the design engineer once the reservoir is dewatered
and existing floating cover is removed. Any unforeseen conditions revealed should be addressed
early in the construction phase to avoid potential project delays.
Long-lead components must be identified early and adequately addressed as soon as
possible. On this project specifically, the CSPE geomembrane stock material for the chafer and
floating cover, along with the outlet valves, actuators, and hydraulic power unit, were all identified
as long-lead items. The CSPE manufacturing supply chain for large quantities of geomembrane
roll stock materials, which are then used by the fabricator to produce large custom shaped factory
panels, require highly coordinated schedules and upfront time to facilitate. This process guarantees
the project-specific sized panels deliver to the job site within the project timeline to be installed.
The valve actuators were manufactured in Italy, the valves manufactured in Chicago, Illinois, and
HPU manufactured in Rochester, New York. All three components were assembled, and shop
tested in Chicago before being sent to the reservoir site in Carlsbad, California.
During this project, lessons learned included the sheer-importance of preparation through
the coordination of shop drawing submittals, fabrication schedules, different contracting entities,
and subcontractors, which all proved to be essential components of success. All of these
components should be aggressively pursued right at the project onset.
Figure 5. Floating cover panel seaming Figure 6. Floating cover fabricated panel
progress. deployment progress.
Figure 7. Positioning of the floating cover Figure 8. Floating cover and rainwater
and wrinkle removal. collection trough progress.
Figure 10. Aerial view of completed floating cover system with high aesthetic
value.
ABSTRACT
Electrical leak Location (ELL) methods are the most technologically advanced way to control
leakage from containment facilities. The method used for locating the most significant damage,
caused during cover material placement, is the dipole method. Measurement density and dipole
spacing both have an effect on the sensitivity of the dipole method, with a higher measurement
density and a larger dipole resulting in a more sensitive ELL survey. In order to quantify the
benefit of an increase in measurement density and a larger dipole, field trials were conducted by
the Author. A three-meter (ten-foot) dipole and a one-meter (three-foot) dipole, both commonly
used instruments for dipole testing, were used to measure electrical signal strength at two
different offsets from a simulated leak as outlined by both ASTM D7007-16 and ASTM D8265-
20. The results of the measurements are presented in order to quantify the benefit of using a
measurement density of 1.5 m (5’) by 1.5 m (5’) rather than 3 m (10’) by 3m (10’) and by using
a 3-meter (10-foot) dipole rather than a one-meter (three-foot) dipole. The results also reveal a
fundamental flaw in the standard D7007-16 in specifying measurement density without
addressing dipole spacing and in using signal strength to define a leak detection distance. The
testing details investigated herein can be used to improve existing standard methodologies and to
craft project specifications that maximize both the sensitivity and efficiency of ELL surveys with
the end result of locating more leaks more efficiently.
INTRODUCTION
Many variations of the dipole method are practiced, so engineers lean on standardized
methodologies in order to ensure a properly applied test. However, there is much room for
variability within the standardized methodologies. Significant factors in method sensitivity such
as measurement density and dipole spacing are not adequately addressed in either of the
standardized practices where the dipole method is used (ASTM D7007-16 and ASTM D8265-
20). For that reason, the goal of this paper is to quantify the benefit of an increase in
measurement density, reported to be beneficial by ASTM D7007-16 and an increase in dipole
spacing, reported to be beneficial by Gilson and Ferreira (2020) and Lugli and Mahler (2016).
ASTM D7007-16 was the first standardized practice for the dipole method. The
procedures require the application of measurements in a grid pattern at some spacing, referred to
as the measurement density. The determination of the measurement density is controlled by the
“leak detection distance”. To determine the “leak detection distance”, data are acquired along a
transect at some offset from an actual or artificial leak. The magnitude of the signal generated by
the leak is divided by the “background noise” of the survey area to obtain an “R” value.
“Background noise” was defined as the magnitude of voltage oscillations without a leak nearby.
The offset distance from the actual or artificial leak when the R value is equal to 3.0 is
considered to be the “leak detection distance”. The “R” value has previously been questioned for
its scientific validity (Gilson-Beck and Ferreira, 2017). At the time ASTM D7007-16 was
The physics of a leak signal propagating through soil material, how that signal is measured by a
dipole method testing apparatus, and how dipole method voltage mapping is used in leak
location surveys are described here in order to provide the fundamental background for
understanding the results obtained by this study.
Dipole Method. The definition of the dipole method is the measurement of voltage across a
surface using two closely spaced electrodes. The spacing of the electrodes is kept constant as the
dipole travels across the surface. Therefore, the dipole is actually measuring the voltage gradient
as opposed to absolute voltage potential. When approaching this bull’s eye-shaped dip in the
voltage field, and when measuring from front electrode to rear electrode, a drop in the voltage
value will be measured, with the peak occurring when the front electrode is nearest the leak. The
Dipole Method Voltage Mapping. A voltage map generated by the dipole method will look
different than an isopotential voltage map (used to portray plan view leak signals in Figures 1-3).
On a dipole method voltage map, the dip followed by a peak can be seen in two dimensions by a
butterfly-like signature, as shown in Figure 4. Leak signatures feature a positive circular peak
stacked directly on top of a negative peak, with closely spaced contour lines between the two
peaks. The colors on the map represent voltage values in order to easily recognize a shift from
positive to negative values. Negative values are represented by red changing to blue with
increasing magnitude and positive values are represented by green changing to yellow with
increasing magnitude. The negative/positive polarity of the entire survey area is created by the
current injector electrode. The characteristic leak signal voltage pattern is opposite that of the
current injector electrode, since current is exiting the survey area at current leakage locations and
entering the survey area at the current injector location.
Perimeter Isolation Issue
Current
Injector
Electrode
Location
Leak #2
Leak #1
A DC voltage was introduced between two electrodes. The applied voltage value was adjusted in
order to keep the dipole voltage meter from maxing out when the dipole was placed directly on
the electrode used to simulate the leak signal. The same applied voltage was used for all trials.
Materials and Methods. A circular stainless steel electrode was inserted into a soil layer to
simulate the signal generated by a leak. A stationary physical grid was laid out up to a distance
of 7.6 meters from the electrode. Each dipole apparatus was spaced along the measurement lines
so that each dipole would straddle the electrode at the closest measurement point to the electrode
at the specified offset. A three meter dipole and a one meter dipole were used, each one using the
same copper sulfate reference electrodes and voltage meter for measurements. For each dipole
and offset, multiple readings were taken along the transect and the values were averaged to
produce the values published here. For each dipole spacing, measurement densities of 1.5 x 1.5
meters and 3 x 3 meters were simulated using a 0.75 meter and 1.5 meter offset, respectively.
One additional trial was done simulating a 1 x 1 meter measurement density using a one meter
dipole.
RESULTS
Results are displayed both graphically and along transects that would be displayed as part of a
dipole method voltage map with the same color coding method of voltage values used for Figure
4. The scales of the graphs for each measurement density are kept the same for comparison. The
zero voltage line is shown in bold to show when the voltage values change from negative to
positive, a key indicator of detectability. Values under the zero line correspond with the
red/blue/black regions of the adjacent map and values above the zero line correspond with the
green/yellow/white regions of the adjacent map. The contour interval for all of the color coded
voltage maps is 0.005. The graphs more readily depict the signal strength (vertical distance
between peaks in the voltage values), while the voltage maps more readily depict the leak
detection distance. For the voltage maps, the leak is detectable as soon as a negative value is
measured as the dipole approaches the leak (initially shown by red). The distance from the
simulated leak to this color shift on the map is defined here as the “leak detection distance”. The
dipole direction of travel is from bottom to top. The Y-axis of the voltage maps represent meters,
with increasing Y-values representing distance from beginning of transect. The leak is located
approximately at a Y-value of 7.6. The location of the leak is not exactly shown by the mapping,
because when the dipole is straddling the leak it can be either slightly positive or slightly
negative, since it is highly improbable to land exactly on a value of zero.
It is common for leak signals in the field to be lopsided, usually caused by the location of
the current injector relative to the leak, since a stronger current density will be present on the side
of the leak closest to the current injector. The data presented here shows that the leak is slightly
more detectable in the “fore” rather than the “aft” side of the simulated leak. This tendency
should not be viewed as testing error, but as a typical feature of field measurements.
The testing results presented in Figures 5 through 9 are also summarized in Table 1. A
leak detection distance of greater than 7.6 meters means that the distance exceeded the limit of
the testing area. The signal magnitude is the voltage differential, from peak to peak.
In order to quantify the benefit of a larger dipole spacing, trials 1-4 were analyzed. For a three
meter by three meter measurement density, the three meter dipole increased the signal strength
by 315% when compared to the signal measured by the one meter dipole. For a 1.5 meter by 1.5
meter measurement density, the three meter dipole increased the signal strength by 176% when
compared to the signal measured by the one meter dipole. However, this does not capture the
most important aspect of the testing, which is the leak detection distance. The only trial of the
one meter dipole that approached the leak detection distance of the three meter dipole was the
one meter by one meter measurement density (Trial 5). It is interesting to compare the one meter
dipole at a one by one meter measurement density to the three meter dipole at a 3 meter by 3
meter density (Figure 9). The signal strengths are about the same, but the leak detection distance
of the three meter dipole is larger, as determined by the Y-axis value on the far left side of the
graphs.
Since the leak detection distance of the 3 meter dipole exceeded the testing area in every
case, the benefit of increasing the measurement density can best be quantified by analyzing the
one meter dipole trials. Increasing the measurement density of a one meter dipole from 3 meters
by 3 meters to 1.5 meters by 1.5 meters, which quadruples the number of data points required,
only increased the leak detection distance by 11%, even though the signal strength increased by
337%. In fact, with the larger offset, the peak to peak signal distance is larger. Lugli and Mahler
argue that the peak to peak distance should determine the maximum offset between survey
transects (i.e. measurement density). Even though an exact measurement for leak detection
distance for the three meter dipole trials was not obtained, a comparison can be made by looking
at the voltage value on the left side of the 3 meter dipole graphs at the same location along the
transect. The increase in measurement density with the three meter dipole actually resulted in a
faster attenuation of the signal, from a value of approximately -0.03 to -0.02 at the same location
along the transect. This shows that there is no significant increase of leak detection distance with
an increase in measurement density. In addition, these results show that it is inappropriate to
determine a measurement density by using the signal strength along an offset distance, as
prescribed by ASTM D7007-16.
Measurement density has been argued as a method of increasing sensitivity by
practitioners of D7007-16, however those practitioners generally use one meter dipoles. There is
certainly an increase in sensitivity when a one meter dipole changes from any measurement
density other than one meter by one meter, which is the maximum prescribed by ASTM D7007-
16. Practitioners using a three meter dipole have long been resistant to this claim, since excellent
sensitivity is always achieved with a three meter dipole as long as site conditions are good. In
fact, the Author has tested many problematic sites with a three meter dipole where the
measurement density was increased in order to increase sensitivity and this method has only
ended up costing owners more time and resources while not solving the problem (i.e. locating the
hole(s)). It is also telling that ASTM D7007-16 prescribes a measurement density for water-
covered areas of 0.4 meters by 0.4 meters when the artificial leak is not detectable (using 0.2-1 m
dipole) and for soil-covered areas a measurement density of 1.0 meters by 1.0 meters when the
artificial leak is not detectable (using a 0.5 – 3 m dipole). The tighter measurement density was
likely prescribed for water-covered areas because the typical dipole testing apparatus was
smaller, resulting in a smaller leak detection distance.
It is clear from the results that a larger dipole spacing enhances the leak signal and increases the
leak detection distance. A one meter dipole, even when applying the maximum measurement
density prescribed by ASTM D7007-16, cannot achieve the level of sensitivity of a three meter
dipole at a three meter by three meter density. On a practical level, this means that surveying
with a one meter dipole at this measurement density will take nine times as many measurements
as the three meter dipole to get close to the same level of leak detection sensitivity. Nine times as
many measurements results in a survey that takes nine times longer.
Part of the dysfunctionality of ASTM D7007-16 is that an ELL practitioner assumes a
specific measurement density as part of the bidding and proposal stage of a project. A lump sum
cost is given for that measurement density. If the measurement density must increase after the
project is awarded, then a change order would have to be issued, which is not always allowed. In
addition to the additional cost, the survey would take additional time. Construction schedules are
very tight and every day is accounted for. A one day survey turning into nine days of surveying
would be problematic for most projects. From a practical perspective, project specifications
should therefore specify a three-meter dipole to get the best price for the least amount of survey
time.
It may not be within the purview of a standardized methodology to specify dipole
spacing, since there are some physical and technical constraints for this larger structure. For
example, the dipole method is sometimes used in physically restrictive areas where a larger
dipole would not physically fit. However, the methodologies can certainly specify that the
measurement density should be determined by the dipole spacing, since this is the technically
correct approach for maximizing the leak detection distance for a given dipole instrument.
Specifying a measurement density with a grid spacing less than the dipole spacing will
not likely result in a higher quality survey, but will result in a more costly survey. Therefore,
project specifications will get the biggest benefit, both from a technical perspective and
economic perspective, by simply specifying a minimum dipole spacing of three meters wherever
appropriate.
REFERENCES
ASTM D 7007-16. Standard Practices for Electrical Methods for Locating Leaks in
Geomembranes Covered with Water or Earthen Materials, ASTM International, West
Conshohocken, Pennsylvania, USA.
ASTM D 8265-20. Standard Practices for Electrical Methods for Mapping Leaks in Installed
Geomembranes, ASTM International, West Conshohocken, Pennsylvania, USA.
Gilson, A. and Ferreira, J. (2020). New Standard Practice for Electrical Leak Location of
Covered Geomembranes. GeoAmericas 2020, 4th Pan American Conference on
Geosynthetics, Virtual Conference, October 26, 2020.
Gilson-Beck, A. and Ferreira, J. (2017). Maximizing the effectiveness of electrical leak location
for covered geomembranes, Geosynthetics 2017, First International Conference on
Technology and Applications of Geosynthetics, 18-20 October, 2017.
ABSTRACT
INTRODUCTION
The QA/QC process is the logical starting point for this proposition as it performs three
key functions when autonomized and then accepted as an industry norm. First, it improves
physical field quality assurance (QA), which produces superior containment systems. Second,
automation expedites the review and reporting quality control (QC) by built-in analysis
algorithms usually performed by multiple parties. And third, it creates a centralized database that
leverages future installs and supplementary parts of geosynthetics projects throughout the
industry (Ramsey 2019). These general principles will be examined more in-depth and evolve in
the following paragraphs, but the cyclical nature of improved QA/QC through automation is
illustrated versus the current process in Figures 1 and 2.
7. No
2. Long,
Readily
Arduous
Available
Data Input
Datbase
6. Long 3. Constant
Engineer 3rd Party
Review Oversight
Process and Checks
5. Longer
Contract 4. Physical
Submittal Compiling
Report Field Data
Generation
7. Metrics
Analysis and 1. MoreTime
Data Dedicated to
Utlization Field QA
for Future
Installs
2. Automated
6. Database Field Data
Development Collection (GPS
As-built)
5. Trusted / 3. Built in
Expeditied Redundancy Checks
Engineer Review via Software for
Process Immediate Review
4. Correct
Contract
Submittal
Report
Generation
Geosynthetics by nature (i.e., typical industry specifications derived from GSI and ASTM
Standards) require a large amount of redundancy when it comes to proper deployment and
seaming. These practices must be performed meticulously (QA) and then documented (QC) as
such as well. Typically, these duties are completed by an installer’s individual QA/QC technician
and verified by an on-site 3rd party owner representative (CQA). There are more specifications
within a geosynthetic system having to do with subgrade conditions, cover soil placements, and
more, but for this paper, we will specifically examine data associated with deployment and
seaming. However, there are boundless opportunities to integrate these ancillary components of a
system when a software infrastructure has been established.
Currently, the industry handwrites QA/QC documentation. This is hard to comprehend in
2020 considering the magnitude of legitimate QA needed for this craft and associated
documentation required on a per-acre basis by installer QA/QC technician and 3rd Party CQA
(Koerner 2012). There are two main identifiable liabilities with this current practice. The first is
that it takes a great deal of time throughout the day to keep up with documentation alone, such as
As-built drawings with all associated panel, roll number, seam and repair info, roll deployment,
trial welds, destructive sample testing, seam information, and repair information. The real value
from a QA/QC Technician and 3rd party CQA is within the QA portion. Their roles should lean
heavily on making sure physical performance is of good quality, not necessarily just the
documentation (Toepfer 2016). The documentation can be perfect, but if the systems fail due to
improper workmanship that went unaddressed during construction because QA efforts were
limited due to the QC effort, project stakeholders are still at risk. The second is that handwriting
allows for more chance of human error and information fabrication/manipulation. Concisely,
improvements to speed and reliability for the day-to-day field documentation will directly
enhance the quality of geosynthetic installations.
Based on these observed areas of improvement to means and methods, automation must
be applied to each section of required QC to address speed and reliability. This automation
begins with as-built generation. Hand sketched, scaled drawings that include all pertinent panel
information are extremely labor-intensive to complete, and information can easily be missed. If
information is missed during the as-built phase, ripple effects on seam and repair info will also
go unnoticed, leaving the door open for future loss. An existing step in the right direction is the
seldom-seen “GPS As-built” specification requirement. Anyone with GPS equipment can shoot
points at each panel intersection and grade break. Once that is completed in the field, the points
file can eventually become a GPS coordinated as-built once they are connected by a program
such as AutoCAD or similar. However, to populate this “GPS As-built,” a reference hand
drawing is likely needed to refer back to in order to know which information goes where. This
includes panel numbering, roll assignment, repair and destruct locations, and terminations.
Therefore, simple “GPS As-built” within these limited parameters does not address speed but
addresses reliable future use. With no speed improvement, QA/QC technicians cannot shift that
time allocation to physical QA, which is the more valuable time commitment.
A more encompassing improvement to the As-built portion of QA/QC, and in turn, other
downstream information collection practices, would be universal use of “automated GPS As-
built” generation. Computer software can automatically generate the linework, panel, repair, and
destruct numbering and termination call-outs without handwriting or using another software to
connect the dots and annotate manually. By merely assigning attributes to the GPS points, the
Remembering automated GPS as-built is the foundation for an improved system; we can now use
the abundance of metadata within the as-built to populate the other QC specification
requirements. Because the software knows every panel intersection, the locations of every repair
and destruct, terminations, panel placement square footage reports, seam and repair information
are automatically generated as a result. This automation makes sure that every piece of info on
the repair and seam reports is in line with what is on the as-built and, most importantly, within
project specification. Currently, the typical process is to walk the liner physically, hand draw the
as-built, then once again walk the liner to populate every line of seam control and repair
reporting on their separate respective report sheets. Using a field tablet or similar technology,
automated GPS as-built offers the opportunity to shoot points and attribute those points once.
Welding and testing information can then be filled in on the already generated lines. Automation
eliminates the need to collect the same information multiple times and eliminates paper
recordkeeping.
To further improve efficiency, it is essential to acknowledge that some information does
need to be “filled in,” requiring the tech to read the information on the liner itself. These
parameters are set up prior to the job so that he/she is not repeatedly writing the same
information, once again saving time. These “fill in” areas on the seam and repair reports are
replaced with dropdowns accompanied by other pre-set conditions. One example of those pre-set
conditions is air test information input. With software, the technician will utilize a pre-set drop
down for the initial start time only, and the end time will automatically populate based on job
specification previously set up, typically five minutes later. See the example screenshot below in
Figures 3.
Currently, the industry relies on thorough contractor QA/QC technicians, persistent site
CQA’s, and post-project data review by engineers to catch all of this information. But do we
really know the QC data submittals are correct per project specification during and at the
completion of the project? Initiating redundant software assistance benefits owner representative
CQA as well. To some extent, the software can do the job of a CQA from a documentation
standpoint by cross-referencing all of this data with the appropriate previously defined
specification. For example, when a line of seam control or repair reporting is completed, a check
function automatically makes sure the information is in line with the appropriate pre-weld
information. This real-time inspection principle provides unique advantages in terms of speed of
work and reassurances to the CQA team that everything is completed and documented prior to
being covered by a subsequent layer in the lining system. If incorrect or missing data is
identified, it may be too late to confirm or verify the information because another layer may
cover the materials in question.
REPORT GENERATION
Thus far, foundational improvements to QA/QC field means and methods have helped
make the physical data collection quicker, less strenuous, and more authentic for field personnel.
It has also been recognized that automated QA/QC software integration provides real-time
project updates via a cloud platform for other stakeholders in geosynthetic installation projects to
monitor progress.
At the completion of a geosynthetics installation, contractors and engineers are left with a
vast amount of data and information. Previously, this info would not be used post project
completion. At most, installers keep track of their destructive test failure rate as a general
industry parameter to track a company’s quality. But there is much more in-depth analysis that
can be made with a metrics analysis tool. Some parameters which are valuable for installers,
engineers, and owners include:
A combination of these metrics paints a far more comprehensive picture of a project’s success
above any beyond simple Pass/Fail percentages.
The climate of our generation is data-driven. Every industry in the world is optimizing
data collection to be able to leverage its operating efficiency. Accurate, centralized data
management software benefits installers, engineers, owners, manufacturers, and other
stakeholders in the geosynthetics industry. Up until now, tangible improvements to field and
reporting under the QA/QC umbrella have been addressed. But in addition to these baseline
improvements, there are more widespread advantages downstream that can recirculate to an
improved next project.
Some examples include targeted internal training by installers if trends are seen with
specific employees not performing well or a specific material is continually underperforming.
Legitimate resume generation during pre-con submittals for owners and engineer’s that they can
trust they do have the experience that is being submitted. Other miscellaneous data optimization
examples include reductions in billing conflicts (Geo-X 2020) and advantages going into
prospect cell or cover construction projects. Tie-in points are known for the existing cell or
covered area; cut and fill plans are easily and accurately adopted from a known boundary
previously established from the as-built GPS locations.
While advancements in materials manufacturing (better additives, taped seams,
conductive backed materials), welding equipment (data acquisition fusion welders), post-install
leak detection (leak integrity testing), and existing “justified quality management systems”
(Koerner 2012) are already contributing greatly to advance the geosynthetics business, a QA/QC
software platform is needed to substantiate and document the effectiveness of these tangential
advances. Show how these other stewards of the industry improved failure rates. Record the data
that tells us which material in which the application performs the best. Right now, these metrics
are stored within the heads of those who performed on these specific projects.
CONCLUSION
It is important to recognize that other solutions are on the market; specifically, Glen
Toepfer’s Supertek and Geo-X’s ‘Geo-Q’ platforms, with similar principles and have paved the
way for better installations and improved containment. The roadblock for universal acceptance
of QA/QC software use seems to be that existing systems only address field CQA and lack
authentication grounds. No approach begins with automated GPS as-built generation and
subsequent automatic deployment and seaming redundancies. Furthermore, the database storage
and filtering for unique metrics analysis is novel. For software to catch on, it must benefit all
stakeholders in a geosynthetics installation. All of these advantages outlined above, and there are
many more, lead to a cost savings that can be related back to the project owner.
REFERENCES
ASTM D 638. Standard Test Method for Tensile Properties of Plastics, ASTM International, West
Conshohocken, Pennsylvania, USA.
Toepfer, Glen. Interview by Chris Kelsey. An Insurance Policy for Geosynthetic Installations, 21
Jan. 2016, https://www.geosynthetica.com/cqas-insurance-policy-geosynthetic-installations/.
Accessed 11 Sept. 2020.
1
SCS Engineers, Denver, Colorado, USA, email: [email protected]
ABSTRACT
The problem to be solved is the disposal and recycling of millions of liters of production water
(brine water) and flow-back water generated annually from the oil and gas industry in an
environmentally safe, low cost, and efficient manner. A technology that is effective and safe is
the evaporation of the water in lined containment ponds after separation and removal of the
hydrocarbon component from the water. Three projects are the case studies for this paper,
located near Wright, Wyoming, Cisco, Utah and Midland, Texas in the Permian Basin. They
were designed to evaporate or recycle water in geomembrane lined ponds. Purpose of this paper
is to demonstrate that the black HDPE increases evaporation over the use of clay or unlined
ponds, and the use of white liner reduces evaporation relative to black color liner.
INTRODUCTION
The aforementioned projects are complete and have been operational for a number of years, and
continue to be expanded per their permit. The production and flow back water from oil and gas
wells in the area local to each site is trucked to the sites for disposal. The water is evaporated in
ponds lined with high density polyethylene (HDPE) as the top layer by using a combination of
factors that are favorable to the evaporative process, including the following:
• Natural characteristics of the site, including the arid climate, windy conditions, and
numerous sunny days,
• The top liner in the ponds is black HDPE, which creates a hot surface,
• HDPE liner was chosen to protect the surface and ground waters of the area and to assist
with the evaporation of the water (evaporation is enhanced due to the black color of the
liner).
• Liner was white for the storage and to reduce the evaporation relative to the black liner.
The projects are interesting in that each facility provides oil and gas production companies in the
area with a large commercial alternative to production water and flow-back disposal versus
numerous small ponds that may service only one well pad, or expensive re-injection wells, or
even more expensive water recycle treatment facilities. The regulatory agencies like it for
centralization and protection of the state’s waters.
CASE STUDIES
PROJECT DETAILS
Purpose
The main purpose of the projects is to evaporate the production water and flow back water as
quickly as possible or store and recycle the water while maintaining environmental controls and
containment. The projects were planned and built in order to service the oil and gas industry for
the disposal and recycling of production water and flow back water from oil and gas production
in the service areas local to each facility location.
Several water disposal options exist, including reinjection wells, frac injection, treatment
for surface discharge, recycling for reuse in the development of oil/gas, and evaporation. The
evaporation technology was chosen for some of these projects due to the ideal site conditions for
evaporation, including low precipitation, windy conditions, high ambient temperatures and sun.
Other projects are designed to store the water for reuse, and therefore, use white color liner.
Other factors that made the project sites ideal include the following; little or no residences within
several kilometers of the site (other than consenting adjacent land owners), easy access to/from a
major highway, long distance to open water at several kilometers, deep groundwater, and low
permeable geologic formations below the sites.
Selection of Technology
To adequately contain the brine water, the top layer of the pond lining needs to be a durable
long-lasting product that is cost-effective and helps to enhance evaporation (black liner) or
reduce evaporation (white liner) while being acceptable to the regulatory agencies involved.
Some of the liner technologies considered include compacted clay, geosynthetic clay liner
(GCL), polyvinyl chloride (PVC), polypropylene (PPE), and high density polyethylene (HDPE).
While several lining technologies exist and are allowed by the regulatory agencies, the HDPE
liner was chosen for the top layer for several reasons, including, durability, resistance to
ultraviolet (UV) degradation, chemical resistance, black color, and ease of construction.
HDPE is designed to be the top layer of ponds and be exposed to the elements (sun,
freeze/thaw, and physical impact), therefore, the material needs to be resistant to UV degradation
and be durable. The addition of the proper amount of high quality carbon black to the
geomembrane during manufacturing is universally accepted as being resistant to significant
deterioration caused by weathering. In addition to high quality carbon black, highly effective
chemical UV stabilizers further extend the life of the liner. These additives absorb incident
radiation and/or terminate free radical production, thus protecting the HDPE against thermal
degradation and possible chemical reactions with surrounding materials. Other factors that affect
Implementation
To enhance the evaporative quality of each facility, and to adequately contain the brine water,
high density polyethylene (HDPE) was chosen as the top layer. The top or primary liner was
designed and constructed with 60-mil thick textured HDPE to help ensure a durable long-lasting
containment. The liner was textured to increase the safety factor for personnel using the facility
(i.e. the textured surface increases traction and gripping to enable easier egress in case of
someone falling into the pond. White color liner was used for the reuse facilities with the intent
to reduce evaporation for storage relative to black liner.
The facilities have been or are currently being constructed. The facilities consist of the
following components (refer to Figures 1 and 2 for details):
General: Production water and flow back water is delivered to the sites via tanker trucks and via
pipeline from well sites located within the geographic area local to each site, and depends on
transportation costs and disposal fees when compared to other alternatives for water disposal in
the area. The tanker trucks are off-loaded and the water is sent through a treatment process,
including separation equipment, gun-barrel tanks, or state-of-the art equipment.
The Danish Flats facility’s plan view is shown on the following Figure 2. The operation
units include gun barrel tanks, a sludge pond, and a series of 2.1 hectare evaporation ponds. All
of the structures are connected via gravity or force-main fed via an underground piping system.
The Bluegrass Water facility process is similar to the Danish Flats layout.
Pond Inlet: Various methods exist for the separation of the oil and water prior to
placement in the ponds for evaporation, and the proper removal of the oil from the water will
dictate whether or not the ponds should be covered with bird control netting.
The incoming water at the Danish Flats and Bluegrass Water sites flows through the
gunbarrel tank systems and the sludge pond before entering the evaporation ponds. The pre-
treatment facilities and the evaporation ponds have been designed to follow the topography,
allowing for gravity flow throughout the system, and the Bluegrass Water and Danish Flats sites
are equipped with force-mains to allow pumping of the water from the lower Phase 1 ponds to
Leak Detection System: As described in the geology/hydrology section of this paper, each site is
underlain by low permeability layers of shale or clay, including at Danish Flats approximately
365.8 meters thick of Mancos Shale. The first usable aquifers for human use are below these
formations for these sites. The geological investigations did not detect perched groundwater.
The first usable aquifer will be protected by the three layers of liner in the pond, as well as
natural clay aquitards below the pond bottoms at approximately 9.1 and 18.2 meters below the
ground surface, which also includes the leak detection under the primary liner.
In addition to the ideal natural conditions at each site, a 60-mil HDPE liner has been installed as
the top layer in all of the ponds. The pond floors slope toward sumps that are fitted with a riser
monitoring pipe and leak detection equipment.
The leak detection system is inspected and data recorded as required. A summary of the
inspections are reported to the regulatory agencies as needed. Liquid from the sump can be
pumped back into the pond, if excessive amounts accumulate then specific protocols for
repairing the liner are required if the volume of the leak exceeds certain thresholds.
Livestock/Wildlife Protection Measures: The entire facility area at each site has been
fenced and gated to help prevent cattle or other animals from entering. Since the sludge ponds
could have oily material on the surface, netting has been used to deter the entry of birds or other
wildlife at the Danish Flats and Bluegrass Water sites.
Capacity: The volume of water able to be stored for evaporation or storage in the ponds is as
follows:
• Bluegrass Water Wright – Ponds 1-8 are 7.62 meters deep of water holding capacity and
nearly 1,000,000 barrels (at 159 liters per barrel) each for a total water holding capacity
of approximately 8,000,000 barrels.
• Danish Flats - Ponds 1 through 8 are 3.65 meters of water holding depth and nearly
240,000 barrels each for a total capacity of approximately 2,000,000 barrels. Ponds 9
through 13 are 6.7 meters of water holding depth at Danish Flats and nearly 632,000
barrels each for a total capacity of 3,160,000 barrels.
• XRI Buchanan - Pond 1 is 3.65 meters of water holding depth and nearly 500,000 barrels.
The partially completed and partially operational project at Danish Flats was photographed from
the air on June 29, 2009 and is shown above. The water was distributed from the sludge pond to
the Ponds 1 through 12, which appear as “black”. The Ponds 13 appears to have “brownish”
water, which includes some construction water is shown in the background and was not yet
approved for water disposal at the time of the photography, but has since been put into operation.
Currently, 14 evaporation ponds are operational at Danish Flats.
Operational Data
At Danish Flats they have experienced various quantities of water deliveries ranging from 10,000
barrels to 35,000 barrels per day. Each barrel is equal to 159 liters. The water is moved from the
off-loading area through the sludge pond and to the evaporation ponds by gravity or via force
main for distribution to Phase 2. Each pond at Danish Flats, Utah has a free board requirement
of 0.61 meters, and each pond the Bluegrass Water has a free board requirement of 0.91 meters.
When an individual evaporation pond was brought on-line, such as Ponds 5 through 8 at
Danish Flats, and the water was allowed to flow into the empty pond lined with HDPE, the water
was observed as “disappearing” due to the evaporative nature of the HDPE when in combination
with the hot sun and arid climate in Utah in July and August.
In Cisco, UT in July and August the ambient air temperatures often exceeds 37.8 degrees
Celsius and the wind normally blows to some extent. The actual evaporation encountered during
the months of July and August 2008 at the site was measured to be approximately 38.1 and 45.7
centimeters per day, respectively. The facility operators observed very favorable evaporation of
the water and measured the total evaporation for the year 2008 above the estimate of 127
centimeters for approximately six months of operation.
In year 2009, the Danish Flats facility was measured to have 152.4 centimeters of
evaporation, which took place mostly in the months from April 1 to October 31, and again in
year 2010 the evaporation total has exceeded 152.4 centimeters over the entire water surface of
In an effort to increase evaporation with low costs in mind, a “weep” system was added to the
allow water to flow and fan out over the surface of the HDPE liner that is above the water line.
This system utilizes the exposed HDPE liner to increase evaporation by using the heat generated
from the exposed HDPE liner in combination with the increased surface area of the water
fanning out over the liner. Please refer to the photograph of the “weep” system.
At XRI Buchanan, the top liner used was a white color 60-mil thick HDPE to reduce the
evaporation relative to the black liner, due to the facility wanting to retain the water for reuse in
the fracking operations.
CONCLUSIONS
The use of HDPE as the primary liner in the ponds appears to be favorably enhancing the
evaporation of the water. At Danish Flats, the estimate of 127 centimeters of evaporation per
year was far exceeded given the 83.8 centimeters of evaporation experienced in only July and
August 2008, which totaled 177.8 centimeters for 2008. In years 2009 and 2010, the evaporation
rate was over 152.4 centimeters. In 2012, the evaporation rate was 106.7 centimeters from May
through August. The “weep” system was an enhancement to increase evaporation, which was
not quantitatively measurable, but may have been a factor in the total evaporation. The deeper
ponds at Danish Flats experienced approximately a 30 percent lower evaporation rate due to
cooler water at depth. Similarly, the actual evaporation experienced at the Bluegrass Water
ACKNOWLEDGEMENTS
Thank you to Bluegrass Water and XRI Buchanon, and to Mustang Extreme and
Raven/Colorado Lining, Inc. who provided installation expertise and also performed the
construction of the HDPE liners at the ponds in field, which all are performing exceptionally
well and without leaks due to construction.
REFERENCES
Gundle/SLT Environmental, Inc. (GSE). (2003). “Technical Note – HDPE, UV Resistance for
GSE Geomembranes.” http://www.truslate.com/grid/techspec.pdf .
Hunt, G. L. (1996). Environmental Handbook, Environmental Regulations for the Oil & Gas
Exploration and Production Industry.
Ivy, N (2002). HDPE geomembrane after 20 years of service, GFR Magazine June/July 2002.
ABSTRACT
INTRODUCTION
Geosynthetic clay liners (GCLs) consist of a thin layer of sodium bentonite (Na-B) sandwiched
between two geotextiles (Shackelford et al. 2000; Jo et al. 2001, 2005; Scalia et al. 2014; R. Kerry
Rowe, 2020). The Na-B in GCLs primarily consists of Na-montmorillonite (65 to 90%), which
has large surface area, high cation exchange capacity, and high swelling potential (Shackelford et
al. 2000; Jo et al. 2001, 2005; Bradshaw and Benson 2014). Osmotic swelling of montmorillonite
yields narrow and tortuous flow channels, resulting in low hydraulic conductivity of GCL (Edil et
al. 2011; Tian et al. 2019). However, several researchers have reported that leachates with high
ionic strength (e.g., I > 300 mM), predominantly polyvalent cations, and/or extreme pH condition
can inhibit the swelling of Na-B, resulting in large intergranular pore space and high hydraulic
conductivity of GCL (>10-10 m/s) (Shackelford et al. 2000; Jo et al. 2001, 2005; Di Emidio et al.
2015; Tian et al. 2016, 2019; Chen et al. 2019).
Recognize these deficiencies, the Na-B have been modified using organic compounds or
polymer to improve the chemical compatibility of GCLs (Kolstad et al. 2004; Katsumi et al. 2008;
Scalia et al. 2014; Özhan, 2018; Chai et al. 2020). These polymer-modified GCLs, also known as
bentonite-polymer (B-P) GCLs, comprise of bentonite-polymer composites (BPC) or dry-blended
polymer and bentonite (Scalia et al. 2014; Di Emidio et al. 2015; Tian et al. 2016, 2019; Chen et
al. 2019). B-P CCLs have been found to have high resistance to chemicals and lower hydraulic
conductivity to leachates from coal combustion product (CCP) (Chen et al. 2019; Binte and Tian
Geosynthetic Clay Liners. Three GCLs were used in this study, including one conventional Na-
B and two B-P GCLs. B-P GCLs are manufactured by mixing granular polymer with granular
Na-B. The granule size distribution of the GCLs was determined by mechanical sieve analysis
following ASTM D6913. All the GCLs had similar grain size distribution (medium to fine sand),
as shown in Figure 1. Mass per unit area, thickness and polymer loading of the GCLs is given in
Table 1.
Polymer loading in B-P GCLs were determined following the loss on ignition (LOI)
method adopted by Scalia et al. (2014) and Tian et al. (2016). Polymer loading was determined
based on the assumption that polymer burns completely during LOI test and by discounting the
LOI of the conventional Na-B. One B-P GCL has 0.5% polymer loading and the other one has
5.5% polymer loading.
Table 1. Mass per unit area, initial thickness and polymer loading of sodium bentonite (Na-
B) and bentonite-polymer (B-P) GCLs used in this study.
Mass per unit area
GCL Thickness (mm) Polymer loading (%)
(kg/m2)
Na-B 4.5 5.0 -
B-P-0.5 5.7 7.0 0.5
B-P-5.5 6.0 8.1 5.5
Note: Polymer loading is calculated based on loss on ignition as per ASTM D7348. Mass per unit area is
measured as per ASTM D5993. “-” indicates not applicable. The numeric digits with B-P GCLs represent
their polymer loading.
40
20
0
10 1 0.1 0.01
Granule Size (mm)
Figure 1. Grain size distribution of sodium bentonite (Na-B) and bentonite polymer (B-P)
GCLs used in this study.
Permeant Solutions. CCP leachate data collected from more than 130 CCP disposal units
(landfills and impoundments) located within United States was chemically characterized based
on dominant CCP type i.e., bottom ash, fly ash, flue gas desulfurization (FGD) materials (e.g.,
FGD gypsum, FGD solids, fixated FGD), mixed coal ash. The master variables that affect the
hydraulic conductivity of GCL were I, pH, relative abundance of monovalent and divalent
cations (RMD). Synthetic FGD solids (TFGDS) leachate (I = 473 mM, RMD = 0.65 M1/2) was
created by taking the geometric mean of all the leachates collected from FGD solids disposal
facilities shown in figure 2. The concentration of major cations, anions and the bulk properties (I,
RMD, pH) of the TFGDS leachates selected for this study are given in Table 2.
3
10
CCP Leachate
2 Synthetic TFGDS Leachate
10
CCP Leachate from FGD
solids disposal facilities
1
10
)
1/2
0
10
RMD (M
-1
10
-2
10
-3
10
-4
10
-1 0 1 2 3 4
10 10 10 10 10 10
Ionic Stength (mM)
Figure 2. Ionic strength and RMD of CCP leachates collected from more than 130 CCP
disposal units across U.S.
The synthetic TFGDS leachate was prepared by dissolving reagent-grade NaCl, MgSO4
and Na2SO4 in Type II DI water as per ASTM D1193. The synthetic leachate was stored in sealed
carboy to prevent interaction with atmosphere (CO2). The electrical conductivity (EC) and pH of
the synthetic leachate was checked periodically to assure no changes in the leachate chemistry.
Hydraulic Conductivity. The hydraulic conductivity of GCLs were measured with falling-head
test using flexible-wall permeameters according to ASTM D6766. GCL specimens were
hydrated with permeant solution at an effective stress of 20 kPa for 48 hours, and then conducted
hydraulic conductivity test. Fifty mL burettes were used to gather the influent liquid and the
effluent were collected using 60 mL HDPE bottles.
Tests were conducted until reaching hydraulic and chemical equilibrium (Jo et al. 2005).
Hydraulic equilibrium criteria require the measurements of hydraulic conductivity are steady, and
the last three consecutive measurements of ratio between the outflow (Qout) and influent volumes
(Qin) are between 25% variation. The chemical equilibrium criteria require that the electric
conductivity (EC) of the effluent (ECout) are falling within 1.0 ± 10% of influent value (ECin) , and
the ratio of the pH of effluent (pHout) and influent (pHin) are within 1.0 ± 10. Tests were initially
conducted at 20 kPa confining effective stress. Once the hydraulic conductivity and chemical
equilibrium reached, the confining effective stress was increased to 100, 250, and 500 kPa to mimic
the stresses induced by the mass of the waste placed in the landfill.
Temporal behavior of the B-P-0.5 permeated with TFGDS leachate is shown in Figure 3. The
hydraulic equilibrium achieved at the early stage of the test, where the Qout/Qin was within 1 ± 25%
(Fig. 3a). The chemical equilibrium reached around 13 PVF, i.e., both EC and pH of the effluent
leveled off and fell within the 1 ± 10% of the EC and pH in the influent (Fig. 4b). The confining
stress of the hydraulic conductivity test was then increased from 20 kPa to 100, 250, and 500 kPa.
The hydraulic conductivity of B-P-0.5 GCL decreased from 1.4 x 10-7 to 1.5 x 10-9 when the
confining stress increased from 20 kPa to 100 kPa. At 250 kPa, the hydraulic conductivity of B-P-
0.5 GCL decreased approximately two orders of magnitude (6.9 x 10-11 m/s). The hydraulic
conductivity of B-P-0.5 to TFGDS decreased drastically at a PVF of 17.6 to 18.0 because polymer
that eluted from GCL clogged the effluent tubes, resulting in decreasing of hydraulic conductivity.
After removing polymer clogging by flushing tubes, the hydraulic conductivity of B-P-0.5 GCL
increased from 3.0 x 10-12 m/s to 7.2 x 10-11 m/s and remained constant. The hydraulic conductivity
of B-P-0.5 further decreased to 1.3 x 10-11 m/s at 500 kPa.
EC (mS/cm)
Q /Q
-10
10 6
out
Clogging due to
pH
polymer elution 30
-12 + 10%
in
10
4
1 Influent EC = 17.5 mS/cm + 10%
25
-14
10
20
-16 2
10 + 25%
Q /Q 15
out in EC
-18
10 0 0 10
0 5 10 15 20 25 30 0 5 10 15 20 25 30
PVF PVF
Figure 3. Hydraulic conductivity, ratio of inflow to outflow (Qout/Qin), pH, and EC from test
on B-P-0.5 permeated to TFGDS leachate.
-6
10
DI
-7 TFGDS
10
Hydraulic Conductivity (m/s)
-8
10
-9
10
-10
10
-11
10
-12
10
Na-B B-P-0.5 B-P-5.5
Hydraulic conductivity of Na-B and B-P GCLs to TFGDS leachate and DI water are shown
in Figure 4. Hydraulic conductivity of all the GCLs (Na-B, B-P-0.5 and B-P-5.5) to DI water were
less than 10-10 m/s. Both Na-B and B-P-0.5 GCLs showed hydraulic conductivity > 10-10 m/s when
permeated with TFGDS-473 leachate at 20 kPa effective confining stress, which were much faster
than that of Na-B and B-P-0.5 GCLs to DI water. B-P-5.5 GCL had similar hydraulic conductivity
when permeated with TFGDS-473 leachate and DI water.
Hydraulic conductivity of the Na-B and B-P GCLs permeated with TFGDS leachate
decreased as the confining stress increased (Figure 5). The hydraulic conductivity of Na-B GCL
decreased from 3.1 x10-7 m/s to 2.1 x 10-9 m/s when the effective confining stress increased from
20 kPa to 500 kPa. Chen et al. (2018) also reported that increasing the effective stress from 20 to
450 kPa caused the hydraulic conductivity of Na-B GCLs decreased up to three orders of
magnitude.
-6 Na-B
Hydraulic Conductivity (m/s)
10 B-P-0.5
B-P-5.5
-7
10
-8
10
-9
10
-10
10 -10
< 10 m/s
-11
10
-12
10
0 100 200 300 400 500 600
Effective stress (kPa)
CONCLUSIONS
Hydraulic conductivity of Na-B and two B-P GCLs were evaluated using TFGDS leachate and
DI water. The following conclusions can be made based on the findings of the study:
1. The hydraulic conductivity of B-P GCLs were lower than Na-B GCL when permeated with
TFGDS leachate.
2. Increase of the effective confining stress lead to the decrease in the hydraulic conductivity
of the GCLs permeated with TFGDS leachate. B-P GCLs showed a fast decreasing trend of
hydraulic conductivity than that of Na-B GCL.
3. Additionally, B-P GCLs with higher polymer loading have better chemical compatibility
than B-P GCLs with low polymer loading, and can be used to manage CCP leachates.
ACKNOWLEDGEMENTS
This material is based upon work supported by the Environmental Research & Education
Foundation (EREF) and CETCO Inc. Any opinions, findings and conclusions in this material are
those of the authors and do not necessarily reflect the views of EREF and CETCO Inc.
ASTM D 1193. Standard Specification for Reagent Water, ASTM International, West
Conshohocken, Pennsylvania, USA.
ASTM D 5993. Standard Test Method for Measuring Mass per Unit of Geosynthetic Clay Liners,
ASTM International, West Conshohocken, Pennsylvania, USA.
ASTM D 6766. Standard Test Method for Evaluation of Hydraulic Properties of Geosynthetic
Clay Liners Permeated with Potentially Incompatible Aqueous Solutions, ASTM International,
West Conshohocken, Pennsylvania, USA.
ASTM D 6913. Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using
Sieve Analysis, ASTM International, West Conshohocken, Pennsylvania, USA.
ASTM D 7348. Standard Test Methods for Loss on Ignition (LOI) of Solid Combustion Residues,
ASTM International, West Conshohocken, Pennsylvania, USA.
Bradshaw, S. L. and Benson, C. H. (2014). Effect of municipal solid waste leachate on hydraulic
conductivity and exchange complex of geosynthetic clay liners, Journal of Geotechnical and
Geoenvironmental Engineering, 140(4): 04013038.
Chai, J. and Prongmanee, N. (2020). Barrier properties of a geosynthetic clay liner using
polymerized sodium bentonite, Geotextiles and Geomembranes, 48(3): 392–399.
Chen, J. N., Benson, C. H. and Edil, T. B. (2018). Hydraulic conductivity of geosynthetic clay
liners with sodium bentonite to coal combustion product leachates, Journal of Geotechnical
and Geoenvironmental Engineering, 144(3): 04018008.
Chen, J. N., Salihoglu, H., Benson, C., Likos, W., and Edil, T. (2019). Hydraulic Conductivity of
Bentonite-Polymer Composite Geosynthetic Clay Liners Permeated with Coal Combustion
Product Leachates, Journal of Geotechnical and Geoenvironmental Engineering, 145
(9):04019038.
Di Emidio, G., Mazzieri, F., Verastegui-Flores, R. D., Van Impe, W., and Bezuijen, A. (2015).
Polymer-treated bentonite clay for chemical-resistant geosynthetic clay liners, Geosynthetics
International, 22(1):125-137.
Edil, T., Shackelford, C., Scalia, J., Benson, C., & Bohnhoff, G. (2011). Geosynthetic clay liners
containing bentonite polymer nanocomposite, Geo-Frontiers 2011, ASCE, Dallas, TX, USA:
2001-2009.
Jo, H. Y., Katsumi, T., Benson, C. H., and Edil, T. B. (2001). Hydraulic conductivity and swelling
of nonprehydrated GCLs permeated with single-species salt solutions, Journal of Geotechnical
and Geoenvironmental Engineering, 127(7): 557-567.
Jo, H. Y., Benson, C. H., Shackelford, C. D., Lee, J. M., and Edil, T. B. (2005). Long-term
hydraulic conductivity of a geosynthetic clay liner permeated with inorganic salt
solutions, Journal of Geotechnical and Geoenvironmental Engineering, 131(4): 405-417.
Katsumi, T., Ishimori, H., Onikata, M., and Fukagawa, R. (2008). Long-term barrier performance
of modified bentonite materials against sodium and calcium permeant solutions, Geotextiles
and Geomembranes, 26(1): 14-30.
Kolstad, D.C., Benson, C.H. and Edil, T.B. (2004). Hydraulic conductivity and swell of
nonprehydrated geosynthetic clay liners permeated with multispecies inorganic solutions,
Journal of Geotechnical and Geoenvironmental Engineering, 130(12): 1236-1249.
Özhan, H.O., (2018). Hydraulic capability of polymer-treated GCLs in saline solutions at elevated
INTRODUCTION
The chemical resistance of a geomembrane is usually the initial aspect of the design process
and HDPE geomembranes are generally chosen because of it. In a project where the chemicals
will interface directly with the liner, the geomembrane’s resistance must be assured for the life of
the facility. This situation has long been evaluated by manufactures and has resulted in various
chemical resistance charts which lists generic chemicals against HDPE geomembranes on a
relative basis. The principal primary effects of chemical interaction with HDPE geomembrane
resin is mass gain / swelling, changes in their elongation at break and reductions in their tensile
strength. Also, the chemicals can interact with the antioxidant package, inactivating them.
HDPE geomembrane with GM13 GRI minimum specs - Stage A prediction lifetime
Immersion in Alkaline Liquor (pH 8.10) Immersion in Acidic Liquor (pH 5.67)
Temp (ºC) Time(yrs) Time(yrs)
10 87 19
20 53 15
30 34 12
40 22 10
50 15 9
60 10 7
70 7 6
80 5 5
90 4 5
100 3 4
Table 1 GRI GM13 - HD Geomembrane lifetime immersion in Alkaline & Acidic liquors prediction.
Analyzing the results, it can be observed that in both immersions at ambient temperatures
(20ºC) the lifetime prediction is considerably lower than the estimation predicted by GSI (GRI
White Paper 6) for non-exposed geomembranes in landfills (Stage A - lifetime of 208 years at
20ºC). Approximately four times reduction in alkaline liquors and fourteen times in acidic liquors.
In addition, it can be seen how the liner behaves differently in each liquor. It shows a
significant impact of the acid liquors on the geomembrane lifetime in comparison with the alkaline
one. Moreover, it can be observed how the influence of temperature affects significantly above 70
degrees, equaling the lifetime prediction at this temperature. From this temperature onward, this
becomes the main factor in the loss of antioxidants.
Given these results, a deeper research has been done to understand the behavior of a
standard GRI GM13 geomembrane in acidic solutions. It has been incubated two samples of a
regular HDPE that meets GRI GM13 requirements with a highly aggressive acid liquors – high
concentration of sulphuric acid (10% of concentration of H2SO4) with pH close to 1 at two high
temperatures 85°C and 100°C. The two coupons were monitoring by periodically removed and
evaluating their antioxidant package by S-OIT and HP-OIT tests. Figure 1 and 2 shows the results
obtained.
400
300
200
100
0
Initials 2 weeks 4 weeks 6 weeks 8 weeks 13 weeks
Immersion Time (weeks)
S-OIT HP-OIT
Figure 1 GRI GM13-HDPE geomembrane OIT depletion in highly acidic liquor immersion at 80ºC
Analyzing Figure 1, it can be observed that, after 13 weeks of immersion the GRI GM13
geomembrane in a highly aggressive acid liquor at 85 ºC, the antioxidant package is already
consumed, starting the induction period to onset of degradation. The results show how in the first
two weeks both OIT tests steep dropped. In four weeks, the S-OIT is not detecting any antioxidant
package and the HP-OIT remain from that point with a low level of antioxidants up to three months
(13 weeks), in where any antioxidant is detected in the liner.
It should be noted that a correct reading of OIT test values should be done, understanding
test value outputs. It is considered in these test standards that when S-OIT reach 1 minute and the
HP-OIT reach 50 minutes, there would be no remaining antioxidants.
400
300
200
100
0
1 2 3 4 5 6
Immersion Time (weeks)
S-OIT HP-OIT
Figure 2 GRI GM13-HDPE geomembrane - OIT depletion in highly acidic liquor immersion at 100ºC
In the following section it is analyzed how the chemical solutions affect to the HD
geomembrane recipes.
Mining industry is the pillar of many economies around the world, providing in many
countries more than 50% of the export earnings. This impact is not only economic, the industry is
also found to be the largest producer of waste worldwide. Whereas, in order to obtain a gram of
gold, one tonne of mineral bearing rock should be crushed and processed, and approximately
another tonne of waste rock is produced, it can give a general picture of the immensity of the waste
containment problem faced by the mining sector. Environmental impacts made by the chemicals
emitted from mining processes is a major concern within the industry and that is the reason behind
why this industry calls for the best standards in lining systems to reduce any possible risk of
contamination.
As a result, the need for high performance lining systems have become a critical issue to
face in the mining sector. HDPE geomembranes has emerged as a key component to address this
demand as barrier containment of process solutions, after being proven of its relatively well
behavior. However, as these geomembranes should face extreme conditions not present in any
other containment application, a complete and deep analysis should be taken by designer to
understand and specify the most suitable geomembranes.
Bauxite is the naturally way form of aluminium ore, being the world's main source of
aluminium. It is often strip mined/open-pits and normally processed into alumina. Approximately
four or five tonnes of bauxite are needed to produce one tonne of aluminium. Over 95% of the
alumina produced globally is through the Bayer process. Bauxite residue, also called red mud, is
an inevitable secondary product that is generated in the extraction of alumina from bauxite by the
Bayer process. The bauxite refining alumina production generates liquors with highly alkaline pH
leachate (pH > 10), high sodium (NaOH) concentrations as well as elevated temperature of cooling
water (>60ºC). The effects that these liquors might have on HDPE geomembrane are as follows:
• Highly alkaline pH leachate (pH > 10) – Some antioxidants may be affected. Possible changes
in HD geomembrane formulation could be increasing the amount of the antioxidants and the
selection of specific ones to be more resistant to alkalis environments.
• High sodium (NaOH) concentrations. The present of sodium (Na) will not impact in excess in
the durability of the geomembrane.
• Elevated temperature (>60ºC). This will increase the risk of oxidation rising the reaction
velocity and accelerating any physical degradation. The geomembrane could include specific
type of antioxidant for in service high temperatures as antioxidants with higher molecular
weight and HDPE resins that behaves better in high temperatures.
Consequently, the formulated HD geomembrane for this specific environment would include high
amount of antioxidants, specific ones resistant to alkalis environments and with high molecular
weight. Also, may include resins that behaves well in high temperatures. In terms of geomembrane
Gold is often strip mined/open-pits or using underground hard rock mining techniques.
Once the ore is mined the gold is normally extracted by means of cyanide leaching. Gold ore waste
rock pile, heap leach process liquors and tailings dam leachates generate liquors with acid drainage
(pH down to 2) and acid and metalliferous water (pH < 1). The effects that these liquors from gold
ore waste processing might have on HDPE geomembrane can now be identified.
• Acid drainage (pH down to 2) / Acid and metalliferous water (pH < 1). HD geomembrane
additive packages with this highly acidic liquor would be adversely affected. HDPE
geomembrane would show a steep drop in HP-OIT and S-OIT parameters. Possible changes
in HD geomembrane formulation could be the use of specific antioxidants to acid solutions.
Liner formulation for this site will include high amount of antioxidants, with specific ones resistant
to acid environments. In terms of geomembrane HD parameters should include high SCR, high
initial HP-OIT and S-OIT values, Oven Aging at 85 ºC with retained percentage of both HP-OIT
and S-OIT.
Gold mines can also generate another type of leachate by gold processing. Liquors with
elevated chloride and sulfate salinity, and moderate to strongly alkaline solutions (pH 9–11)
containing highly elevated CN- and possibly NH4OH. The effects that this might have on
geomembrane are present as follows:
• Liquors with elevated chloride and sulfate salinity. Chlorine (Cl2) is an extremely reactive
and strong oxidizing agent element, therefore a high antioxidant package should be present in
the geomembranes to ensure their life service.
• Moderate to strongly alkaline solutions (pH 9–11) containing highly elevated CN- and
possibly NH4OH. Some antioxidants may be affected. Possible changes in HD geomembrane
formulation could be increasing the amount of the antioxidants and the selection of specific
ones to be more resistant to alkalis environments.
Geomembrane formulation for this site would be similar to the one formulated for the bauxite
residue which would include specific antioxidants that resist to alkalis environments.
A formulated HDPE geomembrane has been created for a site that the liner will be in
contact directly and permanently with high acid liquor. Similar conditions to the one presented in
a Gold mine (liquors generated by Gold ore waste rock pile, heap leach process liquors and/or
tailings dam leachates). It has been formulated a geomembrane with high quality resin, high
amount of Antioxidants, specific ones resistant to acid environments and with high molecular
weight. In terms of geomembrane HD parameters includes high SCR (>3000h), high initial HP-
OIT(>1000min) and S-OIT (>200min), Oven Aging retention at 85 ºC (HPOIT retention > 80%
AND S-OIT retention > 55%).
In contact with Acid a regular geomembrane would show a steep drop in their antioxidant
package. The result of this formulated geomembrane incubated in high concentration of sulphuric
1000
900
800
700
600
500
400
1 8 15 22 29 36 43 50
Immersion Time (Days)
Figure 3 Formulated HDPE - HP-OIT depletion in highly Acidic Liquor immersion at 20ºC , 60ºC and 85ºC
200
150
100
50
0
1 8 15 22 29 36 43 50
Immersion Time (Days)
Figure 3 shows that after almost 60 days of immersion in acid liquors at 20ºC , 60ºC and
85ºC the site-specific formulated HD geomembrane has retained more than 80% of their HP-OIT
not showing any steep drop. Figure 4 shows that after almost 60 days of immersion in acid liquors
at 20ºC , 60ºC and 85ºC the site-specific formulated HD geomembrane has retained more than
90%, 65% and 40% of their S-OIT respectively. It shows a drop in the first 30 days essentially at
85ºC and then it remains. These results show the impressive behavior this formulated
In 1995 GSI (GRI at the time), all geomembrane specifications contained a requirement
for warranty of 5 years duration. In 2006, GSI removed all warranty clauses with the following
comment: “They were added appendages from the outset and they never provided any realistic
added security for the user”. As it has been evaluated and presented in this document, the aim
should be to understand the geomembrane design life by defining it, identifying the potential
degradation mechanisms against the product properties, and ensuring a high-quality installation.
Rising the product properties in order to ensure geomembrane expected lifetime.
Currently in the industry, rather than specified a geomembrane parameter that technically
can be linked to specific site conditions, it sometimes specifies in critical projects GM13
geomembranes parameters along with requesting warranties of 10, 20 or even 30 years. Clearly. if
well specified and linked the material properties with the site conditions, the geomembrane will
be within the materials capability to meet this requirement, and technically can be proved.
However, these warranties represent a questionably relevant and useful document for the final
user, more related with paperwork than a real parachute in case of a degradation before the end of
the warranty period. Specially, as any Geomembrane manufacturing warranty offered will disclaim
against clauses that include “normal” conditions/weathering, which are conditions that actually
exist on only very few sites, and certainly not a critical site. Not providing any realistic added
security to the client. As such, the aim should be identifying site conditions to technically ensure
geomembrane expected lifetime.
Therefore, a detailed risk analysis in terms of exposure to chemicals and the related studies
about which formulation fits better for those specific ones, including a lifetime estimation, seems
to be more logical to add security to the end user.
In mining applications as a challenging site where the risk should be reduced at minimum,
a new approach in term of specifying HDPE geomembrane is felt to be necessary being site specific
formulated. It would benefit all parts involves in a project as well as the risk would be minimized
by creating and customizing the most suitable HD geomembrane for the site needs. Asset owners
and designers could prescreen and test a set of liners under site-specific environmental conditions
that include short and long-term immersion testing. When assessed by index tests and performance
tests at different concentrations and temperatures, longevity prediction can be linked to ambient
exposure to provide reliable lifetime prediction.
A preevaluation model for geomembrane products in critical applications also allows an
assessment of long-term durability risk onsite. If sufficient project specific testing is carried out
CONCLUSION
Currently geomembranes are being used in applications where the site chemistry and
conditions challenge traditional HDPE formulations. GRI GM13 standard, whilst being an
excellent general-purpose specification, would be inadequate in projects where the leachate in
contact is very aggressive as mining processing sites. To ensure long-term performance of this
site’s geomembrane, it is very important to understand geomembrane formulation, how resin and
antioxidant package interact with each other and with the environment that are in contact with. In
this document has been presented a complete preliminary assessment, identifying site conditions
and their impact on HD formulations. As well as being proposed formulated HD geomembranes
that has been proved to behave better in this environment, minimizing the site risk by creating and
customizing the most suitable HD geomembrane for the site needs. For challenging containment
applications where the risk should be reduced at minimum, the HD geomembrane designed should
be site specific. Using most up-to-date geomembrane technology to reduce any environmental,
public health and economy impact.
Abdelaal, F.B. Rowe, R.K., and Islam, M. Z. 2014. Effect of leachate composition on the long
term performance of a HDPE geomembrane. Geotextiles and Geomembranes, 42(4):348-362.
ASTM D 5747. Standard Practice for Tests to Evaluate the Chemical Resistance of Geomembranes
to Liquids, ASTM International, West Conshohocken, Pennsylvania, USA
ASTM D 5885. Standard Test Method for Oxidative Induction Time of Polyolefin Geosynthetics
by High-Pressure Differential Scanning Calorimetry, ASTM International, West Conshohocken,
Pennsylvania, USA
ASTM D 3895. Standard Test Method for Oxidative-induction Time of Polyolefins by Differential
Scanning Calorimetry. ASTM International, West Conshohocken, Pennsylvania, USA.
Bouazza, A., Gates, W.P, Scheirs, J., Geosynthetics in Mining Applications, GhIGS GeoAfrica
2013 Conference, International Geosynthetics Society, Accra, Ghana.
GRI GM13 Standard Specification, revision 15th - 2019. Geosynthetic Institute. Folsom,
Pennsylvania, USA.
GRI Guide GM10, revision 4th - 2015. The Stress Crack Resistance of HDPE Geomembrane
Sheet. Geosynthetic Institute. Folsom, Pennsylvania, USA.
GSI White Paper 32 – 2015. Rationale and Background for the GRI-GM13 Specification for HDPE
Geomembranes. Geosynthetic Institute. Folsom, Pennsylvania, USA.
Hornsey, W.P., Scheirs, J., Gates, W.P., Bouazza, A. (2010) Impacts of Mining Solutions/liquors
on Geosynthetics, Geotextiles and Geomembranes 28 (2010):191–198.
Hsuan, Y. G., Schroeder, H. F., Rowe, R.K., Müller, W., Greenwood J., Cazzuffi, D., R.M.
Koerner, Long-Term Performance and Lifetime Prediction of Geosynthetics, EuroGeo4 -
European Geosynthetics Conference 2008, International Geosynthetics Society, Edinburgh,
United Kingdom, UK Chapter.
Koerner, R.M (2012) Designing with Geosynthetics - 6th Edition, Xlibris, USA.
Rowe, R.K., Islam, M.Z., Brachman, R.W.I., Arnepalli, D.N., Ragab Ewais, A. (2009), Antixidant
Depletion from a High Density Polyethylene Geomembrane under Simulated Landfill Conditions,
Journal of Geotechnical and Geoenvironmental Engineering, ASCE,136:930-939.
Scheirs, J. (2009) A Guide to Polymeric Geomembranes, John Wiley and Sons Ltd, West Sussex,
United Kingdom.
ABSTRACT
Stress crack resistance (SCR) of high-density polyethylene (HDPE) geomembranes, with densities
higher than 0.94 g/cc, has been widely researched and documented. Over the years, PE resin
technology has evolved and has helped to improve many long-term performance properties
including SCR. In this study, resistance to stress-cracking of bi-modal polyethylene raised
temperature (PE-RT) HDPE was assessed and compared to HDPE and LLDPE geomembranes
over a load range from 28 to 60% of yield stress. The higher tensile resistance of this specific bi-
modal resin resulted in higher resistance in the ductile failure mode than standard HDPE, but
moreover, its stress-cracking resistance behavior was found without any clear transition of the
failure envelope from a ductile to a brittle behavior. This observation suggests a longer projected
lifespan of this unique bi-modal PE compared to existing geomembranes developed using uni-
modal resins. Previous studies on this material have analyzed tensile, antioxidant depletion, and
resistance to brine and chlorine at elevated temperatures. In all cases, an improvement in durability
was demonstrated. This study on stress cracking provides a comprehensive understanding of all
known key mechanisms contributing to bi-modal PE geomembrane durability.
INTRODUCTION
This paper describes the stress crack testing that was performed on a geomembrane made with a
bi-modal HDPE resin. It is well documented that stress cracking in geomembrane is caused by
tensile stresses lower than its short-term mechanical strength. Stress cracking is essentially a brittle
cracking phenomenon that occurs at a constant stress lower than the short-term yield strength of
the material (Peggs, 2003). Most stress crack resistance testing on bi-modal resins have been
performed on pipe grade resins that are reported to have high resistance to the primary exposures
that lead to failure in polyethylene gas piping systems. Notable material properties that are used as
performance indicator of pipe robustness are 1. slow crack growth (SCG) resistance and 2. rapid
crack growth (RCG) resistance. Resistance to defects and external damage is another property
tested by pipe manufacturers to evaluate robustness of bi-modal resins for high performance pipe
applications. These tests “as is” can’t be extended to geomembranes primarily due to product type
and the end use applications. In 2014, the authors started a research project to see if any of these
new bi-modal pipe resins had the potential to be used as a geomembrane. While the pipe industry
testing looked very good there was no correlation that would show how a geomembrane would
work with the same resin. This is the fifth research paper on the development of bi-modal resins
for geomembrane applications.
Notched Constant Tensile Load test is a standard test to evaluate stress cracking under a constant
tensile load condition in an accelerated environmental condition . In this test, dumbbell shaped
specimens are notched to 20% of their thickness and are subjected to stress between 20-50% of
the geomembranes tensile yield strength as measured using ASTM D6693. The specimens are then
placed in a solution containing surface-active agent and tested at 50°C. These accelerated test
conditions cause the material to develop crack growth and fail. A plot of the percent yield stress
versus average failure time of the three tests at each load is shown in figure 1 below (GRI GM10).
The test requires at least 3 points to be in the ductile region of the curve and at least 3 points shall
be in the brittle region of the curve. The transition between ductile and brittle failure indicates the
stress crack resistance of the material.
Time
Figure 1. Transition from ductile to brittle failure, adapted from Hsuan, 1995.
In general, the molecular weight distribution of the polymer determines the polymer properties
(plasticpipe.org). The bottom axis shows the molecular weight (the length of each chain). The
vertical axis shows the weight fraction. These graphs usually create a classic bell curve (normal
distribution in statistics). A uni-modal distribution, on the left of Figure 2, shows a single peak
distribution.
The main material investigated in this evaluation was a bi-modal PERT geomembrane. Since this
was the first time a bi-modal PERT geomembrane resin was evaluated for stress cracking
performance, the authors felt it was necessary to compare its performance with other
polyethylene types commonly used for the manufacturing of geomembranes. The following
geomembranes were part of this study:
- GM13 complaint HDPE
- GRI GM 17 complaint LLDPE
- Bi-modal PERT HDPE
Table 1 provides summary of physical properties of the material tested in this study.
TEST METHODOLOGY
The resistance to stress cracking was determined in accordance to ASTM D5397, including a
complete evaluation of test loads, test loads were selected between 28-68% of the measured
stress at yield which was determined as per ASTM D6693. Table 2 summarizes the test loads
used for this study. Samples were retrieved at different intervals and evaluated for stress crack
resistance. The last sample tested was exposed to 10,000 hours before being tested for SCR.
Images by scanning electron microscopy (SEM) on the surface was carried out to determine
brittle or ductile failure.
NCTL Tests. Figure 3 describes the relation between the load in percent of the measured yield
stress to failure time.
This type of analysis induces a bias from the initial resistance to tensile stress. On an
absolute basis, Figure 4 presents the resistance to stress crack propagation in terms of tensile
stress, in psi.
Bimodal PERT
HDPE
LLDPE 45% y.s./ 789 psi HDPE 35% y.s. / 933 psi
The behavior of PE-RT HDPE to ASTM D5397 describes three possible NCTL response curves
as shown in Figure 6. These are the bi-linear or knee curve, the overshoot or nose curve, and the
tri-linear or step curve.
While variability in testing data makes it difficult to determine which of these curves may
apply, the more important goal is to identify the transition point between a brittle failure and a
ductile failure. In all the curves shown it is the transition in the slope of the line in which we are
most interested.
Identifying the transition point in our data (highlighted in Figure 1) is complicated by the
variability of the data. Fitting curves to the data it is still not immediately clear enough to draw
conclusion from trends on the location of the ductile-brittle transition. However, the transition
point may be assessed from microscopic view of the specimen rupture faces, which may provide
evidence of ductile or brittle failures, shown on Figure 3. The use of microscopy allowed us to find
the transition times for each material, this transition can then be looked upon on the graph to see
if the data on the graph are close to that transition time. For bi-modal PE-RT HDPE, this transition
was showing an inflection opposite to the ones proposed by ASTM D5397.
CONCLUSION
The assessment of stress-crack resistance of PE-RT bi-modal HDPE was done using ASTM
D5397, and compared to reference materials commonly used for geomembranes. Whereas no
stress-cracking failures were observed with LLDPE, both HDPE grades have shown a transition
from ductile to brittle behavior under accelerated long-term tensile stresses. The bi-modal PE-RT
HDPE grade has shown longer time to ductile-brittle transition, and failure by stress-cracking than
the reference HDPE. The findings of this study are in accordance with previous studies on the
aging of bi-modal polyethylene grades for its usage in the geomembrane applications, including
ACKNOWLEDGEMENT
This project has been funded under a grant from NSERC. The study on the resistance of this novel
bi-modal PE-RT HDPE was initiated by Andrew Mills, formerly from Layfield. Andrew has now
retired, the authors would like to acknowledge the great contribution of Andrew to this paper, and
well as previous ones on the subject.
REFERENCES
Peggs, I.D. 2003. Geomembrane liner durability: contributing factors and the status quo.
Proceedings from the First United Kingdom Geosynthetics Symposium, UK Chapter of IGS.
June 2003.
Hsuan, Y.G., Koerner, R.M. (1995). The Single Point-Notched Constant Tension Load Test: A
Quality Control Test for Assessing Stress Crack Resistance, Geosynthetics International, 1995,
Vol. 2, No. 5.
Beaumier D., Mills A., Dolez P., Blond E. (2016). Tensile Resistance of Geomembranes for High
Temperature Applications, GeoVancouver 2016, Canadian Geosynthetics Society, Vancouver,
BC, Canada.
Mills A., Beaumier D. (2017). Long-term Performance of HDPE Geomembranes Exposed to a
High Temperature Brine Solution, GeoFrontier 2017, IFAI, Orlando, FL, USA.
Rangel E., Mills A., Beaumier D., Fraser B. (2017), A new geomembrane for chlorinated water
containment, Geosynthetics 2017, Santiago, Chile.
Mills A., Fraser B., Beaumier D., Long-term Performance of HDPE Geomembranes Exposed to a
High Temperature Brine Solution, Geosynthetics 2019, IFAI, Houston, TX, USA.
ASTM D 5397. Standard Test Method for Evaluation of Stress Crack Resistance of Polyolefin
Geomembranes Using Notched Constant Tensile Load Test, ASTM International, West
Conshohocken, Pennsylvania, USA.
ASTM D 6693. Standard Test Method for Determining Tensile Properties of Nonreinforced
Polyethylene and Nonreinforced Flexible Polypropylene Geomembranes, ASTM International,
West Conshohocken, Pennsylvania, USA.
GRI - GM13. Standard Specification for “Test Methods, Test Properties and Testing Frequency
for High Density Polyethylene (HDPE) Smooth and Textured Geomembranes” , Geosynthetic
Institute, Folsom, Pennsylvania, USA.
GRI - GM17. Standard Specification for “Test Methods, Test Properties and Testing Frequency
for Linear Low Density Polyethylene (LLDPE) Smooth and Textured Geomembranes”,
Geosynthetic Institute, Folsom, Pennsylvania, USA.
Plasticpipes.org. Extracted from https://plasticpipe.org/pdf/chapter03.pdf, Plastics Pipe Institute.
Material Properties, Chapter 3, pg. 53.
ABSTRACT
INTRODUCTION
Shoreline and inland estuary erosion protection has been and will continue to be a major concern
for inhabitants, businesses, and tourist living near or visiting these areas. Traditional methods of
protection, in too many cases, have exacerbated versus mitigating the erosion problems causing
engineers and regulators to rethink adaption living shoreline designs for new projects or
rehabilitation of old projects. Given these conditions, Living Shorelines, once only a dream of
environmentalist and government regulators, are becoming a reality. Marine engineers practicing
erosion control, for shoreline protection design and construction now have an expanding verity of
engineered materials to select from that have proven track records of performance. This is the case
of the Currioman Bay project in Westmorland County, Virginia.
CHALLENGE:
The James River and the adjacent Currioman Bay located in the Northern Neck of Virginia is a
very popular body of water enjoyed by local sports fishermen and water enthusiast. See Figure 1.
Because of this location’s popularity and access to the Chesapeake Bay, Westmorland County built
a boat launch and has provided the Currioman boat launch facility free of charge for those enjoying
the river and bay to launch and trailer their sports crafts since the early 1950’s. However, over the
SOLUTION
In 2018 Westmorland hired a local marine engineering firm to develop a master plan for the
redevelopment and protection and reestablishment of the spit of land to its’ pre 1994 condition,
dredging the entry channel, upgrading the surrounding property, and reopening the Currioman
Boat Launch for public use.
The priority was the development of an erosion protection design for spit that would incorporate a
soft armor system that would blend with the natural setting yet provide a Living Shoreline
environment. The option chosen by the engineering firm was to install a geotextile tube with a
scour apron around the entire perimeter or the original spit. The top elevation of the geotextile tube
would be the +0.9m (+3.0 ft.) MLW elevation. See Figure 4. The engineer specified a composite
geotextile for the geotextile tube. The composite geotextile consisting of three layers. The outer
layer was 1,050 grm/m3 (30 oz/yd2) of UV stabilized high denier polypropylene fiber needled into
a high strength woven polypropylene geotextile with a non-woven geotextile backing. See Figure
5 for an image of the composite geotextile used to fabricate the geotextile tubes and Table 1 for
the physical and hydraulic properties of this composite geotextile tube material. The outer layer is
designed to entrap the sand and sediment taking on a natural appearance that blends in with the
surrounding environment. This composite geotextile was chosen based on the ability of a data
reported by Little et al in their 2016 published paper geotextile that concludes Soft Substrate
Geotextiles support soft marine growth when deposited in an estuarine condition. The thick soft
fiber structure of the composite geotextiles provides this type of substrate for an environmentally
sustainable structure. The engineer specified that sediments deposited around the boat launch and
within the channel leading from the boat launch would be used as fill material for the geotextile
tubes.
The second level of the design requires that once the geotextile tube perimeter has been installed,
the remaining sediments of silt and sand within the boat launch and channel will to dredged and
deposited within the geotextile tube perimeter to a level of +1.25m (4.0 ft.). See Figure 4 for the
final design. This will create a channel for the boats to enter the bay and return to the boat launch
with a channel depth of -1.25m (4.0 ft.).
The final design consideration was to be able to reestablish the native vegetation that grew on the
spit of land before it was destroyed by erosion. To provide additional stabilization and restore the
spit to its’ original function and appearance. Three types of native species will be planted on the
east side of the spit facing the bay and three different native species will be planted on the west
side facing the land. See Table 2 for the types of marsh grass. In total more than 22,000 plugs
grown in a local nursery will be planted. In addition, any remaining grass on the spit after the
installation of the geotextile tube perimeter and before the dredging operation will be removed
with the root mat and preserved for replanting like sod on the spit.
CONSTRUCTION
The construction phase of the project began in July 2020 with the installation of the outer row of
scour aprons and geotextile tubes. The inside row installation was completed September 2020 and
the dredging completed in the same month with the grass planting finishing the project in mid-
October 2020. All dredging was performed mechanically using a long stick excavator. The
geotextile tubes were filled using a hopper and water pump. See Figures 6, 7, 8, 9, and 10.
During the installation of the geotextile tubes forming the perimeter of Currioman Bay Spit
Restoration, a variation of local materials was accessed to fill the containers. When the project was
bid in 2019 the area at the base of the spit peninsula had already washed out good quality sand was
evenly spread over this area in a thickness of about 1’ depth. However, by the time geotextile tube
installation commenced in June 2020, this area had experienced additional overwash for about six
months resulting in a concentration of preferred sediments more toward the south of the site. An
on-site investigation identified there were acceptable sediments remaining below where the
previous sand strata previously existed. The combination of mini suction dredges along with a
double port fill hopper allowed for filling the geotextile tubes with both types of material and
variations in between. As a result, additional double handing of material was implemented. The
flexibility of having two type of fill devices on site allowed the construction team to vary fill
methods based on the proximate sediment types. Layers of saturated bark were encountered on the
site. Therefore, the use of the mini suction dredge allowed these deposits to be easily identified
and avoided.
ENVIRONMENTAL ASSYMILATION OF GEOTEXTILE TUBES:
Each geotextile tube section was installed either with a suction dredge or a combination of fill
hopper and an excavator on a floating barge. Each type of method had minimal impact on the
environment. The floating barge made it possible for access to occur without significantly
impacting benthic area designated for protection from work area. Also, the mini suction dredges
were deployed atop a Carolina skiff in a similar manner preventing further impact. Throughout the
• Traditional hard armor erosion control material like stone rip rap are expensive and not
conducive to environmentally friendly Living Shoreline solutions.
• Geotextile Tube structures with soft armor surfaces have the capability of providing a
sustainable Living Shoreline environment that supports and encourages marine growth.
• The Geotextile Tube Living Shoreline design and installation created a lower cost than
traditional construction technique that allowed the project to be completed within the
owner’s budget without impacting the sensitive surrounding environment.
• The Geotextile Tube Living Shoreline had no environmental impact on the natural site
sedimentation or literal drift.
ACKNOWLEDGEMENT
This paper could not have been completed without the information provided by John Brooks at
Apex Engineering in Richmond, Virginia and Shannon Wilkins of Docks of the Bay Construction
Company in Irvington, Virginia.
REFERENCES
Little, J, et al, 2016, Quantitative Evaluation of Marine Growth on Geosynthetic Reef Trials in
Beaufort, North Carolina, Geosynthetics 2016, Miami, Florida, USA.
ABSTRACT
This paper explores Geocontainment Systems used in erosion control works for inland
waterways. Over time, rivers and canals are subject to natural erosion processes. If left
unattended, the continued erosion can cause major destruction of the basin and/or watercourse
resulting in increased flooding, reduced vegetation growth and destroyed habitat. A variety of
erosion control systems are available, with rock-based or concrete based systems being adopted
traditionally. However, a soft and environmentally friendly solution, or Geocontainment
solution, is often preferable. Examples of Geocontainment Systems include geotextile bags and
sand filled mattresses. There is a wide range of engineered geotextiles and composites used for
the fabrication of Geocontainment Systems. These engineered fabrics are designed for strength,
robustness, abrasion resistance, UV resistance, etc. for the most demanding of site conditions.
Our goal is to show how the versatility of these materials as Geocontainment Systems together
with their low cost, and simple design makes a compelling case for their adoption as commonly
used methods for erosion control.
INTRODUCTION
Inland waterways are continually subjected to natural erosion resulting in flow meandering,
flooding and damage to infrastructure. Erosion is the action of surface processes, such as water
flow or wind, that removes soil, rock or dissolved material from one location on the Earth’s
crust, and then transports it to another location. In order for erosion to occur three processes must
take place; detachment, entrainment and transport (Yee, 2012). Detachment occurs when soil
particles are removed from the earth’s surface through the impact of raindrops, running water,
scouring action, flowing debris abrasion or wave breaking action. Entrainment refers to the loss
of frictional resistance of the soil to its surrounding environment due to the forces of fluid drag.
Once a particle is entrained it tends to move as long as the velocity of the current is high enough
to transport the particle horizontally. The transport of entrained soils continues until the flow
velocity is lower than the settling velocity. Figure 1 shows the erosion and settling velocities for
different soil particles sizes.
Traditionally, hard armor erosion control materials, such as rock and/or concrete based systems,
have been used to mitigate bank erosion. But, as those materials become increasingly scarce, and
more expensive, the use of Geocontainment Systems is being adopted as a viable alternative. The
earliest recorded use of Geocontainment Systems is sand filled geotextile bags in The
Netherlands and Northern Germany in the 1950s (Koerner, 2016). The geotextile bags were used
to encapsulate sand fill to form erosion resistant gravity structures. Since that time
Geocontainment Systems have been widely developed and can be categorized in three main
categories; geotextile bags, geotextile mattresses and geotextile tubes. The information provided
in this circular focuses only on geotextile bags and sand filled mattresses.
Traditional methods used to prevent soil erosion on channel banks include rock-based systems,
such as gabions, rubble and riprap, or concrete based systems, such as filter point or fabric
formed mats, block and poured concrete. While these systems offer some advantages, such as
stability and endurance, they also present disadvantages, such as higher cost and limited
availability. The cost disadvantage exceeds that of just the materials. Transportation, site
preparation, site access, heavy machinery, and installation all contribute to the higher cost of
these type cover layers. Also, in many regions, materials for rock-based systems are unavailable,
and thus are not an option. Apart from the cost and availability of traditional materials, they are
often unattractive and alter the natural appearance of the waterway.
GEOCONTAINMENT SYSTEMS
Geotextile Bags
Geotextile bags come in different shapes and sizes, with fill volume ranging between 0.3 to
10m3 (Bezuijen and Vastenburg, 2013). Most geotextile bags found in the market today are
either pillow shape or box shaped. A pillow shaped geotextile bag is comprised of a folded piece
of specially engineered fabric that is seamed along three sides. A box shaped geotextile bag is
comprised of several pieces of geotextile seamed along the edges to form a box like unit.
Designs for geotextile bag structures include stacked arrangements that greatly increase stability
under hydraulic actions. Geotextile bags are usually installed using two types of geometry.
Figure 2(a) depicts geotextile bags stacked horizontally in an offset fashion. Figure 2(b) depicts
geotextile bags placed length wise following the profile of the slope surface. The two geometries
have a different effective thickness that impacts the hydraulic stability of the structure. As with
traditional protection methods, these designs also include a secondary layer of filter fabric to
prevent particle erosion on the slope face.
(a) (b)
Figure 2. Geotextile bags arrangement (a) geometry I (b) geometry II (Yee, 2012)
Geotextile bags, as shown in Figure 3, can be filled with various materials such as soil, gravel
and concrete. However, the preferred fill material is sand. Sand is a common resource along
many waterways. And, because it is mechanically and volumetrically stable, it has predictable
engineering properties. Selecting the right fill material to maximize the fill density of geotextile
bags is critical to ensure they maintain their shape over the life of the structure. It is a common
practice to hydraulically fill geotextile bags to fully compact and maximize the volume of the
sand fill.
Geotextile bags used for erosion protection include many advantages when compared to
traditional hard cover layers. The size and shape of geotextile bags can be customized to meet
design requirements for hydraulic loading. Localized soils can be used to fill geotextile bags
which reduces both material and material transportation cost. Since a geotextile bag structure is
ABSTRACT
Built in 1849 and originally known as the Maurice River Lighthouse, the two-story brick structure,
now known as the East Point Lighthouse, is the second oldest lighthouse in the state of New Jersey.
Over the last decades, the historic building has become vulnerable to storms and flooding due to
years of shoreline erosion and today at mean high tide, it sits just 90 feet from the shoreline. The
geotextile tube technology was invented in the early 60’s in the Netherlands and for more than 25
years it has been successfully used in the United States. The first shoreline application was installed
in Atlantic City, New Jersey in 1993. Throughout the years, thousands of tubes have been being
installed for marine application around the country, which helped to restore many miles of natural
protective coastal dunes. As the geosynthetics evolved over time, new composites and high
strength geotextiles have been engineered to provide better aesthetics, higher UV resistance, higher
performance and consequently more durability to geosystems as marine structures. It’s also
important to highlight that these new materials provide a more susceptible media for marine life
growth. This paper presents the case study of the use of the geotextile tube technology to protect
an American symbol, the East Point Lighthouse, and shows how this innovative solution draw a
line in the sand in order to stop the erosion to progress.
INTRODUCTION
Over the last decades, storm surge and flooding have washed the sediments away from the beaches
on the Delaware Bay. The advanced erosive process has been causing serious environmental and
historical impact on the region. This paper presents the case study of the use of the geotextile tube
technology to protect an American symbol, the East Point Lighthouse, and shows how this
innovative solution draw a line in the sand in order to stop the erosion to progress. Figure 1 details
how erosion in this region over the past 73 years has impacted the sensitive coastal wetlands
environment and is threatening the historic lighthouse structure.
HISTORIC BACKGROUND
This two-story structure built in 1849 and originally known as the Maurice River Lighthouse, now
known as the East Point Lighthouse, is the second oldest lighthouse in the state of New Jersey,
surpassed in age only by the Sandy Hook Lighthouse, built in 1764.
The Cape Cod-style Lighthouse provided hundreds of Delaware Bay oyster schooners with a
guiding light to the ports of Port Norris and Port Elizabeth, operating until the time of the Second
Figure 1: Google Earth images showing the erosive process from 1940 to 2013.
ENVIRONMENTAL IMPACT
The East Point Lighthouse is surrounded by wetlands, a preserved ecosystem that provide habitat
for thousands of species of aquatic and terrestrial plants and animals. They also are valuable for
flood protection, water quality improvement, shoreline erosion control, recreation, and aesthetics.
The geotextile tube structure was installed all around the wetlands as a reinforced sand dune core.
The geotextile tube technology was invented in the early 60’s in the Netherlands and for more than
20 years it has been successfully used in the United States, which had its first application in
Atlantic City, New Jersey (Pilarczyk, 2000, Lawson, 2006, Bezuijen, 2013). Throughout the years,
thousands of tubes have been being installed for marine application around the country, which
helped to restore many miles of natural protective coastal dunes. As the geosynthetics evolved
over time, new composites and high strength geotextiles have been engineered to provide better
aesthetics, higher UV resistance, higher performance and consequently more durability to
geosystems as marine structures. It’s also important to highlight that these new materials provide
a more susceptible media for marine life growth. Figure 2 shows the first job using the geotextile
tube technology in 1962 and Figure 3 shows the geotextile tubes in Atlantic City, New Jersey in
1993.
Figure 3: First geotextile tubes installed in the United States (Atlantic City, New Jersey in
1993).
PROJECT DESIGN
Solution. The solution was to use the geotextile tube technology to protect the 600ft (183m) of
shoreline right in front of the lighthouse, reinforcing the sand dune core that had been eroded over
The 600ft structure was designed to have eight sections and each section to have three elements:
the scour apron with two anchor tubes, a Sand Filled Mattress (SFM) on top of the scour apron,
and geotextile tube elements on top of the SFM. The SFM is made by a durable composite and
was used in this project to provide extra weight to the scour apron. Figure 4 shows the eight
sections on a plan view and the relative position of the Lighthouse and the wetlands to the structure.
Different lengths of tubes were used to allow the system to follow the designed alignment.
Geotextile Specifications. The geotextile used to fabricate the Scour Apron was a woven
geotextile with a tensile strength of 79 x 110 kN/m (450 x 635 lb/in) and seam strengths of 70
kN/m (400 lb/in). The SFM tri-composite top layer geotextile has a thickness of 6.35mm (0.25
in.), a mass of 1,200 grm/m2 (35 oz/yd2). See Figure 5 for an example of the Tri-Composite
geotextile. In addition, the SFM has a hurricane impact resistance according to ASTM E1886 of
1,665 N/m (1,233 lbf) and a high UV resistance. When tested according EN12224 the estimated
half life of +35 years when exposed to sunlight at the latitude of New Jersey. Also, the SFM has a
tensile strength of 63 kN/m (360 lb/in). The geotextile tube was fabricated from a woven textile
with a tensile strength of 200 x 200 kN/m (1,250 x 1,250 lb/in) and the same hurricane impact
resistance as the SFM. These unique high strength – high impact resistant geotextile materials were
selected for this project because the anticipated exposure to annual hurricane and nor’easter storm
events and for their proven track record on other projects with similar weather patterns.
Figure 4: The eight sections on a plan view and the relative position of the Lighthouse and
the wetlands to the structure.
.
Conceptual Design. The geotextile tube was designed using the Geotube® Simulator, which is a
proprietiary TenCate software that has been developed to create the cross sectional geotextile tube
image with dimensions and volume and to calculate the forces exerted against the container in the
circumference and axial direction, and against the fill ports when the container is filled with a fluid
of any given density (Plaut, 2018). Input variables to the Geotube® Simulator are the
circumference and fill height of the tube, the relative density of the fill material, the type of
geotextile to be used, the type of filling port, and the tube fabrication method. The output data are
the tensile forces exerted on the container in the circumferential and the axial directions, the tube
fill width, the cross section area and the volume per unit length, and the FoS (Factors of Safety)
against rupture for the given input parameters. Figure 6 shows the Geotube® Simulator graphic
output for the East Point Lighthouse project.
PROJECT EXECUTION
The first step was to excavate the terrain and level it up in order to keep the designed elevation of
the crest of the structure. Next, the scour apron was installed having the two anchor tubes filled
with slurry sand from a fix sand box. The next element was the SFM, which was filled separately
and positioned by using an excavator, and finally the geotextile tube was placed and filled up to
5ft. It was used geotextile tubes with flat ends to assure that the structure would not have lower
zones where the tubes overlap.
The project was implemented in December of 2019 and it took about 30 days to be concluded. It
was the contractor’s first job installing geotextile tubes, although they learned fast and did a great
job. The method they developed to install the SFM helped to speed up the installation process.
Figure 7 shows geotextile tube with its flat end.
As the sections were being finalized, they were covered with sand that from time to time, specially
after big storms, it is recommended to be replaced. Figure 8 shows the Sand Filled Mattress being
installed. Figure 9 shows the structure completed after six months.
CONCLUSIONS
The main objective of the project was achieved, which was to stop the advancement of the erosion
that was threatening the historic lighthouse building.
The use of geotextile tubes with flat ends provided cost savings because it was not necessary to
overlap the units and lose a portion of the structure longitudinally.
The use of geotextile tubes provides a clean and safe environment for the beachgoers, since there
are no rocks spread all over the beach.
It’s important to address that the geosynthetics that were used are chemically inert, allow
vegetation growth and interact very well with marine life. For instance, the horseshoe crabs spawn
on the beach of Delaware Bay every year and 2020 was not different.
REFERENCES
Bezuijen, A., Vastenburg, E. W., Geosystems: design rules and applications, 1st edition, ISBN
978-0-415-62148-9, TA455.G44B49 2013.
ABSTRACT
The buoy that is part of the offshore terminal for tanker ships loading oil off the Colombian
coastline is anchored to a submerged pipeline 42” in diameter that sits 30m deep over the
seabed.
Underwater currents have caused localized scouring along the pipeline, creating voids
underneath it and additional strain on the pipe. To provide a definitive solution, it is key to
understand that loading of the ships is the number one priority of the facility, therefore very
specific windows of operation are open to install or build any solution.
With this restriction in mind, the project opted to fill onshore large Geotextile bags,
3
25m in capacity each, that would be loaded onto a barge using a lifting harness made of
polyester geogrid and a PVC coating. The geotextile bags would be lowered into position
using a large crawler crane which would be fixed on to the barge and set into position with the
help of deep-sea divers. With the bags in place, resting on each side of the pipeline, a geotextile
tube would be installed in between the bags and under the pipeline and filled from the surface
with a sand and water slurry.
The geotextile bags are 5.0m long x 2.5m wide x 2.0m high and each has a filled capacity
of 25m3 and weighs in approximately 40 tons. Once the Geotextile bag and Geotextile tube
are in position, a final Geotextile tube type-of -mattress would be placed overlapping the bags
and the geotextile tube and filled with a sand slurry to fill in voids so that it can provide the
support required to keep the submerged pipeline stable and in place. This geosynthetic system
will provide a long-lasting solution for this scouring problem for good.
1. INTRODUCTION
The crude oil pipeline stretches from the south eastern plains in Colombia, in Cusiana and runs
northwest to Covenas, on the Caribbean coast of Colombia, covering a total length of 850km on land
and 12km underwater, lying on the bottom of the sea bed, 30m deep, where it connects to a manifold
and valve system known as “TLU buoy” where super tanker ships are loaded, and the crude oil is
exported or sent to the refinery in near-by Cartagena. Figure 1 – Project Location.
The submerged pipeline is 42” (1.06m) in diameter, it seats on the seabed and undergoes constant
electronic monitoring and scuba diving supervision. Localized scouring along the pipeline has been
detected in the past, mainly caused by underwater currents and several attempts to stop it have been
made, with partial success.
An inquiry was brought to our attention on finding a way to solve this scouring problem for good and
a solution utilizing a combination of geosynthetics was chose: large Geotextile bags units would be
placed along each side of the pipeline; then, Geotextile Tubes and a Geotextile tube type-of-mattress
would be installed. Figure 2 – Condition Prior to Geotextile Tube Solution
One of the constraints to carry out the installation of the Geotextile Bags and Tubes, was the time
frame allowed to move near the buoy and carry out field maneuvers, as the priority of operation of
the buoy consists in exporting crude oil, therefore any attempt to work around the site, would have to
To reduce such risk, it was decided to split the construction process into two phases: the first phase
would be carried out onshore, with the deployment of the Geogrid Lifting Harness and the Geotextile
bag units. Initially, these bags were designed with a capacity of 35m3, but it was later decided to
bring them down to 25m3. The bags would be deployed over the geogrid lifting harness, filled and
then loaded on to a barge. A total of 21 Geotextile bag units would be required for this project,
containing over 525m3 of coarse grain material.
Once the Geotextile bag units were lowered into position, all crane and additional vessels would no
longer be required, thus reducing construction risks to manual deployment of the Geotextile tubes
and mattresses.
2. LABORATORY TESTS
To determine the Geogrid Lifting Harness Factors of Safety, we carried out Pullout tests, as per
ASTM D 6706, using a 400kN/m geogrid as pullout specimen overlying by a 200kN/m x 200kN/m
geotextile sample, so as to simulate the behavior of the geogrid – geotextile bag system interaction.
Pullout tests allowed us to determine the apparent coefficient of friction of Geogrid – Geotextile
system, which would be used to calculate the geogrid’s lifting harness factors of safety against rupture
and pullout resistance, based on the geotextile bag’s geometry and weight.
Several factors were taken into consideration for the design of the geotextile bag and Geotextile Tubes
used on this project. Although geotechnical information was not made available, a recent survey and
Three sectors were identified that would require stabilization. As there was no geotechnical data,
information provided by the diving team was used to determine the size of geotextile bags. A layer
of fine grain material, approximately 1.2 to 1.5m in thickness was present. Therefore, geotextile bag
units that would be placed along the side of each sector should be as heavy as possible so that they
would sink through this layer and become stable reducing future settlements. Initially, geotextile bag
units were designed to contain 35m3 but were later reduced to 25m3 each. Fabrication and lifting
would have been possible; however, this decision was made in stake of risk management on behalf
of the client. Final geotextile bag design was a unit made of a woven geotextile, 200kN/m x 200kN/m
and 5.0m long, 2.5m wide and 2.0m high. Finally, each geotextile was 30m lowered into position
with the use of a crawler crane and the Geogrid lifting harness. Figure 4 – Geotextile bag Lifting
Harness and Installation.
Geotextile Tubes were designed with a fill height of 2.0m also, having Flat-Ends on each end so that
they would snug fit between Geobag units. These Geotextile tubes were lowered and secured into
All Geobag units and Geotextile tubes were installed successfully and have provided support to all
scoured sections. Installing the Geotextile tubes on the seabed by divers proved difficult as time was
limited during each dive, yet it was achieved. Also, pumping the sand slurry 30m to the bottom was
accomplished successfully.
Project was completed in 2019 and first monitoring will be made during the first quarter of 2020.
4.1 REFERENCES
Ruiz, N., Geobags para la protección de la socavación en las esclusas de Gatún, Canal de Panamá,
Geosynthetics 2017, Santiago, Chile, 2017
Anmoba Solutions SAS, Análisis de cargas durante el bombeo de estabilización de lecho en oleoducto
submarino, Bogota, 2019
SGI Testing Services, LLC, TenCate Geosynthetics Geogrid Pullout Testing (ASTM D 6706),
Georgia, 201166
Alice Jia Li Song,*1 Jeremy Bilotti,*2 Sarah Dole,3 Hassan Maniku,4 Tom Stephens,5
Schendy Kernizan,6 Jared Laucks,7 Skylar Tibbits8
ABSTRACT
This paper presents a new approach for promoting sand accumulation through strategically placed
submersible geotextile geometries. This technique is being tested both in a laboratory environment
and full-scale field experiments in the Maldives. Typical attempts to reduce wave forces or fight
erosion rely on static physical barriers or continual beach replenishment, which resist the
constantly changing natural forces of the ocean. Our approach instead, attempts to work with
waves and currents to harness their energy in promoting sand accumulation. With large scale
triangular prismatic geometries (20m ✕ 4m ✕ 2m) fabricated from geotextile membranes, the
interaction of the water and sediment flowing over the geometries has shown to promote targeted
accumulation. This paper will compare our approach to existing strategies for erosion control,
discuss the material fabrication techniques, existing laboratory experiments as well as our latest
results from the field experiments showing substantial sand accumulation within a targeted area.
INTRODUCTION
As climate change progresses, island nations and coastal regions face a growing risk of flooding.
Sea level rise due to increasing global temperatures and ice melt will likely cause inundation of
coastal regions. As storms grow in frequency and severity, coastlines will be further battered and
eroded. Increasing ocean temperatures could also contribute to the loss of the remaining coral
reefs, which serve to protect coastal and island integrity. With more than 40% of the world’s
population living near coastlines, it is imperative that we find novel approaches to address this
mounting threat.
The Maldives has faced continued environmental challenges throughout its 2500 year
history. The development of the Maldives is very much based on the ecosystem that surrounds it.
Studies indicate that 89% of GDP depends on biodiversity (Das, 2010), mainly the marine
ecosystems (coral reefs) which are at their thresholds due to the impacts of climate change. Out of
the 200 inhabited islands around 85% are directly impacted by erosion. Some islands have even
lost large percentages of their land due to erosion. On the other hand, there has been an increase
of human-induced dredging and expanding of islands which applies further strain on the already
Our research explores the relationship between the natural forces of the ocean and the
formation of sand morphologies, aiming to promote the accumulation of sand in targeted locations.
Our hypothesis is that strategically placed submersible objects with specific geometries sitting on
the ocean floor, much like a moveable artificial reef or other geomorphic feature, can influence
and guide sediment transport to help grow beaches or islands. We have conducted a series of lab
experiments and full-scale field experiments to test this hypothesis and understand the most
successful geometries and specific parameters for guiding sand accumulation. Our field
experiments aim to test the effectiveness of our submersible geosynthetic bladders in accumulating
sand with real world conditions. The lab experiments attempt to understand the dynamics of the
sediment transport in a controlled environment by simulating the forces and material
characteristics.
Our aim for this research is to develop a scientific understanding of sediment transport in
the Maldives with our underwater geotextile structures and test our hypothesis for sand
accumulation. Additionally, we are aiming to develop a working model through lab and field
experiments which can eventually be scaled to provide an environmentally sustainable approach
to mitigate erosion and sinking islands. Our latest field experiment is showing early promising
results with hundreds of cubic meters of sand accumulation in a targeted area over the course of
several months. We hope to eventually expand this research to other island nations and coastal
regions to understand the dependent regional dynamics and independent scalable parameters of
our system.
BACKGROUND
It has long been understood by the Maldivian communities that their islands shift, grow and move
over the course of the year. An island can grow by many meters on one side during one monsoon
season, and then shift to the other side of the island in the opposite season. Leading researchers,
such as Paul Kench, have documented this phenomenon in a number of noteworthy publications,
showing that many Maldivian islands have actually grown in size even while sea levels have
increased dramatically in the past decades (Kench, et al., 2014, 2015, 2018). This unique finding
argues that these coral-based islands can be extremely active and may continue to shift with the
increasing dynamics of climate change. It does not guarantee their survival, however, because the
islands are built from coral; with ocean temperatures rising, the coral is bleaching and dying,
thereby decreasing the production of sand and limiting the size of the island. Thus, it is imperative
that we understand how to utilize the potentially scarce resource of sand by helping to transport
and guide its accumulation in strategic areas.
There has been a wide range of engineered solutions attempted more recently to fight beach
erosion, longshore drift and flooding (the results of storm surges and sea level rise). The most
typical engineered approaches include fixed infrastructural systems like dykes, jetties, sea walls,
tetrapod walls and geotextile breakwaters. Soft approaches include sand dunes, beach nourishment
and dredging (Pilkey et al., 2012). Technologically innovative solutions have been proposed like
artificial seaweed networks, tidal power generators or chemical sand additives (Linham et al.,
2012). Similarly, a recent approach developed in the Netherlands, the Sand Engine, is attempting
to guide the accumulation of sand by first dredging and placing sand in one location then letting
the natural currents of the water to redistribute it (Speybroeck, 2006). However, this method still
relies on dredging and does not promote the accumulation of new sand. Rather, it moves artificially
placed volumes of sand.
Simultaneously, material developments over the past several decades have led to new
approaches for erosion mitigation technologies that go beyond hard rock walls and concrete
barriers. Synthetic geotextiles, for example, were first developed in the early 1950s but did not
come into widespread use until the late 1970s and early 1980s. The most common products during
this time were non-woven geotextiles with tensile strength in the 20 to 40 kN/m range. By the
1980s industrial textile weaving and fiber extrusion equipment was developed that had the
capability to produce high strength woven polypropylene geotextile products that could reach
uniaxial strengths of 100 kN/m. By the mid 1990s textile innovations made possible the production
of geotextiles that could achieve biaxial strengths upwards of 200 kN/m. Accompanying these
critical advances, geotextile fabrication using seaming reached a level of refinement such that seam
strengths exceeded 50% of the textile strength.
Recent geotextiles advances have focused on survivability from UV exposure, impact, and
abrasion resistance (Stephens, 2019, Timpson, 2018). The most recent geotextiles are composites,
combining the woven geotextile substrates and cover layers of course fibers that entrap sand and
sediments, and help establish vegetation for installations above the water level while encouraging
marine organism attachment for underwater bladders. Also, fabrication techniques, materials, and
equipment have improved such that seaming can reach 80% of the geotextile’s tensile strength.
Together with our collaborators in the Maldives, we have analyzed, designed, tested and
deployed a series of submersible geotextile bladders that have been shown to promote sand
accumulation in targeted areas simply as a result of their geometry, orientation and material
resilience over time. By harnessing wave forces to guide the accumulation of sand in strategic
locations, and adapting the placement of the devices to seasonal changes or storm direction, our
approach aims to naturally and sustainably reshape sand bathymetry using the forces of nature. In
the long-term, we aim to better understand sediment transport dynamics to be able to scale our
approach to other regions, helping to rebuild and stabilize heavily-populated coastlines and other
vulnerable island nations.
METHODS
Two types of experiments were performed to inform geotextile design decisions and assess the
effectiveness of submersible geotextile bladders: Tank Experiments in a laboratory setting and
Field Experiments in the Maldives. The laboratory tank experiments were performed before the
field experiments and informed the setup of subsequent field experiments. A controlled laboratory
setting allowed testing to be accelerated compared to slower and more complex field experiments.
A laboratory environment also allowed for the isolation of conditions for the purpose of studying
sediment transport behavior with fewer environmental variables.
The full-scale field experiments allowed our research to move from idealized lab
conditions into the real world. The field experiments also informed transportation and deployment
strategies, material properties, as well as data and environmental observations affecting the
bladders. In the latest field experiment, the geotextile bladders were left on site for a prolonged
period of time allowing for long term recording of data and observations of sand accumulation
over a number of seasons.
As a first step, a scaled sample beach was recreated and contained in a 1.82 m table top wave tank.
In this series of tests, the goal was to rapidly generate iterations of geotextile bladder geometries
in order to glean patterns and visual results while building an intuition for sediment transport
behavior. A ramp-like geometry was selected as the most effective form for producing sand
This phase of lab testing focused on producing rapid and accelerated conditions compared
to those found on-site while undergoing condensed experiment run times of 20 minutes. A
Universal Robot arm with a sculpted foam paddle was used to produce patterned wave movement.
The paddle was accelerated toward the ramp, and then decelerated and stopped after travelling
15cm. The paddle then returns to its starting position. This process represents one period, lasting
1.5 seconds, and is repeated throughout the duration of the test. Using this method, we were able
to produce desired wavelengths and wave height with pre-programmed repetitive movements.
Height ratios from 1:3 to 2:3 were used as the volume of sand to water within the tank. The height
of water within the tank was always fixed at 7.62 cm, measured from the bottom of the tank, in
order to submerge the tested geometry. The sediment bed gradually sloped upwards towards the
far side of the tank to simulate a beach condition.
In this experiment, the tested geometry is placed at the center of the glass tank. The lower
end of the ramp geometry faces towards the wave paddle to receive the movement of water and
sediment while the higher end of the ramp geometry faces towards the beach. A consistent
wavelength and wave height are produced for the duration of the testing period of 20 minutes while
results are observed from side and top views and analyzed via video documentation. Sediment
retention observations, accumulated sediment depth, and associated times are recorded. Figure 1
shows the typical test setup.
Fig 1. Typical test setup including a UR arm (1) to the left with paddle attachment (2). The
wave tank (3) is shown with sand (4) and water (5). Wedge geometry (6) located in center
of tank.
The wedge shape with an angle close to 20° produced the most substantial accumulation of sand
in the given timeframe. However, the double wedge demonstrated a potentially effective method
of increasing deployability in the field by splitting the wedge into two pieces. There was no
observed disadvantage to this design decision; in fact, a slightly larger amount of accumulated
sand was observed when the wedge was split in two.
Fig 2. Profile view of 20° bladder geometry with change of 5.91 cm over 20 mins.
Fig 3. Profile view of 50° bladder geometry with change of 2.29 cm over 20 mins.
FIELD EXPERIMENTS
Field Experiment 1. The first field experiment was conducted in February 2019. Two bladders
were fabricated at MIT and installed in the Maldives. A shallow reef flat lagoon in the Maldives
was selected as the site due to its ease of accessibility. The specific location within the lagoon was
selected due to the consistent water depth of 1-2m which could accommodate the fabricated
bladder height of 2m. The MIT team fabricated two bladders with dimensions of 3m ✕ 2m ✕ 2m
from heavy canvas material. The angle of the ramp was fabricated at 33.69 degrees. This angle
was selected to fall between the two laboratory tests and could accommodate the amount of
available material to produce a 2m tall bladder. The bladders were flat-packed and transported to
the site. Figure 5 depicts the procedures for producing, packing and deploying the bladder in the
field.
The first field test required an excavator to fill the geotextile bladders with sand, forming
two 3m ✕ 2m ✕ 2m ramp geometries which were then placed side by side in the water. They were
oriented such that the lower end of the ramp geometry was facing east and the higher end was
facing west. This orientation was selected due to the predominant wave and current forces moving
from east to west in this particular location during the targeted monsoon season.
Field Experiment 1: Results. This initial field installation was installed in February and lasted
roughly one-month due to degradation of the bladder’s biodegradable canvas material. We had
intended for the material to be biodegradable yet it dissolved much more quickly than anticipated.
In addition to the material degradation, the monsoon season shifted in March/April switching the
predominant wave and current directions from northeast to southwest. Initially the results from
this field experiment looked promising after only a few days, however, we did not record any
accumulation data given the short timeframe of the experiment. Even though this field experiment
did not lead to clear results in terms of sand accumulation, the learnings from this test led to
substantial changes in the next field experiment, focusing our development on the geotextile
bladder material and a longer deployment that could be studied over many months or years.
Field Experiment 2. The second field experiment was conducted in October 2019. It was focused
on the geotextile material and two large-scale bladders (10m ✕ 4m ✕ 2m each) with longer
deployment on-site. The triangular prismatic bladders were fabricated by Tencate and maintained
a similar geometry to the previous field experiments and lab experiments. The field experiment
was installed in the Maldives in a similar location as the second field experiment within the shallow
reef flat lagoon with water depths measuring 1-2m.
For this field experiment, we used a sand pump on the end of an excavator to fill the
geotextile bladders. Given the large bladder sizes, the previous method of filling the bladders was
not possible and therefore the sand pump was selected as the most efficient method. First, the
geotextile bladders were delivered to site and unrolled, then placed in the water. Vertical poles
were placed within the sand and the unfilled geotextile bladder was placed in the water and secured
to the poles. The sand pump was then inserted into openings in the bladder and a sand/water mix
was pumped into the bladders. The water is able to move through the geotextile membrane while
the sand is tramped within the geometry, thus, filling the bladder completely. The bladders were
oriented such that the lower end of the ramp geometry was facing east and the higher end was
facing west. This orientation was selected due to the predominant wave and current forces moving
from east to west in this particular location during the targeted monsoon season.
Field Experiment 2: Results. Over the subsequent 4 months from installation, there were
approximately 0.5m of new sediment accumulation over an area of approximately 20m ✕ 30m.
This is ~ 300m3 of new sand over an area of 600m2. By inspecting satellite images in between this
period, a “v-shape” formation can be found with significant sediment accumulation occurring at
the tall edge of the bladder and trailing in the direction of sediment movement. A shallow sediment
trough can be found in between the horns of sand accumulation. On the two sides of the sediment
area there is a fairly steep incline from the ocean floor to the top of the accumulation zone. Two
areas of scouring were observed behind the two short ends of the bladder. The physical
measurements of sand accumulation were taken using GPS coordinates and a measuring stick
recording the height of the sand while factoring in the changes in the water level due to the tides.
These early results show a substantial amount of sand accumulation within a short time frame
within our targeted zone. Following the 4 month timeframe of the measurements we have
continued to monitor this area with satellite images and are seeing what appears to be a continual
growth of the sand accumulation zone in the x and y directions. However, further physical
dimensions have not yet been recorded due to travel restrictions during the COVID-19 pandemic.
Fig 10. Aerial photos of the bladder over 4 months showing accumulated sediment change.
September 19, 2019 (before) October 23, 2019 (install) March 11, 2020
Fig 11. SkySat satellite imagery.
DISCUSSION
To further understand the dominant forces and important variables in promoting sand
accumulation, we have begun to build simple computational models that bridge the lab and field
experimental results. Our initial models are built using Computational Fluid Dynamics simulation
frameworks (Weymoth, 2015), and begin to model our empirical observations from the tank and
field experiments. This work points towards a simple, yet effective method for using natural ocean
forces to promote sand accumulation based on geotextile bladders. As we develop these
simulations in tandem with continued testing in the field, we aim to be able to finely tune the
design of the geotextile bladders’ shape and material composition.
The research that we have conducted to date uses geotextile bladders that are relatively
easy to fill and place underwater. However, in our next field experiments we are looking to further
advance our light footprint and adaptability goals by exploring movable and buoyancy-controlled
systems that can be reoriented or completely removed in order to adjust to varying seasons and
ocean dynamics. We also acknowledge that substantial development needs to be conducted to
ensure scalability. To do this, we are aiming to reduce the material usage, manufacturing time and
installation complexity to ensure that larger field experiments can be scaled and easily deployed.
CONCLUSIONS
The research presented in this paper proposes a new approach for promoting sand accumulation in
targeted locations through simple and adaptable geotextile geometries submerged in a shallow
lagoon. We have tested this approach through laboratory experiments and full-scale field
experiments in the Maldives. Through our lab experiments we have tested idealized conditions of
wave dynamics with various bladder geometries to maximize the morphological change through
sand accumulation. These studies lead to two different field experiments with meter-scale
geotextile bladders manufactured and installed in a shallow reef flat lagoon in the Maldives.
Through physical measurements, drone footage and high-resolution satellite imagery we have
monitored the accumulation of sand over the course of several months. We have seen hundreds of
cubic meters of sand accumulation in an area cover 20m ✕ 30m offering early, yet promising
results.
REFERENCES
Andrew, J. & Cooper, Andrew & Pilkey, Orrin. 2012. Pitfalls of Shoreline Stabilization:
Selected Case Studies. Pitfalls of Shoreline Stabilization: Selected Case Studies, by J.
Andrew, G. Cooper, and Orrin H. Pilkey. Coastal Research Library, Vol. 3. Berlin: Springer
Verlag, 2012.
Das, P. K.. 2010. “Climate Change and Education: Maldives”. UKaid, Department for
International Development.
https://www.unisdr.org/files/16354_climatechangeedmaldives.pdf
Erftemeijer, Paul & Riegl, Bernhard & Hoeksema, Bert & Todd, Peter. 2012. Environmental
impacts of dredging and other sediment disturbances on corals: A review. Marine pollution
bulletin. 64. 1737-65. 10.1016/j.marpolbul.2012.05.008.
Kench, P. S., Ford, M. R., & Owen, S. D. 2018. Patterns of island change and persistence offer
alternate adaptation pathways for atoll nations. Nature communications,
9(1)10.1038/s41467-018-02954-1
Kench, P. S., Thompson, D., Ford, M. R., Ogawa, H., & McLean, R. F. 2015. Coral islands defy
sea-level rise over the past century: Records from a central Pacific atoll. Geology, 43 (6),
515-518. 10.1130/G36555.1
Kench, P. S., Owen, S. D., & Ford, M. R. 2014. Evidence for Coral Island Formation During
Rising Sea Level in the Central Pacific Ocean. Geophysical Research Letters
10.1002/2013GL059000
Kench, P.S., R.F. McLean, S.D. Owen, M. Tuck, and M.R. Ford. 2018. “Storm-Deposited
Coral Blocks: A Mechanism of Island Genesis, Tutaga Island, Funafuti Atoll, Tuvalu.”
Geology 46 (10): 915–18. https://doi.org/10.1130/G45045.1.
Linham, Matthew M., and Robert J. Nicholls. 2012. “Adaptation Technologies for Coastal
Erosion and Flooding: A Review.” Proceedings of the Institution of Civil Engineers -
Maritime Engineering 165 (3): 95–112. https://doi.org/10.1680/maen.2011.29.
Pilkey, Orrin H., and J. Andrew G. Cooper. 2012. “‘Alternative’ Shoreline Erosion Control
Devices: A Review.” In Pitfalls of Shoreline Stabilization, edited by J. Andrew G. Cooper
and Orrin H. Pilkey, 3:187–214. Coastal Research Library. Dordrecht: Springer
Netherlands. https://doi.org/10.1007/978-94-007-4123-2_12.
Shakir, Kashima Ahmed. 2015. “Memories of Umar Zahir’s Services”. Umar Zahir.
Shin, E. C., and Y. I. Oh. 2007. “Coastal Erosion Prevention by Geotextile Tube
Technology.” Geotextiles and Geomembranes, Special Issue on Tsunami Reconstruction
with Geosynthetic Containment Systems, 25 (4): 264–77.
https://doi.org/10.1016/j.geotexmem.2007.02.003.
Speybroeck, J., Bonte, D., Courtens, W., Gheskiere, T., Grootaert, P., Maelfait, J.‐P., Mathys, M.,
Provoost, S., Sabbe, K., Stienen, E.W., Lancker, V.V., Vincx, M. and Degraer, S. (2006),
Beach nourishment: an ecologically sound coastal defence alternative? A review. Aquatic
Conserv: Mar. Freshw. Ecosyst., 16: 419-435. doi:10.1002/aqc.733
Stephens, T. (2019), Sand Filled Geotextile Mattress Installed to Recover and Protect a
Critical Section of Waikiki Beach. Geosynthetics 2019 Conference Proceedings, vol. 1.
ISBN: 978-1-5108-9352-8
Stephens, T., Ruiz, N. (2019), Innovative Technology Saves 100-Year-Old Panama Canal Locks.
Smart Rivers 2019 Conference Proceedings.
Timpson, C., Stephens, T. (2018), Beach Development and Protection of Resort Coastline
using Geotextile Tubes. Dredging Summit 2018 Conference Proceedings.
Trower, Elizabeth J., Marjorie D. Cantine, Maya L. Gomes, John P. Grotzinger, Andrew H.
Knoll, Michael P. Lamb, Usha Lingappa, et al. 2018. “Active Ooid Growth Driven By
Sediment Transport in a High-Energy Shoal, Little Ambergris Cay, Turks and Caicos
Islands.” Journal of Sedimentary Research 88 (9): 1132–51.
https://doi.org/10.2110/jsr.2018.59.
Weymouth, Gabriel D. 2015. “Lily Pad: Towards Real-Time Interactive Computational Fluid
Dynamics.” ArXiv:1510.06886 [Physics], October. http://arxiv.org/abs/1510.06886.
ABSTRACT
INTRODUCTION
Materials
Sporosarcina pasteurii (ATCC 11859) was used in this study. The growth media (ATCC
1376) is constituted by following per liter of deionized water: (1) 0.13 M tris buffer (pH = 9.0),
(2) 10 g (NH4)2SO4, and (3) 20 g yeast extract. The bacteria and growth media were centrifuged
at 4,000 g for 20 min after incubating aerobically at 300C in a shaker at 200 revolutions /min
overnight. Then supernatant was removed and replaced with fresh growth media before the
bacteria was resuspended every time. The bacteria were grown for 24–28 h to an optical density
(OD) of 600 nm (OD600) of 0.3–1.5 (Al Qabany et al. 2011). The bacteria concentration was
controlled by measuring absorbance (optical density) of the suspension using a
spectrophotometer (Genesys 20, Thermo Scientific) at 600-nm wavelength. Higher OD600 value
means higher bacteria growth and more calcite precipitation and properties improvement may be
resulted. The OD600 of bacteria solution in this study was kept as 0.6, and the urease activity of
bacteria solution was 3.31 mM hydrolyzed urea/min.
Cementation medium provided chemical compositions for ureolysis in the MICP process,
including urea, CaCl2·2H2O, NH4Cl, NaHCO3, and nutrient broth (Mortensen et al. 2011). The
chemical concentration of cementation media in this paper was kept constant as 0.5M Ca. The
chemical compositions were 10.0 g/L NH4Cl, 3 g/L nutrient broth, 2.12 g/L NaHCO3, 30 g/L
urea, and 73.5 g/L CaCl2·2H2O with urea-Ca2+ molar ratio of 1:1.
MICP process was conducted in a batch tank reactor using the immersing method. The reactor
shown in Figure 2a included a plastic box to contain samples, cementation media, sample
supported shelf, and air pumps to provide oxygen for bacteria. For non-reinforced bio-bricks, the
uniform mixture of 900 g sand and 250 mL bacteria solution was compacted into the rigid full
contact mold. The rigid full contact mold (see Figure 2b) used in this study was consist of a
flexible layer and rigid holder. The flexible layer was made of geotextile which is fully
permeable. The geotextile was a polypropylene, staple-fiber, needle-punched nonwoven material
(a) (b)
Cementation Media
Samples
Air
Plastic Box Pump
Sample
supported
Shelf
Figure 2. (a) sketch drawing of batch reactor for immersing treatment method, (b) Sample
preparation of bio-brick in rigid full contact mold.
For synthetic fiber-reinforced bio-bricks, the proportion of fiber was 0.3% by weight. The
synthetic fiber was uniformly mixed with sand then placed in the rigid full contact mold, and 250
mL bacteria solution was added in the sand through geotextile cover. At least four samples were
prepared for each case to produce a representative condition. In the single MICP process, the soil
samples within the bacteria solution were submerged in the 0.5 M Ca cementation media for 7
days of reaction. All treatments were carried out at the ambient temperature of the laboratory.
The four-point bending tests as shown in Figure 3a were conducted on the bio-bricks to study
their flexure behavior. The samples were located on two adjusted supports that were 152.4 mm
apart from each other, and the vertical load was applied on top two supports in the middle of the
specimen with a 50.8 mm distance. Following the testing method of ASTM D6272, the vertical
load was conducted under strain control conditions at a uniform loading rate of 1.5%/min until
the beam failed.
(1)
(a) (b)
Figure 3 (a) Four point bending testing system; (b) Accelerated erosion set up.
The stress-strain curves obtained from four-point bending tests on MICP-treated bio-bricks
without fiber, with 0.3% synthetic fiber is shown in Figure 4. Li et al. (2015) and Wen et al.
(2018) found that the optimum synthetic fiber content in the reinforcement of bio-specimens was
0.3%. The improvement of the ductility of bio-specimens was significant when 0.3% fiber was
added to reinforce the bio-beam. The flexure stress and strain of the MICP-treated samples
increased by 105% and 210%, respectively, through 0.3% synthetic fiber addition in bio-bricks.
These results indicated that the ductility of bio-bricks was improved significantly by 0.3%
synthetic fiber content.
Figure 5 shows the maximum erosion rate of non-reinforced and 0.3% synthetic fiber
reinforced bio-bricks under accelerated erosion test. The maximum erosion rate of 0.3%
synthetic fiber reinforced bio-bricks was 0.08 mm/min, which was around 51.6% reduction from
erosion rate of 0.165 mm/min of non-reinforced bio-bricks. This implied that the inclusion of
0.3% synthetic fibers in the bio-bricks would increase the resistance of bio-bricks against
accelerated erosion. Liu et al. (2019) studied the effect of 0.3% synthetic fiber addition on wet-
dry cycles of MICP-treated samples. They found that the failure strain of fiber-reinforced
samples reached 1.6% compared with non-reinforced samples of 0.4% after 5 wet-dry cycles.
1400
sand
1200 sand + 0.3% synthetic fiber
1000
Flexture Stress (kPa)
800
600
400
200
0
0.0 2.0 4.0 6.0 8.0 10.0
Flexture Strain (%)
Figure 4 Flexure stress-strain curves for MICP-treated samples
0.20
Sand Sand + 0.3% fiber
Maximum Erosion Rate (mm/min)
0.15
0.10
0.05
0.00
Figure 5 Maximum erosion rate for MICP-treated sample with fibers reinforcement.
CONCLUSION
This paper presents the properties of MICP-treated bio-bricks enhanced with synthetic fibers.
The flexure strength of bio-bricks reinforced by 0.3% synthetic fibers increased from 1185 kPa
to 1210 kPa. The MICP-treated samples were subjected to erosion with a maximum erosion rate
of around 0.165 mm/min during the test of 60 min period. The maximum erosion rate of 0.3%
synthetic fiber reinforced bio-bricks was 0.08 mm/min, which was around 51.6% reduction from
REFERENCES
Al Qabany, A., Soga, K., Santamarina, C., 2011. Factors affecting efficiency of microbially
induced calcite precipitation. J. Geotech. Geoenviron. Eng. 138, 992-1001.
ASTM D6272-17, Standard Test Method for Flexural Properties of Unreinforced and Reinforced
Plastics and Electrical Insulating Materials by Four-Point Bending, ASTM International, West
Conshohocken, PA, 2017. 10.1520/D6272-17.
DeJong, J. T., Fritzges, M. B., Nüsslein, K., 2006. Microbially induced cementation to control
sand response to undrained shear. J. Geotech. Geoenviron. Eng. 132, 1381-1392.
Li, M., Li, L., Ogbonnaya, U., Wen, K., Tian, A., Amini, F., 2015. Influence of fiber addition on
mechanical properties of MICP-treated sand. J. Mater. Civ. Eng. 28, 04015166.
Mortensen, B. M., Haber, M. J., DeJong, J. T., Caslake, L. F., & Nelson, D. C. 2011. Effects of
environmental factors on microbial induced calcium carbonate precipitation. Journal of
applied microbiology, 111(2), 338-349.
Walker, P. 2002. The Australian Earth Building Handbook: HB 195, Standards Australia
International Ltd, New South Wales, https://doi.org/10.1016/j.cemconcomp.2018.04.013.
Wen, K., Bu, C., Liu, S., Li, Y., & Li, L. 2018. Experimental investigation of flexure resistance
performance of bio-beams reinforced with discrete randomly distributed fiber and bamboo.
Construction and Building Materials, 176, 241-249. https://doi.org/10.1016/j.conbuild
mat.2018.05.032.
Jiannan Chen, Ph.D., EIT,1 Sarah A. Gustitus, Ph.D. Candidate, EIT,2 and
Craig H. Benson, Ph.D., P.E, NAE3
1
Department of Civil, Environmental, and Construction Engineering, University of Central
Florida, Orlando, FL 32816; e-mail: [email protected]
2
School of Engineering, University of Virginia, Charlottesville, VA 22903; e-mail:
[email protected]
3
School of Engineering, University of Virginia, Charlottesville, VA 22903; e-mail:
[email protected]
ABSTRACT
INTRODUCTION
Approximately 275 Tg of bauxite ore is mined each year globally for alumina production, with
Australia (33%), China (20%), and Brazil (16%) the leading bauxite producers (Xue et al. 2016,
Kishida et al., 2017). Approximately 60 Tg/yr of red mud, a highly alkaline residue from refining
bauxite ore to produce aluminum, is generated as a byproduct of alumina refining annually. Most
red mud (85%) is stored in impoundments on-site or adjacent to alumina refineries.
Red mud consists primarily of fines (particles < 0.075 mm) and has high alkalinity (Sun et
al. 2019). The porewater in red mud is “bauxite liquor,” having high pH (>14 in some cases) and
high ionic strength (I >1 M in some cases) due to the NaOH used for the dissolution of alumina.
Geosynthetic clay liners (GCLs) are used as liners in red mud disposal facilities (Benson et al.
2010, Athanassopoulos et al. 2015, Tian and Benson 2019), generally in conjunction with a
geomembrane in a composite liner (geomembrane directly over a GCL). Hydraulic conductivity
(K) of the GCL component in a composite liner has a controlling influence on the effectiveness of
the barrier.
The sodium bentonite (NaB) in conventional GCLs is composed primarily of the clay
mineral montmorillonite, which swells when hydrated in water to form a gel with very low
hydraulic conductivity (Jo et al. 2001, Kolstad et al. 2004, Benson et al. 2010). However, the high
pH and ionic strength of bauxite liquor can suppress swelling of the montmorillonite, resulting in
Bauxite liquors. Samples of bauxite liquor were obtained from red mud management facilities in
the aforementioned countries. These bauxite liquors are labeled: USBL1 and USBL2 (US),
BRABL (Brazil), SAUBL (Saudi Arabia), UAEBL (UAE), and CHNBL1 and CHNBL2 (China).
The pH, electrical conductivity (EC), and ionic strength of the liquors are summarized in Table 1.
The bauxite liquors are hyperalkaline, with pH ranging from 12.0 to 14.2. The ionic strength ranges
from 239 to 1546 mM. EC of the bauxite liquor ranges from 1.8 to 16.4 S/m at 25 oC.
Geosynthetic clay liners. One conventional NaB GCL and sixteen BPC-GCLs were evaluated in
this study, all of which are commercially available. The BPC-GCLs are manufactured by dry
mixing granular proprietary polymers (one or more polymers) with granular sodium bentonite.
These BPC-GCLs are labeled as C6.3, C6.4, C6.5, C7.3, C7.5, C7.6, C10.1, C10.8, C12.1, G4.3,
G8.1, N3.8, N5.4, N7.3, GE3.0, and O6.5 with the letter designating the supplier and the numerical
suffix representing the polymer loading in % dry mass determined based on loss on ignition (LOI)
of the BPC and NaB using the procedure in Scalia et al. (2014).
Swell Index. The Swell index of bentonite or BPC from each GCL was measured in accordance
with ASTM D5890 (ASTM 2011) using bauxite liquors or ASTM Type II DI water as the
hydrating liquid. The bentonite (or BPC) was ground with a mortar and pestle to pass the No. 200
US standard sieve (0.075 mm) and oven-dried for 24 hours at 105 oC. A 100-mL graduated cylinder
was filled with 90 mL of the test liquid, and 2 g of ground bentonite was added to the cylinder in
0.1 g increments. The graduated cylinder was then filled to 100 mL and let sit for 24 h prior to
recording the swell index.
RESULTS
Effect of Ionic Strength. Hydraulic conductivity of the NaB and BPC-GCLs as a function of ionic
strength of the bauxite liquors is shown in Fig. 1. The hydraulic conductivity to DI water is shown
in Fig. 1 for comparison (plotted at ionic strength = 10-3 mM).
Hydraulic conductivity of the NaB GCL is closely related to the ionic strength of the
bauxite liquor (Fig. 1 – closed symbols). The NaB GCL has low hydraulic conductivity (2.4 x 10-
11
m/s) to DI water, but much higher hydraulic conductivity to bauxite liquor (>3.6 x 10-9 m/s).
Hydraulic conductivity of the BPC-GCLs is lower than for the NaB bentonite when permeated
with DI water and with bauxite liquors (Fig. 1 – zone enclosed by dashed lines).
The effect of the ionic strength on the hydraulic conductivity of the BPC-GCLs is evident.
When permeated with DI water or bauxite liquor with ionic strength lower than 288 mM, the
hydraulic conductivity of BPC-GCLs is less than 1 x 10-10 m/s. However, when permeated with
bauxite liquor with ionic strength higher than 620 mM, the BPC-GCLs exhibit a wide range of
-6
10
C6.3
C6.4
-7 C6.5
10
C7.3
-13
10 -3 2 3 4
10 10 10 10
Ionic Strength (mM)
Figure 1. Hydraulic conductivity as a function of ionic strength of \bauxite liquors. The zone
enclosed by dashed lines bounds hydraulic conductivity of BPC-GCLs to bauxite liquors.
Effect of Swell Index. Hydraulic conductivity of the NaB GCL and BPC-GCLs versus swell index
of the bauxite liquors is shown in Fig. 2. Hydraulic conductivity of the NaB GCL is closely related
to swell index, indicating that bentonite swelling controls the hydraulic conductivity of the NaB
GCL (Fig. 2 closed symbols). However, a different mechanism controls the hydraulic conductivity
for the BPC-GCLs. When swell index of BPCs is higher than 15 mL/ 2g, all GCLs have low
hydraulic conductivity (< 10-10 m/s) to bauxite liquor. However, when the swell index is less than
15 mL/2 g, some BPC-GCLs have low hydraulic conductivities (<10-10 m/s) and others are much
higher. For example, the hydraulic conductivity of the R6.4 BPC-GCL is less than 10-11 m/s when
permeated with bauxite liquor or DI water, even though the swell index of R6.4 is only 7 mL/2 g
in bauxite liquor.
-6
10
C6.3
C6.4
-7 C6.5
10
C7.3
Hydraulic Conductivity (m/s)
C7.5
-8 C7.6
10 C10.1
C10.8
-9 C12.1
10 G4.3
G8.1
-10 N3.8
10 N5.4
N7.3
GE3.0
-11
10 O6.5
NaB
-12
10
-13
10
0 5 10 15 20 25 30 35 40
Swell Index (mL/2 g)
-6
10
C6.3
C6.4
-7 C6.5
10
C7.3
Hydraulic Conductivity (m/s)
C7.5
-8 C7.6
10 C10.1
C10.8
-9 C12.1
10 G4.3
G8.1
-10 N3.8
10 N5.4
N7.3
GE3.0
-11
10 O6.5
Tian et al. (2019)
NaB
-12
10
-13
10
0 2 4 6 8 10 12 14
Polymer Loading (%)
Hydraulic conductivity tests were conducted on BPC-GCLs and a NaB GCL using DI water and
bauxite liquors as permeant liquids. The bauxite liquors were obtained from red mud management
facilities at alumina refineries around the world. The bauxite liquors were hyperalkaline (pH>12)
and had ionic strengths ranging from 239 to 1546 mM.
Based on the findings of this study, the following conclusions and recommendations are drawn.
• BPC-GCLs tend to have higher hydraulic conductivities when permeated with bauxite liquors
having higher ionic strength and more alkaline pH. However, they are less permeable than NaB
GCLs permeated with the same liquors.
• Sufficient polymer loading is needed to ensure a BPC-GCL has low hydraulic conductivity. For
the bauxite liquors in this study, a polymer loading greater than 7.5% was necessary to ensure
the hydraulic conductivity was less than 1 x 10-10 m/s.
REFERENCES
ASTM D5890. Standard test method for swell index of clay mineral component of geosynthetic
clay liners, ASTM International, West Conshohocken, Pennsylvania, USA.
ASTM D6766. Standard test method for evaluation of hydraulic properties of geosynthetic clay
liners permeated with potentially incompatible aqueous solutions, ASTM International, West
Conshohocken, Pennsylvania, USA.
ASTM D5084. Standard test methods for measurement of hydraulic conductivity of saturated
porous materials using a flexible wall permeameter, ASTM International, West Conshohocken,
Pennsylvania, USA.
Athanassopoulos, C., Benson, C., Chen, J., Donovan, M. (2015). Hydraulic Conductivity of a
Polymer-Modified GCL Permeated with High-pH Solutions, Geosynthetics ‘15, IFAI, St. Paul,
MN, 181-186.
Benson, C., Oren, A., Gates, W. (2010). Hydraulic conductivity of two geosynthetic clay liners
permeated with a hyperalkaline solution, Geotext. Geomembr. 28(2):206–218
Chen, J., Benson, C., Edil, T., and Likos, W. (2018), Hydraulic Conductivity of Geosynthetic Clay
Liners with Sodium Bentonite to Coal Combustion Product Leachates, J. Geotech.
Geoenvironmental Eng., 144(3), 0401800.
Chen, J., Salihoglu, H., Benson, C. H., and Likos, W. J. (2019). Hydraulic Conductivity of
Bentonite-Polymer Geosynthetic Clay Liners to Coal Combustion Product Leachates, J.
Geotech. Geoenviron. Eng., 145(9), 04019038.
Li, Q., Chen, J., Benson, C., and Peng, D. (2020). Hydraulic Conductivity of Bentonite-Polymer
Composite Geosynthetic Clay Liners Permeated with Bauxite Liquor, Geotextiles and
Geomembranes, doi: 10.1016/j.geotexmem.2020.10.015 .
Hosney, M., and Rowe, K. (2019). Polymer-enhanced Bentonite–Sand to Cover Calcium-Rich
Soil, Environmental Geotechnics, 6(3), 155–161.
Jo, H., Katsumi, T., Benson, C., and Edil, T. (2001). Hydraulic conductivity and swelling of non-
prehydrated GCLs permeated with single species salt solutions, J. Geotech. Geoenviron. Eng.,
127(7), 557-567.
Kishida, M., Harato, T., Tokoro, C., Owada, S. (2017). In situ remediation of bauxite residue by
sulfuric acid leaching and bipolar-membrane electrodialysis, Hydrometallurgy, 170, 58–67.
ABSTRACT
There are three primary components required to produce a quality geomembrane seam using
thermal welding techniques: heat, speed, and pressure. Each of these components can be
impacted by a multitude of variables – from design through the actual field installation. This
paper will look at factors influencing each of the three primary components from design through
field installation and identify key visual clues that indicate one or more components of the
welding process are compromising weld integrity. The reader will come away with a better
understanding of the thermal welding process, things that impact weld quality, ways to mitigate
poor weld quality, and proper ways to remedy poor welds should they occur in the field.
INTRODUCTION
Thermal welding is the use of heat as the primary agent for joining or repairing geomembrane
panels and consists of three different methods: hot air, fusion, and extrusion. One or more
methods of thermal welding is used for the joining of many different geomembrane formulations
including polyethylene (PE), polypropylene (PP), polyvinylchloride (PVC) and Ethylene
Interpolymer Alloy (EIA) resin-based materials. These geomembrane materials are further
defined at the molecular or polymer level, chemical compositions, and the presence of a
reinforcement scrim. Chlorosulfinated Polyethylene (CSPE), Linear Low Density Polyethylene
(LLDPE), Low Density Polyethylene (LDPE), and High Density Polyethylene (HDPE) are some
of the PE resin based materials. LLDPE and flexible polypropylene (fPP) are both manufactured
with or without reinforcement scrims (with scrims the designation is LLDPE-R and fPP-R
respectively) whereas CSPE and EIA are manufactured exclusively with reinforcement scrims
(CSPE-R and EIA-R respectively).
There are also woven coated polyethylene (WCPE) geomembranes and reinforced
composite geomembranes (RCG) for which thermal welding methods are used. Additionally,
each of these materials can have different characteristics which impact the weld settings used by
the installer; for instance: extra carbon black content on the bottom of an HDPE liner to
facilitate electric leak location surveys, thickness (HDPE and LLDPE range from 0.5 mm (20
mils) to 3.0 mm (120 mils)), the presence or absence of a surface texturing, the presence or
absence of reinforcement scrim, and so forth. In the case of extra carbon black, the machine
speed may need to be reduced while the temperature is increased from that of a geomembrane of
the same thickness without the carbon black. Similarly, materials that have a reinforcement
scrim may need a reduction in temperature and/or an increase in speed so that the reinforcement
scrim is not compromised during.
On the other side of the spectrum, textured geomembrane sometimes requires additional
heat and a slower speed than a non-textured geomembrane. A liner installation welding
technician may be exposed to any or all of these materials in a single construction season.
Understanding and remembering the difference in the parameters required to get a good weld
when dealing with so many variances is critical. While the material type, thickness, and surface
No matter the method used, geomembrane welding is an imperfect science in that at the
time of the writing of this paper, there are no guarantees that every inch of every seam will be
uniform even when temperature, speed, and pressure remain constant.
DESIGN
Design must take field construction into consideration in order to be a valid design. Reality is
millions of dollars can be spent on design and materials but if a project is not constructed
correctly, then it is all wasted. If a designer is not taking field construction into account in every
aspect of their design, then they are failing. The ability to obtain good quality welding starts with
the design process.
Field constructability. Issues with in project designs is a consistent problem throughout
the industry. Designers must be aware of and account for the limitations of welding personnel
and welding equipment within their designs. Welds fall in places they simply cannot be welded
properly and maneuverability of the equipment is one of the main limitations. When equipment
Testing Protocols. Another often overlooked design consideration is allowing for the
proper non-destructive testing and/or destructive testing of the weld. If neither can be
performed, there is often no other way to verify the continuity and/or integrity of the weld. There
is this concept that certain types of welds such as fusion welds have become so sophisticated that
The designer should also account for proper construction as they develop the technical
specifications that go along with their design. Engineers should keep the following phrase in
mind as they go through the design and specifications of their project: “If it is not in the specs, it
doesn’t get done”.
TECHNICAL SPECIFICATIONS
The technical specifications should not only ensure the proper materials and equipment are used
for the design, but they should also empower Quality Assurance/Quality Control personnel to
enforce quality concerns. Some of most overlooked areas include those mentioned below.
Power supply. For thermal welding of any type to be consistent, the power supply to the
welding apparatus must be sufficient and consistent (no fluctuations). Power supply variations
will predominantly impact speed and temperature and these variations will then show-up in the
quality of the welds. The power supply not only consists of using a power source meeting the
manufacturer’s recommendations, but also requires the proper gauge of cord with associated
maximum run lengths of cords as well as a maximum number of connections between lengths of
cord. The power source also needs to remain consistent from trial welds through the welding
process.
As an example, Revision E of Demtech’s VM-20 Operators Manual recommends in-field
generators be rated for 3,500 watts minimum with a preferred rating of 5,000 watts or more “in
order to obtain the best welder performance and temperature control.” The manual further states
that extension cords between the generator and welding device be at least 12 gauge with 3 plug
end connections. At table is provided for maximum recommended cord lengths, based on 3 wire
cords by gauge; the maximums listed are: 10 gauge, 500 feet; 12 gauge, 250 feet; and 14 gauge,
100 feet.
Interface. Interface refers to the layers being bonded together – namely the top surface
of the bottom sheet and the bottom surface of the top sheet where the weld will occur (or in the
instance of extrusion fillet welding, the top surface of both sheets). Interface of the weld plays
an important role in weld quality, at least among textured and smooth variations of HDPE
geomembranes. A textured geomembrane typically has the same core thickness (nominal) as it’s
smooth counterpart but the asperity height increases that thickness, even more significantly in
double-sided textured products. As a result, fixed pressure devices allow for little
accommodation in this area so the most common adjustment is to slow down the machine speed
while sometimes leaving the temperature constant. Without the ability to accurately adjust for
varying thicknesses that textured liners present, the pressure setting can be too much or too little.
Based on prior research, there can be significant variations in failure rates within the
overall failure rate on a project. Toepfer and Duganiero state that on a study of 7 projects (two
LLDPE and 5 HDPE, the combined average destructive failure rate was 5.4% (range 3.7% -
9.4%). However, when looking at interfaces within these projects, the smooth/smooth interface
averaged 4.3% (range 0% - 6.9%). However, the textured/textured interface failure rate
averaged 10.8% (range 4.2% to 20.0%) and the smooth/textured interface averaged a failure rate
of 11.4% (range 0% to 25.0%). The failure rates of the smooth/textured interface is 271% higher
and the textured/textured is 257% higher than the smooth/smooth interface on these same
projects.
GEOMEMBRANE INSTALLER
The geomembrane installer is critical to producing quality seams. Not all geomembrane
installers are created equally nor are the crews for any given company created equally. It is
important to find a reputable installer who has a crew having significant installation and welding
experience with the material being used on each project. This crew should be designated to the
project and should not be exchanged.
Panel layout. One requirement of an installer that is often required (and should always
be required) is the submittal of a proposed panel layout drawing to the owner or the owner’s
representative (often the construction certifying engineer). The panel layout drawing is an
opportunity to not only verify the seams fall in accordance with the design and specifications, but
it is also an opportunity to gauge the installer. A sloppy panel layout drawing missing butt seams
and other details can be an indicator of the quality to expect during the installation. The panel
layout drawing should then be approved by the engineer and the approved layout should then be
followed during the field installation with any modifications approved solely by the engineer. A
sample proposed panel layout drawing is shown below in Figure 1 which illustrates the presence
of butt seams.
WELDING EQUIPMENT
Normally it is the responsibility of the installation contractor to provide the proper welding
equipment for the material being installed. Having the proper equipment is equally as critical as
using the proper procedures. Many personnel involved in the project outside of the installation
firm have little knowledge of some of the equipment that may be customized by the installer for
a specific material or application. The following is a short list of these items:
Wedge. The wedge-shaped heating element used in mechanically propelled hot air and
fusion welders comes in a variety of materials – copper, stainless steel, and porcelain to name a
few. While copper provides some of the most uniform heat transfer, it also reacts with PVC.
Most installers will switch out the wedge component without anyone even knowing. Some hot
air devices also utilize an interchangeable short wedge/long wedge which also impacts the
amount of heat transfer to the material.
Nip rollers. Like the wedge, nip rollers come in a variety of materials including stainless
steel (with fine or coarse knurls), HDPE, silicone, and rubber. A thin material and reinforced
materials are often better suited with HDPE or rubber nip rollers that are softer and do not have
VISUAL ASSESSMENT
Visual assessment consists not only of looking at trial seams, the weld itself, and destructive
seam results, but in looking at the wholistic picture being told at any moment in time during the
preparation and welding of a seam. There are many challenges in the field that impact one or
more of the fundamental requirements for a quality weld: geomembrane surface temperature,
wind speed, and moisture to name a few. Likewise, welding technicians that are careless or tired
may drip sweat into the weld area, fail to adjust machine settings from one weld interface to
another, or gradually decrease the angle of an extrusion welder from nearly perpendicular to a
45-degree angle or less. Each of these play a role in the overall quality of the weld and often
lead to failures because minor changes like these can have a huge impact on heat, speed, and
pressure. An example of work performed by a tired crew shown in Photo 4 is the failure to
abraid the HDPE geomembrane prior to an extrusion weld, resulting in weld failure as it
separates from the geomembrane.
Photo 4. Tired crew did not abraid HDPE geomembrane prior to extrusion weld.
MITIGATION
CONCLUSION
Thermal welding is highly adventitious and can yield good, long-term results when heat, speed,
and pressure are properly controlled. There are many extraneous variables present on projects
beyond heat, speed, and pressure that were not discussed, such as dust/dirt in welds, because they
negatively impact weld quality even when the operator has the primary three components of a
good weld properly established.
In order to give the installation team the best chance of success welding, the variables
discussed within this paper need to be considered and monitored on every project, from
conception through the installation. There are frequent case studies at conferences illustrating
these successes but they often leave out the most integral part of the equation that is
understanding the principles of seaming and addressing them before the field crew ever hits the
site.
REFERENCES
Beck, Abigail. (2016, April). How much does my landfill leak. Plastatech
https://plastatech.com/media/literature/geomembrane_product_comparison.pdf
D. Daniel & R Koerner, Waste Containment Facilities, 2nd edition, Reston, VA, USA, American
Society of Civil Engineers, 2007
Demtech. (2015). Operators Manual – Model 500—1—XL. Demtech
https://www.demtech.com/wp-content/uploads/2012/10/Pro-Wedge-XL-Manual.pdf
B.J. Duganiero & G.W. Toepfer, Material Interface Types: Impact on Destruct Sample Failure
Rates, Presented at Geosynthetics 2019, Houston, TX, USA February 10-13, 2019, 1129
Geosynthetic Research Institute. 2013. “GRI GM-9” Accessed October 1st, 2020
https://geosynthetic-institute.org/grispecs/gm9.pdf
G.W. Toepfer, Weld Integrity – Moving Beyond Peel and Sheer, Presented at
Geosynthetics 2019, Houston, TX, USA February 10-13, 2019, 1129
G.W. Toepfer, Extrusion Welds – The Good, The Bad, and The Ugly, Presented at
Geosynthetics 2015, Portland, OR, USA February 15-18, 2015, 246
G.W. Toepfer, “The Complete Field Guide to Ensuring Quality Geosynthetics Installations:
Jiannan Chen, PhD, EIT,1 Sarah A. Gustitus, PhD Candidate, EIT,2 and
Craig H. Benson, PhD, PE, NAE3
1
Department of Civil, Environmental, and Construction Engineering, University of Central
Florida, Orlando, FL 32816; e-mail: [email protected]
2
School of Engineering, University of Virginia, Charlottesville, VA 22903; e-mail:
[email protected]
3
School of Engineering, University of Virginia, Charlottesville, VA 22903; e-mail:
[email protected]
ABSTRACT
Hydraulic conductivity tests were conducted to evaluate the hydraulic conductivity of bentonite-
polymer composite (BPC) geosynthetic clay liners (GCLs) to coal combustion product (CCP)
leachates from coal-fired power plants in the United States. The CCP leachates ranged from acidic
to highly alkaline (pH = 4.3 to 12.0), with ionic strengths up to 681 mM. All tests were conducted
in flexible-wall permeameters with direct permeation and without prehydration. Hydraulic
conductivity of BPC-GCLs to the CCP leachates ranged from 10-12-10-10 m/s and was often several
orders of magnitude lower than the hydraulic conductivity of NaB-GCLs permeated with the same
leachate (10-8-10-7 m/s). Hydraulic conductivity of BPC-GCLs depends on the chemical properties
of the CCP leachate and the polymer loading.
INTRODUCTION
Coal combustion products (CCPs) are residuals from coal-fired boilers that are disposed in lined
landfills when they cannot be used beneficially in other applications (EPRI 2009). Land disposal
of CCPs is regulated under the “coal ash rule” incorporated into Subtitle D of the Resource
Conservation and Recovery Act (RCRA) (Federal Register 2015). The coal ash rule requires that
coal ash disposal facilities be lined with a composite liner consisting of a geomembrane underlain
by a compacted clay liner at least 0.6 m thick having a hydraulic conductivity no greater than 1x10-
9
m/s (Bittner et al. 2019). Geosynthetic clay liners (GCLs) can be used in lieu of compacted clay
liners provided that the GCL meets the equivalency criteria in the coal ash rule. This generally
requires that the hydraulic conductivity of the GCL be less than 3x10-11 m/s when tested with the
CCP leachate to be contained (Bittner et al. 2019).
CCPs leachates contain a variety of cations and anions that can affect the hydraulic
conductivity of GCLs (Chen et al. 2018). Jo et al. (2001) and Xu et al. (2009) evaluated how ionic
strength, cation valence, and pH of permeant solutions affect the swelling and hydraulic
conductivity of sodium bentonite (NaB) GCLs. They show that the hydraulic conductivity of NaB
GCLs increases as the ionic strength of the leachate increases, and that GCLs are more permeable
to solutions with polyvalent cations (e.g. calcium, magnesium, aluminum) than those with
monovalent cations (e.g., sodium, potassium, lithium), all other factors being equal. Extreme pH
(pH>13 or pH<2) also alters the hydraulic conductivity of NaB GCLs. Kolstad et al. (2004)
evaluated how multi-species solutions affect swelling and hydraulic conductivity of NaB GCLs.
MATERIALS
CCP Leachates. Seven CCP leachates were obtained from coal ash diposal facilities in Virginia
(CCP-VA1, CCP-VA2, CCP-VA3, and CCP-VA4), Wyoming (CCP-WY), and Minnesota (CCP-
MN1, CCP-MN2). Two of the synthetic CCP leachates (i.e., FGD and HS) from Chen et al. (2018)
were also used. Bulk chemical parameters, including pH, electrical conductivity (EC), ionic
strength (I), relative abundance of monovalent and polyvalent cations (RMD), and anion ratio
(molar ratio of chloride to sulfate, Cl-/SO42-) are summarized in Table 1. The pH of the CCP
leachates ranges from 4.3 to 9.9, the ionic strength ranges from 33 to 681 mM, and the EC ranges
from 0.3 to 4.4 S/m at 25 oC. The leachates range from chloride rich (CCP-VA2) to sulfate rich
(CCP-VA1).
where MM is the total molarity of the monovalent cations and MD is the total molarity of polyvalent
cations in the permeant solution. RMD of the CCP leachates ranges from 0.07 to 2.4 M1/2, or
predominantly polyvalent (low RMD) to predominantly monovalent (high RMD).
The relationship between RMD and ionic strength for the CCP leachates is shown in Fig.
1 along with leachates in the Electric Power Research Institute (EPRI) leachate database reported
by Chen et al (2018, 2019). The CCP leachates in this study (closed symbols in Fig. 1)
predominantly have ionic strengths in the upper portion of the ionic strengths in the EPRI leachate
database (open symbols in Fig. 1), and tend to have lower RMD (more polyvalent).
2
10
CCP-VA1
CCP-VA2
1 CCP-VA3
10 CCP-VA4
CCP-WY
CCP-MN1
0 CCP-MN2
10
RMD (M )
1/2
FGD
HS
EPRI
-1
10
-2
10
-3
10
1 10 100 1000
Ionic Strength (mM)
Figure 1. RMD versus ionic strength for CCP leachates in this study. Leachates from EPRI
database shown with open symbols.
Geosynthetic clay liners. Seven commercially available BPC-GCLs were evaluated in this study.
All of the BPC-GCLs are manufactured by dry mixing one or more granular proprietary polymers
(cross-linked or linear polymers) with granular sodium bentonite. The BPC-GCLs are labeled as
BP4.0, BP5.8, BP6.3, BP8.6, BP8.9, BP9.0, and BP9.7, with the numerical suffix representing the
polymer loading in percent by dry mass as measured based on loss on ignition (LOI) of the BPC
and NaB using the procedure in Scalia et al. (2014).
RESULTS
K and Q /Q
in out
10 1.5 1.5
-10 Q /Q
10
in
EC /EC
in out
pH /pH
Q /Q
in
out
1 1 1
out
out
-11
10 in
0.1 0.5 Closed = pHout /pHin 0.5
Hydraulic Conductivity
Open = ECout /ECin
pH and EC
10
-12
0.01 0 0
0 50 100 150 200 250 0 50 100 150 200 250
Cumulative Inflow (mL) Cumulative Inflow (mL)
Figure 2. Hydraulic conductivity, Qin/Qout, pHout/pHin, and ECout/ECin from test on BPC6.3
GCL permeated with CCP-VA2 leachate.
Effect of Ionic Strength. Hydraulic conductivity of the BPC-GCLs as function of ionic strength
of the CCP leachates is shown in Fig. 3. Hydraulic conductivities of the NaB GCLs to CCP
leachates from Chen et al. (2019) are also shown in Fig. 3. Hydraulic conductivities of the BPC-
GCLs are one to four orders of magnitude lower than hydraulic conductivities of the NaB GCLs
(zone enclosed by dashed lines in Fig. 3) for similar ionic strength. Hydraulic conductivity of the
NaB GCLs is strongly affected by ionic strength, whereas hydraulic conductivity of the BPC-
GCLs is nearly independent of ionic strength. All of the BPC-GCLs had hydraulic conductivity
-8
BP9.0
10 BP9.7
NaB
-9
10
-10
10
-11
10
-12
10 -3 1 2 3
10 10 10 10
Ionic Strength (mM)
Figure 3. Hydraulic conductivity versus ionic strength of the CCP leachates. Zone enclosed
by dashed lines corresponds to hydraulic conductivities of NaB GCLs to CCP leachates.
Effect of RMD and Anion Ratio. Hydraulic conductivity of the BPC-GCLs is shown as a function
of RMD and anion ratio of the CCP leachates in Fig. 4. No trends are evident with RMD or anion
ratio, except the highest hydraulic conductivities were obtained for leachates with lower RMD and
lower anion ratio, and the lowest polymer loading. The low RMD may have suppressed swelling
of the bentonite, rendering the polymer loading insufficient to achieve low hydraulic conductivity
for these more permeable BPC-GCLs.
-9
10
-9 10
(b)
BP4.0
(a)
BP4.0
BP5.8 BP5.8
BP6.3 BP6.3
Hydraulic Conductivity (m/s)
Hydraulic Conductivity (m/s)
BP8.6 BP8.6
-10
-10
10 10 BP8.9
BP8.9
BP9.0 BP9.0
BP9.7 BP9.7
-11
-11
10 10
-12
-12
10 10 -2 -1 0 1 2 3
10
-3
10
-2
10
-1
10
0
10
1 10 10 10 - 10
2-
10 10
Cl /SO
RMD 4
Figure 4. Hydraulic conductivity vs. (a) RMD and (b) anion ratio of CCP leachates.
BP8.6
-8 BP8.9
10
BP9.0
-9
BP9.7
10 NaB
-10
10
-11
10
-12
10
0 2 4 6 8 10 12
Polymer Loading (%)
CONCLUSION
Hydraulic conductivity tests were conducted on seven BPC-GCLs using seven coal combustion
product (CCP) leachates. The GCLs were permeated directly with leachate (no prehydration) at an
effective stress of 20 kPa. The following conclusions are drawn:
• BPC-GCLs have appreciably lower hydraulic conductivity than NaB GCLs when permeated
with CCP leachates. The BPC-GCLs had hydraulic conductivities to CCP leachates ranging
from 10-12 to 10-10 m/s, whereas the NaB GCLs had hydraulic conductivities to the CCP
leachates ranging from 10-10 to 10-6 m/s.
REFERENCES
ASTM D6766. Standard test method for evaluation of hydraulic properties of geosynthetic clay
liners permeated with potentially incompatible aqueous solutions, ASTM International, West
Conshohocken, Pennsylvania, USA.
ASTM D5084. Standard test methods for measurement of hydraulic conductivity of saturated
porous materials using a flexible wall permeameter, ASTM International, West Conshohocken,
Pennsylvania, USA.
Benson, C., Chen, J., Likos, W., and Edil, T. (2018). Hydraulic Conductivity of Compacted Soil
Liners Permeated with Coal Combustion Product Leachates, J. Geotech. Geoenvironmental
Eng., 144(4), 04018011.
Bittner, A., Kondziolka, and J., Benson, C. (2019) Relative Liner Performance for Coal
Combustion Product Management Sites: Conceptual Review and Model Evaluation for Surface
Impoundments. EPRI, Palo Alto, CA, 3002016498.
Chen, J., Benson, C. H., and Edil, T. B. (2018). Hydraulic Conductivity of Geosynthetic Clay
Liners with Sodium Bentonite to Coal Combustion Product Leachates. J. Geotech. Geoenviron.
Eng., 2018, 144(3): 04018008.
Chen, J., Salihoglu, H., Benson, C. H., and Likos, W. J. (2019). Hydraulic Conductivity of
Bentonite-Polymer Geosynthetic Clay Liners to Coal Combustion Product Leachates, J.
Geotech. Geoenviron. Eng., 145(9), 04019038.
Di Emedio, G., Van Impe, W., Flores, V. (2011). Advances in geosynthetic clay liners: polymer
enhanced clays. GeoFrontiers 2011. Advances in Geotechnical Engineering, American Society
of Civil Engineers, Reston, 1931-1940.
EPRI (2009). Coal ash: characteristics, management, and environmental is-sues. Electric Power
Research Institute, Palo Alto, CA.1019022.
Federal Register (2015), 80 FR 21301, Federal Register, the Daily Journal of the US Government,
21301-21501.
Jo, H., Katsumi, T., Benson, C., and Edil, T. Hydraulic conductivity and swell of non-prehydrated
GCLs permeated with single species salt solutions. J. Geotech. Geoenviron. Eng., 2001, 127(7),
557-567.
Katsumi, T., Ishimori, H., Onikata, M., and Fukagawa, R. (2008). Long-term barrier performance
of modified bentonite materials against sodium and calcium permeant solutions. Geotext.
Geomembr., 26(1), 14−30.
Kolstad, D., Benson, C., and Edil, T (2004). Hydraulic conductivity and swell of non-prehydrated
GCLs permeated with multi-species inorganic solutions. J. Geotech. Geoenviron. Eng.,
130(12), 1236-1249.
Mazzieri, F., Emidio, G., Van Impe, P. (2010). Diffusion of calcium chloride in a modified
bentonite: Impact on osmotic efficiency and hydraulic conductivity. Clays Clay Miner., 58(3),
351-363.
ABSTRACT
Flow stress of polymer gel and swell index of bentonite in bentonite-polymer composite (BPC)
geosynthetic clay liners (GCLs) were assessed as indices of hydraulic conductivity. Three
commercially available BPC-GCLs were permeated with aggressive solutions, yielding hydraulic
conductivities ranging from 1.3x10-12 m/s to 4.2x10-8 m/s. Hydraulic conductivity of the BPC-
GCLs was not strongly related to flow stress of the polymer gel or swell index of the BPC.
However, high (> 10-9 m/s) and low (< 10-11 m/s) hydraulic conductivities were differentiated by
the product of flow stress of the polymer gel and swell index of the NaB component of the BPC,
herein referred to as the flow-swell index. The flow-swell index accounts directly for the two
mechanisms controlling hydraulic conductivity in BPC-GCLs – swelling of the NaB component
and propensity for elution of the polymer component. A narrow transition zone between high and
low hydraulic conductivities was identified corresponding to a small change in flow-swell index.
Flow-swell index greater than 14 kPa - mL/ 2g corresponded to long-term hydraulic conductivities
< 7x10-12 m/s.
INTRODUCTION
Bentonite-polymer composite (BPC) geosynthetic clay liners (GCLs) are employed in containment
facilities for wastes that generate aggressive leachates that can adversely affect the hydraulic
conductivity of GCLs containing sodium bentonite (NaB). Aggressive leachates that may
necessitate the use of BPC-GCLs are derived from wastes including red mud from alumina
refining, coal combustion products, or low-level radioactive wastes (Athanassopoulos et al. 2015;
Tian et al. 2016a; Donovan et al. 2017; Tian and Benson 2018; Chen et al. 2019).
Mechanisms controlling the hydraulic conductivity of NaB- and BPC-GCLs are illustrated
in Fig. 1. For NaB-GCLs, the hydraulic conductivity is controlled by swelling of the NaB. As NaB
granules swell, the intergranular pore spaces become smaller and more tortuous, resulting in low
hydraulic conductivity (<10-9 m/s, Fig. 1A). However, if swelling is suppressed by the hydrating
or permeant liquid, the intergranular pores are much larger and the hydraulic conductivity of a
NaB-GCL will be much higher (Fig. 1B; Kolstad et al. 2004, Jo et al. 2006, Scalia and Benson
2011). In a BPC-GCL, the size and tortuousity of the pore spaces is affected by swelling of the
bentonite as well as clogging of intergranular pores by hydrated polymer gel. If the NaB
component of a BPC swells minimally, the hydraulic conductivity of the BPC-GCL is primarily
controlled by polymer gel filling the pores (Scalia et al. 2014; Tian et al. 2016a; b; Özhan 2018).
For this reason, BPC-GCLs can maintain low hydraulic conductivity when hydrated or permeated
with aggressive solutions for which NaB-GCLs are much more permeable (i.e., solutions with high
Figure 1: (A) Swollen bentonite with narrow tortuous pores and low hydraulic
conductivity; (B) bentonite with swell suppressed, large intergranular pores, and high
hydraulic conductivity; (C) bentonite-polymer composite with polymer gel filling
intergranular pores and low hydraulic conductivity; (D) bentonite-polymer composite after
elution of polymer gel, with large pores, and high hydraulic conductivity.
BPC-GCLs maintain low hydraulic conductivity provided the polymer gel remains within
the pores, creating narrow and tortuous flow paths similar to those found in highly swollen NaB
(Scalia et al. 2014; Tian et al. 2016a; b; Özhan 2018). However, the polymer in BPC-GCLs is
prone to elution during permeation, which can result in preferential flow paths and higher hydraulic
conductivity (Tian et al. 2019; Gustitus and Benson 2020). Identifying conditions under which
NaB swelling and polymer retention yield high or low hydraulic conductivity is critical to evaluate
whether a BPC-GCL can be an effective barrier for an aggressive solution.
Currently there are no standardized or widely used index tests to screen BPC-GCLs for
compatibility with aggressive leachates. An effective index test to evaluate compatibility between
BPC-GCLs and aggressive solutions should represent the mechanisms controlling the hydraulic
conductivity (i.e., retention of the polymer and/or swelling of the NaB), similar to how swell index
represents the dominant mechanism controlling hydraulic conductivity of NaB-GCLs. Swell index
measured in accordance with ASTM D5890 is routinely used to screen NaB-GCLs, but is not
suitable for BPC-GCLs because swelling is only one mechanism contributing to low hydraulic
conductivity (McRory and Ashmawy 2005; Scalia et al. 2011, 2018; Salihoglu et al. 2016; Chen
et al. 2019). Water vapor sorption has been suggested as an index of compatibility, but the
relationship between hydraulic conductivity and water vapor sorption depends on the chemistry of
the permeating solution (Akin et al. 2017), precluding an assement of hydraulic conductivity a
priori. Correspondence between hydraulic conductivity and the fluid indicator test (FIT) has been
reported for one type of BPC permeated with CaCl2 solutions of various concentrations, but the
generality of this correpondence has not been demonstrated for other BPCs or permeant solutions
(Norris et al. 2019). Viscosity of the BPC hydrated with leachate has been suggested as an index
Materials. Three commercially available BPC-GCLs were used in this study. All of the GCLs
consisted of BPC constrained by upper and lower non-woven geotextiles bound by
needlepunching. BPC-GCL-PL also contained a woven slit-film between the BPC and the lower
non-woven geotextile. BPC-GCL-PC contains 6.5 g polymer/kg BPC of polymer PC, a cross-
linked polymer. BPC-GCL-PL contains 4.0 g polymer/kg BPC of polymer PL, a linear polymer.
BPC-GCL-PM contains 4.5 g polymer/kg BPC of polymer blend PM, a mixture of linear and cross-
linked polymers. All of the polymers were synthetic and water-soluble or water-swellable. They
are proprietary to the GCL manufacturers and therefore their chemical formulations are not
available.
The same NaB was used as the base clay for each of the BPC-GCLs. Quantitative X-ray
diffraction (XRD) conducted using the methods in Moore and Reynolds (1989) and Scalia et al.
(2014) indicate that the montmorillonite content of the bentonite is 75%. Other minerals in the
bentonite include cristobalite content (16%), tridymite (3%), oligoclase (3%), quartz (1%), calcite
(1%), and gypsum (1%). Grain size distribution measured following ASTM D6913 indicates that
99.6% of the NaB was finer than a US No. 10 (2 mm) sieve, 38.7% was finer than a US No. 20
(0.841 mm) sieve, and 0.9% was finer than a US No. 200 (0.074 mm) sieve.
Three solutions with varying chemical compositions were used as permeants: 50 mM
CaCl2 (electrical conductivity, EC = 1.0 S/m; pH 5.8), a synthetic bauxite liquor (EC = 6.6 S/m;
pH 13.5), and the CEN alkaline standard solution (EC = 1.4 S/m; pH 12.4) as described in EN
14030:2001. The synthetic bauxite liquor contained 287.2 mM NaOH, 0.06. mM CaCl2, 3.0 mM
KCl, 0.3 mM Na3PO4, 0.4 mM NaNO3, 54.2 mM Na2O-Al2O3, 19.1 mM NaCl, and 5.0 mM
Na2SO4.
Methods.
Hydraulic conductivity. Hydraulic conductivity was determined using the falling headwater,
constant tailwater method using flexible-wall permeameters in accordance with ASTM D6766.
The average effective stress was 29 kPa and the average hydraulic gradient was 115. Prior to
permeation, GCLs were hydrated with the permeant solution in the permeameter for 48 h with the
cell pressure and headwater applied and the outflow line closed. No backpressure was used to
preclude geochemical alterations that would not occur at natural porewater pressures.
The hydration tray used in these experiments had 7 mm wide compartments. Within each
compartment, oven-dry granular NaB was placed on one side the polyester filter and oven-dry
polymer was placed on the other. A combined total of 12 g of NaB and polymer was used for each
test, of which the masses were distributed to replicate the polymer to NaB ratio in the BPC-GCL.
The NaB and polymer were carefully spread across the opposite faces of the filter using a small
spatula. Solution (10 g) was directly applied to the filter using a small bulb dropper. The container
was sealed for 30 min, after which an additional 2 g of solution was added to the filter. Two steps
were used because preliminary testing demonstrated that the filter could only imbibe 10 g of fluid.
The container was then resealed and the contents allowed to equilibrate for at least 48 hr. Following
Viscoelastic properties. Storage and loss moduli of polymer gels were measured using shear-
strain-amplitude sweeps with controlled-shear deformation with an Anton Paar MCR 302
rheometer (Anton Paar, Austria). Amplitude sweeps were completed over a range of 0.01 to
10,000% shear strain using a 25-mm-diameter sandblasted parallel plate. Flow stress of the
hydrated polymer gels was determined as the shear stress corresponding to equality of the storage
and loss moduli. Tests were conducted on polymer gels hydrated with permeant solution to
moisture contents of 200, 500, 1000, and 2000%. This range of moisture content encompasses the
range of moisture contents determined using the bentonite-polymer moisture affinity test.
Swell index. Swell index was measured on the NaB alone and each BPC in general accordance
with ASTM D5890, except the BPC was ground to 100% passing the US No. 40 sieve and 65%
passing the US No. 60 sieve. A coarser grind then stipulated in D5890 was used to reduce the
effect of grinding on the polymer structure, and to ensure that there was no segregation of polymer
that would alter the results (Christian et al. 2020). Scalia et al. (2019) demonstrate that swell
indices of bentonite ground to pass a No. 40 sieve are similar to those for bentonite ground to pass
a No. 200 sieve.
Polymer loading. Polymer loading of the BPC-GCLs was determined by total carbon analysis
following the methods in Gustitus et al. (2020) using a Shimadzu TOC-L analyzer (Kyoto, Japan)
paired with a solid sample module (SSM).
RESULTS
Component in-situ moisture contents. Moisture contents of the polymer gels determined using
the bentonite-polymer moisture affinity test are summarized in Table 1. The gel moisture content
ranged from 405% for BPC-GCL-PC with synthetic bauxite liquor to 983% for BPC-GCL-PM
with 50 mM CaCl2. Moisture content of the hydrated NaB was consistently much lower than that
of the polymer, and ranged from 51% for BPC-GCL-PC with CEN alkaline solution to 77% for
BPC-GCL-PL with 50 mM CaCl2. For a given BPC, the polymer gel and NaB moisture contents
varied between hydrating solutions.
Total BPC moisture content from the competitive hydration test was between 90-110%,
which is comparable to the total moisture content of 100% used to define the volume of hydrating
solution added to the filter. The total moisture content (~100%), compartment width (7 mm), and
BPC loading (~3 kg/m2) in the bentonite-polymer moisture affinity test were representative of
typical conditions in the BPC-GCLs evaluated in this study.
Flow stress of hydrated polymer gels. Flow stress (𝜏𝜏f) of each gel decreased with increasing
moisture content. Examples of flow stress relationships are shown for each polymer hydrated with
50 mM CaCl2 in Fig. 3A. The relationship between flow stress and moisture content was unique
for each polymer-solution pair, but followed the power function:
𝜏𝜏𝑓𝑓 = 𝛼𝛼𝑤𝑤 𝛽𝛽
where w is the moisture content and α and β are empirically derived parameters. The
relationship between flow stress and moisture content varies with the chemistry of the hydrating
solution for a given polymer, as illustrated in Fig. 3B for polymer PC hydrated with the 50 mM
CaCl2, synthetic bauxite, and CEN alkaline standard solutions.
Figure 3. Relationships between flow stress and moisture content (A) for polymer gels
hydrated with 50 mM CaCl2 and (B) for polymer PC hydrated with each permeant
solution.
Swell Index. Swell indices of the BPCs and the NaB from each BPC are summarized in Table 1
for each solution. Swell index of the NaB ranged from 11 mL/2g with 50 mM CaCl2 and synthetic
bauxite liquor to 31 mL/2g with the CEN alkaline standard solution. Swell index of the BPCs
ranged from 11 mL/2g for BPC-GCL-PC and -PL with the 50 mM CaCl2 solution to 41 mL/2g for
BPC-GCL-PL with the CEN alkaline standard solution. Swell index of the BPCs was similar to or
higher than swell index of the NaB alone when hydrated in the same solution.
DISCUSSION
Hydraulic conductivity is shown versus flow stress in Figure 4A and versus BPC swell index in
Figure 4B. There is no distinct correspondence between hydraulic conductivity and flow stress or
swell index, but both data sets indicate thresholds that segregate low and high hydraulic
conductivities. For example, BPC-GCLs with a gel flow stress > 1.2 kPa have hydraulic
conductivity < 10-11 m/s. Similarly, BPC-GCLs with a BPC swell index greater than 17 mL/2g
have hydraulic conductivity < 7x10-12 m/s. The lack of strong correspondence for either index is
not suprising, as neither index accounts for both mechanisms affecting the hydraulic conductivity
for BPCs. That is, low hydraulic conductivity corresponding to narrow and tortuous pore spaces
can be achieved by swelling of bentonite granules, polymer clogging pore spaces between
unswollen bentonite granules, or a combination of both mechanisms.
To account for both mechanisms, hydraulic conductivity was graphed vs. the product of
NaB swell index and flow stress of the gel in the BPC as shown in Fig. 5, where the flow stress
corresponds to the moisture content of the gel obtained from the competitive moisture content test.
Swell index of the NaB is used in lieu of swell index of the BPC to account for the NaB swelling
mechanism independent of the gel. This product is referred to herein as the flow-swell index and
has units of kPa-mL/2 g.
CONCLUSIONS
Hydraulic conductivity tests were conducted on three commercially available BPC-GCLs with
three permeant solutions ranging in ionic composition, ionic strength, and pH. Flow stress of the
polymer gel and swell index of the BPC and the NaB alone were also measured using the same
solutions to evaluate whether an index could be identified as an indicator of chemical
compatibility.
A clear correspondence between hydraulic conductivity of the BPC-GCLs could not be
identified between swell index of the BPC or flow stress of the polymer gel, although thresholds
for both indices exist that correspond to low hydraulic conductivity. The lack of correspondence
is not suprising, as neither index completely represents the mechanisms controlling the hydraulic
conductiviy of BPC-GCLs. The product of polymer gel flow stress and swell index of the NaB
component, referred to as the flow-swell index, provides a clear demarcation between conditions
corresponding to low and high hydraulic conductivity and a very narrow transition zone where low
and high hydraulic conductivities both reside. The flow-swell index is a more effective indicator
of chemical compatibility because both of the primary mechanisms (swelling of NaB granules and
retention of polymer gel in pore spaces) affecting the size and tortuousity of the pore space are
represented. Additional testing using a broader range of BPC-GCLs and chemical solutions is
needed to confirm the generality of flow-swell index as an indicator of chemical compatibility.
ACKNOWLEDGMENTS
Financial support for this study was provided by CETCO of Minerals Technology Inc., the US
Department of Energy’s Consortium for Risk Evaluation with Stakeholder Participation (CRESP)
III through Cooperative Agreement No. DE-FC01-06EW07053, the Environmental Research and
REFERENCES
ASTM D2216-19. Standard Test Methods for Laboratory Determination of Water (Moisture)
Content of Soil and Rock by Mass. ASTM International, West Conshohocken, PA.
ASTM D6766-20a. Standard Test Method for Evaluation of Hydraulic Properties of Geosynthetic
Clay Liners Permeated with Potentially Incompatible Aqueous Solutions. ASTM
International, West Conshohocken, PA.
Akin, I. D., Chen, J., Likos, W. J., and Benson, C. H. (2017). Water Vapor Sorption of Bentonite-
Polymer Mixtures Contacted with Aggressive Leachates. Geotechnical Frontiers 2017, 209–
218.
Athanassopoulos, C., Benson, C., Donovan, M., and Chen, J. (2015). Hydraulic Conductivity of a
Polymer - Modified GCL Permeated with High - pH Solutions. Geosynthetics 2015, Industrial
Fabrics Association International, St. Paul, MN, 181–186.
Chen, J., Salihoglu, H., Benson, C. H., and Likos, W. J. (2019). Hydraulic Conductivity of
Bentonite-Polymer Geosynthetic Clay Liners to Coal Combustion Product Leachates.
Journal of Geotechnical and Geoenvironmental Engineering, 145(9), 04019038.
Donovan, M. S., Valorio, R., and Gebka, B. (2017). Polymer Enhanced Geosynthetic Clay Liners
for Bauxite Storage. Proceedings of 35th International ICSOBA Conference, Hamburg,
Germany, 2-5 October, 2017, 469–478.
Geng, W., Likos, W. J., and Benson, C. H. (2016). Viscosity of Polymer-Modified Bentonite as a
Hydraulic Performance Index. Geo-Chicago 2016, 498–507.
Gustitus, S. A., and Benson, C. H. (2020). Assessing polymer elution and hydraulic conductivity
of bentonite-polymer composite geosynthetic clay liners permeated with aggressive solutions.
4th Pan American Conference on Geosynthetics.
Gustitus, S.A., Nguyen, D., Chen, J. & Benson, C.H. (2020). Quantifying Polymer Loading in
Bentonite-Polymer Composites Using Loss on Ignition and Total Carbon Analyses.
Geotechnical Testing Journal. In Press.
Hornsey, W. P., Scheirs, J., Gates, W. P., and Bouazza, A. (2010). The impact of mining
solutions/liquors on geosynthetics. Geotextiles and Geomembranes, Elsevier Ltd, 28(2), 191–
198.
Jo, H. Y., Katsumi, T., Benson, C. H., and Edil, T. B. (2001). Hydraulic Conductivity and Swelling
of Nonprehydrated GCLs Permeated with Single-Species Salt Solutions. Journal of
Geotechnical and Geoenvironmental Engineering, 127(7), 557–567.
Kolstad, D. C., Benson, C. H., and Edil, T. B. (2004). Hydraulic Conductivity and Swell of
Nonprehydrated Geosynthetic Clay Liners Permeated with Multispecies Inorganic Solutions.
Journal of Geotechnical and Geoenvironmental Engineering, 130(12), 1236–1249.
McRory, J. A., and Ashmawy, A. K. (2005). Polymer Treatment of Bentonite Clay for
Contaminant Resistent Barriers. Geo-Frontiers Congress 2005, Austin, TX.
Mezger, T. G. (2015). Applied Rheology. Anton Paar GmbH, Austria.
Moore, D. M., and Reynolds, R. C. (1989). X-Ray Diffraction and the Identification and Analysis
of Clay Minerals. Oxford University Press, Oxford.
Norris, A., Scalia, J., and Shackelford, C. (2019). Fluid indicator test (FIT) for screening the
hydraulic conductivity of enhanced bentonites to inorganic aqueous solutions. Proceedings
ABSTRACT
Based on the results of composite liners exposed to freeze-thaw conditions where ice lenses were
formed due to cryogenic sections, the effect of these conditions on the interface transmissivity and
subsequent potential leakage through composite liners used in mine waste covers is examined.
This paper briefly discusses the testing conducted to establish the interface transmissivity
parameters followed by the modelling conducted to assess the potential leakage for three scenarios,
three cover thicknesses giving applied stresses of 10 kPa, 15 kPa, and 20 kPa. The significance of
the difference in the thickness of the cover is discussed in the context of both its impact on the
number of freeze-thaw cycles and on the ultimate leakage.
INTRODUCTION
There is extensive use of geosynthetics for hydraulic containment applications. Composite liners
which are typically comprised of a geomembrane (GMB) laid over a geosynthetic clay liner (GCL)
are widely used in applications such as lining the base of landfills or acting as a cover in mine
waste facilities to prevent the contamination of the environment surrounding these areas. The
GMB and GCL will each typically contain several different types of imperfections such as
variations in the thickness of the bentonite along the GCL which results in the lack of perfect direct
contact between them. As a result, a parameter called the interface transmissivity, denoted by θ
and with dimension of [L2T-1], is used to represent the resistance to fluid flow between the
geomembrane and GCL layers.
Uncovered and exposed to sunlight, polyethylene geomembranes expand when heated and
develop wrinkles due to the high coefficient of thermal expansion of polyethylene (Take et. al
2012). The different construction operations performed on top of the liner result in the
development of holes in the geomembrane, especially in wrinkles once the cover soil is placed.
This occurs even when good quality assurance is present (Gilson-Beck 2019, Rowe 2020). When
holes are present in wrinkles, the wrinkles act as a conduit for distributing fluid over a much larger
area than would occur if the hole were in direct contact with the GCL. This results in the
development of downward flow directly beneath the wrinkle. Due to the lack of perfect contact
between the geomembrane and GCL, lateral flow will also develop between the two layers beyond
the edges of the wrinkle along a distance called the wetted distance measured from the center of
the wrinkle outwards. The presence of this wetted distance leads to the development of additional
downward flow beyond the edges of the wrinkle and along the width of the wetted distance. The
interface transmissivity, hydraulic conductivity of the GCL, and the pressure head along the GMB-
GCL interface are the three main parameters that influence the extent of the wetted distance.
𝑘𝑘𝑠𝑠𝑠𝑠 ℎ𝑑𝑑
𝑄𝑄 = 2𝐿𝐿 �𝑘𝑘𝑠𝑠𝑠𝑠 𝑏𝑏 + �1 − 𝑒𝑒 −∝(𝑎𝑎0−𝑏𝑏) �� [1]
∝ 𝐷𝐷
where L is the length of the wrinkle, b is half of the width of the wrinkle, ksa and ksb are the harmonic
mean of the hydraulic conductivities of the GCL and the foundation layer beneath it, i.e.,
ksa 0.5
∝= [ ] , [3]
Dθ
hd is the difference in heads between the top of the GCL and the point where there exists zero
pressure head, hd = hw + C, and hw is the applied water head on the composite liner.
The wetted distance, ao, can be directly calculated using (Rowe 1998):
ao = b – [ln(C/(hw+C)]/α, [5]
Table 1: Interface Transmissivity Results for Composite Liners Subjected to Five and
Sixteen Freeze-Thaw Cycles in a Closed System.
Interface Transmissivity, θ (m2/s) Applied Overburden Stress
Number of Freeze- Thaw Cycles 10 kPa 15 kPa
5 4.5x10-8 9.2x10-10
16 8.3x10-7 2.0x10-9
Additional tests were performed to compare the transmissivity values that can be obtained
under low applied loads (10, 15, and 20 kPa) using composite liners subjected to five freeze and
thaw cycles under both open and closed system conditions. A solution with the chemical
composition to simulate rainwater that has percolated through the cover soil above the GCL was
also used as the permeant for these tests. Open system conditions are setup to represent field
conditions; thus, the transmissivity results obtained from the composite liners used in this system
are meant to be more representative of field conditions than traditional methods of freeze-thaw
sample preparation (Jabin et. al 2020). In this setup, the GCL and composite liner was directly
placed on the subgrade and was allowed to hydrate from the soil beneath it and, the GCL remained
sandwiched between the geomembrane and subgrade throughout its initial hydration and while
being subjected to freeze and thaw cycles.
Table 2. Interface Transmissivity Results for Open and Closed System Tests Subjected to
Five Freeze-Thaw Cycles.
Interface Transmissivity, θ (m2/s) Applied Overburden Stress
System 10 kPa 15 kPa 20 kPa
Closed 6.0x10-9 2.9x10-10 1.5x10-10
Open 1.1x10-6 1.3x10-9 6.9x10-10
The differences in the obtained results listed in Table 2 show that the number of freeze and
thaw cycles and the applied overburden stress on the composite liner has an impact on the interface
transmissivity of the GMB-GCL interface. In addition, under low loads, there was a large
difference in the interface transmissivity results obtained from open and closed system tests. Since
the interface transmissivity is a function of the wetted distance and thus, leakage, the main
METHODOLOGY
Three base cases representing one hectare (ha) of mine waste facility (100 m x 100 m) are assessed
in this paper. All three cases consist of 0.3 m thick foundation layer covered with a composite liner
consisting of a 1.5 mm thick HDPE geomembrane followed by a 0.01 m thick GCL. The
foundation layer was taken to be a sandy material and given a hydraulic conductivity, kAL, of 1x10-
5
m/s. The geosynthetic clay liner was given a ka value of 6x10-11 m/s and a kb value of 6x10-10
m/s. The applied water head on the composite liner, hw, was assumed to be 0.15 m. It was assumed
that there is one 100 m long holed wrinkle per hectare with a wrinkle width, 2b, of 0.1 m. The
pressure head was assumed to be zero beneath the GCL. For all the calculations that were
performed, these parameters remained constant unless otherwise stated. The only difference
between the three base cases are the overburden stresses applied on the composite liner for each
case shown in Figure 1.
For each case considered and depending on the transmissivity test result taken into
consideration from Tables 1 and 2, the wetted distance and leakage flow were calculated using
Equations 1 and 5 to identify the degree of leakage flow and contamination that occurs due to the
presence of holed wrinkles under the different cases, systems, and parameters considered.
Impact of Number of Freeze and Thaw Cycles under Different Applied Loads.
The wetted distances and leakage were calculated for two of the base cases developed, the cases
subjected to 10 and 15 kPa overburden stress, using the different transmissivities obtained where
the composite liners were subjected to 5 and 16 freeze-thaw cycles under closed system conditions
listed in Table 1.
The results are listed in Table 3 and show that under a constant overburden stress of 10
kPa, the wetted distance and leakage obtained using the transmissivities of the composite liners
subjected to 16 freeze-thaw cycles are more than 4-fold and 3-fold higher than the results obtained
using the composite liners subjected to five freeze-thaw cycles respectively. Under an overburden
stress of 15 kPa, the wetted distance and leakage calculated using the composite liners that were
subjected to 16 freeze-thaw cycles were 50% and 20% higher in magnitude compared to those
obtained from the composite liners subjected to five freeze-thaw cycles respectively. This shows
that under low overburden stresses, the more the composite liner is subjected to freeze and thaw
cycles, the higher the leakage and contamination that is expected to develop beneath the holed
wrinkle. As the overburden applied stress on the composite liner increases, the less the degree of
impact of the number of freeze-thaw cycles the composite liner is subjected to is on the wetted
distance and leakage.
Impact of Using Interface Transmissivity Test Results Obtained from Open and Closed
System Setups on Wetted Distance and Leakage.
The transmissivity results tabulated in Table 2 that were obtained for composite liners subjected
to five freeze-thaw cycles from two different lab setup systems, an open and closed system, have
been used to calculate the wetted distance and flow that will develop beneath the three base cases
considered in this paper.
Table 4: Wetted Distance and Leakage Results for Open and Closed System Setup
Transmissivities.
Applied Overburden Stress System Type ao (m) Q (lphd)
(kPa)
10 Closed 2.8 23.8
10 Open 37.6 218.8
15 Closed 0.7 11.7
15 Open 1.3 15.5
20 Closed 0.5 10.7
20 Open 1.0 13.6
Under a constant overburden stress of 10 kPa, the wetted distance and leakage obtained
from the interface transmissivity listed for the composite liner that was subjected to open system
conditions were more than 13-fold and 9-fold higher than those obtained using the transmissivity
listed for the test that used a composite liner that was subjected to closed system test conditions
for the same number of freeze-thaw cycles. The wetted distance and flow calculation results for
kb = 6x10-9 m/s
kb = 6x10-10 m/s
kb = 6x10-11 m/s
1000
Q (lphd)
100
10
6x10-12 6x10-11 6x10-10 6x10-9
ka (m/s)
Q vs. ka - 15 kPa
1000
kb = 6x10-9 m/s
kb = 6x10-10 m/s
kb = 6x10-11 m/s
100
Q (lphd)
10
1
6x10-12 6x10-11 6x10-10 6x10-9
ka (m/s)
kb = 6x10-9 m/s
kb = 6x10-10 m/s
kb = 6x10-11 m/s
100
Q (lphd)
10
1
6x10-12 6x10-11 6x10-10 6x10-9
ka (m/s)
Impact of Changes in the Applied Leachate Head on Flow under Different ka Values.
The impact of changing the applied water head of the three base cases considered under different
ka values on leakage was tested, and the calculated results were graphed (Figures 5 to 7).
All three figures show that as hw increases, the curves shift upwards and the calculated
leakage increases. In addition, for all applied water heads, as ka increases, the flow increases
especially once ka exceeds 6x10-11 m/s where the slopes of the curves increase significantly. In
addition, the graphs show that the higher the applied water head on the composite liner, the steeper
and more significant is the slope increase of the curves as ka increases. Comparing Figures 5, 6
and 7 shows that the impact of increasing ka on leakage is much more significant for a 10 kPa
overburden stress compared to 15 and 20 kPa. The effect on leakage of a 5 kPa increase in
overburden stress from 15 to 20 kPa was very small compared to the decrease that was observed
when the overburden stress is increased from 10 to 15 kPa. This stresses the importance of
considering the dependence of the degree of contamination on the applied overburden stresses and
obtained interface transmissivity when a composite liner is being used in low load applications
such as mining covers.
2000 hw = 0.45 m
hw = 0.3 m
hw = 0.15 m
hw = 0.05 m
1500
Q (lphd)
1000
500
0
6x10-12 6x10-11 6x10-10
ka (m/s)
Figure 5: Q vs. ka at Different hw values under 10 kPa of Applied Stress (kb = 6x10-10 m/s)
Q vs. ka - 15 kPa
100
hw = 0.45 m
hw = 0.3 m
80 hw = 0.15 m
hw = 0.05 m
60
Q (lphd)
40
20
0
6x10-12 6x10-11 6x10-10
ka (m/s)
Figure 6: Q vs. ka at Different hw values under 15 kPa of Applied Stress (kb = 6x10-10 m/s)
hw = 0.45 m
70 hw = 0.3 m
hw = 0.15 m
60 hw = 0.05 m
50
Q (lphd)
40
30
20
10
0
6x10-12 6x10-11 6x10-10
ka (m/s)
Figure 7: Q vs. ka at Different hw values under 20 kPa of Applied Stress (kb = 6x10-10 m/s)
CONCLUSION
Recent data published by Jabin et. al listing interface transmissivity values detected under low
loads for different conditions subjected to arctic conditions in two different lab setups, closed and
open system setups, were used to evaluate the impact of the number of freeze and thaw conditions,
type of GCL used in the composite liner, and the applied water head on the leakage that occurs
beneath a holed wrinkle in a composite liner used for cover applications. This was done by
performing wetted distance and leakage calculations for a hectare of a mine waste facility that uses
a composite liner for cover applications having a 100 m long holed wrinkle. Calculations were
performed for a range of different parameters under conditions where the cover soil placed on the
composite liner applied an overburden pressure of 10, 15 and 20 kPa. Based on these results and
for the conditions considered, the following conclusions were reached:
• For composite liners subjected to 5 and 16 freeze-thaw cycles, there was a substantial
difference in the interface transmissivity at an applied load of 10 kPa. This resulted in
higher calculated leakage for the composite liners subjected to 16 freeze-thaw cycles
compared to those subjected to 5 freeze-thaw cycles under the same load. The difference
between the leakage calculated under an applied stress of 15 kPa was small compared to
that detected under a 10 kPa applied stress.
• Using the interface transmissivities obtained from the composite liners subjected to open
system freeze-thaw gave higher calculated leakage than those obtained from the composite
liners subjected to closed system freeze-thaw. The difference was most substantial for the
case where 10 kPa stress was applied on the composite liner. This shows the importance
of selecting the type of lab test setup especially when low loads are applied on the
composite liner.
• The hydraulic conductivity of the GCL beneath the GMB is stress dependent causing
leakage to be impacted by it. Thus, under the same conditions and parameters, the
ACKNOWLEDGEMENTS
Funding for the development of the research infrastructure was provided by Grant CFI 36663 of
the Canada Foundation for Innovation and Project 36663 of the Ontario Innovation Trust and the
Ontario Research Fund Award. The research was funded by Strategic Grant STPGP 521237 from
the Natural Sciences and Engineering Research Council of Canada The support of all those listed
above is much appreciated; however, the opinions expressed in the paper are solely those of the
authors.
REFERENCES
ABSTRACT
In general, a Geosynthetic Clay Liner (GCL) deployment should not be carried out in the presence
of excessive moisture, nor shall they be left exposed overnight. If the GCL is prematurely hydrated,
the project technician and/or engineer shall determine whether the material is acceptable or if
alternative measures must be taken to ensure the quality of the design – dependent upon the degree
of damage. However, most project sites do not have the luxury of being moisture free. Subgrades
might contain the presence of a constant stubborn groundwater and/or a weather event occurs
during the deployment of a GCL. What are the effects of “Premature Hydration” on a GCL and
what to do in these instances are commonly asked questions. While there are no definitive
procedures to quantify a product’s usefulness after this type of occurrence, or for determining
whether or not the material should be removed and replaced, there are a few rules of thumb that
can be followed to aid project personnel in formulating the proper plan of action. The aim of this
paper is to offer project site technicians and/or engineers with some guidance that certain needle
punched GCLs can withstand weather events and/or be left exposed to the elements for a certain
period of time without cause for concern – application dependent. Some basic peel strength
laboratory testing was done on fully saturated GCL samples, to provide some insight on how
certain GCLs retain their initial needle-punched strengths.
INTRODUCTION
Geosynthetic Clay Liners (GCLs) are typically needle punched reinforced composites which
combine two or more durable geotextiles outer layers with a uniform core of natural sodium
bentonite clay to form a hydraulic barrier. The wide range of GCL uses include landfill caps and
base liner applications, dams, canals, ponds, rivers and lakes, and even waterproofing of buildings
and similar structures. Numerous laboratory studies have shown the excellent performance
capable with natural sodium bentonite GCLs. In general, GCL deployment should not be carried
out in the presence of excessive moisture. In addition, in the usual instance when these materials
are to be covered by geomembranes or soil materials, only a certain amount should be deployed in
a given working shift as can be covered by geomembrane or soil in that given work shift. This
will minimize the potential exposure of material to poor weather conditions. These deployment
guidelines on GCLs were made and written prior to the development of needle punched GCLs
when GCLs were unreinforced. Unreinforced GCLs such as glued bentonite to a geomembrane
are prone to the loss of bentonite in hydrated soil/site conditions rendering them to have no
hydraulic barrier capabilities whatsoever, not to mention the fact they should not be used in slope
conditions due to the low midplane friction angle of bentonite. A key parameter of needle punched
GCLs is their peel strength, the ability of the two or more geotextiles to hold together when shear
PREMATURE HYDRATION
What are the effects of “Premature Hydration” on needle punched GCLs and what to do in these
instances are commonly asked questions. While there no definitive procedures to quantify a
product’s usefulness after this type of occurrence, or for determining whether or not the material
should be removed and replaced, there are a few rules of thumb that can be followed to aid project
personnel in formulating the proper plan of action. However, it should first be understood from
where the remove and replace strategy originated in order to put it into proper context.
BACKGROUND
Reinforced needle punched GCLs are significantly different from the unreinforced GCLs and other
systems (stich bonded or glued GCLs), as there are thousands of fibers extending from one
geotextile (nonwoven) through the layer of bentonite into the other carrier geotextile (‘scrim’
woven or nonwoven) and/or geotextiles (scrim-nonwoven – 2 textiles). This mechanical bonding
provides an inherent confining stress not found with unreinforced GCLs. When exposed to water,
the swelling bentonite is unable to break this bond. Some GCLs are thermally locked following
the needle punching bond, providing an added strength to this bond, leaving the quality of the GCL
Top fabric
bentonite
Bottom fabric
Figure 1: Cross-section of needle punched Geosynthetic Clay Liner. Top fabric being a
nonwoven geotextile. Bottom fabric being either a woven or nonwoven or scrim-nonwoven
geotextile. Bentonite sandwiched between the top fabric and bottom fabric. Fibers from
the top fabric nonwoven are introduced into the bentonite with needle punching boards
(needles) and released into the bottom fabric. Some needle punched GCLs are thermally
locked to increase the peel strength, i.e. interlock the bottom fabric.
As precipitation can fall in many ways, such a heavy rainfall or a prolonged mist, and as
the degree of GCL saturation will be dependent on this factor, the focus of the issue is most
appropriately placed on subsequent installation procedures rather than hydration qualifications.
With a reinforced needle punched GCL, it is more often the activity that takes place over the
hydrated material which causes the damage, not the hydration itself.
Premature hydration or partial hydration in and of itself is not necessarily a damaging
event; it merely changes the installation conditions. The needle punching and thermally locked
GCLs differentiates these types of GCLs versus other types of GCLs, as they are not prone to
delaminating, a phenomenon that can occur with unreinforced GCL products.
That is not to say there aren’t circumstances when the removal and replacement of the
prematurely hydrated GCL product is necessary. Many site-specific factors influences the “to
leave or not to leave” decision including the degree of UV exposure, the degree of hydration, the
location of the hydrated material, the liner system profile, the differential loading that the affected
area will be subjected to during the completion of the installation as well as by the construction
techniques being utilized. All of these factors must be weighted for a ‘site-specific’ decision to be
made.
It should be noted that “removal and replacement” should never be done on a flat-no slope
section of a particular project. Leaving a fully hydrated GCL in place will not harm the project
design. If the decision is made that the fully hydrated GCL will not achieve the required
Figure 2. Scrim-Reinforced GCL left exposed for 3 days in a SWM Pond application.
ACCEPTANCE CRITERIA
At a minimum, the GCL should not be torn, separated or otherwise physically damaged.
Substantial indentations should not remain where walked upon nor should bentonite extrude
through the fabrics when subjected to any other stress. Overlapped seams should be intact,
including any accessory bentonite used in the laps. If the surface of the affected area has been
subjected to direct flow it should be checked for mass per unit area as prolonged turbulent flow
may have the effect of “eroding” away some of the bentonite. Finally, the affected area should not
be on a slope greater than 4H:1V.
If these basic conditions are met, the product will likely not require replacement. Once
subjected to the design normal loads, the excess absorbed water will consolidate out of the
Specimens are cut from across the entire width of a Geosynthetic Clay Liner creating a
representative sample, which are then submerged in deionized water for various lengths of time.
The bottom and top layers of these hydrated samples are gripped individually in tensile grips and
pulled at a specified constant rate of extension by a tensile testing machine until the top and bottom
layers separate. The average bonding peel strength is then calculated by the Instron Merlin IX
interface software as per ASTM Method D6496/D6496M – Standard Test Method for Determining
Average Bonding Peel Strength Between Top and Bottom Layers of Needle-Punched Geosynthetic
Clay Liners. These values are then compared against the peel bonding strength of the original dry
specimen in order to calculate the percentage of peel strength lost over time.
It should be noted that the testing done herein did not review permeability performance.
Testing done herein only reviewed the interlocking peel strength of samples after a fully
hydrated duration (time) length.
EQUIPMENT
Tensile testing machine - Instron 3365 Universal Testing Machine Utilizing Merlin IX software.
Clamps – 1 by 4 in Instron Screw Action Side Grips, 5kN capacity.
Die – One 13 by 13 in, and one 4 by 8 in.
Container – Appropriately sized waterproof container for submerging samples.
Miscellaneous – Utility Knife.
SAMPLING PROCEDURE
Using a dye as a template, five 13 by 13 in specimens are carefully cut from across the width of
the sample. This is repeated four times in total, with an individual 4 by 8 in sample cut from the
interior. All samples are cut parallel to machine direction. The 13 by 13 in specimens are then
marked with unique identifiers to differentiate soaking times.
The results of the tests are summarized in Tables 1 and 2. The percentage loss results are calculated
from a dry specimen taken from the same sample to show the loss in strength as a percentage.
Table 2. Nonwoven (top fabric) & Scrim-Nonwoven (bottom fabric) / Heat Treated GCL.
50.0% 51.0%
45.0% 46.0%
42.1% 42.6%
Percent Loss
20.0%
8 hrs 16 hrs 1 Day 2 Days 5 Days 7 Days 14 Days
CONCLUSIONS
Rejecting and removing a partially hydrated GCL can compromise an installation schedule even
if only a small area is affected, without increasing liner quality or performance. While the removal
or repair of damaged material is recommended to ensure a quality liner is construction, removing
partially hydrated GCL is not logical if it is not physically damaged or will not be damaged by a
quantified and predetermined installation and/or covering procedure.
Attempting to quantify the degree of hydration is very difficult. A sample with a modest
moisture content may not “appear” to be in satisfactory condition whereas a sample with what
could be considered an unacceptable moisture content (100% under a confining stress of only 5
psi is possible), may be deemed entirely acceptable. Each case of premature hydration tends to be
unique and site specific. The subsequent remedy should be based on the conditions that exist at
the location where the hydration occurs.
In the absence of an all-encompassing and industry accepted, quantifiable test procedure,
a commonsense approach must be applied when evaluating these relatively common situations.
As this is an installation-related phenomenon, the use of reinforced GCLs should be
maximized to ensure the potentially damaging affects of premature hydration are minimized.
REFERENCES
ASTM. (2009). Standard test method for determining average bonding peel strength between the
top and bottom layers of needle-punched geosynthetic clay liners. ASTM International
Thevachandran Shenthan, Ph.D., P.E., G.E., 1 Kris Khilnani, P.E., G.E.,2 and
Timothy D. Stark, Ph.D., P.E., D.GE3
1
Advanced Earth Sciences, Inc., Irvine, California 92618; [email protected]
2
Advanced Earth Sciences, Inc., Irvine, California 92618; [email protected]
3
Department of Civil and Environmental Engineering, University of Illinois at Urbana-
Champaign, Urbana, IL 61801; [email protected]
ABSTRACT
Multi-layer interface tests using site-specific composite liner components, typically involving 4-5
layers, provide a direct measure of the lowest peak and large displacement strength of the entire
liner system. If performed properly using site-specific and well-developed test procedures, the
multi-layer interface test provides reliable, consistent, and repeatable test results that compare well
with the results of single interface tests on the weakest interface. This paper presents multi-layer
interface shear test results for composite liner systems from eighteen landfill projects in California.
Peak strengths, shear displacements at peak strengths, and post-peak strength reduction at the end
of shearing were analyzed for multi-layer and single interface tests for four of the eighteen projects.
The correlations between the results of multi-layer and single interface tests are found to be
excellent. Shear displacements at peak strength for multi-layer tests tend to be slightly higher than
for single interface tests, but these have no impact on the mobilized peak and large displacement
(LD) strengths, which show excellent agreement between the two test types.
INTRODUCTION
Municipal solid waste and hazardous waste landfills in California are typically lined with a
composite liner system involving multiple layers of geosynthetics and earthen materials including
low-hydraulic conductivity compacted soil liner, high-density polyethylene (HDPE)
geomembrane (GM), geosynthetic clay liner (GCL), drainage geocomposite, geotextile, leachate
collection and removal system (LCRS) gravel, and protective cover soil. The composite liner
system configurations are designed based on the waste characteristics, level of groundwater
protection needed, landfill geometry (slope stability considerations), and regulatory requirements.
Interface and internal shear strengths of the composite liner components govern the stability of
refuse slopes and are critical for optimizing landfill capacity (Stark and Choi 2004; Stark et al.
2015). Two methods to determine the interface shear strength are: (a) single interface shear tests
(using two materials in contact) for each of the interfaces involved and determining the
combination peak shear strength envelope for the weakest interface, and (b) multi-layer interface
shear test using all of the relevant liner components in a sandwich configuration (Stark et al. 2015,
Khilnani et al. 2017, Shenthan et al. 2019). Use of multi-layer method has received considerable
recent attention and is now included in the ASTM D5321, 2020 edition.
Although single interface tests provide a better understanding of each interface behavior,
it requires multiple tests for each interface and typically 5 to 6 interfaces depending upon the
number of liner material components to determine the weakest interface. The multi-layer tests, on
Figure 1 shows typical details for floor (base/bottom) and side slope composite liner systems
discussed. They include (Shenthan et al. 2019):
The key parameter that controls the critical interface and the corresponding interface shear
strength is texturing of the GM. When SST GM is used, the critical interface will almost always
be the smooth side of the GM against geotextile or geocomposite, as applicable. On the other hand,
when DST GM is used, the weakest interface could be on Geotextile/GM, GM/GCL, or
GM/Subgrade depending on the peak strength of the respective interfaces. The weakest interface
would be the one with the lowest peak strength. For an unencapsulated GCL, i.e., GCL installed
directly on subgrade (or compacted soil liner), the critical interface could even be the
GCL/subgrade (or compacted soil liner), although that is uncommon. The composite liner systems
discussed in this paper include four different configurations, including (a) DST GM/GCL/DST
GM (encapsulated GCL), (b) DST GM/GCL/subgrade (unencapsulated GCL), (c) DST
GM/Compacted Soil Liner (no GCL) – Subtitle D liner (Code of Federal Regulations 2012), and
(d) SST GM on GCL and overlain by Geotextile or Geocomposite (for side slope liner).
Data from four projects, where both single interface and multi-layer interface shear tests were
performed are presented in this section. Peak strengths, shear displacements at peak strengths, and
post-peak strength reduction at large displacement were analyzed.
Site 1 (Encapsulated GCL). The composite liner for this site consists of (top to bottom) LCRS
gravel, geotextile, DST HDPE GM, GCL, DST HDPE GM, and prepared subgrade. Single and
multi-layer interface tests were conducted using hydrated and as-received (unhydrated) GCL. In
the multi-layer interface tests, concrete sand was used in place of the LCRS gravel. Results from
these tests were subjected to detail studies by Stark et al. (2015). A comparison of LD strengths
between single and multi-layer interface tests were also made by Shenthan et al. (2019). Figure 2
For the unhydrated GCL, the shear displacements at peak strength for single interface tests
and multi-layer tests are relatively close at about 10 mm. For the hydrated GCL tests, the
displacements at peak strengths for multi-layer tests are larger than single interface, but both
appear to increase with increasing applied normal stress. However, the LD strengths for both single
and multi-layer interface tests with the hydrated GCL are nearly identical, as discussed below.
Figure 3 compares peak and LD shear strength results for the above tests. Combination
strength envelopes for single interface tests were developed using Stark et al. (2015) methodology.
For unhydrated GCL tests, both peak and LD shear strengths from multi-layer tests compare well
with those from single interface tests, except at the highest normal stress (1,500 kPa), at which the
LD strength from single interface test is slightly lower than the multi-layer test. In Figure 3(b), the
peak hydrated GCL shear strengths from multi-layer tests are higher than those from single
interface tests with the difference increasing with normal stress. LD results from single interface
tests using hydrated GCL are about 30% lower for a normal stress of 700 kPa and up to 15% lower
for larger normal stresses. The average LD strengths of hydrated and unhydrated GCL tests, which
is adopted as the design strength for an encapsulated GCL liner system in California, are typically
10% lower for single interface tests as compared to multi-layer tests.
Based on the information provided by the testing laboratory, the differences may be due to
the type of substrate. For the single interface tests, the GM was affixed to steel with mini spikes,
Site 2 (Unencapsulated GCL). There were two types of composite liner used: (a) LCRS Gravel/
DST GM/GCL/Foundation Soil Layer and (b) Protective Soil Cover/Geocomposite/DST
GM/GCL/Subgrade soil. For both liner systems the GCL was tested in a hydrated condition. A
comparison of shear strength vs. shear displacement plots for single and multi-layer tests are
presented in Figure 5. For liner system (a), the weakest interface is the hydrated GCL/DST GM.
At the highest normal stress, internal failure of the GCL occurred for both the single and multi-
layer tests. Although the stress-displacement plots vary slightly (see Figure 5), the LD strengths
for single and multi-layer tests are nearly identical.
Figure 6 presents shear strength vs. displacement relationships for all of the single interface
tests performed for liner system (b) at a normal load of 383 kPa. Figure 6 also presents the result
from the corresponding multi-layer test. During the Foundation Soil Layer/GCL single interface
test, the GCL failed internally. However, the GM/Geocomposite interface is the critical interface
because it exhibited the lowest peak strength. In summary, the multi-layer test correctly identified
the critical interface identified by the single interface tests.
A comparison of shear displacements at the peak strength condition for Site 2 is presented
in Figure 7. Displacements are similar for both types of liner systems, i.e., (a) and (b), under both
types of tests. These displacements, typically 10 to 15 mm, are low compared to the LD (75 mm),
and have no impact on the LD strengths from single and multi-layer tests.
Figure 8 presents peak and LD shear strength envelopes from the single and multi-layer
tests for Site 2. The multi-layer test strength envelopes compare well with the single interface test
envelopes for the weakest interface. A comparison was also made of the post-peak strength drop,
and the results are presented in Figure 9. Once again, the strength drop, although only a qualitative
indicator as previously discussed, is similar for single interface and multi-layer interface tests,
which is important because the LD strength controls the static and seismic slope design using the
scenarios proposed by Stark and Poeppel (1994).
Site 3 (Unencapsulated GCL). The composite liner system for this site consists of (top to bottom)
Protective Cover Soil/Geocomposite/DST GM/GCL/Foundation Soil Layer. Single interface tests
were only performed on the weakest interface, i.e., GM/Geocomposite. Shear strength vs.
displacement plots and displacements at peak strength are presented in Figure 10. The multi-layer
tests show larger displacements at the peak strength compared to single interface tests. However,
the displacements are relatively small (10 to 20 mm) compared to the LD value of shear
displacement (75 mm) and the interfaces underwent similar post-peak displacements to reach
almost the same LD strength values as single interface tests. The large difference in displacements
at peak strength between multi-layer and single interface tests may be attributable to the type of
GCL (needle punched vs. threads locked by heat burnishing), type of bentonite (powdered vs.
granular), test conditions, etc. More data on different types of GCL material are needed to confirm
this. Figure 11(a) presents peak and LD shear strength envelopes for the single and multi-layer
tests for Site 3. The multi-layer test peak and LD strength envelopes are in excellent agreement
with the single interface test envelopes for the weakest interface. A comparison was also made of
the post-peak strength drop, and the results are presented in Figure 11(b). The strength drop is
again similar for single interface and multi-layer interface tests, which is important for slope
design.
Site 4 (Subtitle D Liner – GM/Compacted Soil Liner, No GCL). The composite liner system
for this site consists of (top to bottom) LCRS Gravel/Geotextile/DST GM/Compacted Soil Liner.
Single interface tests were only performed for the critical interface, i.e., GM/Geotextile. Shear
strength vs. displacement plots and displacements at peak strength are presented in Figure 12.
A large database of multi-layer interface tests (ASTM D5321/D6243) has been developed from
interface tests for 18 landfill projects. The results are divided into the four composite liner
configurations described above. The LD strengths are reported in Shenthan et al. (2019). Peak
strengths and shear displacements at peak strengths are reported herein.
Category (a) - DST GM and Encapsulated GCL. Figure 15 shows peak shear strength results
from six projects, with a total of 74 test points for hydrated GCL and 62 tests points for
unhydrated GCL. The results indicate the following:
• For the tests with hydrated GCL, the critical interface is the GM/GCL interface for 70 of
the 74 points. For four (4) points, the failure occurred on the GM/Compacted Soil Liner
interface.
• For the tests with unhydrated GCL, the critical interface is generally the upper or lower
GM/GCL (37 out of 62); for 19 out of 62 tests, the critical interface is the GM/Geotextile
or Geocomposite interface, and for 6 out of the 62 tests, failure occurred on the
GM/Compacted Soil Liner interface.
• The data shows good repeatability between multi-layer interface tests for normal stresses up
to about 1,350 kPa. Significant scatter is observed at normal stresses greater than 1,350 kPa.
Best strength envelopes and the corresponding equations are shown in Figure 15. The
average of the LD strengths for the hydrated and unhydrated GCL tests in Figure 15 can
be used for preliminary design of an encapsulated GCL but must be verified for final
design.
• The results show stress-dependent shear strength behavior with adhesion trending to zero.
• There is considerable scatter in the shear displacements at peak strength (typically 10 to 30 mm)
with much greater scatter for the hydrated GCL condition.
Category (b) - DST GM and Unencapsulated GCL. Figure 16 shows the results from 110 tests
performed using unencapsulated GCL for eight projects. Tests were performed with a fully
hydrated GCL. The results indicate:
• Similar to an encapsulated GCL, the unencapsulated GCL liner system also exhibits stress-
dependent shear strength behavior.
• The weakest interface is either GM/hydrated GCL or GM/Geotextile or Geocomposite, when
geocomposite was used. GM/Geotextile provides the benefit that it typically exhibits a lower
peak strength than the GM/hydrated GCL interface at low normal stresses, but a higher LD
strength.
• Displacements at the peak strength typically range from 10 mm to 30 mm.
Figure 16. Peak Shear Strength Data - DST GM and Unencapsulated GCL
Category (c) - DST GM on Compacted Soil Liner. Figure 17 shows results from 39 tests
performed for six projects, where a Subtitle D composite liner system with a GM underlain by 600
mm thick low hydraulic conductivity compacted soil liner was used as the composite liner. The
results indicate:
• Critical failure surface is either the GM/Compacted Soil Liner (15 out of 39) or
GM/Geotextile or Geocomposite interface, when geocomposite was used.
• The best-fit strength envelope also shows stress dependent shear strength behavior.
• Displacement at the peak strength typically ranges from less than 10 mm to 20 mm.
Category (d) - Composite Liner with SST GM (Side Slope Liner). Figure 18 shows the results
from 92 tests performed for eight projects, where SST GM was used on side slopes. The multi-
layer test configuration included a GM with the textured side down against a hydrated GCL and
overlain by cushion geotextile or geocomposite. The results indicate:
• The critical failure surface is always the smooth GM/Geotextile or Geocomposite interface
as expected.
• The peak shear strengths are consistent and repeatable because the smooth geomembrane
surface creates little variability.
• The best-fit strength envelope is relatively linear and not stress dependent because there is
little change in behavior with increasing normal stress.
• Because the tests results show limited variability and the critical interface is always the
smooth GM side and geotextile or geocomposite, single interface tests may generally
suffice in lieu of multi-layer tests.
• The shear displacements at the peak strength are typically less than 10 mm.
Figure 18. Peak Shear Strength Data - Composite Liner System with SST GM (Side Slope Liner)
SUMMARY
Multi-layer interface data from 18 projects involving 377 interface tests are presented in this paper.
Comparisons are made between multi-layer and single interface tests for four sites where both
types of interface tests were performed. The following observations can be made:
• Multi-layer interface tests, if performed using careful test setup and well-developed site-
specific test procedures, provide reliable, consistent, and repeatable results for direct use
of measured LD strengths for slope stability analyses.
REFERENCES
ASTM D5321/D5321M. Standard test method for determining the shear strength of soil-
geosynthetic and geosynthetic-geosynthetic interfaces by direct shear, ASTM International,
West Conshohocken, Pennsylvania, USA.
ASTM D6243/D6243M. Standard test method for determining the internal and interface shear
resistance of geosynthetic clay liner by the direct shear method, ASTM International, West
Conshohocken, Pennsylvania, USA.
ASTM D7702/D7702M. Standard Guide for Considerations When Evaluating Direct Shear Results
Involving Geosynthetics, ASTM International, West Conshohocken, Pennsylvania, USA.
Code of Federal Regulations (2012). Criteria for Municipal Solid Landfills, Title 40, Part 258.
Khilnani, K., Stark, T.D. and Bahadori, T.M. (2017). Comparison of Single and Multi-Layer
Interface Strengths for Geosynthetic/Geosynthetic and Soil/Geosynthetic Interfaces,
Geotechnical Frontiers 2017: Waste Containment, Barriers, Remediation, and
Sustainable Geoengineering, GSP 276: 42-51.
Shenthan, T., Khilnani, K. and Stark, T.D. (2019). Case Histories of Multi-Layer Interface Tests
for Composite Liners and Comparison to Single Interface Tests, Geo-Congress 2019:
Earth Retaining Structures and Geosynthetics, GSP 306, ASCE: 331-343
Stark, T.D. and Choi, H. (2004). Peak vs. Residual Interface Strengths for Landfill Liner and
Cover Design, Geosynthetics Intl. J, 11(6), December 2004: 491-498.
Stark, T.D., Niazi, F., and Keuscher, T. (2015). Comparison of Single and Multiple Geosynthetic
Interface Tests, Intl. J. Geotech. and Geol. Eng., Springer Publishing, April 2015: 1-17.
Stark, T.D. and Poeppel, A.R. (1994). Landfill Liner Interface Strengths from Torsional Ring
Shear Tests, Journal of Geotechnical Engineering, ASCE, 120(3), March 1994: 597-615.
ABSTRACT
This paper presents the results of the survey on geotextile filtration conducted in 2012-2013 by the
International Geosynthetics Society (IGS). This survey received more than 200 responses from
practitioners from over 5 continents. It was focusing on identification of design practices around
the world; occurrence of failures or perceived failures; confidence in the technology; as well as
regulatory aspects. The results of this survey were used to define the structure of Standard ISO
18228-3 on the design of geotextiles for filtration, developed by ISO TC221 on Geosynthetics, in
press at the time this publication is written. This structure is presented in this paper as well. This
document is not intended to provide an exhaustive description of all relevant publications and
practices currently available on filtration. It presents a state of the practice based on a survey
conducted among IGS members, as well as a design strategy which has reached consensus among
all the nations member of ISO TC221.
INTRODUCTION
In geosynthetics, the filtration function is to stabilize a soil by maintaining in place the skeleton in
contact with the geotextile, while allowing the passage of water or other fluids across the filter.
The filtration function has historically been provided by soils slightly coarser than the soils being
retained. However, the simplicity of use of geotextiles has made them a replacement of choice of
granular filters. A geotextile filter also avoids the need for multiple, staged soil filters by offering
a continuous structure capable to retain the soil, and openings which must be selected to retain the
skeleton of the soil.
The most frequent uses of geotextiles for their filtration capability include:
• Filter envelope for drainage systems. A drain work thanks to the difference of permeability
between the material being drained and the material acting as a drain, such as coarse gravel,
drainage pipe, edge drain, drainboard, geonet, or prefabricated vertical drains (PVDs). To
maintain the efficiency of the drain, it is essential to avoid its contamination by particles
of the soil being drained, therefore to install a filter selected to avoid contamination of the
drainage core by fine particles, while not restraining the flow of water.
• Filter used between a soil and a rip-rap, gabions or similar products, e.g. for coastal
protection, banks protections, in canals or in dams. The geotextile filter is then intended to
let the water flow freely between the soil and the environment, while avoiding erosion.
• Separators for roadway applications, where they are intended to avoid interpenetration of
the road base and the infrastructure, while avoiding the development of pore pressure.
In geosynthetics, the filtration function is to stabilize the soil by maintaining in place the
soil skeleton in contact with the geotextile surface and restrain uncontrolled passage of soil, while
KEY FINDINGS OF THE SURVEY ON CURRENT PRACTICES WITH THE USE AND
DESIGN OF GEOTEXTILE FILTERS
In order to gather information on current practice, the following groups were consulted:
• Membership of ISO TC221-WG6-PG3
• Membership of the IGS TC-H (Technical Committee on Hydraulics) and TC-F (Technical
Committee on Filtration)
Overall, about 1000 survey were distributed, and more than 200 were returned.
Qualifications of the respondent is summarized below:
• 97 % were holding an engineering or higher degree;
• More than 65 % had at least 10 years of experience with the use of geosynthetics, and less
than 15 % had only three years of experience with geosynthetics or less.
• Respondents were well distributed over five continents, with 25 from Africa, 39 from Asia,
7 from Oceania, 57 from Europe, 48 from North America and 29 from South America.
• They were involved in different fields of practice (research, design, manufacturing,
installation).
• Their practice included coastal protection, road drainage, foundation drainage, slope
drainage, mine waste applications, municipal solid waste applications.
Overall, these numbers suggest that the results of the survey reflect the opinion of a group
of individuals familiar with the industry, with a high education, without emphasizing too much on
a particular region, profession, or field of practice. The response to the survey were analyzed, and
eventually led to the definition of a few observations which are presented below.
2- Variety of standards used to qualify geotextile properties. It was found that there are two
main standardization bodies used to qualify geotextile properties: ASTM and ISO, but there is also
more than 25% of respondents who are using methods other than ASTM or ISO. Responses can
be summarized as follow:
• ISO (i.e. ISO 12956, ISO 11058, etc) : 77
• ASTM (i.e. ASTM D4751, ASTM D4491, etc): 119
• Other national standard (often based on ISO): 67
• Other standards, i.e. from institutes or private agencies: 59
3- Are geotextiles filters performing well? A section of the survey was dedicated to the
observation of failures, with the question focused arbitrarily on witnessing the failure within the
last three years. The intention of this question was to assess qualitatively whether geotextile filters
actually fail in the field on a regular basis, or not. Three options were offered for the answer, to
distinguish failures actually witnessed, first-hand, from failures that could have been promoted for
various reasons, e.g. for commercial reasons, by a party representing a competitive technology.
Results were classified depending on the primary activity of the respondent. They are summarized
in table 1.
It was interesting to observe that for each professional practice, less than 30 % of all
respondents have directly witnessed a failure, disregarding the type and magnitude of the failure.
4- Level of confidence (of the respondents) in geotextile filters. The question asked was: “Would
you specify a geotextile filter (based on available current filter criteria) to a large geotechnical or
geoenvironmental project (for instance: a medium to high risk project such as an embankment
dam over 30 m high, or a project with a total value > 50 M$ where the geotextile plays a significant
role)?” The answers provided are reported in Table 2.
Table 2. Confidence.
Yes 34
166 (73.5 %)
Yes, depending on the project characteristics 132
No, because of lack of long-term performance of geotextile filters in
20
such applications.
No, because of lack of confidence on the success of the filter. 9
No, because of concerns regarding durability, damages during 47 (20.1 %)
12
installation, etc.
No, because it is not in the codes and there is no local experience
6
for this application.
Other (please specify) 13 13 (5.7 %)
Based on these answers it seems that about three quarter of respondents have a good level
of confidence in geotextile filters. The concerns raised for a quarter of the respondents include:
• Lack of confidence in long term durability.
• Lack of confidence in the ability of the filter to perform as intended.
• Regulatory / building code-related issues.
5- Most important issue restraining the use of geotextile filters. For this question, 65% of
respondents highlighted the need to have a better control and understanding of the products
functions and behavior; 27% pointed toward the lack of confidence of owners of the projects, while
about 10 % mentioned regulatory issues.
Observations based on the Survey. The most important observations made in this survey were
as follow:
• There are, in fact, a relatively limited number of failures related to filtration performance
of geotextiles.
• There are sometimes regulatory issues restraining the use of geotextile filters.
• The lack of confidence of some owner and some design engineer in long-term
performances of geotextile filters needs to be addressed.
Further analysis suggests that a limitation to the use of geotextiles for their filtration
function is not supported by evidence of problems, but more by the lack of information, and/or
10 projects were set up within WG6 on Design with Geosynthetics. Each of them will lead
to a standard that will help users not familiar with a product identify relevant concerns and design
practice:
• PG1 – General
• PG2 – Separation
• PG3 – Filtration
• PG4 – Drainage
• PG5 - Stabilization
• PG6 – Protection
• PG7 – Reinforcement
• PG8 – Surface Erosion
• PG9 – Barriers
• PG10 – Asphalt Overlays
ISO TC221-WG6-PG3 on Designing for Filtration was initiated in 2014. Canada
coordinated this project. The development of the standard started with the analysis of the IGS
survey, as reported above. Based on the survey it was decided that the design standard should stay
relatively simple in its format and give confidence to users in the high performance of geotextile
ISO TC 221 Working Group 6, Project Group 3 (WG6-PG3) worked on the development of this
standard, including the recommendations arising from the survey, and gathering the various design
recommendations available from the committee members. Although this document is protected by
copyrights, the key, important sections are described herein:
• Chapters 1 to 3: Scope, Normative references, Terms and Definitions
• Chapter 4: Concepts and fundamental principles
• Chapter 5: Typical applications
• Chapter 6: Materials
• Chapter 7: Functional properties relevant to design
• Chapter 8: Principles of design
• Chapter 9: Testing the soil/geotextile filtration compatibility
• Chapter 10: Examples of material specifications and design guidance
Chapter 4: Concepts and fundamental principles. In this section, key concepts defining
filtration performance are proposed. Basic performance goals are formulated, i.e. the geotextile
must retain the soil skeleton and let water pass perpendicularly to its plane. Additional propositions
are also formulated, such as the need to properly understand the application: type of soil, type of
fluid (liquid or gas). A distinction is proposed between slurry and soil filtration.
The need for the geotextile to meet minimum mechanical properties is defined, considering
survivability requirements as well as the capacity of the product to resist mechanical stresses
during service, if any. Finally, durability and long-term degradation are discussed.
No minimum values are proposed in this section for mechanical properties or durability
requirements as these are typically project- or application-specific.
Chapter 7: Functional properties relevant to design. The relevant ISO, ASTM and other
standards which should be used to qualify the various properties of geotextiles are identified in
this section:
• Opening size, which can be a characteristic opening size, or a value selected from the pore
size distribution.
• Velocity index and permittivity – or permeability.
• Resistance to water penetration.
• Number of constrictions, although there is no consensus on criteria that can be used for
design.
• Percent open area.
It is important to highlight that this ISO guidance is intended to be international and useable
in any country or jurisdiction. For that reason, Chapter 7 (and the rest of the document) does not
point toward single test methods as the unique solutions for evaluating given properties. As
identified in the survey, there are as many experts using ISO as there are using ASTM standards.
The primary focus of this section is therefore to list properties and standards available to measure
them, instead of limiting options, therefore limiting the applicability of the guidance.
Chapter 8: Principles of design. This chapter is basically the core of the standard, and among the
most important for potential new users of geotextiles as it defines the environmental conditions
that need to be controlled to ensure long-term performance of the structures utilizing a geotextile
filter. Considerations are given to:
• Installation conditions, and the need to ensure an intimate contact between the soil and the
geotextile before the filtration process is initiated, i.e. before liquid flows through from the
soil to the geotextile.
• Risk of premature degradation caused by solar exposure, excessive heat or chemical
exposure.
• Risk of premature degradation caused by abrasion, puncture, tearing or other mechanical
damage.
• Control of the risk of biological or chemical clogging, i.e. iron ochre, or mineral
precipitation, as well as specific environmental conditions such as leachate filtration.
• Risk associated to high suspended particle content in the water, in particular with filters
used for shore protection, on riverbanks, etc.
Guidance provided for the design of geotextiles for soil filtration are then provided. These
are essentially based on the Canadian Geotechnical Manual as modified by Heibaum (2014). A
step by step approach is offered as follow:
The various factors (B, C, E) as well as the selection of the indicative diameters of the soil
dI and dJ are defined in the standard and depend on soil properties and operating conditions:
• For the retention criteria, B and dI depend on the coefficient of uniformity of the soil and
flow conditions.
• For the non-retention criteria of fines in suspension, C and dJ depend on the coefficient of
uniformity of the soil and flow conditions. In the case of woven geotextile filtration, a
minimum value of Percent Open Area (POA) is also specified.
• For the permeability criteria, E depends on the risk and associated consequence of the
pressure build up on the upstream side of the geotextile and varies from 10 to1000.
Chapter 8 also introduces the design of geotextile for slurry and suspended solids filtration
as in geocontainers, silt fences, sludges and tailing filtration. However, a criterion is not provided
per se, as slurry filtration is far more complex and efficiency may be defined in several different
ways depending on the application. The design of a geotextile to interact with a given slurry is
usually performed using laboratory tests.
Chapter 9: Testing the soil/geotextile filtration compatibility. This chapter describes laboratory
tests commonly used to assess the performance of a soil / geotextile systems, including:
• Soil/geotextile compatibility (ASTM D5101, ASTM D5567 and ISO 10772)
• Evaluation of slurry/geotextile behavior (ASTM D7701 and D7880)
• Biological or chemical clogging potential (ASTM D1987)
• Impact of abrasion on the filtration properties of geotextiles (ASTM D4886 and ISO
13427)
CONCLUSION
The results of a survey on the use of geotextiles for filtration was introduced. The results of this
survey were used to define the structure of Standard ISO 18228-3 on the design of geotextiles for
filtration, developed by ISO TC221 on Geosynthetics, which reflects an international consensus
from experts from all around the world on this matter.
The most important finding arising from the survey was the relatively small number of
failures encountered by experts with typically more than 10 years of experience with the use of
geotextiles for filtration. This observation suggests that the reliability of geotextiles for filtration
is, in general, very high.
A secondary finding from this survey was that education and availability of simple
guidance is needed to increase the confidence of potential users of geotextiles. The development
of ISO 18228-3 was made with this goal in mind. Such simple design guidance and good practices
are provided. These reflect a consensus from international experts involved in ISO TC221.
REFERENCES
Giroud, J.P., 1996, “Granular Filters and Geo1987textile Filters”, Proceedings of GeoFilters ’96,
Lafleur, J. & Rollin, A.L., Editors, Montréal, Canada, May 1996, pp. 565 – 680.
Giroud, J.P., 2010, “Development of criteria for geotextiles and granular filters”, Prestigious
Lecture, Proceedings of the 9th International Conference on Geosynthetics, Guarujá, Brazil,
May 2010, Vol. 1, pp. 45-64.
Heibaum M., 2014, “Rethinking geotextile filter design”, Proceedings of the 10th International
Conference on Geosynthetics, 21 to 24 Septembre 2014, Berlin
ASTM D4751 - Standard Test Methods for Determining Apparent Opening Size of a Geotextile
ASTM D4491 - Standard Test Methods for Water Permeability of Geotextiles by Permittivity
ASTM D5101 - Standard Test Method for Measuring the Filtration Compatibility of Soil-
Geotextile Systems
ASTM D5567 - Standard Test Method for Hydraulic Conductivity Ratio (HCR) Testing of
Soil/Geotextile Systems
ASTM D7701 - Standard Test Method for Determining the Flow Rate of Water and Suspended
Solids from a Geotextile Bag
ASTM D7880 - Standard Test Method for Determining Flow Rate of Water and Suspended Solids
Retention from a Closed Geosynthetic Bag
ASTM D1987 - Standard Test Method for Biological Clogging of Geotextile or Soil/Geotextile
Filters
ASTM D4886 - Standard Test Method for Abrasion Resistance of Geotextiles (Sandpaper/Sliding
Block Method)
ISO 18228-3 (in press) - Design using geosynthetics – Part 3: Filtration
ISO 12958:2010 - Geotextiles and geotextile-related products – Determination of water flow
capacity in their plane
J. P. Kline, P.E.1
1
Geotechnics, Inc., East Pittsburgh, PA; Email: [email protected]
ABSTRACT
Geosynthetic products used to construct waste containment systems may be tested during the
design or to pre-qualify the product, but most often by the manufacturer after production as quality
control and by construction quality assurance to confirm the product meets project specified
requirements. These tests consist of index tests that confirm that the product is the same product
approved for construction, and performance tests which verify that the product will meet the
specified design requirements. For performance testing, project specific test parameters are
required to produce results that are relevant to each project.
The direct shear test is one of the most critical performance tests used for construction
materials used in containment structures. Through this testing, it can be demonstrated that the
materials being used will provide a stable structure throughout the containment system design life.
There are a number of factors that go into producing a successful and relevant interface or internal
shear test. How the test specimens are prepared, the test is set up and performed can have a
significant influence on the results.
In the United States, shear testing is performed using the ASTM D5321 test standard for
interfaces incorporating geosynthetic products excluding geosynthetic clay liners (GCL) and
ASTM D6243 test standard for GCL interfaces and internal shear. After test results are provided
by the testing laboratory, the interpretation of the test data can influence whether a product’s shear
results are acceptable. ASTM has provided a standard guide, ASTM D7702, for considerations
when evaluating geosynthetic shear results. This paper will discuss the necessary test parameters
to establish applicable project test results, considerations when evaluating the tests results and the
available ASTM referenced standards.
INTRODUCTION
There are three ASTM standards concerning direct shear testing with geosynthetics. These ASTM
standards are living documents that are periodically updated to improve the standards. It should
be noted that any update or change is discussed within its task group and must be approved by the
committee through a ballot process before being incorporated into the standard.
The first standard, ASTM D5321 “Standard Test Method for Determining the Shear
Strength of Soil-Geosynthetic Interfaces by Direct Shear,” was originally approved in 1992 with
the current revised version being approved and published in 2020. The second standard, ASTM
D6243 “Standard Test Method for Determining the Internal and Interface Shear Strength of
Geosynthetic Clay Liner by Direct Shear Method,” was originally approved in 1998 with the
current revised version also being approved and published in 2020. The D5321 and D6243 test
standards basically mirror each other in content except for considerations specific to GCLs in the
D6243 test standard. These test standards are performance based tests intended to model field
conditions as closely as possible to provide project relevant shear data. Both standards provide
Regarding the actual test parameters that a specific test is performed, ASTM D5321 & D6243 test
standards are not prescriptive to allow the requester the freedom to specify the test conditions most
appropriate to their construction situation. Both test standards provide a checklist in its appendix
to aid the test requester in specifying the shear test. It is worthwhile to note that some of the test
labs performing these tests have their own test request forms similar to these checklists that can be
used to specify the shear tests. The following test parameters should be specified to obtain the
intended representative shear results.
Products
To model field conditions for interface shear testing, the actual products or materials to be installed
or representative samples of the same material should be used. In many cases, it is also important
to identify the side of the product to be tested at the interface and possibly the orientation of the
product.
Product Orientation
Because products are mostly installed in the slope direction, it is generally assumed that shearing
will also occur in the same direction; thus, specimen are usually placed in the shear box oriented
in the machine direction. If the shear direction is not in the product machine direction, this should
be clearly identified.
Sample Conditioning
GCL Specimens
If the shear test contains a GCL, the GCL specimen can be placed in the shear box as-received or
conditioned by wetting the specimen. Wetting of the GCL specimen can be accomplished by
pouring water over entire specimen, spray wetting the surface of the specimen, partially hydrating
the specimen to a specified bentonite water content, or hydrating entire specimen submerged in
water. The GCL may be hydrated at the test normal load for a specified duration prior to shearing
or at a much lower normal load for a specified duration before increasing the applied pressure to
test normal load prior to shearing. Hydrating at the lower normal load is usually done to model
the GCL hydration shortly after installation that may happen in the field.
Seating/Consolidation Time
The seating or also referred to as consolidation time for shear tests with soil or hydrated GCLs is
the duration of time that the test normal load is applied to the interface prior to shearing. For
geosynthetic materials and drainable soils, such as sands and gravels, a seating time of 1 hour may
suffice for allowing the test normal load to act upon the interface prior to shearing. For less
drainable soils or GCLs, the seating or consolidation time prior to shear is usually a time period of
16 hours (overnight) to 24 hours to allow for dissipation of any potential pore pressures created
while applying the test normal load.
Complimentary Information
Although not required by either shear test standard, certain properties for each interface material
can be measured to provide better insight into the shear characteristics of that material. Shear
results with textured geomembranes are directly influenced by the texturing of that geomembrane;
thus, asperity height measurements (per ASTM D7466) of each shear specimen prior to placement
in shear box are typically included with the interface shear results.
Although usually not directly influencing the measured interface shear results, a shear test
requester may want a peel test (per ASTM D6496) for GCLs or ply adhesion test (ASTM D7005)
for geocomposites performed on the same sample the shear is being performed. These index tests
can offer an understanding of the product’s bond strengths needed to prevent the shear failure
plane happening in the internal reinforcement of the GCL or the bond between the geocomposite’s
geonet and geotextile instead of at the intended interface. For GCL peel strength and
Geocomposite ply adhesion, it is recommended that the test specimens be taken adjacent and in-
line in the machine direction to the shear specimen. Soil gradation and classification is also
beneficial information to have for the soil samples used for interface shear testing.
REVIEW
After the shear test had been completed, per the test standards, the test lab is to report the peak and
post-peak shear stress values at each applied normal load tested, plots of the shear force versus
shear displacement and shear stress versus normal stress with the adhesion intercept, coefficient
of friction and/or the friction angle identified as well as the test parameters for which the shear test
This equation is derived for each shear test from the best fit line drawn through the data
points on the Shear Stress vs. Normal Stress graph for the shear test. The below graphs 1a & 1b
provide an example of the Shear Force vs Shear Displacement and Shear Stress vs Normal Stress
graphs that are included in the shear results.
SHEAR FORCE
PEAK
SHEAR STRESS
τ = 0.5196σ + 397
POST-PEAK
τ = 0.2073σ + 271
NORMAL STRESS
SHEAR DISPLACEMENT Peak Shear Data Post-Peak Shear Data
1a. Shear Force vs Shear Displacement 1b. Shear Stress vs Normal Stress
The peak and post-peak shear values can be viewed for each normal load tested on the
Shear Force vs Shear Displacement graph. The post-peak shear values are taken at the end of the
shear displacement distance. This displacement distance is typically 75 mm (3 in.) as that is the
limit of most commercially available large scale shear machines. Note that the post-peak shear
value is often referred to as the “residual” shear value, although it may not be the true residual
value as the shear displacement may need to exceed the 75 mm displacement to attain the residual
value.
The identified peak and post-peak shear values for each normal load from the Shear –
Displacement curves are plotted on the Shear Stress vs Normal Stress graph and the best fit lines
are drawn to provide the Mohr-Coulomb shear strength envelops. From the example above, the
peak friction angle is calculated taking the inverse tangent of coefficient of friction (0.5196) in the
first term of the peak shear equation which equals 27.5 degrees. The second term provided in the
peak shear equation (397) is the adhesion intercept. Caution should be given to simply evaluating
shear data based on the calculated Mohr-Coulomb friction angle without consideration of the
adhesion value. Doing so may greatly underestimate the actual shear strength of the interface
being tested.
Another value that may be included in the reported shear test results is the secant friction
angle which is the friction angle specific to the normal load tested. It is the angle of the line drawn
When evaluating test shear data with respect to a specified required Mohr-Coulomb friction angle,
the secant friction angles at each tested normal load can be an indication of whether the Mohr-
Coulomb shear strength envelop of the tested interface may meet the intent of the specified Mohr-
Coulomb friction angle. If the secant friction angles for all the normal loads tested exceed the
specified Mohr-Coulomb friction angle, then the shear failure envelop of the tested interface
exceeds the shear strength envelop defined by the specified required Mohr-Coulomb friction angle.
For an in-depth discussion of shear strength fundamentals, interpretation of adhesion,
evaluation of shear displacement curves, comparison of shear results to historic data and post-test
sample inspection, see the standard guide ASTM D7702. Although this standard is an excellent
refence, it is not intended to replace education or experience and should only be used in
conjunction with professional judgement; as noted in this standard guide.
CONCLUSION
Interface shear testing with geosynthetics and GCLs are performed using ASTM D5321 and
D6243 test standards. These standards provide instruction of the equipment requirements,
instruction of how to perform tests and guidance of the information needed from the test requestor
to achieve project relevant test results. When reviewing the test results, standard guide ASTM
D7702 is a helpful tool in understanding the test results provided by the geosynthetic and GCL
shear tests.
REFERENCES
ASTM D 5321. Standard Test Method for Determining the Shear Strength of Soil-Geosynthetic
Interfaces by Direct Shear, American Society for Testing and Materials, West Conshohocken,
Pennsylvania, USA.
ASTM D 6243. Standard Test Method for Determining the Internal and Interface Shear Strength
of Geosynthetic Clay Liner by Direct Shear Method, American Society for Testing and
Materials, West Conshohocken, Pennsylvania, USA.
ASTM D 7702. Standard Guide for Considerations When Evaluating Direct Shear Results
Involving Geosynthetics, American Society for Testing and Materials, West Conshohocken,
Pennsylvania, USA.
Yue Xu,1 J. David Frost, Ph.D., P.E.2, Susan E. Burns, Ph.D., P.E.3
1
School of Civil and Environmental Engineering, Georgia Institute of Technology, 790 Atlantic
Dr. NW, Atlanta, GA, 30332; email: [email protected]
2
School of Civil and Environmental Engineering, Georgia Institute of Technology, 790 Atlantic
Dr. NW, Atlanta, GA, 30332; email: [email protected]
3
School of Civil and Environmental Engineering, Georgia Institute of Technology, 790 Atlantic
Dr. NW, Atlanta, GA, 30332; email: [email protected]
ABSTRACT
Turf reinforcement mats differ from other rolled erosion control products by providing long-term
erosion protection under higher expected flow conditions. Different turf reinforcement mats can
vary significantly in terms of basic laboratory index properties and field performance. Physical
and mechanical property testing approaches are designed for product quality control. Generally,
manufacturers and the National Transportation Product Evaluation Program report physical
properties for turf reinforcement mats. However, turf reinforcement mats can be damaged during
installation and operation by heavy or sharp stones. One approach to model the potential damage
due to heavy loading is to perform standard tests such as static puncture and dynamic perforation
tests. These tests are necessary because they indicate the endurance of turf reinforcement mats
under potential mechanical damage. This experimental study investigated index properties and
mechanical performance in the laboratory for several turf reinforcement mat products. This study
adopted ASTM D6241 and ISO13433 to measure the puncture resistance under static and dynamic
puncture processes, respectively. The experimental results show that the static puncture resistance
and extension of tested woven turf reinforcement mats increases as mass per unit area increases.
Maximum hole diameter, puncture strength, and extension at failure of turf reinforcement mats
should be tested and routinely included in product reports together with basic index properties as
indicators in rolled erosion control material selection.
INTRODUCTION
The development of rolled erosion control products (RECP) by industry is attributed to the higher
demand for various turf reinforcement mats (TRMs), which are applicable for long-term slope or
channel erosion control. As a class of geosynthetics, TRMs have not received as much attention
as geogrids and geotextiles. There have not been sufficient studies to evaluate the performance of
TRMs. Available index property values of widely used TRMs are provided by manufacturers’
brochures and the National Transportation Product Evaluation Program (NTPEP) reports, which
is summarized in Table 1. Basic index properties such as thickness and mass per unit area are used
for product quality control. However, TRMs lose strength primarily during installation as a result
of penetrations by heavy or sharp stones since the literature shows that many geosynthetics are
damaged during construction (Bolt and Duszynska, 2010; Collins and Holtz, 2005). ASTM and
ISO standards provide instructions on impact and puncture resistance tests for turf reinforcement
mat, the results of which are not normally provided in manufacturer’s brochures. These tests are
Termonia (2006) summarized the four steps of puncture failure under a needle projectile
as: (1) the initial steady increase in force with penetration of tip due to contact pressure between
the tip and fiber strand; (2) a sudden drop of force due to slippage of cylinder behind the tip into
inter-fiber space; (3) another increase in force due to friction of cylinder against fabric; (4) a steady
decrease in force due to further penetration of cylinder behind the tip. Atmatzidis and Chrysikos
(2002) investigated correlations between static puncture strength and tensile strength of nonwoven
PP (polypropylene) geotextiles and indicated a linear relationship between puncture resistance and
tensile strength as well as mass per unit area. Koerner and Koerner (2011) compared three standard
puncture tests on PP and PET (polyester) needle punched nonwoven geotextiles and indicated that
puncture resistance of geotextiles is linearly related to fabric mass per unit area. In contrast, Jones
et al. (2000) conducted static puncture testing and concluded that static puncture resistance was a
nonlinear function of mass per unit area for needle punched nonwoven geotextiles but linearly
related with tensile strength in the cross-machine direction. They also stated that static puncture
resistance provided “a better indication of protection performance” compared with other tests such
as the tensile strength test and the drop cone test. These experimental studies were performed on
geotextiles, while no related studies were conducted on turf reinforcement mats.
The main objective of this study was to investigate mechanical performances among
several turf reinforcement mat products in the laboratory. Laboratory testing results of basic index
properties were compared with manufacturer’s data as well as other data collected from NTPEP
reports. The correlation between physical properties and the mechanical performance of these
TRMs is discussed in the manuscript.
EXPERIMENTAL METHODS
Figure 1. Test configuration for ASTM D6241 standard test of static puncture
strength(left) and ISO13433 geosynthetics dynamic perforation test(right).
Figure 2. Test locations for HPTRM A: same test locations can also be applied to HPTRM
B, TRM C, and HPTRM E.
Figure 7 illustrates that mass per unit area influences the static puncture strength in woven
and nonwoven geotextiles. This figure indicates that static puncture strength increases with
increased mass per unit area. The results for (HP)TRM from the current study are also included
Figure 7. Correlation between static puncture resistance and mass per unit area of
woven and nonwoven materials
Turf reinforcement mats provide protection for exposed soil slopes or high flow channels during
vegetation development. Any potential damage on the turf reinforcement mat can lead to failure
of its function in erosion protection. Standard tests such as static puncture test and dynamic
perforation test can simulate the damage caused by heavy or sharp stones during installation or
construction. From this study, the following conclusions can be drawn:
(1) Static puncture test simulates the resistance of geosynthetics to penetration by long-term heavy
loading. The loading process of woven (HP)TRMs experienced fiber rearrangement, fiber
extension, and monofilament failure. Measured puncture strengths range from 3415 to 6825 N for
the tested (HP)TRM specimens. Both puncture strength and extension at failure should be
considered as indicators to describe the puncture behavior of (HP)TRMs.
(2) Static puncture test can be viewed as a modified tensile test, and higher tensile strength
indicates higher static puncture. Higher mass per unit area shows greater static puncture strength
and extension for woven turf reinforcement mats.
(3) The diameter of the punctured hole under the fixed drop cone energy indicates the impact
resistance. Among the six tested TRM specimens, HPTRM D and F show better impact resistance
to the dropped cone because of smaller hole diameter. The fiber compactness of a woven (HP)TRM
affects dynamic puncture resistance.
(4) The measured maximum hole diameter values of punctured (HP)TRMs range from 6.7 to 20.5
mm. There is no strong relationship between tensile strength and maximum hole diameter.
ACKNOWLEDGEMENTS
The (HP)TRM manufacturers are thanked for providing samples for this study. The assistance of
a former graduate student, Zhi Ge, who helped with static puncture strength tests in this study, is
acknowledged. Partial support for the first author was provided through the Gene Boyd-Vulcan
Materials Company Endowed Fellowship.
REFERENCES
ABSTRACT
Geosynthetic interlayers have proven successful in retarding the rate of reflective crack
development in asphalt overlays. In addition, geosynthetic interlayers are also expected to enhance
the structural capacity of pavements (e.g., by retarding the development of permanent deflections
and tensile strains within the asphalt layers). However, the relevant mechanisms leading to an
enhanced performance of geosynthetic-reinforced asphalt layers are not clearly understood and the
structural benefits from geosynthetics are yet to be quantified. In this study, the asphalt strain
response in full-scale field test sections comprising both unreinforced (control) and geosynthetic-
reinforced asphalt overlay test sections was evaluated using static plate load tests. The road
sections included an oxidized old asphalt layer and rehabilitation involved placing tack coat,
installing geosynthetic interlayer (only in the geosynthetic-reinforced section), and finally
constructing a 3-inch-thick asphalt overlay. The asphalt strains were recorded by the asphalt strain
gauges installed at a depth of 3 inches within the old asphalt layer, under a static plate load
application. Comparison of settlement and asphalt strain response of geosynthetic-reinforced
overlay section with that of control section indicates that the geosynthetic reinforcements
significantly reduced tensile strains in the asphalt layers. Specifically, under the same plate loads,
the tensile strains in the geosynthetic-reinforced section was at least 90% less than the tensile
strains in the unreinforced (control) section.
INTRODUCTION
A wide range of pavement interlayers have been used to enhance the performance of the asphalt
overlays. The main functions that have been expected from using pavement interlayers include
waterproofing, stress relieving and reinforcement (Lytton 1989). Engineering fabrics (such as
geotextiles) and geocomposites have been typically used to provide waterproofing and stress
relieving while grid-structure interlayers (such as geogrids and glass grid materials) have been
mostly used to provide reinforcement function. However, specific conditions in which the benefits
from each type of interlayers are realized are still unclear and need further investigation.
A wide range of experimental procedures have been used to evaluate performance of
pavement interlayers. Examples include bond strength tests (e.g., Canestrari et al. 2005; Kumar et
al. 2017; Leutner 1979; Roodi et al. 2017; West et al. 2005), flexural beam tests (e.g., Khodaii et
al. 2009; Kumar and Saride 2017; Montestruque et al. 2004; Pasquini et al. 2014), and physical
As part of a rehabilitation plan along a long section of State Highway 21 in Texas, a 3-inch-thick
asphalt overlay was constructed over the existing pavement. As part of this research study, a short
section of the construction was used to investigate effectiveness of using pavement interlayers.
Specifically, two different pavement interlayer systems were tested at two sections under static
plate load test. In Section 1, referred to as the control section (CS), no pavement interlayer was
used while in Section 2, referred to as the GG section, a geocomposite interlayer was used.
The road profile at the two tested locations were investigated by drilling from the pavement
surface through the subgrade. Figures 1a and b show the road profile in Sections 1 and 2,
respectively. The thickness of the old asphalt was 6 and 5 inches in Sections 1 and 2, respectively.
The thickness of the base and subbase courses were 6 and 10 inches in Section 1, respectively, and
7 and 9 inches in Section 2, respectively. The old asphalt, base course and subbase course had
similar characteristics in the two sections. The new asphalt included a 2-inch-thick Type D mix
overlain by a 1-inch-thick thin overlay mix (TOM), classified according to Texas Department of
Transportation (TxDOT) Standard Specifications for Construction and Maintenance of Highways,
Streets, and Bridges (TxDOT 2014).
(a) (b)
Figure 1. Roadway profile at test sections: a) Section 1 (control section); b) Section 2
(reinforced section).
The interlayer material that was used in Section 2 was a geocomposite consisting of a glass-
fiber grid backed by a thin layer of fabric. The geocomposite (GG) had a coating with 60% bitumen
content and an ultimate tensile strength of 100 kN/m at 3% strain in both machine and cross-
machine directions.
EXPERIMENTAL PROGRAM
The test sections were loaded using a static plate device before and after construction of the
overlay. The plate load tester device, provided by Humboldt, conformed to specifications required
by DIN 18134:2012-04 standard (DIN18134, 2012). The testing plate had a diameter of 300 mm
and a thickness of 25 mm.
The loading system consisted of a hydraulic pump connected to a hydraulic jack via a high-
pressure hose. One end of the hydraulic jack was placed on the loading plate and the other end was
secured against a heavy truck for reaction. Both ends had a hinged connection and a load cell was
placed between the hydraulic jack and the settlement plate to measure the applied load. The system
was capable of applying, maintaining, and releasing the load in controlled stages. The load capacity
of the system was 50 kN, equivalent of an applied stress of 0.7 MPa.
The settlement measurement system included a support frame resting on a three-point
bearing support. A rotatable rigid contact arm was mounted onto the support frame and could be
extended for 1.5 m to reach the loading plate. The end of the contact arm could be adjusted at the
center of the plate through a measuring tunnel designed on the plate. A displacement transducer
was mounted onto the support frame and attached to the free end of the contact arm to record the
settlement. The above system could measure the settlement with a resolution of 0.01 mm. Figure
3 shows a picture of static plate load setup used in this study.
The static plate load tests were conducted in two phases exactly on the same locations,
including before (Phase 1) and after (Phase 2) construction of the overlay. In both phases, a seating
load of 0.01 MPa were applied to the pavement surface in the beginning of the test. In the first
phase (before overlay construction), consistent with DIN 18134:2012-04, the test sections were
loaded in six approximately equal increments of 0.08 MPa to reach the maximum stress of 0.5
MPa. Each loading stage was completed within one minute and after a waiting period of 120
seconds, the plate settlement was recorded. Asphalt strain gauges had not yet been installed in this
phase; thus, the plate settlement was the only measurement made.
The loading in the second phase of the test (after overlay construction) was identical to the
first phase except for the maximum stress. The maximum stress in the second phase was limited
to 0.24 MPa, which was applied in three approximately equal increments of 0.08 MPa. In addition,
asphalt strain gauges had been installed in this phase; hence, the tensile strain in the old asphalt
layer was measured for each loading stage in addition to the plate settlement.
The pavement response under a static plate load test (PLT) is generally presented in a typical load-
settlement plot. In addition, the time corresponding to each load and unload stage was carefully
recorded in this study. The settlement response corresponding to each load and unload stages were
then correlated with the corresponding response recorded from the asphalt strain gauges, as a
function of time. Figures 4 and 5 present the ‘Time-settlement’ and ‘Time-strain’ recorded under
a typical static PLT adopted, for the control and geosynthetic reinforced pavement test sections,
respectively. It can be observed that the time corresponding to a settlement is almost the same as
that of strain, suggesting a good correlation between the settlement and strains recorded. In
addition, both, settlement and tensile strain increased with an increase in the applied load and vice-
versa. However, the settlement in the control section (Fig. 4a) is consistently lower than that of
geosynthetic reinforced section (Fig. 5a), while the tensile strains in the control section (Fig. 4b)
is consistently higher than that of the geosynthetic-reinforced section (Fig. 5b), under the same
loading and unloading stages. This condition could be attributed to the influence of ambient and
surface temperature during the test and the pre-existing pavement conditions in the control and
geosynthetic-reinforced test sections, which will be discussed in next sections of this paper. The
average asphalt surface temperature during the static PLT conducted on the control and
geosynthetic-reinforced sections were 15 °C (59 °F) and 22 °C (72 °F), respectively.
Besides, another important observation from ‘Time-strain’ plots (Figs. 4b & 5b) suggest
that the strains recorded under a typical load/unload stage did not completely stabilize, before
proceeding to the next load stage.
160
0.1
Settlement (mm)
120
Strain (µε)
80
0.2
40
CS
0.3 0
0 200 400 600 800 1000 0 200 400 600 800 1000
Time (sec) Time (sec)
GG
30
0.1
Settlement (mm)
Strain (µε)
20
0.2
10
0.3 0
0 200 400 600 800 1000 0 200 400 600 800 1000
Time (sec) Time (sec)
Hence, to understand this condition, a typical load and unload stage was considered for the
control and geosynthetic-reinforced sections, as shown in Fig. 6. It can be seen that the slope of
the strain-time curve for both load and unload stages are steep indicating the settlement and strains
recorded under an applied load after 120 seconds of wait period was not completely stabilized.
The displacement transducers adopted with the PLT device to record the settlements were not able
to record continuous displacements at micro-level and only the ultimate settlement at the end of
each loading and unloading stage was recorded. On the other hand, the strain gauges adopted in
the study were capable of recording the strain values on the order of micro-strains, suggesting to
adopt waiting periods longer than that prescribed in DIN 18134:2012-04. It should also be noted
Load Stage
120 CS -20
GG
Strain (µε)
Strain (µε)
80 -60
60 -80
40 -100
20 -120
0 -140
0 50 100 150 200 250 300 0 50 100 150 200 250 300
Time (sec) Time (sec)
Figure 7 shows the settlement and strain responses for three loading stages adopted in the
second phase (i.e., after overlay construction) of testing in this study and it can be observed that
the settlement and strains increased with an increase in the applied load. The settlement in the
control section is consistently lower than that of the geosynthetic-reinforced section, while the
strains in the control section are consistently higher than that of the geosynthetic-reinforced
section. As previously discussed, this may be due to the influence of asphalt surface temperature
and the pre-existing pavement conditions. The influence of asphalt surface temperature and the
pre-existing conditions on the surface settlement and asphalt strains are discussed in the sections
below.
0 250
(a) (b)
CS CS
GG GG
200
0.1
Settlement (mm)
150
Strain (µε)
100
0.2
50
0.3 0
0 0.05 0.1 0.15 0.2 0.25 0 0.05 0.1 0.15 0.2 0.25
Stress (MPa) Stress (MPa)
Figure 7. Settlement and strain responses under different loading stages (as recorded).
It is well known that the asphalt mixes are viscoelastic under small strain conditions, which is a
function of time and temperature (Witczak and Solti 2004; Hu et al. 2019). The ambient and asphalt
surface temperatures greatly influence the resilient modulus of asphalt layer and changes in the
modulus influence the surface settlement and the tensile strains within the asphalt layer. Hence, to
completely characterize the asphalt mixture adopted in the study, dynamic modulus tests were
conducted at different temperatures of 14 °F, 40 °F, 70 °F, 100 °F, and 130 °F, and different
frequencies of 0.1 Hz, 0.5 Hz, 1 Hz, 5 Hz, 10 Hz, and 25 Hz. Subsequently, a dynamic modulus
master curve was developed, as shown in Fig. 8. The dynamic modulus master curve is often
described by a sigmoidal function as follows (Witczak and Solti 2004; Hu et al. 2019):
𝛼𝛼
𝑙𝑙𝑙𝑙𝑙𝑙|𝐸𝐸 ∗ | = 𝛿𝛿 + 𝛽𝛽+𝛾𝛾𝛾𝛾𝛾𝛾𝛾𝛾𝑡𝑡𝑟𝑟 (1)
1+𝑒𝑒
where, δ is the minimum value of 𝑙𝑙𝑙𝑙𝑙𝑙|𝐸𝐸 ∗ | in the sigmoid function; α is the vertical span of
the function; β and γ are shape parameters for the sigmoid curve; and tr is the reduced loading time.
Based on the time-temperature superposition principle, log tr in Eq. 1 can be expressed as:
where, t is the actual loading time at a given temperature (T); aT is the temperature shift
factor. The time-temperature shift factor can be fitted by a second order polynomial as shown in
Fig. 8b.
10000000 6
2
Modulus, E* (MPa)
log aT
100000 0
14 oF -2
40 oF
10000 70 oF
100 oF
130 oF
-4
Master curve
1000 -6
-8 -6 -4 -2 0 2 4 6 8 0 20 40 60 80 100 120 140
log tr Temperature (oF)
Figure 8. Dynamic Modulus Master Curve of the asphalt mixture used in the study.
From Fig. 8 and Eq. 1, the dynamic modulus of the asphalt mixture adopted in the study
could be estimated for different temperatures between 14 °F and 130 °F and different frequencies
(load time) between 0.01 Hz (10 secs) and 25 Hz (0.04 secs). However, to understand the influence
of dynamic modulus of asphalt concrete on the surface settlement and asphalt strains at a depth of
6 inches, multi-layer linear elastic analysis (MLEA) was performed. The MLEA was performed
where, Δ is the surface settlement in mm; E’ is the modulus of asphalt layer in MPa; and
𝜀𝜀𝑥𝑥𝑥𝑥 is the tensile strain at a depth of 6 inch in the asphalt layer.
0.01
∆ = 3.9849(E')-0.349
R2 = 0.9089
0.1
Settlement (mm)
10
10 100 1000 10000 100000
Modulus, E' (MPa)
Figure 9. Multi-layer linear elastic analysis: (a) Variation of surface settlement with
modulus of asphalt layer; (b) Variation of tensile strain (depth of 6 inch) with modulus of
asphalt layer.
Since the asphalt surface temperature was different for the static PLT performed on the
control and geosynthetic-reinforced pavement sections, a reference temperature of 77 °F was
chosen. The modulus value corresponding to reference temperature of 77 °F was estimated to be
217,170 MPa, using Eq. 1 and Fig. 8. The estimated modulus value was then adopted in Equations
3 and 4 and the corresponding settlement and tensile strains were estimated to be 0.054 mm and
6.22 × 10-7 mm/mm, respectively. Similarly, the modulus values corresponding to test
temperatures of 59 °F and 72 °F were estimated to be 575,610 MPa and 282,648 MPa, respectively.
Subsequently, the settlement and strains corresponding to the modulus values at 59 °F and 72 °F
were estimated to be 0.0389 mm and 2.53 × 10-7 mm/mm, and 0.0498 mm and 4.88 × 10-7 mm/mm,
respectively, in the control and geosynthetic-reinforced sections. Eventually, temperature
CS 500 CS
GG GG
0.1 400
Settlement (mm)
Strain (µε)
300
0.2 200
100
0.3 0
0 0.05 0.1 0.15 0.2 0.25 0 0.05 0.1 0.15 0.2 0.25
Stress (MPa) Stress (MPa)
Figure 10. Settlement and strain response under different loading stages (after temperature
correction).
The influence of pre-existing conditions of the pavement sections before the overlay construction
is an important parameter to understand and fairly evaluate the performance of geosynthetic-
reinforced section against the control section. Hence, to address the influence of pre-existing
pavement conditions, static PLT performed on the old pavement prior to the installation of asphalt
strain gauge and overlay construction, as discussed under ‘Experimental Program,’ has been
considered. It should also be noted that only settlement response was recorded from the PLTs
performed on the old pavement, but not strain response.
A maximum static plate load corresponding to a stress of 0.24 MPa was considered in the
study, even though a maximum stress of 0.50 MPa was applied on the old pavement, to have a fair
comparison between the PLTs performed on the old pavement and overlay. Fig. 11 presents the
settlement response of the old pavement on which the control and geosynthetic-reinforced overlay
sections were constructed. The PLTs were performed at different temperatures during this phase
of testing as well, hence, a temperature correction corresponding to a reference temperature of 77
0.1 0.1
Settlement (mm)
Settlement (mm)
0.2 0.2
0.3 0.3
As recorded After Temp. correction
CS CS
GG GG
0.4 0.4
0 0.05 0.1 0.15 0.2 0.25 0 0.05 0.1 0.15 0.2 0.25
Stress (MPa) Stress (MPa)
Figure 11. Settlement response of pavement section before overlay construction: (a) as
recorded; (b) after temperature correction.
90
0
80
Reduction in settlement (%)
-25
Reduction in strain (%)
70
60
-50
50
-75
40
-100 30
20
-125
10
-150 0
CS GG
GG
Figure 12. (a) Percentage reduction in settlement; (b) Percentage reduction in tensile strain.
CONCLUSION
In this study, the plate settlement and asphalt strain responses in full-scale field test sections
comprising both unreinforced (control) and geosynthetic-reinforced asphalt overlay test sections
was evaluated using static plate load tests. The following conclusions can be drawn from the study:
The asphalt strain gauges adopted in the study were capable of measuring the influence of
plate loads on the order of micro strains, suggesting a waiting period greater than 120 seconds
between successive load/unload stages during a static plate load test.
The plate settlements and asphalt strains recorded under the static plate loads suggest a
significant influence of the asphalt surface temperature and the pre-existing condition of the
pavement sections on their responses.
The plate settlements on the overlay was found to be 140% higher than that on the old
pavement in the control section, owing to the oxidation of the old asphalt resulting in a stiffer and
brittle asphalt layer.
The geosynthetic reinforcement provided additional flexural stiffness and resilience to the
asphalt layers and the geosynthetic-reinforced section effectively resisted the settlement under the
plate loads.
A reduction of 90% in the tensile strain was quantified in the geosynthetic-reinforced
section against the control section, irrespective of the pre-existing pavement conditions.
Overall, it can be summarized that the geosynthetic-reinforcement adopted in the study was
effective in resisting the plate settlements and minimizing the critical tensile strains responsible
for asphalt cracking.
ACKNOWLEDGEMENTS
The authors wish to thank the Texas Department of Transportation (TxDOT) for financial support
of this study.
REFERENCES
Canestrari, F., Ferrotti, G., Partl, M.N. and Santagata, E. (2005). Advanced testing and
characterization of interlayer shear resistance, Transportation Research Record, 1929:69-78.
ABSTRACT
In this study, the influences of geosynthetic interlayers on permeability and interface bond
strength of asphalt pavements were evaluated using Florida permeability and NCAT bond
strength tests, respectively. The permeability test results indicated that the inclusion of
geosynthetic interlayers effectively reduced the permeability of asphalt pavement. The bond
strength results demonstrated that the asphalt specimens containing geosynthetic had lower bond
strength values than the control specimens, but asphalt samples containing polyester and
polypropylene-based geosynthetic products still had bond strength greater than 100 psi,
indicating satisfactory interface bonding. In addition, this study evaluated the performance of a
new hot mix asphalt with 30% RAP containing a new polypropylene paving fabric. The moisture
susceptibility test results demonstrated that this geosynthetic RAP asphalt mixture had much
higher dry and wet tensile strength values than those minimum values specified by Caltrans
Specification Section 39. The Hamburg wheel tracking test results showed that this geosynthetic
RAP asphalt mixture only had a rut depth of 2.65-mm after 15,000 wheel passes, which was
significantly better than the maximum rut depth specified by Caltrans (i.e., 12.5-mm). The
Illinois flexibility index test results showed that this geosynthetic RAP and Control RAP asphalt
mixtures had comparable flexibility index values.
INTRODUCTION
Geosynthetic interlayers have been widely used in pavement rehabilitation to mitigate the
reflective cracking distresses of asphalt overlays. Lytton (1989) described the three benefits of
geosynthetic interlayers, which included stress relief, waterproofing barrier, and reinforcement.
The geosynthetic reinforcement in asphalt layers provides additional tensile strength to the
resulting composite by increasing the amount of energy that can be absorbed during the repeated
loading (Correia et al. 2014). The geosynthetic also absorbs and retains the asphalt tack coat to
form a moisture barrier with low permeability. Ridgeway (1982) evaluated the relationship
between permeability of paving fabric and application rate of tack coat. He found that the
permeability of paving fabric reduces to 1×10-6 - 1×10-7 cm/sec when the application rate reaches
1.13 liter/sq. meter (0.25 gallon/sq. yard). For conventional dense-graded asphalt pavement, the
permeability usually ranges from 1×10-5 to 1×10-3 cm/sec, which is considered impermeable
Although geosynthetic interlayers show promising benefits for pavement structures, they
also bring concern for interface bonding. Poor interface bonding may result in delamination,
pavement slippage, and fatigue cracking, which can cause significant reduction in pavement life.
Therefore, the use of a geosynthetic interlayer shall provide satisfactory bonding strength
between existing pavement and asphalt overlay.
The objective of this paper was two-fold: one was to evaluate the influences of
geosynthetic interlayers on permeability and bond strength of asphalt pavements; and the other
was to evaluate the performance of a new hot mix asphalt with a percentage of RAP containing a
new millable and recyclable paving fabric and to determine whether the presence of the fabric
has an adverse impact on the quality of a new asphalt mixture.
Six commercially available geosynthetic interlayer products were selected for permeability and
bond strength tests. Table 1 presents the properties of these geosynthetic products.
Permeability Test
To simulate the actual field construction, the specimens for permeability test were prepared
according to the following procedures:
• Place an old asphalt slab of dense-graded asphalt mixture at the bottom of slab
compactor, which aimed to simulate the existing pavement;
• Place an aluminum sheet on top of bottom slab;
• Place tack coat of PG 64-22 asphalt binder at the recommended application rate shown in
Table 1;
• Place geosynthetic products over tack coat;
• Pour the open-graded friction course (OGFC) mix with 135°C on top of geosynthetic and
compact the slab using the kneading method;
• Remove the bottom slab of dense-graded asphalt mixture;
• Cool down the compacted slab for two days;
• Remove aluminum sheet, core cylindrical asphalt specimens with geosynthetic, and seal
the side of specimens using the candle wax, as shown in Figure 1a.
The Florida permeability test apparatus was used to determine the flow rate of water
through the specimen, as shown in Figure 1b. The side of specimen was sealed by latex
membrane. An air pump capable of applying 103.4 kPa (15 psi) pressure and capable of applying
vacuum was used to evacuate the air from the sealing membrane cavity. Water in graduated
cylinder flowed through the saturated specimen and the interval time taken to reach a known
change in head was recorded. The permeability of specimen was determined using Equation 1,
which is based on Darcy’s Law.
aL h1
ln
k= tc (1)
At h2
where: k is the coefficient of permeability, a is the cross-sectional area of the burette, L is the
thickness of specimen, A is the cross-sectional area of specimen, t is the elapsed time between
h1 and h2 , and tc is the temperature correction factor for viscosity of water.
4 Pmax
SB = (2)
πD 2
where: SB is the interlayer bond strength, Pmax is the maximum shear load applied to test
specimen, and D is the specimen diameter (i.e., 150 mm).
Recyclability Tests
A new millable and recyclable paving fabric was installed on an existing pavement per
manufacturer recommendations under a 50-mm (2-inch) Caltrans surface mix and subsequently
milled using standard procedures to produce RAP containing the paving fabric (labeled as
“Enviro RAP”). Meanwhile, a similar RAP material without geosynthetic was labeled “Control
According to ASTM D2172, the binders from Control and Enviro RAP were extracted
with trichloroethylene. The binder contents of Control and Enviro RAP were 4.5% and 5.0%,
respectively. It is reasonable that the RAP with the paving fabric had a slightly higher binder
content since the paving fabric absorbed a considerable amount of tack coat in the field. The new
12.5-mm nominal maximum aggregate size (NMAS) mixes were designed in accordance with
Caltrans Specification Section 39. The designed mixes contained 30% of each type of RAP. The
mixes used the same virgin granite aggregate and PG 67-22 asphalt binder. A liquid antistrip
agent was added in the mixes with a dosage rate of 0.5%. The mixes were designed with an Ndes
of 85 gyrations. Table 2 summarizes the volumetric properties of the Enviro RAP mix and the
same ratios of aggregate blends were used for the Control RAP mix. The only difference
between these two mixes is that the Control RAP mix had 3.9% virgin binder, while the Enviro
RAP mix only contained 3.7% virgin binder. This implied that the Enviro RAP mix might have a
lower material cost than the Control RAP mix.
Milled Fabric
b. Enviro RAP
a. Control RAP
Figure 2. Photos of Control and Enviro RAP
In this study, the performance tests included tensile strength ratio (TSR) test, Hamburg
wheel tracking test (HWTT), and Illinois Flexibility Index (I-FIT) test to evaluate the moisture
susceptibility, rutting resistance, and cracking resistance of asphalt mixtures, respectively.
203.6
Tensile Strength (psi) 200.0 190.1
150.0
100.0
100.0
70.0
50.0
0.0
Enviro Dry Caltrans Enviro Wet Caltrans
Minimum Dry Minimum Wet
Figure 5. Moisture Susceptibility of Asphalt Mixture Containing Enviro RAP
(a) (b)
Figure 7. I-FIT Test; (a) Specimen Setup, (b) Typical Results.
6.0
4.9 4.9
5.0
4.2
Flexibility Index
4.0
3.0
2.0
1.0
0.0
Enviro RAP Control RAP TT N1
Figure 8. I-FIT Test Results of Asphalt Mixtures
In this study, the influences of geosynthetic interlayers on permeability and interface bond
strength of asphalt pavements were evaluated using Florida permeability test and NCAT bond
strength test, respectively. To simulate the actual field construction, the specimens were cored
from the laboratory slabs prepared using the kneading compaction method. The permeability test
results indicated that the inclusion of geosynthetic interlayer systems effectively reduced the
permeability of asphalt pavement. The use of the geosynthetic products containing
polypropylene-only, polyester-polypropylene, or polyester-fiberglass as interlayers turned highly
permeable OGFC specimens to be impermeable. The bond strength test results demonstrated the
asphalt specimens containing geosynthetic interlayers had lower bond strength values than the
control specimens. Only the asphalt samples with the paving fabrics and the all polyester paving
mat had bond strength greater than 689 kPa (100 psi), indicating asphalt mixture and those
geosynthetic interlayers had satisfactory bonding.
REFERENCES
Al-Qadi, I., Ozer, H., and Lambros, J. et al. (2015). Testing protocols to ensure performance of
high asphalt binder replacement mixes using RAP and RAS. Illinois Center for
Transportation Report No. FHWA-ICT-15-017, Urbana-Champaign, Illinois.
American Association of State Highway and Transportation Officials (AASHTO). (2014).
Standard method of test for resistance of compacted asphalt mixtures to moisture-induced
damage. AASHTO T 283, Washington, D.C.
AASHTO. (2019). Standard method of test for Hamburg wheel-track testing of compacted
asphalt mixtures. AASHTO T 324, Washington, D.C.
ASTM International. (2017). Standard test method for quantitative extraction of asphalt binder
from asphalt mixtures. ASTM D2172, West Conshohocken, PA.
ASTM International. (2019). Standard test method for breaking force and elongation of textile
fabrics (Strip method). ASTM D5035-11, West Conshohocken, PA.
Correia, N., Zornberg, J., and Bueno, B. (2014). Behavior of impregnated paving geotextiles:
study of optimum tack coat rate. Journal of Materials in Civil Engineering, 26(11):
04014077.
Lytton, R. (1989). Use of geotextiles for reinforcement and strain relief in asphalt concrete.
Geotextiles and Geomembranes, 8(3): 217-237.
Ridgeway, H. (1982). Pavement subsurface drainage systems. NCHRP Synthesis of Highway
Practice 96, Washington, D.C.
West, R., Zhang, J., and Moore, J. (2005). Evaluation of Bond Strength between Pavement
Layers. NCAT Report 05-08, Auburn, AL.
West, R., Timm, D., Powell, B., et al. (2018). Phase VI NCAT Test Track Findings. NCAT Draft
Report 18-04, Auburn, AL.
ABSTRACT
A study was undertaken to determine the feasibility of assessing the performance of pavement
interlayer products using a full-scale, rolling wheel load, testing device. The test was conducted
on paved test sections carefully constructed in an indoor roadway systems laboratory. Four
pavement interlayer materials were evaluated along with a control (i.e., no interlayer). Paved test
sections were built within a concrete-lined trench. Transverse cracks were sawed into the initial
asphalt layer, which subsequently received various pavement interlayer treatments prior to
resurfacing with an asphalt overlay. Performance was evaluated by trafficking the test sections
using an accelerated pavement tester (APT) and measuring crack progression on the pavement
surface over time. Reflective cracks did not extend through the entire thickness of the overlay in
any of the test sections; however, after removal of samples from the test area, side profiles
revealed the beginning of reflective crack in the control test section. A full description of the test
effort is outlined, and based on the lessons learned, two main recommendations are proposed to
improve the outcome of this type of testing in the future.
BACKGROUND
Geosynthetic interlayers have been used for decades to prevent water infiltration, impede
reflective crack propagation through overlays, or reinforce asphalt pavements. Some interlayer
products are used to provide mechanical reinforcement through tensile stresses borne in the
material. These products improve the crack area through the use of a stiff structural geogrids or
stiff composite matrix. Another common approach is to use a thicker non-woven geotextile
interlayer designed to absorb the stresses by de-coupling the two layers from one another. Field
studies have be undertaken to evaluate the performance of these products with respect to the
suppression of reflective cracks (e.g., Button and Lytton, 2003, Makowski et al., 2005); however,
field studies take a long time to conduct. Laboratory tests on bench top sized sample have also
been used to estimate the performance (e.g., Germann and Lytton, 1987; Lytton, 1989; Mukhtar
and Dempsey, 1996; Prieto et al., 2007; Khodaii et al., 2009; Yu et al., 2013). The use of large-
scale pavement simulation, however, is rarer (Correia and Zornberg, 2016). The study covered
in this paper undertook to determine the feasibility of testing relative performance of several
interlayer products using full-scale pavement test sections trafficked by an accelerated pavement
tester (APT). The setup and design of experiments was created to resemble an asphalt beam
fatigue test that includes an interlayer (Wargo et al., 2016).
INTRODUCTION
TRI Environmental, Inc. (TRI) conducted a study to determine feasibility of assessing the
performance of various pavement interlayer products using a full-scale rolling wheel load tester.
The test was conducted at TRI’s indoor roadway systems laboratory located in Greenville, SC.
Paved test sections were built within a concrete-lined trench. The test area was comprised of
MATERIALS
Construction of the test area was designed to quantify differences in performance of various
pavement interlayer materials under the same conditions (i.e., same subgrade, base course
thickness and asphalt thickness). Four pavement interlayer materials were used along with a
control (i.e., no interlayer) are described in Table 1. A description of the subgrade, base course
and asphalt is described below.
The subgrade soil was obtained from a large nearby stockpile. It was classified as sandy silt
(ML) according to the USCS classification system, and had the properties listed in Table 2.
The base course consisted of 50 mm minus crushed granite obtained from a local gravel pit. It
classified as poorly-graded gravel (GP) according to the USCS classification system. The
maximum dry unit weight was 22.2 kN/m3 and the optimum moisture content was 5.3%,
according to the Standard Proctor test protocol (ASTM D698, Method C).
The asphalt used to pave the test area consisted of a Surface C mix, based on a South Carolina
Department of Transportation mix design. The maximum nominal aggregate size of the asphalt
mix was 12.5 mm.
CONSTRUCTION
Construction began by mixing and placing the subgrade in the concrete trench using a skid-steer
tractor. Larger clumps of subgrade were broken down and mixed in to ensure the subgrade was
uniform when placed. The subgrade was placed in the trench at its natural moisture content and
graded smooth to form lifts approximately 150 mm thick. Compaction of the subgrade was
accomplished using a smooth drum vibrating compactor. The sixth and final layer of the
subgrade was leveled by hand to a tolerance of ±6 mm. In-place density of the final layer of
subgrade was measured using a sand cone. The four sand cone tests resulted in an average dry
unit weight of 17.3 kN/m3. DCP tests run on the compacted subgrade resulted in an average
CBR strength of approximately 5.4%.
The base course was constructed in two layers. The aggregate was moisture conditioned and
screeded to form a uniform thickness across the entire test area. The smooth drum vibrating
roller used to compact the subgrade was also used to compact the gravel. The final total
thickness of the gravel layer was 275 mm. The in-place density of the base course was measured
using a nuclear densometer gauge, resulting in an average dry unit weight of 21.3 kN/m3.
Hot-mix asphalt was placed in a single lift that had an average thickness of 81 mm over an area
approximately 2.9 m wide by 11 m long. The final surface of the test area is shown in Figure 1.
EXPERIMENTAL DESIGN
Pavement interlayer fabrics are designed to mitigate reflective cracking in pavement overlays.
To simulate an aged, cracked pavement upon which to deploy the interlayer materials, transverse
pavement cracks were cut through the depth of the asphalt using a walk-behind wet saw.
Finished crack widths were approximately 6 mm wide (see Figure 2). A sawcut was also made
in the longitudinal direction to separate the test area having the transverse cuts from the
remaining adjacent pavement, forming blocks approximately 0.8 m wide by 1.2 m long that
could move independently from one another. A layout of the sawcuts made in the pavement
surface is shown in Figure 3.
0.8 m
Figure 3: Plan view of paved test area showing sawcuts (dashed lines).
Installation of the four interlayer products began by applying hot asphalt emulsion to the
pavement surface. The asphalt emulsion was provided by a local paving contractor and was
heated to 66° C using a portable heating kettle. The average residue fraction of the emulsion was
determined to be 56.8%. Using this value, target and in-place residual emulsion rates for each
interlayer product were determined (summarized in Table 3). The hot emulsion was placed
using a portable hand sprayer to carefully control and distribute the amount applied in each test
section (Figure 4), and masking paper was used to protect areas outside of each test section from
overspray. A minimal amount of emulsion was used in the control areas.
In-Place
Interlayer Target Emulsion
Emulsion Rate
Material Rate (l/m2)
(l/m2)
A 0.68 0.72
B 0.68 0.68
C 1.27 1.45
D 1.13 1.13
1 2 3 4 5
Figure 5: Plan view illustration of the installed interlayers with respect to sawcuts.
Control
Product C
Product D
The asphalt overlay consisted of the same material (South Carolina, Surface C mix) that was
used for the base pavement. Placement of the asphalt overlay was done using a paving machine
(Figure 8), and compaction was done using a pneumatic roller and steel drum roller. The
finished thickness of the overlay was 57 mm on average.
Performance of the interlayers and controls was evaluated by trafficking the test sections using a
full-scale accelerated pavement tester (Figure 9), and recording the number of traffic passes
needed for a crack to propagate through the overlay. The surface of the pavement was painted
white in the areas of the sawcuts to help perceive cracks as they propagated to the surface.
Wheel loads on the APT were applied through a dual-wheel assembly equipped with 315/80 R
22.5 HSU2 tires rated for high load carrying capacity. The downward force applied to the
Samples were cut from the test sections after trafficking and the side profiles were examined to
evaluate their performance. A photo of the side profile was taken of each sample. A summary
of pertinent observations made in reference to these photos is listed below.
• All of the sawcut gaps had closed during trafficking, significantly limiting reflective
crack propagation into the overlay (Figure 10 through Figure 14).
• In Test Section 1 (Product A) no reflective crack was evident in the overlay above the
interlayer (Figure 10).
• Test Section 2 (Product B) performed similarly to the Test Section 1, where no reflective
crack was evident in the overlay above the interlayer (Figure 11).
• In the Control test section, a reflective crack initiated directly above the sawcut, but did
not extend through the entire thickness of the overlay (Figure 12).
• In Test Section 4 (Product C), a crack had formed in the overlay approximately 50 mm to
the left of the sawcut (Figure 13). The crack was wider at the top indicating that it likely
extended from the top down (possibly during removal of the slab from the test area).
• In Test Section 5 (Product D), a hairline crack could be noticed on the surface of the
overlay, but it was difficult to determine whether that crack extended through the entire
Product A
Sawcut
Product B
Sawcut
Sawcut
Distress Crack
Product C
Sawcut
Product D
Sawcut
CLOSING REMARKS
A full-scale test was designed and constructed to evaluate the relative performance of four
interlayer fabrics and a control. The test area consisted of subgrade topped with compacted
gravel, and paved with 81 mm of asphalt. Transverse cuts were made in the initial pavement
surface to simulate existing cracks. Interlayer fabrics were installed and a 57 mm overlay was
constructed on top of the existing pavement. Simulated traffic from an APT was used to load the
test sections, and the progression of reflective cracking was monitored over time as the main
measure of performance. Reflective cracks did not extend through the entire thickness of the
overlay in any of the test sections. After removal of samples from the test area, side profiles
revealed the beginning of reflective crack in the control test section; however, the crack did not
extend through the entire thickness of the overlay.
Two recommendations are proposed to improve the outcome of this type of testing in the future.
First, it is recommended that sand or other filler be used to keep the sawcut gaps from closing
during trafficking. The filler will help maintain the gap without bonding the two pieces together.
This will allow the two slabs being bridged by the interlayer to move independently, and thereby
promote reflective cracking of the overlay. Second, it is recommended that the asphalt on the
outside of the test sections be cut away and removed to expose the side profile of the test
samples. This will significantly improve the ability to monitor the progression of reflective
cracks from the side rather than from the top where it is more difficult to see cracks due to the
rougher surface texture.
ACKNOWLEDGEMENTS
The research described in this paper was made possible through the generous support provided
by Propex. Special thanks are extended to Mark Marienfeld of TreadMark, Inc. and Joel
Sprague of TRI Environmental, who helped with the installation of the interlayer fabrics.
Jeb S. Tingle, P.E.,1 William J. Robinson, Ph.D.,2 Eli Cuelho, P.E.3, and Erol Tutumluer,
Ph.D.4
1
U.S. Army Engineer Research and Development Center, 3909 Halls Ferry Road, Vicksburg,
MS; e-mail: [email protected]
2
U.S. Army Engineer Research and Development Center, 3909 Halls Ferry Road, Vicksburg,
MS; e-mail: [email protected]
3
TRI-Environmental, 9063 Bee Caves Rd, Austin, TX; e-mail: [email protected]
4
University of Illinois at Urbana-Champaign, Department of Civil and Environmental
Engineering, 205 N. Mathews, Urbana, IL 61801; e-mail: [email protected]
ABSTRACT
The objective of this paper is to present large-scale laboratory box testing as a performance test
for evaluating the benefits of including commercial geogrid products in pavement applications. A
literature of relevant large-scale laboratory box experiments was conducted, and the results from
pertinent studies summarized. Results from the literature review are used to propose the
standardization of large-scale laboratory box test equipment and methods including minimum box
dimensions, box features, loading mechanisms, load frequency, minimum instrumentation
requirements, model pavement construction specifications, and recommendations for data
analyses and reporting of results.
INTRODUCTION
There is general widespread agreement among pavement engineering professionals that the
inclusion of geosynthetics within the pavement foundation can provide significant performance
benefits in terms of extended pavement service life and/or a reduction in the thickness of the
engineered pavement layers. The primary function of geotextiles within the pavement foundation
is typically separation of the engineered material from the natural subgrade with some secondary
benefits in terms of reinforcement resulting from the tensioned membrane effect in pavement
working platforms which may involve large surface deformations. In contrast, the primary
function of geogrids within a pavement foundation is reinforcement and stiffening due to aggregate
interlock with some minor secondary benefits of separation depending upon the soil properties of
the two layers and the effectiveness of the interlocking mechanism at the layer interface.
While the separation of dissimilar materials within a pavement foundation can be
reasonably accomplished with a variety of different geosynthetic types, it is desirable that the
geosynthetics allow the transmission of water to alleviate the accumulation of pore pressure while
retaining the fine particles of the subgrade to prevent contamination of the engineered granular
layer. Fortunately, filtration criteria and the filtration properties of the geosynthetics are
reasonably well understood and characterized; thus, providing practitioners with reasonable design
criteria and specifications for geosynthetic selection. Alternatively, the reinforcement of aggregate
base and subbase layers is less defined. The potential reinforcement mechanisms of tensioned
membrane effect, general bearing capacity improvement, and lateral restraint have been reasonably
The objective of this paper is to present large-scale laboratory box testing as a performance test
for evaluating the benefits of including commercial geogrid products in pavement foundations.
This paper summarizes several large-scale laboratory box testing efforts and demonstrates the
utility of the test method for differentiating the performance benefits of different commercial
geogrid products in pavement foundation applications. This paper also discusses the need for
standardization of large-scale laboratory box testing methods for this application, as well as the
advantages and disadvantages of implementing this method as a means of product specification.
Large-scale laboratory box tests have been used by researchers for decades to evaluate the behavior
of pavement materials in a laboratory environment, particularly where smaller-scale laboratory
apparatus cannot reasonably capture the behavior of the pavement materials or where the cost of
full-scale testing is prohibitive. Performance evaluation of geosynthetic reinforced pavement
materials lends itself to large-scale laboratory box testing due to the characteristics of the
geosynthetics (i.e. geogrid aperture sizes, etc.) and the proposed reinforcement mechanisms (i.e.
tensioned membrane effect and lateral restraint). Small-scale laboratory test methods have
difficulty in capturing the realistic global behavior of reinforced pavement materials. A literature
Tingle and Jersey (2005) Reinforced Steel Box Circular 40.0 730 550 1.0 Hz
1.8m X 1.8m X 1.4m Plate
Reinforced Steel Box: Circular
Chen et al. (2009) 40.0 730 550 0.77 Hz
2.0m X 2.0m X 1.7m Plate
Reinforced Steel Box: Circular
Abu-Farsakh and Chen (2011) 40.0 730 550 0.77 Hz
2.0m X 2.0m X 1.7m Plate
Reinforced Steel Box: Circular
Qian et al. (2011) 40.0 730 550 0.77 Hz
2.0m X 2.2m X 2.0m Plate
Reinforced Steel Box: Circular
Sarici et al. (2016) 40.0 730 550 0.77 Hz
2.0m X 2.0m X 2.0m Plate
Reinforced Steel Box: Circular
Tingle (2019) 40.0 730 550 0.83 Hz
1.8m X 1.8m X 1.4m Plate
Reinforced Steel Box: Circular
Robinson et al. (2019) 128.0 730 1750 0.77 Hz
1.8m X 1.8m X 1.4m Plate
Table 2 provides generalizations of the materials used and profiles of the pavement sections
evaluated by each researcher. Table 2 shows that a variety of materials have been used in previous
experiments and that material thicknesses and engineering properties vary significantly between
Table 2. Materials and Pavement Profiles Used in Large-Scale Laboratory Box Experiments
Asphalt Thickness Relative Base Thickness Relative Subgrade Thickness Relative Geosynthetic
Experiment Surface mm Strength Type mm Strength Type mm Strength Type1 Location
Crushed
Bauer and Abdelhalim (1987) None None None 75-3000 High SP 900 Medium GT Varied
Limestone
Crushed Very Low
Haas et al. (1988) Hot Mix 50-100 Medium 100-300 High SP 175-375 GT or GG Varied
Stone to Medium
Barksdale et al. (1989) Hot Mix 25-38 Medium Varied 150-200 Low-High ML-CL 450 Very Low GT or GG Varied
Douglas and Valsangkar (1992) None None None Varied 150 Low-High Peat 1200 Very Low GT and GG Varied
Al-Qadi et al. (1994) Hot Mix 70 Medium Granite 150 High SM 1220 Medium GT or GG Interface
Crushed
Gregory and Bang (1994) None None None 0-50 High CL & CH 175 Low GT and/or GG Interface
Limestone
Sandy
Kelly et al. (1995) None None None 200 High CL 500 Low GT or GG Interface
Gravel
Clean
Douglas (1997) None None None 25-75 Low Peat NR Very Low GT Interface
Sand
Crushed
Montanelli et al. (1997) Hot Mix 75 Medium 300 High SP 400 Low-High GG Interface
Limestone
Hot Mix 75 Medium Crushed 300-375 970-1045 Very Low
Perkins et al. (1999) High CH or SM GT or GG Varied
Cold Mix 75 Low Stone 200-210 1128-1145 to Medium
Leng et al. (2002) None None None Granite 150 or 250 High SC 750-900 Low GG Interface
Crushed
Tingle and Jersey (2005) None None None 360-510 High CH 710-810 Very Low GT and/or GG Interface
Limestone
Clayey
Qian et al. (2011) None None None 300 Low SC 1000 Very Low GG Interface
Gravel
Sarici et al. (2016) None None None Granite 300-450 High ML-CL 1400 Low GG Varied
Tingle (2019) None None None Varied 150 Low-High CH 610 Low GT and/or GG Interface
Crushed
Robinson et al. (2019) Hot Mix 127 High 483 High CH 711 Low GT or GG Interface
Limestone
1
GT indicates the inclusion of a geotexttile, and GG indicates the inclusion of a geogrid.
The literature clearly demonstrates that large-scale laboratory box testing can be effectively used
to evaluate the potential of geosynthetics for performance improvement of pavement sections.
There are numerous caveats regarding the direct use of absolute values such as the number of load-
cycles-to-failure for design, but the preponderance of the experimental evidence shows that the
test method can verify that performance improvements are likely and aid in the relative ranking of
products. Thus, several researchers, the authors included, have proposed the use of large-scale
laboratory box testing as a performance test for base reinforcement applications. To accomplish
this, the test method would require standardization so that different test agencies could generate
Tingle and Jersey (2005) conducted a finite element analysis to minimize the influence of the
rigid boundary conditions on the interior response of the pavement section while maintaining an
acceptable scale for laboratory construction. They recommend minimum box dimensions of 1.8
meters by 1.8 meters in plan and a depth of 1.3 meters. To minimize the potential for wall
deflection during loading, the sides of the box were constructed of 25-mm steel plate reinforced
with 155-mm square steel tubing to minimize the potential for wall deflection during loading.
However, suitable designs could be fabricated from reinforced concrete as evidenced by Perkins
(1999) or other materials provided that the deflections at the boundaries are minimized. In order
to facilitate construction, Tingle and Jersey as well as Perkins designed their boxes such that one
side of the box was removable. The predominant concern is that the method of closure of the
box must minimize deflections. Rigidly enclosed box designs such as concrete tanks could
provide a suitable containment vessel provided that their dimensions are large enough to allow
reasonable construction of the pavement section. Containment vessels constructed at or near the
minimum recommended dimensions would provide a very confined construction space that
would likely affect the ability to achieve quality construction results representative of normal
construction processes. Figure 1 shows the reinforced steel box designed and used by Tingle and
Jersey (2005), Tingle (2019), and Robinson et al. (2019).
Laboratory Instrumentation
Instrumentation is typically included in large-scale laboratory box testing of model pavement
sections to measure the pavement response to loading. This section describes recommendations
for a basic instrumentation array; however, the inclusion of instrumentation should be
specifically designed to accomplish the test objectives. The most basic instrumentation consists
of an in-line load cell on the actuator that is capable of measuring the maximum applied loading
with an accuracy of at least 0.05 kN, an internal Linear Variable Differential Transducer (LVDT)
for measuring the plate deformation, and at least 1 externally mounted LVDT to measure the
deformation of the load plate near the edge as a check on the internal LVDT measurement and to
monitor plate bending. Optional but recommended sensors include a minimum of three LVDTs
spaced at set distances from the center of the load plate to measure pavement surface
deformation, earth pressure cells (EPC) for measuring the load-induced stress at different
locations within the pavement, at least one pore pressure transducer to monitor the accumulation
of pore pressure near the top of subgrade soils, a temperature transducer, and a moisture
transducer. The surface LVDTs can be used in conjunction with the internal actuator LVDT to
create a deflection basin for backcalculation of the pavement layer moduli using layered elastic
analysis software. In addition, the shape of the deflection basin provides insight as to the failure
behavior of the model pavement section. The inclusion of earth pressure cells at critical
locations within the pavement structure can be used to compare the stress distribution profiles of
unreinforced and reinforced pavement sections as well the calibration of mechanistic models.
The pore pressure transducers, moisture sensor, and temperature probe are used to monitor the
environment for the model subgrade. Additional instrumentation can be included as necessary to
accomplish specific test objectives. An example instrumentation array used by Tingle and Jersey
(2005) is shown in Figure 3. Figure 4 shows an example of the test setup including the LVDT
arrangement from Tingle and Jersey (2005).
Figure 4. Completed test set up prior to load testing from Tingle and Jersey (2005).
Construction of Model Pavement Sections
The construction of the model pavement sections should be performed as similar to standard
field construction techniques as reasonably possible given the practical restrictions related to
large-scale laboratory box testing. First, each model pavement section should be constructed and
tested separately including complete reconstruction of subgrade materials to ensure that there are
no residual effects from previous load sequences. Prior to subgrade placement, the test box
should be lined with plastic membrane to retard moisture loss. Subgrade soil should be
mechanically processed to achieve the target moisture content necessary to produce the desired
strength when compacted within target density limits. It is recommended that layer thicknesses
be limited to less than or equal to 125-mm due to the reduced size of the compaction equipment
used in box testing versus standard compaction equipment. For fine-grained materials, it is
recommended that the material be compacted using a pneumatic compactor to ensure kneading
of the material. For coarse-grained materials, compaction can be achieved by a combination of
vibratory plate compactors and a pneumatic compactor at the very edge where the curvature of
the bottom plate of the vibratory compactor doesn’t permit proper contact. When appropriate,
Load Testing
As noted, a seating load of 0.45 kN is recommended to maintain contact between the load plate
and the pavement surface. Static and dynamic response data should be collected prior to load
testing each model pavement section. This “conditioning” sequence should include 10 cycles at
4.4-kN increments up to a maximum of 40 kN. This “conditioning” sequence provides
preliminary response data and is considered representative of typical construction traffic during
the construction of new pavement sections. Once the conditioning sequence is complete,
baseline static data should be collected and then cyclic loading of the test item commenced.
While continuous data collection and storage are desired, dynamic data in 10-cycle increments
can be collected at selected intervals in the test sequence to minimize data storage requirements.
Dynamic testing of the model pavement sections should continue beyond the typical failure
criteria for flexible pavements (25 mm) for standard tests and may extend to greater levels of
deformation to meet specific test objectives. It should be noted that the temperature of the test
environment should be relatively constant between model pavement sections. A target
temperature of 25oC is recommended, and the actual temperature should be recorded during
testing. This is particularly important for model pavement sections including HMA.
CONCLUSION
This paper summarizes relevant experiments utilizing large-scale laboratory box testing to evaluate
the benefits of including geosynthetic products in flexible pavement foundations. The results of
this review demonstrate the utility of the test method for differentiating the performance benefits
of different commercial geotextile and geogrid products in pavement foundation applications. The
REFERENCES
Abu-Farsakh, M. Y., and Chen, Q. (2011). Evaluation of geogrid base reinforcement in flexible
pavement using cyclic plate load testing. International Journal of Pavement Engineering, 12(03),
275- 288.
Al-Qadi, I. L., Brandon, T. L., and Bhutta, A. (1997). Geosynthetic stabilized flexible
pavements, Proceedings of Geosynthetics ’97, IFAI, Vol. 2, Long Beach, California, pp. 647-
662.
Barksdale, R. D., Brown, S. F., and Chan, F. (1989). Potential benefits of geosynthetics in flexible
pavement systems, National Cooperative Highway Research Program Report No. 315,
Transportation Research Board, National Research Council, Washington, D.C.
Bauer, G.E. and Abdelhalim, A.O.A. (1987). The performance of geogrid reinforced road bases,
In Construction & Building Materials, Vol. 1, No. 2, pp. 71-75.
ABSTRACT
The construction of a vertical expansion of existing waste disposal facilities (piggyback landfills)
involves the use of reinforcement geosynthetics to address differential settlements and stability
issues that will be reactivated under the load of the new cell. The challenge is to guarantee the
integrity of the new liner system. This paper presents the extension project of an old landfill and
the design method used to evaluate the tensile strength of the required reinforcement geosynthetic.
The methodology used in this project is a calculation method for the design of geosynthetics in the
case of soil subsidence and sinkholes. This reference method, usually used with granular backfill,
has been adapted and optimized to consider waste material-specific properties.
PROJECT OVERVIEW
To extend the life of its Non-hazardous Waste Storage Facility (NWSF), an operator proposed to
continue operating its site, within the perimeter already authorized, by a vertical expansion of the
cells already in operation to a maximum thickness of waste of about 16 m (52 ft). This project is
based on non-hazardous waste storage cells about 15 m (50 ft) thick, some of which are more than
20 years old and, therefore, at different degradation stages.
The vertical expansion requires the new cell to be hydraulically independent of those
already in place underneath. The overall leachate barrier system must comply with the current
regulation and must remain functional in the long term. The design included the installation of a
soil layer rein-forced with geosynthetics over the old final cover system. This layer is becoming
the subgrade soil for the new leachate barrier system. A typical section is shown in Figure 1. As
the site also operates as a valorization and disposal site for incinerator bottom ash, it has been
decided to use this material to construct the soil-reinforced layer.
GEOTECHNICAL DESIGN
In addition to the slope stability considerations and design, the vertical expansion of the cell
requires a specific analysis to estimate the overall settlements that will occur.
Global settlements. Global settlements in waste result from complex phenomena that occur over
time. They can be determined by adding up:
• Primary settlements caused by the weight of the new waste (short term);
• Residual secondary settlements due to the non-homogeneous degradation of the old waste
(long term).
The guide "Recommandations pour la conception des extensions d'ISDND en appui sur
des casiers anciens" (BRGM, 2020) recommends the application of the "Modèle Incrémental de
Prédiction des Tassements" (Olivier, 2003 and ADEME, 2005), also called ISPM model. This
model, developed from field experience in France and abroad, allows the prediction of the
evolution of the primary (short-term) and secondary (long-term) settlements of a waste mass in the
case of a vertical expansion over it. It is recommended to apply this model by retro-analysis (or
calibration) to improve accuracy, which has been done on that project.
The estimation of the primary settlements was carried out from the field data by applying
the pressiometric method from modulus values measured on-site (average Pressuremeter Modulus
EPMT = 9.2 MPa) and the ISPM method from data collected in the literature. The estimation of the
secondary settlements was achieved by applying the ISPM method with data resulting from a retro-
analysis carried out using the topographic survey on the post-operation settlements of the site. In
The consideration of the structural differential settlements led to specific constructive measures:
• Modification of the landfill gas collection network, including the vertical wells, to avoid
the development of localized hardpoints;
• Specific layout with the installation of two monodirectional reinforcement geosynthetic
layers orthogonally crossed to have a homogeneous reinforced soil structure at any point
under the new cell.
nxD
It must be verified that none of these limit states are to be reached either during construction
or during the expected service life of the cell.
Serviceability limit state (SLS). The maximum admissible deflection for the lining system is first
determined. A value of 3% is used in the literature for a 2 mm (80 mil) HDPE geomembrane used
as a primary lining system (Seeger et al., 1996). The other components of the leachate barrier
system may influence this value.
The stress distribution on the reinforcement geosynthetic is considered uniform and vertical
without considering any contribution from the circumference of the soil cylinder:
𝜎𝜎 = 𝐹𝐹𝐹𝐹𝐺𝐺𝐺𝐺𝐺𝐺𝐺𝐺 × �𝛾𝛾𝑤𝑤𝑤𝑤𝑤𝑤𝑤𝑤𝑤𝑤 × 𝑛𝑛 × 𝐷𝐷 + 𝛾𝛾𝑝𝑝𝑝𝑝 × 𝐻𝐻𝑝𝑝𝑝𝑝 + 𝛾𝛾𝑠𝑠𝑠𝑠 × 𝐻𝐻𝑠𝑠𝑠𝑠 + 𝛾𝛾𝑙𝑙𝑙𝑙 × 𝐻𝐻𝑙𝑙𝑙𝑙 + 𝑃𝑃� + 𝐹𝐹𝐹𝐹𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄 × 𝑄𝑄 (1)
where:
σ: Stress on the reinforcement geosynthetic
FSGsup, FSQsup: Factors of safety
γwaste: Unit weight of the waste
n: arching effect factor (n=3 for municipal solid waste)
D: diameter of the cavity
γpb: Unit weight of the primary leachate barrier system
Hpb: Thickness of the primary leachate barrier system
γsb: Unit weight of the secondary leachate barrier system
Hsb: Thickness of the secondary leachate barrier system
γll: Unit weight of the leveling layer (above the reinforcement geosynthetic layer)
Hll: Thickness of the leveling layer (above the geosynthetic layer)
P: Permanent loads
Q: Temporary loads
The residual stiffness of the reinforcement geosynthetic during the service life of the
structure must be greater than:
𝜎𝜎×𝐷𝐷 1
𝐽𝐽𝑚𝑚𝑚𝑚𝑚𝑚 = × �1 + (2)
2× 𝜀𝜀𝑚𝑚𝑚𝑚𝑚𝑚 6×𝜀𝜀𝑚𝑚𝑚𝑚𝑚𝑚
where:
εmax: maximum allowable elongation in the reinforcement geosynthetic to ensure that the barrier
system remains fully functional.
The strength increase in the reinforcement geosynthetic will cause the geosynthetic
deformation in the anchoring zones and increase the deflection in the cavity. The stiffness of the
reinforcement geosynthetic must then be overdesigned to take it into account and remain within
the allowed deformations.
where:
Tult: Ultimate tensile resistance of the reinforced geosynthetics
RFs: Reduction factors specific to the product, the environment, and the installation
GEOSYNTHETIC DESIGN
High-tenacity yarn
Woven geotextile
The process guarantees a high level of reinforcement with reduced elongation as the cables
are inserted without undulation during the knitting process. It also allows dissociating the
separation and reinforcement functions. Indeed, because the high-tenacity polymer yarns provide
the reinforcement capability of the product, the woven geotextile keeps its filtration opening size
constant regardless of the tensile strength of the geosynthetic. The composition of the high-tenacity
yarns (PET, PVA, etc.) is selected according to the type of structure and the nature of the
surrounding soils.
The reinforcement geosynthetic selected for this project is GEOTER F PVA 450. It is made
with PVA high-tenacity yarns and has an ultimate tensile strength of 450 kN/m. The sizing of the
geosynthetic is described in the following paragraphs.
Product sizing. The minimum required long term tensile strength and elongation for the
reinforcement geosynthetic has been calculated by the project engineer with a geotechnical design.
Then, a study has been performed by the geosynthetic manufacturer to select the appropriate
product. As for any project using geosynthetics, this study took into account:
The ultimate tensile resistance Tult of the reinforced geosynthetics is then given using the
following formula:
𝑇𝑇𝑢𝑢𝑢𝑢𝑢𝑢
𝑇𝑇𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑 = (4)
𝑅𝑅𝑅𝑅𝐶𝐶𝐶𝐶 × 𝑅𝑅𝑅𝑅𝐼𝐼𝐼𝐼 × 𝑅𝑅𝑅𝑅𝐷𝐷 × 𝑅𝑅𝑅𝑅𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔
where
Tdesign: allowable tensile strength (kN/m)
RFCR: reduction factor for creep to account for long term behavior,
RFID: reduction factor for installation Damage, determined form construction damage tests,
RFD: reduction factor for durability, chemical resistance of the polymer in the specific
environment under consideration
RFglobal: safety coefficient on the geosynthetic material, equal to 1,25 for every application.
Creep behavior. The creep behavior was determined by an independent expert laboratory using
ASTM D6992 standard. The isochronous curves were obtained according to this test, which was
performed during several months at several strains on a creep bench.
The reduction factor for creep is obtained from the isochronous curves, getting the
remaining fraction of the initial ultimate strength (Load UTS) at the allowed elongation
(determined by the geotechnical design), as written in the following formula:
100
𝑅𝑅𝑅𝑅𝐶𝐶𝐶𝐶 = (5)
𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿 𝑈𝑈𝑈𝑈𝑈𝑈 (𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚 𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒 (%))
Installation Damage. The installation damage reduction factor has been determined by doing in-
situ tests (as described in NF G38-064 and ISO/TR 20432 standards). Strips of the product have
been backfilled with several soil types, from fine soils to gravel 0-12in (Figure 4).
Figure 4. In-situ tests with several types of soil over the geosynthetic
Tensile strength tests have been carried out on the exhumed product by an independent laboratory
to determine the installation damage reduction factor function of the tested soils (Table 1).
Table 1. RFID for several types of soil in contact with the reinforcement geosynthetic
Fine material Sand < 2mm Gravel 0/100mm Gravel 0/300mm
RFID 1.05 1.19 1.15 1.26
Durability. The high-tenacity yarns of the selected reinforcement geosynthetic are made in
Polyvinyl Alcohol (PVA). Oxidation has been identified to be the significant degradation
mechanism of PVA. Tests on PVA yarns in wet and dry cycles for the use in reinforced earth
structures (Nait-Ali et al., 2009) results in a reduction factor for durability of 1.20.
Applying the reduction factors to the allowable tensile strength determined by the
geotechnical design led to the selection of the reinforcement geosynthetic with PVA high-tenacity
yarns and ultimate tensile strength of 450 kN/m: GEOTER F PVA 450.
The final cross-section for the vertical expansion of the cell is presented in Figure 7.
Landfill gas management. To ensure the collection of landfill gas from the existing waste and to
avoid the development of hardpoints under the embankment, the following improvements have
been proposed:
• Old wells are modified to ensure a safe distance from the soil-reinforced layer. This
distance is equivalent to the estimated maximum settlement under the future cell;
• Old wells are not connected to the horizontal collector pipes; the gas flows through a 300
mm (1 foot) gravel drainage layer between the old waste and the soil-reinforced layer.
Soil-reinforced layer. A 550 mm (1.8 ft) thick soil-reinforced layer is required to have a uniform
load distribution over the old waste mass and limit the differential settlements. It is composed of:
• Two layers of PVA reinforcement geosynthetic with an ultimate tensile strength of 450
kN/m and a maximum elongation of 6% installed perpendicularly at two different levels to
fully mobilize the interface friction angles; the overlaps are calculated to ensure continuity
of the reinforcement;
• Incinerator bottom ash material available on site.
Numerous analyses have been carried out on the bottom ash material to characterize its
physical, mechanical, and chemical properties (Table 2). It has been found suitable as a backfill
material. The pH, which may exceed 10, has been considered when selecting the reinforcement
geosynthetic. PVA material has been proven to be more adapted for that range of pH.
Leachate barrier system. The leachate barrier system required by the French regulation is
implemented on top of the soil-reinforced layer. It is composed of (from bottom to top):
• A clayey layer 1 meter (3 feet) thick with a hydraulic conductivity inferior to 1x10-9 m/s,
and a geosynthetic clay liner (GCL);
• A 2 mm (80 mil) HDPE geomembrane protected by a non-woven geotextile;
• A gravel drainage layer 0.50 m (1.6 ft) thick.
The barrier system allows the leachate generated in the new cell to be collected separately
with dedicated collection wells. The slope of the bottom cell has been increased to 3% in the
drainage direction to ensure a remaining long-term slope of 1% after the maximum expected
settlements.
GEOSYNTHETIC INSTALLATION
To limit overlaps, simplify the installation, and ensure the continuity of the reinforcement, rolls
with specific lengths have been produced. The length of the product was 120 m (395 ft). Handling
was achieved using mechanical shovels.
The product is placed with the woven geotextile on top to protect the high-tenacity yarns
during the backfilling. Two layers of geosynthetics were installed, perpendicular to each other,
with a soil layer in between.
Overlaps. Side by side (longitudinal) connections are achieved with a minimum overlap of 300
mm (12 in.) following the direction of the backfill placement (Figure 10).
Bottom ash material placement. The incinerator bottom ash material is free of foreign matter
that could damage the geosynthetic. A 300 mm (1 ft) thick layer has been placed between the two
geosynthetic layers to improve the interface friction properties (Figures 11 and 12).
MONITORING
Figure 13. Hydraulic settlement gauge Figure 14. Backfilling of the gauges
The gauges are connected to a reference tank, and a data logger is mounted on a concrete
base outside the cell (Figures 15 and 16). The concrete base must not settle and is under a
topographical survey. The data acquisition is made manually by connecting a reading device to the
datalogger.
CONCLUSION
The use of a soil-reinforced layer as a subgrade for a piggyback landfill ensures that the leachate
barrier system of the new cell will remain functional over the long-term. The designed and selected
GEOTER F PVA reinforcement geosynthetic is a high-modulus woven geotextile made with high
tenacity yarns that exhibits a tensile strength of 450 kN/m at 6% strain. It creates a uniform
repartition of the load on the old waste and controls the differential settlements.
The high tenacity yarns made in PVA permit to re-use the bottom ash material (available
on site) as backfill material on the product.
The methodology followed for the design of the reinforcement is already in use and
described in several guides; however, the implementation of a monitoring system permits to refine
the calculation and assumptions taken into account in the geotechnical model and confirm the
expected behavior of the structure.
REFERENCES
BRGM (2020). Guide de recommandations pour la conception des extensions d’ISDND en appui
sur des casiers anciens, France, 81 p.
Olivier, F. (2003). Tassement des déchets en CSD de classe II : du site au modèle, PhD Thesis,
Grenoble University, France, 325 p.
ADEME (2005). Guide méthodologique pour le suivi des tassements des Centres de Stockage de
Classe II, France.
Seeger, S. and Müller, W. (1996). Limits of Stress and Strain: Design Criteria for Protective Layers
for Geomembranes in Landfill Liner Systems, Proceedings Geosynthetics: Applications,
Design and Construction, Rotterdam, The Netherlands, pp 153-157.
ASTM D6992, Standard Test Method for Accelerated Tensile Creep and Creep-Rupture of
Geosynthetic Materials Based on Time-Temperature Superposition Using the Stepped
Isothermal Method, ASTM International, West Conshohocken, Pennsylvania, USA
ISO/TR 20432, Guidelines for the determination of the long-term strength of geosynthetics for soil
reinforcement, ISO, Geneva, Switzerland
Nait-Ali, K.L. and Freitag, N. (2009). Reinforcement made of Polyvinyl Alcohol yarns: Effect of
wet/dry cycles and consequences on the design in the framework of the French standards,
Rencontres Géosynthétiques, CFG, Nantes, France: 181-188.
ABSTRACT
Contractors and owners are interested in innovative and cost-effective solutions for solar farm
development over weak soils. One efficient solution is to use high strength geosynthetics to
provide constructability and long-term reinforcement to the access roads, staging areas, and other
site features. Soil-geosynthetic interaction provides an improved soil stress distribution from the
surface loads to the underlying soft soils, which can reduce the required aggregate thickness for
the site construction. This paper will explore soil-geosynthetic considerations, including
suggested measures during site assessment, design and installation sequencing which will
increase the performance of geosynthetic-soil stabilization. The economical savings and reduced
environmental impact of two recent solar development projects in Chicot County, AR and Lamar
County, TX using geosynthetics for soft soil stabilization will be explored.
INTRODUCTION
Solar power is more affordable in the United States than ever before, leading to its widespread
development. If solar photovoltaic (PV) panels were to be installed on 0.6% of the nation’s total
land area, the United Stated could have enough solar potential to provide electricity to power the
entire country (Office of Energy Efficiency & Renewable Energy , n.d.). Although these systems
have become more cost-effective, there is a need to reduce the costs associated with development
and maintenance of solar energy to be more practical up against traditional energy sources.
Typically, rural, and often undesirable land is selected for solar site development due to
affordable land cost. Following contractor selection, construction activities over unsuitable soil
such as saturated soils, marshlands, high fines, or expansive subgrades present challenges. Many
times, the selected project site requires soil stabilization to improve the bearing capacity of the
section. Stabilization with aggregate alone leads excessive import material quantities and
associated transportation and placement of that material.
High strength geotextiles have been used in the heavy civil and energy sector to bridge
soft spots, provide separation and filtration and provide long term reinforcement to site features
including component storage yards, access roads, and construction entrances. This is a highly
efficient and economical solution which does not require specialized equipment or labor and can
handle high stress installations and ultimately reduced the amount of money and time spent on
importing materials to strengthen weak subgrades on large project areas.
Although the apparent desired function when discussing soil stabilization with geosynthetics is
reinforcement, it is important to understand other functions that affect the overall performance of
a geosynthetic reinforced subgrade system. Geosynthetics in subgrade stabilization applications
are typically used to provide one or more of the following functions:
The geogrid will provide reinforcement and confinement when properly sized aggregate is
placed above the geogrid to provide interlock to develop tensile strength. Typically, the graded
aggregate needs to be ½” to 1.5” to work in accordance with most standard subgrade
reinforcement geogrids. Regardless of aggregate size, a geogrid will not provide separation or
filtration. To address these functions, a non-woven geotextile should be placed below the
geogrid.
Geotextiles are permeable planar materials that can provide reinforcement, confinement,
separation, filtration, and drainage. Geotextiles are either woven or nonwoven as highlighted in
Figure 2. For non-woven geotextiles, yarns or fibers are mechanically or chemically entangled,
or bonded to produce textile material. For woven geotextiles, the yarns are mechanically
interlaced. Geotextiles are sometimes considered to be weaker products; however engineered
geotextiles can provide the same or even higher tensile strengths than geogrids.
There are many different types of both woven and nonwoven geotextiles which will vary
in their performance based on their physical properties. Properties such as apparent opening size,
pore size distribution, and coefficient of interaction are important to consider when selecting a
geotextile to serve the project requirements.
Proper selection of the product related to the unique site conditions as well as the
intended functions is the first step in included geosynthetics as a solution for subgrade
stabilization.
Similar to all geotechnical systems, the collection and evaluation method to determine the
subgrade strength which will be used in a geosynthetic reinforced design will influence the
recommended solution and the confidence in the final design. Geosynthetic systems are
installation sensitive so the constructability of the section is equally as important as the required
long-term capacity. For solar farms specifically, loads during geosynthetic installation and
aggregate compaction (and possible paving activities) are commonly the heaviest loads the
section will experience during its design life. Successful installation is inherently dependent on
the soil conditions present at the time of site stabilization activities. The design of geosynthetic
reinforced sections should always consider constructability for the possible site conditions that
could be encountered, including weather events which could cause increase in moisture content
of soils and decrease of soil strength.
The strength of the subgrade input to the design is an influential parameter directly
related to the required aggregate thickness. Consider an analysis using the subgrade strength in
terms of California Bearing Ratio (or CBR). The designer must address the difference between a
CBR and a soaked CBR in their design. For example, if the subgrade strength was quantified by
a dynamic cone penetrometer, or DCP, during a dry condition, the soils could be weaker when
saturated (especially true for fine grained soils). When available, a soaked CBR following
ASTM D1883 (D18.05, 2018) will provide the designer with a high level of confidence that the
design subgrade strength accounts for strength related to the soil in a saturated state. However, a
CBR value (by other methods) can decrease rapidly during the first 24 hours of wetting and will
continue to decrease at a reduced rate following the initial wetting period as shown in Figure 3
(Chandravali Pandey, 2019).
As designers are constantly pushed to develop the most economical solutions from a cost
perspective, a geosynthetic reinforced section could be under-designed based on values presented
in a geotechnical report or through field analysis. If test methods were used that do not capture
the weakest soil state, the designer needs consider further soil testing or an added factor of
safety. One possible solution to balance out a conservative or non-conservative analysis based on
soils which could lose strength due to added moisture is to provide a “wet-weather” and “dry-
weather” section to optimize the required sections which would address constructability concerns
for each case. Similarly, other components which are not always known as the time of design can
influence the required thickness such as the quality of the fill material placed above the
geosynthetic and the compactive efforts that will be used.
In the same effort to produce economical site stabilization designs, contamination of the
stabilized sections is commonly overlooked. For most sites, it is quickly identified that
stabilization of the access roads is required. While access roads, parking areas or construction
entrances receive this attention and are considered for stabilization efforts, it is common that
other areas are left untreated. On solar farms, segmented rows of adjacent solar panels are
typically called “cells” and it is uncommon that there would be any geosynthetic installed in
these areas. However, consider development of a 50-acre solar farm, where several crews are
simultaneously working. It is common that the in-situ soils could have one or more of the
following characteristics: high plasticity clays or fine-grained soils, poor strength, moisture
sensitive (swell/shrink, freeze/thaw potential), high water table. These types of problematic soil
are present over the entire project area, and due to the ongoing efforts of multiple crews
operating construction equipment to install solar panel piles, solar panels, build roads, and
construct facilities, contamination of the treated access road sections is inevitable.
If the crew driving piles is working in an untreated area of the project (for example in a
high plasticity clay subgrade) it will track that material onto the stabilized access roads.
Contamination of fines into the aggregate sections of roadway pose several issues: (1) Aggregate
thickness loss due to equipment removing the upper layer of aggregate (2) Strength loss due to
contamination of fines into the aggregate section. Even with as little as eight percent (8%) fines
contamination, the effective strength of this aggregate layer can be decreased by up to fifty
percent (50%) as shown in Figure 4 (Hicks, 1986).
Depending on the in-situ soil types, treatment with a geosynthetic over the entire site area
should be considered to reduce potential contamination and degradation of the structural
thickness of the road sections. For the areas of the project where only separation is required (not
reinforcement) consider use of a lower tensile strength geosynthetic. This will provide an
affordable option to minimize contamination of the site infrastructure. This will provide an
economical treatment for the non-load bearing areas.
ECONOMIC BENEFIT
During the evaluation of subgrade stabilization options, the focus is on designing a long-lasting
structure which can withstand environmental effects and dynamic loading. Selection
considerations commonly include cost, ease of installation, successful history with achieving
compaction requirements, and permanency of strength. There are three primary stabilization
solutions to treat unsuitable soil: (1) remove the unsuitable material and replace with higher
shear strength aggregate, (2) Geosynthetic Reinforcement and, (3) Chemical Stabilization (lime,
Portland cement or fly ash).
Typically, option 1, the remove and replace method, involves undercutting and removing
soft, weak, possibly wet or otherwise undesirable soils and replacing with an engineered fill.
This method is costly and may not address the problem at hand. Sometimes, excavation through
the weak surface soil exposes even lower strength soil and has the potential to interfere with
ground water. Additionally, depending on the project’s cut/fill requirements, removal of
excavated material and importing select materials “engineered/granular fill” can prove to be
costly and time consuming. For solar farm projects, it is common that the haul distance for
import and export of materials is substantial adding to the construction schedule and cost of this
method.
Located in Southeast Arkansas, the Chicot Solar Energy Center will be the largest universal,
utility-scale solar energy project in Arkansas (Segrave, 2019). The 825-acre site will include
350,000 solar panels capable of generating enough power for more than 18,000 homes.
This site was constructed over former rice fields, presenting significant soil support challenges
for site access and development. Cultivated rice is extremely sensitive to water shortages; to
ensure sufficient water supply, most rice farmers aim to maintain flooded conditions in their
fields. With the area’s historical agricultural purpose, as well as the wet 2019-2020 construction
season, saturated soils drove the need for site stabilization. The subgrade soils were classified as
CH soils (fat clay) under the unified soil classification system. The soil has a soaked California
Bearing Ratio, CBR, of 1.5%. Moisture induced volume changes and strength loss due to high
water content were of concern for load support. Figure 5 shows site conditions prior to
stabilization measures.
Once it was determined that stabilization efforts were required, Giroud-Han unpaved
design methodology (Giroud-Han, 2004) was utilized to determine the required unreinforced and
reinforced thickness of aggregate. The Giroud-Han method employs stress distribution theory to
Where: h = required base thickness (m) ; α = load distribution angle; r = radius of load
(equivalent to wheel or dual wheel) (m); P = wheel load (kN); Nc = bearing capacity factor; cu =
undrained cohesion of subgrade soil (kPa) and m = bearing capacity mobilization coefficient
Geosynthetics are incorporated into this equation with the bearing capacity factor Nc,
which is based on the presence of geotextile or geogrid reinforcement.
Nc = 𝜋𝜋 no reinforcement
Nc = 𝜋𝜋 + 𝟸𝟸 geotextile reinforcement
Nc = 3"𝜋𝜋" /2 + 1 geogrid reinforcement (with geotextile separator)
It was determined that the required unreinforced thickness was sixteen inches (16”) of an
aggregate with a CBR of 20%, or seven inches (7”) of aggregate over the high strength geotextile
with properties displayed in Table 1.
The geotextile and aggregate section increased the bearing capacity of the soft, saturated
soils, providing a surface capable of supporting the intended loads as shown in Figure 6.
The equipment during construction was the governing load case since long-term use of
the facility intended to have lighter, less frequent vehicle traffic. As road construction activities
advanced ahead of pile driving activities, the use of the geosynthetic roads by tracked pile
driving equipment caused some section loss of the aggregate-geosynthetic road sections. This
section loss was not due to heavier loads or more axle passes than considered in the design, but
rather by constant tracking of the pile driving equipment between the untreated native high
plasticity clay areas and the geosynthetic-aggregate roads causing contamination of the aggregate
road sections as well as section loss. Due to the adhesive properties of the clay, the tracked
equipment would pull aggregate away from the road section. The reduction of aggregate was
severe in some spots exposing the geotextile (Figure 7). For this reason, sacrificial thickness of
aggregate was added to preserve the integrity of the seven-inch structural section. Alternatively,
the project team could have elected to provide a geotextile separator over the entire site to
minimize contamination of the roadway sections.
The recommended option included six to eight inches (6”-8”) of Texas Department of
Transportation flexible base over a high strength woven geotextile. The product selected had the
following performance and index properties shown in Table 2.
Figure 10 exhibits a stabilized roadway with the high strength geotextile and six inches
(6”) of aggregate on this project. Note the excessive rutting on the adjacent unreinforced section.
Each road sections constructed with this option experienced exceptional performance, minimal
surface rutting and provided a significant cost savings for this project.
Table 2. Performance and Index Properties of Geotextile used for Impact Solar Project
Initially the subgrade stabilization plan included twelve inches (12”) of worked subgrade
with six inches (6”) of lime stabilization, and six inches (6”) of flexbase. The lime stabilization
was budgeted at $32 per square yard. Using the high strength geotextile above with up to 8
inches (8”) of aggregate was budgeted at $7.00 per square yard (including installation). For the
thirteen (13) miles of road on the project, seventeen (17) foot wide roads, this provided a savings
of over $3.2M in subgrade material reinforcement alone. The solution was quick to install and
provided the required stabilization both during constructability and for facility use. The
CONCLUSION
Since the main purpose of solar energy is to preserve natural resources, doing so during the
construction of the solar facilities should be an apparent consideration in the selection of
treatment to strengthen unsuitable soils. Geosynthetics provide an economical option for
mechanical stabilization of subgrades with unsuitable soils both during construction and to
adhere to long-term performance requirements of the solar facilities. Evaluation of the soil
properties in the geotechnical report or by other provided information (in-situ field testing or by
visual inspection) could potentially underestimate soil strength for the saturated condition. Since
geosynthetic-soil performance for subgrade stabilization is dependent on the soil strength during
at the time of installation, consider soil strength parameters that capture the saturated case as
well. Two case studies were presented where high strength geotextiles provided effective
solutions for solar farm development providing the project with significant cost savings and
long-term advantages over other methods of stabilization such as remove and replace or
chemical stabilization.
REFERENCES
Christopher, B. R., Perkins, S. W., Lacina, B. A., Marr, W. A., “Pore Water Pressure Influence
on Geosynthetic Stabilized Subgrade Performance” Proceedings, 2009 Geosynthetics
Conference, Salt Lake City, Utah, February 2009
Pandey, C., Agarwal, S. (2019). "Comparitive Study Between Soaked & Unsoaked Value of Soil
Samples" International Research Journal of Engineering and Technology, Volume 6, Issue 6.
pg 3263
Jornbey, B. Hicks, R.G. (1986). Base Course Contamination Limits.
Giroud, J.P., Han, J. (2004). “Design method for geogrid-reinforced unpaved roadsPart I:
theoretical development. ASCE Journal of Geotechnical and Geoenvironmental, 776-778.
Giroud, J.P. and Noiray, L. (1981), “Geotextile-reinforced unpaved road design” ASCE Journal
of Geotechnical and Geoenvironmental Engineering, 107(9), pp 1233-1253.
Office of Energy Efficiency & Renewable Energy . Retrieved from Energy.gov:
energy.gov/eere/solarpoweringamerica/solar-energy-united-
states#:~:text=Solar's%20abundance%20and%20potential%20throughout,power%20the%20e
ntire%20United%20States.&text=PV%20can%20also%20be%20installed,essentially%20no%
20land%20use%20impacts.
Segrave, K. E. (2019, December 05). Steps taken toward solar farm. Chicot Newspaper.
ASTM D 1883-16. Standard Test Method for California Bearing Ratio (CBR) of Laboratory-
Compacted Soils, ASTM International, West Conshohocken, Pennsylvania, USA.
ABSTRACT
This paper discusses the construction of high embankments on challenging, weak foundation soils
using Controlled Modulus Columns (CMC)TM combined with Load Transfer Platforms (LTPs)
reinforced with high modulus, high strength geosynthetic reinforcements. It describes relevant
characteristics of each of the main elements comprising the ground improvement system. It
discusses the benefits of the solution when compared to traditional and typically less cost-effective
alternatives. Two short case studies are included to discuss the design approach and local
geotechnical conditions. On both of the presented cases, CMCs combined with high strength
reinforced LTPs were successfully utilized. The inclusion of high strength polyvinyl alcohol
(PVA) geosynthetic reinforcements in the platform made it possible to minimize horizontal
deformation on the CMC foundation systems.
INTRODUCTION
Construction of embankments and stockpiles on soft soils presents significant challenges. The lack
of soil bearing capacity needs to be remediated to avoid impacts such as lateral squeeze, excessive
deformation, and global failures.
Different techniques employed to address these issues vary widely in cost, constructability,
and performance. The focus of this paper will be the use of a grid of vertical rigid inclusions,
namely Controlled Modulus Columns (CMC)TM, topped with a granular Load Transfer Platform
(LTP), which is reinforced with very high strength and tensile modulus woven polyvinyl alcohol
(PVA) textiles. The combination offers highly improved factors of safety against global stability
failures, significantly reduced total and differential settlements, and stabilized column tops to
minimize lateral displacement.
This paper will provide an introductory explanation regarding the use of CMCs as bearing
elements combined with PVA reinforcement as part of the LTP for heavy vertical surcharges on
soft foundation soils. It will provide two case studies illustrating the solution used on recent
projects.
Many different solutions are available to prevent failure of the foundation soil due to its low
bearing capacity. Local conditions, loads, performance criteria and cost are among the main
CMC Rigid Inclusions. CMCs, or CMC Rigid Inclusions, are displacement-drilled grouted
elements which reinforce soft ground by attracting a significant portion of the overlying load and
transferring it to more competent strata at depth. This lower stress level in compressible soil
layers can reduce typical ground settlement by factors of 2 to 10. In addition, CMCs can provide
substantial improvements in global stability by keeping shear stresses in weak soil layers well
below ultimate strengths, while also providing moderate lateral capacity in the inclusions
themselves. Finally, CMCs increase allowable bearing capacity by adding the frictional and end-
bearing capacity of the inclusion to the existing capacity of the ground.
One of the most common applications for CMCs is supporting embankment fills, often
generically known as a “Column Support Embankment” (CSE). For embankment projects, the
settlement reduction and improved stability offered by CMCs can allow for rapid construction or
paving without extensive waiting periods or staged construction. In the US, CMCs have been
designed for post-paving settlement tolerances as strict as 12 mm (0.5 inch), although more typical
post-paving tolerances are between 25 mm and 76 mm (1 and 3 inches).
The CMC design must be performed in concert with the Load Transfer Platform design.
The LTP consists of a compacted, granular soil layer directly above, and often surrounding, the
tops of the CMCs. The high shear capacity of this layer allows for efficient distribution of loads
into the tops of the inclusions. This stress transfer, often described as “arching”, is based on a
variety of factors, such as LTP material, compaction level, stress level, and properties of the
underlying soils. The incorporation of geosynthetics within the LTP will enhance this stress
distribution, while aiding in overall stability and bearing capacity. Various design methods and
considerations for geosynthetics are discussed later in this paper.
For shorter embankments, especially those topped with flexible pavements, proper design
of the LTP and CMCs is critical to the surficial performance. If excessive stress is transferred to
the soft soil between the CMCs, this will result in consolidation or compression of this material.
While limited settlement between inclusions is often expected as part of the CMC design, in a
short embankment there is less vertical distance for the LTP to smooth out this differential
settlement. If this differential deflection were to be transmitted at the surface, in a phenomenon
known as “dimpling”, pavement sections could become bumpy and unusable.
For taller embankments, dimpling is not typically a concern, but different considerations
are required. In taller embankments, even when CMCs permit only a small percentage of the total
bearing pressure to be transmitted to compressible soil layers, it can result in significant
deformations due to the higher overall stress levels. A portion of this vertical deflection also
manifests as lateral displacement. In retaining wall scenarios or where adjacent structures are
present, this lateral displacement must be considered. Furthermore, the lateral displacement can
potentially damage perimeter CMCs by causing excessive bending and shear forces. To address
this issue, steel reinforcement can be installed within the CMCs. Alternatively, the LTP layer can
LTP Geosynthetic Reinforcement Design. The function and design method used will define the
requirements for the reinforcement integrated into the platform. Some methods can underestimate
the required resistance of reinforcement, which can lead to excessive vertical and lateral
deformations, punctures, etc. Naturally, the poorer the soil resistance, the larger the risk and
consequences. Good understanding of each method is important, especially its assumptions,
limitations and indicated function for the reinforcement.
The study by Ariyarathne and Liyanapathirana (2015), identified that methods based on a
simplified approach, for example those where triangles or pyramids with fixed angles are used to
determine the surcharge carried by the reinforcement, greatly underestimate the tension to be
transferred to the geosynthetic. The results obtained from such methods cannot be relied upon
because material parameters are not considered. There are many cases of excessive deformation,
settlement and failure of even low surcharge fills where the LTP was designed using these
simplified methods. As explained ahead, the LTP should contain as few layers of reinforcement
as possible, whereas the simplified methods recommend a minimum of three reinforcement layers.
Codes that better model soil arching and consider multiple sources of stresses to be
developed on the reinforcement are more reliable. Examples are the British Code of practice for
strengthened/reinforced soils and other fills (2010) and the New German Method as presented on
Recommendations for Design and Analysis of Earth Structures Using Geosynthetic
Reinforcements – EBGEO (2010).
The latter two methods referenced above consider arching as semi-spheres or as multi-
shells. The stress on the reinforcement is estimated using the membrane theory, and support from
the soft soil between the CMCs can either be considered or ignored. The German method also
considers the tensile modulus of the reinforcement as part of the design procedure. Both guidelines
recommend the designer to minimize the number of reinforcement layers to be placed within the
LTP. That is due to concerns of uneven distribution of stresses among the layers, since force
distribution is not fully understood and failure of the system becomes possible. Therefore, the
tensile resistance should, where possible, be provided in one reinforcement layer (in each direction
of main stresses).
The more sophisticated approaches, BS 8006-1:2010 and EBGEO, verify the tensile stress
condition of the reinforcement under different requirements: load redistribution due to arching,
and lateral spreading and extrusion. The reinforcement also increases the overall stability of the
embankment and allows for greater spacing of the CMCs.
In addition to these verifications, it is also important to assess the deformation and stresses
that could be experienced by the CMC Rigid Inclusions. The behavior mechanisms of a CMC
system consist of a sequence of complex interactions: between the embankment and the LTP,
between the LTP and the soft soil, between the CMC and the soft soil, and between the CMC and
the end-bearing soil. For this complicated analysis, the Finite Element Method is recommended.
A first-level analysis typically consists of a unit cell study, modeling one CMC and its tributary
area to assess typical settlements and load transfer efficiency in the middle of an embankment. To
assess global effects such as lateral displacement, more complex models are required. A plane-
strain finite element model, typically cut across an embankment, allows the designer to model
multiple rows of CMCs and study the bending and shear stresses on each row. From there, a
Besides tensile modulus, creep (elongation over time under constant load) of the material
also has a strong influence on the performance of the reinforced structure. Creep is especially
important over the long term and unless considered, the structure may fail shortly or years after
construction is completed. Strain over time must be considered during design to account for this
phenomenon. Isochronous curves are used to evaluate the creep behavior of geosynthetic
materials. Figure 2 illustrates typical load-extension curves for a few polymers. Clearly, there is a
remarkable difference in strain accumulation with time between the two materials represented. The
Figure 2. Example isochrones for: (left) a HDPE extruded geogrid, (right) a PET product.
(source: EBGEO 2010)
Besides the parameters discussed above, durability and installation damage are also
considered during selection of the reinforcement. When the pH of the soil in contact with the
material is too low, or too high, PET is not suitable. In applications in direct contact with CMCs,
PVA or AR should be used instead of PET due to the alkalinity of cement.
From the discussion above, the materials with the best combined performance, considering
durability, low strain tensile modulus and creep are PET, PVA and AR. HDPE and PP exhibit very
large creep and are not recommended for medium/high load requirement structures with more than
a few weeks of service life like embankments, slopes and walls.
CASE STUDIES
Ground improvement utilizing a system comprised of CMCs and geosynthetic reinforced LTP can
address multiple geotechnical issues: lack of bearing capacity, low factor of safety against
rotational and translational failures, excessive deformation, sliding, soil extrusion, lateral
deformations and need of distribution of stresses to the supporting columns.
For the two case studies presented, significant fills were planned over top of soft soils
which necessitated a Column Supported Embankment system using CMCs. In both cases, the
initial CMC design was performed first without utilizing reinforcements. The predicted horizontal
deformations using the Finite Element Method were excessive, resulting in high estimated bending
moments and shear stresses in the CMCs. To limit the lateral displacement, aid load transfer into
the CMCs, and improve overall stability, the LTPs for these two embankment systems were
reinforced with high strength PVA geogrids and woven fabrics. The high-tensile-modulus, creep-
Iron Stockpiles. In 2018, construction commenced on a new production plant for hot-briquetted
iron in Toledo, OH. The selected location was a brownfield site which was redeveloped for this
project. The new facility requires significantly less energy for steel production, and generates
lower greenhouse gas emissions than traditional methods. Furthermore, no hazardous or toxic by-
products are generated, and water use and discharges are minimized. Commissioning and startup
of the facility are expected to take place in late 2020.
The iron oxide storage areas had to be designed for stockpiles with heights up to 16 m
(approximately 54 ft), with a material unit weight of approximately 23 kN/m3 (144 lb/ft3). The
underlying soil profile consisted of a small amount of shallow, variable fill over top of a cohesive
glacial till layer. Within the top 9 m (30 ft), the till stratum exhibited only moderate over-
consolidation and fairly low shear strengths. Therefore, high vertical loads combined with the
existing subgrade’s geotechnical parameters posed significant challenges. To mitigate potential
issues, a CSE system with CMC Rigid Inclusions drilled into the deeper, harder till zone was
proposed.
During the design process, the surcharge loads caused excessive predicted lateral forces on
the top portions of the CMCs, especially towards the perimeter of the CMC support grid. Under
the estimated lateral strain, unreinforced CMCs would have been compromised, resulting in loss
of global stability and bearing capacity. Rebar cages within the CMCs to handle these strains were
too costly to the project and would have slowed down the overall schedule. Therefore, the final
design called for a ground improvement system combining CMCs with an LTP reinforced with
transversal layers of woven PVA reinforcement. Figure 3 shows a detail of the typical, PVA, high
strength, high modulus reinforcement material used.
Figure 3. Detail of a high strength, high modulus, PVA reinforcement used on LTPs.
(source: HUESKER Inc.)
The family of materials used, Stabilenka Xtreme, is among the highest strength
geosynthetics produced in the world. On this project, the strongest reinforcement used, had an
Figure 5 illustrates the final predicted lateral movement plot, after incorporation of the
high-stiffness (high tensile modulus) geosynthetic into the model. The reduction in lateral
movement allowed all CMCs to be installed without steel reinforcement, resulting in a rapid and
economical installation process. The CMCs and LTP were completed in 2019, with the stockpiles
reaching full height in 2020 in preparation for startup of the processing facility.
I-75 DiSalle Bridge Replacement Project. This major project by the Ohio Department of
Transportation encompasses the widening and reconstruction of Interstate 75, interchange
reconfigurations, and the replacement of the DiSalle Bridge over the Maumee River in Toledo,
OH.
At the south bridge approach, a historical man-made fill resulting from byproducts from
the glass-making industry formed a variable composite layer known locally as “Rouge”. Most
comparable to an over-saturated silt, this material generally exhibited high moisture contents but
seemingly high undisturbed “strengths” due to chemical cementation. When sheared, however,
the high-water content caused the material to become semi-liquid. Underlying the rouge was a
soft, native silt layer above the dense glacial till bearing layer.
To support significant Mechanically Stabilized Earth (MSE) wall fills in this area up to 9
m (30 ft) high, the DOT proposed a Deep Soil Mixing approach with permitted alternatives. The
selected alternative was comprised of a combination of CMC Rigid Inclusions to support the MSE
walls and retained embankment fills, with Prefabricated Vertical Drains (PVDs, or wick drains) to
accelerate settlement. By draining excess water, the PVDs also served as a contingency to quickly
return the Rouge layer to near its original state if it became disturbed during installation of the
Figure 5. PLAXIS output – lateral deflection – CMCs and geosynthetic supporting iron
stockpile.
(source: Menard Group USA)
In a portion of the south approach, a retention basin in front of the MSE wall posed
considerable design challenges. For the typical MSE wall areas without the basin, the fill in front
of the wall acted as a lateral restraint and the CMCs were designed with only light steel
reinforcement to handle moderate lateral strains. However, in the basin area, the proposed
geometry would potentially cause the wall to slide down into the lower elevation zone in front of
it.
Based on FEM results, this phenomenon resulted in significant predicted lateral
deformations and high bending moments and shear stresses on the majority of the supporting
CMCs. To counteract this effect, the LTP layer between the CMC grid and the MSE wall was
reinforced with a layer of woven PVA reinforcement.
Figure 6 illustrates the FEM lateral movement output plot from the final design, after
incorporating the high-strength geosynthetic, as well as the typical soil profile. The strong direction
of the geosynthetic was oriented perpendicular to the wall to resist the tendency for the wall to
move outward and limit overall deformation. This resulted in reduced lateral stresses on the CMC
elements, limited the amount steel reinforcement in the inclusions, and allowed the design to meet
a strict 13 mm (0.5-inch) post-paving settlement criterion. The CMCs, PVDs, and LTP for the
first phase of the bridge re-construction were installed in 2019 and 2020 (Figure 7), with the final
phase of ground improvement planned for 2021.
Figure 7. CMC rigid inclusion installation at the DiSalle Bridge Replacement Project.
(source: Menard Group USA)
Different methods are available to allow for the construction of embankments on weak soils. The
ground improvement technique comprised of CMCs and high strength, high modulus reinforced
LTPs offers an efficient, simple and cost-effective solution for this type of construction.
The geosynthetic reinforcement can have multiple functions when utilized as part of an
LTP. The foundation system, including the platform, shall be designed considering multiple
loading conditions, and through the use of safe, non-simplified design methods which take into
account soil parameters and material stress-strain behaviors.
This paper discussed the utilization of high strength, high modulus PVA geogrids and
woven fabrics for the primary purpose of minimizing horizontal stresses on CMCs, so that the
need for rebar reinforcement can be eliminated or greatly reduced.
Two successful, high profile projects where high surcharge embankments were to be built
on challenging soil conditions were presented. The foundation solution for both cases was the
combination of CMC grids overlaid by high strength, high modulus reinforced LTPs.
REFERENCES
Ariyarathne, P. and Liyanapathirana, D.S. (2015), Review of existing design methods for
geosynthetic-reinforced pile-supported embankments, Soils and Foundations, The Japanese
Geotechnical Society, 55(1):17-34.
German Geotechnical Society (2010), Recommendations for Design and Analysis of Earth
Structures Using Geosynthetic Reinforcements – EBGEO, Ernst & Sohn, Munich, Germany.
BS 8006-1:2010. Code of Practice for Strengthened/Reinforced Soils and other Fills, British
Standards Publication.
ABSTRACT
This paper focuses on the use of prefabricated thermal drains to improve saturated clay layers
using heating. A prefabricated thermal drain can be formed by integrating a closed-loop
geothermal heat exchanger within a conventional prefabricated vertical drain (PVD). Prefabricated
thermal drains can be installed in a similar way to a PVD but operate by circulating a heated fluid
through the heat exchanger tubing to induce an increase in temperature of the soft clay. This
increase in temperature will lead to thermal consolidation, which can be accelerated by drainage
through the PVD. Although thermal drains have been tested in proof of concept field experiments,
there are still several variables that need to be better understood. This paper presents numerical
simulations of the coupled heat transfer, water flow, and volume change in layers of kaolinite, illite
and smectite clays where a prefabricated thermal drain was embedded. Thermally induced excess
pore water pressures and a slight initial expansion was observed for clay layers with low hydraulic
conductivity. However, the overall volume change resulted in contraction where the rate as well
as the magnitude of settlement was greater for a thermal PVD compared to a conventional PVD.
A further analysis on kaolinite layers at different initial porosities indicated that the increase in the
magnitude of settlement observed when using a thermal PVD was independent of the hydraulic
conductivity of the clay whereas the increase in the rate of settlement was more pronounced for
clays with lower hydraulic conductivity.
INTRODUCTION
Soft soil deposits often cause issues for structural stability due to their undesirable properties such
as high compressibility and low shear strength. Prefabricated vertical drains (PVD) are widely
used for ground improvement prior to construction. A PVD is a type of geosynthetic consisting of
a perforated plastic core with high transmissivity wrapped with a nonwoven geotextile that
provides filtration. PVDs help accelerate drainage processes in soft soils by shortening the
drainage path for excess pore water pressures and shortening the time required for consolidation.
PVDs are typically used in combination with a surcharge to induce an excess pore water pressure.
Although the use of PVDs helps expedite consolidation of soft clay layers, there still exist
challenges when they are being used in ground improvement applications. Installing and
maintaining a stable embankment above the clay layer may be expensive and time consuming,
especially for very soft soils. Furthermore, in some instances the time required for primary
consolidation can still be significant. PVDs are installed in the field using a mandrel and the
installation process causes disturbance of the soil adjacent to the drain. This region of disturbance
is referred to as the smear zone and several researchers have investigated its effects on the
performance of PVDs (e.g., Hansbo 1981, Indraratna and Redana 1998). The hydraulic
BACKGROUND
A thermal PVD is a prefabricated vertical drain which can also behave as a geothermal heat
exchanger. This can be achieved by placing closed-loop plastic tubing within or around the core
of a conventional PVD through which heated fluid will be circulated. A limited number of studies
found in literature observed an increase in the magnitude as well as the rate of settlement when
using thermal PVDs in lieu of conventional PVDs (Abuel-Naga et al. 2006, Pothiraksanon et al.
2010, Artidteang et al. 2011, Salager et al. 2012).
In these studies, thermally induced excess pore water pressures, increases in hydraulic
conductivity and thermo-plastic volumetric strains in normally consolidated clays due to elevated
temperatures were found to be factors influencing the settlements observed in soil surrounding a
thermal PVD. Excess pore water pressure generation at elevated temperatures in undrained or
partially drained soils has been observed by several researchers (Campanella and Mitchell 1968,
Hueckel and Pellegrini 1992, Abuel-Naga et al. 2006). The generation of thermally induced excess
pore water pressure is attributed to the differences in the coefficients of thermal expansion of soil
particles and the pore fluid. The soil will undergo volumetric contraction as the excess pore water
pressures are dissipated.
An increase in temperature will also decrease the density and viscosity of the pore fluid
which will result in an increase in hydraulic conductivity. The relationship between hydraulic
conductivity (k) with fluid and soil properties can be understood using the definition of the intrinsic
permeability K in Equation 1.
𝑘𝑘𝜂𝜂𝑤𝑤
𝐾𝐾 = [1]
𝜌𝜌𝑤𝑤 𝑔𝑔
where K is the intrinsic permeability, ηw is the dynamic viscosity of the fluid, ρw is the fluid density
and g is the coefficient of gravity. An increase in hydraulic conductivity was observed with an
increase in temperature by Abuel-Naga et al. (2006) for Bangkok clay. However, the intrinsic
permeability was found to be independent of temperature. The density of water will vary with
𝜕𝜕𝜌𝜌𝑤𝑤 𝜕𝜕𝜕𝜕
= −𝜌𝜌𝑤𝑤 𝛼𝛼𝑤𝑤 [2]
𝜕𝜕𝜕𝜕 𝜕𝜕𝜕𝜕
Many studies have investigated the changes in volume of soils with changes in temperature
under different stress states and drainage conditions (e.g., Campanella and Mitchell 1968, Baldi et
al. 1980, Abuel-Naga et al. 2006). Most relevant to the application of thermal PVDs in ground
improvement is that normally consolidated clays experience permanent, plastic volumetric
contraction during drained heating (Abuel-Naga et al. 2006). On the other hand, overconsolidated
soils typically show recoverable, elastic volumetric expansion during drained heating. These
thermally induced volume changes are attributed to a thermal yielding mechanism that has been
integrated into thermo-elasto-plastic models (Hueckel and Borsetto 1990, Cui et al. 2000, Laloui
and Cekerevac 2003, Abuel-Naga et al. 2006). A thermal yield limit is defined for the soil where
thermo-elastic strains occur at stress levels or temperatures below the thermal yield limit whereas
thermo-plastic strains occur at stress levels on or above the thermal yield limit. Using a thermo-
elasto-plastic model, Laloui and Cekerevac (2003) proposed the following relationship to obtain
the thermo-plastic volume changes for normally consolidated soils during drained heating.
(1+𝑒𝑒0 )𝛾𝛾𝛾𝛾𝛾𝛾
𝜕𝜕𝑒𝑒𝑇𝑇 = 𝑇𝑇 [4]
2.303𝛽𝛽𝛽𝛽(1−𝛾𝛾𝛾𝛾𝛾𝛾𝛾𝛾�𝑇𝑇 �)
0
where γ is a material parameter, e0 is the initial void ratio, β is the inverse of the plastic
compressibility and T0 is the room temperature.
When a thermal PVD is being used, the temperature of the surrounding soil will increase.
Heat transfer through the soil medium can be considered using Fourier’s law and energy
conservation principles. This increase in temperature will impact the fluid flow through the porous
media by thermally induced excess pore water pressures and increased hydraulic conductivity.
Fluid flow through the porous media can be expressed using principles of mass conservation and
Darcy’s law where Equations 2 and 3 can be incorporated to account for the effects of temperature.
The volume change in a thermal PVD application will consist of mechanical and thermal
components. The mechanical volume change due to a surcharge can be obtained using
compressibility relationships for a normally consolidated clay. The thermo-plastic volume changes
are obtained using a constitutive relationship as shown in Equation 4. For a simultaneous
application of a surcharge and heat, the total stress will remain constant. The change in effective
stress resulting from a change in the pore water pressure can be obtained by subtracting the pore
water pressure from the total stress. Furthermore, the volume change will also lead to a change in
the thermal conductivity of the bulk soil. As the void space reduces, more heat conduction can
occur through the soil particles. The theoretical framework and the numerical formulation
simulating the coupled phenomena of heat transfer, fluid flow and volume change in soft clay
surrounding a thermal PVD are described in detail in previous work by the authors (Samarakoon
and McCartney 2020). The numerical model was validated using experimental data available in
literature. A parametric analysis conducted on the performance of a thermal PVD showed that the
NUMERICAL STUDY
Soil domain geometry. To simulate the soil behavior around a thermal PVD, a finite soil domain
was considered with a single thermal PVD located at the center. A clay layer with a diameter of
0.45 m and a height of 0.7 m was considered in this analysis, where radial drainage was only
permitted at the location of the thermal PVD (i.e., no vertical drainage or drainage from the outer
boundary). The dimensions of the clay layer are similar to those of the large-scale consolidometer
experiment performed by Artidteang et al. (2011) A 50 kPa surcharge was applied to the saturated
clay layer simultaneously with an increase in temperature along the length of the thermal PVD
from 25 °C to 90 °C. The clay layer was assumed to be normally consolidated under the surcharge.
A schematic of the arrangement of the thermal PVD in the clay layer is shown in Figure 1. Heat
transfer and fluid flow were considered to be axisymmetric about the axis of the drain for the
numerical simulation presented in this study. The variation of temperature in the vertical direction
was assumed to be uniform thereby simplifying the geometry to a radial drainage problem. The
outer edge of the cylinder acts as an oedometer which has zero radial strain. A radial variation in
void ratio is expected due to heating from the central thermal PVD. The surcharge is applied in
stress-control conditions so settlements in the clay layer can be nonuniform as a function of the
radius from the thermal PVD. The settlement values presented in this presentation are for the
surface at a radius of 112.5 mm from the center, except in the case that radial settlement profiles
are shown.
Figure 1. Schematic diagram of the thermal PVD arrangement in a finite soil domain.
Boundary and initial conditions. A constant temperature boundary condition was imposed at the
thermal drain whereas a convective temperature boundary condition was maintained at the outer
edges of the clay layer. A constant hydrostatic pressure boundary was also applied at the drain
location and the far field fluid velocity was taken as zero (i.e., no flow). The initial temperature in
the soil domain was 25 °C and the initial pore water pressure was determined based on the
hydrostatic conditions and the applied surcharge. The initial porosity of the three clay layers
considered (kaolinite, illite, and smectite) was 0.5.
Material properties. This study focuses on the behavior of three clay types surrounding a thermal
PVD: kaolinite, illite and smectite. A detailed study on the hydraulic conductivity of these clays
as a function of void ratio was conducted by Mesri and Olson (1971). They found that the hydraulic
conductivity is sensitive to the clay mineralogy and associated particle size and shape as well as
the interaction of the clay particles with the pore fluid. For the void ratio of 0.5 considered in this
study, kaolinite will have the highest hydraulic conductivity while smectite will have the lowest
as shown in Table 1. The other material parameters used in the numerical simulation including the
compressibility indices and the material specific thermal parameter, γ were obtained from literature
(Laloui et al. 2008, Ye et al. 2015). The material parameters for each soil type are summarized in
Table 1. The thermal conductivity and the specific heat capacity of soil particles were assumed to
be 1.9 W/m/°C and 1500 J/kg/°C, respectively, for all three soil types for simplicity. It is
acknowledged that the clay mineralogy likely affects the particle thermal conductivity values, but
this topic has not been well studied in the literature. The thermal conductivity of pore water was
0.6 W/m/°C. The poromechanics approach used in the analysis permits consideration of changes
in thermal conductivity of the bulk soil with changes in volume.
Table 1. Material parameters of clays (Mesri and Olson 1971, Laloui et al. 2008, Ye et al.
2015).
Parameter Kaolinite Illite Smectite
Specific gravity 2.66 2.72 2.69
Hydraulic conductivity at room temperature (m/s) 7.75×10-9 5.50×10-11 1.35×10-12
Initial porosity 0.5 0.5 0.5
Initial total unit weight (kN/m3) 1830 1860 1845
κ (slope of RCL) 0.01 0.02 0.04
λ (slope of VCL) 0.07 0.11 0.40
γ (soil thermal volume change parameter) 0.53 0.56 1.16
Heat Transfer. A thermal PVD leads to an increase in temperature of the surrounding clay due to
radial heat transfer through the soil medium. Spatial as well as temporal variations of temperature
within the clays were obtained for each type of clay. The time series of temperature at different
radial distances for each clay type is shown in Figure 2. The results in Figure 2 indicate that the
soil domain reached thermal equilibrium after about 100 hrs. The locations closer to the drain
reached higher temperatures at equilibrium whereas locations farther away reached lower
temperatures at equilibrium.
Temperature (°C)
50 50
40 40
Radial Distance Radial Distance
30 30 22.5 mm
22.5 mm
20 45 mm 20 45 mm
90 mm 10 90 mm
10
202.5 mm 202.5 mm
0 0
0.1 1 10 100 1000 0.1 1 10 100 1000
Time (hrs) Time (hrs)
(c) 80
70
60
Temperature (°C)
50
40
30 Radial Distance
22.5 mm
20 45 mm
10 90 mm
202.5 mm
0
0.1 1 10 100 1000
Time (hrs)
Figure 2. Time series of temperature for (a) kaolinite; (b) illite; (c) smectite.
Excess pore water pressure. The excess pore water pressures generated in each clay layer at a
radial location halfway between the thermal PVD and the edge of the container are shown in
Figures 3-5. Two cases were compared in which the drain temperature was maintained at 25 °C
and 90 °C. The drain temperature of 25 °C is considered to be representative of a conventional
PVD where excess pore water pressures are generated only due to the application of the surcharge,
whereas the temperature of 90 °C represents a thermal PVD with excess pore water pressures
induced by both the surcharge and heating. For kaolinite, the excess pore water pressures generated
at both temperatures seem to be almost the same. However, the excess pore water pressures at 90
°C dissipates at a faster rate compared to that at 25 °C. For illite, a higher magnitude of excess
pore water pressure is observed at 90 °C. Although the initial excess pore water pressure is higher
at 90 °C, it is still observed to dissipate faster compared to a conventional PVD. Thermally induced
excess pore water pressures are also observed in the smectite layer and their magnitudes are greater
than those observed for illite. The dissipation of excess pore water pressures in smectite with both
a conventional as well as a thermal PVD occur over a similar duration of time.
The differences observed in the generation of excess pore water pressures can be
attributed to the different hydraulic conductivity values of each clay type. In the relatively fast-
draining kaolinite layer, almost no thermally induced excess pore water pressure is generated at
this location for the setting considered in this study. The main contribution to excess pore water
pressure is from the applied surcharge load. On the other hand, in the slower draining clay layers
of illite and smectite, some thermally induced excess pore water pressure is observed as the
temperature is increased from 25 to 90 °C. The sudden increase in temperature and the low
hydraulic conductivity value in a partially drained condition may have resulted in the observed
90
80 25 °C
Excess pore water pressure
70 90 °C
60
50
(kPa)
40
30
20
Surcharge = 50 kPa
10
r = 112.5 mm
0
Time (hrs)
Figure 3. Excess pore water pressure during consolidation in kaolinite.
90
25 °C
80
Excess pore water pressure
90 °C
70
60
50
(kPa)
40
30
20
Surcharge = 50 kPa
10
r = 112.5 mm
0
Time (hrs)
Figure 4. Excess pore water pressure during consolidation in illite.
Volume change. With simultaneous application of a surcharge load and heat, the clay layer will
be subjected to mechanically induced as well as thermally induced strains. Mechanically induced
contractile strains can be obtained using the one dimensional compressibility relationships for a
normally consolidated clay. Thermo-plastic contractile strains were obtained from the relationship
proposed by Laloui and Cekerevac (2003) shown in Equation 4, which is only valid for normally
consolidated soils.
A comparison of settlements obtained when using a conventional PVD and a thermal PVD
for each clay type are shown in Figures 6-8. For all three clay types an increase in the magnitude
90
25 °C
80
Excess pore water pressure 90 °C
70
60
50
(kPa)
40
30
20
Surcharge = 50 kPa
10
r = 112.5 mm
0
Time (hrs)
Figure 5. Excess pore water pressure during consolidation in smectite.
Time (hrs)
-0.2
25 °C
Normalized Settlement
0.0 90 °C
0.2
0.4
0.6
An interesting observation made from the simulation results was the slight initial expansion
observed in illite and smectite clay layers at 90 °C. Thermally induced excess pore water pressures
were observed in the same two clays. As discussed in the previous section, under partial drainage
conditions, some initial expansion can be expected corresponding with the increase in thermally
induced excess pore water pressure. Laboratory tests conducted by Campanella and Mitchell
(1968) and Ghaaowd et al. (2016) where soil specimens were subjected to an increase in
temperature under fully undrained conditions have reported expansion during heating. However,
as the clay layer continues to drain, volumetric contraction occurs and the net volume change at
the end of consolidation results in contraction. A closer observation of the impact of temperature
on the initial expansion and excess pore water pressure in smectite is shown in Figure 9. It can be
Time (hrs)
-0.2
25 °C
Normalized Settlement
0.0 90 °C
0.2
0.4
0.6
0.8 Surcharge = 50 kPa
r = 112.5 mm
1.0
Figure 7. Comparison of settlement curves obtained in illite.
Time (hrs)
-0.2
25 °C
Normalized Settlement
0.0 90 °C
0.2
0.4
0.6
0.8 Surcharge = 50 kPa
r = 112.5 mm
1.0
Figure 8. Comparison of settlement curves obtained in smectite.
Hydraulic Conductivity. The hydraulic conductivity of the soil surrounding a thermal PVD will
increase as the temperature of the soil domain increases. This increase can be obtained using
Equations 1 and 3. For the clay types evaluated in this study, the hydraulic conductivity of the clay
when using a thermal PVD was 1.62 times faster than the hydraulic conductivity of the clay when
a conventional PVD was being used. Pothiraksanon et al. (2010) estimated the hydraulic
conductivity with a thermal PVD to be 1.8 time faster when compared to the hydraulic conductivity
with a conventional PVD for a field scale test on Bangkok clay. For, the clay types considered in
this study, the decrease in viscosity of the pore fluid for a given temperature increment will be the
0.00 70
50 °C
60
70 °C 50
0.05
(kPa)
90 °C 40 25 °C
30 40 °C
0.10 20 50 °C
Surcharge = 50 kPa Surcharge = 50 kPa 70 °C
r = 112.5 mm 10
r = 112.5 mm 90 °C
0.15 0
0.2
0.4
0.6
0.8
1.0 Kaolinite
1.2 Illite
Smectite
1.4
Figure 10. Radial profile of equilibrium settlement obtained from a thermal PVD.
Normalized Settlement
90 °C 90 °C
0.02 0.02
0.04 0.04
0.06 0.06
0.08 0.08
0.10 0.10
Surcharge = 50 kPa Surcharge = 50 kPa
0.12 0.12 r = 112.5 mm
r = 112.5 mm
0.14 0.14
Figure 11. Comparison of settlement curves in kaolinite; (a) n = 0.43 (b) n = 0.67.
0.14
0.12 25 °C
Normalized Settlement
0.1 90 C°
0.08
0.06
0.04
0.02
0
1.E-11 1.E-10 1.E-09 1.E-08 1.E-07 1.E-06
Hydraulic conductivity (m/s)
Figure 12. Effect of hydraulic conductivity on equilibrium settlement in kaolinite.
CONCLUSION
A study was conducted on the performance of a thermal PVD on saturated normally consolidated
layers of kaolinite, illite and smectite clay. Specifically, a simultaneous application of mechanical
and thermal loads was considered and the coupled processes of heat transfer, fluid flow and volume
change were simulated using a numerical model. In general, the main conclusion is that the
properties of the clay will determine the effectiveness of thermal consolidation as a means of soil
improvement. Thermally induced excess pore water pressures were initially observed for the low
permeability illite and smectite clay layers, but not in the higher permeability kaolinite clay layer.
At the same time, a slight initial expansion was also observed in the illite and smectite clay layers.
The observed initial expansion and the thermally induced excess pore water pressure were found
to increase with an increase in applied temperature to the thermal PVD. Despite the difference in
initial behavior for the illite, smectite, and kaolinite clays, a net contraction was observed for all
three clay layers with an increase in the rate as well as magnitude of settlement when a thermal
PVD was used. An analysis conducted on the effect of hydraulic conductivity on the performance
of a thermal PVD in kaolinite also observed a slight initial expansion for the clay layer with low
hydraulic conductivity. Clay layers with different hydraulic conductivity values was observed to
have a similar increase in the magnitude of settlement obtained when using a thermal PVD.
However, the effect of temperature on the rate of settlement is more significant for clay layers with
low hydraulic conductivity. A study on the use of a thermal PVD in different clay types
demonstrated that some initial expansion would occur in clays with low hydraulic conductivity
values. As this was dependent on the magnitude of temperature at the drain, slower heating using
ACKNOWLEDGEMENTS
Funding from NSF grant CMMI 1941571 is appreciated. The opinions are those of the authors.
REFERENCES
Abuel-Naga, H.M., Bergado, D.T. and Suttisak, S. (2006). Innovative thermal technique for
enhancing the performance of prefabricated vertical drain system, Geotextiles and
Geomembranes, 24(6): 359–370.
Artidteang, S., Bergado, D.T., Saowapakpiboon, J., Teerachaikulpanich, N. and Kumar, A. (2011).
Enhancement of efficiency of prefabricated vertical drains using surcharge, vacuum and heat
preloading, Geosynthetics International, 18(1): 35–47.
Baldi, G., Hueckel, T. and Pellegrini, R. (1988). Thermal volume changes of the mineral-water
system in low-porosity clay soils, Canadian Geotechnical Journal, 25(4): 807–825.
Campanella, R.G. and Mitchell, J.K. (1968). Influence of temperature variations on soil behavior,
Journal of the Soil Mechanics and Foundation Division, ASCE, 94(3): 709–734.
Cui, Y.J., Sultan, N. and Delage, P. (2000). A thermomechanical model for clays, Canadian
Geotechnical Journal, 37(3): 607–620.
Ghaaowd, I., Takai, A., Katsumi, T. and McCartney, J.S. (2017). Pore water pressure prediction
for undrained heating of soils, Environmental Geotechnics, 4(2): 70–78.
Hansbo, S. (1981). Consolidation of fine-grained soils by prefabricated drains, 10th International
Conference on Soil Mechanics, A.A. Balkema, Ed., Stockholm, Sweden: 3: 677-682.
Hillel, D. (1980). Fundamentals of Soil Physics, Academic Press, New York, NY, USA.
Hueckel, T. and Borsetto, M. (1990). Thermoplasticity of saturated soils and shales: Constitutive
equations, Journal of Geotechnical Engineering, 116(12): 1765-1777.
Hueckel, T. and Pellegrini, R. (1992). Effective stress and water pressure in saturated clays during
heating-cooling cycles, Canadian Geotechnical Journal, 29(6): 1095-1102.
Indraratna, B. and Redana, I.W. (1998). Laboratory determination of smear zone due to vertical
drain installation, Journal of Geotechnical Engineering, ASCE, 124(2): 180-184.
Laloui, L. and Cekerevac, C. (2003). Thermo-plasticity of clays: an isotropic yield mechanism,
Computers and Geotechnics, 30(8): 649-660.
Laloui, L., Leroueil, S. and Chalindar, S. (2008). Modelling the combined effect of strain rate and
temperature on one-dimensional compression of soils, Canadian Geotechnical Journal, 45(12):
1765-1777.
Mesri, G. and Olson, R.E. (1971). Mechanisms controlling the permeability of clays, Clays and
Clay Minerals, 19(3): 151-158.
Pothiraksanon, C., Bergado, D.T. and Abuel-Naga, H.M. (2010). Full-scale embankment
consolidation test using prefabricated vertical thermal drains, Soils and Foundations, 50(5):
599-608.
Salager, S., Laloui, L. and Nuth, M. (2012). Efficiency of thermal vertical drains for the
consolidation of soils, 2nd International Conference on Transportation Geotechnics, Hokaido,
Japan. 1-10.
Samarakoon, R.A. and McCartney, J.S. (2020). Simulation of prefabricated thermal drains in soft
clay, GeoAmericas 2020: Proc. of the 4th Pan American Conference on Geosynthetics, 1-9.
ABSTRACT
North Central DuPage Regional Trail over County Farm Road (Key Route 0362) is a three-span,
Prefabricated Pedestrian Bridge. There are two piers and two Geosynthetic Reinforced Soil
abutments. This is Illinois’s Second Geosynthetics Abutments. The owner of this bridge is Forest
Preserve District of DuPage County. The Geosynthetic Reinforced Soil (GRS) Integrated Bridge
System (IBS) provides an economical solution to accelerated bridge construction. During the
preliminary design of North Central DuPage Regional Trail over County Farm Road Bridge,
different types of abutments such as full height abutments, stub abutments, integral abutments on
pile foundation, and Geosynthetic Reinforced Soil abutments are investigated. Geosynthetic
Reinforced Soil abutments yields most economical solution at this bridge site, also shortens the
construction schedule.
INTRODUCTION
The Geosynthetic Reinforced Soil (GRS) Integrated Bridge System (IBS), FHWA (2018)
provides an economical solution to accelerated bridge construction. Employing this technology
will help agencies save both time and money in planning and executing projects. GRS-IBS is a
fast, cost-effective method of bridge support that blends the roadway into the superstructure to
create a jointless interface between the bridge and the approach (FHWA (2018)). With GRS-
IBS, shallow foundation is typically used to support the superstructure, which would be cheaper
than deep foundation. It consists of three main components: the reinforced soil foundation
(RSF), the abutment, and the integrated approach. The RSF is composed of granular fill material
that is compacted and encapsulated with a geotextile fabric. It provides embedment and increases
the bearing width and capacity of the GRS abutment. It also prevents water from infiltrating
underneath and into the GRS mass from a river or stream crossing. This method of using
geosynthetic fabrics to reinforce foundations is a proven alternative to deep foundations on loose
granular soils, soft fine-grained soils, and soft organic soils. The abutment uses alternating layers
of compacted fill and closely spaced geosynthetic reinforcement to provide support for the
bridge, which is placed directly on the GRS abutment without a joint and without cast-in-place
(CIP) concrete. GRS is also used to construct the integrated approach to transition to the
superstructure. This bridge system therefore alleviates the “bump at the bridge” problem caused
by differential settlement between bridge abutments and approach roadways.
The North Central DuPage Regional Trail (NCDRT) is a 19-mile trail spanning northern DuPage
County. Stretching from Roselle to Wayne, the eastern terminus of the NCDRT connects to
trails in Cook County that merge at Busse Woods Forest Preserve in Elk Grove. This Trail has
been planning since 2000.
As part of this 19-mile trail, North Central DuPage Regional Trail over County Farm
Road (Key Route 0362) is a three-span, Prefabricated Pedestrian Bridge. There are two piers and
DESIGN PROCEDURE
Pre-fabricated truss is selected to speed up the construction and reduce the traffic impact on
County Farm Road. For Spans 1 and 2, constant depth trusses are selected to reduce the cost. For
Span 3 over County Farm Road, variable depth truss (top chord has parabolic curve) is selected
to have aesthetic appearance.
Before starting the spread footing design, the designer needs to contact the prefabricated
truss vendor for reactions under dead load and live load. Then, contact the geotechnical engineer
for allowable soil pressure or soil bearing resistance.
The design of spread footing is pretty straight. First, line up the bearing with centerline of
spread footing to avoid the eccentric bending. Once footing size can be easily determined with
vertical loads and bearing resistance. The footing thickness is designed by bending and shear.
The pier was designed by vertical load (dead load from pier self-weight and superstructure and
live load) and wind loads.
Hammerhead Pier with architecture treatment (Form Liner) is selected to have aesthetic
appearance. The pier is founded on spread footing, which is much cheaper than deep foundation.
CONSTRUCTION
The bridge plans were bided on 03/04/2016. The winning/lowest bid is $2,354,372 (max bid
price is $4,392,786), which is much higher than engineer’s estimate of $1,264,000 because some
unit prices engineer was using were too low because not too many projects using for GRS-IBS.
Obviously, the unit price used for GRS-IBS is too low. Martam Construction Incorporated was
selected to build the bridge. The construction sequences are:
1. Build embankment
2. Build geosynthetic abutments and piers at the same time.
3. Once substructure construction was completed, erect pre-fabricated truss
4. Cast concrete deck
5. Open to pedestrians and bikers.
The project, which was completed within 95 working days on May 15, 2017, The Geosynthetic
Reinforced Soil abutments were completed in about three months. The following is a list of
figures took during construction.
1. Fig. 2 Building Geosynthetics Abutments
CONCLUSION
The Geosynthetic Reinforced Soil (GRS) Integrated Bridge System (IBS) provides an
economical solution to accelerated bridge construction. Spread footing is typically used at
abutments, which is much cheaper than pile foundations. Pedestrian bridges or steel bridges with
short spans would be good candidates to use The Geosynthetic Reinforced Soil (GRS) Integrated
Bridge System.
REFERENCES
FHWA (2018), Michael Adams and Jennifer Nicks, “Design and Construction Guidelines for
Geosynthetic Reinforced Soil Abutments and Integrated Bridge Systems”, PUBLICATION NO.
FHWA-HRT-17-080, The FHWA Office of Bridges and Structures, 1200 New Jersey Avenue,
SE, Washington DC 20590, June 2018.
Forest Preserve District of DuPage County (2018), “Forest Preserve District of DuPage County
Earns Two Awards for County Farm Road Bridge Project”
ABSTRACT
The paper describes the construction procedure and load-testing of two instrumented, large-scale
model Geosynthetic Reinforced Soil (GRS) abutments in an outdoor test station. The models were
built in conformance with the FHWA recommendations relative to the type and quality of materials
used, reinforcement length and spacing. The two models were comparable to each other except for
their facing configuration. One model was built with cored concrete masonry units (CMU),
whereas the other model was built using significantly larger solid concrete blocks. It was observed
that using large concrete blocks for the facing helped with the construction quality, construction
speed and performance of the GRS abutments, and hence, their use is recommended for field
applications where possible.
INTRODUCTION
Geosynthetic Reinforced Soil-Integrated Bridge Systems (GRS-IBS) have gained increased
popularity for new or replacement projects in local and county roads across the United States due
to several observed advantages over conventional methods, including faster construction at
reduced costs, and allowing to eliminate the ‘bump at the end of bridge’ problem (Adams et al.
2011, 2012; Adams and Nicks 2018). GRS abutments and GRS-IBS as a bridge system have been
the subject of several studies in recent years. A review of selected related studies is provided in
the papers by Xu et al. (2020) and Doger and Hatami (2020).
In the design of GRS abutments, any possible structural contribution of the facing is not
relied upon in the current guidelines (e.g. Adams and Nicks 2018) due to the self-contained
structural integrity of the composite fill with tightly spaced reinforcement. Therefore, different
facing configurations can be used merely to protect the fill against erosion, sloughing, scour (e.g.
in combination with rip rap or other means as necessary) and similar non-structural factors.
At the same time, a large variety of concrete blocks are currently available for use in
Mechanically Stabilized Earth (MSE) and other similar applications at affordable costs. Therefore,
the focus of this study was to investigate the potential advantages of using large concrete blocks
over the more commonly used, cored concrete masonry units (CMU) relative to the construction
quality and speed of GRS abutments, and their load-bearing performance.
EXPERIMENTAL
Figures 1 and 2 show schematic cross-sections and elevation-view photographs of the two GRS
abutment models examined in this paper, respectively. The two instrumented, large-scale (2.45 m-
high) models were constructed in an outdoor test chamber with inside dimensions of 2.75 m (H) ×
Figure 1. Schematic cross-sections and instrumentation layouts for the GRS model
abutments in this study (Doger 2020, Doger and Hatami 2020): (Left) Model #1, (Right)
Model #2 (Dimensions shown are in inches; 1 in. = 25.4 mm).
Figure 2. Elevation views of GRS abutment models #1 (left) and #2 (right) at end of
construction (Doger 2020, Doger and Hatami 2020).
Materials. The models were built using the same materials and construction procedures except for
the size of their facing blocks as shown in Figure 1, and as described below: Model #1 was built
using 12 courses of 200 mm × 200 mm × 400 mm cored concrete masonry units (CMU) with
reinforcement spacing, Sv = 200 mm, to a full height of H1 = 2.40 m. Model #2 was built with 4
courses of much larger (i.e. 0.6 m × 0.6 m × 1.2 m) solid blocks for its facing to a full height of H2
= 2.45 m with the same reinforcement spacing. Both types of blocks were available from a local
% Finer by weight
3/8" Cover #2 60
50
40
30
20
10
0
100 10 1 0.1 0.01
Sieve Opening Size (mm)
The reinforcement material used in the abutment models was a polypropylene woven
geotextile, with an ultimate strength of 70 kN/m in both machine (MD) and cross-machine
directions (XD) as per the ASTM D4595 test protocol. Details of reinforcement instrumentation
using WP are given in the paper by Doger and Hatami (2020).
Construction and Load Testing of Models. The GRS abutment models were built in 200 mm
lifts using a Jumping Jack compactor in an inward spiral pattern. Backfill compaction using the
jumping jack in Model #1 was kept limited to 0.45 m away from the back of the CMU facing - as
recommended in FHWA guidelines - to minimize the anticipated block movements during the
compaction process. Instead, a 250 mm × 250 mm-plate steel hand tamper was used to compact
the fill immediately behind the facing. Additionally, each course of CMU blocks in Model #1 was
placed with a 13 mm setback for the same reason, and to counter a negative facing batter at the
end of construction. The setback placement of the blocks started with the fifth course when
detectable compaction-induced deformation started to occur at that level. In contrast, backfill
compaction using the Jumping Jack compactor was done with no problem all the way to the back
of the large facing blocks in Model #2, and no setback placement of blocks was necessary to
counter block movements during construction.
Construction speed was found to be faster in the case of Model #2 for the above reason,
and due to significantly fewer blocks that needed to be placed for comparable lifts of backfill.
Model #1 required 74.5 person-hours to complete, which also included time required for steel rod
and grouting of the top three courses as per the FHWA guidelines. In comparison, Model #2 took
53.5 person-hours to complete.
Once the construction of each model abutment was complete, the surcharge loading
assembly was completed on the top of the abutment fill. A 2.45 m-long × 0.20 m-wide loading
beam was placed and leveled, and additional steel blocks were used underneath the hydraulic
cylinders as necessary to ensure a uniform application of vertical loading on the beam. The vertical
load was applied in 50-100 kN increments followed by a pausing period of several minutes to
ensure that readings from the load cells were stabilized before the next loading step was applied.
Once the load level on each model reached a magnitude that was considered safe to terminate the
loading, the loading assembly was dismantled, and the models were deconstructed in lifts.
Figure 4 shows load-settlement responses of the two model abutments at the top surface under the
loading beam. FHWA design values for the bridge abutment service load (190 kPa = 4 ksf) and
settlement (i.e. 0.50% of the abutment height = 0.50% × 2.40 m = 12 mm) are also shown in the
figure for comparison purposes.
Results in Figure 4 show steady and nearly linear performances for both abutment models
throughout their loading stage. Model #1 was subjected to significantly larger loads with the initial
objective to determine its load-bearing capacity and observe possible modes of failure. However,
apart from a 160 mm of settlement directly underneath the loading beam at 1,572 kN of surcharge
load (353.25 kips, equivalent to 3,380 kPa of vertical stress on the abutment), no significant sign
of excessive deformation or instability was observed. Therefore, it was decided to abort the load
testing procedure for safety reasons, and to prevent the loading frame from overstressing
excessively. Load testing of Model #2 was aborted at smaller surcharge load for the same reasons.
Nevertheless, results in Figure 4 clearly indicate that Model #2 with large-block facing was
significantly stiffer and projected to be much stronger than Model #1. For instance, measured
settlement in Model #2 at its maximum load of 1,050 kN was only 56 mm, compared to 95 mm in
Model #1 (i.e. 41% less settlement at the same load level). The maximum loads applied on both
models were nonetheless an order of magnitude larger than the service load requirement of 190
kPa in the FHWA guidelines.
Maximum lateral movements during construction in both models, measured at the crown
of each facing configuration, were equal to 130 mm and 15 mm in Models #1 and #2, respectively
(Doger and Hatami 2020). A significant part of these lateral deformations are attributed to a
cumulative, compaction-induced movement of the facing blocks over the height of each facing.
Since there were significantly more courses of smaller blocks in Model #1, the cumulative effect
Figure 5. Facing deformations (from mean values of WP readings) at the top for the two
abutment models during surcharge loading (Doger 2020, Doger and Hatami 2020)
(1 in. = 2.54 mm, 1 ksf = 47.88 kPa).
Figure 6 shows facing deformation profiles for the two abutment models under different
magnitudes of surcharge load during the tests. Similar to the results in Figure 5, data in Figure 6
show that facing deformations of both model abutments were significantly smaller than the
limiting value recommended in the FHWA guidelines (i.e. 25 mm), and never reached this limit
even after they had been subjected to a surcharge load 10 times as large as the design value (i.e.
1,900 kPa = 40 ksf).
Figure 7 shows an example plan view of WP connections to a reinforcement layer in the
model abutments in this study. The diagram is shown for the top reinforcement layer at 2.31 m (91
in.) above the foundation slab in GRS Abutment Model #2. Figure 8 shows the corresponding data
during surcharge loading and after complete removal of the load. Results in Figure 8 show that
WPs closer to the abutment facing consistently measured larger displacements throughout the
loading-unloading process. They also indicate that the largest difference in WP displacements
occurred between the WPs #2 and #3 (from the facing), consistent with the location of the loading
beam on the GRS fill and their proximity to the facing (Figures 1b and 7).
Reinforcement Layer
Abutment Facing
Tail-end of
Results of the type shown in Figure 8 were used to calculate global strains at different
reinforcement layers in the two models (Doger and Hatami 2020), which indicated that the
locations of maximum reinforcement strain in both models, and at different loading magnitudes,
remained underneath the surcharge load throughout the testing period. Maximum reinforcement
strains underneath the loading beam in Models #1 and #2 at 190 kPa loading level were 0.057%
and 0.041%, respectively (Doger and Hatami 2020). These values are significantly smaller than
the maximum 2% value recommended in the FHWA guidelines at the service load magnitude of
190 kPa (Adams and Nicks 2018). Maximum reinforcement strains increased only to 1.6% and
1.5% in Models #1 and #2, respectively, after the models were subjected to a 10-fold surcharge
load magnitude of 1,900 kPa, which was still below the 2% serviceability level by a safe margin.
CONCLUSIONS
Construction and load-testing of two large-scale (2.45-m tall) model GRS bridge abutments were
described in the paper. The models were comparable to each other except for their facing
configuration, which varied significantly relative to the size and type of concrete blocks used. The
models were instrumented to measure their facing deformations, load-settlement performance at
the abutment top surface and reinforcement strains. Results of study showed that:
ACKNOWLEDGMENTS
Funding for this project was provided by the Oklahoma Department of Transportation (ODOT)
through SP&R Item No. 2262-Phase II. The GSI Fellowship granted to the second author by the
Geosynthetic Institute in Folsom, PA is gratefully acknowledged. Donations of the fill aggregate
by Dolese Bros., Inc. in Oklahoma City, OK and the geotextile reinforcement material by TenCate
Geosynthetics, in Cornelia, GA are gratefully acknowledged.
The authors also wish to acknowledge helpful discussions with Mr. Shannon Sheffert, PE
(ODOT Local Government Division Engineer at the time of this study), and invaluable assistance
from Mike Schmitz, the Fears Structural Laboratory Manager at the University of Oklahoma, and
those of graduate students, Jerome Boutin, Kirby Falcon and Matsuura Kazunori, and
undergraduate research assistants Stephen Schnabel, Coleman Ross, Uzeir Hodzic, John King,
Daniel Farley, Vuth Chea, and Jackie Pham during the construction and testing of the GRS
abutment models described in this study.
REFERENCES
Adams M., Nicks J., Stabile T., Wu J., Schlatter W., and Hartmann J. (2011). Geosynthetic
Reinforced Soil Integrated Bridge System Synthesis Report, Report No. FHWA-HRT-11-027,
Federal Highway Administration, Washington, D.C., USA.
Adams M., Nicks J., Stabile T., Wu J., Schlatter W., and Hartmann J. (2012). Geosynthetic
Reinforced Soil Integrated Bridge System Interim Implementation Guide, Report No. FHWA-
HRT-11-026, Federal Highway Administration, Washington, D.C., USA.
Adams M. and Nicks J. (2018). Design and Construction Guidelines for Geosynthetic Reinforced
Soil Abutments and Integrated Bridge Systems, FHWA Publication No: FHWA-HRT-17-080
HRDI-40/06-18(200)E, Federal Highway Administration, Washington, D.C., USA.
ASTM D4595. Standard Test Method for Tensile Properties of Geotextiles by the Wide-Width
Strip Method, ASTM International, West Conshohocken, Pennsylvania, USA.
Doger R, (2020). Influence of Facing on the Construction and Structural Performance of GRS
Bridge Abutments, PhD Dissertation, The University of Oklahoma, Norman, OK, USA.
Doger R and Hatami K, (2020). Influence of Facing on the Performance of GRS Bridge
Abutments, International Journal of Geosynthetics and Ground Engineering, Springer, 6(4):
https://doi.org/10.1007/s40891-020-00225-y.
ABSTRACT
The Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS) technology blends the
roadway into the superstructure to create a jointless interface between the bridge and the approach;
however, the thermal superstructure movement and induced lateral pressures between the backwall
and integrated GRS-IBS substructure are not yet well understood. This paper presents the results
of a thermal monitoring program of the State Road (SR) 7A bridge over the Housatonic Railroad
in Sheffield, MA after over 2 years of in-service performance. Small, longitudinal movements in
the abutment were measured and compared with the theoretical movements of the superstructure
and the corresponding lateral pressures behind the backwall. Lateral earth pressures on the
reinforced backfill, due to the thermal expansion and contraction of the superstructure, were also
measured. It is concluded that in a properly designed and constructed GRS-IBS, the differential
thermal movement between the superstructure and substructure, and the resulting pressures, is not
an impediment in the adoption and implementation of the technology; rather, the behavior is
advantageous. Long-term performance monitoring of the bridge is ongoing to continue evaluating
the trends over time.
INTRODUCTION
Geosynthetic reinforced soil (GRS), composed of alternating layers of compacted soil and
geosynthetic reinforcement, has emerged as a low-cost, accelerated construction solution to many
complex problems. Foundation systems constructed with GRS, such as bridge abutments and
integrated bridge systems (IBSs), are increasingly being used. As of December 2016, more than
44 State highway agencies had deployed GRS-IBS technology to construct more than 200 bridges
in a variety of environments; 11 States have adopted GRS-IBS technology as a standard practice
(Harman, 2017; Alzamora, 2018). A recent manual developed by the Federal Highway
Administration (FHWA) provides guidelines for the design and construction of GRS-IBS,
materials specifications, performance monitoring, maintenance, and repair, along with quality
assurance and quality control procedures (Adams and Nicks, 2018).
When the Massachusetts Department of Transportation (MassDOT) needed to replace the
State Road (SR) 7A bridge over the Housatonic Railroad in Sheffield, MA, originally a three-span
bridge supported on concrete piers and abutments, with a 105-ft single span, a GRS-IBS was
eventually selected. The new bridge consists of steel girders with a cast-in-place (CIP) deck
The role and impact of thermal interaction between the superstructure and substructure of bridges
has long been recognized and investigated. Variation in the ambient temperature was cited as the
major contributing factor to the movement of bridges in a study conducted by Emanuel and Lewis
(1981). Temperature variations in the superstructure generate stresses along the span due to axial
elongation or contraction. During expansion of the superstructure, the abutment and approach
backfill resists the movement through the development of passive earth pressures. The passive
earth pressures imposed on the backfill from an abutment undergoing displacement and rotation
can be modeled using Rankine earth pressure theory. As the daily temperature increases from
morning through the afternoon, the superstructure will expand, causing the abutment to push
against the backfill, generating the highest passive pressure at the maximum displacement. Then,
as the daily temperature decreases from late afternoon through the night, the superstructure will
contract, causing the abutment to pull away from the backfill, which leads to active earth pressure
conditions. The diurnal cycle of temperature variation and corresponding abutment movement
continues throughout the life of the bridge (Hassiotis et al., 2006).
The American Association of State Highway and Transportation Officials (AASHTO)
LRFD Bridge Design Specifications (2020) includes provisions for addressing stresses in the
superstructure components caused by diurnal and seasonal variations in ambient temperature;
however, the impact of using a GRS-IBS and its interaction with the superstructure is not provided
because it is not yet well understood. The emergence of integral and semi-integral abutment
bridges has brought the issue of thermal interaction between the superstructure and substructure
back to the forefront. Integral abutment bridges, also known as jointless bridges, are bridges where
the deck has no expansion joints and the substructure and superstructure move, expand, and
contract as one integral unit. Semi-integral abutments are similar to integral abutments, except that
the superstructure moves independently from the substructure, with the bridge traditionally
supported on elastomeric bearing pads. Based on the typical design for a GRS-IBS, the technology
can be considered a type of semi-integral abutment since the superstructure is not rigidly connected
to the GRS abutment.
The concept of integral and semi-integral abutment bridges is more than a century old;
however, State DOTs did not embrace the concept until the advent of the Hardy Cross method for
the analysis of continuous frames in the 1930s. Integral abutment bridges were further recognized
during the construction of the Interstate Highway System in the 1950s, and their acceptance kept
growing since they eliminated leaky joints and deteriorated or frozen bearings, which are major
contributors to bridge deterioration, and, in some cases, failure of bridges (Kunin and Alampalli,
2000). In 1980, FHWA recommended the use of integral abutment bridges for different types of
SR 7A BRIDGE
The SR 7A bridge on Ashley Falls Road over the Housatonic Railroad is in Sheffield, MA. The
bridge, with NBI number S10023BDDDOTDES, was originally a three-span structure, including
two concrete piers and two concrete abutments (Figure 1a). MassDOT first considered
conventional designs for the replacement, including abutments supported by either micropiles or
spread footings; however, the construction challenges presented by the existing railway and the
excessive estimated cost motivated MassDOT to consider and finally select a GRS-IBS. The new
GRS abutments were moved farther from the railway track, supporting a single span length of 105
ft and eliminating the need for piers (Figure 1b). The estimated bearing pressure on each of the
abutments due to the weight of the superstructure is 10.2 psi. The new bridge has a wider roadway,
wider sidewalk, raised roadway profile, and deeper steel girders, skewed at 30 degrees. The
selection of a GRS-IBS for the SR 7A bridge resulted in a cost savings of 49 percent compared to
the conventional abutment options considered (Connors, 2016).
(a) (b)
Figure 1. (a) Original SR 7A bridge and (b) New SR 7A GRS-IBS. (Source: FHWA.)
Figure 2. Cross section of the west abutment along with type and location of
instrumentation. (Source: FHWA.)
The superstructure was placed on the GRS abutments in five stages (Figure 3a). The first
stage included pouring concrete to construct the rectangular footings directly on the bearing bed
reinforcement (Figure 3b); the girders were set and leveled on the footings in the second stage; the
(a) (b)
Figure 3. (a) Super-substructure construction stages and (b) construction during stage 2.
(Source: FHWA.)
INSTRUMENTATION PLAN
IPIs. IPIs using micro-electro-mechanical systems (MEMS) were installed to monitor the lateral
movement at the integrated approach backfill–footing interface for each abutment (Figure 2). The
casing that housed the IPIs was installed as the abutment was constructed. Since the bridge was
skewed, the grooves of the IPI casing were aligned perpendicularly to the superstructure and along
the centerline to capture the movement of the bridge. There were seven sensors located along the
depth of the IPI casings for both abutments; for the east abutment, sensors were located at depths
of 4.1, 8.2, 12.3, 16.4, 20.5, 24.6, and 28.7 ft below the top of the casing, and for the west abutment,
sensors were located at depths of 3.0, 6.1, 9.3, 12.6, 15.9, 19.2, and 22.5 ft.
Contact Pressure Cells (CPCs). Five CPCs, each with a 9-inch diameter and a capacity of 25 psi,
were installed for each abutment to measure lateral earth pressures behind the backwall and on the
cheek walls and to evaluate thermal interaction and any effect due to the 30-degree skew. A plan
view of the CPC instrumentation layout, including the nomenclature used to distinguish the results,
is shown in Figure 4. For consistent pressure measurements, the position of each CPC was kept at
RESULTS
Since the construction of SR 7A, completed in November 2014, a large volume of data has been
collected remotely from various sensors installed on and within the two GRS abutments. The data
presented and discussed in this paper is focused on the lateral displacement from the IPIs and the
lateral earth pressures from the CPCs over a 2-year period to primarily evaluate the response due
to the thermal cycles of the bridge, both diurnal and seasonal.
Lateral Displacement. Figure 5 shows the variation of temperature and change in cumulative
lateral displacement measured at the top IPI sensor for both the east (IPI-E1) and west (IPI-W1)
abutments during a diurnal temperature cycle for winter and summer days during the first year of
being in service. The theoretical displacement of the superstructure is also shown, calculated
assuming the coefficient of thermal expansion for the steel girders is equal to 7.2E-06 (Roeder,
2002). Note that positive values for the change in displacement indicate movement towards the
GRS integrated approach; negative values indicate movement inwards towards the bridge deck or
the railway tracks between the abutments.
(a) (b)
Figure 5. Temperature and displacement during selected (a) winter and (b) summer days.
(Source: FHWA.)
Note that there is a lag of about 6 hours between the maximum/minimum recorded air
temperatures (and theoretical movement) and the maximum/minimum measured displacement.
The 6-hour delay in response is likely due to the temperature differential between the air and the
various bridge components (Ooi et al. 2019). Similarly, Lucas (2018) showed that the average
measured temperatures of the deck and girders for a traditional semi-integral bridge in Ohio also
cycled about 6 hours behind the air temperature. Lucas (2018) also showed that the steel girders
had a lower measured temperature compared to the concrete bridge deck. The temperature
differential may explain why the changes in measured displacement during diurnal cycles are
within a range of about 0.05 inch, whereas the theoretical change in displacement is within a range
of about 0.20 inch. The more minimal response measured during the winter as compared to the
summer, and as compared to the theoretical movement, may be similarly due to the differences in
thermal energy storage and dissipation within the superstructure components.
The changes in measured displacement in the east abutment are slightly more pronounced
than the changes in the west abutment, with about a 0.025-inch maximum difference recorded over
the 2 weeks capturing summer and winter timeframes (Figure 5). The difference in measured
displacement could be due to the slight change in elevation between the top IPI sensors on each
abutment; IPI-E1 and IPI-W1 are positioned at a depth of 4.1 ft and 3.0 ft from the top of the
roadway, respectively. Another potential factor is the relative location of the abutments with
respect to the thermal energy from the sun. Overall, however, the difference in magnitude is very
minor, indicating that the bridge is longitudinally expanding and contracting uniformly along its
centerline.
Figure 6 shows selected cumulative displacement profiles for the east and west GRS
abutments over the first 2 years in service, from September 2014 to September 2016. The profiles
show that the movement of the superstructure results in displacements throughout the height of the
GRS integrated approach and abutment, stabilizing around the elevation of the RSF. A clear
(a) (b)
Figure 6. Cumulative displacement of the (a) east and (b) west GRS-IBS. (Source: FHWA.)
Lateral Earth Pressures. As the bridge expands when it heats up, the longitudinal movement will
be resisted by the integrated approach behind the backwall, leading to an increase in the lateral
pressure; pressure is then relieved as the bridge contracts. While the movement was only measured
along the centerline of the bridge, lateral earth pressures were measured at midheight along the
length of the backwall (south, center, and north) and on both the obtuse and acute cheek walls
(Figure 4). The lateral pressure measurements will provide some indication into any differential
pressures due to movement of the skewed bridge against the integrated approach and associated
wing walls.
Figures 7 and 8 show the variation of temperature and lateral earth pressures during a
diurnal cycle in winter and during a diurnal cycle in the summer for both abutments, respectively.
As expected, the lateral earth pressures increase as the temperature increases (i.e., as the bridge
expands) and decreases as the temperature decreases (i.e., as the bridge contracts). Note that the
negative lateral earth pressures likely indicate a separation of the back/cheek wall from the
integrated approach/wingwalls, although the negative values, instead of zero lateral earth pressure,
are artifacts of the instrumentation. Similar to the IPI sensor readings, there is a delayed response
between the air temperature and the pressure response.
The variation of lateral earth pressures during winter is more pronounced than that during
the summer; similarly, there is more activity on the west abutment than the east abutment. The
(a) (b)
Figure 7. Lateral pressures for the (a) east and (b) west abutment during winter.
(Source: FHWA.)
(a) (b)
Figure 8. Lateral Pressures for the (a) east and (b) west abutment during summer.
(Source: FHWA.)
Figure 9 shows the lateral pressures measured over the first 2-year period. While the
pressures change with temperature, there is no appreciable increase in magnitude over the period
evaluated. No appreciable increase in magnitude may indicate that the GRS-IBS, particularly the
integrated approach and wingwalls, successfully resist the eccentricity in passive pressures caused
by the skew of the superstructure. As hypothesized before, the spikes seen in the winter months
are possibly due to infiltrated water that froze around the CPCs. In general, however, the measured
pressures are within the pressures expected for the backfill during at-rest or active conditions; there
is not enough movement to fully mobilize passive pressures.
DISCUSSION
The lateral displacements and lateral earth pressures measured in the two GRS abutments is
considered small, with excellent long-term performance of the substructure expected. The lateral
displacement profile along the depth of the two abutments is very similar with higher displacement
at the top and diminishing to almost zero at the bottom. The east abutment has exhibited a slightly
higher negative movement when the abutment pulls away from the soil during falling
temperatures, but it is still small. The difference in the lateral displacement of the two abutments
may be attributed to the fact that the east abutment is taller than the west abutment.
As small as the lateral displacement and lateral earth pressure in this study are, they are not
solely temperature-induced. Rather, they are also a combination of gravity and
temperature-induced loads. In the study of New Trammel Creek bridge by Zhihui et al. (2015), it
was noted that the contribution of temperature-induced pressure was, on average, 33 percent of the
bearing pressure induced by combined gravity and temperature-induced loads. The New Trammel
Creek bridge is an example of an integral abutment bridge with traditional design and construction
practices. The bridge consists of concrete deck over concrete girders supported by two abutments
and three intermediate piers. Based upon finite element modeling, Zhihui et al. (2015) estimated a
combined gravity and temperature-induced pressure of 29.2 psi, and temperature-only induced
pressure of 9.8 psi.
The lateral displacement data obtained in this study can also be compared with lateral
displacement of abutments for traditional integral abutment bridges in studies by others. For
example, a detailed parametric and field monitoring study of two Illinois bridges was conducted
by LaFave et al. (2017). The bridges studied included the eastbound Kishwaukee River bridge and
the eastbound Union Pacific Railroad (UPRR) bridge along I-90. The Kishwaukee River bridge,
constructed in 2013, is a four-span and 549-ft-long integral abutment bridge supported on steel
piles. The UPRR bridge, constructed in 2014, is a single-span and 184.5-ft-long integral abutment
bridge supported on steel piles. From field monitoring of eastbound Kishwaukee River bridge,
lateral displacement of the north abutment varied from 0.5 to -2 inches and the lateral displacement
of the south abutment varied from 1 to -1.8 inches. Comparatively, the lateral displacements for
CONCLUSIONS
The deteriorated and structurally deficient three-span SR 7A bridge over the Housatonic Railroad,
located in Sheffield, MA, was replaced with a single-span GRS-IBS in 2014. The bridge has two
abutments, without any intermediate piers, deck joints, or traditional bearings at the interface of
deck and the abutments. The abutments were constructed utilizing the GRS-IBS technology and
instrumented with a variety of sensors to measure lateral displacements and pressures due to the
thermal movement of the superstructure. The results presented are over a period of 2 years using
a remote data acquisition system. Initially, the thermal interaction between the superstructure and
substructure was not well understood, although empirically, there have been no concerns when
employing GRS-IBS. The results of this study have clearly demonstrated that the SR 7A GRS-IBS
has performed better than the traditional integral abutment bridge configuration
(i.e., deck–girder–pier–pile configuration). The lateral displacement and lateral earth pressure of
the abutments are much smaller compared to traditional integral abutment bridges that have been
constructed, instrumented, and monitored within a similar time frame as that of SR 7A bridge.
The monitoring of the SR 7A bridge is ongoing, and a condition survey of the
superstructure is planned to have a holistic view of the performance of the bridge. The
superstructure of the SR 7A bridge, including the CIP deck and the steel girders, was not
instrumented in this study. Also, a parametric study of the bridge is planned to compare the field
monitoring data with a theoretical model.
REFERENCES
AASHTO. (2020). AASHTO LRFD Bridge Design Specifications, 9th Edition. AASHTO,
Washington, DC.
Adams, M. and Nicks, J. (2018). Design and Construction Guidelines for Geosynthetic Reinforced
Soil Abutments and Integrated Bridge Systems, Report No. FHWA-HRT-17-080. FHWA,
Washington D.C.
Alzamora, D. (2018). “Turning Skeptics into Adopters.” Public Roads, 82(1). FHWA,
Washington, D.C.
Connors, P. (2016). “Performance of Geosynthetic Reinforced Soil Integrated Bridge Systems
(GRS IBS): RT 7A Over Housatonic RR (2014).” Workshop sponsored by the Transportation
Research Board Committees on Geosynthetics and Transportation Earthworks, Transportation
Research Board 2016 Annual Meeting, Washington, D.C.
Emanuel, J.H. and Lewis, D.B. (1981). “Abutment-Thermal Interaction of Composite Bridge.”
Journal of Structural Engineering, 107(11), pp. 2111–2126. American Society of Civil
Engineers (ASCE), Reston, VA.
ABSTRACT
Geosynthetic cofferdams are increasingly utilized for civil construction applications including
dewatering, flood control and sediment control. This paper describes one of the more commonly
used geosynthetic dam system which was developed in the early 1990’s and has been used
extensively in North America as a portable cofferdam. It is a water control structure designed to
source water directly from the stream, river or pond to control, contain and divert the flow of
water. It is used in applications such as dewatering for bridge foundation work, dam repair,
pipeline crossing, canal liner repair and shoreline construction and restoration. Geosynthetic
dams provide an economical and modular alternative to conventional construction of earth dikes
and mechanical sheet piling in these applications.
This paper highlights a recently installed 1,400 lineal foot (427 m) project to control
sediment during the excavation of a new channel during bridge construction in Kilisut Harbor,
Washington. The North Olympic Salmon Coalition (NOSC) and the Washington State
Department of Transportation (WSDOT) were looking to restore the historic tidal channels and
fish runs between southern Kilisut Harbor and Oak Bay in Jefferson County, Washington. This
challenging tidal application required the portable geosynthetic dams be installed in various
heights up to 12 feet (3.66 m) to isolate the channel for dewatering and sediment removal using
excavators and dump trucks.
INTRODUCTION
Cofferdams by definition are an enclosure built within or across a body of water to allow the
enclosed area to be dewatered. This creates a dry working environment so that construction can
be carried out properly and safely. Typical cofferdams are welded steel structures consisting of
sheet piles, wales or cross braces and are normally dismantled after construction. However new
portable or temporary geosynthetic cofferdam systems provide an effective alternative. These
systems come in a variety of different designs, materials and installation methods and provide a
more economical solution for temporary site dewatering versus conventional structural
cofferdams. Portable geosynthetic cofferdams are typically lighter weight modular systems
produced from geomembrane and geotextile fabrics. They limit the impact of construction
generated silt and sedimentation when excavating in submerged or dredging areas, which lessens
the environmental impact. Most systems are also modular in design allowing for bends and turns
in the project waterway. They can also be installed and removed quicker than standard structural
cofferdams which makes them more cost-effective. Properly handled, these dams can also be
drained and re-used, eliminating the need to purchase a new dam for different projects in some
instances. Common applications for the geosynthetic portable cofferdams include dewatering for
bridge foundations, dam repairs, pipeline crossing, irrigation canal repair and shoreline
construction and restoration. Smaller diameter geosynthetic dams are also used extensively for
flood control barriers. Figure 1 and 2 above show the installation and applications of the
geosynthetic cofferdams.
For this paper, the cofferdam system produced by the manufacturer consists of two
geomembrane tubes contained by a high strength woven textile outer tube. The two inner tubes
are filled with water which creates a stable, non-rolling water-controlled structure. A center
baffle curtain is installed for stability, reducing movement or tipping as a result of hydrodynamic
loading. The local water source is normally used to fill the inner tubes of the dam. This
cofferdam dam system was first introduced in the early 1990’s and is constructed in a range of
sizes from 4’ diameter to 16’ diameter in standard 100’ and 200’ lengths. Special connecting
collars are used to join the dams during installation. Standard fill and drain ports are installed
This section summarizes the system stability and engineering needs of the water filled
manufacturers dams. System stability is critical to the successful use and installation of the
portable cofferdams. The basic principle behind the water filled dam system incorporates a dual
inner tube system with a center baffle to stabilize the entire structure. This is shown in figure 4
below. The safety factor against sliding depends greatly on the coefficient of friction of the
material that the dam is sitting on. In this case where it is sitting on a wet grass surface, the
coefficient of friction used is 0.20 (Noon, 1994). The factor of safety against sliding is 1.33
when 24” (0.61 m) of water is being held back.
Engineering designs with proper calculated safety factors are required based on individual
manufactured systems and project specific site conditions. Under hydrodynamic loads the
portable dams need to be designed to resist sliding, tipping, and overturning. In order for the
manufacturers dam to move as a result of the pressure exerted on one side, it must either be
tipped over or slide across the surface on which it rests. In order to tip, the water pressure must
lift the first inner tube up and over the second. The following calculation verifies the dam's
resistance to tipping:
Assumptions:
The inner tubes are assumed rectangular when filled to facilitate the calculations. The water level
on one side will assumed to have reached the top of the Aqua Dam to simulate the worst-case
scenario.
P = Pressure
h = water depth
D = width of Aqua Dam
l = length of Aqua Dam
Þ = mass density of water
g = gravitational acceleration
y = specific weight of water
F = Force exerted on the face of the Aqua Dam due to pressure (P)
A = area of the side face of the Aqua Dam
W = weight of water in the inner tube
V = Volume of the inner tube
P = Þgh = yh
Pavg = y(h/2)
A = hl
F = PA = Pavg A
W = yV
The force exerted on the side of the water structure is defined as:
Table 1. Design Factor of Safety for Water Level at Top of Manufacturers Dams
In 2019, the North Olympic Salmon Coalition and the Washington State Department of
Transportation needed to restore the historic tidal channels and fish runs between southern
Kilisut Harbor and Oak Bay in Jefferson, County Washington. This included removing the
outdated culverts and installing a new elevated bridge which replaced a causeway as part of
creating 2,300 acres of productive fish habitat in the Puget Sound region. The first phase of this
project included restoration of the channel on the north side of the highway in a sensitive marine
environment. Figure 6 shows the cofferdams being deployed during tide out conditions.
PROJECT SCOPE
As part of the new bridge construction, the project scope required the contractor to excavate and
dewater a large channel in a very environmentally sensitive region for the protection of salmon
stocks and their migration. To address these environmental concerns, silts and sedimentation
from construction had to be tightly controlled. Based on the project constraints, the engineer and
contractor chose a temporary portable coffer dam. Layfield USA Corporation’s modular
cofferdam system was chosen for the project. The project scope including the manufacturing
and installation support of 1,400 feet (427 m) of multiple sizes dams in sizes of 4’, 6’, 8’, and 12’
(1.22, 1.83, 2.44, 3.66 m) in heights. The installation started in September 2019 with a crew of
seven field technicians.
The project faced a number of unique challenges. One of the main challenges was working in
tidal conditions which required the installation of the dams to only take place during low tide
cycles. The contractor was also not allowed to operate equipment on the majority of the site in
order to protect the pickle grass and wetlands area. This required many of the dams to be
unrolled and positioned manually. With the multiple size dams, special fabricated collars were
manufactured to connect the different sizes on site.
Figure 8. Aerial view of completed Kilisut Figure 9. 8' Cofferdams being installed -
Cofferdam installation Toppenish, WA
CONCLUSION
The installation of the modular dams took 7 days to complete and were drained and removed in
January 2020. The dams performed successfully with the contractor being able to complete
solids removal from the channel in dry conditions. This was a significantly faster method versus
if they had had to rely on a vacuum dredge. The use of the temporary cofferdams was a key
REFERENCES
Wikipedia contributors. (August 10, 2020) Cofferdams, In Wikipedia, The Free Encyclopedia,
https://en.wikipedia.org/wiki/Cofferdam
Sati, R., (2011) Case Study: Performance of rapid respond flood control system during 2011
flood in Manitoba. 2011 Geo Manitoba, Winnipeg, MB, Canada
Noon, R.k (1994). Engineering Analysis of Vehicular Accidents, CRC Press, Boca Raton
ABSTRACT
Permafrost degradation by human interventions and climate change has been a serious
concern for infrastructure development in the pristine physiographic setting of Northern
Canada. Several First Nation settlements spread over that region need permanent year-round
access for uninterrupted supply of basic need items. The railway line built a century ago
leading to Churchill in Manitoba crosses many stretches of permafrost. The flood in 2017
washed away sections of the railway line rendering the only on-land access to the town
unusable. Repair was immediately needed to avoid airlifting the essential commodities for the
residents, but it took two years to find an innovative way to do it. There was exposed
permafrost at the washout sections, and as it was a linear project, access to the next location
was possible only after repairing the damage preceding it. Limited access and construction
material and harsh weather conditions were other obstacles. This paper discusses the
rehabilitation work using high-strength novel polymeric alloy (NPA) geocell. The findings in
this paper are supported by design basis and experience-based construction practice,
photographs, and construction records. The two years of track operation has presented a
promising technology for the future of transportation infrastructure in the permafrost region.
INTRODUCTION
Churchill is a port city located on Hudson Bay in Northern Manitoba at the mouth of Churchill
River. The nearest road head is at the village of Gillam approximately 300km south. The
history of the railway discussed in the paper dates back over a century. Hudson Bay Railway
(HBR) was initiated in the early 1900s and completed in 1929 to serve as the only mode of
land transport to Churchill. This single line railway track has served the northern port of
Manitoba uninterrupted since then. It may have lived up to expectation but due to the lack of
timely maintenance and upgrades it gets damaged putting extra burden on the maintenance
budget and interruption in the services. The railway built on extremely soft ground crosses
many stretches of permafrost. In recent years, permafrost deterioration caused by rising
temperature and degradation caused by other forms of human intervention has impeded the
smoothness of the rail ride and other serviceability features of this rail line. In the spring of
2017, the railway line was severely damaged by the flood in the streams crossing the rail line,
some of the damage may have been further aggravated by the degrading permafrost. As the
only mode of ground transport feeding the town was rendered unusable everything including
the goods of daily need for the local population was air lifted causing further hardships to the
remote town, where the daily mean temperature remains subzero for over 8 months in a year.
Even before this 2017 washout, in May 2016 a visit was arranged for the authors by
the railway company with the track maintenance personnel to assess the impact of degrading
Geocells was originally developed by the US Army Corps of Engineers to increase the vehicular
mobility over loose, sandy subgrade through confinement (Webster and Alford, 1978). Pokharel
(2010) and Han et al. (2010) had identified three key mechanisms of geocell reinforcement as
lateral and vertical confinement, wider stress distribution and the beam or slab effect. The higher
stiffness of the geocell system reduces the stress applied to the subgrade due to bending stiffness
of the mattress composite, similar to a slab (Pokharel et al., 2011). Giroud and Han (2016) clearly
identified geosynthetics reinforcement to continue to contribute to the structural performance of
pavement structures. On road pavement applications Norouzi et al. (2019) had discussed the state
of the art of the pavement design method and emphasized the need for a robust structure that
experiences repeated loading, recommending Geocell reinforcement as one of the reliable options.
Railway embankments also undergo extensive cyclic loading and must be able to withstand the
applied repeated load occurrences at the same time be economical to be sustainable in long term.
The need for more robust embankment structure poses a huge challenge to the supply of granular
material that are of the adequate quality and are affordable (Pokharel et al., 2017). Where a good
quality material is not easily available, it requires a strong, high modulus and creep resistant
geosynthetic reinforcing material at the substructure. Ability of geocells to use recycled, marginal
or poorly graded granular material helps reduce the burden on environment and adds value to the
design. In railway applications for the reinforcement of structural layers, Geocells can be used to
reinforce the ballast or sub-ballast to improve the reinforced layer’s modulus and reduce the stress
Designing Sustainable Infrastructure with limited engineering data is always a challenge and
more so when it comes to where minimal interference to the environment is expected.
Rehabilitation of HBR line had similar challenges as it passes through several stretches of
permafrost. The rail line was damaged by flood that was triggered by melting snow and rain,
that caused damages to the underlying permafrost as well. This, compounded with the harsh
winter, shorter construction season and linear construction sequence, demanded a solution
that could address all these issues and complete the work within reasonable time and budget.
A design with NPA Geocell reinforcement for the railway embankment addressed issues like:
i) providing necessary structural strength for the railway traffic,
ii) protecting the underlying permafrost from further degradation,
iii) Controlling erosion at the embankment slopes against snow melt and creek flows,
iv) facilitating linear construction schedule to be completed within available time
and budget significantly less than that estimated for conventional construction.
The pre-flood condition of the track in May 2016 and post flood condition in Spring
of 2017 and 2018 are shown in Figures 1 through 3.
Figure 2. The railway line during the flood in 2017, aerial view. (Global News, 2017)
Figure 3. The condition of railway line after the flood event pictures from 2018.
Very little has been done in dealing with the infrastructure development in permafrost
region. Innovative design, construction methods with minimal interference to the surroundings and
the protection of the permafrost below the structure is important both for the stability of the
structures and to control the degradation of the permafrost. Global warming and other human
interventions have led to permafrost degradation as shown by deepening of the active layer,
thinning permafrost, rising ground temperatures, expanding taliks and the disappearance of
permafrost patches (Jin et al., 2007). Climate change could be the real cause of permafrost
degradation but the excessive and unwarranted human intervention to the pristine environment are
other important causes that need to be addressed immediately with due diligence. Surface melt due
The design of transportation infrastructure in the Tibetan permafrost area has brought some
light on how they should be sustainably designed. Citing 35 years of experience, Wu et al.
(1998) had indicated that the height of embankment over 0.8m maintains a steady state on the
permafrost. Based on an overall analysis on the change in permafrost table under the
embankment and after considering the fact that the permafrost in the area is degrading and the
requirement of the deformation of the road surface is of high quality, it was suggested that
1.6m height of embankment for the gravel road as optimal. Wang et al. (2009) emphasized
the need to control the width of embankment as the increase in width was found to increase
the gross heat absorption that could lead to permafrost degradation by 1.0m width increase
and can bring the permafrost table down by 0.11m. Qi et al. (2012) suggested that in the initial
operation years the degree of thaw consolidation of permafrost increases. However, it tends
to decrease after the increase in the characteristic drainage length and decrease in the effective
consolidation time. But it would take some residual consolidation time to dissipate causing
settlement of embankment as an ongoing process. It was important to have minimum cover at
the same time avoiding the unnecessary fill to avoid residual consolidation.
The HBR track was not in a good shape especially as it has lost the smoothness of
ride because of the undulation in the track. The reason of that rough ride was because of
permafrost degradation causing vertical deformations at some locations and at many places
the lateral spreading of ballast and the sub-ballast material ultimately unevenly causing the
track to settle. The aim this time was to bring it to its running condition as it was before the
damaging flood event. The major mode of failure was washout which has exposed the
Figure 4. Typical design sections, requiring single and double layers of Geocell
The original plan of the design was to reinforce the ballast section too with perforated
NPA geocells to maintain required drainage and provide confinement and control on lateral
spreading of the ballast material but, due to the construction constraints and available tamping
equipment at the site option to reinforce the ballast was abandoned. The ballast regulators are
the common equipment used in railway maintenance which use spikes of about 150mm to 200mm
deep to shape and place ballast under the track ties. It turned out that reinforcing the ballast
would have increased the ballast thickness by 150mm thus avoiding mechanical damage to
MATERIALS USED
The geosynthetic materials used in this project was woven and non-woven geotextiles and
high strength polymeric geocells. Salvaged washed away granular material was used wherever
possible. Granular infill material with less than 12% was desired but the site engineer and
contractor had to use the washed out granular material deposited at the downstream side to
save the construction time and cost in bringing similar material which was available at a gravel
deposit near Gillam (200km far). From visual observation and experience-based qualification
of the 75mm minus pit run gravel designers approved the material fit for infill in the geocell.
The granular fill chosen was the only option available at the site as it had been previously
used at the sub-ballast layer, so it was approved. Riprap used was 150mm to 300mm size.
Two different types of NPA Geocell was used for reinforcement. NPA geocell was
chosen for the design as it has higher tensile strength, modulus, and creep resistance than other
available geocell material. The top layer of sub-ballast just below the ballast was reinforced
with Type D geocell and layers below were reinforced with Type C geocell. Both geocells
were perforated, 150mm high and had 330mm between seams. Type D, the higher grade
geocell of the two was used immediately below the ballast and Type C was used at lower layer
where lesser applied stress was expected. The properties Geocells used are given in Table 1.
CONSTRUCTION METHODS
The pictures and videos of damaged area were made available for the design. There was no
survey of other engineering data available. The designers conducted aerial survey to assess
the extent of damage to determine whether repair work at the washout locations will be good
enough to get the rail traffic back. During this it was clear that this project would be a linear
construction and ground access to next location would be available only after completing
work at the preceding location. The author also reached the first damaged site on highrail and
walked to next few location on foot to access the damage and check the suitability of the
design plus construction methods. The construction crew also needed to be extra careful as
there were protected wild animals including polar bears in the area. As the access was limited
the work needed to be completed with limited number of construction equipment or whatever
could be transported to the site by available means. Even daily commute for the construction
crew from nearest available camp in Gilam on highrail or caboose was not easy. The travel
time alone was in the order of 6 hours two way per day.
There was very limited space to work in those locations as the construction team was
instructed not to touch/damage any area outside of the railway right of way. Transporting
heavy compactor and heavy equipment except for whatever could be accommodated within
the width of railway line was out of question. The geosynthetic installation procedures were
followed as per the manufacturer’s installation guide and experience-based compaction
methodology was applied for compacting the granular fill at the sub-ballast and layers below.
The lower layer of the gravel fill was compacted to the possible extent only so that the
permafrost layer at the subgrade was not damaged. As there was no facility to do compaction
testing, ruts developed by the 4-ton compactor were used as an indication of the required
degree of compaction. At each location as the construction moved to the upper layers, a
maximum rut of 12.5mm under the roller wheel was taken as equivalent to 95% compaction
and was used for the entire construction. Twelve passes of the compactor were used as the
minimum compaction criteria at the site at every point. The picture in Figures 5 through 8
show the construction sequence of the repair work in order from track cutting and removal,
geocell installation, gravel compaction, and reinstalled rail track.
Geocell was stretched and installed at the site with guide stakes. The requirement of
more than one layer of the Geocell was decided at the site wherever there was more than
750mm fill required between two layers. The railway track was cut and placed aside to allow
the installation of geocell and construct the embankment. When the embankment was ready
it was lifted back to the position and connected.
Figure 7. Geocell for sub-ballast reinforcement and section ready for ballast fill
DISCUSSION
Sustainable construction can be achieved by appropriately choosing the technology and using
innovative ideas. Reusing the washed-out material can save the environment, cost, and time.
As pointed out in the preceding sections the design in this rehabilitation project did not only
consider the strength requirement but it also gave due consideration to the environment. The
design had to balance among protecting the permafrost, controlling the lateral spreading and
This project also showed that knowledge and experience of the construction crew to
work on the harsh climate and difficult situation plays a very important role especially those
who have prior experience working in similar settings and materials. The project was
completed in effective 33 working days at a cost about 20% of initially anticipated for
conventional rehabilitation work. The saving was primarily because of the reduced construction
time, use of the washout material, and working right on top of the existing subgrade without
removing the degraded subgrade material. The construction equipment available was limited so a
coordinated approach between the geocell installers, culvert pipe installers and earth work crew
were of utmost importance to getting the job done in timely fashion.
Unless a ballast tamping method that does not damage the reinforcing geocell at the
ballast layer is found out, the ballast layer cannot be reinforced so the loss of ballast material
by lateral spreading in this railway line is expected. So, there is a need to find a different
technique in the remote area to do the tamping that allows ballast reinforcement as well to
control the loss of ballast material by lateral spreading.
All possible precautions were made to cause minimal or no damage to the unspoiled
surrounding ground. Better pre planning on construction activities involving all the sub-
contractors can improve overall productivity of a project. At times prime contractor and client’s
engineers understanding of geocell technology, led to some misunderstanding. However, as the
work progressed, the work went smoothly.
The damage to this railway infrastructure was contributed in part by the melting
permafrost, unmanaged cross drainage structures and erosion prone embankment slopes. The
permafrost degradation along the railway track is evident by the uneven settlement along the
railway length and subsidence of the existing culvert pipes. Lateral spreading of ballast was
Figure 9. First train arrival October 31st, 2018 in Churchill in almost two years
CONCLUSION
Mathilde Riot1, Cyrille Balland2, Philippe Delmas3, Pascal Villard4, Maria Delli Carpini4,
Fabrice Emeriault4 and Stephan Fourmont5
1
Afitexinov, Rue Louis Blériot, Champhol, FRANCE; [email protected]
2
Ineris, Campus ARTEM, Nancy, FRANCE; [email protected]
3
Consultant, Paris, FRANCE; [email protected]
4
3SR, Université de Grenoble, Grenoble, FRANCE; [email protected]
5
Afitex-Texel, Parc Industriel Sainte-Marie, Québec, CANADA; [email protected]
ABSTRACT
The use of reinforcement geosynthetics to prevent localized collapses such as cavities is common
today. Numerous experimental and numerical studies allow a precise understanding of the
geosynthetics behavior related to these applications. Within the REGIC (reinforcement by
intelligent geosynthetics on natural or anthropic cavities) research project, an innovative solution
has been developed and patented by the Afitexinov company. This solution includes a specific
reinforcement geosynthetic coupled with an autonomous and remote warning device to detect a
localized collapse or sinkhole. This innovative geosynthetic is an inverted bi-modulus
reinforcement geosynthetic equipped with optical fibers. The first modulus at lower strength
allows detecting possible deformations before transmitting the load to the second modulus with
higher strength. This two-stages reinforcement system guarantees a high degree of safety from the
start of the failure.
The new geosynthetic solution presented in this article aims to reduce the costs and time
related to the installation of a monitoring system on a construction site. This solution's installation
and set-up do not require an expert on-site, thanks to a standalone monitoring box. This Preditect®
system is able to monitor large critical areas for ground deformations and detect potential
underground failures. In case of any unexpected event, it will launch an automatic alert.
INTRODUCTION
Compressible soils are characterized by low shear strength that increases with consolidation, high
compressibility, and delayed behavior under loading over time. Any construction on soft soils will
face stability and settlement issues. One of the solutions used for the construction of embankments
on compressible soils is the use of high modulus geosynthetics. This is a cost-effective solution
that permits to save natural resources and reduce the time of work.
Geosynthetics significantly increase the safety factor and the maximum allowed height of
the embankment by reducing displacements during construction and uniformizing settlements after
construction. In conjunction with other geotechnical ground improvement methods, like rigid
inclusions or aggregates piers, high modulus geosynthetics are also used as a distribution mattress
to transfer the loads to the pile heads.
Implementing a high modulus geosynthetic makes it possible to secure civil engineering structures
built on areas at risk of underground cavities (e.g., karstic zones). It will retain the soil in case of
collapse and limit the settlements of the surrounding layer within the acceptable limit for the
The high modulus geosynthetic material needs to have at least the following characteristics:
- High tensile strength (as per the design considerations),
- High stiffness (immediate tension of the technical yards, raw material used),
- Ability to effectively retain the soil (even if cohesive soil, separation function).
All reinforcement geosynthetic solutions, no matter how well dimensioned they are (Villard et
al. 2000), have one main limitation: the monitoring of the reinforced structure over time. This is
even more important for Mechanically Stabilized Earth (MSE) walls or reinforced structures on
areas at risk of underground cavities. The possibility of having real-time monitoring of the stress-
strain distribution in the reinforcement geosynthetics is a real contribution to any of these solutions,
especially for the reinforcement of areas at risk of cavities. While the design of high modulus
geosynthetics in areas at risk of cavities is currently limited to cavities with a diameter of 5 m, the
use of an instrumented geosynthetic in conjunction with the appropriate monitoring system is a
solution to detect and monitor the risk of large diameter cavities.
High-tenacity yarn
Woven geotextile
A numerical model using a Discrete Element Method (DEM) coupled with a Finite Element
Method (FEM) has been used to analyze the interaction of the inverted bi-modulus reinforcement
geosynthetic with the cohesive soil at the different stages of the collapse. This numerical model
has already been tested and validated in the case of mono-modulus reinforcement (Delli Carpini
et al., 2020).
Numerical model. The numerical model is based on the Spherical Discrete Element Code (SDEC)
calculation code (Donzé, 1997). It uses the DEM to model the soil and the FEM to model the
reinforcement geosynthetic. The DEM considers particles interacting at the points of contact,
which allows it to describe the soil's behavior under large deformations and the failure in a block
as observed for cohesive soils ruptures. The reinforcement geosynthetic is modeled by connected
deformable planar elements interacting with the soil at the contact points.
The geometry and main characteristics of the numerical model are shown in Figure 3. The
particles are bounded together at their points of contact by a cohesive bound (normal and tangential
adhesion) with a Mohr-Coulomb type criterion to simulate the cohesive soil (Delli Carpini, 2021).
Experimental device. An experimental apparatus has been constructed to validate and calibrate
the numerical model. Laboratory models have already been implemented (Hassoun et al. 2017),
but no in situ model has been carried out. It reproduces a 2 m (80 in) diameter cavity with a trapdoor
mechanism to simulate the cavity's opening under the reinforcement geosynthetic. The trapdoor is
placed in a concrete sump and allows for draining (when open) the aggregates from the upper
chamber to the lower chamber (Figure 5). The trapdoor is divided into several zones to control the
opening factor of the cavity and permit to create first a 1 m (40 in) diameter cavity and extend it
to 2 m (80 in).
The reinforcement geosynthetic is first put in place with the sensors. The Bragg grating
sensors used to measure strain within the geosynthetic are placed every 0.5 m (20 in) from the side
of the cavity along its diagonal, as shown in Figure 6.
The 0.50 m (20 in) thick layer of cohesive soil is then placed on the reinforcement
geosynthetic and compacted. Its main geotechnical characteristics are shown in Table 1.
The experimental device is left in place for 15 days before opening the cavity. It is first
opened to 1 m (40 in) diameter; a slight deformation takes place, as shown in Figure 7. Then the
cavity is opened to 2 m (80 in) diameter.
Opening 2 m + loaded
Before
Opening 2 m (T0 + 17 days)
Opening 1 m opening 2 m
(T0 + 17 days)
(T0 + 15 days) (T0 + 17 days)
Figure 7. Deformation recorded by the sensors during the test for one iteration
Following the opening of the cavity, the soil layer is loaded with successive steel plates 80
kg (176 lbs), each placed on a steel cube 0.50 m (20 in) wide and 30 kg (66 lbs) in weight (Figure
8). The aim is to produce the collapse of the cavity.
Results. The numerical model has been performed to give the vertical displacement of the two
types of reinforcement geosynthetics (mono-modulus and inverted bi-modulus) function of the
loading until the failure of the soil layer. Several steps are presented:
- I: Opening of the cavity,
- R: First failure of the cohesive soil layer,
- E: Collapse of the soil bloc on the geosynthetic.
The two products have the same behavior at each step of the loading (Figure 9). The value of
16 kN for the load to reach the soil collapse in the numerical model is higher than the values
measured with the experimental device that were not superior to 12 kN. It is explained by the non-
homogenous compaction of the soil layer (that has been observed on the experimental device) and
its geotechnical characterization.
The elongation of the reinforcement geosynthetics function of the distance to the center of
the cavity has also been modeled for the 3 steps I, R, and E (Figure 9). The total length is 12 m (39
ft), which corresponds to the 2 m (80 in) diameter of the cavity and the anchoring. The maximum
elongation in the inverted bi-modulus reinforcement geosynthetic reaches 2.07 % with the
numerical model when the experimental value measured is 1.96 %. For the mono-modulus
reinforcement geosynthetic, the maximum elongation is 1.5 % with the numerical model compared
to 1.46 % with the experimental model.
The numerical model is accurate to characterize the deformations in the geosynthetics.
Moreover, it clearly shows the different behavior of the two types of reinforcement geosynthetics,
especially in the anchorage zone, which leads to higher deformation values in the center of the
cavity for the inverted bi-modulus reinforcement geosynthetic, even though the vertical
displacements obtained for both products are the same at 250 mm (Figure 10).
Preditect® system. The development of the inverted bi-modulus reinforcement geosynthetic and
its specific mechanical behavior allows the use of a monitoring system within the product to detect
the soil failure at the early stage. This monitoring system is composed of optical fibers regularly
inserted and positioned in the product during the manufacturing process (Figure 11). They are
connected on both sides together during the manufacturing process to have a redundancy of the
signal. The coverage of the optical fibers is sized according to the required resolution of the system
and the sensitivity of the monitored structure.
Preditect® system uses the Fiber Bragg Grating (FBG) technology that allows temperature and
strain measurements. The optical fibers used in the product can measure deformations up to 6%
elongation before breakage and have a range of 50 km. The accuracy is about 1 µdef, the
measurement acquisition time is of the order of milliseconds, with a spatial resolution of 8 mm.
The optical fibers are connected on-site to a self-sufficient data logger, powered by a solar
panel (Figure 12). The data logger monitors the deformations in the reinforcement geosynthetic on
the overall covered area. It generates a detailed report at given intervals through dedicated software
and sends an alert to the selected persons in case of an unexpected event (if the deformations
exceed the limit values fixed by the user).
Server Report
/ Alert
The Preditect® software allows customizing the acceptable deformations limit in the
reinforcement geosynthetic per zones, the generation frequency of the report, the emergency
contacts, etc. (Figure 13).
CONCLUSION
The use of inverted bi-modulus reinforcement geosynthetics increases the elongation in the
geosynthetic for small displacements of the surrounding soil compared to a mono-modulus
geosynthetic, keeping the same mobilized strength in the geosynthetics and the same behavior of
the reinforced structure.
A numerical model has been developed to predict the behavior of the geosynthetic and the
failure mechanism of the structure in case of reinforcement of cavities on cohesive soils. This
model has been compared to experimental instrumentations, and both confirmed the differences
mentioned above between the two types of reinforcement geosynthetics. Therefore, the numerical
model seems relevant and could be used for parametric studies (influence of the soil layer's
thickness, the geometry, and size of the loading plate or even on the soil model).
REFERENCES
Villard P., Gourc J.P., Giraud H. (2000). A geosynthetic reinforcement solution to prevent the
formation of localized sinkholes. Canadian Geotechnical Journal, Vol. 37, pp 987-999.
Delli Carpini, M., Emeriault, F., Villard P., Riot M., Briançon, L., Delmas P., Al Heib M., (2021).
Utilisation d’un géosynthétique à double raideur pour le renforcement des remblais cohésifs,
13èmes Rencontres Géosynthétiques, Saint-Malo, France.
Delli Carpini, M., Emeriault, F., Briançon, L., Villard, P., Mengue, E., Leguernevel, G. (2020).
Etude du comportement des remblais cohesifs renforcés par géosynthétique, Journées
Nationales de Géotechniques de l'Ingénieur, Lyon, France, pp. 1–8.
Delli Carpini, M., (2021). Analyse des mécanismes d’effondrement des couches de sol cohésives
renforcées par géosynthétique sur cavité, Ph. D. Grenoble University, France.
Hassoun, M., Villard, P., Alheib, M., Emeriault, F. (2017). Limitation of the hazard caused by the
collapse of roofs of underground cavities using geosynthetic reinforcement, 11èmes Rencontres
Géosynthétiques, Lille, France, pp. 239-248.
ABSTRACT
The majority of available models in practice to predict the punching shear resistance of working
platforms may result in considerable overestimation of platform thickness due to
conservative simplifications in the development process of the design models. With this
background, systematic large laboratory tests were conducted to identify and overcome the
shortcomings in the available design models with a particular focus on the popular model by
BRE470. The focus is laid on achieving an improved understanding of the parameters and
processes affecting the behavior of geogrid reinforced working platforms under concentrated
loads. In this regard, the working platform is subject to extreme loads representing track
loads. The gained improved knowledge from laboratory tests is then used to modify the
available bearing capacity equation to account for the effect of a footing punching through a
geosynthetic reinforced granular platform material overlying a soft cohesive subgrade. In
addition, the data is further analyzed to develop a simplified semi-empirical equation to predict
the immediate deformation of working platforms subject to loads from semi-rigid tracks. The
developed prediction models are finally applied for the boundary conditions of the laboratory
tests and the accuracy of models in terms of bearing capacity and deformation is examined.
INTRODUCTION
Dimensions of piling rigs and cranes as well as their operating loads have grown considerably
over the last years as the demand to install larger structural components is increasing (e.g.
piled foundations, on-shore wind turbines, etc.). This has resulted in an increasing
number of applications using geogrid-reinforced base courses and increased knowledge of
understanding the interaction of reinforcement to stabilize granular soils (e.g. Vollmert & Bräu,
2018). Transferring the beneficial behavior to working platforms results in a competitive
solution to thicker unreinforced aggregate layers, especially in terms of both costs and
response to heavy loads induced by tracked plant. Hardstands for this increasingly heavy
equipment demand a reliable, safe and economical ultimate limit state design procedure which
enables a complete verification of safety against different failure modes.
Currently applied design procedures for geogrid reinforced working platforms being
exposed to high concentrated loads caused by tracked plant mainly consist of two analyses:
(i) Ultimate Limit State analysis to prove sufficient punching shearing resistance of the
reinforced platform subject to the high localised forces;
(ii) Serviceability Limit State analysis to restrict total and differential settlements of
working platforms under tracked plant overlying the soft cohesive soil.
For an Ultimate Limit State (ULS) design of working platforms, considerable advances in
design and analysis of reinforced working platforms is achieved through the contribution of several
research studies and design standards such as the popular methods of load spreading angles,
BRE470 etc. Among these models, the model from BRE470 is one of the most popular models
due to its simplicity even though that, the limitation of this model is addressed in several research
studies (e.g. Dobie et al., 2019; Scotland et al., 2019). In general, the main weakness of the BRE40
method can be summarized as:
the model does not consider the curved shear planes develop between the edge of the
track and the formation and assumes a vertical shear plane which underestimates the
working platform shear strength;
the effect of the geogrid tensile strength in the basic resistance equation proposed by
BRE470 has not been considered around the perimeter of the track despite the
symmetric shape of track;
the effect of relative subgrade-working platform stiffness in the reduction of working
platform shear strength as suggested by Hanna and Meyerhof (1980) is neglected in
BRE model.
For Serviceability Limit State (SLS) designs of working platforms, less attention is paid to
the estimation of immediate deformations underneath tracked plant and most of the designs in
practice focus solely on the ULS design, which addresses the punching shear resistance of the
working platform.
Therefore, new knowledge and modelling techniques need to be generated for both SLS
and ULS designs of reinforced working platforms underneath high concentrated loads. Indeed, it
is crucial for both, design optimization and safety assessments, to develop an improved
For the laboratory tests in small-scale condition to investigate the bearing capacity of working
platforms, several phenomena such as scale effect and the effect of boundary conditions might
influence the accuracy of the results. Therefore, large scale experiments were performed on
geogrid reinforced working platforms by Stuttgart university in the framework of a DFG (Deutsche
Forschungsgemeinschaft) project in Germany (Deutsche Forschungsgemeinschaft). The main
objective of these experiments was to investigate the effect of reinforcement on the behavior of
the working platform and consequently develop a conceptual model to estimate the working
platform thickness and the type of reinforcement under localized high loads from rigid footings.
The model setup of the laboratory tests for the working platform over soft clay subject to
loads from footing is shown in Figure 2.
272 cm
Displacement transducer
Strain gauges
25 cm 25 cm
Hydraulic Cylinder
Force Transducer
482 cm
35 cm
Working platform
Geogrid
20 cm
Strain Geocomposite
gauges (Geogrid + Force Transducer
80 cm
geotextile)
Soft clay (a) (b)
Figure 2. Model setup: a) cross section; b) plan view
Loads of increasing magnitude (P=10, 20, 40, 50 etc.) are applied on the working platform
to allow for an incremental comparison of results for reinforced versus non-reinforced platforms
and to enable a trackback estimation of maximum allowable bearing capacity. The model is subject
to loads from a rectangular shaped plate with the dimension of 25 cm x 35 cm. The geometry of
model is considered to represent a prototype problem with a scale of 1/3. The width of the box and
the distance between the footing and the wall is chosen large enough to minimize the boundary
effects (footing width / box width < 0.1). The settlements in several positions underneath the
loaded area corresponding to each load step is measured by the displacement transducers. Different
10 kN
20 kN
Settlement (cm)
40 kN
50 kN
67.6 kN
Working platform
20 cm
Geotextile
80 cm
soft clay
Figure 3. Recorded settlement and ultimate bearing capacity for: a) reinforced working
platform and; b) unreinforced working platform
The test results showed that, the extreme loading of the working platform cause large and
deep shear failures at the perimeter of plate and further away far from the loaded plate.
Elastic and immediate settlement will occur directly after the application of loads from the tracks
of a heavy machine. The magnitude of the developing settlements is a function of the geotechnical
properties of the working platform and subsoil. Among the soil parameters, which affect the
immediate settlement, the modulus of elasticity of the working platform is the most decisive
parameter to influence the magnitude of the settlement. Several experimental and numerical
studies have revealed that, the application of geogrids in working platforms may significantly
increase the soil mechanical parameters (e.g. modulus of elasticity). With this background, large
triaxial tests of 500 mm diameter and 1.1 m height have been carried out at the Institute of
Foundation Engineering, Soil Mechanics and Waterways Construction at RWTH Aachen
university for quantification of the effect of geogrid application on the soil characteristics.
Figure 4 a) shows the test setup, while the number of geogrid layers has been varied. Strain gauges
3 layers of geogrid
unreinforced
Figure 4. Large scale triaxial tests at RWTH Aachen university (Ruiken, 2013)
a) test setup b) strain development of a geogrid placed in the centre of the sample with
three layers of Secugrid®30/30 Q6 at a uniaxial strain of the sample of e1 = 1 % c) increase
of appliable stress of a sample with three layers of geogrid Secugrid®30/30 Q1 compared to
an unreinforced sample
The ultimate bearing capacity of a single or multi-layered soil is generally determined according
to Terzaghi theory (1943) which has been developed by the extension of Prandtl plastic failure
theory (1921). Several models have been proposed so far, to refine the solution as provided by the
Terzaghi’s bearing capacity formula.
Ca Ca 𝛗𝐩
H 𝜸𝒑 Platform
Pp 𝛅 𝛅 Pp
𝐂u Subgrade
BRE470 𝜸𝒔
failure plane
Figure 5. Punching shear failure mechanism of layered soils according to Meyerhof &
Hanna (1978)
Figure 6. Applied methodology for development of the prediction model for punching shear
resistance of reinforced working platform
In the “Third Step” the developed semi-empirical model was applied to estimate the
allowable pressure over the working platform to the lab tests in Stuttgart considering the boundary
condition of each test. Load settlement curve related to a certain test is shown in Figure 7 (left).
As shown in the figure, the ultimate resistance of working platform is obtained with 285.7 kPa (25
kN / B / L) for this particular test. The developed model is this study is then applied for the test
condition to predict the maximum allowable load on the working platform. The maximum bearing
capacity of the working platform is estimated considering applying load versus settlement. As
shown in Figure 7 and 3b, increasing the load from 20 kN to 40 kN has resulted a dramatic
settlement of working platform thus the ultimate bearing capacity is expected to be between these
values. As shown in Figure 7 (right) the ultimate bearing capacity by the model in this study is
estimated with 250 kPa. Afterwards, the original model from BRE470 is implemented to predict
the allowable loads on the working platform. As can be seen, the model from BRE470 has
dramatically underestimated the allowable loads on working platform (on the safe side). The
further results for the prediction model vs. tests are shown in Figure 7 (right). The area below the
line is the safe zone where the predicted allowable load is lower than the measured soil bearing
capacity. The proposed model in this study and the BRE model are applied to estimate the
allowable pressure on the working platform. The result shows that, the developed model in this
study tends to predict safe and optimised results (utilisation factor between 0.7 to 0.95). In contrast,
even though that the model in BRE has proposed safe results, the allowable load is much smaller
P = 25 kN
250
q model (kPa)
6
230
8
210
10
190
12
170
14
16 150
18 130
130 180 230 280
q test (kPa)
Figure 7. Allowable pressure on working platform: developed model vs. large scale
laboratory tests from Stuttgart university
In addition to the semi-empirical model as developed in this study derived from Meyerhof’s
model, a Kinematic Element Model (KEM) is set up (Step Four) to investigate the rotational and
overall stability of the working platform. The KEM model implements the rigid body approach to
examine the equilibrium state, thus enabling a full interaction of soil wedges with the intersecting
geosynthetic reinforcement. The rotational and overall stability of the working platform might be
even more dominant when the construction equipment is positioned close to the edge of working
platform.
The KEM and the developed model in this study are applied (Step five) to perform a
systematic parametric study by variation of the most influencing parameters affecting the ultimate
bearing capacity of the working platform (e.g. soil shear strength, loads, geometry of tracks, etc.).
The preliminary results show that, while the stability of working platforms overlying firm to hard
cohesive subsoil (approx. cu > 30 kN/m2) is commonly governed by the soils punching shear
strength, the failure mode of working platforms over very soft to soft cohesive soil may be
governed by rotational slip circles. Therefore, it is recommended to investigate the overall and
rotational stability of the platform (especially when the heavy machine is positioned close to the
platform’s edge) during the design phase.
According to the preliminary KEM results in this study, further development of the
available models in practice is required to take into account the rotational and overall failure modes
of working platforms.
While several design guidelines provide methods and equations for the prediction of the punching
shear strength of the working platform, less attention is paid so far to the estimation of
deformations underneath the tracked plant. For the design of working platforms under tracked
1−𝜇𝜇𝑠𝑠2
S = Dσ (αB) 𝐼𝐼𝑠𝑠 𝐼𝐼𝑓𝑓 Eq. (1)
𝐸𝐸𝑠𝑠
Where:
Dσ = net applied pressure on the foundation
μs = Poisson’s ratio of soil
Es = weighted average modulus of elasticity related to reinforced working platform und subsoil
under the foundation up to z = 4B
B = the width of track for estimation of maximum deformation
Is = shape factor
If = depth factor
α = factor that depends on the location on the foundation where settlement is being calculated
According to Eq. (1), the influencing parameters can be classified into (i) geometrical
parameters; (ii) load parameters and; (iii) soil geotechnical parameters. While less uncertainties in
determination of geometrical and load parameters during the design process of working platforms
is expected, the correct estimation of soil parameters (especially through application of geogrid
reinforcement) is known as the most challenging task for an accurate settlement analysis.
Nevertheless, it is crucial to implement the correct value of elasticity modulus as well as Poisson
ratio for a reliable deformation estimation of the working platform. Therefore, the focus of this
study is on the general equation for immediate deformation of shallow foundation to account for
the effect of geogrid stabilization and reinforcement of the working platform material. As a result,
a simplified relation is proposed to predict the soil elasticity modulus as a function of geogrid
stiffness and the number of reinforcement layers.
For this purpose, the data from the large triaxial tests at RWTH Aachen university is
analyzed to investigate the effect of soil stabilization due to application of 1, 3, and 5 geogrid
layers. The results from the triaxial tests are depicted in Figure 8 (left). Accordingly, the equivalent
elasticity modulus of the soil has been extracted using the classical geotechnical equation
according to triaxial tests and are shown in Figure 8 (right). The best fitted exponential function
has been determined by statistical analysis of the data and the function is proposed for the particular
geogrid as used in this study.
The result from laboratory tests shows that, the application of laid and welded geogrids
with a defined initial tensile stiffness may increase the soil elasticity modulus up to ca. 70%.
Es,R / Es,UR
σ1 (KN/m2)
250,00
1,4
200,00
1,3
150,00 1 Layer
Un-reinforced
1,2
100,00 1 layer
3 Layers 1,1
50,00
5 Layers
Un-reinforced
0,00 1,0
0,00 2,00 4,00 6,00 8,00 10,00 12,00 0 1000 2000 3000 4000 5000
ε [%] J (kN/m)
The modified deformation model is then applied to predict the settlements underneath the
footing as measured in laboratory tests from Stuttgart tests taking into account the boundary
conditions as defined for the experiments (Dσ = 120 kPa, μs = 0.3, Es,UR = 80000 kN/m for sandy
material, B=0.25 m, L=0.35 m). For the test with two layers of a laid and welded geogrid
reinforcement a total stiffness of 600 kN/m (@ 2% strain) are applied. Therefore, the Es,R can be
predicted to 112720 kN/m according to Figure 8 and the proposed equation for estimation of
equivalent elasticity. For this particular case study (Stuttgart test), the developed settlement
equation estimates an immediate settlement of 21 mm. The comparison of recorded data (see
Figure 3a) against the calculated settlement shows an inconsistency of less than 5% for this
particular test.
CONCLUSION
The main objective of this study was to (i) generate a knowledge base through performing large
scale laboratory tests to improve the understanding of the processes involved in the interaction of
laid and welded geogrids and aggregates within working platforms; (ii) develop an optimized and
reliable methodological approach for the prediction of the maximum bearing capacity of working
platforms by overcoming the weaknesses of the BRE470 design methodology; (iii) quantify the
effect of geogrid reinforcement on improvement of soil mechanical behavior and accordingly
develop equation for the prediction of total immediate deformation of working platforms. In this
regard the key achievement of this study can be summarized as follows:
(i) The large-scale laboratory tests on reinforced and non-reinforced working platforms
under a rectangular plate at Stuttgart university along with the large scale triaxial tests
at Aachen university were applied to improve the knowledge associated with the
ultimate limit state (bearing capacity) and serviceability limit state (deformation)
analyses of working platforms. Both tests revealed that the application of a laid and
welded geogrid will improve soil mechanical properties and will enhance the working
platform behavior in terms of bearing capacity and deformation.
(ii) Given the knowledge and practice gaps in the design of working platform (i.e.
aforementioned weaknesses and shortcomings from BRE470) and considering the
REFERENCES
Al-Shenawy, A. O., & Al-Karni, A. A. (2005). Derivation of bearing capacity equation for a two
layered system of weak clay layer overlaid by dense sand layer. Pertanika J. Sci. & Technol,
13(2), 213-235.
Ballard, J.-C., Delvosal, P., Yonatan, P., Holeyman, A. & Kay, S. (2011). Simplified VH equations
for foundation punchthrough sand into clay. Frontiers in Offshore Geotechnics II (ed.
Gourvenec & White), CRC:London, pp. 655-660.
BRE (2004). Working platforms for tracked plant. BR470. Garston, Watford
Burd, H. J., and Frydman, S. (1997). Bearing capacity of plane-strain footings on layered
soils. Canadian Geotechnical Journal, 34(2), 241-253.
Chen, Q., & Abu-Farsakh, M. (2015). Ultimate bearing capacity analysis of strip footings on
reinforced soil foundation. Soils and Foundations, 55(1), 74-85.
Das, B. M., & Sobhan, K. (2013). Principles of geotechnical engineering. Cengage learning.
Dobie, M., Lees, A., & Khanardnid, J. (2018). Case study: performance of a geogrid stabilised
working platform constructed over extremely soft dredged silt. In Proceedings of the 11th
International Conference on Geosynthetics, Korea.
Dobie, M. J. D., Lees, A. S., Buckley, J., & Bhavsar, R. (2019). Working platforms for tracked
plant–BR 470 guideline and a revised approach to stabilisation design with multiaxial
Ming Zhu, Ph.D., P.E.1, Bryan Scholl, Ph.D., P.E.2 and Rutuparna Joshi, P.E.3
1
Watershed Geosynthetics, 11400 Atlantis Place, Suite 200, Alpharetta, GA 30022; e-mail:
[email protected]
2
Watershed Geosynthetics, 11400 Atlantis Place, Suite 200, Alpharetta, GA 30022; e-mail:
[email protected]
3
Watershed Geosynthetics, 11400 Atlantis Place, Suite 200, Alpharetta, GA 30022; e-mail:
[email protected]
ABSTRACT
The final cover system is a critical component of a modern engineered landfill to isolate the waste
and protect the environment. Recent years have seen increased use of the engineered turf cover for
final closure of municipal and industrial waste landfills and coal combustion residuals (CCR)
landfills and impoundments. A typical engineered turf cover consists of, from bottom to top, a
structured geomembrane, an engineered turf, and a specified infill. The engineered turf cover
overcomes long-standing challenges of soil erosion and veneer-type soil slope instability
associated with many traditional soil covers. An overview of the engineered turf cover is provided,
followed by a comparison of the engineered turf cover with the traditional soil cover. Technical
performance of the engineered turf cover has been documented through extensive laboratory tests
and numerous field observations. Major technical aspects of the engineered turf cover are
discussed, including ultraviolet (UV) longevity, wind uplift, sand infill mobility, landfill
settlement, cover slope stability, and landfill gas management. Beneficial reuse of a closed landfill
with a new solar power generation technology is also presented.
INTRODUCTION
The final cover system is critical to achieve the performance standards set forth by regulations to
close a landfill with the ultimate goal to manage and mitigate potential long-term risks that the
underlying waste may pose to the environment. Traditionally, modern engineered landfills have
been closed using soil covers that include both soil and geosynthetic materials (e.g., geomembrane,
geosynthetic clay liner [GCL], and geocomposite). The past decade has seen increased use of the
engineered turf cover for closure of waste containment facilities, including municipal solid waste
(MSW) landfills, coal combustion residual (CCR) landfills and impoundments, and other
industrial waste landfills [Abreu and Franklin 2014, Saindon 2019, SWANA 2017].
A typical engineered turf cover (e.g., ClosureTurf) consists of, from bottom to top, a
structured geomembrane, an engineered turf, and a specified infill (Figure 1). The structured
geomembrane serves as a hydraulic barrier to isolate waste from the environment and minimize
infiltration of precipitation into the waste. The engineered turf is manufactured of polyethylene
(PE) synthetic turf fibers (synthetic grass blades) tufted into a double-layer geotextile backing,
which covers the underlying geomembrane and protects it from ultraviolet (UV) radiation
exposure and wind uplift. The specified infill, which is a minimum 0.5-inch (13-millimeter [mm])
thick sand layer buried in the synthetic grass blades, provides additional wind ballast and UV
protection and improves trafficability on the cover surface.
The engineered turf cover meets the performance requirements of a final cover system by
the U.S. EPA Subtitle D landfill and local state solid waste management regulations. It has been
approved by the regulatory agencies as an alternative to the prescriptive soil cover system for the
final closure of landfills. Since the first installation in 2009, more than 2,000 acres (800 hectares)
of engineered turf covers have been installed at sites located in a wide range of weather conditions
in the U.S. Aerial photos of two landfills installed with the engineered turf covers are shown in
Figure 2.
Baldwin County Landfill, Georgia (Green Turf) Portola Landfill, California (Tan Turf)
A traditional landfill soil cover, for example, consists of (from bottom to top) a geomembrane
barrier layer, a geocomposite drainage layer, and minimum 24-inch (0.6-meter) thick soil layers
(Figure 3). The engineered turf cover uses the engineered turf and specified infill to replace the
soil layers in a traditional soil cover, as shown side by side for comparison with the traditional soil
cover in Figure 3. Elimination of the soil layers overcomes two long-standing challenges
associated with many traditional soil covers, i.e., soil erosion and veneer-type soil slope instability,
because the soil layers are the sources of erosion and driving force behind landfill cover downslope
movement [Duffy 2016, Zhu et al. 2019].
Figure 3. Comparison of a traditional soil cover with the engineered turf cover.
Compared with a traditional soil cover, the engineered turf cover is not dependent on
availability and quality of borrow soils. Performance of the engineered turf cover is more
predictable and less affected by changing weather conditions. Without the soil layers (except for
the thin layer of sand infill), runoff from the engineered turf cover is virtually free of eroded soil
particles. Abreu and Franklin [2014] presented a case study where the surface water runoff was
sampled and tested to evaluate the quality of runoff from two distinct areas of the Tangipahoa
Regional Solid Waste Facility located in Independence, Louisiana. One area was capped with the
engineered turf cover and the other area with a clayey intermediate cover. Other than the type of
cover installed, both areas were approximately 5 acres (2 hectares) in size and had similar
characteristics. The test results indicated a turbidity of 11 Nephelometric Turbidity Units (NTU)
for the runoff from the engineered turf cover area, compared to 371 NTU from the soil cover area.
The Total Suspended Solids (TSS) concentration was measured to be less than 4 milligram per
liter (mg/L) for the runoff from the engineered turf cover area, compared to 349 mg/L from the
soil cover area. The runoff samples collected from the site (Figure 4) show the improvement in the
runoff quality as a result of the engineered turf cover installation.
The engineered turf cover requires much less post-closure maintenance than a traditional
soil cover because soil erosion repairs, re-vegetation, fertilization, mowing, and stormwater pond
cleaning are not needed. The carbon footprint of the engineered turf cover is estimated to be 5
times less than traditional soil covers due to faster installation, less heavy construction equipment
operations, less use of construction materials, and less truck trips, based on the data and calculation
procedure by the Geosynthetic Institute (GSI) [Koerner et al. 2019]. Impact on local communities
is less as a result of less truck traffic on local roads to transport construction materials. Land
disturbance is avoided because borrow soils are not needed for construction of the engineered turf
cover.
UV Longevity. Advancements in polymer technology have made geosynthetic materials last much
longer [Zhu et al. 2019]. The engineered turf cover is projected to last over 100 years, provided it
is installed and maintained properly in accordance with design drawings, engineering
specifications, and post-closure care requirements. This duration exceeds the current post-closure
regulatory period of 30 years in the U.S. by more than 3 times.
The structured geomembrane component of engineered turf cover is protected by the
overlying engineered turf and sand infill from UV exposure. Based upon the research by GSI
[Koerner et al. 2011 and Koerner et al. 2012], a covered geomembrane has an expected lifetime
(i.e., a half-life) of several hundred years. The engineered turf layer is comprised of two distinct
parts: (1) a double-layer woven geotextile backing with enhanced UV resistance; and (2) PE turf
fibers tufted into the woven geotextiles. The sand infill and turf fibers provide UV shielding of the
geotextile backing. With the sand infill in place, the geotextile backing will remain intact and in
place covering the structured geomembrane, allowing the geomembrane to realize its full design
life.
Outdoor UV longevity testing was performed on the turf fibers at the Atlas Weathering
Facility in New River, Arizona, which is among the highest UV radiation places in the U.S.
Samples of the turf fibers were collected at approximately 1, 3, 5, and 10 years after being exposed
in the field and then tested at an independent geosynthetics laboratory for tensile strength. The
remaining tensile strength of the turf fibers was compared to the original tensile strength. Based
on the test data, the number of years to reach 50% of the original tensile strength (i.e., the half-life)
was projected to be over 100 years [Geosyntec 2015].
The turf fiber tensile strength values over time are compared to the required service value
in Figure 5. At Year 100, the turf fibers are projected to have approximately 60% of the original
tensile strength. Considering that the average tensile strength of virgin turf fibers is approximately
35 pounds (lbs) (156 Newtons [N]) per fiber, the tensile strength at Year 100 is therefore projected
to be approximately 20 lbs (89 N) per fiber, which is still significantly greater than the minimum
tensile strength necessary for the turf fibers to perform in the field (i.e., in the order of 3 to 4 lbs
[13 to 18 N] per fiber). The minimum required tensile strength of the turf fibers was estimated by
comparing a synthetic turf fiber to a real grass stem.
100
90
Retained Tensile Strength (%)
80
70
60
50
40
30
20
10
0
10,000 100,000 1,000,000
Exposed Hours
Saufley Field (Pensacola, FL) Atlas Material Testing (New River, AZ)
LaSalle-Grant (Jena, LA) Atlas Material Testing Projection
Figure 6. Outdoor testing and field performance of turf fiber tensile strength.
Wind Uplift. Extensive wind tunnel studies have been performed to evaluate the wind
performance of the engineered turf cover. It was tested in 2010 for wind speeds up to
approximately 120 miles per hour (mph) (190 kilometers per hour [km/h]) at the Georgia Tech
Research Institute (GTRI) Aerospace, Transportation & Advanced Systems Laboratory. The test
was performed on a flat surface and no uplift of the engineered turf sample was observed due to
the wind load. A photo of the test is shown on the left in Figure 7.
Georgia Tech Test, 2010 Iowa State University Test, 2018 and 2019
Figure 7. Engineered turf cover wind tunnel testing.
The wind pressure coefficient can be used to calculate the wind load using the following
equation [Giroud et al. 1995, Wayne and Koerner 1988]:
1
𝑃𝑃 = ∙ 𝐶𝐶𝑝𝑝 ∙ 𝜌𝜌 ∙ 𝑈𝑈(𝐻𝐻)2
2
where, 𝑃𝑃 (pounds per square foot [psf]) is wind-generated pressure normal to the surface, 𝜌𝜌 is the
air density (𝜌𝜌 = 0.0024 slug/cubic foot [ft3] at 59ºF and sea level), 𝑈𝑈(𝐻𝐻) (feet/second [ft/s]), is the
Sand Infill Mobility. Large-scale rainfall erosion testing (ASTM D6459) and channel erosion
testing (ASTM D6460) have been conducted to evaluate hydraulic performance of the engineered
turf cover, specifically the sand infill mobility. The large-scale rainfall erosion test results show
minimal sand loss (i.e., less than 0.1%) at the simulated rainfall intensity up to 6.57 inches per
hour (167 mm per hour). The large-scale channel erosion test results show a sand thickness loss of
less than 0.05 inches out of the original thickness of 0.5 inches at an estimated hydraulic shear
stress of 0.8 psf (38.3 Pascals [Pa]). The sand infill specification has been developed as a result of
the extensive hydraulic testing program and is shown in Figure 9. The specification includes
requirements of the grain size distribution, angularity, and specific gravity of the sand infill.
Printed: 12/2/2019
2" 1" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200
100%
WG Sand Infill GSD Specification
10%
0%
100.00 10.00 1.00 0.10 0.01
Grain Diameter (mm)
Multiple landfill sites along the East Coast installed with engineered turf covers have been
hit by significant rainfall events, including hurricanes and tropical storms. Field observations
indicate that the engineered turf covers have performed as expected without significant sand infill
movement.
Landfill Settlement. Landfill settles due to compression and consolidation of waste and
foundation soils. Settlement is expected to continue after the landfill is closed. Differential
settlement as a result of inhomogeneous waste properties can create local depression and surface
cracks on a traditional soil cover. The engineered turf cover, which consists of flexible
geomembrane and engineered turf with high elongation properties, can tolerate much greater
Cover Slope Stability. As discussed previously, one of the long-standing challenges with
traditional soil covers is veneer-type soil slope instability that in some cases could result in failures
(i.e., sliding) of the soil covers. Such failures have been documented in literature, a majority of
which were attributed to internal drainage clogging and subsequent saturation of soil layers,
insufficient internal shear strength of soil materials, and insufficient interface shear strength of the
soil layers and underlying geosynthetic materials [Bonaparte et al. 2004, Duffy 2016, Nadukuru et
al. 2017, Siebecker 2005, Stark and Newman 2010]. By replacing the overburden soil layers with
an engineered turf and a thin layer of sand infill, the engineered turf cover essentially eliminates
possibility of veneer-type soil slope instability associated with a traditional soil cover.
Stability of the engineered turf cover is evaluated by investigating the shear strength of the
two interfaces, i.e., the turf/geomembrane and geomembrane/subgrade interfaces, to prevent
potential movement that could result in wrinkles of the engineered turf cover. Direct shear testing
has been performed to evaluate the interface shear strength of the engineered turf layer against the
underlying structured geomembrane. For example, Figure 10 shows the direct shear test results of
the interface between the engineered turf and Super Gripnet geomembrane. The test results
indicate a peak interface friction angle of 36 degrees and a large-displacement interface friction
angle of 25 degrees.
Figure 10. Direct shear results between engineered turf and structured geomembrane
Landfill Gas Management. Landfill gas collection and control system (GCCS) is another critical
component of modern engineered landfills, especially MSW landfills where significant landfill gas
can be generated as the waste degrades over time. The engineered turf cover can be integrated with
the conventional landfill GCCS that consists of vertical gas extraction wells, as shown in
Figure 11. Geomembrane boots are used to seam the penetration around the gas well to prevent
gas migration.
Figure 11. Landfill gas extraction wells integrated with engineered turf cover.
Pressure relief valves have been developed for the engineered turf cover to protect it from
potential gas uplift during a shutdown of the landfill gas flare system or due to malfunction of the
landfill gas collection system. It is designed as a one-way check valve to relieve the gas pressure
below the engineered turf cover, which is only activated when a small positive gas pressure builds
up below the geomembrane. A picture of the pressure relief valve installed in the field is shown in
Figure 12.
One of the beneficial reuses of the large space after landfill closure is to convert it to a solar farm,
a clean source of green energy. The engineered turf cover makes a preferred foundation for a solar
farm, because it requires minimal post-closure maintenance. The solar panels are free of potential
damage from mowing equipment used for traditional soil covers. The runoff from the drip edge of
the solar panels does not create soil erosion that undermines the traditional soil cover foundation.
In addition, the landfill closed with the engineered turf cover is a relatively dust free environment
promoting more efficient solar collection.
A new solar power generation technology consisting of a patent-pending solar panel system
has been custom-designed for direct installation on the engineered turf cover. It is a three-
component system that consists of solar panels, mounting rails, and friction strips, as shown in
Figure 13.
The new solar panel system does not require penetrations through or mechanical
connections to the engineered turf cover. The friction strips attached to the underside of the
mounting rails provide sufficient interface friction between the solar panels and underlying
engineered turf cover, which maintains stability of solar panels and keeps them from sliding on
slopes with inclinations typical of final cover systems. Because of the non-racking design, this new
solar panel system is faster and easier to install than traditional solar systems supported using a
ballasted racking system. It can be installed on landfill side slopes in addition to top decks, thereby
maximizing the power-generation potential of a closed landfill site. Figure 14 is a photo of the new
solar panel system installed on the engineered turf cover at the Chadwick Road Landfill, Georgia,
as part of a demonstration project. As can be seen from the photo, the solar panel system is flexible
and can accommodate local differential settlement of the landfill cover, allowing for installation
of solar panels while the landfill is still going through the settlement stage.
The new solar panel system has been tested extensively in the wind tunnel facility at the
Iowa Stata University using both scaled and full-size solar panel models. The test results have
demonstrated satisfactory wind performance due to its low-profile setup and aerodynamic
boundary conditions associated with the underlying engineered turf cover. The wind load design
guidance has been developed based on the wind tunnel test results and the new solar panel system
can be designed properly based on site-specific geometries and the selected design wind speed to
keep it from wind uplift.
REMARKS
The engineered turf cover provides an innovative geosynthetic solution to overcome long-standing
challenges faced by the traditional soil cover approach. Extensive laboratory testing and over a
decade of field installation have demonstrated that the engineered turf cover can meet the
performance requirements for landfill closure. The engineered turf cover can be used with the new
custom-designed solar power generation technology to provide another innovative solution for
beneficial reuse of the closed landfill space and maximize the generation of clean and renewable
energy.
REFERENCES
Abreu R.C. and Franklin J. (2014). Design and installation of a geosynthetic final cover utilizing
artificial turf in Louisiana, 7th International Congress on Environmental Geotechnics, ICEG
2014, Barton, ACT, Engineers Australia: 1397-1404.
Bonaparte, R., Gross, B.A., Daniel, D.A., Koerner, R.M., and Dwyer, S.F. (2004). Technical
Guidance for RCRA/CERCLA Final Covers, United States Environmental Protection Agency,
Office of Solid Waste and Emergency Response, Washington DC.
Duffy, D.P. (2016). The worst-case scenario: landfill cover erosion and slope instability, MSW
Management, Feb. 9th, 2016.
Geosyntec (2015). Literature Review and Assessment of ClosureTurf UV Longevity, Report
prepared by Geosyntec Consultants for Watershed Geosynthetics, 15 May 2015.
Giroud, J.P., Pelte, T., and Bathurst, R.J. (1995). Uplift of geomembranes by wind, Geosynthetics
International, Vol. 2, No. 6, 897-952.
Min Zhou, Ph.D.,1 Fei Wang, Ph.D., P.E.,2 and Yan-Jun Du, Ph.D.3
1
Assitant Professor, School of Science, North University of China, Taiyuan, Shanxi, China, 030051;
Formerly, Ph.D. student, Institute of Geotechnical Engineering, Southeast University, Nanjing,
Jiangsu 210096, China; e-mail: [email protected]
2
Assistant Professor, Department of Engineering and Computer Science, Tarleton State University,
Box T-0390, Stephenville, TX 76402, USA; e-mail: [email protected]
3
Professor and Director, Institute of Geotechnical Engineering, Southeast University, Nanjing,
Jiangsu 210096, China; e-mail: [email protected]
ABSTRACT
INTRODUCTION
Buried pipelines are increasingly threaten by localized ground subsidence, and the accidents of
pipelines caused by localized ground subsidence have been reported all over the world (O’Rourke
and Liu, 1999; and Zhou et al., 2019). Localized subsidence is generally defined as a deep and
narrow depression with a slope steeper than 1/2000 (Zhou et al., 2019). High Density Polyethylene
(HDPE) pipe, widely adopted in municipal projects, could be damaged easily by the localized
ground subsidence due to low flexure bending resistance along the pipe (Zhou et al., 2019).
Geosynthetics have been widely used in pipeline projects to minimize the effect of external loads
on pipes including traffic loads and penetrating loads. Kawabata et al. (2003) used five layers of
geogrids to reduce the overburden load on a deeply HDPE buried pipe, which resulted in a
reduction of 25% of the overburden load above the pipe. Tafreshi and Khalaj (2008) pointed out
that geosynthetic reinforcement was effective to reduce the ground surface settlement and
deflection of pipes. Palmeira and Andrade (2010) proposed the use of geogrids to prevent the
damages of buried steel pipes from penetrating loading and the wrapped-around reinforcement
mode turned out to be the best reinforcing mode. Geocells were used by Mehrjardi et al. (2013)
to protect buried PVC pipes, which caused a reduction of 65% and 35% for ground surface
NUMERICAL MODELING
Numerical Modeling Cases. Based on the model test results in Zhou et al. (2020), woven
geotextile was found to be a better solution for reinforcing flexible pipes subjected to localized
ground subsidence compared to geogrids. To further investigate the performance of the proposed
mitigation method, the effects of location and layer number of the geotextile on the pipe behaviors
were investigated by conducting a series of numerical modeling. Numerical modeling cases are
summarized in Table 1.
Baseline Model. A commercial Finite Element Method (FEM) software ABAQUS® was adopted
in this study to simulate the performance of HDPE pipe subjected to localized ground subsidence.
Considering the symmetry of the numerical model, only half of the baseline model is used as
shown in Figure 1. The boundary conditions are shown in Figure 1(a), and a displacement is
applied at the bottom of the model to simulate the localized ground subsidence. The side
boundaries of the model were restrained against displacements in the horizontal direction, and the
top surface was set at free displacement. The height, width, and length of the model were 1,100,
1,000, and 2,000 mm, respectively. The outer diameter of the HDPE pipe was 150 mm, and the
wall thickness of the pipe was 9 mm. A layer of geotextile was installed at the bottom of the pipe
for the baseline model, which has a width of 1,000 mm and a length of 2,000 mm. The surrounding
soil was simulated using C3D20R, and the geotextile was modeled using M3D8R which was the
special model for geotextiles provided by the ABAQUS software. Hard contact was used to
simulate the interfaces of the pipe and geotextiles with the surrounding soil. Hard contact is a type
of contact which the normal force is not limited, and the interfaces would be separated if the normal
force is equal to zero. The coefficient of friction at the interface of pipe and soil was 0.7, while
the one for geotextile-soil interface was 0.9. Elastic perfect plastic responses of soil were
1000
2000
1100
Pipeline
150
Geotextile
Symmetric plane
Applied displacement
(a)
1000
2000
1100
Pipeline
150
Geotextile
Symmetric plane
(b)
Figure 3 shows the comparison of the calculated and measured pipe displacement at different
bottom plates lowering sequences. It can be seen from Figure 3 that the error is in a range of 5%
to 9%, which demonstrates the numerical modeling procedure used in this study is effective. Table
3 is the comparison of the measured and calculated earth pressures at the pipe top. The relative
error of the earth pressures is in a range of 11.2% to 43.8%, which might be caused by the following
reasons: (1) the surrounding soil in the numerical model is a continuum media, and the relative
displacement of sand particles cannot considered in the numerical modeling, which could not
simulate the soil arching effect above the pipe very accurately; and (2) the displacement at the
10
Sequence 1
15 Sequence 2
Lowering sequence Sequence 3
4 1 1 4 10 mm Sequence 4
20 5 2 2 5 20 mm Sequence 5
6 3 3 6 20 mm Sequence 6
#3 #4 #5 #6 FE simulation results
25
Table 3. Comparison of measured and calculated earth pressure at the pipe top.
Measuring section 1 Measuring section 2
Lowering
sequence Measured Numerical Measured Numerical
Error (%) Error (%)
(kPa) (kPa) (kPa) (kPa)
1 7.9 6.4 23.4 8 8.9 11.2
2 9 7 28.6 8.3 9.8 18
3 10 7.4 35.1 8.6 10.3 19.8
4 11.5 8 43.8 9.1 11.3 24.2
5 12 8.4 42.9 9.9 11.8 19.2
6 12.5 10.5 19 12 14.7 22.5
12
20
(b) vertical displacement of 30 mm
Distance to the centerline of model box (m)
-1.0 -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 1.0
0
Vertical displacement of pipe (mm)
10
15
25
15
(a) vertical displacement of 10 mm
Distance to the centerline of model box (m)
-1.0 -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 1.0
0
Verical displacement of geotextile (mm)
10
15
10
15
20
25
Reinforced by woven geotextile underneath the pipe (Case 1)
Reinforced by woven geotextile at 20 mm underneath the pipe (Case 2)
30 Reinforced by woven geotextile at 40 mm underneath the pipe (Case 3)
35
(c) vertical displacement of 50 mm
Figure 5. Variations of vertical displacement of geotextile at different vertical displacement
at model bottom with single layer of geotextile reinforcement.
Effect of Geotextile Layer Number. Figure 6 presents variations of vertical displacement of pipe
with multiple layers of geotextile reinforcement. It is seen that the vertical displacements of pipes
for the cases with single, two, and three layers of geotextile reinforcements are almost the same,
and the relative error is less than 5%. The reason is the vertical displacement of the pipe subjected
to localized ground subsidence could be controlled mainly by the geotextile installed at the pipe
bottom, and the benefits from the other two layers of geotextiles are minimal. It can be concluded
that the reinforcement only installed at the pipe bottom should be sufficient to protect the pipe
subjected to localized ground subsidence.
10
(a) vertical displacement of 10 mm
CONCLUSIONS
Buried pipes are threaten by the localized ground subsidence and the accidents have been reported
all over the world. Geosynthetics were proposed in Zhou et al. (2020) to reinforce HDPE pipes
subjected to localized ground subsidence through physical model tests and the geotextiles was
proved as the best reinforcement method. However, the effects of installation location and layer
number of the geotextile reinforcement on the performance of the reinforced pipe have not been
understood well. In this study, a three-dimensional FEM was employed to investigate the effects
of these two factors on the performance of the reinforced pipe subjected to localized ground
subsidence. The numerical model was firstly verified by the physical model test results from Zhou
et al. (2020), and five numerical cases considering different reinforcing locations and layer number
were calculated. The vertical displacements of the pipe and the geotextile were used to evaluate
the reinforcement performance. The following conclusions can be drawn:
REFERENCES
Corey, R., Han, J., Khatri, D.K., Parsons, R.L. (2014). Laboratory study on geosynthetic protection
of buried steel-reinforced HDPE pipes from static loading. Journal of Geotechnical and
Geoenvironmental Engineering; 140(6): 04014019.
Kawabata, T., Uchida, K., Hirai, T., Mohri, Y., Ling, H.I., Koyama, N. (2003). Experiments on
buried pipe using backfill of cover with geosynthetics. Proc. of the ASCE International
Conference on Pipeline Engineering and Construction, ASCE, Baltimore, MD: 1271-1278.
Mehrjardi, G.T., Tafreshi, S.N.M., Dawson, A.R. (2013). Pipe response in a geocell-reinforced
trench and compaction considerations. Geosynthetics International; 20(2): 105-118.
O'Rourke, M.J., Liu, X. (1999). Response of buried pipelines subject to earthquake effects.
Multidisciplinary Center for Earthquake Engineering Research, Ph.D. Dissertation, University
at Buffalo, Buffalo, New York.
Palmeira, E.M., Andrade, H. (2010). Protection of buried pipes against accidental damage using
geosynthetics. Geosynthetics International; 17(4): 228-241.
Tafreshi, S.N.M., Khalaj, O. (2008). Laboratory tests of small-diameter HDPE pipes buried in
reinforced sand under repeated-load. Geotextiles and Geomembranes; 26(2): 145-163.
Zhou, M., Wang, F., Du, Y.J., et al. (2019). Laboratory evaluation of buried high-density
polyethylene pipes subjected to localized ground subsidence. Acta Geotechnica; 14(4): 1081-
1099.
Zhou, M., Wang, F., Du, Y.T., Corey, R., and Liu, M.D. (2020). Feasibility study on the use of
geosynthetics to reinforce buried HDPE pipe subjected to localized ground subsidence.
Transportation Geotechnics; 22: 100303-1-11.
Ryan A. Corey, Ph.D., P.E.,1 Deep Khatri, Ph.D.,2 Jie Han, Ph.D., P.E., F. ASCE,3
and Robert Parsons Ph.D., P.E., M. ASCE4
1
RTE Technologies, 7924 Floyd Suite 100, Overland Park 66204; e-mail: [email protected]
2
United Consulting; 625 Holcomb Rd. Norcross, GA 30071;e-mail: [email protected]
3
University of Kansas Dept. of Civil Environmental and Architectural Engineering, 2150
Learned Hall, 1530 W. 15th St. Lawrence, KS 66045; e-mail: [email protected]
4
University of Kansas Dept. of Civil Environmental and Architectural Engineering, 2150
Learned Hall, 1530 W. 15th St. Lawrence, KS 66045; e-mail: [email protected]
ABSTRACT
A full-scale static load test of a buried pipe with and without a layer of geosynthetic showed that
a layer of geosynthetic effectively reduced the load on the pipe. Based on the calibration of a
numerical analysis to the full-scale laboratory test of the geosynthetic reinforced pipe, a series of
numerical analysis were run with varying pipe stiffness. The behavior and design of buried pipes
is controlled by the relative pipe and soil stiffness ratio. Correspondingly the pipe and soil stiffness
ratio can be predictive in the effectiveness of attenuating static forces with a geosynthetic layer.
By running the same analysis with varying pipe and hoop stiffness an indication of the potential
effectiveness of geosynthetic reinforcing for static loads relative to the pipe and soil stiffness ratio
is quantified and provided.
INTRODUCTION
There has been an interest in using geosynethics to protect and improve the resiliency of buried
pipes. Several researchers have investigated reducing the loads on shallow pipes from static
surface loads, dynamic surface loads, and penetrating loads using a variety of geosynthetic and
configurations including; Pearson and Milligan (1991), Bathurst and Knight (1998), Kawabata et
al. (2003), Bueno et al. (2005), Moghaddas-Tafreshi, and Khalaj (2008, 2011), Palmieri and
Andrade (2010), and Pires and Palmieri (2017). This investigation was to determine what pipes
will benefit most from the protection and reinforcement from static surface loads. Based on a full-
scale test and a calibrated numerical analysis, a parametric study of relative pipe stiffness and hoop
stiffnesses, as described by McGrath (1999), was performed to determine the potential benefit of
geosynthetic protection of different types of pipes.
FULL-SCALE TESTING
Full scale testing of a geosynthetic protected buried pipe was completed at the University of
Kansas in a 3m wide by 2m wide x 2m long box (Fig. 1A). A Fat Clay backfill (Table 1) was
placed into the box and compacted in 152 mm lifts, up to 1.6 m deep. The lifts were compacted
to a density of 14.5 kN/m3 resulting in a clay of medium stiffness. With two braced forms, a 1.14
m deep by 1.22 m wide trench was formed in the middle of the 3 m wide box along the entire
length of the box. A 152 mm bedding lift of 19 mm clean limestone aggregate (Table 2) was poured
Reaction Frame
Loading
plate
Geotechnical
Testing Box
Trench
Pipe
Two displacement transducers were placed at the center of the pipe directly under the
loading plate to measure the relative displacements of the crown, invert, and spring-line. One
transducer was placed vertically to measure the vertical displacements of the pipe, while the second
transducer was placed in a horizontal position to measure horizontal displacements of the pipe
section. A third displacement transducer was placed vertically at the center line of the pipe, 0.30
m longitudinally from the loading plate. The three displacement transducers DT 1, DT 2, and DT
3 can be seen in Figure 2. A tell-tale was attached to the crown of the pipe to measure the movement
of the crown of the pipe in relation to a stationary datum.
DT1 DT3
DT2
0.3 m
An earth pressure cell with a capacity of 500 kPa (KDE-500) was placed 51 mm above the
crown of the pipe directly under the loading plate. A 0.30 m diameter loading plate with a rubber
base was used to apply a static load in the load increments of 68.9 kPa up to 689 kPa. After the
maximum load was reached the load was reduced in four steps.
NUMERICAL ANALYSIS
A calibration numerical analysis of the lab test was performed with FLAC 3D. The geotechnical
box was modeled as a fixed boundary. The fat clay fill was modeled as a linearly elastic material
with a bulk modulus of 20.8 MPa and a shear modulus of 9.6 MPa. The crushed stone aggregate
around the pipe was modeled non-linearly, utilizing the cap-yield soil constitutive model with the
parameters shown in Table 5.
The AB-3 aggregate base course was modeled as a linearly elastic perfectly plastic soil.
The layer was modeled with a friction angle of 45 degrees and a cohesion of 22 kPA. The elastic
properties are shown in Table 6. The stiffness of the unreinforced condition was based on a bulk
modulus of 13.7 MPa and a shear modulus of 6.4 MPa. For the reinforced condition, the bulk
modulus and shear modulus were estimated at 22.7 and 10.6 MPa, respectively. The orthotropic
pipe was modeled as a uniformly thick plate shell. The bending stiffness and membrane stiffness,
in the two different directions, were estimated using mechanical properties based in Ugural (1981)
and based on the pipe properties (Table 3). The pipe properties are shown in Tables 6 and 7. The
geogrid was modeled with a FLAC 3D built in geogrid structural element that resists membrane
loads only. Based on the measured strains in the laboratory the geogrid was modeled with a
membrane stiffness of 660 kN/m in the machine direction, and a 990 kN/m stiffness in the cross
direction. Similarly, to the laboratory tests, vertical pressures under a 0.3 m plate were applied to
the model in 68.9 kPa increments up to 689 kPa.
Table 6. FLAC 3D Pipe Shell Bending Table 7. FLAC 3D Pipe Shell Membrane
Stiffness Properties. Stiffness Properties.
Dx (kPa-m3) 2.7x10-4 Ex (kPa) 1.03x106
Dy (kPa-m3) 1.24 Ey (kPa) 106x106
Gxy (kPa-m ) 6.7x10-5
3
G (kPa) 253x103
Dxy (kPa-m3) 1.3x10-4
CALIBRATION RESULTS
A comparison of the plate settlements, vertical deflections, and earth pressures at the crown of the
pipe are shown in Figures 4, 5, and 6.
Test 5 - U.R.
2 Test 7 - S.L.
4 FLAC - U.R.
6 FLAC - S.L.
8
10
12
14
16
18
20
5
Figure 4. Vertical Pipe Deflection.
200
Test 5 - U.R.
Vertical Pressure at
Test 7 - S.L.
150
Crown (kPa)
FLAC - U.R.
FLAC - S.L.
100
50
0
0 200 400 600 800
Applied Pressure (kPa)
Figure 5. Earth Pressure at Crown.
The results of labs tests 5 and 7, unreinforced and with a single layer respectively as
described in the full-scale testing section are shown with a continuous line. The numerical analysis
is shown with a dashed line. For this condition, the inclusion of a single layer of geosynthetic
protection, slightly increased the vertical plate settlement and vertical deflection of the pipe, while
the applied pressure at the crown of the pipe slightly decreased with inclusion of the geosynthetic.
Because the steel reinforced HDPE pipe is relatively flexible in bending but stiff axially as
compared to a thermoplastic pipe it became important to investigate what pipes would potentially
benefit from geosynthetic protection based on these criteria.
PARAMETRIC STUDY
McGrath (1998) introduced the Bending Stiffness Factor (Sb) and the Hoop Stiffness Factor (SH)
based on the parameters for the elastic solution proposed by Burns and Richards (1964). These
factors in Equations’ 1 and 2, are dimensionless and have been conveniently used to describe and
predict pipe behavior:
where Ms is the constrained modulus of the soil, E, A, I, and R are the modulus of elasticity,
the area, the moment of inertia, and the radius of pipe wall, respectively. The bending stiffness
factor describes the ratio of the soil stiffness to the bending stiffness of the pipe wall, similar to
the pipe stiffness determined from a parallel plate load test. The Hoop stiffness factor is a ratio of
soil stiffness to axial stiffness of pipe wall. A higher number in the bending stiffness and hoop
stiffness factors represent a more flexible pipe was as compared to the soil constrained modulus.
The calibrated model was the basis for the parametric study and all parameters of the model
were unchanged except for the pipe bending stiffness and pipe hoop stiffness, which were modified
individually. The constrained modulus for the aggregate back-fill was estimated as 13.1 MPa
based on plate loading tests. Based on the elastic pipe parameters and constrained modulus the
bending stiffness factor (SB) was estimated as 282. Since the pipe used for the box test was near
the low end of pipe stiffnesses commonly used the pipe stiffness was increased by factors of 1/16,
4, 16, and 256. The hoop stiffness SH of the pipe used on this project was calculated to be 0.026
based on the constrained modulus of 13.1 MPa and the pipe wall area. The hoop stiffnesses selected
for the parametric study were selected to range from 0.001 to 10 as shown in Table 10. The
bending stiffness was modified by changing Dy in Table 6 and Ey in Table 7. The bending
stiffness modifications did not change hoop stiffness for that parametric study and vice versa.
In the following results of the parametric study only the displacements and pressures for
maximum applied pressure (689 kPa) is presented. The results of the parametric study were plotted
versus the relative pipe stiffness (Figures 6, 7, and 8) and the Hoop Stiffness Factors (SH) (Figures
8, 9, and 10).
Deflection (mm)
4
3
2
1
0
0.01 1 100
Relative Pipe Stiffness
16
14
Plate Displacement (mm)
12
10
8
6
4 Unreinforced
2 Reinforced
0
0.1 1 10 100 1000
Relative Pipe Stiffness
Figure 7. Maximum Plate Settlement vs Relative Pipe Stiffness.
200
Vertical Pressure (kPa)
150
100
50 Unreinforced
Reinforced
0
0.1 1 100.01 100 1000
Relative Pipe Stiffness
Figure 8. Maximum Vertical Pressure at the Crown vs Relative Pipe Stiffness.
Deflection (mm)
Reinforced
Maximum Pipe
20
15
10
5
0
0.00011 0.01 100
SH
Figure 9. Maximum Pipe Deflection Vs. Hoop Stiffness Factor.
60
Unreinforced
50
Plate Displacemnt (mm)
Reinforced
40
30
20
10
0
0.0001 0.01 1 100
SH
Figure 10. Maximum Plate Settlement Vs. Hoop Stiffness Factor.
200
Vertical Stress (kPa)
150
100
50 Unreinforced
Reinforced
0
0.0001
SH 1 0.01 100
Figure 11. Maximum Earth Pressures Vs. Hoop Stiffness Factor.
Generally, it is desired to reduce pipe deflection and loads transmitted to the pipes by the
concentrated load. As can be expected, the stiffer the pipe is in relation to the surrounding soil
stiffness, the less effective the geogrid is in reducing soil pressures on the crown of the pipe and
vertical pipe deflections. At a bending stiffness ratio of 16 times greater than the pipe stiffness
CONCLUSIONS
The benefit of the geosynthetic in respect to loading plate settlements, is generally uniform and
independent of this pipe stiffness. The exception being pipes with a low hoop stiffness, or
conditions where hoop stiffness factor is greater than 1. For conditions where the hoop stiffness
is greater than one the pipe deflection increases significantly, and that displacement is translated
to the surface. In these cases there is a distinct benefit from including a geosynthetic. By the
finding of this analysis, geosynthetics can be assessed to benefit pipe design when the bending
stiffness factor is greater than 10, or the hoop stiffness factor is greater than 1.
REFERENCES
Bathurst, R.J., and Knight, M.A. (1998). “Analysis of geo-cell reinforced-soil covers over large
span conduits.” Computers and Geotechnics, 3(22), 205-219.
Bueno, B.S., Viana, P.M.F., and Zornberg, J.G. (2005). A novel construction method for buried
pipes using geosynthetics. Proc., Geo-Frontiers 2005, ASCE, Austin, TX, 4155-4161.
Dave, M. M., Solanki, C. H. (2020). Protection of Buried Pipelines Using Geosynthetics Under
Different Loading Conditions—A Review. 249-262.
Kawabata, T., Uchida, K., Hirai, T., Mohri, Y., Ling, H.I., and Koyama, N. (2003). "Experiments
on buried pipe using backfill of cover with geosynthetics." Proc. of the ASCE International
Conference on Pipeline Engineering and Construction, ASCE, Baltimore, MD, 1271-1278.
McGrath, T.J. (1998). Design method for Flexible Pipe, A Report prepared for the Polyethylene
Pipe Design Task Group of the AASHTO Flexible Culvert Liaison Committee, Simpson
Gumpertz, & Heger, Inc., Arlington, MA.
Moghaddas Tafreshi, S.N., and Khalaj, O. (2008). Laboratory tests of small-diameter HDPE
pipes buried in reinforced sand under repeated-load. Geotextiles and Geomembranes, 26(2),
145-163.
Moghaddas Tafreshi, S.N., and Khalaj, O. (2011). Analysis of repeated-load laboratory tests on
buried plastic pipes in sand" Soil Dynamics and Earthquake Engineering, 31(1), 1-15.
Palmeira, E.M., and Andrade, H.K.P.A. (2010). Protection of buried pipes against accidental
damage using geosynthetics. Geosynthetics International, 17(4), 228-241.
Pearson, A.E., and Milligan, G.W.E. (1991). Model tests of reinforced soil in conjunction with
flexible culverts. Proc. of the International Reinforced Soil Conference, Glasgow, 365-369.
Pires, A.C.G., Palmeira, E.M. (2017). Geosynthetic Protection for Buried Pipes Subjected to
Surface Surcharge Loads. Int. J. of Geosynth. and Ground Eng., 3 (4), 1-11.
ABSTRACT
Buried concrete box culverts have commonly been used at shallow depths under roadways for
drainage. Higher stiffness of these buried culverts relative to their surrounding soil affects traffic
load distribution. For instance, in embankment culverts, the deformation of the soil column above
the culvert is less than that of the surrounding soil due to the relative stiffness between the rigid
structure and the soil. Therefore, under traffic loads, this stiffness difference increases the traffic-
induced stresses on the buried culverts due to the mobilization of negative soil arching. Expanded
Polystyrene (EPS) geofoam has been used above the buried culverts as a compressible material to
reverse the relative deformation within the embankment and reduce the stresses above the culverts.
However, limited studies have been carried out to investigate the effect of the EPS geofoam
geometry (such as thickness, width, and location) on the traffic load distribution above the buried
structure. In this study, a finite element analysis using Plaxis3D was used to calculate the vertical
stress profile on the box culvert due to static traffic loading. The finite element model was built and
validated against the reduced-scale physical model tests conducted in the geotechnical lab at the
University of Kansas. Then a parametric study was carried out by varying three parameters, i.e.,
the thickness, the width, and the location of the EPS geofoam, to investigate their effects on the
traffic load distribution above a buried box culvert. The numerical results show a reduction in
vertical stresses on the box culvert with the use of geofoam due to the mobilization of positive soil
arching. Moreover, increasing the thickness of the EPS geofoam reduced the vertical stress on the
culvert, while increasing the geofoam width to be larger than the culvert width slightly increased
the stress on the culvert. Placing the geofoam farther from the culvert increased the pressure on the
culvert.
INTRODUCTION
Buried culverts or pipes within embankments are often subjected to traffic loading. The safety of
these infrastructures under surface loadings is important and their behavior depends on their
surrounding soil. In addition to the overburden stress, additional stresses from the surface traffic
EXPERIMENTAL TEST
Al-Naddaf et al. (2019) conducted physical model tests under a plane-strain condition at the
University of Kansas geotechnical lab to investigate the behavior of buried twin-cell concrete box
culverts under static footing loads. The interior dimensions of the test box were 1.76 m long, 0.46
m wide, and 1.50 m high. More details about the test box, conducted tests, and special treatments
used to minimize the boundary effects can be found in (Al-Naddaf et al. 2019; Al-Naddaf et al.
2019; Al-Naddaf 2019). Al-Naddaf et al. (2019) simulated two construction methods, the positive
projection embankment (PPE) and induced trench installation (ITI) methods. In the PPE test, only
a concrete culvert with no geofoam was embedded in the center of the test box, while EPS geofoam
was placed atop the concrete culvert in the ITI method test. The numerical models of this study
were verified against both the PPE and ITI tests.
Figure 1. Test box for the ITI method test used for the numerical model showing the
locations and dimensions of the culvert, geofoam, footing, and the instrumentation (unit:
mm) (Al-Naddaf et al. 2019)
NUMERICAL MODELING
The numerical model was built based on the above-described tests using a finite element mothed
(FEM) incorporated in the commercial Plaxis3D software. This paper discusses the FEM analyses
that were carried out to investigate the effects of the EPS geofoam geometry including its thickness,
width, and location on the responses of buried culverts. Table 1 and Figure 2 present the numerical
models used in this study. The hardening soil (HS) model, which is an elastoplastic hyperbolic
model to describe the non-linear behavior of the sand, was used to simulate the backfill soil. The
HS model includes eight parameters to describe the soil behavior as shown in Table 2. Table 2
(a) (b)
(c) (d)
Figure 2. Numerical models for: (a) verification, (b) geofoam location, (c) geofoam width,
and (d) geofoam thickness.
Model verification. Prior to the parametric study, two numerical models with the parameters in
Table 1 were analyzed and verified against the experimental test results of PPE and ITI method
tests. Figure 3 shows the vertical pressures on the culvert for the numerical models and those
measured in the experimental tests. Figure 3 shows reasonably well agreement between the
numerical and experimental results. Figure 3(a) indicates that the hardening soil (HS) model for
the embankment soil and the linearly-elastic model for the concrete culvert well simulated the
buried culvert-embankment soil interaction. The HS model has been widely used by other
researchers to simulate the backfill material above buried structures (Allard and El Naggar 2016;
Katona 2017; Kitane and McGrath 2006). Figure 3(b) shows the reasonableness of the numerical
model used to simulate the behavior of the buried culvert, EPS geofoam, and embankment soil.
Even though a similar trend was obtained for the response of the pressure increase on the culvert,
the numerical model (for the ITI condition) slightly over-predicted the average vertical pressure on
the culvert. In the following parametric study, the same properties for the concrete culvert,
geofoam, and soil were used to investigate the effects of geofoam thickness, width, and location on
the behavior of buried culverts.
30 30
20 20
10 10
0 0
0 20 40 60 80 100 120 0 20 40 60 80 100 120
Applied footing pressure (kPa) Applied footing pressure (kPa)
(a) (b)
Figure 3. Numerical model verification by the calculated versus measured vertical pressures
on the culvert under footing loading in (a) the PPE test and (b) the ITI method test
Effects of geofoam thickness. Figure 4 shows the calculated vertical pressures on the culvert for
different geofoam thicknesses (i.e., 0.2Bc, 0.4Bc, and 0.8Bc) under the embankment overburden
load and the monotonic footing load. As the embankment height increased, the geofoam thickness
had more effects in reducing the vertical pressure on the culvert as depicted in Figure 4(a). The
geofoam with the thickness of 0.8Bc resulted in the lowest vertical pressure on the culvert than
those with the geofoam thicknesses of 0.2Bc and 0.4Bc, respectively. For instance, at the
embankment height of 820 mm, the vertical pressure on the culvert was reduced by approximately
10.2% and 24.2% in the models with the geofoam thicknesses of 0.4Bc and 0.8Bc, respectively, as
compared to that in the model with 0.2Bc. However, as the applied footing pressure increased, the
vertical pressure reduction due to a thicker geofoam gradually decreased as shown in Figure 4(b).
At an applied footing pressure of 100 kPa, the vertical pressure on the culvert was the same for all
three geofoam thicknesses. This result may be attributed to the confining pressure (lateral thrust)
on the geofoam sides that restricted the vertical deformation of the geofoam, thus reducing the
pressure transfer from the top of the geofoam to the surrounding soil. This is consistent with the
reasoning given by Al-Naddaf et al. (2019) for the behavior of the geofoam in their experimental
work.
Figure 5 shows the effectiveness of placing the EPS geofoam on the culvert (i.e., the ITI
method) in reducing the vertical pressure as compared to that without any geofoam (i.e., PPE). The
normalized pressure, shown in Figure 5, was calculated by dividing the pressure on the culvert in
the ITI model to that in the PPE model. Figure 5 shows the benefit of the geofoam in reducing the
pressure on the culvert by approximately 13%, 22%, and 33% when the geofoam thicknesses were
0.2Bc, 0.4Bc, and 0.8Bc, respectively, as compared with the PPE. This result is attributed to the fact
that (1) light-weight material (geofoam) was used instead of heavy soil and (2) positive soil arching
mobilized and transferred the pressure away from the culvert to the surrounding soil when the
geofoam was used. Furthermore, as the footing pressure increased, the reduction in the vertical
pressure decreased to 6% for all three geofoam thicknesses.
3
8
0 0
0 200 400 600 800 1000 0 20 40 60 80 100 120
Embankment height (mm) Applied footing pressure (kPa)
(a) (b)
Figure 4. Effects of the geofoam thickness on the vertical pressure on the culvert (a) during
embankment construction and (b) under static footing loading
1.1
Normalized pressure on culvert
1.0
0.9
0.8
No geofoam
0.7 0.2Bc
Geofoam
0.4Bc
thickness
0.8Bc
0.6
0 20 40 60 80 100 120
Applied footing pressure (kPa)
Figure 5. Normalized vertical pressures on the culvert in the ITI models with different
geofoam thicknesses and the PPE model under static footing loading
Effects of geofoam width. Figure 6 shows the effect of the geofoam width on the vertical pressure
on the culvert during embankment construction and footing loading. Since the geofoam thickness
was the same (i.e., 0.2Bc) for all models, the same average vertical pressure was calculated on the
culvert as the geofoam width increased from 1.0Bc to 2.0Bc during the embankment construction
stage. Subsequently, as the footing pressure increased to 100 kPa, the vertical pressure on the
culvert slightly increased when the geofoam width increased. Thus, a wider geofoam caused more
pressure on the culvert. Increasing the ratio of geofoam to the footing width (for the same culvert
width) resulted in a wider zone under the effect of footing load that would transfer the load to the
culvert since the geofoam was directly placed on the culvert. This finding is consistent with that
reported by (Kang et al. 2008; Kim and Yoo 2005; Meguid et al. 2017). Similarly, Figure 7 shows
18 56
Geofoam Geofoam
width width
Calculated vertical pressure (kPa)
3 8
0 0
0 200 400 600 800 1000 0 20 40 60 80 100 120
Embankment height (mm) Applied footing pressure (kPa)
(a) (b)
Figure 6. Effects of the geofoam width on the vertical pressure on the culvert (a) during
embankment construction and (b) under static footing loading
1.1
Normalized pressure on culvert
1.0
0.9
0.8
No geofoam
0.7 1.0Bc
1.5Bc
Geofoam
width
2.0Bc
0.6
0 20 40 60 80 100 120
Applied footing pressure (kPa)
Figure 7. Normalized vertical pressure on the culvert in the ITI models with different
geofoam widths and the PPE model under static footing loading
Effects of geofoam location. To evaluate the effects of the geofoam location on the vertical
pressure on the culvert, this study evaluated three models with different distances of 0.0Bc, 0.2Bc,
and 0.4Bc from the top of the culvert to the bottom of the geofoam. Figure 8 shows the numerical
results of these models during embankment construction and under footing loading. Figure 8 clearly
shows that the geofoam placed farther from the culvert increased the pressure transferred to the
culvert. Similar findings was reported by Kim and Yoo (2005) in their numerical analysis for a
18 56
Geofoam Geofoam
location location
Calculated vertical pressure (kPa)
3 8
0 0
0 200 400 600 800 1000 0 20 40 60 80 100 120
Embankment height (mm) Applied footing pressure (kPa)
(a) (b)
Figure 8. Effects of the geofoam location on the vertical pressure on the culvert (a) during
embankment construction and (b) under static footing loading
1.1
Normalized pressure on culvert
1.0
0.9
0.8
No geofoam
0.7 0.0Bc
Geofoam
0.2Bc
location
0.4Bc
0.6
0 20 40 60 80 100 120
Applied footing pressure (kPa)
Figure 9. Normalized vertical pressures on the culvert in the ITI models at different
geofoam locations and the PPE model under static footing loading
This study investigated the effects of geofoam geometry on the vertical pressure above the culvert
by the finite element method. Two numerical models were first verified against the reduced-scale
physical tests before the parametric study. The parametric study considered three geofoam
thicknesses (0.2Bc, 0.4Bc, and 0.8Bc), three geofoam widths (1.0Bc, 1.5Bc, and 2.0Bc), and three
geofoam locations (at distances of 0.0Bc, 0.2Bc, and 0.4Bc from the culvert top). Based on the
numerical results, the following conclusions can be drawn:
1. The use of EPS geofoam reduced the vertical pressure on the culvert due to the mobilization
of positive soil arching.
2. Less vertical pressure was applied to the culvert as the geofoam thickness increased from
0.2Bc to 0.8Bc during the embankment construction stage; however, the vertical pressure on
the culvert increased and reached the same value for all geofoam thicknesses under the
application of footing pressure.
3. The geofoam width had no effect on the vertical pressure on the culvert during embankment
construction. However, it caused a slight increase in the vertical pressure on the culvert
under footing loading.
4. The geofoam placed at a farther distance from the culvert transferred the more pressure to
the culvert.
5. After the investigation of the geofoam thickness, width, and location, it can be concluded
that a thick geofoam with the same width as the culvert and directly placed on the top of
the culvert is the most effective geofoam geometry in the vertical pressure reduction.
REFERENCES
Abdel-Karim, A. M., Tadros, M. K., and Benak, J. V. (1993). "Structural response of full-scale
concrete box culvert." Journal of Structural Engineering, 119(11), 3238–3254.
Abu-Farsakh, M. Y., Haque, M. N., and Tsai, C. (2017). "A full-scale field study for performance
evaluation of axially loaded large-diameter cylinder piles with pipe piles and PSC piles." Acta
Geotechnica, 12(4), 753-772.
Acharya, R., Han, J., Brennan, J. J., Parsons, R. L., and Khatri, D. K. (2016). "Structural response
of a low-fill box culvert under static and traffic loading." Journal of Performance of
Constructed Facilities, 30(1), 04014184.
Al-Naddaf, M., Han, J., and Xu, C. (2019). "Geofoam Stiffness Effect on Surface Load
Distribution on Buried Box Culverts Installed with the Induced Trench Method."
Al-Naddaf, M., Han, J., Xu, C., and Rahmaninezhad, S. M. (2019). "Effect of geofoam on
vertical stress distribution on buried structures subjected to static and cyclic footing loads."
Journal of Pipeline Systems Engineering and Practice, 10(1), 04018027.
Al-Naddaf, M. A. M. (2019). "INVESTIGATION OF SOIL ARCHING UNDER DIFFERENT
MODES OF SOIL MOVEMENT AND SURFACE LOADING." University of Kansas.
Allard, E., and El Naggar, H. (2016). "Pressure distribution around rigid culverts considering
soil–structure interaction effects." International Journal of Geomechanics, 16(2), 04015056.
Alzabeebee, S. (2020). "Influence of backfill soil saturation on the structural response of buried
pipes." Transportation Infrastructure Geotechnology, 7(2), 156-174.
Chen, B., and Sun, L. (2013). "Performance of a reinforced concrete box culvert installed in
trapezoidal trenches." Journal of Bridge Engineering, 19(1), 120-130.
Hao Liu,1 Jie Han, Ph.D., F.ASCE,2 and Robert L. Parsons, Ph.D., F.ASCE3
1
Ph.D. Student, Civil, Environmental, and Architectural Engineering (CEAE) Department, Univ.
of Kansas, 1530 W. 15th St., Lawrence, KS 66045-7609; e-mail: [email protected]
2
Glenn L. Parker Professor, CEAE Department, Univ. of Kansas, 1530 W. 15th St., Lawrence,
KS66045-7609; e-mail: [email protected]
3
Professor, CEAE Department, Univ. of Kansas, 1530 W. 15th St., Lawrence, KS 66045-7609; e-
mail: [email protected]
ABSTRACT
To save cost and avoid distresses of retaining walls, Expanded Polystyrene (EPS) foam and
geosynthetic reinforcement have been used to reduce lateral earth pressures behind the wall.
However, previous studies mostly assumed retaining walls to be non-yielding, but actual retaining
walls can deform to some extent. In this study, three model tests were conducted in laboratory with
different backfill details (backfill only, EPS placed between the wall facing and the backfill, EPS
placed between the wall facing and the geogrid-reinforced backfill) to investigate the effects of
EPS and geogrid reinforcement to reduce lateral earth pressures behind the wall facing during
construction. Among these three tests, the retaining wall without EPS foam placed behind moved
farthest from the backfill, while the retaining wall with EPS and geogrid reinforcement moved the
least. Considering the magnitudes of movement and lateral earth pressure of the retaining wall
after construction, the geogrid-reinforced backfill with the EPS between the wall facing and the
backfill was the best choice to reduce the lateral earth pressures behind the wall.
INTRODUCTION
Magnitude and distribution of lateral earth pressures on the back of a retaining wall are important
for wall design. Designers have often assumed lateral earth pressures behind the retaining wall
increase with depth linearly (e.g., Jaky, 1944). The lateral earth pressure distribution behind a wall
actually depends on many factors, such as height and stiffness of the wall structure, backfill
strength, wall movement mode (i.e., rotation about top, rotation about base, translation, and their
combination) (Karpurapu and Bathurst, 1992). In addition, the lateral earth pressure distribution
behind the retaining wall is often nonlinear due to soil arching between the wall facing and the
backfill if the wall facing is flexible and/or wall movement happens (Handy, 1985). Lateral earth
pressures near the top surface of the backfill can even reach the Rankine passive state if vibratory
compaction (a common method to densify backfill material) is used (Duncan and Seed, 1986;
Cheng and Fang, 2008).
Lateral earth pressures on the retaining wall decrease even if the wall has a small lateral
movement away from its retained soil. Knowing this concept, several mitigation measures have
been proposed to reduce lateral earth pressures behind retaining walls. These measures include a
vertical layer of compressible geosynthetic material between the wall facing and its backfill (e.g.,
Expanded Polystyrene (EPS), Extruded Polystyrene, and tire chips), corrugated cardboard and
removable plywood forms, geosynthetic-reinforced backfill, and use of lightweight material to
TEST APPARATUS
Figure 1 shows that the retaining wall was 1.05 m high, 0.30 m wide, and 0.12 m thick. The wall
was constructed on a firm platform so that it could not move vertically. In addition, the wall was
supported laterally both at its base and at the height of 0.99 m. The stiffness of these lateral supports
were same in each test; therefore, the movement of the wall was indication of the effect of
backfilling on the wall. In other words, if the construction process caused more forces onto the
wall, it would move more away from the backfill. The backfill in each model was 1.46 m long,
1.05 m high, and 0.30 m thick and its relative density (Dr=75%) (i.e., a density of 1840 kg/m3)
was controlled by the constant thickness and weight of the air-dried Kansas River sand in each lift.
Direct shear tests measured the peak friction angle of this backfill at the relative density of 75% as
42.3°.
Younan and Veletsos (2000) defined wall flexibility using a relative flexibility (dw) index
as shown Eq. (1):
12𝐺𝐺𝐻𝐻 3 (1−𝑣𝑣𝑤𝑤
2)
𝑑𝑑𝑤𝑤 = 3 (1)
𝐸𝐸𝑤𝑤 𝑡𝑡𝑤𝑤
where G is the shear modulus of the backfill (i.e., 9.6 MPa derived from Young’s modulus (25
MPa) and Poisson’s ratio (0.3) of this sand (Al-Naddaf, 2019)), H is the wall height (1.05 m), vw
is the Poisson’s ratio of the wall material (0.20), Ew is the Young’s modulus of the wall material
(25 GPa), and tw is the thickness of the wall (0.12 m). In this study, the relative flexibility of the
wall was 3.0, indicating it was a rigid wall based on the recommendation by Younan and Veletsos
(2000).
Each test used two displacement transducers (DTs), five earth pressure cells (EPCs), and a
load cell (LC). The bottom DT at the wall height of 0.15 m and the top DT at the wall height of
0.99 m were used to measure lateral movements of the wall during backfilling. Five EPCs were
Top Height
DT (m)
EPC 5
0.90
Geogrids (if used)
EPC 4
0.75
0.60
EPC 3 1.05 m
0.45
EPC 2
Layer boundary (if geogrid not used)
0.30
Bottom
0.15
DT EPC 1
0.12 m 1.46 m
Figure 1. Cross section of the retaining wall with instrumentation.
Table 1 shows the conditions of these three tests whether EPS and/or geogrid were included
in the backfill. A piece of EPS with dimensions of 1.05 m high, 0.30 m wide, and 0.025 m thick
and a density of 16 kg/m3 was placed behind the back of the wall facing in T2 and T3. Uniaxial
geogrid prepared from a biaxial geogrid by cutting off two ribs of every four ribs in the machine
direction was used as backfill reinforcement in this study considering the scale effect. The same
uniaxial geogrid was used by Xiao et al. (2016), Kakrasul et al. (2020), and Jawad et al. (2020) in
their study. The T1 model included ten lifts of backfill with a lift thickness of 0.10 m without any
geogrid. The T2 or T3 model included 10 layers of geogrid with vertical spacing of 0.10 m and
length of 0.75 m placed within the backfill (the lowest geogrid layer was placed at the height of
0.05 m).
Movement of wall. Figures 2 and 3 show the lateral displacements of the wall at the heights of
0.15 and 0.99 m, respectively, during backfilling. In general, the wall in T3 moved less away from
the backfill than that in T1 and T2, but the walls in T1 and T2 had similar movements. It should
be pointed out that the movements in Figures 2 and 3 were the wall movements at the bottom or
the top while the backfill was placed up to a certain height. After the backfill was placed up to 0.8
m, the wall in T2 moved less than that in T1, indicating that the EPS in T2 had some benefit in the
wall behavior during backfilling. Geogrid reinforcement of the backfill in T3 minimized the
movement induced by backfilling. The benefit of the EPS inclusion was not that significant, maybe
because of three reasons: (1) the EPS was not compressible enough due to its small thickness (25
mm), (2) the modulus of the EPS was not that low as compared with that of the sand under a low
normal stress, and (3) the wall was only 1.05 m tall and the backfill was compacted by a small
hand tamper. The EPS was just subjected to low lateral earth pressures induced by self-weight of
the backfill and compaction by the tamper; therefore, the deformation of the EPS was small so that
it did not fully perform as a stress reliever. However, the geogrid reinforcement limited the stress
transfer onto the wall facing during backfilling because the geogrid reinforcement restrained the
lateral movement of the sand.
During backfilling, the movement of the wall was a combination of a translation mode (T
mode) and a rotation about the base mode (RB mode) when the wall movements at the top and the
bottom were not same. However, since their differences were small as compared with the wall
height, the portion of the RB mode in the combination did not make an apparent difference.
Therefore, the mode of the wall movement could be treated as the T mode only. Horvath (1997)
indicated a wall displacement of 0.3%H (H is the wall height) could make a well-compacted sand-
gravel backfill reach a fully active state, while Clough and Duncan (1991) suggested a wall
displacement of 0.1%H should be enough to reach a fully active state in a dense sand. After
backfilling, the movements of the wall in T1, T2, and T3 were 0.06%H, 0.05%H, and 0.04%H,
respectively, which are less than those suggested by Horvath (1997) and Clough and Duncan
(1991); therefore, the fully active state was not reached in this study.
Figure 2. Lateral movement of the wall at the height of 0.15 m during backfilling.
Earth pressure behind wall. Figures 4 shows the lateral earth pressures behind the wall facing
after backfilling. The values of the Rankine active earth pressures (Ka=0.20), the Jaky earth
pressures at rest (Ko=0.33), and the Rankine passive earth pressures (Kp=5.10) are also provided
for easy comparisons. Chen and Fang (2008) found that vibratory compaction of backfill against
a non-yielding wall would induce additional lateral earth pressures within an influence zone, up to
the Rankine passive earth pressure near top of the backfill surface as found by Duncan and Seed
(1986). However, lateral earth pressures at greater depths might gradually converge back to the at-
rest earth pressure due to the increase of wall height and vertical overburden stress. The three tests
in this study also showed a similar pattern of lateral earth pressure distribution within the upper
soil layers, but the lateral earth pressures in the lower layers decreased significantly to lower than
the at-rest pressures. The lower pressures in the bottom layers might be caused by movement of
the wall bottom away from the backfill during backfilling. It is expected that the lateral earth
pressures near the backfill surface should be higher and closer to the passive earth pressure if the
wall was non-yielding.
In general, EPS and geogrid reduced the lateral earth pressures behind the wall facing,
considering more movement of the wall from the backfill in T1 (no EPS and geogrids were used).
However, the lateral earth pressure at the height of 0.59 m in T3 was higher than that at the same
height in T1, while the lateral earth pressure at the height of 0.15 m in T2 was higher than that at
the same height in T1. Borms (1971) and US Navy (1982) suggested that the lateral earth pressure
behind a retaining wall increased with depth to a value and then kept at this value until the at-rest
or Rankine active earth pressure reaching this value. The test results from T1 generally conformed
to this lateral earth pressure distribution except for the pressure at the height of 0.15 m, which
might be caused by the movement of the wall at the bottom away from the backfill. T2 had a
different distribution of the lateral earth pressures behind the wall facing from those in T1 and T3.
It appeared that the inclusion of the EPS changed the earth pressure distribution below the middle
of the wall.
Coefficient of lateral earth pressure. It is a common practice that lateral earth pressures behind
wall facing are assumed to increase linearly with vertical overburden stresses at different depths
and the slope of this linear relationship is referred to as the coefficient of lateral earth pressure, K.
In the test setup in this study, the moment to the wall toe caused by lateral earth pressures should
be equal to that provided by the force at the height of 0.99 m to support the wall. Therefore, the
coefficient of lateral earth pressure, K, can be estimated using Eq. (2):
where K is the coefficient of lateral earth pressure; F is the force at the height of 0.99 m to support
the wall, which was measured by the load cell; H is the height of the load cell (0.99 m); γ is the
unit weight of the backfill (18.05 kN/m3); h is the height of the backfill; and B is the width of the
wall facing (0.3 m).
Figure 5 shows the change of the lateral earth pressure coefficient (K) with the height of
the backfill placed. It should be pointed out that the lateral earth pressure coefficient calculated
using Equation (2) is the overall coefficient and different from the lateral earth pressure coefficient
calculated based on the lateral earth pressure divided by the vertical overburden stress at a specific
height. This figure indicates that EPS and geogrid reinforcement reduced the coefficient after
backfilling. Considering more movements of the wall at the bottom and the top away from the
backfill after backfilling in T3 than those in T2, T3 had more reduction in the lateral earth pressures
behind the wall facing even though T3 and T2 had almost the same K values at the end of
backfilling (i.e., 1.05 m high). During the construction process, the K value for T3 was much
smaller than those for the other two tests. At the end of the construction, the K value of the backfill
was greater than the coefficient at rest (0.33), due to compaction-induced stresses. The
Figure 5. Change of lateral earth pressure coefficient with backfill height during
backfilling.
CONCLUSIONS
Lateral earth pressures behind a non-yielding rigid retaining wall often approach the at-rest state
after backfilling, but the lateral earth pressures within the upper portion may reach passive earth
pressures due to compaction of backfill in lifts. Higher lateral earth pressures require a thicker wall
cross section and a higher structural capacity, thus resulting in a higher cost. This study included
three physical model tests: (1) T1 without any EPS foam and geogrid, (2) T2 with EPS placed
between the wall facing and the backfill, and (3) T3 with EPS placed between the wall facing and
the geogrid-reinforced backfill. These tests were used to investigate the effects of EPS and geogrid
reinforcement on lateral earth pressures behind the wall facing. Unlike most physical models with
non-yielding walls, the magnitude of the wall movement away from the backfill in this study
depended on the inclusion of EPS and geogrid reinforcement during the backfilling process. From
this study, the following conclusions could be made:
(1) After backfilling, T1 had the largest movement away from the backfill, while T3 had
the smallest movement, indicating the combined use of the EPS and the geogrid effectively
reduced the backfilling effects on the wall.
(2) All three tests showed additional lateral earth pressures induced by compaction within
the upper portion of the wall. Due to the movement of the wall away from the backfill and the
ACKNOWLEDGEMENTS
This study was financially supported by the Kansas Department of Transportation (KDOT)
through the KTRAN program. Mr. Luke Metheny, Chief Geotechnical Engineer at KDOT, was
the project monitor. Dr. Saif Jawad at the University of Baghdad, Iraq, and the technician Kent
Dye at the University of Kansas provided great help to the test setup. The first author received the
GSI fellowship from the Geosynthetic Institute in 2019. The authors gratefully acknowledge all
the above support.
REFERENCES
Al-Naddaf, M. A. M. (2019). Investigation of Soil Arching under Different Modes of Soil and
Surface Loading, Ph.D. thesis, University of Kansas, Lawrence, KS, USA.
Azzam, S. A. and AbdelSalam, S. S. (2015). EPS geofoam to reduce lateral earth pressure on rigid
walls. Proceedings of International Conference on Advances in Structural and Geotechnical
Engineering, (ICASGE’15), Hurghada, Egypt.
Broms, B. (1971). Lateral earth pressures due to compaction of cohesionless soils. Proceedings of
4th International Conference on Soil Mechanics, Budapest, Hungary.
Chen, T. J. and Fang, Y. S. (2008). Earth pressure due to vibratory compaction. Journal of
Geotechnical and Geoenvironmental Engineering, ASCE, 134(4): 437-444.
Clough, G. W. and Duncan, J. M. (1991). Earth Pressures. In Foundation Engineering Handbook.
Springer, Boston, MA.
Dave, T. N. and Dasaka, S. M. (2014). Surcharge induced earth pressure reduction on rigid
retaining wall using EPS geofoam. Tunneling and Underground Construction, ASCE: 836-844.
Duncan, J. M. and Seed, R. B. (1986). Compaction-induced earth pressures under K0-condition.
Journal of Geotechnical Engineering, ASCE, 122(1): 1-22.
Ertugrul, O. L. and Trandafir, A. C. (2011). Reduction of lateral earth forces acting on rigid
nonyielding retaining walls by EPS geofoam inclusions. Journal of Materials in Civil
Engineering, ASCE, 23(12): 1711-1718.
Ertugrul, O. L. and Trandafir, A. C. (2013). Lateral earth pressures on flexible cantilever retaining
walls with deformable geofoam inclusions. Engineering Geology, 158: 23-33.
Fang, Y.S. and Ishibashi, I. (1986). Static earth pressures with various wall movements. Journal
of Geotechnical Engineering, ASCE, 112(3): 317-333.
Handy, R. L. (1985). The arch in soil arching. Journal of Geotechnical Engineering, ASCE, 111(3):
302-318.
Horvath, J. S. (1997). The compressible inclusion function of EPS geofoam. Geotextiles and
Geomembranes, 15(1): 77–120.
Jaky, J. (1944). A nyugalmi nyomas tenyezoje (The coefficient of earth pressure at rest). Magyar
Mernok es Epitesz-Egylet Kozlonye, Hungary: 355–358 (in Hungarian).
Theresa Andrejack Loux, Ph.D., P.E.1 and Archie Filshill, Ph.D., ENV SP2
1
Aero Aggregates of North America LLC, Eddystone, PA; e-mail: [email protected]
2
Aero Aggregates of North America LLC, Eddystone, PA; e-mail: [email protected]
ABSTRACT
Ultra-lightweight foamed glass aggregate (UL-FGA) is a lightweight and insulating fill material
used in the construction of retaining structures, embankments, bridge abutments, and foundation
slabs. UL-FGA is made from 100% recycled glass and is a sustainable, closed-loop product that
has a favorable energy footprint when compared to other lightweight fill options. UL-FGA has
in-place densities between 15 and 24 lb/ft3 and a closed cell structure which minimizes the
moisture content of the material. This paper details the physical and engineering properties of the
UL-FGA produced via the dry manufacturing process, that are needed for the design of
mechanically stabilized earth (MSE) systems with UL-FGA backfill. Internal and external
stability considerations when using UL-FGA as MSE backfill are discussed. Finally, two projects
where UL-FGA has been used as MSE wall backfill are presented.
INTRODUCTION
Mechanically stabilized earth (MSE) systems are a popular and economic option to construct
retaining walls for highways or railways, wingwalls and abutments for bridges, and numerous
other applications for public and private development. An MSE wall is comprised of alternating
layers of fill and soil reinforcements. The reinforcement materials are generally made of
galvanized steel or polymers (e.g., geosynthetics) and take of form of straps or continuous
elements. MSE walls have a vertical or near-vertical face typically comprised of concrete panels
or blocks, segmental blocks, or is a wrapped-earthen face with or without welded wire forms.
Design and construction guidance for MSE walls and backfill specifications for MSE backfill are
dependent on the MSE wall application and location. Entities including the Federal Highway
Administration (NHI 2009) and the National Concrete Masonry Association (NCMA 2010) have
published leading resources.
There are frequent instances where the subsurface conditions warrant the use of a
lightweight backfill material such as ultra-lightweight foamed glass aggregate (UL-FGA). The
lightweight backfill may be needed because of soft, compressible soils, or because of existing
utilities or structures. UL-FGA has been available in Europe since the mid-1990s and is now also
manufactured in the U.S. The manufacturing process consists of cleaning and milling post-
consumer recycled glass, mixing the glass powder with a dry foaming agent, and then heating the
mixture in a kiln to produce a foamed glass cake. Thermal stress breaks the cake into aggregate-
sized pieces.
UL-FGA is manufactured from post-consumer recycled glass which has inherent
environmental advantages because it is not a material that is mined or petroleum-based. Because
of the ultra-lightweight nature, a single truckload delivery of UL-FGA can be upwards of 75 m3
(100 yd3) which may greatly eliminate truck traffic on projects which require imported fill.
Unit Weight and Buoyancy. The typical dry bulk unit weight of closed-cell UL-FGA (Figure 1)
as manufactured varies between 192 and 240 kg/m3 (12 to 15 lb/ft3). Moist bulk unit weights can
vary based on moisture content but are typically between 240 and 300 kg/m3 (15 and 18.75 lb/ft3).
Placement and compaction processes typically produce a volume reduction of up to 20% from the
bulk to compacted state. This equates to a compaction factor of up to 1.25. Therefore, typical
minimum and maximum in-place unit weights for UL-FGA are approximately 240 and 375 kg/m3
(15 and 23.5 lb/ft3), respectively.
Because of the closed cell nature and slight buoyancy of UL-FGA, a buoyancy check
should be completed for projects near waterways. The buoyant unit weight of UL-FGA has been
determined through testing to be approximately -240 kg/m3 (-15 lb/ft3). Therefore, applying a
factor of safety of 1.5, the design buoyant unit weight of UL-FGA is -350 kg/m3 (-22 lb/ft3). This
buoyancy check will consider the design flood elevation and the thickness and unit weights of the
UL-FGA and overlying layers.
Gradation and Plasticity. The American Association of Highway State Officials (AASHTO) has
set forth requirements for MSE backfill material in the Load Resistance Factor Design (LRFD)
Bridge Construction Specifications (2017). Table 1 provides the AASHTO requirement for
gradation in general accordance with AASHTO T 27 (AASHTO 2014) and the UL-FGA reported
values, respectively. Post-compaction analyses on UL-FGA show some breakdown of the
Table 1. Gradation requirements for MSE wall backfill and pre-compacted UL-FGA
gradation.
PERCENT PASSING
Sieve Size
AASHTO (2017) Gradation UL-FGA Gradation
(AASHTO T 27)
Requirements (Pre-compaction)
100 mm (4.0 inch) 100 100
63 mm (2.5 inch) - 85-100
9.5 mm (3/8 inch) - 0-15
425 µm (No. 40) 0-60 -
75 µm (No. 200) 0-15 -
Friction Angle. Shear strength parameters of UL-FGA are affected by the applied normal stress.
The apparent friction angle for UL-FGA determined per ASTM D 3080 modified is shown in
Table 2. Most UL-FGA applications in MSE walls will fall into the <57.5 kPa (<1200 lb/ft2)
normal stress range, but every wall should be evaluated by the designer.
Table 2. Friction angle requirements for MSE wall backfill and UL-FGA apparent friction
angle.
AASHTO (2017) UL-FGA Apparent Peak
(ASTM D 3080)
Requirement Friction Angle
Up to 57.5 kPa (1,200 psf) > 34° 54°-55°
Up to 144 kPa (3,000 psf) > 34° 41°-45°
Soundness. The soundness requirement for MSE backfill material per AASHTO (2017) and UL-
FGA results are shown in Table 3. The magnesium sulfate soundness test is a measure of the
durability of the aggregate to resist freeze-thaw cycles.
Table 3. Soundness loss requirements for MSE wall backfill and UL-FGA soundness loss.
AASHTO (2017)
UL-FGA Soundness Loss
Requirement
Magnesium Sulfate Soundness
≤ 30% 4.1%-14%
(loss after 4 cycles)
Table 4. AASHTO electrochemical requirements for MSE wall backfill and FGA reported
values.
Parameter AASHTO (2017) UL-FGA Reported Values
Requirement
pH 5 to 10 9.2-9.4
Resistivity ≥ 30 Ω · m >3,366,000 Ω · m (As Received)
52,020 Ω · m (Initial – 100% Saturated)
18,666 Ω · m (24-hr Soak – 100% Saturated)
13,158 Ω · m (48-hr Soak – 100% Saturated)
Chlorides ≤ 100 ppm <10 -19 ppm
Sulfates ≤ 200 ppm <10 - 11 ppm
STABILITY CONSIDERATIONS
Internal stability of MSE walls is evaluated during the design process by checking the factor of
safety against reinforcement pullout and reinforcement breakage. Internal stability calculations
are used to assess or determine the reinforcement spacing, reinforcement lengths, reinforcement
strength, and connection strength or overlap distance (for wrapped-face walls). Laboratory scale
pullout testing of UL-FGA with several reinforcement materials has been completed to generate a
relationship for the coefficient of interaction with normal stress (Loux et al. 2019b). External
stability of MSE walls considers overturning, sliding, and global failure of the MSE wall and often
requires site-specific knowledge of the existing onsite soils. To complete the internal and external
stability evaluations, earth pressures due to retained soil, surcharge loads, and live loads must be
considered.
Some projects using UL-FGA backfill may encounter longer than typical reinforcement
lengths to satisfy internal and external stability factor of safety requirements. A full-height UL-
FGA MSE wall is shown in Figure 2(a). If a MSE wall with UL-FGA backfill has stability
concerns, three potential layout adjustments to increase stability are shown in Figure 2(b) through
2(d). In Figure 2(b), while the net surcharge load on the foundation soils will be higher versus a
full-height MSE wall with UL-FGA backfill, this layout may still be competitive with other
lightweight fill options that are available (i.e. expanded shale or clay or cellular concrete). Figure
2(c) shows extending the reinforcements into typical unit weight reinforced fill. The approach in
Figure 2(d) is to cut the existing soils back to a stable angle and fill the triangle formed between
the reinforced fill and cut slope with additional UL-FGA. This method, while increasing the
quantity of the UL-FGA, will greatly decrease the lateral earth pressures on the wall from the UL-
FGA retained backfill.
(c) (d)
Figure 2. MSE wall (a) with full-height UL-FGA MSE backfill, (b) with ~50% height MSE
backfill, (c) with combination UL-FGA and typical unit weight MSE backfill, and (d) with
UL-FGA MSE backfill and UL-FGA retained backfill.
Other design details that are typically considered for MSE walls include drainage, foundation
preparation, and wall facing details. Drainage piping may be included within the UL-FGA to
outlet water from the retained soil, but the entire layer will be highly permeable. Piping may be
used to outlet low spots within the UL-FGA backfill so that any collected water may be allowed
to outlet instead of infiltrate into the foundation soil.
On all walls with UL-FGA backfill that are under roadways, the pavement section should
be analyzed to ensure that the distance between the top of pavement and the top of UL-FGA layer
is sufficient for the pavement design requirements. It is not unusual for this distance to be 915 to
1220 mm (3 to 4 feet) not only to address a flexible pavement design, but also to accommodate
moment slabs for traffic barriers, guide rail, fencing, or buoyancy concerns.
Standard compaction procedures for soils and traditional aggregates should not be applied
to UL-FGA. The compaction procedures recommended by European manufacturers are a method-
based specification that relies on tracked equipment or vibratory plate compaction only and are
based upon over 25 years of experience with UL-FGA. Standard installation procedures from
various manufacturers of UL-FGA cite large maximum lift thicknesses (between 0.6 to 1.0 m) [2
to 3.3 ft]. For standard load-bearing applications a compression ratio of between 1.15 and 1.25 is
CASE HISTORIES
I-95 Section GR-4 Staged Construction, Philadelphia, PA. The Pennsylvania Department of
Transportation (PennDOT) is actively working on the GIR Section of Interstate 95, a three-mile
section from Center City Philadelphia to the north. Both north and southbound viaducts will be
fully reconstructed, and the project incorporates improvements to surrounding areas and
interchanges, including on- and off- ramps.
Retaining Wall 16 of Section GR4 of I-95 follows a curve in the ramp and has an overall
length of approximately 87.7 m (288 feet) and has a maximum height of approximately 9 m (30
feet). The Contractor selected a mechanically-stabilized earth (MSE) system with geosynthetic
reinforcement as part of the support of excavation design for the new on-ramp. Because of soft
soil concerns, the significant height of the ramp, and the presence of adjacent existing deep
foundations, ultra-lightweight foamed glass aggregate (UL-FGA) was used as MSE backfill
material on the section of the embankment directly adjacent to the existing ramp. The contract
indicated that staged construction be undertaken. First, the Contractor demolished half of the
existing on-ramp, constructing half of the new ramp in its place while maintaining traffic on the
portion of the existing on-ramp left undemolished. Then, once the partial new on-ramp was
completed, traffic transferred onto the new ramp and the remaining portion of the existing ramp
demolition was to follow.
The phased construction approach and the switch from an elevated structure to an
embankment for the ramp created a concern: there was the possibility that the new on-ramp
constructed on fill would exert a high bearing pressure on the underlying foundation soils and
possibly compromise the existing ramp’s deep foundations which were still carrying traffic on the
undemolished elevated portion. Rather than undertake the installation of driven sheet piling next
to live traffic then sacrificing the steel sheet material left in the ground which could not be removed
once covered by the fill section for the new ramp, the Contractor selected an alternative involving
UL-FGA fill within the new on-ramp’s embankment to sufficiently lower the load exerted by the
new ramp’s fill section.
Three geogrid products with long term design strengths of 40.9 kN/m, 64.5 kN/m, 83.3
kN/m were used for the reinforcement in the MSE design. Design reduction factors of 1.25, 1.1,
and 1.58 were used for installation damage, durability, and creep, respectively. These values were
based on the geogrid manufacturer’s information and the proposed fill. Various sections of the
Wall were analyzed for internal and external stability. Figure 4 shows the section of SOE 1 with
UL-FGA backfill that is closest to the new Abutment D (Earth Engineering Incorporated 2019).
The Contractor was able to stockpile UL-FGA at a staging area adjacent to the new ramp
construction. The new abutment wingwall were in place prior to the temporary ramp construction.
The geogrid for a portion of the ramp was tied into the new wingwall. There was a geotextile wrap
at the steel welded wire mesh temporary facing to prevent any material from falling through the
mesh openings. Stormwater piping was brought up in sections concurrently with UL-FGA and
geosynthetic placement. Construction of the MSE portion of this project took approximately 4
weeks during May and June of 2019. Photographs of the project during the MSE construction are
shown in Figure 5.
Figure 5. Photographs of MSE with UL-FGA backfill construction at Section GR4 of I-95
in Philadelphia, PA.
(a) (b)
Figure 7. Photographs of UL-FGA placement at the RIDOT Route 6/10 Reconstruction
project. Geogrid reinforcement can be seen in (b).
(b)
Figure 8. Aerial photographs of the UL-FGA MSE backfill at the RIDOT Route 6/10
Reconstruction project. Abutment height is approximately ½ of the final height at the time
of photography.
This paper details the physical and engineering properties of UL-FGA that are needed for the
design of MSE systems with UL-FGA backfill. The conformance of UL-FGA with the
requirements for MSE backfill per AASHTO’s LRFD Bridge Construction Specifications was
discussed. Considerations when using UL-FGA as MSE backfill are presented, including potential
adjustments to UL-FGA layout to increase internal and/or external stability of the wall. There
have been numerous projects where UL-FGA has been used as MSE backfill; this paper includes
details of two highway projects in the U.S. where UL-FGA has been used in this application.
REFERENCES
Aaboe, R., Oiseth, E., Hagglund, J. (2005). “Granulated foam glass for civil engineering
applications.” Recycled materials in road and airfield pavements, Oslo, Norway.
AASHTO (2017). AASHTO LRFD Bridge Construction Specifications, 4th edition. American
Association of State and Highway Transportation Officials, 2017, www.transportation.org.
AASHTO (2014). AASHTO Standard T-27, “Standard Method of Test for Sieve Analysis of Fine
and Coarse Aggregates”. American Association of State and Highway Transportation Officials,
2014, www.transportation.org.
AASHTO (2016). AASHTO Standard T-90, “Standard Method of Test for Determining the Plastic
Limit and Plasticity Index of Soils”. American Association of State and Highway
Transportation Officials, 2016, www.transportation.org.
AASHTO (2008). AASHTO Standard T-236, “Standard Method of Test For Direct Shear Test of
Soils Under Consolidated Drained Conditions”. American Association of State and Highway
Transportation Officials, 2008 (R 2013), www.transportation.org.
AECOM (2018). Retaining Wall Package 1_004_Plans & Profiles, Reconstruction of Route 6 &
Route 10 Interchange, Providence, Rhode Island, dated 08/31/18.
American Geotechnical & Environmental Services, Inc. (2017) Structure Foundation Report for
Final Design, S.R. 0095, Section GR4, Retaining Wall 16, S.R. 8011 Ramp D, Station 30+33.21
to 33+26.32, Philadelphia County, Pennsylvania. June 2017. Revised August 2017.
ASTM (2011). ASTM Standard D3080/D3080M, 2011, “Standard Test Method for Direct Shear
Test of Soils under Consolidated Drained Conditions”. ASTM International, West
Conshohocken, Pennsylvania, 2011, DOI: 10.1520/D3080_D3080M-11, www.astm.org.
ASTM (2013). ASTM Standard D6706, 2013, “Standard Test Method for Measuring Geosynthetic
Pullout Resistance in Soil”, ASTM International, West Conshohocken, Pennsylvania, 2013,
DOI: 10.1520/D6706-01R13, www.astm.org.
ASTM (2011). ASTM Standard D3080, 2011, “Standard Test Method for Direct Shear Test of
Soils Under Consolidated Drained Conditions”, ASTM International, West Conshohocken,
Pennsylvania, 2011, DOI: 10.1520/D3080_D3080M-11, www.astm.org.
Auvinen, T., Pekkala, J., and Forsman, J. (2013). “Covering the highway E12 in the centre of
Hämeenlinna – Innovative use of foamed glass as light weight material of approach
embankment.” The XXVIII International Baltic Road Conference, Vilnius, Lithuania.
Betti, G., Pinori, U., and Marradi, A. (2014). “The use of recycled glassfoam aggregates for
lightweight embankment” Sustainability, eco-efficiency and Conservation in Transportation
Nripojyoti Biswas, S.M. ASCE,1 Anand J. Puppala, Ph.D., P.E., F. ASCE, F. ICE, DGE,2
Md Ashrafuzzaman Khan, S.M. ASCE,3 Sayantan Chakraborty, Ph.D., A.M. ASCE,4 and
Surya S. C. Congress, Ph.D., A.M. ASCE5
1
Zachry Department of Civil and Environmental Engineering, Texas A&M University, College
Station, TX 77840, U.S.A.; e-mail: [email protected]
2
Zachry Department of Civil and Environmental Engineering, Texas A&M University, College
Station, TX 77840, U.S.A.; e-mail: [email protected]
3
Zachry Department of Civil and Environmental Engineering, Texas A&M University, College
Station, TX 77840, U.S.A.; e-mail: [email protected]
4
Texas A&M Transportation Institute, Bryan, TX 77807, U.S.A.;
e-mail: [email protected]
5
Zachry Department of Civil and Environmental Engineering, Texas A&M University, College
Station, TX 77840, U.S.A.; e-mail: [email protected]
ABSTRACT
The pavements constructed on problematic subgrades suffer from longevity and serviceability
issues due to surface cracking, rutting, and differential heaving. The common contributing factors
include moisture intrusion from cracks, utility trenches, or subsoil capillary rise, which results in
swelling and associated strains in the expansive subgrade. Maintenance and rehabilitation of such
distressed pavements result in the delay of traffic operations and account for millions of dollars of
annual expenditure. Application of an innovative wicking geotextile in a farm to market road in
North Texas was found to improve the lateral moisture drainage capacity of the soil subgrade,
creating a suction gradient between the saturated subgrade and the surrounding environment. The
moisture draining efficacy was observed to extend to more than 12 in., below the geotextile, into
the subgrade layer. Apart from wicking action, this innovative geotextile reduced the normal
stresses on the subgrade through reinforcement action, which helped in reducing the permanent
deformation on top of the subgrade. Overall, the performance of the reinforced section has shown
a remarkable improvement over the traditional unreinforced section.
INTRODUCTION
The subgrade soil of North Texas is primarily characterized by high plasticity indices and
substantial swelling and shrinkage potential (Puppala and Musenda 2000, Little and Nair 2009,
Hoyos et al. 2011). Construction of pavements and other light-weight structures over such
problematic soils results in deterioration of long-term performance and subsequent increase in the
maintenance costs during its design period (Texas Department of Transportation 2005, Zornberg
and Gupta 2009, Puppala et al. 2017, Das 2018). The Pavement Design Manual of the Texas
Department of Transportation (TxDOT) recommends several techniques among which
improvement of soil with chemical stabilization techniques, replacement with superior quality
PROJECT LOCATION
The field test sections were constructed near FM1807 Venus, Texas. The existing pavement layers
consisted of a variable 4-5 in. (10-12 cm) thick asphalt layer laid over a 10-11 in. (25-28 cm) base
course and an expansive soil subgrade. As part of regular maintenance, the pavement section was
overlaid with 2 in. (5 cm) thick asphalt in Fall 2017; however, six months into its service period,
the pavement showed signs of rutting and cracking along the wheel paths. Additionally, the
presence of moisture in the drainage ditch and utility trenches from nearby agricultural fields
compounded the problems associated with the expansive subgrade. Therefore, this road section
was used to understand the efficacy of wicking geotextiles. As a result, the eastbound lane was
used to construct the Test Section (TS), whereas the westbound lane was used as a Control Section
(CS).
Section Design and Construction. The design of the TS and CS was performed using TxDOT
recommended design software FPS21, which is based on AASHTO-93 design guidelines. The TS
was designed as a three-layered system comprising of a subgrade layer, 15 in. (38 cm) base course,
and a 2 in. (5 cm) asphalt layer (Figure 1). The materials and stiffness moduli of each layer for
both TS and CS are provided in Table 1. The base layer of the TS was reinforced with the wicking
geotextile, which was placed above the subgrade layer. The flexible pavement is characterized as
a low volume road with an approximate Annual Average Daily Traffic of 1500 vehicles per day.
The percentage of the truckload was assumed to be 7%, as suggested by the local TxDOT office.
C
L Test Section (TS)
Shoulder
15 ft.
Crown
Surface Layer 2 in.
Base 7 8 9 15 in.
SAA Trench
4 5 6
18 in.
12 in.
6 in.
Subgrade
1 2 3
1 in. = 2.54 cm, 1 ft. =0.304 m
Earth Pressure Cells Moisture Sensor
Shape Array Accelerometer (SAA) Wicking Geotextile
The efficacy of using the newly available geotextile was also analyzed using a software-based on
AASHTO-93 design guidelines (MiraSpec Road Design Software). The material parameters from
Table 1, serviceability, and reliability parameters similar to FPS21, were included in this analysis.
An additional variable for this analysis was the inclusion of the hydraulic improvement factor
(HIF) due to the presence of wicking fibers. The HIF values were obtained based on different CBR
values of the subgrade in different regions in the USA. The flexible pavement design software was
used to predict the increase in Equivalent Standard Axle Load (ESAL) value, expressed in Figure
2 as ESALIR (a ratio between ESAL of reinforced section to unreinforced section), due to the
inclusion of the wicking fibers. From Figure 2, it can be observed that there is a significant
improvement in the ESAL ratio due to the inclusion of the wicking fibers over the unreinforced
16
12
IR
IR
ESAL
1.0
SN
8
0 0.0
1.00 1.05 1.10 1.15 1.20
Hydraulic Improvement Factor (HIF)
Figure 2. Influence of Hydraulic Improvement Factor (HIF) on pavement performance
Based on the above design guidelines, the test and control sections were constructed in December
2018, and the sections were regularly monitored over the past 15 months using visual and in-situ
instrumentation monitoring to understand the pavement performance during this initial service
period.
Instrumentation. The TS and the CS were instrumented with Shape Array Accelerometers Micro-
Electro-Mechanical System (SAA-MEMS) deflection sensors, earth pressure cells, and moisture
Depth of Influence. The principal objective of the installation of a wicking geotextile is to remove
the moisture from the pavement layers. The stiffness of the pavement system depends on the
moisture content of the soil. The ability of the soil system to drain out the moisture using the
wicking fabrics is inversely proportional to the distance of the layer from the wicking fibers. Lin
et al. 2019 conducted a numerical study and reported that the ability to drain out moisture could
extend as far as 1 m below the pavement layers. However, they also indicated that the primary
efficacy of the fibers was up to a depth of 0.2-0.4 m beneath the wicking fibers. They also indicated
that a minor reduction in the moisture content by 0.9% near the wicking fiber could increase the
resilient modulus of the subgrade region by 300%. Therefore, in the next section, the current study
provided performance monitoring data and discussed the efficacy of the wicking geotextiles in
improving the characteristics of the pavement subgrade below the test section.
Subsurface Moisture Analysis. The moisture content below the pavement surface during and
after rainfall events in the TS is discussed in this section (Figures 3 and 4). Figure 3 shows the
subsurface volumetric moisture (θV) after a rainfall event on the 11th of May 2019. The local
rainfall station recorded cumulative precipitation of 3.10 in. (7.8 cm) during that period. Figure 3a
shows the moisture contours below the pavement section immediately after the rainfall. Figure 3b
indicates the percentage change in θV over the next six days at different depths below the wicking
geotextile. The MS 6 near the edge of the pavement, placed at 6 in. (15 cm) below the geotextile
and towards the natural drainage trench, underwent the maximum reduction in volumetric moisture
content (≈ 26%). The MS 3, which is located at 12 in. (30 cm) below the geotextile, also underwent
a 5% reduction in θV value over the same period. The reduction in moisture content near the edges
could be attributed to a combination of two factors. First, since the edge soil is near the surface,
the soil dries rapidly due to changes in air humidity and an increase in air temperature.
Additionally, the presence of wicking fibers enables the rapid migration of moisture through its
multichannel cross-section due to the difference in matric suction between the saturated fibers (and
surrounding soil) below the pavement and dry fibers exposed to the surface air near the edges.
The sensors MS 4-5 indicated higher θV reduction (≈ 4.5 %) as compared to the sensors
MS 1-2 (≈ 2 %) located at 12 in. (30 cm) depth in the same sections. The efficacy of the wicking
fibers to drain out moisture reduces to more than 50% with an increase in depth from 6 in. (15 cm)
to 12 in. (30 cm) below the soil subgrade. However, as indicated by Lin et al. (2019), a reduction
in moisture content in soil subgrade as small as 0.9% could increase the matric suction three-fold.
Hence, even though the efficacy of wicking fibers decreases with depth, such a small reduction in
moisture could increase the overall stiffness of the soil layers, especially with high PI clay
subgrade. As a result, this could substantially improve long-term pavement performance. During
a similar observation period, the CS recorded a higher average value of θV ≈ 0.40 m3/m3 indicating
the efficacy of the wicking fibers in moisture redistribution.
18 in.
4 5 6
1 2 3
10
0
∆θ (%)
-10
V
MS 1
MS 2
-20
MS 3
MS 4
MS 5
MS 6
-30
5/12/19 5/13/19 5/14/19 5/15/19 5/16/19 5/17/19
Time (days)
(b)
Figure 3. Subsurface moisture analysis for a rainfall event on 11th of May 2019 (a) Moisture
contours immediately after rainfall (b) Percentage reduction in θV at different depths below
wicking geotextile
Similar results were observed during another rainfall event during the winter month of
February 2020 (Figure 4). Figure 4a represents moisture contours for the rainfall event on the 20th
of February, having a recorded rainfall of 1.13 in. (2.87 cm). The moisture sensors near the edges
underwent a maximum reduction in moisture content as compared to the sensors near the crown
over the following five days (Figure 4b).
18 in.
4 5 6
1 2 3
10
MS 2
∆θ (%)
-10 MS 3
V
MS 4
MS 5
MS 6
-20
-30
2/21/20 2/22/20 2/23/20 2/24/20 2/25/20 2/26/20
Time (days)
(b)
Figure 4. Subsurface moisture analysis for a rainfall event on 20th of February 2020 (a)
Moisture contours immediately after rainfall (b) Percentage reduction in θV at different
depths below wicking geotextile
The efficacy of geotextile to remove subsoil moisture reduced by 50%, as the depth
increased from 6 in. to 12 in. below the geotextile layer (MS 6 and MS 3). Hence, it could be
predicted that the wicking fibers have an influence zone of over 12 in. (30 cm) in a pavement
subgrade near the center of the pavement (crown), which could extend to much higher depth near
the shoulder and edges. Conversely, the moisture sensors in the subgrade of the CS indicated a
higher average value of θV ≈ 0.35 m3/m3 consistently during a similar observation period.
Permanent Deformation. In this section, the average permanent deformation (δP) of the pavement
on the top of the pavement subgrade is analyzed. Figure 5 shows the permanent deformation
recorded in both the test and control sections during each month using the SAA-MEMS. The
cumulative deformation data due to repetitive traffic loads and the vertical soil movement caused
by moisture migration was recorded over time. The unreinforced section showed limited
deformation during the initial period after the construction. However, after a significant rainfall
period, the unreinforced sections underwent substantial permanent deformation. This could be
attributed to the combined effect of moisture intrusion and axle loads. The moisture intrusion
decreases the modulus of the subgrade soil. As a result, the weak subgrade underwent large
deformation due to repetitive axle loads.
0.20 5.0
CS
0.16 TS 4.0
P
P
0.12 3.0
0.08 2.0
0.04 1.0
0.00 0.0
10 25
Precipitation (cm)
8
Precipitation (in.)
20
6 15
4 10
2 5
0 0
*The red dotted line and solid green line are polynomial fits for the permanent deformation
Figure 5. Permanent deformation in the test and control section
CONCLUSION
The paper discusses the efficacy of reinforcement of flexible pavement using a wicking geotextile.
The utilization of wicking geotextile provides a two-fold function in a pavement layer through
reinforcement as well as moisture redistribution. The ability of the wicking geotextile to remove
moisture affects the stiffness of the pavement layer and directly influences the permanent
deformation of the subgrade. The primary observations in the present study are listed below:
• The wicking geotextile was observed to reduce the moisture rapidly from the pavement
layers after rainfall events.
• The efficacy of wicking fibers to reduce the subgrade moisture was observed to be more
significant near the pavement edges (shoulder) as compared to the center (crown) region.
• The efficacy of wicking fibers to remove moisture from the subgrade layer decreased over
50% when the depth increased from 6 in. (15 cm) to 12 in. (30 cm).
• The rapid removal of the moisture has a significant impact on controlling the permanent
deformation of the pavement layer when compared with the control section.
• The utilization of RAP aggregate with the wicking geosynthetic reduced the permanent
deformation after 15 months of construction.
Overall from the initial monitoring period, the presence of wicking fiber is observed to provide
beneficial effects for a pavement constructed over an expansive subgrade. The utilization of
inferior quality RAP aggregates with this innovative geotextile could provide a sustainable
alternative to existing design guidelines for flexible pavement over expansive subgrades. However,
long-term monitoring and analysis are required for developing a comprehensive design guideline
for transportation agencies.
ACKNOWLEDGMENT
This research was funded by TenCate, Inc. (Mr. John Lostumbo, P.E.), NSF Industry-University
Cooperative Research Center (I/UCRC) program funded ‘Center for Integration of Composites
into Infrastructure (CICI)’ site at Texas A&M University (NSF PD: Dr. Andre Marshall; Award #
1464489), and Texas Department of Transportation (TxDOT) - Fort Worth district (Mr. Richard
Williammee, P.E. and Mr. Paul Spraggins, P.E.). The authors would like to appreciate their
support. The authors would also like to thank Dr. Aritra Banerjee and other members of
Geotechnical/Geomechanics Group, TAMU, for their support.
Bennert, T., Papp, W. J., Maher, A. and Gucunski, N. (2000). Utilization of Construction and
Demolition Debris Under Traffic-Type Loading in Base and Subbase Applications.
Transportation Research Record: Journal of the Transportation Research Board, 1714(1): 33–
39.
Bhattacherjee, D. and Viswanadham, B. V. S. (2015). Numerical studies on the performance of
hybrid-geosynthetic-reinforced soil slopes subjected to rainfall. Geosynthetics International,
22(6): 411–427.
Biswas, N. and Ghosh, P. (2018). Interaction of adjacent strip footings on reinforced soil using
upper-bound limit analysis. Geosynthetics International, Thomas Telford Ltd , 25(6): 599–611.
Bouazza, A., Zornberg, J. G., McCartney, J. S. and Nahlawi, H. (2006). Significance of unsaturated
behaviour of geotextiles in earthen structures. Australian Geomechanics, 41(3): 133–142.
Das, J. T. (2018). Assessment of Sustainability and Resilience in Transportation Infrastructure
Geotechnics. University of Texas at Arlington.
Galinmoghadan, J., Zhang, X. and Lin, C. (2019). A Bio-Wicking System to Prevent Frost Heave
in Alaskan Pavements: Phase II Implementation.
Garg, N. and Thompson, M. (2007). Lincoln Avenue Reclaimed Asphalt Pavement Base Project.
Transportation Research Record: Journal of the Transportation Research Board, 1547: 89–95.
George, A. M., Banerjee, A., Puppala, A. J. and Saladhi, M. (2019). Performance evaluation of
geocell-reinforced reclaimed asphalt pavement (RAP) bases in flexible pavements.
International Journal of Pavement Engineering, Taylor & Francis, 1–11.
Giroud, J. P. (2010). Development of criteria for geotextile and granular filters. Proceedings of the
9th international conference on geosynthetics, Guaruja, Brazil.
Giroud, J. P. and Han, J. (2004a). Design Method for Geogrid-Reinforced Unpaved Roads. I.
Development of Design Method. Journal of Geotechnical and Geoenvironmental Engineering,
130(8): 775–786.
Giroud, J. P. and Han, J. (2004b). Design Method for Geogrid-Reinforced Unpaved Roads. II.
Calibration and Applications. Journal of Geotechnical and Geoenvironmental Engineering,
130(8): 787–797.
Guo, J., Wang, F., Zhang, X. and Han, J. (2017). Quantifying Water Removal Rate of a Wicking
Geotextile under Controlled Temperature and Relative Humidity. Journal of Materials in Civil
Engineering, 29(1): 04016181.
Han, J. and Zhang, X. (2014). Recent advances in the use of geosynthetics to enhance sustainability
of roadways. 20th International Conference on Advances in Civil Engineering for Sustainable
Development, Suranaree University of Technology, Nakhon Ratchasima, Thailand: 29–39.
Hoyos, L. R., Suescun, E. A. and Puppala, A. J. (2011). Small-Strain Stiffness of Unsaturated Soils
Using a Suction-Controlled Resonant Column Device with Bender Elements. Geo-Frontiers
2011.
Iryo, T. and Rowe, R. K. (2003). On the hydraulic behavior of unsaturated nonwoven geotextiles.
Geotextiles and Geomembranes, 21(6): 381–404.
Iryo, T. and Rowe, R. K. (2005). Hydraulic behaviour of soil–geocomposite layers in slopes.
Geosynthetics International, 12(3): 145–155.
Khan, M. A., Biswas, N., Banerjee, A. and Puppala, A. J. (2020a). Performance of Geocell-
Reinforced Recycled Asphalt Pavement (RAP) Bases in Flexible Pavements Built on Expansive
Soils. Geo-Congress 2020, American Society of Civil Engineers, Reston, VA: 488–497.
Prajwol Tamrakar, Ph.D.,1 Mark H. Wayne, Ph.D.,1 David J. White, Ph.D., 2 and
Pavana K. R. Vennapusa, Ph.D.2
1
Tensar International Corporation, 2500 Northwinds Pkwy, Alpharetta, GA 30009, USA
2
Ingios Geotechnics, P.O. Box 101, Northfield, MN 55057, USA
ABSTRACT
Laboratory-based testing methodologies are usually adopted for the characterization of pavement
materials. Most pavement design and analysis approaches rely on such characterization methods
for modeling pavement sections and predicting performance. For example, the use of repeated load
triaxial testing on a small cylindrical specimen is popular for estimating the resilient modulus of
an unbound aggregate layer. This testing utilizes a cylindrical specimen (150 mm in diameter and
300 mm in height) for applying confining pressures and repeated axial stresses. However,
laboratory-based triaxial testing cannot truly represent the field conditions. As such, there is a need
for in-situ characterization of pavement material on a fully constructed pavement using dynamic
loads at different stress levels. An Automated Plate Load Testing (APLT) system can measure in-
situ dynamic load-deformation responses using various stress levels and loading cycles and
estimate composite as well as layer-specific resilient modulus for pavement layers. This study aims
to evaluate such properties for geogrid-stabilized and unstabilized pavements using the APLT
system. Field tests were performed on the flexible pavement sections consisting of 190 mm thick
hot mix asphalt. The aggregate base course thicknesses for the geogrid stabilized pavement were
150 mm and 200 mm whereas that for the unstabilized pavement was 250 mm. The geogrid
stabilized section with a 200 mm aggregate base course had a composite modulus of 424 MPa
which is higher than that of the unstabilized section (369 MPa). On the other hand, the total
permanent deformations induced in all sections were almost similar (<1.2 mm) despite the
difference in thicknesses between the pavement sections.
INTRODUCTION
A composite pavement system is formed by bound and unbound pavement layers consisting of
different materials, and a complex interaction of those layers with the existing subgrade. When a
geogrid is incorporated in the unbound pavement layer (e.g., aggregate base course, subbase, or
subgrade), it enhances the mechanical properties of the pavement system (Abu-Farsakh et al. 2019;
Qian et al. 2011; Robinson et al. 2017; Vennapusa et al. 2018). The key features of such a pavement
system are stabilized unbound layers and resisting capacity of the pavement layers against
degradation or plastic deformation due to traffic and climate.
Laboratory-based testing methodologies are usually adopted for the characterization of
pavement materials, and derivation of mechanical properties. Most pavement design and analysis
approaches rely on such characterization methods for modeling pavement sections and predicting
performance throughout the service life. For example, Pavement Mechanistic Empirical Design
(PMED) method considers the resilient modulus (MR) of an unbound aggregate layer as an
Base course stabilization is the process of constructing a mechanically stabilized layer (MSL) with
the use of geogrid (see Figure 1). The mechanism of “stabilization” is different from
“reinforcement” because the former one is referring to “stiffness enhancement” as well as
“stiffness retention for a longer period”. In contrast, the term “reinforcement” implies “adding
force” (Giroud and Han 2016). This mechanism is only effective if the forces are large which in
turn implies that large vertical permanent deformations exist in the aggregate overlying the
geogrid.
When a geogrid is incorporated into a granular material, the aggregate particles interlock
with the geogrid and are confined within the geogrid apertures. As a result, the particles are
restrained from moving laterally. The lateral restraint provided by the geogrid contributes to
reducing induced strain due to traffic loading and thereby increases the stiffness of the granular
layer (Rakowski and Kawalec 2020; Sun et al. 2020; Wayne et al. 2013, 2019). In addition to the
lateral restraint, granular particles immediately adjacent to the interlocked particles are themselves
restrained by the particle to particle interlock. Thus the influence of the geogrid inclusion extends
beyond the geogrid particle interface. Cook and Horvat (2014) demonstrated the existence of such
variation in particle interlocking using a multi-level shear box. The authors found that the influence
of the geogrid on the stiffness of a granular layer will decrease in relation to the distance from the
geogrid. This can be represented as zones of confinement from fully confined to unconfined as
illustrated in Figure 1. Behaviors of confinement due to different geogrid and material types were
PROJECT DETAILS
The project site was located in a pavement section of interstate 20 near Atlanta, GA. Field tests
were performed on the flexible pavement sections consisting of 190 mm thick HMA. The
aggregate base course (ABC) thicknesses for the geogrid stabilized test sections were 150 mm and
200 mm whereas that for the unstabilized test section was 250 mm (see Figure 2). Each test section
was approximately 75 m long. Per the Georgia Department of Transportation specifications, the
ABC is designated as Class A Graded Aggregate Base (GAB). A punched and drawn triangular
aperture geogrid was placed at the interface of ABC and subgrade for constructing stabilized
pavements. The properties of the geogrid are summarized in Table 1. Although all three pavement
sites were close to each other, there was some variation in the subgrade condition. Based on the
Dynamic Cone Penetrometer (DCP) test measurements, the subgrade CBR ranged between 15%
and 25% as shown in Figure 2.
TESTING PROTOCOL
The APLT system (see Figure 3) consists of an advanced electronic-hydraulic control system for
applying cyclic and static load pulses through circular steel plates and high-resolution sensors for
measuring vertical ground displacements (White and Vennapusa 2017). Compared to Falling
Weight Deflectometer (FWD), the APLT has the advantage of applying a conditioning loading
prior to testing and measuring peak, resilient and permanent deformations for each loading cycle.
In this study, a 304.8 mm diameter plate (see Figure 3c) was used to apply cyclic loads over the
HMA layer of geogrid-stabilized and unstabilized pavement sections. A cyclic stress of 482 kPa
was applied in five different stages (or loading frequencies) as described in Table 2. The five
different loading frequencies were selected to simulate high to low traffic speeds. During Step 1,
the accumulated permanent deformation (i.e., rutting) with each loading cycle was recorded to
develop a permanent deformation model which can be represented by the power model as shown
in Equation 1. Monismith et al. (1975) described a similar power model relationship for relating
permanent strain to cyclic loading for repeated triaxial laboratory testing. Such a model can be
used for prediction of deformation at higher loading cycles (Vennapusa et al. 2018; Tamrakar et
al. 2019).
δp = CNd (1)
PRESENTATION OF RESULTS
For each pavement section, APLTs were conducted at three test locations. The test locations were
marked as 1, 2 and 3, and the separation between the consecutive test locations was about 9 m.
Figure 4 shows the permanent deformation responses of stabilized and unstabilized pavement
sections for different loading frequencies and loading cycles. The initial loading up to 2000 cycles
was for 1 Hz loading frequency that consisted of 0.2 second of loading time and 0.8 second of
dwelling time. The permanent deformation increased rapidly for the first 100 cycles
(approximately) and then increased gradually afterward. Such deformation behavior can be
represented using the power model as described in Equation 1. The coefficients for the power
model for stabilized and unstabilized pavement sections are provided in Table 3. Permanent
deformations at the end of 2000 loading cycles are shown in Figure 5. Due to the in-situ precise
2
a) Section A (150mm ABC + Geogrid)
1.5
Permanent Def. (mm)
0.5
0
0 500 1000 1500 2000 2500
1.5
b) Section B (200mm ABC + Geogrid)
1
Permanent Def. (mm)
0.5
0
0 500 1000 1500 2000 2500
1.5
c) Section C (250mm ABC)
1
Permanent Def. (mm)
0
0 500 1000 1500 2000 2500
Number of Cycles
Figure 4 also shows permanent deformations beyond 2000 loading cycles which are for
steps 2 through 5 (i.e., for different loading frequencies) as described in Table 2. The permanent
deformation increased with the decrease in the loading frequency or increasing loading period.
This should be expected because of the visco-elastic nature of the asphalt material, for which lower
frequency loadings lead to larger deformations. In addition, stress-dependent behavior unbound
pavement materials also contribute to the amplification of the permanent deformation response
with the increase in the loading duration (Tamrakar and Nazarian 2017).
2.8
Permanent Def., mm
Figure 6 shows the composite modulus values for each section. At each test location, the
composite modulus decreased with the reduction in the loading frequency. This should be expected
for visco-elastic materials, where rebound deformations increase as loading frequency decreases.
On average, the stabilized section with 200 mm ABC (Section B) had the highest composite
modulus while the remaining two sections had a similar modulus (about 13% to 15% lower than
Section B). As the composite modulus represents the overall response of the entire pavement
structure to the applied load, it can be considered as an indicative factor for the pavement
performance. Further, the moduli at different loading frequencies help to understand the behavior
of pavement at different loading rates. Further studies with a wide range of cyclic stresses and
loading frequencies including sufficient dwelling periods will be needed to simulate the real traffic
scenario.
750
Composite Modulus, MPa
300 0.1 Hz
150
0.01 Hz
-
1 2 3 1 2 3 1 2 3
Test Locations
Figure 6. Composite Modulus Measured at Different Loading Frequencies
6,000
a) Section A c) Section C 2 Hz
HMA Modulus, MPa
b) Section B
5,000 (150mm ABC + Geogrid) (250mm ABC)
(200mm ABC + Geogrid)
4,000 Average at 0.1 Hz
1 Hz
3,000
0.1 Hz
2,000
1,000
0.01 Hz
-
1 2 3 1 2 3 1 2 3
Test Locations
750 2 Hz
a) Section A b) Section B c) Section C
ABC Modulus, MPa
150
0.01 Hz
-
1 2 3 1 2 3 1 2 3
Test Locations
Results indicated that the back-calculated modulus of the ABC layers in the stabilized
sections were higher than that of the unstabilized section (see Figure 8). This increase in ABC
modulus for stabilized sections is due to base course stabilization. In addition, the rate of change
in ABC modulus with the loading frequency was distinctively seen for the stabilized section, more
prominent for the stabilized section with 150 mm ABC. These observations suggest that the
geogrid stabilized pavements are sensitive to loading frequencies. The back-calculated subgrade
layer moduli in the stabilized sections are also higher than that for the unstabilized section (see
Figure 9). This can be attributed to lower stresses on the subgrade, because of wider distribution
of stresses due to presence of geogrid.
Field characterization and evaluation of geogrid stabilized and unstabilized pavements were
conducted using an APLT system. APLTs were conducted over three flexible pavement test
sections consisting of 190 mm thick HMA. The ABC layer thicknesses for two geogrid stabilized
pavements were 150 mm and 200 mm whereas that for the unstabilized pavement was 250 mm. A
punched and drawn triangular aperture geogrid was used in the stabilized sections.
The key finding from this field testing are:
• The total surface permanent deformation responses of geogrid stabilized and unstabilized
pavements were sensitive to the loading frequency and the loading cycles. Such
deformation typically increases with the increases in the loading cycles and the decrease in
the loading frequency.
• The deformations induced in the stabilized pavement with 200 mm ABC and unstabilized
pavements were similar.
• On average, the stabilized pavement with 200 mm ABC had the highest composite modulus
while the remaining two pavements had a similar modulus.
• The back-calculated ABC moduli of geogrid stabilized pavements were higher than that of
the unstabilized pavement. At the loading frequency of 0.1 Hz, the back-calculated ABC
modulus of the stabilized sections A (150 mm ABC + geogrid) and B (200 mm ABC +
geogrid) were 44% and 51% higher than that of the control section (250 mm ABC).
• The composite modulus as well as the back-calculated layer-specific modulus for all
pavement layers were sensitive to the loading frequency. Those moduli decreased with the
reduction in the loading frequency.
In this study, only one set of cyclic stress (482 kPa) was considered for APLT. Further
study with multiple higher cyclic stresses is required for understanding the effects of heavy
vehicles. Besides, a random loading pattern with a mixed set of loading frequencies might be
needed to represent the actual traffic scenario.
REFERENCES
Timothy Yii, P.Eng.,1 Sanat Pokharel, Ph.D., P.Eng.,2 Murtaza Ali, P.Eng.,3 and
Marc Breault4
1
Project Engineer, Stratum Logics, AB, Canada; e-mail: [email protected]
2
Principal Engineer, Stratum Logics, AB, Canada; e-mail: [email protected]
3
Project Engineer, Stratum Logics, AB, Canada; e-mail: [email protected]
4
President, Paradox Access Solutions, AB, Canada; e-mail: [email protected]
ABSTRACT
An 11-kilometer gravel access road was designed and built in MD of Opportunity, Alberta. The
surface conditions varied along the road alignment, generally consisting of deposits of muskeg or
topsoil over soft to firm clay. Through ground penetrating radar and probing, the thicknesses of
the muskeg sections were identified as 1.5-2 m. The project was located in an environmentally
sensitive area with a high water table and wetlands. The traditional method requires muskeg
removal and replacement with competent soils, which is often costly and disagrees with local
regulations. Therefore, a sustainable design option minimizing impacts to the existing ecosystem
was desired. A granular road embankment was designed with two layers of novel polymeric alloy
(NPA) geocell reinforcement and geotextile for separation. This design did not require the removal
of surface materials and maintained water flow using culverts. The road was constructed during
the second half of 2019 and withstood a large number of 30 tonne rock truck passes with minimal
surface rutting and no failures of the embankment structure. This paper discusses the design,
implementation, and performance of the geocell-reinforced granular structure to meet the set
design criteria and describes performance after one freeze-thaw cycle and a year of operation.
INTRODUCTION
Muskeg is a marshy, bog-like soil condition present in Canada and covers a large surface area in
the country. It has been estimated that Canada has at least 1.2 million square kilometers of muskeg
and other peatlands (Terasmae, 2018). Owners of infrastructure projects, especially road owners,
often avoid building projects over muskeg if possible. However, there is a need for project
development in this region to harness the natural resources which therefore demands innovative
techniques to lessen the burden of construction cost while still maintaining the covenants of
sustainable development. Design over muskeg conditions is challenging due to its unique
engineering properties. Typical characteristics of muskeg include: extremely high moisture
content, permanent saturation, high compressibility, immediate settlement under applied stress,
high organic content, and weak resistance to shear. Muskeg is also known as “peat bog”.
A basic methodology for constructing road embankments in such conditions is to remove
the existing muskeg and to replace it with engineered fill materials, but this typically is only
economically feasible for shallower depths (Phukan, 1982). Phukan (1982) summarized
construction methodologies for construction of road embankments in muskeg from several
publications, and a brief summary of these methodologies follows.
The use of geocell reinforcement to support embankment structures over soft soils has been found
to be an effective technique. Initial experiments on geocells were conducted by Webster and
Watkins (1977) who proved geocells were a feasible means of base reinforcement over weak
subgrade. Webster (US Army Corps, 1979) performed experiments using beach sand reinforced
with geocells. Since then, various research studies have been conducted to further understand the
mechanisms of geocell reinforcement (Han et al. 2013). Some of the main reinforcement
mechanisms were identified by Pokharel et. al (2010), Thakur et al. (2013), and Kief et al. (2015)
to be vertical and lateral confinement, wider stress distribution, and the beam/slab effect. The
effectiveness of these mechanisms was also found to be related to higher tensile stiffness, strength,
and creep resistance of the geocells. Specifically, Thakur et al. (2013) identified that resistance to
creep helped with mitigating the initial deformation and rate of creep in the geocell-reinforced soil
composite. Yuu et al. (2008) identified the performance of geocell composites based on various
properties of the composite. They found that the quality of infill soil, subgrade strength, loading
type, and location of geocell placement were influential factors on the performance of the geocell-
reinforced course. Bathurst and Jarett (1989) performed tests to identify that stiffer geocells had
better performance. Pokharel et. al (2017) performed experimental studies on single and multiple
geocell-reinforced bases under repeated loading and found that the inclusion of geocell could
provide a traffic benefit ratio of 12 to road bases.
The project goal was to design and construct an 11 km all-season access road between an existing
private industry road and a compressor station. The compressor station was only accessible by
helicopter or all-terrain vehicles in the summer, or by ice roads constructed within a power utility
cutline every winter. The site was heavily forested and was situated within an environmentally
sensitive area with frequent sightings of bears and other wildlife. Therefore, a key goal of the
design was to minimize the footprint of the all-season access road in order to protect the
environmentally sensitive lands. The road also needed to be designed to be wide enough to allow
turning movements of a 56.49 m long compressor unit transport vehicle, and had to cross a small
creek and three pipelines without impacting any of these crossings. Construction of the road was
limited to linear construction due to the fact that the contractor only had access to the road from
one side.
The site was visited twice (once in June 2015 and once in June 2018) during the project’s
design phase to characterize the site conditions. The purpose of the initial site visit in 2015 was to
characterize the site and determine feasibility of road construction. Based on that visit, it was
estimated that approximately 8 km of the project site consisted of very soft muskeg deposits and
the other 3 km was topsoil over soft to firm clay with approximated undrained shear strength values
of 22 kPa. The site condition that was identified in these visits is shown in Figure 1.
The follow up visit in 2018 was conducted to collect information for design and confirmed
some of the 2015 findings. The surface strength was determined using dynamic cone penetrometer
tests at regular intervals in non-muskeg zones. The surface conditions varied along the alignment
of the road, generally consisting of deposits of muskeg or topsoil over soft to firm clay. Ground
penetrating radar and muskeg depth probing was used to determine the thickness of the muskeg
sections to be 1.5-2 m. The depth of muskeg was not consistent over the entire road alignment and
neither was the strength of the surface soils. For most of the road alignment there was a near-
surface water table.
The starting point of the road was located in a remote region that was only accessible
through several privately-owned unpaved access roads, one of which was a heavily used forestry
road. Because of this, any large amounts of material hauling, either away from the site or brought
to the site as fill, would increase the project cost not only due to the hauling requirements, but also
because the project owner would have to spend money maintaining the roads used to haul the
material. The construction schedule was also limited by environmental regulations. A restricted
activity period for Caribou migration season limited the road to be constructed outside of a certain
time window (February 15 to July 15). No project-related construction activities were permitted.
Figure 1. Site conditions at different locations in the 2015 (left) and 2018 (right) site visits.
Figure 2. Muskeg and soft soils depth over the length of the road alignment as identified by
GPR, DCP, and probing (distorted grid: 0-11.5 km length and 0-2.1 m depth).
(a)
(b)
Figure 3. Two-layered NPA Geocell structure in normal condition (a) and a depiction of the
settled structure in muskeg condition (b).
The design in muskeg section was similar but also relied on the muskeg gaining strength
as it consolidated up to 40% of its initial thickness. In the muskeg section, a higher strength non-
woven geotextile was required to provide an appropriate factor of safety against geotextile rupture
with settlement. The bottom layer of geotextile in muskeg section was also wrapped around the
side slopes of the embankment to protect against soil erosion at the embankment toe, with topsoil
and seeding placed on top. The construction methodology was important in assuring successful
implementation of the design. The design specified that the all granular fills would be limited to
Construction of the road embankment began on July 16, 2019 and was substantially completed
within the year. The initial construction proceeded at a medium pace as the contractor’s workforce
mobilized and got familiar with the construction methodology. Rainfall was larger that year than
in previous years, contributing to a rise in water table and a less than favorable site condition.
Figure 4 shows the partial construction of the bottom layer of the design structure in muskeg
Figure 4. Stretched NPA geocell and non-woven geotextile separation layer (left) and
placement of sand fill (right).
DISCUSSION
The geocell stabilized embankment structure was installed successfully and prevented fully
shearing the muskeg and soft soils beneath. The composite of non-woven geotextile, geocell, and
sand proved to be an effective solution to minimize the distribution of load to the underlying
muskeg. Prior to installation of the top layer, the sand composite basal layer was subjected to
frequent loading from Volvo A30G rock trucks (29,000 kg capacity). It had been anticipated in
design that extreme amounts of loading on this subbase layer could cause structural failures. The
contractor was careful to limit travel on these layers whenever possible. Still, with frequent loading
of the rock trucks a small amount of lateral spreading occurred near the surface of this basal layer.
This was remedied when the embankment slopes were shaped prior to installation of the top layer.
Without the contribution of the NPA geocell cellular confinement, these loads would not have
been supported and the resulting embankment slope failures would have occurred. The geocell
also contributed to reduced stress directed to the muskeg subgrade by distributing loads from
traffic during compressor station construction.
Due to the linear nature of the project, the finished portions of the access road were
constantly under heavy traffic as materials were brought to construct the road. Even with an
At least additional 10,000 tonnes of granular material had been brought on rock trucks for
construction of the compressor station pad site from this road post-thaw period, and in the most
recent inspection, the road surface has revealed minimal rutting and there were no instabilities
identified in the road embankment (personal communication with the contractor’s project
manager, Eric Ludwig, September 14, 2020). The project owner was able to use the access road to
successfully convey all the construction equipment and materials required to construct a new
compressor station without any issues with the road performance. The construction of the
compressor station was completed in the summer of 2020.
CONCLUSION
An unpaved access road in northern Alberta was designed and constructed over muskeg subgrade
using geotextile separator and NPA geocell. The design relied on predictions of the spatial
variability of the subsurface soils and the mechanism of the geocell reinforcement system. The
two-layered NPA geocell design was used as an alternative to the conventional method of
removing muskeg and replacing with competent fill, which resulted in a reduction in aggregate
volume of approximately 66% and reducing CO2 emissions by approximately 77%. Construction
of the road was carried out as per the design intent and successfully provided to access for
construction and operational vehicles. Inspection by the authors and the contractor indicate
remarkable performance of the road after one year and one freeze-thaw cycle. The road structure
as designed was able to effectively satisfy the performance requirements to prevent rutting,
embankment failures, and shearing of the muskeg subgrade.
ACKNOWLEDGEMENTS
The authors would like to thank Eric Ludwig from Paradox Access Solutions for feedback on the
project performance.
Bathurst, R.J. and Jarrett, P.M. (1989). Large-scale model tests of geocomposite mattresses over
peat subgrades, Transportation Research Record, 1188:28-36.
Giroud, J.P. and Han, J. (2004). Design method for geogrid-reinforced unpaved roads. I:
Development of design method. Journal of Geotechnical and Geoenvironmental Engineering,
130(8): 775–786.
Han, J. (2015). Principles and Practice of Ground Improvement, John Wiley & Sons, Inc.,
Hoboken, NJ, USA.
Han, J., Thakur, J., Parsons, R., Pokharel, S., Leshchinsky, D., and Xiaming, Y. (2013). A
Summary of Research on Geocell-Reinforced Base Courses. Design and Practice of
Geosynthetic-Reinforced Soil Structures. Bologna, Italy.
Kief, O., Schary, Y., and Pokharel, S.K. (2015). High-Modulus Geocells for Sustainable Highway
Infrastructure. Indian Geotechnical Journal, Springer, 45 (4): 389-400.
Norouzi, M., Pokharel, S.K., Breault, M., & Breault, D. (2017). Innovative Solution for
Sustainable Road Construction. Leadership in Sustainable Infrastructure, CSCE, Vancouver,
Canada, 085:1-10.
Phukan, A. (1982). Design Methods for Muskeg Area Roads. Civil Engineering Department,
University of Alaska, Fairbanks, AK.
Pokharel, S. K. (2010). Experimental Study on Geocell-Reinforced Bases under Static and
Dynamic Loading. Civil, Environmental, and Architectural Engineering Department,
University of Kansas, Kansas, USA.
Pokharel, S., Martin, I., Norouzi, M., & Breault, M. (2015). Validation of Geocell Design for
Unpaved Roads. Geosynthetics 2015. IFAI, Portland, Oregon, USA. 711-719.
Pokharel, S., Norouzi, M., & Breault, M. (2017). New Advances in Novel Polymeric Alloy
Geocell-Reinforced Base Course for Paved Roads. 2017 Conference of the Transportation
Association of Canada, Transportation Association of Canada, St. John's, NL, Canada.
Pokharel, S.K., Han, J., Leshchinsky, D., Parsons, R, & Halahmi, I. (2010). Investigation of
Factors Influencing Behavior of Single Geocell-Reinforced Bases under Static Loading.
Geotextiles and Geomembranes, 28:570-578.
Pokharel, S.K., Martin, I., and Breault, M. (2013). Causeway Design with Neoweb Geocells. Proc.
of Design and Practice of Geosynthetic-Reinforced Soil Structures, eds. Ling, H., Gottardi, G.,
Cazzuffi, D, Han, J., and Tatsuoka, F., Bologna, Italy. October 14-16, 2013: 351-358.
Pokharel, S.K., Han, J., Leshchinsky, D., Parsons, R. (2017) Experimental evaluation of geocell-
reinforced bases under repeated loading. International Journal of Pavement Research and
Technology, 11(2): 114-127.
Pokharel, S.K., Yii, T.Y., Breault, M., Norouzi, M. (2019). High Strength Geocell and Geogrid
Hybrid Reinforcement for Compressor Station Gravel Pad on Very Soft Subgrade.
Geosynthetics 2019, IFAI, Houston, TX.
Terasmae, J. (2018). October 5. Muskeg. The Canadian Encyclopedia. Available from
https://www.thecanadianencyclopedia.ca/en/article/muskeg [accessed 11 May 2020].
Thakur, J.K., Han, J, and Parsons, R.L. (2013). Creep behavior of geocell-reinforced recycled
asphalt pavement bases. Journal of materials in civil engineering, ASCE, 25: 1533-1542.
ABSTRACT
In this research, an Integrated Mobile Accelerated Test System (IMAS) was used to evaluate
geogrids' reinforcement effects. The IMAS system consisted of a 5 ft diameter and 3 ft deep rigid
box and an automatic loading frame to apply cyclic loads. A total of eight test configurations were
constructed by varying geogrid types, geogrid locations in the base course, and base aggregate
thicknesses. The IMAS performs cyclic load tests of pavement foundation sections to a large
number of load cycles, which simulates vehicle-loading conditions expected during a pavement
system's service life to evaluate the long-term performance of pavement structure. Testing results
showed the effectiveness of geogrid reinforcement in the structural performance of pavements.
Results show that biaxial and triaxial geogrids can decrease permanent deformation at the end of
load cycles with an average value of 47 and 68 percent, respectively. Also, high-strength geogrids
provide at least five psi pressure more than low-strength geogrids within the base course, which
clarify that the high-strength geogrids can provide more confinement.
In the United States, 64% of the roads are paved, and 95% of them are flexible pavement. A
conventional flexible pavement is constructed using an asphalt layer and granular materials on top
of the subgrade layer. Weak subgrade and base course layers are usually the reasons causing the
surface rutting under the accumulated load (Alimohammadi et al. 2020b). The pavement's design
and construction over the weak and moist subgrade layer, which cannot provide sufficient strength,
is always a problem for an engineer. One of the cost-effective methods to reduce the problem and
improve flexible pavement behavior is the use of geogrid reinforcement (Alimohammadi et al.
2020). Additionally, geogrids are an environmentally friendly product that has been studied and
used as reinforcement for the past two decades. Geogrids provide reinforcement to the pavement
structure and offer a number of advantages, including reducing rutting damage, increasing the
In this section, test sections, configurations, sensors, and procedures of performing the tests are
explained.
Test sections. Eight test sections were performed to evaluate the pavement behavior using
different geogrid types and under different locations: GE0, GE1, GE2, GE4, GE5, GE7, GE12,
and GE15. GE0 was the control section, so no geogrid was installed in this section. Biaxial geogrid
was used in GE1, GE2, GE5, and Triaxial geogrid was used in GE4, GE7, GE12, and GE15. For
GE1, GE2, GE4, and GE12, the geogrid products were placed at the interface of the base course
layer and the subgrade layer; for GE5 and GE7, the geogrid was installed at the middle of the base
Configurations. The IMAS equipment and section are shown in Figure 2 a and b, and is used to
perform the laboratory tests. The IMAS (Ingios Geotechnics 2020) was developed to mimic
roadway systems' field loading conditions in a large-scale laboratory system wherein the
conditions can be more easily controlled. The IMAS performs a cyclic load test with a large
number of load cycles, which simulates vehicle-loading conditions on the pavement foundation.
The IMAS can also help determine the resilient modulus, deflection, permanent deformation of
the pavement so that the pavement system's service life and the long-term performance of the
pavement structure can be evaluated. The IMAS device has a square base container, where the
depth is three feet, and the length is five feet. Boundary effects and simulation of the natural soils'
stiffness are controlled through the use of rigid walls and a foam layer. The load plate system or
the hydraulic actuator is above the device's center to provide the repeated loading during the test.
All the sensors are connected to the acquisition system, and the results can be recorded during the
test for up to one million cycles. With the use of the IMAS equipment, eight laboratory tests were
performed with different parameters. 100,000 cycles of random loading were simulated for each
test section, and the test data such as the permanent deformation, strain, and pressure were recorded
by the instrumentations like pressure cell and strain gauges.
Sensors. A lot of information can help compare and evaluate the reinforced pavement's behavior
with different types of geogrids and determine the optimal placement location of the geogrid. To
compare the pavement performance between each test section, it is necessary to record the
permanent deformation, the stress at both the subgrade and base layer, as well as the strain behavior
on the geogrid rib in different directions. These measurements can help to understand the
mechanism for the geogrid and pavement.
Three instrumentations were selected according to the literature review, the data type, and the cost.
The laser Linear Variable Differential Transformer (LVDT) was used to measure the deformation
occurring on the top plate; two types of strain gauges were used to measure the strain behavior on
the biaxial and triaxial geogrid rib, and a pressure cell was used to record the pressure. These
instruments are shown in Figure 3.
a) b) c)
Figure 3. The Instrumentations including a) Laser LVDT, b) pressure cells, c) strain gauges
The following Tensar geogrids were used in the laboratory tests: Light Duty Biaxial – Tensar
BX1100, Heavy Duty Biaxial – Tensar BX1200, Light Duty Triaxial – Tensar TX130s, and Heavy
Duty Triaxial – Tensar TX7. Class 5 aggregates, which are normally used for driveways and the
base of construction projects, were used for the aggregate base layer. A silty clay subgrade soil
with CBR = 3, representative of common subgrade soil conditions in Minnesota, was used. To
achieve CBR = 3, the subgrade was prepared at a target moisture content of 16.6%.
Base layer preparation. After subgrade preparation, the geogrid was placed at the subgrade
surface in some sections, as illustrated in Figure 4b. Then the aggregates were placed above the
geogrid layer. A rake was used to level the surface. After leveling the surface, a 6.5 HP plate
compactor was used to provide the compaction on the base layer for three minutes. Steps of base
preparation are illustrated in Figure 4c. To make sure the geogrids at the interface position will get
the maximum involvement and interlocking with the aggregates, a layer of aggregate with a
thickness of one inch was placed at the top of the subgrade surface. Then the geogrid was placed
at the top of this thin layer, and then base materials were placed and compacted in the tests.
Surface layer preparation. A double layer of steel simulated the asphalt surface, which provides
an equivalent weight of the real asphalt surface. The loading plate was set in the middle of the
container. Each layer of steel has seven pieces of fan-shaped steel to cover the surface of the base
material. Setting the steel surface installation is illustrated in Figure 4d. A thin foam layer was
placed between the steel and the base layer to provide friction and protection. The final step was
to connect all the sensors to the acquisition system, illustrated in Figures 4e and f.
a) b) c)
Figures 5 and 6 illustrate the strain gauge results of biaxial and triaxial geogrids for reinforced
sections under the tests' compaction loading steps, respectively. From the results, it can be seen
that during the application of compaction loads, the results of strain gauge in biaxial geogrids have
fluctuation and reached higher peak values than triaxial geogrids, which gradually increase to get
the maximum value of strains. Also, the residual strain in triaxial geogrids is less than biaxial
geogrids.
Figure 7 illustrates the permanent deformation results of Triaxial and Biaxial geogrids. The
increase in the pavement structure's service life has been commonly defined by the application of
the Traffic Benefits Ratio (TBR). The TBR is described as the ratio of the number of load cycles
to achieve a particular rutting depth in the reinforced section over an unreinforced section with
exactly corresponding thickness, loading characteristics, and material properties. From the results,
it can be seen that the triaxial geogrids perform much better than biaxial geogrids in reducing the
permanent deformation of the sections for the same cyclic load numbers and increasing Traffic
Benefit Ratios (TBR) values of the sections.
Two pressure cells were used for each test, one located on top of the subgrade and the other
located on top of geogrid in the base aggregate layer to measure the value of pressure developing
in both aggregate and subgrade layers in the tests. Figures 8 a to h show comparisons of both
pressure cells in all eight sections performed in this study, and it can be seen from the results that
the test sections with the heavy-duty geogrid always have higher pressure cell data reading than
the light-duty geogrids. For the overall earth pressure cell results, except for GE4 and GE7 in
figure 8 c and e, respectively, the test sections have similar trends: the earth pressure cell data was
increasing as the loading occurred, both in the subgrade and base course layer, but the increasing
rate and magnitude are higher in base course layer than the subgrade layer. From the results in
figure 8 it is obvious that under the same location, the maximum pressure in GE1 with the light-
duty geogrid is 10 psi; however, the maximum pressure in GE2 with the heavy-duty can reach 15
psi.
a) b)
c) d)
g) h)
Figure 8. Pressure cells result for sections a) GE0, b) GE1, c) GE2, d) GE4, e) GE5, f) GE7,
g) GE12, and h) GE15
CONCLUSIONS
In this study, a series of large-scale laboratory tests were conducted to determine the geogrids'
effectiveness under various parameters. These parameters include the types of geogrid, the
aperture of the geogrid, the geogrid's stiffness, the location where to install the geogrid, and the
thickness of the base course layer. After plotting and comparing the results, the following
preliminary observations can be made:
• From the permanent deformation versus the number of loading cycles plot, it can be stated
that the deformation of the control section without the geogrid reaches almost one-inch at
the end of the test; however, the triaxial and biaxial geogrid reinforced section deformation
curves show the maximum deformation around 0.25 and 0.5 inches respectively which is
almost one quarter and half of the unreinforced section deformation. Generally, it can be
stated that triaxial geogrid perform better than biaxial geogrid in decreasing permanent
deformation of the pavement.
• The test sections with the heavy-duty geogrid always have higher-pressure cell readings
than the light-duty geogrid. Also, since the heavy-duty geogrid having a higher stiffness
• For the overall earth pressure cell results, except for GE4 and GE7, the test sections have
similar trends: the earth pressure cell data was increasing as the loading occurred, both in
the subgrade and base course layer, but the increasing rate and magnitude are higher in
base course layer than the subgrade layer. This evidence supports that the geogrids can
stabilize both the subgrade and the base course layer, but more in the base course. GE4 and
GE7 have a converse result, and the reason could be caused by the geogrid location.
• The average earth pressure cell data in triaxial geogrid tests is higher than the biaxial
geogrid tests. The comparison between test section GE1 and GE4 on the earth pressure cell
data overall shows that under the same location and same thickness of the base course
layer, the pressure in section GE4 in the base course is at least two psi higher than the
pressure in the section GE1 on top of subgrade layer. The triaxial geogrid would have more
effectiveness than the biaxial.
ACKNOWLEDGEMENTS
This manuscript is based upon work supported by the Minnesota Department of Transportation
(MnDOT) under contract number 1034932 entitled "Effectiveness of Geotextile/Geogrids in
Roadway Construction; Determine a Granular Equivalent (G.E.) Factor". The authors thank
MnDOT for this support. The contents and views in this paper are those of the authors and do not
necessarily reflect those of the funding agency.
REFERENCES
Abu-Farsakh, M. Y., and Chen, Q. (2011). “Evaluation of geogrid base reinforcement in flexible
pavement using cyclic plate load testing.” International Journal of Pavement Engineering,
12(3), 275–288.
Al-Qadi, I. L., Brandon, T. L., Valentine, R. J., Lacina, B. A., and Smith, T. E. (1994).
“Labtatory evaluation of geosynthetic-reinforced pavement sections.” Transportation
Research Record, 1439.
Al-Qadi, I. L., Dessouky, S., Tutumluer, E., and Kwon, J. (2011). “Geogrid mechanism in low-
volume flexible pavements: Accelerated testing of full-scale heavily instrumented pavement
sections.” International Journal of Pavement Engineering, 12(2), 121–135.
Alimohammadi, H., Schaefer, V. R., Zheng, J., and Li, H. (2020a). “Performance evaluation of
geosynthetic reinforced flexible pavement: a review of full-scale field studies.”
International Journal of Pavement Research and Technology.
Alimohammadi, H., Zheng, J., Buss, A., Schaefer, V. R., Williams, C., and Zheng, G. (2020b).
“Field and simulated rutting behavior of hot mix and warm mix asphalt overlays.”
Construction and Building Materials, Elsevier, 265, 120366.
Alimohammadi, H., Zheng, J., Schaefer, V. R., Siekmeier, J., and Velasquez, R. (2020c).
“Performance Evaluation of Geogrids in Flexible Pavement: A Review of Large-Scale
Laboratory Studies.” Transportation Geotechnics.
Cuelho, E. V., and Perkins, S. W. (2017). “Geosynthetic subgrade stabilization – Field testing
ABSTRACT
Sometimes a pavement deflects only because of seasonal volume change of expansive soils in the
pavement subgrade. Engineering practitioners expect an implementable and straightforward
analysis method for a geosynthetic-reinforced pavement subjected to the swelling/shrinkage issue
of expansive clayey subgrade, in an effort to find the bending moment, shear force and tension
force distributions through the reinforced pavement, which are induced from the volumetric
changes of subgrade soils. The virtual load method (VLM) was proposed in the past following the
Timoshenko beam theory to analyze geosynthetic-reinforced pavement on expansive soils. In the
VLM, the unknown virtual distributed load was obtained in the way by applying the inverse theory
for the identification of material parameters of the pavement-foundation system. It was seen that
the selection of the number of material parameters to obtain virtual load significantly affects the
accuracy of the structural properties of the pavement and tensile properties of the geosynthetics if
the linear least square method is used. In this paper, a unique numerical scheme was proposed in
the hopes of solving the issue. After a forward problem was solved numerically, the Timoshenko
beam deflection was taken as a start-up for the inverse problem to back analyze the load applied
to the pavement. Solutions from forward/backward examples have explicitly shown the accuracy
achieved related to the bending moment in the pavement and tension in the geosynthetic
reinforcements. The proposed methodology can be applied for an in-depth understanding of the
geosynthetic function for the mitigation of longitudinal cracks on pavements caused by
heave/shrinkage of expansive soils.
INTRODUCTION
In the USA, billions of dollars are spent every year to resolve the swelling related distresses on the
highways over expansive soils (Al-Qadi et al. 2009). It is typically not feasible to avoid these soils
because of the widespread distribution everywhere all over the USA (Snethen 1979). Usually,
these soils show volumetric change because of the presence of swelling mineral, e.g.,
montmorillonite that swells or shrinks with the fluctuation of moisture content (Chen 2012). The
highways constructed over these expansive soils are subjected to differential movement with
seasonal wetting and drying. They can cause heave or shrinkage, which results in the development
of cracks that are found prevalently on the surface of the pavements (Nelson et al. 2015). A few
mitigation approaches, including chemical stabilization, compaction, moisture barriers, and pre-
wetting, were developed over time to overcome this issue (Khan et al. 2018; Lytton et al. 2005;
Sarker et al. 2021; Sebesta 2002). However, these methods sometimes miss the mark because of
the unpredictability of the issue and the excessive expense of implementation. Traditional chemical
In the analytical model, the pavement geometry was considered as symmetric to the centerline, as
appeared in Figure 1. The geosynthetic-reinforced pavement was simulated as a reinforced
Timoshenko beam on an elastic foundation. Timoshenko beam theory is referred to as the first-
order shear deformation theory, which assumes that the transverse shear strain is consistent
through the beam thickness. In this study, the Pasternak foundation model was adopted to simulate
the subgrade soil because it considers the shear resistance of the reinforced pavement (Fwa et al.
1996). By adopting the Timoshenko beam theory to simulate pavement and the Pasternak model
to simulate the foundation soil, we will be able to consider the effect of geosynthetic reinforcement.
Finally, the inverse analysis will allow us to understand the mechanism of the initiation and
propagation of the pavement cracks caused by heave or shrinkage of expansive soils subgrade.
(a) (b)
Figure 1. (a) Schematic diagram of 1-D loaded beam supported on elastic foundation, (b)
Relations among loading, shear force, bending moment and tension (Sarker et al. 2019).
Analytical solution. Figure 1(a) shows the reinforcement in a Timoshenko beam resting on an
elastic foundation. Two independent variables are settlement w and rotation angle Φ. Let us
consider a finite beam with a beam length of L, bending stiffness D, and shear stiffness C. The
relationship between moment M and the rate of rotation angle change can be expressed as
(Timoshenko 1921).
𝑑𝑑𝑑𝑑
𝑀𝑀 = −𝐷𝐷 (1)
𝑑𝑑𝑑𝑑
Where Φ = rotation angle, and D is the bending stiffness. The relationship between shear
force Q and shear deformation can be expressed as (Timoshenko 1921)
𝑑𝑑𝑑𝑑
𝑄𝑄 = 𝐶𝐶 � − 𝛷𝛷� (2)
𝑑𝑑𝑑𝑑
Here, C is the shear stiffness of the geosynthetic-reinforced beam.
The vertical force equilibrium of the beam element in Figure 1(b) leads to
𝑑𝑑𝑑𝑑
= 𝑘𝑘𝑠𝑠 𝑤𝑤 − 𝑞𝑞 (3)
𝑑𝑑𝑑𝑑
Where ks is the spring constant in kN/m3, and q is the arbitrary pressure on the beam and
may be a function of x. From the moment equilibrium of the beam element, we get
PARAMETRIC STUDY
As a validation for the inverse method, the external loads from the forward method and the
virtual load computed from the inverse method were plotted and compared. Figure 2 shows the
deflection of the geosynthetic-reinforced pavement caused by a predetermined load applied on the
pavement and the deflection caused by the virtual load. In the forward analysis, the deflection was
caused by external load and plotted as “Wb_FDM”. On the other hand, in the inverse analysis, the
deflection was caused by the virtual load when deflection data obtained from the forward analysis
was taken as input and plotted as “Wb_LLS”. The maximum deflection caused by external load
was obtained by 3.73 mm while taking this deflection data as input in the inverse model produces
a virtual load that causes maximum deflection of 3.50 mm. The percent error between “Wb_FDM”
and “Wb_LLS” was 6.2%. However, percent error could be reduced by increasing the number of
Fourier terms as the first five terms of Fourier constants were considered in this case for inverse
analysis.
Loading, Shear force, and bending moment distribution along the geosynthetic-reinforced
pavement cross-section resulted from forward and inverse analysis methods that were plotted in
Figures—3, 4, and 5, respectively. It can be observed from Figure 3 that the computed virtual load
gets closer to the external load when the number of Fourier terms is increased. In Figures 4 and 5,
“FDM” represent the results obtained from the forward analysis or due to applied external load on
the pavement. In comparison, “LLS” represent the results obtained from the inverse analysis or
due to virtual load. Shear forces and bending moments were calculated for different Fourier terms
such as 4, 8, 15, and 100. It can be observed from Figure 5 that the number of Fourier terms for
q0 = 1000 kPa
x
B = 0.1 m
L=3m
-0.001
0.000
Wb_FDM
Deflection (in m)
0.001 Wb_LLS_n4
0.002
0.003
0.004
0.00 0.33 0.67 1.00 1.33 1.67 2.00 2.33 2.67 3.00
X-coordinate (m)
1200
External load
1000 FDM
Virtual load_n4
Virtual load_n8
800 Virtual load_n15
Virtual load_n100
600
Load, q (kPa)
400
200
-200
-400
0.0 0.5 1.0 1.5 2.0 2.5 3.0
X-coordinate (m)
Figure 3. Load distribution along the cross-section of the reinforced pavement.
50000
LLS_n100
-50000
-100000
-150000
0.00 0.33 0.67 1.00 1.33 1.67 2.00 2.33 2.67 3.00
X-coordinate (m)
Figure 4. Shear force distribution along the cross-section of the reinforced pavement.
25
M_FDM
20 M_LLS_n4
M_LLS_n8
Moment, M (kN.m/m)
15 M_LLS_n15
M_LLS_n100
10
-5
0.00 0.33 0.67 1.00 1.33 1.67 2.00 2.33 2.67 3.00
X-coordinate (m)
The effects of geosynthetic shear stiffness Gg were investigated in this parametric study
research, and different outcomes were plotted in Figure 6. Typically, geotextiles are not considered
to take shear force but tension only. The geosynthetic shear stiffness Gg was assumed to be zero
for this case and plotted as “Zero Gg” (see Figure 6). Then again, geogrid sheets may be considered
to take shear force in addition to tensile force. So, for the geogrid case, their shear stiffness was
fully considered and plotted as “Full Gg” in Figure 6 as well.
Full G
g
2 500 Zero G
g
0 0
-2 -500
0 1 2 3 0 1 2 3
(a) (b)
-3 5
10 10
4 2
Full G Full G
g g
2 1
, (rad)
Zero G Zero G
g g
0 0
Shear, Q, (kN/m)
Rotation,
-2 -1
-4 -2
0 1 2 3 0 1 2 3
(c) (d)
30 60
Full G Full G
g g
20 40
Zero G Zero G
g g
Moment, M, (kN-m/m)
Tension, T, (kN/m)
10 20
0 0
-10 -20
0 1 2 3 0 1 2 3
(e) (f)
Figure 6. (a) Deflections, (b)Virtual load, (c) Rotation, (d) Shear force, and (e) Bending
moment distribution in the pavement, and (f) Tension in the geosynthetic reinforcements.
CONCLUSION
In this research, an inverse-based analytical model was proposed to evaluate the structural
performance of geosynthetic reinforcements in the pavement on expansive soils following the
Timoshenko beam theory by incorporating the volume change of subgrade in formulations. A
practical, robust, and rapid method for the solution of inverse problems associated with
geosynthetic-reinforced pavement on expansive soils was being developed. Numerical results have
shown the efficiency of the proposed model to overcome the convergence problem related to
bending moment on the pavement and tension on geosynthetic reinforcements. The effects of
geogrid and geotextile reinforcement on the performance of pavement on expansive soils were
investigated. The study suggests the superior performance of geogrid over geotextile to moderate
the uplift pressure from the expansive soils subgrade for protecting the pavement surface.
Nevertheless, the method does appear promising and, given data of sufficient precision, will allow
for substantial new developments in the geosynthetic industry. This study will allow the
geotechnical and pavement engineers to design the geosynthetic-reinforced pavement on
expansive soils by integrating volume change-induced deformations of the subgrade in the model.
ACKNOWLEDGEMENT
This work was supported by the Geosynthetic Institute with a 2020-21 GSI Fellowship grant under
contract No. 32-4116-65048 at Louisiana Tech University.
REFERENCES
Ahmed, A., Hossain, M. S., Bin Alam, M. J., and Khan, M. S. (2018). “Moisture and Matric
Suction Behavior in Unsaturated Subgrade through Field Instrumentation and Numerical
Modeling.” PanAm Unsaturated Soils 2017, American Society of Civil Engineers, Reston,
1
Virginia Department of Transportation, 811 Commerce Road, Staunton, VA 24401; e-mail:
[email protected]
2
Virginia Department of Transportation, 530 Edgemont Road, Charlottesville, VA 22903; e-
mail: [email protected]
ABSTRACT
The goal of ASCE’s Grand Challenge is to reduce the life-cycle cost of civil engineered
infrastructure by 50% by the year 2025. Currently there are no life-cycle cost analysis models that
are designed to evaluate the highway agency budget benefits of geotextile separators in paved
roads. To address this gap for the Virginia Department of Transportation (VDOT), life-cycle cost
analysis was performed on two common secondary road designs, each with the options of separator
geotextile and preventive maintenance, using three plausible rates of subbase contamination. The
benefit of geotextile is modeled narrowly as slowing of depth loss of the aggregate layer caused
by fines migrating from the subgrade. In each scenario, the 50-year discounted costs of a pavement
designed with a geotextile layer are compared with those of an analogous but geotextile-free
pavement. The cost analysis required development of conceptual pavement layer deterioration
curves that reflect differentiated subbase deterioration due to fines infiltration. The contamination
rates used are consistent with established literature on (1) the interaction of traffic loading and
aggregate layer contamination and (2) the response of pavement resilient modulus to
contamination of the aggregate layer. Under two treatments of the residual value of the pavements
at the end of the analysis period, the results indicate that separator geotextile would likely deliver
long term cost-effectiveness to asphalt pavements when subgrade fines contamination rates reach
0.1 inch per year and greater.
INTRODUCTION
Although geotextiles are used widely in road design in the U.S., a purely mechanistic life-cycle
cost analysis for a geotextile separator layer in a paved road has yet to be published in public
literature. A “traffic benefit ratio” resulting from incorporation of geotexile (GTX) separator layers
in paved roads was demonstrated 25 years ago (Al Qadi et al. 1994) and consistent findings
followed in subsequent research (Perkins 2001, Al-Qadi and Appea 2003). Life-cycle cost analysis
(LCCA) was subsequently performed for 25 hypothetical secondary pavements with varying
traffic levels, reflecting secondary roads in the Commonwealth of Virginia designed under 1993
AASHTO pavement design guidelines (Yang and Al-Qadi 2007). Yang and Al-Qadi compared
agency and user costs for GTX-free AASHTO pavements against the costs of pavements
containing GTX designed as earlier proposed by Al Qadi for pavement stabilization and separately
by Perkins for pavement reinforcement. The results indicated that the incorporation of GTX could
save an agency up to 40%, but might also break even with the agency cost of a GTX-free pavement.
PAVEMENT DESIGN
The two pavement design options (very low Average Annual Daily Traffic (AADT) and low
AADT) are consistent with VDOT’s Materials Division Memorandum of Instruction Chapter 6
(VDOT 2018). They were created by means of AASHTO (1993) design method in conjunction
with the design input values shown in Table 1. Initial design year is 2020 (end of construction).
AADT and truck percent of AADT presented in Table 1 for the two pavement designs correspond
to typical low-volume roadways in Virginia. The subgrade resilient modulus value is equivalent
to a CBR value of 3.3.
Initial pavement service life of 20 years was considered realistic for both AADT levels
with SuperPave surface mix on a secondary road in Virginia, consistent with reduced maintenance
on the secondary system. Separation GTX was assumed to provide benefits consistent with the
recent findings of Hoppe et al. (Hoppe et al 2019). Specifically, GTX prevents pavement
deterioration caused by contamination of the aggregate layer by the migration of subgrade fines.
DETERIORATION CURVES
Empirical pavement layer deterioration curves with and without GTX are not available in public
literature. Therefore hypothetical deterioration curves were constructed for this analysis,
preserving underlying principles of AASHTO (1993). Structural coefficients for surface,
intermediate, and base layer asphalt mixes were based on remaining life factors established in
AASHTO (1993), recognizing the fundamental tradeoff between Condition Factor and Remaining
Life established in the best-fit curve from the AASHO road tests.
It is generally accepted, however, that bound pavement materials do not deteriorate
suddenly to the structural coefficient of zero even without the presence of GTX. Furthermore,
engineering experience and consensus regarding the function of GTX (Hoppe et al., 2019) suggest
that pavement damage resulting from aggregate contamination can be conceptualized in two
equivalent ways: (1) aggregate layer thickness remains the same but the structural coefficient of
the aggregate layer decreases over time (Figure 1(a)), or (2) the structural coefficient of the
aggregate layer remains the same but the thickness of the aggregate layer diminishes with time
(Figure 1(b)). The second method was selected for this study because it facilitates simplicity in
pavement deterioration calculations.
The accepted mechanisms of pavement layer deterioration when there is no GTX
separation layer are summarized in the interaction modeled between the base and surface layers:
first, the asphalt base mix undergoes stripping and deterioration due to loss of aggregate subbase
thickness; second, asphalt surface mix durability responds differentially to competent versus poor
asphalt base mixes. Figure 2 illustrates these interactive layer mechanisms.
0.12
5
Structural Coefficient
2
0.04
0.02 1
0 0
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25 30 35 40 45 50
Years Years
Geotextile No Geotextile (1 in/5 yrs) No Geotextile (1 in/10 yrs) Geotextile No Geotextile (1 in/5 yrs) No Geotextile (1 in/10 yrs)
(a) (b)
0.5 0.5
0.45 0.45
0.4 0.4
Structural Coefficient
Structural Coefficient
0.35 0.35
0.3 0.3
0.25 0.25
0.2 0.2
0.15 0.15
0.1 0.1
0.05 0.05
0 0
0 5 10 15 20 25 30 35 40 45 50 0 5 10 15 20 25
Years Years
Geotextile No Geotextile (1 in/5 yrs) Surface Mix over BM > 0.33 Surface Mix over BM < 0.33
No Geotextile (1 in/10 yrs) Limit of Serviceable Base Mix 1993 AASHTO Best Fit Curve Limit of Serviceable Surface Mix
(a) (b)
The curves in Figure 2 reflect specific assumptions of the LCCA: all asphalt mixes have
an initial structural coefficient of 0.44, consistent with VDOT’s Manual of Instruction; base mix
deterioration is more rapid for an aggregate layer with infiltrated fines, reflecting pavement
damaging mechanisms that depend on pore water increase and potential stripping; surface mix
condition over an asphalt base with structural coefficient less than 0.33 deteriorates faster than
over an asphalt base with structural coefficient greater than 0.33; surface mix structural coefficient
less than 0.30 triggers a higher-level maintenance intervention; surface mixes on low-volume
secondary roads degrade over a period of 20 years while base and intermediate mixes degrade over
a period of 30 years, as reflected in empirical maintenance practice at VDOT; surface asphalt
service life in all scenarios was set at 20 years to reflect typical mix serviceability and reduced
maintenance on the secondary roadway system; finally, no structural benefit results from the
presence of separation GTX.
VDOT does not currently require the use of GTX in any of its pavement designs and therefore has
no benchmark rates of aggregate contamination by subgrade fines. Yet to estimate the potential
fiscal benefits of GTXs, the adopted pavement layer deterioration curves require identification of
plausible absolute rates of contamination (i.e., inches/year) to trigger the deterioration mechanism
of aggregate thickness reduction.
In two recent reports, a comprehensive contract study for PennDOT (Xiao et al. 2016) and
a derivative report in Kermani et al. (2019), accelerated pavement testing equipment (MMLS3,
model mobile load simulator at 1/3 scale) was used to quantify rates of subgrade fines penetration
into aggregate subbase. Selected parameters of the PennDOT study are shown in Table 2 in
comparison with typical VDOT values:
The results from the PennDOT study indicate that fines contamination of the aggregate
subbase layer begins almost immediately and increases with increasing “cycles”, which for the
modeled collector road section of the studies was equatable with Equivalent Single Axle Loads
(ESALs) (Xiao et al. 2016; Kermani et al. 2019).
An earlier study demonstrated that, starting with aggregate already containing 5.5% fines,
the resilient modulus of an aggregate subbase drops precipitously at approximately 13.5% fines
content (Jorenby and Hicks 1986). Given VDOT No. 21B production tolerances shown in Table
2, additional fines content of 7% was identified as a conservative contamination level sufficient
for a potentially abrupt loss of resilient modulus in VDOT aggregate No. 21B. (Note: Table 2
indicates that VDOT No. 21A aggregate can reach 13.5% fines while within its production
9
8
7
Contamination of Total
Layer Thickness (%)
6
5
4
Kermani ESALs
3 155 AADT
2 1500 AADT
1
0
0 100 200 300 400 500 600
Equivalent Single Axle Loads (Thousands)
Figure 3. Kermani et al. (2019) collector roadway loadings, LCCA secondary road
loadings, and resulting contamination of total layer thickness (%).
Combined, the findings of Kermani and Jorenby and Hicks provide a check on the range
of absolute contamination rates used in this study. Back-calculating using AASHTO (1993), the
pavements in the present study with initial AADT of 155 and 1500 would reach full-aggregate
depth fines contamination of 7% by about 94 years and 18 years after construction, respectively,
assuming 2% annual traffic growth. The corresponding absolute annual rates of contamination are
calculated at 0.064-in and 0.341-in, respectively. This range nearly overlaps the range of absolute
contamination rates used in the present LCCA model, 0.05-0.2-in. per year, and indicates its
reasonableness for VDOT aggregate and typical VDOT pavement structures.
Yet it is important that the threshold contamination percentages of fines indicate the point
at which the aggregate layer loses resilient modulus rather than the time when contamination
initiates. In fact, without a GTX separator, the aggregate subbase layer is subjected to
contamination practically at initial traffic loading. Below the threshold value of 7%, the aggregate
is contaminated to some degree; above the 7% threshold, the aggregate has probably lost nearly
all of its resilient modulus and exhibits behavior similar to the underlying subgrade soil.
It should be noted that the ESAL loadings shown in Figure 3 are applied while the subgrade
soil is saturated. Therefore if the subgrade is saturated only half of its life, full-depth
contamination will be approximately half of that shown in Fig. 3. Actual saturation over a
pavement’s service life, however, is typically unquantifiable at the time of construction.
MAINTENANCE SCHEDULES
Preventive maintenance (PM) was modeled as milling of the existing asphalt surface and
replacement with new asphalt mix. “No PM” was modeled as simple overlay with new asphalt
surface mix, consistent with observed VDOT practice for rural secondary roads.
Treating PM as an option in this LCCA, all pavement scenarios are evaluated at 5-year
intervals for maintenance needs. Surface asphalt patching is considered sufficient when the ERDL
falls below 5 years but the surface mix structural coefficient is still above 0.30 (based on 1993
AASHTO pavement design). The first maintenance activity realistically consists of overlay or
mill/inlay rather than rehabilitation/rebuild, reflecting typical maintenance procedures.
Other maintenance decisions are triggered as follows: if the structural coefficient of the
surface mix is below 0.30, overlay or mill/resurfacing is required; if ERDL is below 5 years (the
duration between the current and next analysis year), patching is required in direct proportion to
the shortfall, unless resurfacing or rebuilding is performed in the same analysis year; if the typical
maintenance activity (overlay or mill/inlay) does not result in a recalculated ERDL of at least 5
years, pavement rehabilitation or rebuild is necessary. The last calculation includes engineering
judgment, although the designs in this analysis minimally meet new design life of 20 years.
Some maintenance activities are determined ad hoc, including the following: 20% of the
roadway length (both sides) requires guardrail; guardrail replacement is necessary after overlay
exceeds 2 inches; and crack-sealing is considered a routine maintenance activity common to all
pavements and therefore is not included in the pavement maintenance histories.
Table 3 shows the maintenance schedule determined for the very low volume secondary
road subjected to the maximum contamination rate over the 50-year analysis period under the No
GTX-No PM scenario.
Note: ERDL = estimated remaining design life; RRDL = recalculated remaining design life; SSC =
surface structural coefficient
COST DATA
Empirical data obtained from VDOT contract awards over the period 2008-2018 were used to
determine construction and maintenance costs for each combination of pavement design and
scenario over the analysis period. Since documentation of the use of separation GTX is not required
by VDOT at the time of this writing, identification of actual costs involved the choice of an item
code for the GTX typically used for separation purposes in VDOT roads and selection of a subset
of construction projects in which the separator GTX was used on the secondary system. When the
tasks were completed, representative quantity-to-unit price relationships were developed for GTX
(Figure 4) and for most major items in secondary pavement construction. These unit prices were
used to determine the cost of maintenance activities. GTX unit cost in VDOT projects ranged from
over $10 per square yard installed for very small quantities to below $2 per square yard installed
for high quantities, in inflation-adjusted prices.
Figure 4. Quantity-to-price relationship for VDOT item 00355 in select roadway projects
(2013 Widen Roadway; 2016 Grade/Drain/Pave).
LCCA results represent the discounted present value of construction and maintenance costs over
the 50-year analysis period, plus a factor that considers the “remaining value” of the pavement at
50 years. Accounting for the remaining pavement value at the analysis termination point is an
aspect of LCCA on which there is no clear consensus in practice. In this study, two methods are
offered for the treatment of remaining value as either (1) an asset (“salvage value”) or (2) a
“normalized” liability reflecting differing final pavement conditions.
In the first method, salvage value is quantified for each pavement design scenario as the
product of ERDL at the beginning of year 50 in ratio to ERDL at original construction (i.e., current
ERDL/20) and the cost of a 20-year pavement design (constant for all alternatives) given the
AADT in year 50, discounted to the present. Salvage value monetized by this method is a life-
cycle cost offset, i.e., the salvage value factor is subtracted from the sum of pavement construction
and discounted maintenance costs.
In the second method, the modeled condition of each existing pavement structure after 50
years is the basis for the creation of a 20-year “terminal pavement design” for each pavement,
reflecting real-world conservation of road inventories. Pavements with low ERDL require more
rehabilitation expense to achieve a 20-year design life than pavements with higher ERDL at year
50. The costs of a “terminal” design for each pavement-scenario combination after year 50 are
discounted in the same manner as earlier maintenance activity costs. But they are added to the sum
of construction and discounted maintenance costs from year 5 through year 50 as a liability, of
greater or lesser magnitude depending on pavement condition at year 50.
Discount rates of 4% (consistent with VDOT practice) and 1.5% (consistent with FHWA
recommendations for long term economic analysis and current rates of return at the time of
analysis) were used to determine the life-cycle cost for a scenario, assuming that interest is
compounded annually as shown:
𝑖𝑖=𝑇𝑇 𝐶𝐶𝐶𝐶𝐶𝐶𝐶𝐶
𝑖𝑖
𝐿𝐿𝐿𝐿𝐿𝐿 = �∑𝑖𝑖=0 (1+𝑑𝑑)𝑖𝑖
� ± 𝑓𝑓
Where i is years from base year 0, Costi is project cost in year i, T is analysis period in
years, d is the discount rate, and f is the remaining value factor at 50 years.
RESULTS
The LCCA methodology developed in this study combines empirical VDOT cost data with a
quantitative pavement deterioration model to measure the cost-effectiveness per mile of pavements
with separator GTX over a 50-year analysis period. Actual VDOT cost data on GTX, aggregate,
base material, intermediate layer, milling and guardrail were collected from secondary road
projects recorded in VDOT’s electronic construction database.
Table 4 shows cost ratios of the GTX pavement (column) to the No GTX pavement (row)
for the 50-year period, under each method of analysis termination. Unshaded cells show direct
comparisons (the presence or absence of GTX only) and shaded cells show cross-comparisons
(i.e., option opposites). For example, at the highest contamination rate modeled here (0.2-in per
year), the present value of the 50-year cost of a very low traffic (AADT = 155) secondary pavement
with a GTX separation layer and no preventive maintenance (GTX-No PM option) would be 50%
of the cost of a pavement with no GTX layer and no PM (No GTX-No PM option), assuming the
Table 4. Summary of LCCA results with (a) monetized salvage value and (b) terminal
pavement design at end of analysis period.
Contamination Rate
0.2 in./yr 0.1 in./yr 0.05 in./yr
Discount Initial (a) (b) (c) (d) (e) (f)
Pavement Design
Rate AADT GTX-No PM GTX-PM GTX-No PM GTX-PM GTX-No PM GTX-PM
No GTX-PM 45% 51% 66% 76% 85% 98%
155
No GTX-No PM 50% 57% 85% 98% 103% 118%
4.0%
No GTX-PM 71% 75% 90% 95% 94% 99%
1500
No GTX-No PM 71% 75% 89% 94% 102% 107%
No GTX-PM 26% 37% 41% 59% 61% 88%
155
No GTX-No PM 28% 41% 60% 86% 92% 132%
1.5%
No GTX-PM 61% 67% 82% 91% 89% 98%
1500
No GTX-No PM 61% 67% 82% 91% 100% 110%
(a)
Contamination Rate
0.2 in./yr. 0.1 in./yr 0.05 in./yr.
Discount Initial (a) (b) (c) (d) (e) (f)
Pavement Design
Rate AADT GTX-No PM GTX-PM GTX-No PM GTX-PM GTX-No PM GTX-PM
No GTX-PM 51% 55% 74% 80% 95% 102%
155
No GTX-No PM 56% 60% 94% 102% 110% 119%
4.0%
No GTX-PM 76% 80% 91% 97% 98% 104%
1500
No GTX-No PM 76% 80% 90% 96% 103% 109%
No GTX-PM 41% 47% 61% 69% 89% 101%
155
No GTX-No PM 43% 49% 85% 97% 114% 130%
1.5%
No GTX-PM 71% 78% 85% 95% 99% 110%
1500
No GTX-No PM 71% 78% 85% 95% 101% 113%
(b)
Note: GTX = geotextile, PM = preventive maintenance.
CONCLUSIONS
Pavements with separator geotextile are expected to be consistently more cost-effective than
pavements without separator geotextile at contamination rates above 0.1 inch/year, regardless of
whether preventive maintenance is performed or whether initial AADT is set at the lower (155) or
higher (1500) level, for discount rates within the range explored in this study (4% and lower).
Separation geotextile in pavement structure can have a significant life-cycle cost advantage
over pavement without geotextile for the highest contamination rate tested in this study when both
pavements receive preventive maintenance, and the cost advantage of separation geotextile usually
increases if neither pavement receives preventive maintenance, regardless of initial AADT.
The life-cycle cost advantage of separator geotextile decreases with decreasing
contamination rate, yet separation geotextile is a relatively low-cost item to install as a preventive
measure to mitigate potential premature deterioration. PennDOT estimated that a future
reconstruction could cost as much as 211% of the present cost of a road with GTX originally
incorporated in construction (K. Petrasic 2017). Only surficial maintenance is likely to be required
with separation geotextile incorporated into the pavement section.
Although aggregate contamination by fine-grained subgrade soils is a well-documented
problem, current pavement design methods do not incorporate this knowledge. Thus, some
pavements designed using these methods may deteriorate at a faster rate than anticipated,
increasing their life-cycle costs. Aggregate layers protected by means of separator geotextile are
more likely to be preserved and reused.
ACKNOWLEDGMENTS
The authors thank Dr. Ed Hoppe and Dr. Shabbir Hossain for their leadership of the research that
enabled the analysis presented here.
REFERENCES
Amr M. Morsy, Ph.D., P.E. 1,2, Jorge G. Zornberg, Ph.D., P.E.3, Jie Han, Ph.D., P.E.4,
Burak F. Tanyu, Ph.D.5, Barry R. Christopher, Ph.D., P.E.6, and Dov Leshchinsky, Ph.D.7
1
Loughborough University, Loughborough, LE11 3TU, UK. Email: [email protected]
2
Cairo University, Giza 12613, Egypt.
3
The University of Texas at Austin, Austin, TX 78712, USA. Email: [email protected]
4
University of Kansas, Lawrence, KS 66045, USA. Email: [email protected]
5
George Mason University, Fairfax, VA 22030, USA. Email: [email protected]
6
Christopher Consultants, Augustine, FL 32080, USA. Email: [email protected]
7
ADAMA Engineering, Inc., Clackamas, OR 97015, USA. Email: [email protected]
ABSTRACT
This paper presents the findings of an experimental study conducted to define the boundary
conditions of composite behavior of Geosynthetic Mechanically Stabilized Earth (GMSE) bridge
abutments. The study involved the development of a new soil-geosynthetic interaction device
capable of generating data required to assess the mechanical interactions between soils and
reinforcing inclusions within a reinforced soil mass. These interactions are key to understanding
the effect of reinforcement vertical spacing on the behavior of GMSE bridge abutments. The soil-
geosynthetic interaction device was designed to accommodate a reinforced soil mass with three
reinforcement layers. One reinforcement layer was subject to increasing tensile loads through an
external loading system, while the other two neighboring reinforcement layers were not subject to
external loads. An extensive instrumentation program was implemented to monitor the mechanical
behavior of the soil and the three reinforcement layers during testing. It was observed that the
neighboring reinforcement layers experience increasing passive tension with increasing active
tension on the loaded reinforcement layer. The interaction among reinforcement layers was found
to increase with decreasing the reinforcement spacing. For the testing program implemented in
this study, one actively loaded reinforcement layer can transfer shear loads to a distance up to 0.20
m normal to its plane with a zone of shear influence of 0.15 m. That is, the interaction between
two neighboring reinforcement layers could be observed for a reinforcement spacing
corresponding to 0.30 m, a spacing capable of forming a composite reinforced soil mass.
INTRODUCTION
Soil-reinforcement interaction is the key property to the mechanical behavior of reinforced soil
structures such as retaining walls and bridge abutments. The interactions between soils and
reinforcing inclusions are governed by several load transfer mechanisms that have studied
extensively over the past few decades (e.g., Palmeria 2009). In design of reinforced soil walls and
bridge abutments, soil-reinforcement interaction has always been considered to be of importance
in restraining soil mass and has often been ignored in the driving mass. This simplification has
been deemed conservative and thus has been acceptable by researchers and practitioners.
Vertical reinforcement spacing in geosynthetic-reinforced soil structures was reported to
control the degree of interaction not only between soil and reinforcement layers, but also among
EXPERIMENTAL APPROACH
A new experimental device was designed and implemented by Morsy (2017) at the University of
Texas at Austin to evaluate soil-reinforcement composite behavior and quantify the thickness of
the zone where shear stresses propagate into the soil adjacent to the interface with a reinforcement
where shear stresses are imposed. The device was used to conduct soil-geosynthetic interaction
tests with various geosynthetic and soil materials under varied testing conditions. This section
provides a descriptive summary of the soil-geosynthetic interaction device and its instrumentation.
The detailed description of the device is presented in Morsy (2017) and Morsy et al. (2019a).
Soil-geosynthetic interaction device. The device consisted of a steel box 1200 mm in depth, 750
mm in width and 1500 mm in length that accommodates geosynthetic-reinforced soil specimens
with three reinforcement layers. A general layout of the soil-geosynthetic interaction device is
presented in Figure 1. One side of the box was made of transparent acrylic. The normal stress was
applied on the geosynthetic-reinforced soil specimens using six pneumatic actuators placed on
load distributing wooden pyramids, as shown in Figure 1a. Tensile loading was applied to middle
reinforcement layer (active reinforcement) using a hydraulic loading system mounted on smooth
liner guides, as shown in Figure 1b. The two other reinforcement layers act as upper and lower
boundaries to represent the presence of neighboring reinforcements. These layers are passively
loaded (passive reinforcements) through the load transfer from the active reinforcement layer. The
soil-geosynthetic interaction device could detect the load transfer amongst neighboring
reinforcements that occur when these layers deform differently (Morsy 2017; Zornberg et al. 2018;
Morsy et al. 2019a, 2019b, 2020; Morsy and Zornberg 2020). The active reinforcement was
attached to a loading system at its front end and was free at its rear end; whereas, the passive
reinforcements were anchored at their rear ends.
Figure 1. Soil-geosynthetic interaction device: (a) general layout; and (b) schematic cross-
sectional side view (Morsy and Zornberg 2020).
Table 1. Summary of soil-geosynthetic interaction tests (after Morsy and Zornberg 2020).
Soil displacement profiles. Figure 2 shows the horizontal displacement profiles normal to the
reinforcement planes near the location of the frontal load at various loading stages for a
representative test (Morsy et al. 2019a). The displacements were measured using the artificial
gravel particles at the center of the reinforced soil mass, as well as using digital imaging at the side
boundary of the reinforced soil mass.
Reinforcement displacement profiles. Figure 3 shows the displacement profiles of the three
reinforcement layers at various loading stages in a representative test (Morsy et al. 2019a). Specific
(a)
(b)
(c)
© Morsy et al. (2019a)
Figure 3. Reinforcement displacement profiles: (a) active reinforcement; (b) upper passive
reinforcement; and (c) lower reinforcement.
CONCLUSION
An experimental study was conducted to investigate the interactions that take place in
geosynthetic-reinforced soils under both working stress and failure conditions considering varying
reinforcement vertical spacings. A device was developed to perform this study designed to
measure displacement fields of soils and reinforcing inclusions. The newly developed
experimental device was used to conduct a comprehensive testing program to study the effects of
normal stress, vertical reinforcement spacing, reinforcement type, and fill type on soil-
reinforcement interaction. The following conclusions could be made:
• The device was capable of measuring tensile strains developing in both actively tensioned and
neighboring geosynthetic reinforcement layers. It allowed direct visualization of the kinematic
response of soil particles adjacent to the geosynthetic layers, which facilitated evaluation of
the soil displacement field via digital image analysis. Evaluation of the soil displacement field
allowed quantification of the extent of the zone of shear influence around a tensioned
reinforcement layer. Finally, the device allowed monitoring of dilatancy within the reinforced
soil mass, providing additional insight into the effect of reinforcement vertical spacing on the
reinforced soil mass.
• Analysis of the experimental results revealed that the existence of the zone of shear influence
and its extent can be directly related to the interaction between neighboring reinforcement
layers.
• The interaction between adjacent reinforcement layers was found to increase with decreasing
reinforcement vertical spacing. A minimum reinforcement vertical spacing threshold was
identified below which the interaction between adjacent reinforcements develops fully. In
addition, a maximum reinforcement vertical spacing threshold was identified beyond which
the interaction between neighboring reinforcements becomes negligible. For the testing
program implemented in this study, the minimum and maximum threshold vertical spacings
were identified as 0.10 and 0.20 m (4 and 8 in.), respectively.
• According to these experimental results, the zone of shear influence extends an average
distance of 0.15 m (6 in.) from the soil‐geosynthetic interface. That is, interaction between
adjacent reinforcements could be observed for a vertical spacing value corresponding to 0.30
m (12 in.), or twice the average distance from the reinforcement for which interaction occurs.
Adams, M.T., Nicks, J.E., Stabile, T., Wu, J.T.H., Schlatter, W., and Hartmann, J. (2011). Geosynthetic
Reinforced Soil Integrated Bridge System Interim Implementation Guide. Report No. FHWA-HRT-11-
026, Federal Highway Administration, McLean, VA.
Leshchinsky, D., Kaliakin, V., Bose, P., and Collin, J. (1994). "Failure Mechanism in Geogrid-Reinforced
Segmental Walls: Experimental Implications." Soils and Foundations, Vol. 34, No. 4, pp. 33-41.
Leshchinsky, D., and Vulova, C. (2001). Numerical investigation of the effects of geosynthetic spacing on
failure mechanisms in MSE block walls. Geosynthetics International, Vol. 8. No. 4, pp. 343-365.
Morsy, A.M., and Zornberg, J.G. (2020), “Soil-Reinforcement Interaction: Stress Regime Evolution in
Geosynthetic-Reinforced Soils,” Geotextiles and Geomembranes. [In Press]
Morsy, A.M., Zornberg, J.G., Leshchinsky, D., Christopher, B.R., Han, J., and Tanyu, B.F. (2020),
“Experimental Evaluation of the Interaction among Neighboring Reinforcements in Geosynthetic-
Reinforced Soils,” Journal of Geotechnical and Geoenvironmental Engineering, Vol. 146, No.10,
October 2020, 04020107.
Morsy, A.M., Zornberg, J.G., Leshchinsky, D., and Han, J. (2019), “Soil-Reinforcement Interaction: Effect
of Reinforcement Spacing and Normal Stress,” Journal of Geotechnical and Geoenvironmental
Engineering, Vol. 145, No. 12, December 2019, 04019115.
Morsy A.M., Zornberg, J.G., Han, J., and Leshchinsky, D. (2019), “A New Generation of Soil-Geosynthetic
Interaction Experimentation,” Geotextiles and Geomembranes, Vol. 47, No. 4, August 2019, pp. 459-
476.
Morsy, A.M. (2017), Evaluation of Soil-Reinforcement Composite Interaction in Geosynthetic-Reinforced
Soil Structures, Ph.D. Dissertation, Department of Civil, Architectural, and Environmental Engineering,
The University of Texas at Austin, Austin, Texas, The United States of America, Advisor: Jorge G.
Zornberg, 635p.
Nicks, J.E., Adams, M.T., Ooi, P.S.K., and Stabile, T. (2013). Geosynthetic reinforced soil performance
testing—Axial load deformation relationships. Report No. FHWA-HRT-13-066, Federal Highway
Administration, McLean, VA.
Palmeira, E.M. (2009). "Soil-Geosynthetic Interaction: Modelling and Analysis." Geotextiles and
Geomembranes, Vol. 27, No. 5, pp. 368–390.
Shen, P., Han, J., Zornberg, J.G., Morsy, A.M., Leshchinsky, D., Tanyu, B.F., and Xu, C. (2019), “Two
and Three-Dimensional Numerical Analyses of Geosynthetic-Reinforced Soil (GRS) Piers,” Geotextiles
and Geomembranes, Vol. 47, No. 3, June 2019, pp. 352-368.
Ziegler, M. (2011). “Interaction of soil reinforcement as key issue for ground reinforcement.” Invited
Lecture, XV ECSMGE, Athens, Greece.
Zornberg, J.G., Morsy, A.M., Kouchaki, B.M., Christopher, B.R., Leshchinsky, D., Han, J., Tanyu, B.F.,
Gebremariam, F.T., Shen, P., and Jiang, Y. (2019), Proposed Refinements to Design Procedures for
Geosynthetic Reinforced Soil (GRS) Structures in AASHTO LRFD Bridge Design Specifications.
NCHRP Web-Only Document 260, National Cooperative Highway Research Program (NCHRP),
Transportation Research Board of the National Academies.
Zornberg, J.G., Morsy, A.M., Kouchaki, B.M., Christopher, B.R., Leshchinsky, D., Han, J., Tanyu, B.F.,
Gebremariam, F.T., Shen, P., and Jiang, Y. (2018), Defining the Boundary Conditions for Composite
Behavior of Geosynthetic Reinforced Soil (GRS) Structures. Project NCHRP 24-41, National
Cooperative Highway Research Program (NCHRP), Transportation Research Board of the National
Academies.
Burak Tanyu, Ph.D., P.E.1, Fitsum Gebremariam, Ph.D.2, Barry R. Christopher, Ph.D.,
P.E.3, Dov Leshchinsky, Ph.D.4, Jie Han, Ph.D., P.E.5, Jorge G. Zornberg, Ph.D., P.E.6
1
Department of CEIE, George Mason University, Fairfax, VA 22030, USA. Email:
[email protected]
2
Arup, New York, NY, USA. Email: [email protected]
3
Geotechnical Consultant, 1 Linda Mar Drive St. Augustine, FL 32080, USA. Email:
[email protected]
4
ADAMA Engineering, Inc., Clackamas, OR 97015, USA. Email:
[email protected]
5
Department of Civil, Environmental, & Architectural Engineering, the University of
Kansas, USA. Email: [email protected]
6
The University of Texas at Austin, Civil Engineering Department, Austin, TX 78712,
USA. Email: [email protected]
ABSTRACT
This paper presents summary of findings from a case study in a geosynthetic-reinforced soil (GRS)
integrated bridge system (IBS). The GRS-IBS cited in this study was constructed in Virginia by
Virginia Department of Transportation (VDOT). The GRS-IBS was 2.2 m high, 9 m wide, and had
a 3.6 m bridge span. The facing of the structure was constructed with standard concrete masonry
unit (CMU) blocks. AASHTO No. 8 aggregate was reinforced with woven geotextiles that were
spaced 0.2 m within the primary reinforcement zone and 0.1 m within the bearing bed zone. The
foundation of the GRS-IBS was constructed with VDOT 21B aggregate encapsulated by a woven
geotextile which rested on bedrock. This article summarizes the observations related to (1) the
vertical stresses within the body of GRS-IBS during and after construction and (2) evaluation of
the connection load and stress-strain conditions right behind the facing of the GRS-IBS.
Observations presented in this article were based on the data obtained from the instruments
installed during construction and monitored over time. The noted vertical stress distributions in
this study were used to evaluate the effects of reinforcement spacing, width of the beam seat, and
seasonal variations. The results showed the effectiveness of the bearing bed (close spacing) in
reducing applied stresses within the abutment and how the width of the beam seat controls the
magnitude of the applied stresses on the GRS abutment. The observations from the field also
showed that the distributions of both lateral stresses and reinforcement strains with depth were
approximately uniform. The connection loads estimated using lateral stresses and reinforcement
strains behind the facing were comparable.
INTRODUCTION
The internal stability evaluation in the design of GRS-IBS is based on empirical observations of
the large-scale laboratory tests (mini-pier tests) performed by FHWA (Nicks et al., 2013). The
vertical stress distribution is estimated using Boussinesq’s theory of stress distribution. The
connection strength at the facing is not evaluated as part of the internal stability evaluation because
GRS is assumed to be internally supported by closely spaced reinforcement and the facing element
is not considered as a structural component except providing frictional connection (Adams and
Nicks, 2018).
This paper presents the summary of findings from previously developed National Cooperative
Highway Research Project (NCHRP) project reports and published articles on a case study in a
field monitored GRS-IBS constructed in Virginia (Zornberg et al. 2018 and 2019, Gebremariam
et al. 2020a and 2020b;). The field monitoring program was designed and implemented to evaluate:
(1) the vertical stresses during and after construction and (2) the connection loads and stress-strain
conditions right behind the facing of the GRS-IBS. The stress and strain measurements from the
field were quantified based the theoretical methods outlined in the design of GRS-IBS by FHWA
and MSE structures by American Association of State Highway and Transportation Officials
(AASHTO).
The field monitored GRS-IBS project site is located on route 720 in Harrisonburg, Virginia. The
construction took place between August 1 and September 15, 2015 and was conducted by
collaboration of Virginia Department of Transportation (VDOT) and George Mason University.
VDOT’s design of the GRS-IBS was conducted following the guidelines specified in the
Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide (Adams et
al. 2011).
The GRS-IBS was 2.2 m high, 9 m wide and had a 3.6 m bridge span. The facing of the structure
was constructed with standard concrete masonry unit (CMU) blocks. AASHTO No. 8 aggregate
and woven geotextile reinforcements were used to construct the abutment. The vertical
reinforcement spacing was 0.2 m within the primary reinforcement zone and 0.1 m within the
bearing bed zone. The foundation of the structure was constructed with VDOT 21B aggregate
The AASHO No.8 aggregate backfill was classified as poorly-graded gravel (GP) with zero fines
content in Unified Soil Classification System (USCS). The aggregate had a maximum particle size
of 12.5 mm, a dry density of 1.6 g/cm3, and a friction angle of 47.6 degrees. The VDOT 21B
aggregate used to construct the RSF and the integrated approach had a maximum dry density of
2.2 g/cm3 with optimum moisture content of 8% and a friction angle of 40 degrees. The woven
geotextile used for reinforcement in the abutment and the RSF had an ultimate tensile strength of
70 kN/m.
The main purpose of the field monitoring program was to evaluate the vertical stress distribution
close and away from the facing and lateral stresses and reinforcement strains immediately behind
the facing of the structure. Earth pressure cells that were in circular shape (EPCs) and rectangular
(RPCs) were installed at the site to measure vertical and lateral stresses in the abutment
respectively. The size of the RPCs were constructed to fit right behind the CMU blocks. Foil type
strain gages (SGs) were installed on the geotextile to measure reinforcement strains. The
instrumentation program was monitored to record short-term responses of the structure due to self-
weight of backfill and placement of bridge slab, in addition to the stage loading that was
implemented during construction. Additionally, data from the embedded instruments were
EPCs were installed at five different layers on both abutments ranging from the layer just above
the RSF to the aggregate layer just underneath the slab and in between the layers from the bottom
to the top. The instrumentation layout was designed to include instruments within both primary
reinforcement and bearing bed zones. The following sections describe the evaluation of the vertical
stress measurements from the field site.
During construction, Abutment A was loaded with Jersey barriers to simulate staged loading.
Staged loading was conducted to evaluate the effects of differences in vertical spacing between
reinforcements on the stresses recorded within the GRS. Four staged loadings were applied on the
primary reinforcement zone and three staged loadings were applied on the bearing bed zone.
Therefore, a comparison of the vertical stress distribution in each of these zones could be used to
evaluate the effects of reinforcement spacing.
The location of each applied staged load was approximately 0.3 m from the facing CMU blocks
coinciding within the zones where EPCs were installed at different heights. In total, there were
seven staged loadings, four of which involved the use of eight Jersey barriers and three of which
involved the use of a single Jersey barrier. Details of Jersey barrier configurations at each layer
can be found in Gebremariam et al. (2020a).
The Jersey barrier used in the staged loadings was 0.6 m wide and 3.6 m long and the magnitude
of the pressure from one barrier was approximately 11 kPa. In the case of eight Jersey barrier
applications, due to the configuration of how the barriers were stacked up on top of each other and
the contact to the ground, the total applied load was 89 kPa where the first and third barrier was
each approximately applying 39 kPa and the middle barrier was applying 11 kPa.
Figure 2a displays the response of EPCs 1 and 7 when both instruments were loaded with a single
Jersey barrier that was located 0.8 m above the EPCs. EPC 1 was loaded as part of stage load 3
and located within the zone where the spacing was 0.2 m. EPC 7 was loaded as part of stage load
7 and located within the zone where the spacing was 0.1 m. Although stage load 7 included eight
Jersey barriers, the comparison was made when only the first Jersey barrier was placed on the
GRS. The results show that the stress measured by EPC 1 was higher than EPC 7, indicating that
the stress values within the primary reinforcement zone (where the spacing between the
reinforcements are larger) were higher than the ones in bearing bed zone.
Figure 2b presents the responses of EPCs 1, 2 and 3 to stage load 4 where the spacing was 0.2 m
and EPCs 7, 8 and 9 to stage load 7 where the spacing was 0.1 m. In this comparison, both staged
loads were conducted with multiple Jersey barriers (39 kPa), but the vertical distance between the
location of the applied load and the instruments was 1.2 m and 0.8 m in stage loads 4 and 7,
Figure 2. Comparison of vertical stresses measured in the field monitored GRS-IBS during stage
loading by means of (a) single Jersey barrier; and (b) from multiple Jersey barriers (figure after
Gebremariam et al. 2020a).
The consistent trends observed in Figure 2 (with both single and multiple Jersey barriers)
demonstrate that closely spaced reinforcements contribute to reduced vertical stresses in the GRS
bearing bed zone. In single Jersey barrier loading, the magnitude of stress was reduced 1.8 times
and in multiple Jersey barrier loading, the magnitude of stress was reduced 2.7 to 5.4 times.
Moreover, this indicates that the effect of closely spaced reinforcements becomes more prominent
with an increase in applied loads. Overall, the results obtained from the staged loadings reveal that
a decrease in reinforcement spacing (increased number of reinforcements) leads to reduced vertical
stresses in the GRS mass.
The purpose of this evaluation was to compare the differences in stress distribution within the body
of GRS-IBS where both abutments were constructed with the same materials and reinforcement
spacing but with two different beam seat widths. One of the abutments had a beam seat width of
0.6 m (Abutment A), which is the minimum width required considering the length of the bridge
span, and the other abutment had a beam seat width of 1.2 m (Abutment B, twice the width of
Abutment A). Although both abutments were loaded with the same slab, the magnitude of
surcharge loads in Abutments A and B were estimated to be 42 and 21 kPa, respectively.
Vertical stress distribution profiles developed in each abutment as determined from the EPCs are
shown in Figure 3. The slab at this project site was constructed by multiple segments and it is
believed that at the top, between the reinforced aggregate and the slab, in some locations, there
(a) (b)
Figure 3. Vertical stress distributions due to bridge slab load at: (a) Abutment A and (b) Abutment
B (figure from Gebremariam et al. 2020a).
Figure 3 also shows comparison of the stress distributions calculated based on theoretical
Boussinesq and 2:1 methods. Details of how the stresses from these theoretical methods were
computed can be found in Gebremariam et al. (2020a). When the difference in stress magnitudes
from each of the method were compared with each other, based on the differences in beam seat
widths, the difference is in the order of 1.5 to 2 close to the top of the abutment. These differences
decrease with depth as the magnitude of applied load also decreases. Although both theoretical
stress distribution methods evaluated in this study showed similar trends, Boussinesq method
appears to provide slightly better agreement for stress magnitudes when compared with the data
obtained from the EPCs and the applied slab loads.
The effect of seasonal variations on the vertical stress distribution within the GRS-IBS was
monitored by loading the slab with a truck. The goal was to record changes in the measured vertical
stress values. To capture the seasonal differences, the truck was parked over the slab at different
times of the year: (1) at the beginning of September (response immediately after construction), (2)
in December (response during winter season), (3) by March (response during spring season), and
(4) by November (response during fall season). The results showed that the vertical stress
distribution in the GRS abutment with AASHTO No. 8 aggregate used as backfill material was
RPCs were installed at Abutment A at locations right behind the facing blocks. Figure 4 present
the distribution of lateral stresses within the body of the GRS-IBS as determined from the installed
instruments (due to self-weight and after the slab is placed) and based on theoretical calculations.
Details of how these theoretical calculations were conducted can be found in Gebremariam et al.
(2020b). The field data shows that with the placement of the slab, the lateral stress distribution
becomes similar to that defined by the active condition and in general shows a uniform trend with
depth. The magnitudes of the lateral stresses measured in the field were slightly lower that the
theoretically calculated stresses under the active condition. However, the difference in magnitude
of stress is in the order of 0.5 to 1 kPa, which is within the accuracy of the instrument. The results
from the field measurements indicate that the theoretical active lateral earth pressure can be used
to define the lateral stress distribution in GRS-IBS structures under service loads.
Note: Shaded areas within the insert indicate the location of RPC instruments
Figure 4. Lateral stress distribution within the body of GRS-IBS (figure from Gebremariam et al.
2020b)
Figure 5 presents the minimum, average, and maximum reinforcement strain values obtained from
the SGs that were installed on the woven geotextile right behind the facing. Similarly to the lateral
stress distribution, the strain distribution with depth also appear to be uniform. The maximum
strain recorded in the field was significantly less than the maximum allowable geosynthetic strains
(2%) in GRS-IBS design (Adams et al. 2011; Adams and Nicks 2018).
Figure 5. Reinforcement strain distribution with depth in GRS-IBS after placement of slab load
(figure from Gebremariam et al. 2020b).
The lateral stresses and strains measured from the field were then used to estimate the loads at the
connection between the geotextiles and the concrete facing blocks. Details of the equations and
approaches used for these computations can be found in Gebremariam et al. (2020b). When the
connection loads (To) calculated from both of these approaches were compared, the magnitudes of
the values were very close to one other and ranged between approximately 0.8 and 1.2 kN/m.
Distribution of the calculated To with depth can be seen in Gebremariam et al. (2020b).
Considering the difference in magnitude of the To values, the overall distribution is considered
uniform.
CONCLUSIONS
This paper presents the summary of findings from a case study in a field monitored GRS-IBS
constructed in Virginia. The main objectives of the study were to investigate: (1) the vertical
stresses and stress distribution during and after construction (Gebremariam et al. 2020a) and (2)
the connection loads and stress-strain conditions right behind the facing of the GRS-IBS
(Gebremariam et al. 2020b). The stress and strain measurements from the field were compared
with the theoretical calculations outlined in the design of GRS-IBS and MSE structures. The
conclusions from this study are summarized as follows:
(1) The results from staged loading revealed that closely spaced reinforcements contribute to
a reduction in vertical stresses in the bearing bed zone.
(2) The width of the beam seat affects the stress distribution within the GRS abutment. A wider
beam seat effectively reduces the stress distribution in the structure that is caused by the
superstructure.
(3) Boussinesq method appears to provide a slightly better estimation of the vertical stress
distribution in GRS-IBS than the approximate 2:1 method.
REFERENCES
AASHTO (2017). LRFD Bridge Design Specifications, 8th Edition, American Association of
State Highway and Transportation Officials, Washington, DC, 1,780p.
Adams, M.T., Nicks, J.E., Stabile, T., Wu, J.T.H., Schlatter, W., and Hartmann, J. (2011).
Geosynthetic Reinforced Soil Integrated Bridge System, Synthesis Report. Report No. FHWA-
HRT-11-027, Federal Highway Administration, McLean, VA.
Adams, M., Nicks, J. (2018). Design and Construction Guidelines for Geosynthetic Reinforced
Soil Abutments and Integrated Bridge Systems. FHWA-HRT-17-080.
Berg, R.R., Christopher, B.R. and Samtani, N.C. (2009). Design and Construction of Mechanically
Stabilized Earth Walls and Reinforced Soil Slopes. FHWA NHI-10-024 Vol I and NHI-10-025
Vol II, U.S. DOTFHWA-NHI-09-083 and FHWA GEC-011, Federal Highway Administration,
Washington, D.C., 2009, pp 306 (Vol I) and pp. 378 (Vol II).
Gebremariam F, Tanyu B. F., Christopher B., Leschinsky D., Han J., Zornberg J. G. (2020a).
Evaluation of Vertical Stress Distribution in Field Monitored GRS-IBS Structure, Journal of
Geosynthetics International, https://doi.org/10.1680/jgein.20.00004.
Gebremariam F, Tanyu B. F., Christopher B., Leschinsky D., Zornberg J. G., Han J. (2020b).
Evaluation of Required Connection Load in GRS-IBS Structures under Service Loads, Journal
of Geosynthetics International, https://doi.org/10.1680/jgein.20.00022.
Jaky, J. (1948). Pressure in Silos. 2nd ICSMFE, London, 1, 103-107.
Zornberg, J.G., Morsy, A.M., and Mofarraj, B., Christopher, B.R., Leshchinsky, D., Han, J.,
Tanyu, B.F., Gebremariam, F.T., Shen, P., Jiang, Y. (2018). Defining the Boundary Conditions
for Composite Behaviour of Geosynthetic Reinforced Soil (GRS) Structures. National
Cooperative Highway Research Program (NCHRP), Project 24-41, Transportation Research
Board, Washington D.C., October, 986 p.
Zornberg, J.G., Morsy, A.M., Mofarraj, B., Christopher, B.R., Leshchinsky, D., Han, J., Tanyu,
B.F., Gebremariam, F.T., Shen, P., Jiang, Y. (2019). Proposed Refinements to Design
Procedures for Geosynthetic Reinforced Soil (GRS) Structures in AASHTO LRFD Bridge
Design Specifications. National Cooperative Highway Research Program (NCHRP), Project
24-41, Transportation Research Board, Washington D.C., March, 64 p.
Panpan Shen, Ph.D.1, Jie Han, Ph.D.2, Jorge G. Zornberg, Ph.D.3, Yan Jiang, Ph.D.4,
Dov Leshchinsky, Ph.D.5, Burak F. Tanyu, Ph.D.6, and Barry R. Christopher, Ph.D.7
1
Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; e-mail:
[email protected]
2
The University of Kansas, CEAE Department, Lawrence, KS 66044, USA; e-mail:
[email protected]
3
The University of Texas at Austin, Civil Engineering Department, Austin, TX 78712, USA; e-
mail: [email protected]
4
Terracon, Inc., 2201 Rowland Ave, Savannah, GA 31404, USA; e-mail: [email protected]
5
ADAMA Engineering, Inc., Clackamas, OR 97015, USA; e-mail: [email protected]
6
Department of CEIE, George Mason University, Fairfax, VA 22030, USA; e-mail:
[email protected]
7
Geotechnical Consultant, 210 Boxelder Lane, Roswell, GA 30076, USA; e-mail:
[email protected]
ABSTRACT
INTRODUCTION
Geosynthetics have been successfully used to reinforce earth retaining structures since the early
1970s. More recently, geosynthetic reinforcement has been increasingly used for load-carrying
structures, such as bridge abutments. These types of structures are frequently referred to in the
Primary conclusions from the numerical analyses of GRR walls with secondary
reinforcement
Jiang et al. (2020) performed a parametric study to investigate the effects of secondary
reinforcement on the performance of GRR walls. The investigated factors included the length,
stiffness, connection, and layout of secondary reinforcement. The following conclusions can be
drawn from the parametric study:
Primary conclusions from the numerical analyses of the GRS bridge abutments
Parametric studies were conducted to investigate the effects of different combinations of
reinforcement spacing and reinforcement stiffness, beam seat width, and setback distance, on the
responses of the GRS bridge abutments (Zornberg et al., 2019; Shen et al., 2020). The parametric
studies also evaluated two layouts with different reinforcement lengths along the height of the
abutment (i.e., trapezoidal and uniform reinforcement layouts). The following conclusions can be
drawn from the parametric studies:
(1) The GRS abutments with trapezoidal and uniform reinforcement layouts exhibited
similar responses under self-weight only and under self-weight with bridge slab loading.
(2) When the total reinforcement stiffness or the ratio of reinforcement stiffness to spacing
J/Sv was equal, different combinations of reinforcement stiffness and spacing did not produce
significant differences in the GRS abutment responses regarding additional vertical stresses under
the beam seat centerline and additional lateral earth pressures behind the abutment facing induced
by bridge slab loading.
The numerical results of the GRS mini-pier tests indicated that reducing reinforcement spacing Sv
was more beneficial than increasing reinforcement stiffness J to improve the performance of GRS
mini-piers in terms of the vertical strain under the applied pressure and the lateral facing
displacements. In contrast, the numerical results of the GRS bridge abutments indicated similar
behavior for the two structures simulated with the same J/Sv ratio regarding the additional vertical
stresses under the beam seat centerline and the additional lateral earth pressures behind the
abutment facing induced by bridge slab loading. Zornberg et al. (2019) pointed out that the
boundary conditions are the main difference between a GRS mini-pier and a GRS bridge abutment:
a GRS mini-pier is similar to a retaining wall with limited fill space, whereas the fill space in a
GRS bridge abutment is relatively larger. In addition, the GRS mini-pier included a footing on top,
the width of which was approximately equal to the width of the pier, while the GRS bridge
abutment included a bridge slab on top, the contact area of which was much smaller than the width
of the reinforced zone.
To investigate the effects of boundary conditions, two GRS structures with different
geometries were evaluated, as shown in Figure 1. The first structure, labeled Structure 1, is
essentially a GRS mini-pier with a height of 2 m and a width of 1 m. The second structure, labeled
Structure 2, is a modified GRS mini-pier with longer reinforcement. The ratios of the
reinforcement length L to the pier height H were 0.5 and 1.5 for Structures 1 and 2, respectively.
Figure 1. Geometry of numerical models: (a) Structure 1 and (b) Structure 2 (Zornberg et al.,
2019).
Figure 3. Lateral facing displacements under an applied pressure of 200 kPa: (a) Structure 1 and
(b) Structure 2 (Zornberg et al., 2019).
Figure 4. Distributions of tensile forces and pullout capacities of reinforcement layers under an
applied pressure of 200 kPa.
CONCLUSIONS
REFERENCES
Adams, M., Nicks, J. (2018). Design and Construction Guidelines for Geosynthetic Reinforced
Soil Abutments and Integrated Bridge Systems. FHWA-HRT-17-080.
Gebremariam, F., Tanyu, B. F., Christopher, B., Leshchinsky, D., Han, J., Zornberg, J. G. (2020a).
Evaluation of vertical stress distribution in field monitored GRS-IBS structure. Geosynthetics
International, 27(4): 414-431.
Gebremariam, F., Tanyu, B. F., Christopher, B., Leshchinsky, D., Zornberg, J. G., Han, J. (2020b).
Evaluation of required connection load in GRS-IBS structures under service loads.
Geosynthetics International, in press. doi: 10.1680/jgein.20.00022.
Jiang, Y., Han, J., Parsons, R. L. (2020). Numerical evaluation of secondary reinforcement effect
on geosynthetic-reinforced retaining walls. Geotextiles and Geomembranes, 48(1): 98-109.
Jiang, Y., Han, J., Zornberg, J. G., Parsons, R. L., Leshchinsky, D., Tanyu, B. (2019). Numerical
analysis of field geosynthetic-reinforced retaining walls with secondary reinforcement.
Geotechnique, 69(2): 122-132.
Leshchinsky, D., Vulova, C. (2001). Numerical Investigation of the Effects of Geosynthetic
spacing on failure mechanisms of MSE block walls. Geosynthetics International, 8(4): 343-
365.
Nicks, J. E., Adams, M., Ooi, P., Stabile, T. (2013). Geosynthetic Reinforced Soil Performance
Testing—Axial Load Deformation Relationships. FHWA-HRT-13-066.
Shen, P., Han, J., Zornberg, J. G., Morsy, A. M., Leshchinsky, D., Tanyu, B. F., Xu, C. (2019).
Two and three-dimensional numerical analyses of geosynthetic-reinforced soil (GRS) piers.
Geotextiles and Geomembranes, 47(3): 352-368.
Shen, P., Han, J., Zornberg, J. G., Tanyu, B., Christopher, B., Leshchinksy, D. (2020). Responses
of geosynthetic-reinforced soil (GRS) abutments under bridge slab loading: Numerical
investigation. Computers and Geotechnics, 123: 103566.
Zornberg, J.G., Christopher, B.R., Leshchinsky, D., Han, J., Tanyu, B.F., Morsy, A.M., Shen, P.,
Gebremariam, F.T., Jiang, Y., Mofarraj, B. (2019). Defining the Boundary Conditions for
Composite Behavior of Geosynthetic Reinforced Soil (GRS) Structures. National Cooperative
Highway Research Program (NCHRP). Project 24–41. Transportation Research Board,
Washington DC: 997p.
1
Professor Emeritus, Dept. of Civil Engineering, University of Idaho, and currently Consulting
Engineer, Moscow, ID; e-mail: [email protected]
2
Engineering Specialist, Propex GeoSolutions, Propex Operating Company LLC, Chattanooga,
TN; e-mail: [email protected]
3
Territory Business Manager, Propex Operating Company LLC, Chattanooga, TN; e-mail:
[email protected]
ABSTRACT
During the summer of 2019 in the Minneapolis area, two public-school construction projects for
facilities expansion required new MSE walls for critical grade-separation areas. A middle school
project needed a wall 8-feet (2.4-m) high to provide grade separation between a parking lot and
ball fields. The high school project needed walls 6 to 15-feet (1.8 to 4.6-m) high constructed
along a steep, natural slope to provide additional flat, usable space at the crest of the slope.
Design drawings and architectural plans originally listed these walls as masonry segmental block
walls. However, the Contractor and Designers responsible for both projects decided to substitute
(with School District approval) an engineered wrap-face vegetated wall system. This
geosynthetic alternative provided a more cost-effective solution, as well as an aesthetic green,
environmentally friendly option, which was favored by public works officials. This paper
presents a case study for the two projects, focused on engineering design, geogrid reinforcement,
construction methods, and vegetation establishment.
INTRODUCTION
During the spring and summer of 2019, two public-school facility upgrade and expansion
projects in the Minneapolis area (more specifically, in Ramsey County) required the installation
of MSE (Mechanically Stabilized Earth) walls to establish grade-separation areas at the sites.
Design drawings and architectural plans originally showed these walls as masonry segmental
block walls (hardscape). The first project, at Edgewood Middle School (MS) in Mounds View,
MN, included a wall approximately 190-feet (58-m) long and 8-feet (2.4-m) high to separate a
paved parking lot from grass play fields. The second project, at Mounds View High School (HS)
in Arden Hills, MN, was more extensive and included approximately 2,400 square feet (223
square meters) of wall face with some sections 15-feet (4.6-m) high.
The general contractor for both projects, as well as the design engineers, discussed with
school district officials the possibility of substituting an engineered vegetated wall system for the
planned MSE masonry block walls. As a result, a geosynthetic wrap-face vegetated (GWFV)
wall system was selected and approved (known as PYRAWALL), a geosynthetic alternative that
provided a cost-effective solution, as well as a green, environmentally friendly option which was
favored by public works officials. This reinforced-soil system uses 1-ft (0.3-m) high uniform
wrap-lifts and relies on three components (Miller, 2017): 1) a polypropylene high-performance
The rolled HPTRM used for the face wraps is 8.5-ft (2.6-m) wide by 120-ft (36.5-m) long. As
illustrated in Figure 1, this width provides a typical wrap layer with 4 ft (1.2 m) along the
bottom, a 1-ft (0.3-m) near-vertical face, and 3.5 ft (1.1 m) folded back over the soil infill lift.
The geosynthetic provides excellent erosion protection as vegetation seeded in the infill soil
(“internal seeding”) emerges and becomes established. The open-weave of the fabric also is
conducive to vegetation being established by hydroseeding (“external seeding”) after the wrap-
face structure has been completed.
The unique lofted, three-dimensional feature of this HPTRM allows for the insertion
(weaving) of bracing-bar components which stand-up the 1-ft (0.3-m) high section of the fabric,
forming a face against which infill soil is placed and compacted. These bracing bars are
fabricated using a high-strength, fiber-composite material consisting of nylon and fiberglass.
Primary geogrid reinforcement is added to the system by inserting (“sandwiching”) the
geogrids between successive wrap lifts, applying a thin soil layer to inhibit any fabric-to-fabric
contact. Wood stakes or metal pins can be used to stretch both the HPTRM and the geogrid taut
and hold them in place while soil backfilling occurs. A schematic drawing presented in the next
section (Figure 1) shows the geosynthetic elements of the engineered vegetated wall system, as
well as an optional topsoil/organic fill-soil at the wall face.
To expand and enhance a parking lot at Edgewood MS, a retaining wall was required to provide
grade separation from a lower playfield area. Site preparation and subgrade compaction were
generally straightforward at the wall site due to an overall relatively flat construction pad. For the
geotechnical design analysis, conservative soil strength values were assumed, and construction
monitoring included regular, on-site compaction testing in the wall backfill area (geogrid-
reinforced zone). The design approach relied on allowable stress design (ASD) methods to check
wall base sliding, wall overturning, and bearing capacity, assuming an estimated traffic load of
250 psf (12 kPa) which could result from heavy truck traffic in the parking lot behind the wall.
The design analysis showed geogrid reinforcement for the 8-foot (2.4-m) high wall would need
to be 11 feet (3.35 m) long with minimum long-term design strength (LTDS) = 860 lb/ft (12.6
kN/m), and placed at vertical intervals of 2 feet (0.6 m). A generalized schematic of the wall is
shown in Figure 1. The contactor placed soil-growth media (organic topsoil material) containing
After the wall was completed, the face was hydroseeded using a slurry mulch with a
selected seed mix. The contractor elected to use combined internal and external seeding to
enhance new growth and provide extensive vegetation coverage, per the request of school
officials. Vegetation filled in quickly during the early fall, exceeding stakeholder expectations.
The completed wall and parking lot are shown in Figure 4, an aerial view from October 2019.
The entire wall was nearly completely covered in vegetation by June 2020, providing a green
sustainable success story (Figure 5).
Due to extended building footprints near a steep natural slope at Mounds View HS, the wall
system was needed along the western edge of the site (Figure 6) to provide more flat area at the
slope crest for traffic flow, especially for emergency vehicles including fire trucks. Subgrade
preparation here was extensive due to topographic variations causing final wall heights to range
from 6 to 15 feet (1.8 to 4.6-m). It is important to note that wall construction was facilitated by
beginning at the lowest elevation portions of the wall base, then progressing upward as grade
changes dictated. This means that “foundation steps” were required along the base of the wall.
Care was taken to make sure these step heights corresponded directly to the height of wrap lifts;
that is, 1 ft (0.3 m).
For the geotechnical design analysis, conservative soil strength values were assumed, and
construction monitoring included regular, on-site compaction testing in the geogrid-reinforced
zone. The design approach relied on allowable stress design (ASD) methods to check wall base
sliding, wall overturning, and bearing capacity, assuming an estimated traffic load of 250 psf (12
kPa) in the travel way behind the wall. In addition, global stability analysis for large-scale
rotational failure paths (Abramson et al., 2002) was conducted to assess whether stronger
geogrid layers would be needed in the lower portion of the backfill zone to provide adequate
resistance to potential “compound” failure paths that could pass through the reinforced zone. The
ASD and Slope/W analysis (GEO-SLOPE, 2018) showed that geogrids 13-feet (4-m) long with
minimum LTDS = 1320 lb/ft (19.3 kN/m) would be needed for the higher wall sections.
Figure 6. Mounds View HS construction site in 2019 (looking north), showing approximate
location of planned MSE wall; courtesy of Google Earth.
Figure 7. Backfilling a geosynthetic lift for a reinforced soil slope section at the
Mounds View HS project.
The overall completed wall system at Mounds View HS comprised approximately 2,400
square feet (223 square meters) of wall face with some sections 15-feet (4.6-m) high. The
contractor chose to rely solely on post-construction hydroseeding for vegetation establishment,
so no top soil was added to the backfill soil lifts near the face, and no grass seed was placed
internally within each wrap face. A few weeks after hydroseeding, newly germinated grass was
growing nicely and becoming well-established along the face of the engineered vegetated wall
system (Figure 9).
A few intense thunder storms with heavy rainfall occurred during the first month after the
wall system was completed; however, the HPTRM wrap face provided complete erosion
protection as the grass seed germinated and began to grow. This erosion protection continued
throughout the winter and into the next growing season to support vegetation establishment.
Another characteristic of this particular woven HPTRM is its ability to retain and hold soil even
when subjected to high-water flow events and flooding (Miller and Loizeaux, 2019). The
HPTRM has a manufacturer’s estimated design life of 75 years, so long-term erosion protection
and flood protection is another advantage of this engineered wall system. By the summer of
2020, most of the wall face was grass covered, and the overall engineered structure comprised of
wall and steep reinforced soil slope was blending well into the green surroundings of the natural
slope west of the high school (Figure 10).
CONCLUSION
A GWFV wall system was selected as a means to provide cost-effective and environmentally
friendly MSE structures at two Minneapolis-area public school construction projects in 2019.
On-site soil comprised of silty fine sand with some clay was suitable for use as structural fill soil
in the backfill zone, (i.e., the geogrid-reinforced zone). Compaction control was monitored
regularly throughout wall construction using a nuclear moisture-density gage per project
recommendations.
At the Edgewood Middle School project, a growth media (organic topsoil) with grass
seed was used in the wrap-lifts near the wall face, and hydroseeding was used post-construction
to apply additional seed at the wrap face. This resulted in excellent vegetation establishment,
with the wall effectively disappearing into the green landscape within 8 months. At the Mounds
View High School project site where the wall faced toward a natural wooded area, no topsoil
was placed in the wrap lifts, and grass seed was supplied solely by post-construction
hydroseeding. This resulted in a reasonably good vegetation cover that is expected to further fill-
in and become more dense over the next several years.
These projects demonstrated that this engineered vegetated wall system can provide a
cost-effective green alternative to masonry hardscape structures for public works projects where
sustainable, environmentally friendly options are preferred by the designer or by the public at
large. Advantages include: 1) this vegetated wall system not only provides a reinforced soil mass
to resist lateral earth pressures, but also provides immediate and long-term erosion protection; 2)
on-site soil can be used for backfill in the reinforced zone, eliminating the cost and carbon
footprint of importing soil to the site; 3) lightweight geosynthetic components are easily
transported and handled in areas with steep or difficult access; 4) the geosynthetic HPTRM at the
face has superior UV resistance for up to 75 years of design life; 5) the system has flexibility to
easily install curves along the wall or reinforced-slope alignment.
For many possible MSE wall applications, owners and designers now have an engineered
vegetated wall option (i.e., a green option) that may be advantageous over hardscape to meet
aesthetic or environmental goals for given projects in some public areas. In some cases, a living
green wall may be preferred over hardscape as a means to blend into natural features and thus
eliminate graffiti and its associated maintenance/cleanup costs. In general, the future demand for
such green alternatives likely will increase, providing an expanded market for these types of
ACKNOWLEDGEMENTS
REFERENCES
Abramson, L. E., Lee, T. S., Sharma, S., and Boyce, G. M. (2002). Slope Stability and
Stabilization Methods, 2nd Ed.; John Wiley & Sons, Inc., New York, 712 p.
GEO-SLOPE International, Ltd. (2018). Slope stability software for personal computers,
Slope/W.
Miller, S.M. (2017). Internally Braced Geosynthetic Wrap-Face Vegetated Walls and Reinforced
Soil Slopes, Geosynthetics, 35(5): 24-33.
Miller, S.M. and Loizeaux, D. (2019). Highway Embankment Construction Using a
Geosynthetic Wrap-Face Vegetated Wall System; in Proc. of Geosynthetics 2019, IFAI,
Houston, TX, USA: 793-803.
Propex Operating Co. LLC (2020). Website: http://propexglobal.com/Pyramat
S. Mustapha Rahmaninezhad, Ph.D., A.M.ASCE,1 Jie Han, Ph.D., PE, F.ASCE,2 and
Mahdi Al-Naddaf, Ph.D., A.M.ASCE,3 Jaber Mamaghanian, Ph.D.4
1
Geotechnical Department, Terracon Consulting Inc., 1506 Mid Cities Dr, Pharr, TX 78577, USA
e-mail: [email protected]
2
Department of Civil, Environmental, and Architectural Engineering, the University of Kansas,
1530 W. 15th St., Lawrence, KS 66045-7609, USA; e-mail: [email protected]
3
Department of Civil Engineering, University of Kerbala, Kerbala, 56001, Iraq; e-mail:
[email protected]
4
School of Civil Engineering, Iran University of Science and Technology, Tehran, Iran; e-mail:
[email protected]
ABSTRACT
Geosynthetic-reinforced retaining (GRR) walls have been used as bridge abutments to support
bridge beams on spread footings instead of traditional deep foundations (such as piles and shafts).
However, so far limited studies have been carried out to investigate the performance of the GRR
wall subjected to footing loads considering possible failure surfaces and bearing capacities of the
footings. This study evaluated the effect of footing loads on the global stability of GRR walls with
modular blocks. The limit equilibrium (i.e., the Bishop simplified method) in a software was used
to determine the possible failure surfaces and the bearing capacities of the footings which were
defined at the factor of safety (FS) equal to one (FS = 1.0). A parametric study was carried out to
investigate the effect of the embedment depth and the offset distance of the footing from the wall
facing on the possible failure surfaces and the bearing capacities of footings. The numerical results
indicated that the possible failure surfaces began from the center of the footing and developed into
the reinforced zone towards the wall facing. When the embedment depth of the footing was
increased to 0.4H (H is the height of the wall), the bearing capacity increased by approximately
26%. However, when the offset distance of the footing from the wall facing was increased to about
0.4H, the bearing capacity increased by approximately 138%.
Geosynthetic-reinforced soil (GRS) has been successfully used for construction of many earth
structures, such as retaining walls, slopes, and embankments. Among these structures, the
geosynthetic-reinforced retaining (GRR) walls have been commonly utilized for many
applications in transportation systems (Zhu et al., 2008; Yang et al., 2012; Han, 2015; Tatsuoka et
al., 2014; Jiang et al., 2016; Kakrasul et al., 2018; Jawad, 2019; Jawad et al., 2020). In recent years,
GRR walls have been increasing used as bridge abutments instead of pile foundations (Lee and
Wu, 2004; Skinner and Rowe, 2005; Adams et al., 2011; Adams and Nicks, 2018; Kakrasul et al.,
2020). In this technology, GRR abutment walls support bridge beams on spread footings
constructed directly on the reinforced fill for bridge approach embankments, roadways, and
railways, which are subjected to traffic loads. To reduce bridge span, footings are often placed
close to the wall facing. The major advantages of this technology are to eliminate pile foundations
thus reducing the overall cost of construction and to minimize bumps at the end of bridges (Abu-
Hejleh et al., 2001; Helwany et al., 2003; Skinner and Rowe, 2005; Rahmaninezhad, 2019; Liu et
al., 2020). Bumps at the end of bridges usually happen due to the differential settlement between
approaching embankments and pile-supported abutments.
According to the FHWA design guideline, design of GRR abutment walls is considered as
a complex geometry and a special condition (Berg et al., 2009). Figure 1 shows a bi-linear potential
failure surface for the abutment wall, which starts from the far edge (i.e., right edge) of the footing
(Berg et al., 2009). In this paper, the “FHWA potential failure surface” is referred to as the present
analysis following the FHWA design guideline. Figure 1 shows that h is the height of the wall as
measured from bottom of the footing to the finished roadway surface and/or the approaching slab
and D is the offset distance between the back face of the wall and the close edge (i.e., left edge) of
the footing. In this study, h and D are considered as the embedment depth of the footing and the
offset distance of the footing from the wall facing, respectively.
Although several studies have been conducted to evaluate the effect of the embedment
depth of the footing on the GRS backfill (Yetimoglu 1994; Patra et al., 2005; Yasrobi et al., 2009;
rahmaninezhad et al., 2009; Sharma at al., 2009;Chen and Abu-Farsakh, 2015), limited studies
have been carried out to investigate the effect of the embedment depth of the footing on the
behavior of GRR abutment walls. The objective of this study is to evaluate the effect of the
embedment depth and the offset distance of the footing from the wall facing on the possible failure
surfaces and the bearing capacities of footings of the GRR abutment walls with modular block
facing.
The LE method incorporated in the ReSSA software Version 3.0, developed by the
ADAMA Engineering, Inc. (2008), was employed to determine the potential failure surfaces and
calculate the factors of safety of GRR walls subjected to footing loading using Bishop’s simplified
method (Bishop, 1955). However, this paper does not evaluate other aspects of GRR wall stability
(such as internal stability, sliding, and overturning).
Figure 2 shows the geometry and material properties of the baseline model used in this study. To
prevent any possible failure in the foundation soil below the GRR wall, the foundation soil was
assumed to have high strength values. The model walls had a height of 6 m from the top of the
foundation level to the finished approaching slab (H+h). In the model walls, the reinforcement
length increased linearly from 8 m at the bottom with a 1:1 slope toward the approaching slab and
road pavement. The vertical spacing of reinforcement layers was 0.4 m. The embedment depth of
the footing (h) and the offset distance between the back of the wall facing and the close edge of
the footing (D) were varied. In this parametric study, one parameter was changed from the baseline
model while all others were unchanged.
RESULTS
The possible failure surface and the ultimate bearing capacity of the footing on the GRR abutment
wall were examined in this study. In this paper, the ultimate bearing capacity is defined as the
pressure at which the corresponding factor of safety using Bishop’s simplified method is equal to
one. However, this approach does not consider the footing load-induced confining stress effect on
the soil and reinforcement resistance.
Effect of Embedment Depth of Footing: Figure 3 shows the calculated ultimate bearing capacity
of the footing on the GRR abutment wall versus the embedment depth of the footing at a constant
Figure 3. Calculated ultimate bearing capacity versus embedment depth of footing (h)
Figure 4 presents the locations and shapes of potential failure surfaces within the walls at
different embedment depths of the footing and the constant footing offset (D=1.5m) determined
using Bishop’s simplified method. Figure 4 shows that the potential failure surfaces began or
passed from the center of the footing and developed into the reinforced zone towards the wall
facing. The footing with a deeper embedment resulted in a slightly deeper failure zone than that
with a shallower embedment as shown in Figure 4.
The comparison between Bishop’s simplified and the FHWA method indicates that the
potential failure surface in the wall with a shallow footing determined by Bishop’s simplified
method was close to the surface identified by the FHWA method. However, an increase of the
embedment depth of the footing, the potential failure surface identified by Bishop’s simplified
method became deeper than that proposed by the FHWA method.
Effect of Offset Distance of Footing: Figure 5 presents the calculated ultimate bearing capacity
of the footing versus the offset distance of the footing with a constant embedment depth (h=1.2 m)
using Bishop’s simplified method. The results show that the wall with a larger offset distance had
a higher ultimate bearing capacity for the footing than the wall with a smaller offset distance.
When the footing was located next to the wall facing (D=0), the calculated ultimate bearing
capacity was 73.1% and 138.5% lower than that with an offset ratio, D/(H+h), of 0.25 and 0.42,
respectively.
Figure 6 presents the locations and shapes of the potential failure surfaces within the walls
at different offset distances that were determined using Bishop’s simplified and the FHWA method.
The potential failure surface, using Bishop’s simplified method, began from the center of the
footing and developed into the reinforced zone towards the wall facing. Therefore, the wall with a
larger footing offset distance had a deeper potential failure surface as compared with that with a
smaller offset distance, using Bishop’s simplified method. When the wall had an offset distance
smaller than 0.5 m (D/(H+h)=0.1), the potential failure surfaces proposed by Bishop’s simplified
and the FHWA method were similar. However, as the offset distance of the footing increased, the
potential failure surface identified by Bishop’s simplified method was deeper than that proposed
by the FHWA method.
Figure 6. Locations and shapes of potential failure surfaces with the walls with different
offset distances of the footing (D)
CONCLUSIONS
This study investigated the effect of a footing (i.e., the embedment depth of the footing and the
offset distance of the footing from the wall facing) on global stability of geosynthetic-reinforced
retaining (GRR) abutment walls with modular block facing. The limit equilibrium (LE) program
was used to determine the potential failure surfaces and calculate the ultimate bearing capacity of
the footings using Bishop’s simplified method. From this study, the following conclusions can be
made:
1. The increase in the embedment depth slightly increased the ultimate bearing capacity of
the footings.
2. The potential failure surfaces, identified by Bishop’s simplified method, began from the
center of the footing and developed into the reinforced zone towards the abutment walls
facing toe.
3. The potential failure surfaces, determined using Bishop’s simplified method, of the
abutment walls with a larger embedment depth of the footing were slightly deeper than
those of the walls with a shallower footing.
4. The abutment wall with a longer offset distance had a higher ultimate bearing capacity for
footings than the walls with shorter offset distance.
REFERENCES
Abu-Hejleh, N., Zornberg, J. G., Wang, T., and McMullen, M. (2001). Performance of
geosynthetic-reinforced walls supporting the Founders/Meadows Bridge and approaching
roadway structures. Report 2: Assessment of the performance and design of the front GRS
walls and recommendations for future GRS abutments.
ADAMA Engineering, Inc, (2008). ReSSA Software Version 3.0 Newark, Delaware, USA.
Adams, M., and Nicks, J. (2018). Design and construction guidelines for geosynthetic reinforced
soil abutments and integrated bridge systems. United States. Federal Highway
Administration.
Adams, M., Nicks, J., Stabile, T., Wu, J. T., Schlatter, W., and Hartmann, J. (2011). Geosynthetic
reinforced soil integrated bridge system, synthesis report. United States. Federal Highway
Administration.
Berg, R., Christopher, B., and Samtani, N. (2009). Design and construction of mechanically
stabilized earth walls and reinforced soil slopes, vols. 1 & 2. Report No: FHWA-NHI-10–
024. FHWA, U.S. Department of Transportation.
Bishop, A.W. (1955). The use of the slip circle in the stability analysis of slopes. Geotechnique 5,
7–17.
Chen, Q. and Abu-Farsakh, M., (2015). Ultimate bearing capacity analysis of strip footings on
reinforced soil foundation. Soils and Foundations, 55(1), pp.74-85.
Gaudio, D., Masini, L. and Rampello, S., (2018). A performance-based approach to design
reinforced-earth retaining walls. Geotextiles and Geomembranes, 46(4), pp.470-485.
Han, J., 2015. Principles and practice of ground improvement. John Wiley & Sons.
Han, J. and Leshchinsky, D. (2010). Analysis of back-to-back mechanically stabilized earth
walls. Geotextiles and Geomembranes, 28(3), pp.262-267.
Helwany, S.M., Wu, J.T. and Froessl, B. (2003). “GRS bridge abutments—an effective means to
alleviate bridge approach settlement.” Geotextiles and Geomembranes, 21(3), pp.177-196.
Hung, W.Y., Yang, K.H., Nguyen, T.S. and Pham, T.N.P. (2020). Performance of geosynthetic-
reinforced soil walls at failure. Journal of GeoEngineering, 15(1), pp.13-29.
Jawad, S., 2019. Evaluating behavior of laterally loaded piles within mse walls under static and
Yu-qiu Ye,1 Jamal Ismael Kakrasul, Ph.D.,2 Jie Han, Ph.D., PE, F.ASCE,3 and Rui Rui,
Ph.D.4
1
Civil, Environmental and Architectural Engineering Department, the University of Kansas,
USA; e-mail: [email protected]
2
Department of Civil Engineering, Soran University, Iraq; e-mail: [email protected]
3
Dept. of Civil, Environmental, and Architectural Engineering, the University of Kansas, 1530
West 15th St., Lawrence, KS 66045-760; e-mail: [email protected]
4
Department of Geotechnical Engineering, Wuhan University of Technology, Wuhan, China; e-
mail: [email protected]
ABSTRACT
Geosynthetic-reinforced Soil (GRS) walls have been widely used in geotechnical engineering
practice, such as highways, bridge abutments, and service roads. In some areas, space for GRS
wall construction is limited. Past research has shown that the magnitude and distribution of earth
pressures in limited-space GRS walls are different from those with large space. This paper briefly
reviewed two model tests carried out to study the vertical stress distribution of limited-space GRS
walls subjected to footing loading. Test results indicated that the measured vertical stresses
decreased with depth, but increased with footing loading. This paper also proposed a simplified
method by modifying the 2:1 stress distribution method to calculate the vertical stress distribution
in limited-space GRS walls under static footing loading. The simplified method adopted a
horizontal slice concept and considered the wall-soil friction effect. Accuracy of this proposed
method and improvement from the 2:1 stress distribution method were assessed with the test
results.
INTRODUCTION
Geosynthetic Reinforced Soil (GRS) walls have been widely used for highways, railways, and
bridge abutments (Abu-Hejleh et al., 2000, 2001; Wu et al., 2006; Han, 2015; Shen et al. 2020).
Static and dynamic footing or traffic loads are applied on the top of GRS walls as part of bridge
abutments and important for their design. There have been a number of studies on GRS walls in
recent years through full-scale tests (e.g., Jiang et al. 2016), physical model tests (e.g., Xiao et al.,
2015; Kakrasul et al. 2016, 2020; and Kakrasul 2018), analytical solutions (e.g., Han and
Leshchinsky 2006), and numerical analysis (e.g., Leshchinsky and Vulova 2001: Ling and
Leshchinsky 2003; Han and Leshchinsky 2010). Mojtahedi and Fakharian (2002) conducted a
parametric study for GRS abutments under static and seismic loading, and proposed their design
methods. These studies were based on GRS walls with large space behind wall facing. Wu et al.
(2006) investigated the bearing capacity of GRS walls with different soil stiffness and foundation
stiffness. Bourgeois et al. (2011) analyzed the influence of a local load on the interaction between
the reinforcement and the backfill material in GRS walls using full-scale tests and finite element
analyses. Xiao et al. (2015) conducted a series of model tests to evaluate the effects of geogrid
MODEL TESTS
Test Setup. Before the presentation of the proposed simplified method, selected model tests
conducted by Kakrasul (2018) are briefly described herein. Details of these tests can be found in
Kakrasul (2018). Kakrasul (2018) adopted a model box for his experimental study on the
performance of limited-space GRS walls subjected to footing loading. The test setup was
composed of a model box, sand, geogrid layers, a loading plate, a hydraulic jack, and a reaction
frame, dial gauges, earth pressure cells, and a load cell. Figure 1 shows the inner dimensions of
the test box as 1100 mm high, 450 mm wide, and 2400 mm long. The front side was made of
transparent glass plates with the thickness of 10 mm each. The glass wall allowed visual
observation and photogrammetry of displacements of wall facing and backfill. The strip footing
was composed of a steel plate of 200 mm wide, 450 mm long, and 25 mm thick. To ensure a plane
strain condition, the length of the footing was approximately equal to the inner width of the box.
Kansas River sand was used as the backfill material. The sand was compacted to a relative density
Rd =70%, which corresponds to a dry unit weight 17.8 kN/m3 in the model tests. The peak internal
friction angle at this density was measured to be 37° using triaxial compression tests.
Test program. Two model tests were selected in this study, which had two different backfill
lengths L = 0.7 m (Test 1, labeled as T1) and 0.5 m (Test 2, labeled as T2) as shown in Figure 2.
The offset d of the footing was 0.2 m, the reinforcement spacing was 0.2 m, and the backfill height
H was 1 m, respectively. Earth pressure cells were placed along the centerline of the loading plate
to measure the vertical stresses in the reinforced backfill.
TEST RESULTS
Figure 3 shows the distributions of the measured vertical stress versus depth under three different
footing applied pressures (50, 100, and 150 kPa) for T1 and T2. The symbols, Test_50, Test_100,
and Test_150 in these tests, represent the applied pressures of 50, 100, and 150 kPa. These two
tests had similar distribution trends of the measured vertical stresses under all the applied footing
pressures. The measured vertical stresses decreased with the depth and increased with the increase
of the applied footing pressure. The increase of the stresses became smaller with the increase of
the depth. Clearly, the footing had a limited influence depth, which was approximately five times
the footing width, which is consistent with the theoretical solution (i.e., the Boussinesq solution).
SIMPLIFIED METHOD
The 2:1 stress distribution method has been commonly used to calculate vertical stresses in GRS
walls under footing loading. However, for limited-space conditions, wall-soil friction has a great
influence on the distribution of vertical stresses. In this study, a simplified method was proposed
considering the wall-soil friction effect. The horizontal slice concept was adopted in the derivation
as shown in Figure 4. The symbols used in the derivation are provided in Figure 4 and other
symbols are described as they appear in equations.
The backfill is divided into n horizontal slices of equal thickness hi.
H
hi = (1)
n
where H is the height of backfill. The effective length Di of the ith slice can be expressed
as follows:
Bf if Z i = 0
B f + Zi if 0 < Z i ≤ Z1
Di = (2)
B f + d + Zi / 2 if Z1 < Z i ≤ Z 2
L if Z 2 < Z i
i
where Z1= 2d, Z2= 2(L-d-Bf) and Z i = ∑ hm .
m =1
i -1
F ( B f W ) -∑ f m
∆σ i = m =1
(3)
DW
i
When Z1 < Z2, the wall-soil friction applied on the ith slice can be expressed as follows:
∆σ i K 0 tan (δ ) hi ( 2 Di ) if 0 ≤ Z i ≤ Z1
f i = ∆σ i K a tan (δ ) hW
i + ∆σ i K 0 tan (δ ) hi ( 2 Di ) if Z1 < Z i ≤ Z 2 (4)
∆σ i K a tan (δ ) hW
i + ∆σ i K 0 tan (δ ) hi ( 2 Di + W ) if Z 2 < Z i
(a) (b)
Figure 4. Analytical model.
When Z1 > Z2, the wall-soil friction applied on the ith slice can be expressed as follows:
∆σ i K 0 tan (δ ) hi ( 2 Di ) if 0 ≤ Z i ≤ Z1
f i = ∆σ i K 0 tan (δ ) hi ( 2 Di +W ) if Z1 < Z i ≤ Z 2 (5)
∆σ i K a tan (δ ) hW
i + ∆σ i K 0 tan (δ ) hi ( 2 Di +W ) if Z 2 < Z i
where K0 is the earth pressure coefficient at rest, Ka is Rankine’s active earth pressure
coefficient, δ is the wall-soil friction angle (assume δ = 2/3φ) and φ is the soil internal friction
CONCLUSIONS
Two model tests were selected to investigate the distribution of vertical stresses measured by earth
pressure cells along the centerline of the footing in limited space GRS walls under static footing
loading. The 2:1 stress distribution method was modified by adopting the horizontal slice concept
and considering the wall-soil friction effect as a simplified method proposed in this paper.
The model tests showed the measured vertical stresses decreased from the bottom of the
footing with the increase of the depth to the minimum value at the depth of five times the footing
width.
The calculated vertical stresses using the proposed simplified method were compared well
with the measured ones in the model tests and better than those calculated by the 2:1 stress
distribution method.
REFERENCES
Abu-Hejleh, N., Wang, T. and Zornberg, J.G. (2000). Performance of geosynthetic reinforced walls
supporting bridge and approaching roadway structures. In: ASCE Geotechnical Special
Publication No. 103. ASCE, Reston, VA, United States, 218-243.
Abu-Hejleh, Zornberg, J.G. and Wang, T. (2001). Performance of Geosynthetic-reinforced Walls
Supporting the Founders/Meadows Bridge and Approaching Roadway Structures. Colorado
Department of Transportation Research Branch, Report No. CDOT-DTD-R-2001-12.
Bourgeois, E., Soyez, L. and Le Kouby, A. (2011). Experimental and numerical study of the
behavior of a reinforced-earth wall subjected to a local load, Computers and Geotechnics, 38(4):
515-525.
Frydman, S., and Keissar, I. (1987). Earth pressure on retaining walls near rock faces, Journal of
Geotechnical Engineering, 113(6): 586-599.
Handy, R. L. (1985). The arch in soil arching, Journal of Geotechnical Engineering, 111(3): 302-
318.
Han, J. (2015). Principles and Practice of Ground Improvement, John Wiley & Sons, Hoboken,
New Jersey, USA, ISBN: 978-1-118-25991-7, June, 432p.
Han, J. and Leshchinsky, D. (2010). Analysis of back-to-back mechanically stabilized earth walls,
Geotextiles and Geomembranes, 28(3): 262-267.
Han, J. and Leshchinsky, D. (2006). General Analytical Framework for Design of Flexible
Reinforced Earth Structures, Journal of Geotechnical and Geoenvironmental Engineering,
132(11): 1427-1435.
Jiang, Y., Han, J., Parsons, R.L., and Brennan, J.J. (2016). Field instrumentation and evaluation of
modular-block MSE walls with secondary geogrid layers. ASCE Journal of Geotechnical and