0% found this document useful (0 votes)
14 views8 pages

Final Report (Part-1)

Uploaded by

srishti8851
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views8 pages

Final Report (Part-1)

Uploaded by

srishti8851
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

DECLARATION

I/We hereby declare that the project work entitled “ …………………………………….”


submitted to CBSE, is a record of an original work done by me/us under the guidance of Mrs.
Monika Goyal, PGT(Computer Science) , ARYA VIDYA MANDIR SENIOR SECONDARY
SCHOOL for the practical examination of subject computer science(083).

Signature

i
ARYA VIDYA MANDIR SR. SEC SCHOOL

CERTIFICATE

This is to Certify that………..……………....Roll no……………….class 12 th of


ARYA VIDYA MANDIR SR. SEC. SCHOOL has satisfactory completed the
project ………………………………………………………………………..……
in the subject computer science(083) prescribed by CBSE in the academic year
2022-2023 for the purpose of practical examination in Class XII .

SIGNATURE PRINCIPAL

MRS. MONIKA GOYAL Mr. HEMANT KUMAR


PGT(COMPUTER SCIENCE)

ii
ACKNOWLEDGEMENT

we wish to express our heartfelt gratitude to Mr. Hemant Kumar, Principal, Arya Vidya
Mandir Sr. Sec School whose support has greatly boosted our self-confidence and will go a long
way on helping us to reach further milestones and greater heights.

I am overwhelmed to express my thanks to the Administrative Officer for providing me an


infrastructure and moral support while carrying out this project in the school.

This project would not have taken shape, without the guidance provided by Ms Monika ,our In-
charge, who helped in the modules of our project and resolved all the technical as well as other
problems related to the project and, for always providing us with a helping hand whenever we
faced any bottlenecks, in spite of being quite busy with their hectic schedules.

I am thankful to all members for the guidance and support received for the success of the project.

iii
ABSTRACT

The project titled “INTRA MAILING SYSTEM” allows organizations with simple intranet to
exchange emails internally without the need of an Internet connection, in which
(a) Usually text is transmitted,
(b) Operations include sending, storing, processing, and receiving information,
(c) Users are allowed to communicate under specified conditions, and
(d) Messages are held in storage until called for by the addressee.

Intra Mailing System is the system which is used to establish online communication
among the employees of an organization at different branches and within the organization
between the departments. The employees of the organization can send mails to each other in the
working in different departments at different locations.

The purpose of “Intra Mailing System” is, an employee of a company can send and
receive mails only in that organization’s Local Area Network or Wide Area Network. It will
work like Internet mailing system for this intranet.

iv
TABLE OF CONTENTS

1. INTRODUCTION

1.1 Problem Statement

1.2 Objective of Proposed System…………………………………………............2

1.3 Proposed System Architecture……………………………………………….…3

1.4 Scope of the Proposed System …………………………………………………3

1.5 Feasibility Study………………………………………………………………..4

1.5.1 Technical Feasibility…………………………………..........4

1.5.2 Economic Feasibility……………………………………......4

1.5.3 Financial Feasibility…………………………………...........

1.5.4 Safety Feasibility……………………………………............

2. SYSTEM ANALYSIS

2.2 H/W Requirements……………………………………………….........................

2.3 S/W Requirements………………………………………………..........................

2.4 Introduction of Tools………………………………………….............................

2.5 Requirements Specification……………………………………..........................

3.SYSTEM DESIGN

3.1 System Functionality …………………………………………………………..

3.2 System Modules ………………………………………………………………...

3.3 Database Design……………………………………………………………….

v
3.4 Outputs ……………………………………………....................

4. TESTING & TEST RESULTS

4.1 Objective of Testing…………………………………………..............................

4.2 Step in Testing……………………………………………….................................

4.3 Level of Testing…………………………………………….................................

4.3.1 Unit Testing………………………………………………………....

4.3.2 System testing……………………………………………………..

4.3.3 Integration testing…………………………………………………

4.3.4 Acceptance Testing…………………………………..........................

4.4 Testing of project…………………………………………..............................

5. SYSTEM IMPLEMENTATION

5.1 System Coding ………………………………………………………………….

6. SUMMARY AND CONCLUSIONS

6.1 Summary …………………………………………………………….

6.2 Future Scope …………………………………………………………………

REFERENCES …………………………………………………………………………..

vi
REFERENCES

vii
viii

You might also like