0% found this document useful (0 votes)
22 views28 pages

Final A3

Uploaded by

bharathsyk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views28 pages

Final A3

Uploaded by

bharathsyk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 28

VISVESVARAYA TECHNOLOGICAL UNIVERSITY

“JnanaSangama”, Belagavi – 590018, Karnataka.

A Mini Project Report


on
“EXTENSIVE SURVEY PROJECT”
Submitted in partial fulfillment for the award of degree of
BACHELOR OF ENGINEERING
in
CIVIL ENGINEERING
Submitted by
STUDENTS OF V SEMESTER
Academic Year 2024-25
Under the Guidance of
Dr. B K Varun Dr. Harish B A Dr. Kiran Kumar H S

DEPARTMENT OF CIVILENGINEERING
GM INSTITUTE OF TECHNOLOGY, DAVANAGERE
GM INSTITUTE OF TECHNOLOGY
Department of Civil Engineering
Post Box No. 4, P.B. Road, Davangere – 577 006, Karnataka State. Email:
[email protected]: www.gmit.ac.in

CERTIFICATE
This is to certify that, the project titled “EXTENSIVE SURVEY PROJECT” carried out by STUDENTS OF V
SEMESTER, in partial fulfillment for the award of Bachelor of Engineering in CIVIL ENGINEERING of the
Visvesvaraya Technological University, Belagavi for the academic year 2024-25.

____________________ ______________________ _______________________________

Dr. B K Varun Dr. Harish B A Dr. Kiran Kumar H S


Camp Officer Camp Officer Camp Officer

______________________
Dr. Y B Bharatharaj Etigi
Head of the Department
ACKNOWLEDGEMENT
The joy and satisfaction that accompany the successful completion of any task would be incomplete without the mention of the people who made
it possible.

We would like to express our gratitude to the Principal, Dr. Sanjay Pande M B, for providing us a congenial environment for engineering studies
and also for having showed us the way to carry out the project.

We consider it a privilege and honor to express our sincere thanks to, Dr.Y B Bharatharaj Etigi, Professor and Head, Department of Civil
Engineering for his support and invaluable guidance throughout the tenure of this project.

We would like to thank our Camp Officers Dr.B K Varun , Associate Professor, Dr. Harish B A, Associate Professor and Dr. Kiran Kumar H
S, Associate Professor, Department of Civil Engineering for support, guidance, motivation, encouragement for the successful completion of this
project.

We would like to thank all the faculty members Dr. Arunkumar S L,Mr. Virupaksha H V,Mr. swamy L V, Mr. Kiran Kumar C M ,Mr.Puttaraj
M H, Dr. Hanumesh B M, Mrs.Sproothi B, Mrs.Bhargavi J, Mrs.Namratha S N & Dr. Nithin K S Department of Civil Engineering for
guiding us and helping us complete the project in time successfully.

We would specially like to thank the non-teaching staff of Department of Civil Engineering, Mr. Prasannakumar S, Ms. Kavya T P, and Mrs.
Aishwarya S, Instructors & Mr. Rajashekharappa, Attender for taking physical strain and being with us throughout the conduct of the entire
project and helping us complete it successfully.
HIGHWAY
PROJECT
EXTENSIVE SURVEY PROJECT - 2024

N N
NN
N N
N

N N N
N

N
N
N
electric pole

culvert edge
electric pole

TITLE OF THE DRAWING : PLAN AND ALIGNMENT OF HIGHWAY


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
PLAN AND ALIGNMENT OF THE HIGHWAY SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

LENGENDS

GROUND PROFILE

GRADIENT LINE

DATUM LINE- 100.00 M

DEPTH OF CUTTING 2.987 3.091 2.659 2.338 1.375 1.074 0.797 0.279 0.082 0.045

DEPTH OF FILLING 0.083 0.011 0.009 0.088 0.115 0.276

FORMATION LEVEL 100.295 100.285 100.275 100.265 100.255 100.245 100.235 100.225 100.215 100.205 100.195 100.185 100.175 100.165 100.155 100.145

RL OF GROUND LEVEL 103.282 103.376 102.934 102.603 101.63 101.319 101.032 100.504 100.132 100.287 100.240 100.174 100.166 100.077 100.04 99.869

CHAINAGE IN M 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225

LONGITUDINAL SECTION OF HIGHWAY PROJECT

TITLE OF THE DRAWING : LONGITUDINAL SECTION OF HIGHWAY PROJECT


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

DATUM RL 95.00 M 0.028 DATUM RL 95.00 M DATUM RL 95.00 M


0.286

0.226

0.237

0.377

0.195

0.329
DEPTH OF CUTTING DEPTH OF CUTTING DEPTH OF CUTTING

0.17
0.341

0.574

0.374

0.286

0.004

0.192

0.221

0.238

0.124

0.143

0.195
DEPTH OF FILLING DEPTH OF FILLING DEPTH OF FILLING

0.34

0.3
103.623 102.999 102.605
FORMATION LEVEL FORMATION LEVEL FORMATION LEVEL
103.909

103.849

103.651

103.282

103.049

103.249

103.337

103.236

103.169

102.995

103.376

102.807

102.778

102.761

102.481

102.462

102.934

102.265

102.305

102.41
102.8
REDUCED LEVEL (M)
REDUCED LEVEL (M) REDUCED LEVEL (M)

30

60
15

10

10

15

15

10

10

15

15

10

10

15
CHAINAGE IN M
5

5
CHAINAGE IN M CHAINAGE IN M

CROSS SECTION AT 0 CHAINAGE CROSS SECTION AT 30 CHAINAGE CROSS SECTION AT 60 CHAINAGE

DEPTH OF CUTTING

TITLE OF THE DRAWING : CROSS SECTION OF HIGHWAY


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DEPTH OF FILLING DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

DATUM RL 95.00 M DATUM RL 95.00 M DATUM RL 95.00 M


0.042

0.044

0.546

0.196

0.771

0.063

0.097

0.183

0.100

0.074

0.077
DEPTH OF CUTTING DEPTH OF CUTTING DEPTH OF CUTTING
0.029

0.162

0.128

0.042

0.183

0.307

0.001

0.269

0.100
DEPTH OF FILLING DEPTH OF FILLING DEPTH OF FILLING

0.14
102.057 101.832 101.242
FORMATION LEVEL FORMATION LEVEL FORMATION LEVEL
102.099

102.101

102.028

102.603

101.895

101.929

102.015

101.649

101.525

102.028

102.603

101.895

101.929

102.015

101.342

101.243

101.316

101.319

100.973

101.102

101.142
REDUCED LEVEL (M) REDUCED LEVEL (M) REDUCED LEVEL (M)

110

140
90
15

10

10

15

15

10

10

15

15

10

10

15
5

5
CHAINAGE IN M CHAINAGE IN M CHAINAGE IN M

CROSS SECTION AT 90 CHAINAGE CROSS SECTION AT 110 CHAINAGE CROSS SECTION AT 140 CHAINAGE

DEPTH OF CUTTING

TITLE OF THE DRAWING : CROSS SECTION OF HIGHWAY


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DEPTH OF FILLING
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

DATUM RL 95.00 M DATUM RL 95.00 M DATUM RL 95.00 M


0.123

0.123

0.244

0.352

0.065

0.281

0.214

0.306

0.035

0.243

0.149

0.095
DEPTH OF CUTTING DEPTH OF CUTTING DEPTH OF CUTTING

0.02
0.5
0.072

0.123

0.035

0.172

0.281

0.198

0.036
DEPTH OF FILLING DEPTH OF FILLING DEPTH OF FILLING

100.680 100.004 100.330


FORMATION LEVEL FORMATION LEVEL FORMATION LEVEL
100.803

100.803

100.924

101.032

100.745

100.608

100.557

100.285

100.218

100.310

100.504

100.365

100.350

100.573

100.132

100.479

100.425

100.294
99.969

99.832

99.723
REDUCED LEVEL (M) REDUCED LEVEL (M) REDUCED LEVEL (M)

200

230
170
15

10

10

15

15

10

10

15

15

10

10

15
5

5
CHAINAGE IN M CHAINAGE IN M CHAINAGE IN M

CROSS SECTION AT 170 CHAINAGE CROSS SECTION AT 200 CHAINAGE CROSS SECTION AT 230 CHAINAGE

DEPTH OF CUTTING

TITLE OF THE DRAWING : CROSS SECTION OF HIGHWAY


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DEPTH OF FILLING
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

DATUM RL 95.00 M DATUM RL 95.00 M DATUM RL 95.00 M


0.146

0.296

0.046

0.147

0.175

0.205

0.103

0.213

0.190

0.078

0.075

0.115

0.087

0.151

0.078

0.075

0.115

0.087

0.151
DEPTH OF CUTTING DEPTH OF CUTTING DEPTH OF CUTTING
0.27

0.05
0.227

0.146

0.104

0.013

0.126

0.108

0.131

0.136

0.112

0.088

0.104
DEPTH OF FILLING DEPTH OF FILLING DEPTH OF FILLING

100.14 100.165 100.305


FORMATION LEVEL FORMATION LEVEL FORMATION LEVEL
100.286

100.410

100.436

100.186

100.287

100.315

100.345

100.268

100.378

100.355

100.243

100.240

100.280

100.252

100.316

100.061

100.355

100.292

100.179

100.197

100.174

100.169

100.193

100.217

100.255
99.913

99.994

REDUCED LEVEL (M) REDUCED LEVEL (M) REDUCED LEVEL (M)


260

290

320
20

20

20

20

20

20
15

10

10

15

15

10

10

15

15

10

10

15
5

5
CHAINAGE IN M CHAINAGE IN M CHAINAGE IN M

CROSS SECTION AT 260 CHAINAGE CROSS SECTION AT 290 CHAINAGE CROSS SECTION AT 320 CHAINAGE

DEPTH OF CUTTING

DEPTH OF FILLING TITLE OF THE DRAWING : CROSS SECTION OF HIGHWAY


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

DATUM RL 95.00 M DATUM RL 95.00 M DATUM RL 95.00 M


0.136

0.141

0.112

0.043
DEPTH OF CUTTING DEPTH OF CUTTING DEPTH OF CUTTING
0.058

0.039

0.008

0.017

0.047

0.084

0.136

0.081

0.071

0.038

0.038

0.086

0.113

0.112

0.269

0.407

0.418

0.355

0.370

0.380

0.386

0.400

0.452
DEPTH OF FILLING DEPTH OF FILLING DEPTH OF FILLING

100.158 100.115 100.410


FORMATION LEVEL FORMATION LEVEL FORMATION LEVEL
100.294

100.229

100.100

100.119

100.166

100.141

100.111

100.074

100.022

100.227

100.158

100.034

100.044

100.077

100.077

100.029

100.002

100.003

100.141

100.003

100.055

100.024
99.992

99.958
100.04

100.03

100.01
REDUCED LEVEL (M) REDUCED LEVEL (M) REDUCED LEVEL (M)

410
350

380
20

20

20

20

20

20
15

10

10

15

15

10

10

15

15

10

10

15
5

5
CHAINAGE IN M CHAINAGE IN M CHAINAGE IN M

CROSS SECTION AT 350 CHAINAGE CROSS SECTION AT 380 CHAINAGE CROSS SECTION AT 410 CHAINAGE

DEPTH OF CUTTING

DEPTH OF FILLING TITLE OF THE DRAWING : CROSS SECTION OF HIGHWAY


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

DATUM RL 95.00 M DATUM RL 95.00 M

0.117

0.134
DEPTH OF CUTTING DEPTH OF CUTTING

0.269

0.407

0.418

0.355

0.370

0.380

0.386

0.400

0.452

0.038

0.041

0.102

0.102

0.117
DEPTH OF FILLING DEPTH OF FILLING

100.410 99.735
FORMATION LEVEL FORMATION LEVEL
100.141

100.003

100.055

100.024
99.992

99.958

99.852

99.697

99.694

99.869

99.633

99.633

99.618
100.04

100.03

100.01
REDUCED LEVEL (M) REDUCED LEVEL (M)

440

470
20

20
15

10

10

15

15

10

10

15
5

5
CHAINAGE IN M CHAINAGE IN M

CROSS SECTION AT 440 CHAINAGE CROSS SECTION AT 470 CHAINAGE

DEPTH OF CUTTING

TITLE OF THE DRAWING : CROSS SECTION OF HIGHWAY


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DEPTH OF FILLING
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

SUPER ELEVATION 0.07m


1

EXTRA WIDENING 0.3m

SHOULDER CARRIAGE WAY


1

n 1
2i
n1 0.3
1i 2 2.5 7.5 2.5 2
1
1 2
1

TYPICAL CROSS SECTION OF


HIGHWAY FOR SUPER ELEVATION AND EXTRA WIDENING
TITLE OF THE DRAWING : TYPICAL CROSS SECTION OF HIGHWAY FOR SUPER ELEVATION AND EXTRA WIDENING
TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

1
CARRIAGE WAY 1

SHOULDER

n 1SHOULDER
2 i
n 1
1i 2 2.5 7.5 2.5 2
1 1
1
1

TYPICAL CROSS SECTION OF


HIGHWAY FOR CUTTING

TITLE OF THE DRAWING : TYPICAL CROSS SECTION OF HIGHWAY FOR CUTTING


TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

CARRIAGE WAY

SHOULDER
1 1

n 1SHOULDER
2 i
2 2.5 7.5 2.5 2.5

1 1

TYPICAL CROSS SECTION OF


HIGHWAY FOR FILLING
TITLE OF THE DRAWING : TYPICAL CROSS SECTION OF HIGHWAY FOR FILLING
TITLE OF THE PROJECT : HIGHWAY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


WATER SUPPLY
PROJECT
EXTENSIVE SURVEY PROJECT - 2024

N
N
185° N
30m
167°
30m
190°
N 30m

192° N
30m N

N
211°
182°
30m
30m

271°
N
30m

N
N

187°
30m
189°
188°
30m 30m
N

N
N

194°
30m

201°
212°
30m 30m

N
N
193°
N

N
201° 60m
N
82° 216° 30m

72° 234° 30m


30m
30m

ALINGNMENT OF WATER SUPPLY


SANITARY PROJECT
PROJECT
TITLE OF THE DRAWING : ALIGNMENT OF WATER SUPPLY
SANITARY PROJECT
PROJECT
N

WATERPROJECT
TITLE OF THE PROJECT : SANITARY SUPPLY PROJECT
OXIDATION POND

52°

90m
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


LONGITUDINAL SECTION OF
WATTER SUPPLY
N

DATUM RL(90.00)M DATUM RL(90.00)M


DEAPTH OF FILLING 0 0 0 0 DEAPTH OF FILLING 0 0 0 0 0 GRADIENT LINE

DEAPTH OF CUTTING 1.80 2.16 2.34 1.80 DEAPTH OF CUTTING 2.40 2.94 2.31 2.43 2.40 REDUCED LEVEL

REDUCED LEVEL(M) 101.620 101.830 101.885 101.160 REDUCED LEVEL(M) 101.620 101.325 100.055 99.160 98.270 CUTTING

CHAINAGR IN M 0 30 60 90 CHAINAGR IN M 0 30 60 90 120

MAIN LINE SUB LINE-A

TITLE OF THE DRAWING:LONGITUDINAL SECTION OF WATER SUPPLY

TITLE OF THE PROJECT:WATER SUPPLY

DATE OF THE DRAWING:

SCALE 1:1
DATUM RL(90.00)M DATUM RL(90.00)M
DEAPTH OF FILLING 0 0 0 0 0 DEAPTH OF FILLING 0 0 0 0 0 NAME:
DRAWN BY
DEAPTH OF CUTTING 2.40 2.95 3.03 2.76 2.40 DEAPTH OF CUTTING 2.40 2.67 3.02 2.72 2.40 USN:

REDUCED LEVEL(M) 100.665 100.950 100.775 100.240 99.620 REDUCED LEVEL(M) 100.860 100.940 100.930 100.610 100.095 PROJECT GUIDE 1: PROJECT GUIDE:2
CHECKED BY
CHAINAGR IN M 0 30 60 90 120 CHAINAGR IN M 0 30 60 90 120

SUB LINE-B SUB LINE -C

DEPARTMENT OF CIVIL ENGINEERING ,GMIT DAVANAGERE


EXTENSIVE SURVEY PROJECT-2024

0 0 5 LEGEND N
.66 101.595 1.60 101.750 101.140 101.215 01.295 101.225 01.34
101

40
10 1 1 CONTOUR INTERVAL- 0.5M
HIGHEST RL- 101.750
0 5 0
101.595
.53 101.510 01.74 101.750 101.095 100.065 101.240 101.100 01.17 LOWEST RL-99.595
101

35
1 1

0 0
.435 101.420 01.69 101.610 101.640 100.955100.955 00.900 1.01
101

30
1 1 10

0 0 0
.36 101.270 01.52 101.470 101.530 100.765 00.755 100.720 00.80
101 1

25
1 1

5 0 0 TITLE OF THE DRAWING : BLOCK LEVELLING FOR WATER SUPPLY PROJECT


.29 101.435 01.37 101.260 101.325 100.545 00.560 100.540 00.57
101 1

20
1 1

0 5 0 TITLE OF THE PROJECT : WATER SUPPLY PROJECT


.24 101.420 01.15 101.920 101.190 00.345 00.375 00.295 00.32
101

15
1 1 1 1 1

5 5 0 DATE OF DRAWING :
.45 101.430 01.03 101.070 101.000 100.060 100.090 100.075 00.12
101

10
1 1

5 5 0 SCALE: 1:1
.29 101.455 01.05 101.775 101.920 99.860 99.890 99.860 9.88
101 1 9
5

NAME:
0 0 0 DRAWN BY:
.19 101.355 01.02 101.765 101.840 99.595 99.625 99.990 9.64
101 35 1 30 25 20 15 10 5
9
0 USN:
40
100.595 100.095
101.095 PROJECT GUIDE 2:
PROJECT GUIDE 1:
BLOCK LEVELLING FOR WATER SUPPLY PROJECT CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING,GMIT,DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

WATE
R TR
EATM
ENT PLA
NT

RB
N
RB

OHT RB RB

RB RB

RB
RB RB RB
RB
RB
RB
RB RB
RB
RB RB

RB
RB RB
RB
RB

RB RB
RB
RB
RB
RB

RB
RB
RB CB
RB
RB

RB
RB RB
RB
RB
RB
RB RB RB RB LEGEND
RB
RB
RB
RB RB PUMP
RB RB
RB
RB
RB
CB
RB
CB RB OHT
RB
RB
OVER HEAD TANK
RB
RB RB

RB RB
RB
RB RB
RB
RB
RB RB
RB
RB RB WATER SUPPLY LINE
RB RB RB
RB RB RB
RB
RB RB RB RB
RB RB RB RB
RB RB WATER TREATMENT PLANT
RB RB
RB RB
RB
RB RB GATE VALVE
RB
RB RB
RB
RB RB
RB
RB RB RB
RB RB

RB RB
RB RB
RB RB

RB RB TITLE OF THE DRAWING : PROPOSED WATER SUPPLY SCHEME FOR NEW TOWN
RB RB
RB
RB TITLE OF THE PROJECT : WATER SUPPLY PROJECT
RB
RB
RB DATE OF DRAWING : 21/07/2024
RB

SCALE: 1:1
NAME :
DRAWN BY:
PROPOSED WATER SUPPLY SCHEME FOR USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


NEW TOWN CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


SANITARY PROJECT
EXTENSIVE SURVEY PROJECT - 2024

N
N
185° N
30m
167°
30m
190°
N 30m

192° N
30m N

N
211°
182°
30m
30m

271°
N
30m

N
N

187°
30m
189°
188°
30m 30m
N

N
N

194°
30m

201°
212°
30m 30m

N
N
193°
N

N
201° 60m
N
82° 216° 30m

72° 234° 30m


30m
30m

ALINGNMENT OF SANITARY PROJECT


TITLE OF THE DRAWING : ALIGNMENT OF SANITARY PROJECT
N

TITLE OF THE PROJECT : SANITARY PROJECT


OXIDATION POND

52°

90m
DATE OF DRAWING : 21/07/2024
SCALE: 1:1
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


CHAINAGE IN M
DATUM RL 90.000 M

DEPTH OF FILLING

DEPTH OF CUTTING

REDUCED LEVEL (M)


FORMATION LEVEL(M)
0 99.155 98.555 0.6 0

98.555
5 99.140 98.497 0.643 0
10 99.040 99.438 0.602 0
15 98.950 98.380 0.570 0
20 98.840 98.322 0.518 0
25 98.760 98.263 0.497 0
30 98.695 98.205 0.490 0

35 98.630 98.147 0.483 0

40 97.835 98.087 0 0.252

45 98.500 98.030 0.470 0


50 98.455 97.972 0.483 0
55 98.425 97.913 0.512 0
60 98.350 97.855 0.495 0

65 98.310 97.797 0.513 0


70 98.205 97.738 0.467 0
75 98.090 97.680 0.410 0
80 98.025 97.622 0.403 0
85 98.170 97.563 0.607 0

90 98.120 97.505 0.615 0


95 98.050 97.447 0.603 0
100 97.960 97.388 0. 572 0

LONGITUDINAL SECTION OF . A . ROAD


105 97.895 97.330 0.565 0
110 97.845 97.272 0.573 0
115 97.840 97.213 0.627 0
120 97.755 97.155 0.6 0
97.155

CHAINAGE IN M
DEPTH OF FILLING
DATUM RL 90.000 M

DEPTH OF CUTTING

REDUCED LEVEL (M)


FORMATION LEVEL(M)

125 97.000 96.475 0.525 0


96.475

130 97.125 96.556 0.569 0


135 97.170 96.634 0.536 0
140 97.215 96.717 0.498 0
145 97.160 96.348 0.812 0
150 97.330 96.879 0.451 0
155 97.390 96.959 0.431 0

160 97.430 97.040 0.390 0


165 97.515 97.121 0.394 0

170 97.600 97.202 0..398 0


175 97.615 97.282 0.333 0
180 97.810 97.363 0.447 0
185 97.930 97.444 0.486 0
SCALE :
EXTENSIVE SURVEY PROJECT - 2024-25

190 98.005 97.525 0.480 0


195 98.110 97.605 0.505 0
DRAWN BY :

CHECKED BY:

200 98.170 97.686 0.484 0


205 98.215 97.767 0.448 0
1:1

210 98.340 97.848 0.492 0

215 98.405 97.928 0.477 0


USN :
LONGITUDINAL SECTION OF . B . ROAD

DATE OF DRAWING :

NAME :

220 98.500 98.009 0.491 0


225 98.615 98.090 0. 525 0
98.090

DEPARTMENT OF CIVIL ENGINEERING , GMIT , DAVANAGERE


PROJECT GUIDE 1 :
LEGENDS :

TITLE OF THE PROJECT : SANITARY PROJECT


N

TITLE OF THE DRAWING : L/S OF A SANITARY PROJECT


: GRADIENT LINE
: GROUND PROFILE

PROJECT GUIDE 2 :
CHAINAGE IN M
DATUM RL 90.000 M

DEPTH OF FILLING

DEPTH OF CUTTING

REDUCED LEVEL (M)


FORMATION LEVEL(M)
230 97.980 97.580 0.4 0
97.580

235 97.950 97.497 0.453 0


240 97.840 97.413 0.427 0
245 97.765 97.330 0.435 0
250 97.675 97.247 0.428 0
255 97.535 97.163 0.372 0
260 97.540 97.080 0.460 0

265 97.540 96.997 0.543 0

270 97.475 96.913 0.562 0

275 97.370 96.830 0.540 0


280 97.700 96.747 0.953 0
285 97.780 96.663 1.117 0
290 97.865 96.580 1.285 0

295 97.925 96.497 1.428 0


300 97.020 96.413 0.607 0
305 96.730 96.330 0.400 0

LONGITUDINAL SECTION OF . C . ROAD


96.330

CHAINAGE IN M
DATUM RL 90.000 M

DEPTH OF FILLING

DEPTH OF CUTTING

REDUCED LEVEL (M)


FORMATION LEVEL(M)

320 95.225 94.475 0.750 0


94.475

335 96.400 94.614 1.786 0


350 96.655 94.753 1.902 0
365 96.865 94.892 1.973 0
380 96.780 95.031 1.749 0
395 97.855 95.169 2.686 0
410 97.745 95.308 2.437 0

425 97.905 95.447 2.458 0

440 98.200 95.586 2.614 0

455 96.475 95.725 0.750 0


SCALE :
95.725
EXTENSIVE SURVEY PROJECT - 2024-25

DRAWN BY :

CHECKED BY:
LONGITUDINAL SECTION OF . MAIN ROAD

1:1

USN :
DATE OF DRAWING :

NAME :

DEPARTMENT OF CIVIL ENGINEERING , GMIT , DAVANAGERE


LEGENDS :

PROJECT GUIDE 1 :
TITLE OF THE PROJECT : SANITARY PROJECT
N

TITLE OF THE DRAWING : L/S OF A SANITARY PROJECT


: GRADIENT LINE
: GROUND PROFILE

PROJECT GUIDE 2 :
EXTENSIVE SURVEY PROJECT - 2024-25

N
15 10 15 5 55 0 0 LEGENDS :
.8 8 8 50 .4 30 .4
4
97 97. 9 7. 97
.
97 97
.
97
CONTOUR INTERVAL : 0.5

5 0 HIGHEST RL : 98.710
0 5 0 10 83 40 34
0
42
0
.0 09 . . .5 . .
98 . 98 97 97 97 97
98 LOWEST RL : 97.585
85
.0
98
90 5 00 30 50 5
.1 06
5
. 98 7.
9 .7 6 58
98 8. 97 9 97 9 7. 9 7.
9

0 0 15 5 5 0
20 5 17 .0 9 1 77
. . 21 98
. 8 .8 .8 97
.
98 98 9 97 97

40
5 0 85 55 35 65 05
. 36 8.
2
8.
1
8.
0 .8 7.
6
98 9 8. 9 9 9 97 9
5
.08
98 45 5 75 70
5 5 5 35 60
60 . 48 8. . .1 8.
0 7.
6
98
.
98 9 98 98 9 9

05 30 85
5 71
0
8.
6 5 3 55 75 8
. 68 8. 9 98. 8. 8.
1
9 7.
98 9 9 9
5
.08 TITLE OF THE DRAWING: BLOCK LEVELLING FOR SEWAGE TREATMENT PLANT
5 98
. 08 TITLE OF THE PROJECT : SANITARY PROJECT
98
DATE OF DRAWING :
SCALE : 1:1
BLOCK LEVELLING FOR SEWAGE TREATMENT PLANT NAME :
DRAWN BY :
USN :

CHECKED BY: PROJECT GUIDE 1 : PROJECT GUIDE 2 :

DEPARTMENT OF CIVIL ENGINEERING , GMIT , DAVANAGERE


EXTENSIVE SURVEY PROJECT - 2024

N
RB

RB

RB RB

RB RB

RB
RB RB RB
RB
RB
RB
RB RB
RB
RB RB

RB
RB RB
RB
RB

RB RB
RB
RB
RB
RB

RB
RB CB
RB
RB
RB

RB
RB RB
RB
RB
RB
RB RB RB RB
RB
RB
RB
RB RB
RB RB
RB
RB
RB
CB
RB
CB RB
RB
RB RB

RB RB

RB RB
RB
RB RB LEGEND
RB
RB
RB RB
RB
RB RB
RB RB RB
RB RB RB RB SEWER LINE
RB RB RB RB
RB RB RB RB
RB RB
RB RB MAN HOLE
RB RB
RB
RB RB
RB
RB RB
RB
RB RB
RB
RB RB RB SEWAGE TREATMENT PLANT
RB RB

RB RB
RB RB
RB RB

RB RB
RB
RB
RB
RB
RB
RB
RB
RB

TITLE OF THE DRAWING : PROPOSED SEWERAGE SYSTEM FOR NEW TOWN


SEWAGE TITLE OF THE PROJECT : SANITARY PROJECT
DATE OF DRAWING : 21/07/2024
SCALE: 1:1

TREATMENT PLANT
NAME :
DRAWN BY:
USN :

PROJECT GUIDE 1: PROJECT GUIDE 2:


PROPOSED SEWERAGE SYSTEM FOR NEW TOWN CHECKED BY:

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE


TOWN PLANNING PROJECT
EXTENSIVE SURVEY PROJECT - 2024

SPECIFICATION
N RB RESIDENTIAL BUILDING

CB COMMERCIAL BUILDING

CZ CMC ZONE

WATER SUPPLY LINE

SEWER LINE

MARKET ELECTRIC STATION


AREA

TEMPLE

PUMP

MARCKET AREA

HOSPITAL

PARK

OVER HEAD TANK

MAN HOLE

SEWAGE TREATMENT PLANT

INSTITUTIONAL ZONE

WATER TREATMENT
PLANT

TITLE OF THE DRAWING : PROPOSED LAYOUT OF TOWN PLANNING


TITLE OF THE PROJECT : TOWN PLANNING

DATE OF DRAWING: -
SCALE : - 1:1

NAME: -
DRAWN BY: -
USN: -

PROPOSED LAYOUT FOR NEW TOWN CHECKED BY : -


PROJECT GUIDE 01 PROJECT GUIDE 02

DEPARTMENT OF CIVIL ENGINEERING, GMIT, DAVANAGERE