Unit Rate Basis: M/S. Kohinoor Enterprise
Unit Rate Basis: M/S. Kohinoor Enterprise
Kohinoor Enterprise
Bill of Quantities
Unit
Unit Total
Item Price Total Price
Price Price
Item Code
Group Description of Item Unit Quantity
no. (if In In Figures
In Words In Words
any) figures (BDT)
(BDT) (BDT)
(BDT)
Earth work in excavation in all kinds of soil for foundation trenches including. layout, providing center lines, local
Three
bench-mark pillars, leveling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk
Thousand
powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning
Nine Four
PART- the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the
1 1 Sqm 360.000 9.626 point Six 3465.360 Hundred
D Engineer, subject to submit method statement of carrying out excavation work to the Engineer for approval.
Two Six and Sixty-
However, Engineer`s approval shall not relieve the contractor of his responsibilities and obligations under the
Five point
contract. a) Layout and marking for earthwork in excavation in foundation accepted by the Engineer. [Plinth area of
Three Six
the structure shall be considered for measurement]
Two
Earth work in excavation in all kinds of soil for foundation trenches including. layout, providing center lines, local
Thousand
bench-mark pillars, leveling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk
Eight
powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning
Fifty-Eight Hundred
PART- the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the
2 2 Cum 48.000 58.626 point Six 2814.048 and
D Engineer, subject to submit method statement of carrying out excavation work to the Engineer for approval.
Two Six Fourteen
However, Engineer`s approval shall not relieve the contractor of his responsibilities and obligations under the
point Zero
contract. a) Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in soft
Four
clayey soil / loose sand / silt
Eight
Forty-
Five Four
Thousand Thousand
Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M. 1.2) and picked jhama chips including Five Two
breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply Hundred Hundred
PART-
3 3 of water, electricity and other charges and costs of tools and plants etc. all complete and accepted by the Cum 8.000 5529.126 and 44233.008 and
D
Engineer. (Cement: CEM-II/A-M) a) Mass concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. Twenty- Thirty-
1.2 Nine Three
point One point Zero
Two Six Zero
Eight
4 PART- 4 Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:6) in foundation and plinth, filling the Cum 22.000 3937.501 Three 86625.022 Eighty-Six
D joints/interstices fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours Thousand Thousand
/
before use and curing at least for 7 days etc. all complete including cost of water, electricity and other charges and Nine Six
accepted by the Engineer. (Cement: CEM-II/A-M) Hundred Hundred
and and
Thirty- Twenty-
Seven Five point
point Five Zero Two
Zero One Two
Six Thirty
Exposed brick works (for exterior wall without outside plaster) with automatic machine made first class bricks, very Thousand Thousand
carefully laid in cement sand (F.M. 1.2) mortar (1:4)) in superstructure with uniform width and depth joints, true to One Five
PART- vertical and horizontal lines including raking out joints scaffolding, soaking the bricks at least for 24 hours before Hundred Hundred
5 5 Cum 5.000 6111.001 30555.005
D use, washing and screening of sand. Curing at least for 7 days and high class flush pointing with cement sand and and Fifty-
(F.M. 1.2) mortar (1:1) including cost of water, electricity and other charges etc all complete and accepted by the Eleven Five point
Engineer. (Cement: CEM-II/A-M) point Zero Zero Zero
Zero One Five
Eighty-
Seven
Nine
Thousand
Sand filling in foundation trenches and plinth with coarse sand having min. F.M. 1.2 in 150mm in layers including Hundred
Six
PART- leveling, watering and compaction to achieve minimum dry density of 90% with optimum moisture content and
6 6 Cum 96.000 912.626 87612.096 Hundred
D (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only Twelve
and
etc. all complete and accepted by the Engineer. point Six
Twelve
Two Six
point Zero
Nine Six
One
Three Thousand
Hundred Two
Single layer brick flat soling in road work with first class or picked jhama bricks as per alignment, camber and and Hundred
PART-
7 7 grade including filling joints with sand (F.M. 0.50) etc. complete including cost of all materials and accepted by the Sqm 4.000 322.001 Twenty- 1288.004 and
D
Engineer. Two point Eighty-
Zero Zero Eight
One point Zero
Zero Four
Reinforced cement concrete works using wooden shutter with minimum cement content relates to mix ratio 1:1.5:3
having minimum fcr = 30 Mpa, and satisfying a specified compressive strength f c = 25 Mpa at 28 days on Three
Eight
standard cylinders as per standard practice of Code ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1- Lakh
Thousand
CEM 1 (32.5 N) / ASTM-C 150 Type ? I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm Thirty-
Three
down well graded stone chips conforming to ASTM C-33, making, placing shutter in position and maintaining true Two
PART- Hundred
8 8 to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer Cum 40.000 8312.501 332500.040 Thousand
D and
machine with hopper, fed by standard measuring boxes, casting in forms, compacting by vibrator machine and Five
Twelve
curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, Hundred
point Five
electricity, testing charges of materials and cylinders, other charges etc. all complete approved and accepted by point Zero
Zero One
the Engineer. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and Four
placing)Individual and continuous footings of column at plinth level.
9 PART- 9 Supplying, fabrication and fixing to details as per design : Ribbed or deformed bar reinforcement for Reinforced Kg 1884.000 71.751 Seventy- 135178.884 One Lakh
D Cement Concrete, produced and market in accordance with BDS ISO 6935-2: 2006 (or standard subsequently One point Thirty-
reieased form BSTI) including straightening and cleaning rust, if any, bending and binding in position with supply of Seven Five
G.I wires, splices or laps what so ever etc. complete in all resoects and accepted by the engineer ( Measurement Five One Thousand
shall be recorded only on standard mass per unit length of Bars, while, dia of bars execeeds its standard). Grade One
400 (RB 400/400W : Complying BDS ISO 6935-2:2006) ribbed or defomed bar produced and marked according to Hundred
/
Bangladesh Standard, with minimum yield strength within allowable limit as per BNBC sec 8.3.3.5/ACI 318-11 sec and
21.1.5.2, the ratio ultimate tenslle strengh fu to yieid strenth fy, shall be that least 1.25 and minimum elongation Seventy-
after fracture and minimum total elongation at maximun force is 16% and 8% respectively: up to ground floor. a) Eight
Ground Floor point
Eight
Eight
Four
Seven
One
Thousand
Hundred
Eight
Rule pointing to brick wall with cement sand (F.M. 1.2) mortar (1:2) with fresh cement and raking out the joints, and Thirty
PART- Hundred
10 10 scaffolding, curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as Sqm 60.000 130.376 point 7822.560
D and
per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) Three
Twenty-
Seven
Two point
Six
Five Six
Seven
Lakh
Thirty-
Two
Grand Thousand
732094.027
Total: AND
Ninety-
Four point
Zero Two
Seven
The work will include supply and carriage of all materials & labours in/c. accessories, labours, taxes, VAT, IT, Insurances unless otherwise specifically mentioned against the items of work.