0% found this document useful (0 votes)
99 views1 page

CC1855 2

Uploaded by

582w6m9hrs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views1 page

CC1855 2

Uploaded by

582w6m9hrs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CASE

ASME BPVC.CC.BPV-2023 1855-2

Approval Date: December 18, 2018


Code Cases will remain available for use until annulled by the applicable Standards Committee.

Case 1855-2 (2) For those portions constructed to Section I rules,


Section VIII, Division 1, Unfired Steam Boiler in Section I the materials shall be limited to those permitted by Sec-
System tion I.
Section I (c) Welds in unfired steam boilers shall be postweld
heat treated to the minimum holding time and tempera-
Inquiry: Code rules permit unfired steam boilers as de- ture requirements of Section VIII, Division 1 unless the
fined in the Preamble of Section I to be constructed under welds satisfy the exemptions in both Section I and Section
the provisions of Section I or Section VIII, Division 1. If it VIII, Division 1.
is desired to construct an unfired steam boiler under the (d) Stamping and Data Reports
provisions of Section VIII, Division 1, under what condi- (1) Those vessels or chambers constructed to Section
tions may it be installed in a Section I system? VIII, Division 1 rules shall be stamped with the ASME
Code “U” Symbol and additional marking required by
Reply: It is the opinion of the Committee that an unfired UG-116, and be documented with the ASME U-1 or U-1A
steam boiler constructed in accordance with the rules of Data Report. A nameplate per UG-119 shall be furnished
Section VIII, Division 1 [see UW-2(c)], may be installed and shall be marked “Case____.”
in a Section I system when the requirements of PG-58, (2) All portions constructed to the rules of Section I
PG-59, PG-60, PG-61, and PG-67 through PG-73 of Section shall be stamped with the applicable Section I Symbol
I, applicable to piping and protective devices, are satisfied and be documented with the applicable Section I data re-
by an appropriate Section I certificate holder, and when port forms. This Case number shall be shown on the Sec-
the following additional requirements are satisfied. tion I master stamping.
(a) When any steam drum is not an integral part of the (3) This Case number shall be shown on the Section
unfired boiler it shall be constructed in accordance with VIII Manufacturer's Data Report for the unfired steam
Section VIII, Division 1, including UW-2(c) or in accor- boiler and the Section I Master Data Report.
dance with Section I.
(b) Ma t er ia l s
(1) For those vessels or chambers constructed to Sec-
tion VIII, Division 1 rules, the materials shall be limited to
those permitted by Section VIII, Division 1;1

1
Except that any nonintegral steam drum, in water or steam service, shall be constructed of materials permitted by Section I, PG-9.1.

The Committee’s function is to establish rules of safety, relating only to pressure integrity, governing the construction of boilers, pressure vessels, transport
tanks and nuclear components, and inservice inspection for pressure integrity of nuclear components and transport tanks, and to interpret these rules when
questions arise regarding their intent. This Code does not address other safety issues relating to the construction of boilers, pressure vessels, transport tanks
and nuclear components, and the inservice inspection of nuclear components and transport tanks. The user of the Code should refer to other pertinent codes,
standards, laws, regulations or other relevant documents.