IP CV_09.2021
IP CV_09.2021
IP CV_09.2021
CORPORATE PROFILE
CURRICULUM VITAE
Head Office:
TABLE OF CONTENTS
INTRODUCTION ............................................................................................................................................................... 3
CONTRACTS THAT WE ARE CURRENTLY ENGAGED IN ............................................................................................. 6
DETAILS OF SOME CONTRACTS COMPLETED TO DATE ACROSS BORDER IN AFRICA ........................................ 7
DETAILS OF CONTRACTS – PER CATEGORY ............................................................................................................ 10
FIRE PROTECTION – SPRINKLER INSTALLATIONS ................................................................................................... 21
SPECIALIZED FIRE PROTECTION ................................................................................................................................ 22
CONTRACTORS AND PROFESSIONAL TEAMS WE HAVE WORKED FOR ............................................................... 23
INTRODUCTION
We take this opportunity of introducing our group and the services that we offer.
We are a contracting group of companies specialising in plumbing and drainage, mechanical services and fire control
installations on a national and continental basis.
Our head office is in Midrand and we have offices in Lusaka, Zambia.
SERVICES WE OFFER:
Design and construct services for fire and petro chemicals installations.
Pumping Stations.
CONTACT DETAILS
STATUTORY COMPLIANCE:
Registered with the CIDB (Construction Industry Development Board).
Current SARS tax clearance.
Up to date audited financial statements.
Members of IOPSA (Institute of Plumbing South Africa).
BBBEE Compliance
We welcome the opportunity to tender or negotiate with your company on any projects currently or in the future.
Please feel free to contact us at any time for more information.
Yours faithfully
DEREK ZIPP
CEO
CONTRACTOR / VALUE
CONTRACTS IN ZAMBIA % COMPLETE SERVICE
DEVELOPER ‘R’ millions ‘
Inter-Continental Hotel upgrade WBHO 22.8 50 Plumbing / Fire
Mukuba Property
Rhodes Park Heights Hotel 4.8 40 Plumbing
Development
Graduare Property
East Park Mall Phase 6 1.8 95 Plumbing
Services
VALUE
CONTRACT CONTRACTOR SERVICE
‘R’ millions
VALUE
CONTRACT CONTRACTOR SERVICE
‘R’ millions
VALUE
CONTRACT CONTRACTOR SERVICE
‘R’ millions
VALUE
HOSPITALS AND CLINICS CONTRACTOR SERVICE
‘R’ millions
VALUE
HOTELS & RESORTS CONTRACTOR SERVICE
‘R’ millions
VALUE
HOTELS & RESORTS CONTRACTOR SERVICE
‘R’ millions
VALUE
OFFICE BLOCKS CONTRACTOR SERVICE
‘R’ millions
JSE Building (New Park Towers) Group Five Building 3.5 Plumbing
Sandton
VALUE
OFFICE BLOCKS CONTRACTOR SERVICE
‘R’ millions
VALUE
COMMERCIAL / FACTORIES CONTRACTOR SERVICE
‘R’ millions
Soccer City – Nasrec (as JV) Grinaker LTA Interbeton 58.0 Plumbing
Jet Park Phase I, II and III (Factory LTA Building (Gauteng) 1.2 Plumbing
Complex)
VALUE
COMMERCIAL / FACTORIES CONTRACTOR SERVICE
‘R’ millions
VALUE
RESIDENTIAL / APARTMENTS CONTRACTOR SERVICE
‘R’ millions
Thlabane - 818 Houses and 240 Flats LTA Building (Gauteng) 5.4 Plumbing
VALUE
RESIDENTIAL / APARTMENTS CONTRACTOR SERVICE
‘R’ millions
Landrost Hotel into dwelling units Mboya Barrow Projects 1.6 Plumbing
VALUE
RESIDENTIAL / APARTMENTS CONTRACTOR SERVICE
‘R’ millions
VALUE
SHOPPING CENTERS CONTRACTOR SERVICE
‘R’ millions
East Rand Mall – Phase 1 and 2 Stocks & Stocks 6.0 Plumbing
The Core Shopping Centre Sunninghill G. Liviero & sons 3.5 Plumbing
Glen Shopping Centre (Including bulk CGM Joint Venture 2.2 Plumbing
services)
VALUE
SHOPPING CENTERS CONTRACTOR SERVICE
‘R’ millions
Wonder Park Shopping Centre Murray and Roberts 0.7 Temp plumbing
WITH REFERENCE TO OUR MECHANICAL AND FIRE CONTROL DIVISION, WE LIST SOME
CONTRACTS THAT OUR MANAGEMENT TEAM HAS BEEN INVOLVED WITH:
APPROX
CLIENT/CONTACT VALUE
CLIENT DESCRIPTION OF WORK
PERSON
R MILLION
Relocating and refurbishing of SO3
Hatch Africa –
Akulu Marchon plant complete including pumps, tanks 3.7
Mr. M Vos and associated switchgear.
2.4
SupraChem Mr. S. du Toit New gas manifolds for coke ovens
APPROX
CLIENT/CONTACT VALUE
CLIENT DESCRIPTION OF WORK
PERSON
R MILLION
Steam, condensate, calorifiers, hot &
Nkonjeni Hospital Delen & Oudkerk, Mr. B cold water pumps and associated 0.8
Oudkerk piping.
Edendale Hospital Delen & Oudkerk, Mr. B Steam and condensate for kitchen
equipment. 0.6
Oudkerk
Compressed air, hot & cold water,
Geest Foods Bosch Associates tanks, pumps, associated piping & 0.6
stainless steel process piping.
Sappi Lomati Mill TFD Steam, condensate and heating coils. 0.4
Steam, condensate, plant water and
CPC Tongaat Foods Mr. J. Butler 0.3
associated pumps.
APPROX
CLIENT/CONTACT VALUE
CLIENT DESCRIPTION OF WORK
PERSON
R MILLION
OR Thambo International Airport, Protection Services and Installation of fire sprinkler 21.5
CTB JV WBHO system
OR Tambo Int’l Airport –Dunhill Protection Services Installation of fire sprinkler 0.1
Smoking Lounge system
Watch Tower Watch Tower Bible and Fire Sprinkler Installation 7.5
Tract Society of South
Africa
APPROX
CLIENT/CONTACT VALUE
CLIENT DESCRIPTION OF WORK
PERSON
R MILLION
Khutala Mine Witbank Advanced Fire Mechanical & fire installation 9.0
BP Waltloo (Sidekicks) Mr. Ken Duncan Installation of pumps hydrant and 7.8
foam solution piping and
associated fire equipment.
Ceramic Industries Mr. Pieter de Lange Installation of pump & cooling 1.8
water supply.
Tosas Germiston Tosas (Pty) Ltd Mechanical & fire installation 1.7
(Part of Sasol Oils)
Watch Tower Watch Tower Bible and Fire Sprinkler Installation 7.5
Tract Society of South
Africa