0% found this document useful (0 votes)
89 views1 page

Toll Fee Notification Format

calculation type
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views1 page

Toll Fee Notification Format

calculation type
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

For the year 2024-2025

Light
Heavy
Commer
Car, Construction Oversiz
cial Three- Persona
Sl No User fee rates for 26.387 km length Jeep, Bus or Machinery or e
Vehicle, Axle l Car -
van or Truck Earth Moving vehicles
Light Commer Local
Light (Two Equipment or (seven
Goods cial Monthly
Motor Axles) Multi axle or more
Vehicle vehicles Pass
Vehicle vehicles (four axles)
or Mini
to six axles)
Bus

1 Base Rates 0.65 1.05 2.20 2.40 3.450 4.2 150


2 Base Rates A 0.65 1.05 2.2 2.4 3.450 4.2 150
Revised 3 Fixed increase (16*3%) B=A*48% 0.312 0.504 1.056 1.152 1.656 2.016 72
Base Rates 4 Revised Base rates C=A+B 0.962 1.554 3.256 3.552 5.106 6.216 222
5 WPI as on Jan 2007 D 208.8 208.8 208.8 208.8 208.800 208.8 208.8
Variable 6 WPI for Jan 2024 (151.1x1.641x1.873 = 464.420) E 464.42 464.42 464.42 464.42 464.420 464.42 464.42
increase 7 40% of increase in WPI (As % of revised base rates) F=(E-D)/D*0.4 0.489693 0.489693 0.489693 0.489693 0.490 0.489693 0.489693
8 Increase in base rates due to change in WPI G=C*F 0.471085 0.760984 1.594442 1.739391 2.500 3.043935 108.712
9 Revised Base rates (Cumulative) H=C+G 1.433085 2.314984 4.850442 5.291391 7.606 9.259935 330.712
Road 10 Road length in Kms (excluding length of bypass if any) I 26.387 26.387 26.387 26.387 26.387 26.387 26.387
Length 11 Structure on Road Length in Kms J 0.28 0.28 0.28 0.28 0.280 0.28 0.28
(Kms) 12 Net Road length without structures>60m (Kms) K=I-J 26.107 26.107 26.107 26.107 26.107 26.107 26.107
Bypass 13 Length of bypass costing more than Rs 10 crores L 0 0 0 0 0.000 0
Length 14 Length of structures>60m on bypass only (Km) M 0 0 0 0 0.000 0
(Kms) 15 Net Bypass length without structures>60m (Kms) N=L-M 0 0 0 0 0.000 0
Structure 16 Total length of structure>60m on road (On road & Bypass) O=J+M 0.28 0.28 0.28 0.28 0.280 0.28 0.28
Length
(Kms) 17 Converted equivalent road length for structures>60m(in Kms) P=O*10 2.8 2.8 2.8 2.8 2.800 2.8 2.8
18 Total tollable road length in kms Q=K+P 28.907 28.907 28.907 28.907 28.907 28.907 28.907
19 Fee for the road stretch R=Q*H 41.42619 66.91923 140.2117 152.9582 219.877 267.6769 6417.354
20 Fee for the bypass S=H*N*1.50 0 0 0 0 0.000 0
21 Fee for the whole section T=R+S 41.42619 66.91923 140.2117 152.9582 219.877 267.6769
22 Rounded off fee for single trip U 40 65 140 150 220 270
23 Prerounded fee for return trip V=T*1.50 62.13929 100.3788 210.3176 229.4374 329.816 401.5154
24 Rounded off fee for return trips W 60 100 210 230 330 400
25 Prerounded fee for monthly pass for 50 trips X=T*50*2/3 1380.873 2230.641 4673.724 5098.608 7329.249348789 8922.564
26 Rounded off fee for monthly pass valid for 50 single trip Y 1380 2230 4675 5100 7330 8920
Discounted Fee for the commercial vehicles registered within the
27
district Z=T*0.5 20.7131 33.45962 70.10586 76.47912 109.939 133.8385
Rounded off Fee for the commercial vehicles registered within the
28
district AA 20 35 70 75 110 135

You might also like