0% found this document useful (0 votes)
331 views20 pages

Time & Work WS

Uploaded by

ummarsuni45
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
331 views20 pages

Time & Work WS

Uploaded by

ummarsuni45
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

Join Telegram- Maths by Aditya Ranjan Time and work

Time and Work @le; vkSj dk;Z


(Practice Sheet With Solution)
1. A and B do a work in exactly 16 days, B and C 5. X can do a job in 10 days, Y in 15 days and Z
do the same work in exactly 12 days while C in 18 days. Y and Z begin the work but have
and A do the same work in about 10 days. If A, to leave after 3 days. How many days will X
B and C can together do the work in integral take to finish the job?
number of days, then C does the work alone in. X fdlh dke dks 10 fnuksa esa]
Y 15 fnuksa esa vkSj
Z 18
A vkSj B fdlh dke dks Bhd 16 fnuksa esa djrs B gSa] fnuksa esa dj ldrk gSA
Y vkSjZ dke 'kq: djrs gSa ysfdu
vkSjC mlh dke dks Bhd 12 fnuksa esa djrs gSa Ctcfd mUgsa 3 fnu ckn NksM+uk iM+rk gSA dk;Z dks X iwjk d
vkSjA mlh dke dks yxHkx 10 fnuksa esa djrs gSaAA] ;fn

r
dks fdrus fnu yxsaxs\
B vkSjC ,d lkFk dk;Z dks iw.kZ fnuksa esa dj ldrs gSa] rks 57

si
57
C vdsys ml dk;Z dks fdrus fnuksa esa djrk gSA (a) days (b) days
9 11
(a) 15 days (b) 16 days

an by
53
(c) 18 days (d) 20 days (c) days (d) 6.5 days
12
2. Two persons A and B can do a work alone in

n
6. To do a certain piece of work, B would take
29 days. A takes the rest of one day after every three times as long as A and C together and C
4 days and B takes the rest of one day after twice as long as A and B together. The three

ja
every 5 days. If A and B starts working
R s
together, then the work will be completed on.
men working together can complete the work
in 10 days. How long would B take by himself
nks O;fDrA vkSjB vdsys fdlh dk;Z dks 29 fnuksa esa dj
a th
to complete the same piece of work?
ldrs gSaAA çR;sd 4 fnuksa ds ckn ,d fnu dk vkjke fdlh dke dks djus esaB dks A vkSjC ds dqy le; ls
ysrk gS vkSj
B çR;sd 5 fnuksa ds ckn ,d fnu dk vkjke rhu xquk le; yxsxk vkSjC dks A vkSj B ds dqy le;
ysrk gSA ;fn
A vkSjB ,d lkFk dke djuk 'kq: djrs gSa] ls nqxquk le; yxsxkA rhuksa O;fDr feydj dke djrs gq,
ty a

rks dke iwjk gks tk,xkA 10 fnu esa dke iwjk dj ldrs gSaA
B dks vdsys mlh dke
(a) 15th day (b) 16th day dks iwjk djus esa fdruk le; yxsxk
di M

th
(c) 17 day (d) 18th day (a) 24 days (b) 30 days
3. 12 men and 16 boys can do a piece of work in (c) 40 days (d) 36 days
5 days and 13 men and 24 boys can do it in 4 7. Two men, A and B, working separately can mow
days. Compare the daily work done by a man a field in 10 and 12 hours respectively. If they
with that done by a boy. work for an hour alternately, B beginning at 9 am,
then at what time will the mowing be finished?
12 iq#"k vkSj 16 yM+ds ,d dke dks 5 fnuksa esa dj ldrs
nks vkneh]A vkSjB] vyx&vyx dke djrs gq, ,d •sr
gSa vkSj 13 iq#"k vkSj 24 yM+ds bls 4 fnuksa esa dj ldrs
dh ?kkl dks Øe'k% 10 vkSj 12 ?kaVs esa dkV ldrs gSaA
gSaA ,d vkneh }kjk fd, x, nSfud dk;Z dh rqyuk ,d
os ckjh&ckjh ls ,d&,d ?kaVs dke djrsBgSa]
lqcg 9 cts
yM+ds }kjk fd, x, nSfud dk;Z ls djsaA
ls dke 'kq: djrk gS] rks ?kkl dkVus dk dke fdrus cts
(a) 3 : 2 (b) 2 : 1
lekIr gksxk
(c) 4 : 7 (d) 3 : 1
(a) 7:30 pm (b) 8:00 pm
A

4. If 5 men and 3 boys can reap 23 hectares in 4


days and if 3 men and 2 boys can reap 7 (c) 8:30 pm (d) 9:00 pm
hectares in 2 days, then how many boys must 8. Ram can do a piece of work in 20 days which
assist 7 men in order that they may reap 45 Shyam can do in 30 days. They begin together
hectares in 6 days? with the condition that Ram shall leave the job
3 days before the actual completion of work.
;fn 5 iq#"k vkSj 3 yM+ds 4 fnuksa esa 23 gsDVs;j iQly What is the total number of days required to
dkV ldrs gSa vkSj ;fn 3 iq#"k vkSj 2 yM+ds 2 fnuksa esacomplete
7 the work? (approx)
gsDVs;j iQly dkV ldrs gSa] rks fdrus yM+dksa dks 7 iq#"kksa
jke ,d dke 20 fnu esa dj ldrk gS vkSj ';ke 30 fnu
dh lgk;rk djuh pkfg, rkfd os 6 fnuksa esa 45 gsDVs;j esa dj ldrk gSA os bl 'krZ ds lkFk dke 'kq: djrs gSa fd
iQly dkV ldsa\ jke dke ds okLrfod lekiu ls 3 fnu igys dke NksM+
(a) 1 (b) 2 nsaxsA dke iwjk djus ds fy, dqy fnuksa dh la[;k D;k gS
(c) 3 (d) 4 (yxHkx)

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs1


Join Telegram- Maths by Aditya Ranjan Time and work

(a) 14 days (b) 19 days nks O;fÙkQ veu vkSj Hkkuq Øe'k% 20 fnuksa vkSj 25 fn
(c) 27 days (d) 9 days ,d xîôk •ksn ldrs gSa vkSj ,d rhljk O;fÙkQ phuw ml
9. 25 days of Ram’s wages can be paid by a xîôs dks 50 fnuksa esa Hkj ldrk gSA rhuksa O;fÙkQ viu
certain sum of money. The same amount of 'kq: djrs gSa vkSj dqN le; ckn phuw dke NksM+ nsrk g
money is sufficient to pay Badriprasad’s wages ;fn 'kq#vkr ls xîôk •ksnus esa dqy 13 fnu yxrs gSa] rks
for 20 days. The number of days for which the
money will be sufficient to pay the wages of Kkr dhft, fd fdrus fnuksa ds ckn phuw us viuk dke
both if they work together is. NksM+ fn;k\
(a) 8.5 days (b) 7.5 days
jke dh 25 fnu dh etnwjh ,d fuf'pr jde ls pqdkbZ (c) 9.5 days (d) 8 days
tk ldrh gSA bruk gh iSlk cæhçlkn dh 20 fnuksa 13. dh Rohan takes twice the time taken by Sohan
etnwjh nsus ds fy, i;kZIr gSA ;fn os ,d lkFk dke djrs to complete a piece of work and half of the
gSa rks fdrus fnuksa ds fy, iSlk i;kZIr gksxkA time taken by Mohan to complete the work.
If all of them working together can complete
(a) 10 days (b) 11 days
the work in 12 days, in how many days Rohan
100 110 and Sohan working together can complete

r
(c) days (d) days that work?
9 9
jksgu ,d dk;Z dks iwjk djus esa lksgu }kjk fy, x, le;

si
10. A can do a job in 10 days. B can do in 12 days
and C can do in 15 days. All begin together but dk nksxquk le; ysrk gS vkSj eksgu }kjk fy, x, le;

an by
A leaves the work after 2 days and B leaves 3 dk vk/k le; ysrk gSA ;fn os lHkh ,d lkFk dk;Z djrs
days before the work is finished. How long did gq, 12 fnuksa esa dk;Z iwjk dj ldrs gSa] rks jksgu vk

n
the work last?
lksgu ,d lkFk dk;Z djrs gq, ml dk;Z dks fdrus fnuksa
A fdlh dke dks 10 fnuksa esa dj ldrk gSA
B, 12 fnuksa esa iwjk dj ldrs gSa\
esa dj ldrk gS vkSjC, 15 fnuksa esa dj ldrk gSA lHkh

ja
(a) 12 days (b) 14 days
R s
,d lkFk dk;Z 'kq: djrs gSa ysfdu
A, 2 fnu ckn dke (c) 21 days (d) 25 days
NksM+ nsrk gSBvkSjdke iwjk gksus ls 3 fnu igys dke14. A can do a piece of work in 18 days, B can do
a th
NksM+ nsrk gSA dke fdrus le; rd pyk\ it in 24 days and C can do it in 60 days.
Efficiency of D is twice the efficiency of C. If
(a) 5 days (b) 9 days A worked for 2 days, B worked for 4 days and
(c) 4 days (d) 7 days C worked for 6 days. How many days will D
ty a

11. Anamika can do a piece of work in 30 days an take to complete the remaining work alone?
Anjali can do the same work in 40 days. Anjali A fdlh dke dks 18 fnuksa esa dj ldrk gS] B mlh dke
di M

starts the work alone and works for 15 days dks 24 fnuksa esa dj ldrk gS vkSjC mlh dke dks 60
and left the work. After that remaining work
completed by Anamika and Arun together in fnuksa esa dj ldrk gSA
D dh {kerk C dh n{krk ls nksxquh
1 gSA ;fnA us 2 fnuksa ds fy, dk;Z fd;k]B us 4 fnuksa ds
7
2
days. In how many days can Arun do the fy, dk;Z fd;k vkSj C us 6 fnuksa ds fy, dk;Z fd;kA 'ks"k
whole work alone? dk;Z dks vdsys iwjk djusDesadks fdrus fnu yxsaxs\
vukfedk ,d dke dks 30 fnuksa esa dj ldrh gS vatyh 2 3
(a) 28 days (b) 28 days
mlh dke dks 40 fnuksa esa dj ldrh gSA vatyh vdsys dke 3 4
'kq: djrh gS vkSj 15 fnuksa ds fy, dke djrh gS vkSj 2 3
(c) 18 days (d) 18 days
dke NksM+ nsrh gSA mlds ckn 'ks"k dk;Z dks vukfedk vkSj 3 4
15. A, B and C can do a piece of work in 12, 18
1
v#.k us feydj 7 fnu esa iwjk fd;kA v#.k iwjs dke and 24 days, respectively. They all begin
A

2 together. A work continuously till it is finished,


dks vdsys fdrus fnuksa esa iwjk dj ldrk gS\ B leaves the work 2 days before its completion
(a) 15 days (b) 20 days and C leaves the work 4 days before its
completion. In what approximate time is the
(c) 30 days (d) 25 days work finished?
12. Two persons Aman and Bhanu can dig a pit A] B vkSjC ,d dke dks Øe'k% 12] 18 vkSj 24 fnuksa esa
in 20 days and 25 days respectively and a dj ldrs gSaA os lc ,d lkFk 'kq: djrs gSaA
A dk;Z lekIr
third person Cheenu can fill that pit in 50
days. All of the three persons start their work gksus rd dk;Z djrk gS]B dk;Z iwjk gksus ls 2 fnu igys
and after sometime Cheenu leaves the work. dk;Z NksM+ nsrk gS C dk;Z
vkSj iwjk gksus ls 4 fnu igys dk;Z
If total time taken to dig the pit from the NksM+ nsrk gSA dke fdrus vuqekfur le; esa lekIr tk;sxk\
beginning is 13 days, find after how many (a) 4 days (b) 7 days
days Cheenu left his work? (c) 5 days (d) 9 days

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs2


Join Telegram- Maths by Aditya Ranjan Time and work

16. A contractor decided to complete a work in 20. A group of men decided to do a job in 4 days,
90 days. He employed 250 men at the but 20 men dropped out everyday. Find the
beginning and another 150 men after 60 days number of men who initially decided to do the
and completed the work in stipulated time. job, if job was completed in 7 days?
Had he not employed the additional men, iq#"kksa ds ,d lewg us 4 fnuksa esa ,d dke djus dk iQSlyk
what percent more time he would have taken
to finish the work? fd;k] ysfdu 20 vkneh gj jkst ckgj fudy x,A iq#"kksa
,d Bsdsnkj us ,d dke dks 90 fnuksa esa iwjk djus dk dh la[;k Kkr dhft, ftUgksaus 'kq: esa dk;Z djus dk fu.kZ;
iQSlyk fd;kA mlus 'kq#vkr esa 250 yksxksa dks dke ij j•kfy;k] ;fn dk;Z 7 fnuksa esa iwjk fd;k tkrk gS\
vkSj 60 fnuksa ds ckn 150 yksxksa dks dke ij j•k vkSj r; (a) 70 (b) 110
le; esa dke iwjk dj fy;kA vxj mlus vfrfjDr yksxksa dks (c) 140 (d) 120
21.
dke ij ugha j•k gksrk] rks mls dke iwjk djus esa fdrus If 5 men and 5 women work together then they
can finish a work in 5 days but if 5 women
çfr'kr vf/d le; yxrk 40
(a) 27% (b) 30% work alone then they take more days than
3
(c) 20% (d) 50%

r
the time required by 5 men. Find efficiency of
17. Vijay can do a piece of work in 24 days. Rakesh one woman is how much percentage less than

si
can do the same work in 30 days and Vinod in one man?
40 days. Vijay and Vinod worked for 4 days and ;fn 5 iq#"k vkSj 5 efgyk,a ,d lkFk dk;Z djrs gSa rks os

an by
handed it to Rakesh. Rakesh worked for some
,d dk;Z dks 5 fnuksa esa lekIr dj ldrs gSa ysfdu ;fn 5
days and handed it again to Vijay and Vinod 6
days before completing the work. For how many efgyk,a vdsys dk;Z djrh gSa rks os 5 iq#"kksa }kjk fy, x

n
days did Rakesh work? 40
le; ls vf/d fnu ysrh gSaA ,d efgyk dh n{krk
fot; ,d dke dks 24 fnu esa iwjk dj ldrk gSA jkds'k 3

ja
mlh dke dks 30 fnuksa esa vkSj fouksn mlh dke dks 40 ,d iq#"k ls fdrus çfr'kr de gS\
R s
fnuksa esa iwjk dj ldrk gSA fot; vkSj fouksn us 4 fnu (a) 60% (b) 66.66%
a th
dke fd;k vkSj dke jkds'k dks lkSai fn;kA jkds'k us dqN (c) 40% (d) 62.5%
fnu dke fd;k vkSj dke iwjk gksus ls 6 fnu igys dke 3
dks fiQj ls fot; vkSj fouksn dks lkSai fn;kA jkds'k22.us A can do
5
th of work in 15 days. Efficiency
fdrus fnu dke fd;k of B is 25% more than that of A. Both A and B
ty a

(a) 5 days (b) 10 daysC started working together and left the work
after five days. C completed the remaining
(c) 8 days (d) 6 days
di M

work in 11 days. Efficiency of C is what


18. A can finish a work in 5 days and B takes 4 percent more/less than that of A ?
days to do the same work. If the work is
3
increased by 8 times, How many days will it A 15 fnu esa dke dj ldrk gSA B dh {kerk A dh
take for both of them to finish the work if they 5
work together? rqyuk esa 25» vf/d gSA A vkSjB nksuksa us ,d lkFk dke
A ,d dke dks 5 fnu esa iwjk dj ldrk gS vkSjB mlh djuk 'kq: fd;k vkSj ikap fnuksa ds ckn dke NksM+ fn;kA
dke dks djus esa 4 fnu ysrk gSA ;fn dk;Z dks 8 xquk c<+k C us 'ks"k dk;Z dks 11 fnuksa esa iwjk
C dh
fd;kA
{kerk A
dh
fn;k tkrk gS] rks nksuksa feydj dk;Z dks iwjk djus esa fdrus rqyuk esa fdrus çfr'kr vf/d@de gS\
fnuksa dk le; ysaxs\ (a) 20% less (b) 25% more
(a) 10 days (b) 15 days (c) 20% more (d) 25% less
(c) 25 days (d) 20 days 23. 5 Men can do a piece of work in 6 days. 6
Women can do 40% of same work in 4 days and
A

19. 12 students working for 5 hours a day can


solve a certain number of problems in 8 days. 3 Children can do 75% of same work in 6 days.
How many boys are needed to solve five times If 2 Men, 3 Women and 1 Child start work
the original number of problems, if they work alternately, then who will be the last to
at 4 hours a day for 15 days? complete the work?
12 Nk=k çfrfnu 5 ?kaVs dke djds 8 fnuksa esa ,d fuf'pr 5 iq#"k ,d dke dks 6 fnuksa esa dj ldrs gSaA 6 efgyk,a leku
la[;k esa leL;kvksa dks gy dj ldrs gSaA ;fn os 15 fnuksadk;Z dk 40» Hkkx 4 fnuksa esa dj ldrh gSa vkSj 3 cPps mlh
rd çfrfnu 4 ?kaVs dke djrs gSa] rks ewy la[;k ls ikap dk;Z dk 75» Hkkx 6 fnuksa esa dj ldrs gSaA ;fn 2 iq#"k] 3
xquk vf/d leL;kvksa dks gy djus ds fy, fdrus yM+dksa efgyk,a vkSj 1 cPpk ckjh&ckjh ls dke djuk 'kq: djrs gSa]
dh vko';drk gksxh rks dke iwjk djus okyk lcls vkf•j esa dkSu gksxk\
(a) 90 (b) 45 (a) Men (b) Women
(c) 40 (d) 100 (c) Child (d) Can’t be determined

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs3


Join Telegram- Maths by Aditya Ranjan Time and work

24. 3 workers Peroola, Rahul and Prashant can 28. If 10 men or 20 women or 40 boys can do a
complete a piece of work in 6 days. Peroola job in 7 months, then 5 men, 5 women and 5
takes 15 days less than Rahul to complete the boys can do half the work in,
same work. Find in how many days will ;fn 10 iq#"k ;k 20 efgyk,a ;k 40 yM+ds fdlh dke dks
Prashant complete the whole work alone with
7 eghus esa dj ldrs gSa] rks 5 iq#"k] 5 efgyk,a vkSj 5
75% of his original efficiency, if Rahul can
complete the work alone in 35 days? yM+ds vk/s dke dks fdrus fnuksa esa dj ldrs gSa\
(a) 6 months (b) 5 months
3 deZpkjh is:yk] jkgqy vkSj ç'kkar ,d dke dks 6 fnuksa
(c) 4 months (d) 8 months
esa iwjk dj ldrs gSaA is:yk leku dk;Z dks iwjk djus esa
29. A can do a work alone in 4 days and B can do
jkgqy ls 15 fnu de ysrk gSA Kkr dhft, fd ç'kkar viuh the same work alone in 6 days. If they work
ewy n{krk ds 75» ds lkFk vdsys iwjs dk;Z dks fdrus fnuksa
in alternate days with A starting the work, in
esa iwjk djsxk] ;fn jkgqy vdsys dk;Z dks 35 fnuksa esa iwjk
how many days will the work be completed?
dj ldrk gS\ A vdsys fdlh dke dks 4 fnuksa esa dj ldrk gS vkSj
B
560 499
vdsys mlh dke dks 6 fnuksa esa dj ldrk gSA ;fn os

r
(a)
37
days (b)
36
days ,dkarj fnuksa esa dke djrs gSaAvkSj
dke 'kq: djrk gS]
rks dke fdrus fnuksa esa iwjk gksxk\

si
361 555
(c) days (d) days 1 1
17 43 (a) 4 days (b) 3 days

an by
2 2
25. X can complete half of the work in 20 days
and Y can do one-fifth of the same work in 10 1 2
(d) 4 days

n
(c) 3 days
days. X started the work and left after 8 days. 4 3
Then Y took over to complete the remaining 30. A b u il d er ap p oi n ts th r ee co n st r uc t io n

ja
work. The total number of days taken by them workers Akash, Sunil and Rakesh on one of
R s
to complete the work is: his sites. They take 20, 30 and 60 days
respectively to do a piece of work. How many
X dke dk vk/k fgLlk 20 fnu esa iwjk dj ldrk gS vkSj
a th
days will it take Akash to complete the entire
Y mlh dke dk ik¡pok¡ fgLlk 10 fnu esa iwjk dj ldrk work if he is assisted by Sunil and Rakesh
gSAX us dke 'kq: fd;k vkSj 8 fnu ckn NksM+ fn;kA fiQj every third day?
Y us cpk gqvk dke iwjk djus dk ftEek laHkkykA dke iwjk,d fcYMj us viuh ,d lkbV ij rhu fuekZ.k Jfedksa
ty a

djus esa mUgsa dqy fdrus fnu yxs vkdk'k] lquhy vkSj jkds'k dks fu;qDr fd;kA os ,d dk;Z
(a) 50 days (b) 60 days dks djus esa Øe'k% 20] 30 vkSj 60 fnu ysrs gSaA vkdk
di M

(c) 40 days (d) 48 days dks iwjs dke dks iwjk djus esa fdrus fnu yxsaxs ;fn gj
26. 10 men or 15 women can complete a work in rhljs fnu lquhy vkSj jkds'k mldh lgk;rk djrs gSa\
30 days. In how many days can 15 men and (a) 10 days (b) 15 days
27 women complete the work? (c) 25 days (d) 30 days
31. P and Q can complete a project in 15 days
10 iq#"k ;k 15 efgyk,a ,d dk;Z dks 30 fnuksa esa iwjk dj and 10 days, respectively. They started doing
ldrs gSaA 15 iq#"k vkSj 27 efgyk,a dk;Z dks fdrus fnuksa the work together, but after 2 days, Q had to
esa iwjk dj ldrs gSa\ leave and P alone completed the remaining
work. In how many days was the whole work
1 1
(a) 9 (b) 5 completed?
11 11
P vkSj Q ,d ifj;kstuk dks Øe'k% 15 fnukas vkSj 10
1 1 fnuksa esa iwjk dj ldrs gSaA mUgksaus ,d lkFk dke
A

(c) 11 (d) 6
11 11 fd;k] ysfdu 2 fnuksa ds ckn
Q dks NksM+uk iM+kP vkSj
27. A can complete one-sixth of a work in 5 days us vdsys 'ks"k dke iwjk fd;kA iwjk dke fdrus fnuksa e
and B can complete one-fourth of the same
work in 15 days. In how many days, will both
lekIr gqvk\
working together complete the work? SSC CGL 01/12/2022 (Shift- 01)
A fdlh dk;Z dk NBk Hkkx 5 fnuksa esa iwjk dj ldrk gS (a) 11 (b) 12
vkSjB mlh dk;Z dk ,d&pkSFkkbZ Hkkx 15 fnuksa esa iwjk dj (c) 13 (d) 10
ldrk gSA nksuksa feydj dk;Z djrs gq, ml dk;Z dks fdrus
32. 6 men and 8 women can do a piece of work
in 10 days, whereas 26 men and 48 women
fnuksa esa iwjk djsaxs\
can do the same work in 2 days. What will
(a) 20 days (b) 25 days be the time taken by 15 men and 20 women
(c) 10 days (d) 12 days to do the same work?

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs4


Join Telegram- Maths by Aditya Ranjan Time and work

6 iq#"k vkSj 8 efgyk,a¡ ,d dke dks 10 fnuksa es dj 4


uqeu 5 le; esa xxu ls vk/k dke djrk gSA ;fn os
ldrs gSa] tcfd 26 iq#"k vkSj 48 efgyk,a mlh dke
dks 2 fnuksa esa dj ldrs gSaA mlh dke dks djus ds fy, ,d lkFk ,d dk;Z dks iwjk djus esa 16 fnu ysrs gSa] rks
15 iq#"kksa vkSj 20 efgykvksa dks fdruk le; yxsxk\ xxu dks ml dk;Z dks iwjk djus eas fdruk le; yxsxk\
SSC CGL 05/12/2022 (Shift- 01)
SSC CGL 01/12/2022 (Shift- 04)
(a) 23 days (b) 24 days
(a) 6 days (b) 10 days
(c) 25 days (d) 26 days
(c) 4 days (d) 8 days
37. A, B and C together can complete the work
33. A takes twice as much time as B and thrice
in 24 days. Efficiency of A is thrice of B and
as much time as C to finalise a task. Working
efficiency of C is 50% of A and B together.
together, they can complete the task in 8 days.
In how many days B alone complete the work?
The time (in days) taken by A, B and C,
respectively, to complete the task is: A, B vkSjC feydj 24 fnuksa esa dke iwjk dj ldrs gSaA
A fdlh dk;Z dks iwjk djus esa
B ls nksxquk vkSj
C ls A dh n{krkB dk rhu xquk gS vkSj
C dh n{krkA vkSj
B dh ,d lkFk n{krk dk 50» gSA fdrus fnuksa B esa
rhu xquk le; ysrk gSA ,d lkFk feydj dk;Z djrs gq,]

r
os 8 fnuksa esa dk;Z dks iwjk dj ldrs gSaA dk;Z dks vdsys
iwjk dke iwjk djrk gS\
(a) 36 days (b) 40 days
djus ds fy, Øe'k% A, B vkSj C }kjk fy;k x;k le;

si
(c) 144 days (d) 48 days
(fnuksa esa) Kkr dhft,A 38. A and B can complete the work in 20 days

an by
SSC CGL 02/12/2022 (Shift- 02) and 30 days respectively and after 5 days C
(a) 42, 21, 14 (b) 60, 30, 20 joined with them. C is twice the efficiency of

n
(c) 54, 27, 18 (d) 48, 24, 16 B. In how many days total work is completed?
34. Ruchi, Khushi and Teju can do a piece of work A vkSjB Øe'k% 20 fnuksa esa 30 fnuksa esa dke iwjk

ja
in 30, 40 and 60 days respectively. In how many ldrs gSa vkSj 5 fnuksa ds Cckn
muds lkFk tqM+ x;kA
R s
days can Ruchi do the work, if she is assisted C, B dh n{krk ls nksxquk gSA dqy dk;Z fdrus fnuksa
by both Khushi and Teju on every third day? iwjk gksrk gS\
a th
#fp] [kq'kh vkSj rstw ,d dk;Z dks Øe'k% 30] 40 vkSj 8 8
60 fnu esa iwjk dj ldrs gSaA ;fn [kq'kh vkSj rstw nksuksa
(a) 5 days (b) 6 days
9 9
gj rhljs fnu #fp dh lgk;rk djrs gSa] rks #fp fdrus 8 8
ty a

fnu esa dk;Z iwjk dj ldrh gS\ (c) 7


9
days (d) 8 days
9
SSC CGL 03/12/2022 (Shift- 01) 39. In the beginning Akash works at a rate such
di M

550 85 that he can finish a piece of work in 36 hours,


(a) days (b) days but he works at this rate for 12 hours. After
12 4
that he increased his efficiency by 33.33%. If
71 360 Akash is to finish this work at a stretch, how
(c) days (d) days
2 17 many hours will he take to finish this work?
35. A and B working separately can complete a 'kq#vkr esa vkdk'k bl nj ls dk;Z djrk gS fd og 36
piece of work in 10 and 16 days, respectively. ?kaVs esa ,d dk;Z [kRe dj ldrk gS] ysfdu og bl nj
If they work for a day alternately, with A ij 12 ?kaVs dk;Z djrk gSA blds ckn mUgksaus viuh dk;Z{
beginning the work, in how many day(s) will
(n{krk) esa 33-33 izfr'kr dh o`f¼ dhA ;fn vkdk'k
the work be completed?
dks bl dk;Z dks ,d gh ckj esa iwjk djuk gS] rks mls
A vkSj B vyx&vyx dk;Z djrs gq, ,d dk;Z dks
bl dk;Z dks iwjk djus esa fdrus ?kaVs yxsaxs\
Øe'k% 10 vkSj 16 fnuksa esa iwjk dj ldrs gSaA ;fn os (a) 32 (b) 30
A

,d fnu ds fy, ckjh&ckjh ls dk;Z djrs gSa]


A }kjk dk;Z
(c) 28 (d) 25
'kq: djus ds lkFk] dk;Z fdrus fnu@fnuksa esa iwjk40.
gksxk\
Efficiency of Pawan is 50% more than Ravish
SSC CGL 03/12/2022 (Shift- 04) and Ravish takes 21 days to complete a piece
1 1 of work. Pawan started the work alone and then
(a) 10 (b) 12 Ravish joined her 5 days before actual
4 4
completion of the work. For how many days
1 1
(c) 1 (d) Pawan worked alone?
4 4 iou dh n{krk joh'k ls 50» vf/d gS vkSj joh'k dk;Z
36. Numan does half of the work as Gagan in
4 dks iwjk djus esa 21 fnu dk le; ysrk gSA vdsys iou
5 us dk;Z 'kq# fd;k vkSj fiQj joh'k dk;Z ds Bhd iwjk
time. If together they take 16 days to complete
a piece of work, then how long will Gagan take
gksus ls 5 fnu igys mlds lkFk tqM+ x;kA vdsys iou us
to complete the work? fdrus fnuksa rd dk;Z fd;k\

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs5


Join Telegram- Maths by Aditya Ranjan Time and work

2 5 44. Efficiency of A is 30% more than that of B


(a) 5 (b) and B takes 39 days to complete a piece of
3 3
work. A started work alone and then B joined
11 19 him 6 days before the actual completion of
(c) (d) the work. How many days A worked alone?
3 3
41. A and C can do a piece of work in 14 days. C A dh {kerk B dh rqyuk esa 30» vf/d gS vkSj B ,d
and D can do the same work in 10.5 days. If dk;Z dks iwjk djus esa 39 fnu ysrkA vdsys
gSA dke 'kq:
the efficiency of B is seven times of C . A and djrk gS vkSj fiQj
B okLrfod dke iwjk gksus ls 6 fnu igys
D can do the same work in 8.4 days, find the
time taken by B to complete the work.
mlds lkFk tqM+ tkrkAgSA
us fdrus fnu vdsys dke fd;k\
A vkSj C ,d dke dks 14 fnuksa esa dj ldrs gSaAC (a) 16
5
days (b) 17
5
days
vkSjD leku dk;Z dks 10-5 fnuksa esa dj ldrs gSaA ;fn 13 13
B dh n{krk C dh lkr xquk gSA A vkSj D mlh dk;Z 5 5
dks 8-4 fnuksa esa dj ldrs gSa]
B }kjk dk;Z dks iwjk (c) 18 days (d) 19 days
13 13
djus esa fy;k x;k le; Kkr dhft,A

r
45. Two persons X and Y can do a piece of work
(a) 4 (b) 5 in 84 days and 72 days respectively. Another

si
(c) 6 (d) 7 3
person Z can do the same work in 17 more

an by
42. A Completes the work alone in 20 days. Ratio 13
of efficiency of A and B is 3:2. Ratio of time days as X and Y take together to complete the

n
between B and C is 3:4. A started the work. work. If on the first day X and Y work together
After 2 days, B joined with him. After 2 days and on the second day Y and Z work together
of work A left the work. B alone worked for 2 alternatively, then find how many days the

ja
R s
days, then C joined him. B and C worked for total work will be completed?
4 days then B left the work. Now C increased nks O;fDrX vkSjY ,d dk;Z dks Øe'k% 84 fnuksa vkSj
a th
its efficiency by 33.33% and finished the work.
Find the total time taken to finish the work.
72 fnuksa esa dj ldrs gSaA ,d vU; O;fDr
Z leku dk;Z

A vdsys dk;Z dks 20 fnuksa esa iwjk djrkA vkSj


gSA B dks 17
3
vf/d fnuksa eas dj ldrk gS tSlsX vkSjY
dh n{krk dk vuqikr 3 % 2 gSA B vkSjC ds chp le; 13
ty a

dk vuqikr 3 : 4 gSAA us dke 'kq: fd;kA 2 fnuksa ds ,d lkFk dk;Z dks iwjk djrs gSaA ;fn igys X
fnu
vkSj
ckn B mlds lkFk tqM+ x;kA 2 fnu ds dk;Z ds cknA Y ,d lkFk dk;Z djrs gSa vkSj nwljs Y
fnu
vkSjZ ,d
di M

us dk;Z NksM+ fn;kA vxys 2 fnuB rd vdsys dke lkFk oSdfYid :i ls dk;Z djrs gSaA rks Kkr dhft, fd
djrk gSAB vkSjC us 4 fnu dke fd;k fiQj B us dke dqy dk;Z fdrus fnuksa esa iwjk gksxk\
NksM+ fn;kA Cvcus viuh n{krk esa 33-33» dh o`f¼ 13 11
dh vkSj dk;Z lekIr dj fn;kA dk;Z dks iwjk djus esa (a) 24 days (b) 34 days
17 13
fy;k x;k dqy le; Kkr dhft,A
5 4
(a) 22 days (b) 23 days (c) 37 days (d) 28 days
7 9
(c) 25 days (d) 36 days 46. B is 20% less efficient than C. A is 20% more
43. A is 25% less efficient than B. A completes efficient than C. A and C working together can
the work in 16 days. A and B start the work, complete a work in 8 days. Then find the
after 5 days of work A leaves the work, B works number of days taken by A and B to complete
A

one day alone then C joins him and finishes the work with 50% of his efficiency.
the rest of the work in 1 day. Find how many B, C ls 20» de dq'ky gSAA, C ls 20» vf/d dq'ky
days will C alone complete the work.
gSAA vkSjC ,d lkFk dk;Z djrs gq, 8 fnuksa esa ,d
A, B ls 25» de dq'ky gSAA leku dk;Z dks 16 fnuksa dk;Z dks iwjk dj ldrs gSaAArks vkSj B }kjk viuh
eas iwjk djrk gSA
A vkSjB dke 'kq: djrs gSa] 5 fnuksa dk;Zdq'kyrk ds 50» ds lkFk dk;Z dks iwjk djus esa fy,
ds dke ds ckn A dke NksM+ nsrkBgS],d fnu vdsys x, fnuksa dh la[;k Kkr dhft,A
dke djrk gS fiQj C mlds lkFk tqM+ tkrk gS vkSj ckdh
dke dks 1 fnu esa [kRe dj nsrs gSaA Kkr dhft,C fd 2 1
(a) 18 days (b) 18 days
vdsys leku dk;Z dks fdrus fnuksa esa iwjk djsxkA 3 7
(a) 9.6 days (b) 9.3 days 1 3
(c) 17 days (d) 17 days
(c) 10.5 days (d) 11.36 days 5 5

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs6


Join Telegram- Maths by Aditya Ranjan Time and work

47. Person A can complete the same work in 10 50. 6 women can do a work in one day is equal
days more than the time taken by person B. to the work done by 4 men in a day. If a
Person C takes as much time to do a piece manager assigned 60 men to complete a work
of work as does person A and B together. C in 40 days. But in 25th day he realized only
can complete the same work in 12 days. In 1
how many days will persons A, B and C rd of the work was completed and he
3
complete the same work, if persons A is decided to appoint additional men to
accompanied by B and C on alternate days? complete the remaining work in given days.
O;fDr A leku dk;Z dks iwjk djus ds fy, O;fDr B Find the number of women equivalent to the
number of additional men appointed to
}kjk fy, x, le; ls 10 fnu vf/d le; esa iwjk dj complete the remaining work?
ldrk gSA O;fDrC dks fdlh dk;Z dks djus esa mruk gh 6 efgyk,a ,d fnu esa ,d dk;Z dj ldrh gSa tks ,d fnu
le; yxrk ftruk le; O;fDr A vkSjB dks ,d lkFk esa 4 iq:"kksa }kjk fd, x, dk;Z ds cjkcj gSA ;fn ,d
djus esa yxrk gSAC leku dk;Z dks 12 fnuksa esa iwjk dj izca/d us fdlh dk;Z dks 40 fnuksa esa iwjk djus ds fy, 60
ldrk gSA O;fDrA, B vkSjC mlh dk;Z dks fdrus fnuksa O;fDr;ksa dks fu;qDr fd;k gSA ysfdu 25 osa esa mls
fnu

r
esa iwjk djsaxs] ;fn O;fDr
A ds lkFk]B vkSjC oSdfYid ,glkl gqvk fd dsoy
1
dk;Z gh iwjk gqvk gS vkSj mlus
fnuksa esa lkFk vkrs gSa\ 3

si
'ks"k dk;Z dks fn, x, fnuksa esa iwjk djus ds fy, vfrfjDr
(a) 20 days (b) 30 days
iq#"kksa dks fu;qDr djus dk iQSlyk fd;kA 'ks"k dk;Z

an by
(c) 10 days (d) 5 days iwjk djus ds fy, fu;qDr vfrfjDr iq#"kksa dh la[;k ds
48. The time taken by A and B together to cjkcj efgykvksa dh la[;k Kkr dhft,\

n
complete a work is 9.6 hours and the time (a) 180 (b) 240
taken by B and C together to complete the (c) 200 (d) 210

ja
work is ___ hours and the time taken by A and 51. Amal completes 75% of the work in 45 days and
R s 33 Pavithra completes the work in 120 days. If Amal
C together to complete the work is 7 hours. and Pavithra started the work together after 15
a th
31 days both left and the remaining work is
C is 60% more efficient than B. Find the value, completed by Sheela and Divya in 45 days and
which can be filled in the blank? then Divya alone completes 50% of the work
,d lkFk A vkSjB }kjk ,d dk;Z dks iwjk djus esa fy;k in 72 days. In how many days Sheela alone
ty a

x;k le; 9-6 ?kaVs gS vkSj ,d lkFk


B vkSjC }kjk dk;Z completes the work?
dks iwjk djus esa fy;k x;k le; ------ ?kaVs gS vkSj ,d vey 45 fnuksa esa 75» dk;Z iwjk djrk gS vkSj ifo=kk
di M

lkFk A vkSjC }kjk dk;Z dks iwjk djus ds fy, fy;k 120 fnuksa esa dk;Z iwjk djrh gSA ;fn ,d lkFk vey
vkSj ifo=kk dk;Z 'kq: djrs gSa vkSj 15 fnuksa ds ck
33 nksuksa dke NksM+ nsrs gSa vkSj 'ks"k dke 'khyk vk
x;k le; 7 ?kaVs C, gSAB ls 60» vf/d dq'ky gSA
31 45 fnuksa esa iwjk djrs gSa vkSj fiQj vdsys fnO;k d
og eku Kkr dhft, ftls fjDr LFkku esa Hkjk tk ldrk gS\ dk 50»] 72 fnuksa esa iwjk djrh gSA vdsys 'khyk dk;
2 8 dks fdrus fnuksa esa iwjk djsxh\
(a) 6 hours (b) 11 hours (a) 144 days (b) 288 days
13 13
(c) 72 days (d) 180 days
10 3 52. A is 25% more efficient than B. If B works
(c) 10 hours (d) 9 hours with 20% more efficient than A then B
13 13
completes the work in 10 days. Find the
49. ‘A’ man can finish a work in B days and 0.8A number of days taken by A and B together to
A

woman can finish the same work in 2(B+4) complete the work, when they work on an
days. Then find how many days required for alternative day starts with A.
0.4A men to complete the same work, if 0.55A
A, B ls 25» vf/d dq'ky gSA ;fn B, A ls 20» vf/d
women can complete it in 128 days?
dq'kyrk ds lkFk dk;Z djrk gS rks
B ml dk;Z dks 10
'A' iq:"k ,d dke dks B fnuksa eas iwjk dj ldrs gSa vkSj fnuksa esa iwjk djrk gSA dk;Z dks iwjk djus ds fy, ,d
0.8A efgyk,a mlh dke dks2(B + 4) fnuksa esa iwjk dj lkFkA vkSjB }kjk fy, x, fnuksa dh la[;k Kkr dhft,
ldrh gSaA rks Kkr dhft, fd0.4A iq#"kksa dks mlh dk;Z tc os A ls 'kq: djds oSdfYid fnu ij dk;Z djrs gSA
dks iwjk djus ds fy, fdrus fnuksa dh vko';drk gksxh] 1 2
;fn 0.55A efgyk,a bls 128 fnuksa esa iwjk dj ldrh gSa\ (a) 13 days (b) 15 days
4 7
(a) 100 days (b) 124 days 5
3
(c) 168 days (d) 186 days (c) 14 days (d) 16 days
4 8

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs7


Join Telegram- Maths by Aditya Ranjan Time and work

53. Worker A alone can complete 40% work in 8 hours 56. If A alone can complete a work in 20 days and B
and time taken by worker B alone to complete alone can complete the same work in 30 days,
50% work is equal to that taken by worker A alone then which of the following statements is/are
to complete 75% work. If ratio of B’s efficiency correct?
to C’s efficiency is 1: 2, then in what time A and A vdsyk fdlh dk;Z dks 20 fnuksa esa iwjk dj ldrk gS vkSj
C together will complete the work? B vdsyk mlh dk;Z dks 30 fnuksa esa iwjk dj ldrk gS] rks
vdsyk dk;ZdrkZ A 40» dk;Z dks 8 ?kaVs esa iwjk dj ldrk fuEufyf[kr esa ls dkSu&lk@ls dFku lgh gS@gSa\
gS vkSj vdsys dk;ZdrkZB }kjk 50» dk;Z dks iwjk djus I. Ratio of efficiency of A and B is 3 : 2.
esa fy;k x;k le; vdsys dk;ZdrkZA }kjk 75» dk;Z dks A vkSjB dh n{krk dk vuqikr 3 %2 gSA
Il. Working together A and B can complete the
iwjk djus ds fy, x, le; ds cjkcj gSA ;fn B dh
same work in 12 days.
n{krk lsC dh n{krk dk vuqikr 1 % 2 gS] rks ,d lkFk A vkSjB ,d lkFk dk;Z djrs gq, mlh dk;Z dks
12 fnuksa
A vkSjC dk;Z dks fdrus le; esa iwjk djsaxs\ esa iwjk dj ldrs gSaA
6 4 SSC CHSL 10/03/2023 (Shift-02)
(a) 9 hours (b) 8 hours
7 7 (a) Neither I nor II

r
(b) Both I and II
5 3

si
(c) 6 hours (d) 7 hours (c) Only II
7 7 (d) Only I
54. B can complete work 1 alone in 20 days and 57. A, B and C together can finish a piece of work in

an by
work 2 in 18 days. A is 33.33% more efficient 20 days. A alone can finish the work in 40 days.
in work 1 than B and 40% less efficient in work What part of the work B and C together can finish

n
2 than B. A complete work 1 with help of C in in a day ?
10 days, at same time A complete work 2 with A, B vkSjC feydj ,d dk;Z dks 20 fnuksa esa lekIr dj

ja
help of C. Find the difference of time taken by
ldrs gSaA
A vdsyk40 fnuksa esa dke [kRe dj ldrk BgSA
vkSj
R s
C alone to complete work 1 and work 2 alone?
C feydj dk;Z dk fdruk Hkkx ,d fnu esa iwjk dj ldrs gSa\
B vdsys dk;Z 1 dks 20 fnuksa esa iwjk dj ldrk gS vkSj
a th
SSC CHSL 14/03/2023 (Shift-03)
dk;Z 2 dks 18 fnuksa esa iwjk dj ldrkA]gSA
dk;Z 1 esa
1 1
B ls 33-33» vf/d dq'ky gS vkSj dk;Z 2 esa B ls (a) (b)
5 20
40» de dq'ky gSAA] C dh enn ls dk;Z 1 dks 10
ty a

1 1
fnuksa esa iwjk djrk gS] mlhA]le;C dh enn ls dk;Z (c) (d)
10 40
2 dks iwjk djrk gSA
C }kjk vdsys dk;Z 1 dks iwjk djus58. Ram alone can do a work in 5 days working 4
di M

vkSj dk;Z 2 dks iwjk djus esa fy, x, le; dk varj hours a day. Seema alone can do the same work
Kkr dhft, in 3 days working 10 hours a day. How many
hours do they need to work together in a day to
(a) 15 days (b) 14 days complete the same work in 6 days?
(c) 18 days (d) 12 days jke vdsyk ,d fnu esa 4 ?kaVs dke djds fdlh dk;Z dks 5
55. To do a certain task X would take 3 times as fnuksa esa dj ldrk gSA lhek mlh dk;Z dks vdsys 10 ?ka
long as Y and Z together; and Z would takes izfrfnu dke djds 3 fnuksa esa dj ldrh gSA blh dk;Z dks 6
4 times as long as Y and X together. Three fnuksa esa iwjk djus ds fy, mUgsa lkFk feydj ,d fnu esa fdru
of them together can complete the task in 10 ?kaVs dke djuk iM+sxk\
days. How much time is taken by X and Z to
complete the task? SSC CHSL 17/03/2023 (Shift-04)
(a) 1 hour (b) 3 hours
,d fuf'pr dke djus ds fy, X dks] mlh dke dksY
A

(c) 5 hours (d) 2 hours


vkSjZ dks ,d lkFk feydj djus esa yxs le; ls 3 xquk 1
le; yxrk gS] vkSj Z dks] Y vkSj X dks ,d lkFk 59. S does half as much work as T in 8 of the time
feydj djus esa yxsa le; ls 4 xquk le; yxrk gSA rhuksa taken by many days shall S alone take to complete
feydj dke dks 10 fnuksa esa iwjk dj ldrs X gSaA
vkSjZ that work ?
dks ,d lkFk feydj dke iwjk djus esa fdruk le; yxsxk\ T }kjk fy, x, le; ds
1
Hkkx esa
S, T ls vk/k dk;Z djrk
8
SSC CPO 09/11/2022 (Shift-01)
gSA ;fn os feydj fdlh dk;Z dks 60 fnuksa esa iwjk djrs gSa]
2 1 S vdsys mlh dk;Z dks fdrus fnuksa esa iwjk djsxk\
(a) 18 days (b) 20 days
9 9
SSC CHSL 17/03/2023 (Shift-03)
2 2 (a) 80 days (b) 90 days
(c) 20 days (d) 22 days
9 9 (c) 75 days (d) 100 days

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs8


Join Telegram- Maths by Aditya Ranjan Time and work

60. 4 men and 7 women can do a work in 8 days. 7 28


men and 4 women can do the same work in 5 (a) (b) 4
days. Find the number of days in which 8 women 8
can finish the work ? 32
(c) (d) 32
4 iq#"k vkSj 7 efgyk,¡ fdlh dke dks 8 fnuksa esa dj ldrs gSaA 7
7 iq#"k vkSj 4 efgyk,¡ leku dk;Z dks 5 fnuksa esa dj ldrs65.
gSaA
15 men and 21 women, working together, can do a
Kkr dhft, fd 8 efgyk,¡ ml dk;Z dks fdrus fnuksa esa iwjk job in 56 days, while 12 men and 24 women,
dj ldrh gSa\ working together, can do the same job in 64 days.
In how many days can the same job be done by 18
SSC CHSL 16/03/2023 (Shift-01)
men and 24 women, working together?
(a) 60 days (b) 55 days
(c) 40 days (d) 45 days 15 iq#"k vkSj 21 efgyk,¡ ,d lkFk dke djds ,d dke 56
61. A certain number of persons can complete a fnuksa esa dj ldrs gSa] tcfd 12 iq#"k vkSj 24 efgyk,¡ ,d
work in 90 days. If there be 10 persons less, it lkFk dke djds mlh dke dks 64 fnuksa esa dj ldrs gSaA 18
would have taken 10 days more for the work to
be completed. Find the total numbers of persons
iq#"k vkSj 24 efgyk,¡ ,d lkFk dke djds mlh dke dks
fdrus fnuksa esa dj ldrs gSa

r
in the begining.
,d fuf'pr la[;k esa dqN O;fDr fdlh dk;Z dks 90 fnuksa esa SSC CGL TIER I 17/07/2023 (Shift-04)

si
iwjk dj ldrs gSaA ;fn 10 O;fDr de dj fn, tk,] rks dk;Z 6 5
iwjk gksus esa 10 fnu vf/d yxsaxsA 'kq:vkr esa O;fDr;ksa
(a)dh47 (b) 47

an by
19 19
dqy la[;k Kkr dhft,A 9 3
SSC CHSL 20/03/2023 (Shift-01) (c) 47 (d) 47

n
19 19
(a) 90 (b) 110 66. A and B are equally efficient, and each could
(c) 85 (d) 100 individually complete a piece of work in 30

ja
62. A alone can complete a work in 20 days with
R s
full efficiency. If the efficiency of A decreases
days, if none took any holiday. A and B started
working together on this piece of work, but A
by 20 %, then A alone can do the same work in
a th
took a day off after every four days of work,
how many days? while B took a day off after every five days of
A vdsys iwjh n{krk ds lkFk fdlh dk;Z dks 20 fnuksa esa iwjk
work. If the both had started work on 01 August
dj ldrk gSA ;fn A dh n{krk 20» de gks tkrh gS] rks
A 2022, on which date was the work completed?
vdsyk mlh dk;Z dks fdruh fnuksa esa dj ik,xk\
ty a

A vkSjB leku :i ls dq'ky gSa] vkSj ;fn dksbZ Hkh Nqêðh


SSC CHSL 20/03/2023 (Shift-04) ugha ysrk gS] rks çR;sd O;fDr 30 fnuksa esa ,d dke iw
di M

(a) 30 (b) 20
dj ldrk gSA A vkSj B us bl dke ij ,d lkFk dke
(c) 25 (d) 36
63. A's efficiency is twice that of B's. A can work djuk 'kq: fd;k] ysfdu A us gj pkj fnu ds dke ds
only for 8 hours a day while B can work for 12 ckn ,d fnu dk vodk'k fy;k] tcfd B us gj ik¡p
hours a day. If A can finish a work in 12 days, in fnu ds dke ds ckn ,d fnu dk vodk'k fy;kA ;fn
how many days can B finish the same work? nksuksa us 01 vxLr 2022 dks dke 'kq: fd;k Fkk] rks fdl
A dh dk;Z {kerkB dh dk;Z {kerk ls nksxquh A gSA
,d fnu rkjh• dks dke iwjk gqvk
esa dsoy 8 ?kaVs dk;Z djrk gS] tcfd
B ,d fnu esa 12 ?kaVs
SSC CGL TIER I 18/07/2023 (Shift-03)
dk;Z djrk gSA ;fnA fdlh dk;Z dks 12 fnuksa esa iwjk dj
(a) 19 August 2022
ldrk gS] rksB ml dk;Z dks fdrus fnuksa esa iwjk djsxk\
(b) 17 August 2022
CGL PRE, 14/07/2023 (Shift-3)
(c) 16 August 2022
(a) 8 (b) 10
A

(c) 16 (d) 12 (d) 18 August 2022


64. To do a certain work, Ajay and Bharat work on 67. A alone can finish a work in 15 days. A works
alternate days, with Bharat starting the work only for the first two days and last two days.
on the first day. Ajay can finish the work alone The rest work is done by B and the work is
in 32 days. If the work gets completed in exactly completed in 20 days. In how many days A and
8 days, then Bharat alone can finish 7 times B together can finish the work?
the same work in ____ days.
A vdsys fdlh dk;Z dks 15 fnuksa esa iwjk dj ldrk gS vkSj
,d fuf'pr dk;Z dks djus ds fy, vt; vkSj Hkjr ,dkarj
og
fnuksa esa dk;Z djrs gSa] Hkjr igys fnu ls dk;Z 'kq: djrk gSA dsoy igys nks fnu vkSj vkf•jh nks fnu ds nkSjku
vt; 32 fnuksa esa vdsyk dk;Z iwjk dj ldrk gSA ;fn dk;Z dk;Z djrk gSA 'ks"k dk;Z B }kjk fd;k tkrk gS vkSj dk;Z
20
Bhd 8 fnuksa esa iwjk gks tkrk gS] rks Hkjr vdsyk mlh dk;Z dk fnuksa esa iwjk gksrk
A vkSj
gSAB feydj ml dk;Z dks
7 xquk____ fnuksa esa iwjk dj ldrk gSA fdrus fnuksa esa iwjk dj ldrs gSa\
CGL PRE, 14/07/2023 (Shift-4) SSC CGL TIER I 18/07/2023 (Shift-03)

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs9


Join Telegram- Maths by Aditya Ranjan Time and work

90 80 71. A group of men decided to do a job in 13 days


(a) (b) but 9 men left the work after each day. The
8 7
work, as a result, got completed in 16 days.
80 70 How many men were initially in the group?
(c) (d)
9 8 iq#"kksa ds ,d lewg us 13 fnuksa esa ,d dk;Z djus dk iQSly
68. A man and a woman can finish a work together
in half the time taken by a woman and a boy
fd;k ysfdu çR;sd fnu ds ckn 9 iq#"k dk;Z NksM+rs x,A
together. A boy can finish the work alone in 20 ifj.kker%] dk;Z 16 fnuksa esa iwjk gks ik;kA çkjaHk esa
days and 2 women together can finish it in 30 fdrus iq#"k Fks\
days. In how many days will the work be SSC CGL (PRE) 25/07/2023 (Shift-1)
finished by 4 men?
(a) 378 (b) 360
,d iq#"k vkSj ,d efgyk feydj ,d dk;Z dks] ,d efgyk
(c) 330 (d) 380
vkSj ,d yM+ds }kjk feydj fy, x, le; ls vk/s le; 72. 10 women take 16 days to complete a work
esa iwjk dj ldrs gSaA ,d yM+dk vdsys bl dk;Z dks 20 which can be completed by 6 men in 8 days.
fnu esa iwjk dj ldrk gS vkSj 2 efgyk,a¡ feydj mls 30 12 men started working and after 2 days 6 men

r
fnu esa iwjk dj ldrh gSaA 4 iq#"k dk;Z dks us fnu
fdr esa left, and 5 women joined them. In how many
iwjk djsax
s\ days will the work be completed ?

si
SSC CGL TIER I 18/07/2023 (Shift-04) 10 efgyk,a fdlh dk;Z dks iwjk djus16
esafnu ysrh gSa] ftls
6 iq#"k8 fnuksa esa iwjk dj ldrs gSaA12;fn
iq#"kksa us dk;Z

an by
(a) 2 (b) 2.14
(c) 2.5 (d) 3 djuk 'kq: fd;k vkSj 2 fnuksa ds ckn
6 iq#"k dk;Z NksM+ nsrs

n
69. A and B can individually complete a piece of gSa vkSj
5 efgyk,¡ muds lkFk 'kkfey gks tkrh gSa] rks dk;Z
work in 18 days and 30 days, respectively. A fdrus fnuksa esa iwjk gks tk,xk\

ja
and B started working together, but A left
SSC CGL (PRE) 26/07/2023 (Shift-3)
2
R s
16 days before the work is completed and B 3 8
a th
3 (a) (b)
alone completed the rest of the work. For how 2 2
many days did A work? 5 26
A vkSj B vyx&vyx ,d dk;Z dks Øe'k% 18 fnu vkSj (c) (d)
2 5
30 fnu esa iwjk dj ldrs gSaAA vkSj B ,d lkFk dk;Z 73.
ty a

(N + 18) persons, each working for 7.5 hours a


2 day, can complete 48% of a work in 20 days.
djuk 'kq: djrs gSa] ysfduA dk;Z iwjk gksus16ls fnu
di M

3 (N + 12) persons can complete the remaining


igys dke NksM+ nsrk gSBvkSj vdsys 'ks"k dk;Z dks iwjk work in 30 days, if each of them works for 6.5
djrk gSAA us fdrus fnuksa rd dk;Z fd;k\ hours per day. Determine the value of N.
SSC CGL TIER I 20/07/2023 (Shift-01) (N + 18) O;fDr ftlesa ls çR;sd gj fnu 7-5 ?kaVs dk;Z
(a) 4 (b) 5 dj jgk gS] 20 fnu esa 48» dk;Z iwjk dj ldrs gSaA
(N +
(c) 6 (d) 3 12) O;fDr 'ks"k dk;Z 30 fnu esa iwjk dj ldrs gSa] ;fn
70. P and Q can do a job in 24 days, Q and R can muesa ls çR;sd gj fnu 6-5 ?kaVs dk;Z djrk
N dk
gSAeku
do it in 30 days, while P and R can do it in Kkr djsaA
40 days. X is four times as efficient as P, Y is
half as efficient as Q, and Z is 2.5 times as SSC CGL TIER I 19/07/2023 (Shift-01)
efficient as R. Determine the number of days (a) 18 (b) 16
required to complete the same job if X, Y and (c) 20 (d) 22
A

Z work together. 74. 20 women and 15 men together can complete


P vkSj Q ,d dk;Z dks 24 fnuksa esa iwjk dj ldrs Q
gSa] a work in 6 days. It takes 150 days for a single
vkSjR blh dk;Z dks 30 fnuksa esa iwjk dj ldrs gSa] tcfd woman to complete the work. In how many
P vkSjR ml dk;Z dks 40 fnuksa esa iwjk dj ldrs
X,gSaA
P days can a single man complete the work?
ls pkj xquk dq'ky gS]
Y, Q dk vk/k dq'ky gS] vkSj
Z, R 20 efgyk,¡ vkSj 15 iq#"k feydj ,d dk;Z dks 6 fnuksa esa
ls 2-5 xquk dq'ky gSA ;fnX, Y vkSj Z ,d lkFk dk;Z iwjk dj ldrs gSaA ,d vdsyh efgyk dks dke iwjk djus esa
djrs gSa] rks leku dk;Z dks iwjk djus ds fy, vko';d 150 fnu yxrs gSaA ,d vdsyk iq#"k fdrus fnuksa esa dke iw
fnuksa dh la[;k Kkr dhft,A dj ldrk gS\
SSC CGL TIER I 20/07/2023 (Shift-03) SSC CGL PRE, 25/07/2023 (Shift-4)
(a) 9 (b) 12 (a) 450 (b) 225
(c) 8 (d) 10 (c) 350 (d) 210

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs10


Join Telegram- Maths by Aditya Ranjan Time and work

75. 4 men's work is equal to 6 women's work, and 76. A group of men decided to do a job in 11 days
4 women's work is equal to 6 boys' work. A boy but 16 men left the work after each day. The
can finish the work in 60 days. In how many work, as a result, got completed in 15 days.
days can the work be finished by a man and a Ho w ma ny m en w er e th er e in it ia ll y in
woman together? the group?
4 iq#"kksa dk dk;Z
6 efgykvksa ds dk;Z ds cjkcj gS vkSj 4 iq#"kksa ds ,d lewg11usfnuksa esa ,d dke djus dk iSQlyk
efgykvksa dk dk;Z6 yM+dksa ds dk;Z ds cjkcj gSA ,d yM+dkfd;k ysfdu izR;sd fnu ds ckn16 iq#"k dke NksM+ nsrs Fks
dk;Z dks60 fnu esa iwjk dj ldrk gSA ,d iq#"k vkSj ,d efgyk ifj.kke Lo:i] dke 15 fnuksa esa iwjk gks x;kA rks crkb, fd
}kjk feydj dk;Z dks fdrus fnu esa iwjk fd;k tk ldrkS\g 'kq:vkr esa lewg esa fdrus iq#"k Fks\
SSC CGL (PRE) 26/07/2023 (Shift-1) SSC CGL (PRE) 26/07/2023 (Shift-1
(a) 16 (b) 24 (a) 400 (b) 480
(c) 20 (d) 12 (c) 420 (d) 450

Answer Key

r
si
1.(b) 2.(c) 3.(b) 4.(b) 5.(a) 6.(c) 7.(b) 8.(a) 9.(c) 10.(d)

an by
11.(b) 12.(a) 13.(b) 14.(c) 15.(b) 16.(c) 17.(b) 18.(d) 19.(c) 20.(c)

n
21.(b) 22.(b) 23.(a) 24.(a) 25.(d) 26.(a) 27.(a) 28.(c) 29.(d) 30.(b)

ja
R s
a th
31.(b) 32.(c) 33.(d) 34.(b) 35.(b) 36.(d) 37.(c) 38.(d) 39.(b) 40.(a)

41.(c) 42.(b) 43.(a) 44.(d) 45.(b) 46.(d) 47.(c) 48.(b) 49.(a) 50.(d)
ty a

51.(a) 52.(a) 53.(b) 54.(a) 55.(d) 56.(b) 57.(d) 58.(d) 59.(c) 60.(b)
di M

61.(d) 62.(c) 63.(c) 64.(d) 65.(d) 66.(d) 67.(c) 68.(b) 69.(b) 70.(d)

71.(b) 72.(d) 73.(a) 74.(a) 75.(a) 76.(c)


A

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs11


Join Telegram- Maths by Aditya Ranjan Time and work

SOLUTIONS
1. (b) A + B 16 Days 5. (a) x  10 9
15
B + C 12 Days 20 240 y  15 6 90
C + A 10 Days 24 z  18 5
A, B, C together can do the whole work Work done by y and z = 3 × 11 = 33
remaining work = 90 – 33
59
~ 30 days 57
2 Time taken by x = Days
then, 9
C's efficiency 30 – 15 = 15 6. (c) B 1 3 C 1 4
  (effi)   
240 AC 3 3 AB 2 4

r
C can do whole work = = 16 days
15
A B C

si
2. (c) A 29 effi  : :
1 5 3 4
29

an by
Total work = 12 × 10
B 29 1
120
ATQ,

n
Time taken (B) = = 40 days
Days Work 3
4 4×2=8 7. (b) ATQ,

ja
5th day A rest B work
R s A  10 6
60
Next day B rest A work
B  12 5
a th
then,
B  1 hour  5
6 10
A  1 hour  6
6 10
 2 hour  11 unit
2× ×2
ty a

Days Work
12 20
4+ +4×2 2 11 unit
2×5 11 × 5 = 55 unit
di M

16 28
Work done  17th day Remaining work done by B alone = 1 day
3. (b) (12M + 16B) × 5 = (13M + 24B) × 4 then,
60M + 80B = 52M + 96B Total time = 11 hours
8M = 16B 9 am + 11 hours = 8 pm
8. (a)
M 2 Ram  20 Days 3
 60
B 1 Shyam  30 Days 2
4. (b) 4 × (5M + 3B) = 23 hectars Total work = 60 + 3(3) = 69
2 × (3M + 2B) = 7 hectars
 20M + 12B = 23 ......(1) 69
Time taken to complete work =
(6M + 4B = 7) × 3 ......(2) 5
on solving (1) and (2) = 14 Days (approx)
A

2M = 2 9. (c) 25 × Ram = 20 × Badriprasad


M=1
Ram 4
1 
and B = Badriprasad 5
4
ATQ, Total work = 25 × 4
6(7M + xB) = 45 100
Total time (working together) = days
 1  9
 6 7  x 
  45
 4  10. (d) A  10
3 6
 x 3 x=2 B  12 5 60
2 4
No of boys = 2 C  15

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs12


Join Telegram- Maths by Aditya Ranjan Time and work

Work done by A in 2 Days = 6 × 2 = 12 15. (b) A  12


Work done by B in 3 days = 3 × 5 = 15 6
B  18 4 72
Total work = 60 – 12 + 15 = 63 3
C  24
63 Work done by B in 2 days = 4 × 2 = 8
Time taken by (B + C) = = 7 days
9 Work done by C in 4 days 4 × 3 = 12
11. (b) ATQ, total work = 72 + 12 + 8
Anamika  30 Days 4 92
120 time taken (A + B + C) = = 7 days (approx)
Anjali  40 Days 13
3
16. (c) Total work = 250 × 60 + 400 × 30
Work done by Anjali in 15 Days = 15 × 3 = 45
= 15000 + 12000 = 27000
Remaining work = 120 – 45 = 75
If he had now employee additional men
75
(Anamika + Arun) efficiency = 2 27000

r
15 time taken = = 108 days
250
Efficiency of Arun = 10 – 4

si
extra time = 18 days
120
Time taken by Arun = = 20 Days 18

an by
6 =  100 = 20%
90
12. (a) Aman  20 Days

n
5 17. (b) Vijay  24 days
Bhanu  25 Days 4 100 4 5 120
Rakesh  30 days

ja
Cheenu  50 Days 2 3
R s Vinod  40 days
Let Cheenu left after x days, but Aman and Work done by Vijay and Vinod = 4 × 8 = 32
a th
Bhanu both work for all 13 Days
Remaining work = 88
So, Work done (Aman + Bhanu) = 13 × 9
Work done by Vijay and Vinod in 6 days
= 117 unit
= 6 × 8 = 48
ty a

Extra work = 117 – 100 = 17


Remaining work = 40
17
Time taken by – Cheenu  = 8.5 days
di M

2 40
Time taken (Rakesh) = = 10 Days
4
So, x = 8.5
Rakesh work for 10 Days
13. (b) M R S
18. (d) A  5 days
Time  4 : 2 : 1 4
20
Effi.  1 : 2 : 4 B  4 days 5
Total work = 12 × 7 8 times of work increased
84 total work = 20 + 160 = 180
Time taken by (Rohan + Sohan) = = 14 days
6 180
Time taken by (A + B)  = 20 Days
14. (c) A  18 9
20
A

19. (c) ATQ,


B  24 15 360
C  60 6 12  5  8 x  4  15

efficiency of D = 2 × 6 = 12 1 5
ATQ, x = 40 students
2A + 4B + 6C + x × D = 360 20. (c) ATQ,
40 + 60 + 36 + 12x = 360 Let number of men initially = x
12x = 360 – 136 x + x – 20 + x – 40 + x – 60 + x – 80 + x – 100
+ x – 120 = 4 × x
12x = 224
7x – 420 = 4x
224 3x = 420
x=  18 2 Days
12 3 x = 140

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs13


Join Telegram- Maths by Aditya Ranjan Time and work

21. (b) Let men can do the whole work in x days ATQ,
then, Days Work
1 1 1 3 19
 
x 40 5 ×6 ×6
x
3
18 114
40 Remaining work 120 – 114 = 6 unit
x x
3 1 Remaining work done by Men

 40  5 24. (a)
x x  
 3  Peerola + Rahul + Prashant  6 days
70
 40   40  12
 2x  5 = x x   Rahul  35 days 420
 3   3 
21
Peerola  20 days
200 2 40x
10x  = x  Efficiency of Prashant = 70 – (12 + 21) = 37

r
3 3
time taken by Prashant working 75% of its
40x 200 efficiency

si
x2  – 10 x –
3 3 420  4 560
= = days

an by
10x 200 37  3 37
x2   0
3 3 25. (d) X  1 = 20  40

n
3x² + 10x – 200 = 0 2 5
200
20 1 4

ja
Men x = days X = 10  50
3
R s 5
Work done by X in 8 days = 8 × 5 = 40 unit
a th
20 40 Remaining work = 160 unit
Women =  = 20 days
3 3
160
Efficiency  Men : Women Time taken by Y = = 40 days
4
3 : 1
ty a

Total time = 40 + 8 = 48 days


2 26. (a) 10M = 15W
Required% = × 100 = 66.66%
3
di M

M 3

22. (b) ATQ, W 2
3 Total work = 10 × 3 × 30
A th  15 days  25 days
5 10× 3×30
time taken by (15M + 27W) =
(45+ 94)
A B
eff  :
4 5 10  3  30 100 1
= = 9 days
total work = 25 × 4 = 100 99 11 11
work done (A + B) in 5 days = 5 × 9 = 45 27. (a) 1
A   5 days 30 Days 2
Remaining work done by C in 11 days 6
60
55 B  1 15 days  60 Days 1
eff. of C = =5 4
A

11
A : C 60
eff. 4 5 Time taken by (A + B) = = 20 days
3
28. (c) 10M = 20W = 40B
1
M W B
1  : :
= × 100 = 25% more 4 2 1
4
23. (a) (5M) × 6 = (6W) × 10 = (3C) × 8 Total work = 10 × 4 × 7
30M = 60W = 24C 10  4  7
Time taken =
M:W:C (20  10  5)
4 :2: 5 40  7
= = 8 months = 4 months
Total work = 5 × 4 × 6 = 120 35

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs14


Join Telegram- Maths by Aditya Ranjan Time and work

29. (d) A  4 day 33. (d) A B C


3
12 Time  6 3 2
B  6 day 2 Efficiency  1 2 3
A  1 Day  3 unit Total work = 8 × 6 = 48 units
B  1 Day  2 unit 48
A = 48 days
Days Work 1
2 5
2× ×2 48
B = 24 days
4 10 2
Remaining work completed by A 48
C = 16 days
then, 3
2 2 'OR'
Total time = 4  = 4 days Directly check from option ratio of time should be

r
3 3
(6 : 3 : 2)

si
30. (b) Akash  20
6 34. (b) R  30
4 4

an by
Sunil  30 120 K  40 3
120 units
2
Rakesh  60 2

n
T  60
ATQ, Working fashion  R, R, R + K + T

ja
Days Work 3 days  4 + 4 + 9 = 17 units
A
2
R s 12 21 days  119 units
+ +
a th
1
S+R+A 1 12 Remain work done by R = days
4
S+R+A 3 24
5× ×5 1 85
 Total time = 21 days = days
ty a

15 120 4 4
Required days = 15 35. (b) A 10 8
di M

80 units
31. (b) P  15 2
B  16 5
30
Working fashion = (A, B, A, B...)
Q  10 3
2 days  13 units
ATQ, 12 days  78 units
2(P + Q) + xP = 30
1
2(5) + 2x = 30 13th days by A  days
2x = 20 4
x = 10 1
 Total time = 12 days
 Whole work completed in:- 4
10 + 2 = 12 days N4 G5
32. (c) (6M + 8W)10 = (26M + 48W)2 36. (d) 
A

1 2
30M + 40W = 26M + 48W
N 5
4M = 8W  (efficiency)
G 8
M 2 Total work = 16 × 13
 =
W 1 16 × 13
Gagan = = 26 days
Total work = (6 × 2 + 8 × 1)10 8
= 200 unit 37. (c) ATQ,
(15M + 20W) D = 200 Efficiency Ratio
(15 ×2 + 20 × 1) D = 200 A:B=3:1 C : A + B 1 : 2
50D = 200 In every condition efficiency of A & B are always
D = 4 days same

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs15


Join Telegram- Maths by Aditya Ranjan Time and work

Therefore, 42. (b) Efficiency Ratio of A, B & C


C : A + B  (1 : 2) 2 : 4  A : B  3 : 2
then, B : C  4 : 3
A : B : C 3 : 1 : 2  A : B : C  6 : 4 : 3 (Efficiency)
Total work  6 × 24 144
Total work  6 × 20  120 unit
then,
work done in 2 days by A  6 × 2  12 unit
144 work done in 2 days by A & B together =10 × 2
B can do the whole work   144 days
1 =20 unit
38. (d) A 20 3 work done In 2 days by B  4 × 2  8 unit
60 work done In 4 days by B & C  7 × 4 =28 unit
B 30 2 Rem. work 120 – (12 + 20 + 8 + 28) = 52 unit
Efficiency of C 2 × 2  Before After
work done In 5 days by A & B together Ration of C'S efficiency  3 : 4
 5 × 5 25 unit

r
Remaining work done by A, B & C in 52
Remaining work done by C In  13 days

si
4
35 8
= 3 days total time  13 + 2 + 2 + 2 + 4  23 days
9 9

an by
43. (a) Efficiency Ratio of A & B
then,
 A : B  3 : 4

n
8 8 Total work  3 × 16  48 unit
total time  5  3  8 days
9 9 work done in 5 days by A & B  7 × 5 35 unit

ja
1 work done in 1 days by B  4 × 1  4 unit
39. (b) 33.33% 
R s
3 B can do the work in 1 days  4 unit
a th
A  36 3 Remaining work done by C in 1 days
108 Then,
36
A (II Rate)  3 = 27 4 C's efficiency  5 unit/day
4
ty a

48
36 C can do the whole work in  = 9.6 days
A=  12 5
3
di M

72 A B
Remain II rate = = 18 44. (d) Efficiency  13 : 10
4
Time  10 : 13
Total time = 30 hours
×3 ×3
40. (a) ATQ,
Efficiency Ratio  Pawan : Ravish 30 39
3 : 2 Total work  39 × 10 = 390 unit
Ravish can do the whole work in  21 days Work done in 6 days by A & B together
then, total work  21 × 2 = 42 unit 6 × 23 = 138
work done in 5 days by Pawan & Ravish together
 5 × 5  25 unit 252 5
Remaining work done by A =  19 days
17 2 13 13
Remaining work done by pawan In  5
A

3 3 5
days A does work alone = 19 days
13
41. (c) A+C 14
3 45. (b) X 84 6
21 4 72×7
C+D  42
2 Y 72 7
42 5
A+D  72 × 7 224
5 Z can do the whole work in = +
Efficiency Ratio  A : B : C : D 13 13
2 :7 : 1: 3 504 224 728
  = = 56 days
42 13 13 13
B can do the whole work =  6 days then,
7

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs16


Join Telegram- Maths by Aditya Ranjan Time and work

X 84 6
7 48. (b) A+B  96 1250
Y 72 72×7 10

Z 56 9 32×125×3
Days Work 250 1488
A+C 
x+y  1 13 31
y+z  1 16 Efficiency ratio  B : C
5:8
 2  29 then,
 17  17 A + C – A – B = 1488 – 1250
34 493 C – B = 238
3 unit  238
Remaining work done by X and Y together in
238
11 13 unit  × 13

r
= days 3
13 then,

si
11 B & C can do the whole work
Total time = 34 days

an by
13 32  125  3  3 8
=  11 hours
46. (d) Efficiency ratio = B : C  4 : 5 238  13 13

n
C:A 5 : 6 49. (a) We know
A:B:C 6 : 4:5 M1D1 M2D2

ja

Total work  11 × 8 = 88 unit
R s W1 W2
88 then,
a th
Work done by A & B together in 
5 0.55A × 128 = 0.8A × 2(B + 4)
(with 50% efficiency) 0.55A
  64 = (B + 4) B = 40 days
3 0.8A
ty a

 17 days then,
5
0.4A men can do the whole work
47. (c) ATQ,
di M

 0.4A × D = 40 × A
Let A can do the whole work in  x + 10 days. D = 100 days
then, 50. (d) 6W = 4M
1 1 1 M:W=3:2
 = ATQ,
x  10 x 12
m × 60 × 25 xm ×15
2x  10 1 =
 2  1 2
x  10x 12 3 3
 24x + 120 = x² + 10x  x² – 14x – 120 = 0 60 × 25 × 2 = x × 15
x = 20, – 6 x = 200
Then, Additional men  200 – 60 = 140
A

Additional women based on Additional men


A 30 2  m : w
3 60
B 20 2 : 3
C 12 5 70  70
140 210
Days Work
There fore, Required women  210
A+B  1 5 51. (a) ATQ,
A+C  1 7 3
 2 12 Amal complete the whole work  = 45
4
 5  5 = 60 days
10 days 60 then,

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs17


Join Telegram- Maths by Aditya Ranjan Time and work

Amal 60 2 54. (a) B  Work -1  20 days


120 3
A  Work -1  20 × = 15
Pavithra 120 1 4
Work done in 15 days by Amal & Pavithra B  Work -2  18
together
5
 3 × 15 = 45 A  Work -2  18 × = 30
3
Remaining work done by Sheela and Divya
together in = 45 days C alone can complete the work – 1
The total work done by divya & Sheela together 15  10
= = 30 days
75 3  120 5
= 45  =  72 days C alone can complete the work – 2
120 5
Divya alone can complete the 30  10
Whole work in  72 × 2 = 144 days. = = 15 days
20

r
then, Required difference = 30 – 15 = 15 days
Sheela alone can complete the whole work 55. (d) Case- I

si
72  144 Time taken by x and (y + z) = 3 : 1
= = 144 days
72

an by
Eff. = 1 : 3 = 5 : 15
52. (a) Efficiency  A : B
Case- 2
5 : 4

n
Time taken by z and (y + x) = 4 : 1
then,
B work 20% more Efficiency then A Eff. = 1 : 4 = 4 : 16

ja
Total work = 20 × 10 = 200 units
A : B
R s
5 : 6 Time taken by x and z to complete the work
a th
then, 200 2
Total work  6 × 10 = 60 unit   22 days
9 9
Days Work
A 1 5 56. (b) A  20 3
ty a

B 1 4 60
B  30 2
di M

 2 9
(I) Efficiency of A and B = 3 : 2
×6 ×6
(II) A and B together complete the Same work
12 54
60
A +1 +5 = = 12 days
32
13 59 Both (i) and (ii) are correct.
B + 1 +1
4 57. (d) A+B+C 20 2
1 60
13
4
A 40 1
1
Complete work done in 13 days Efficiency (B + C) = (A + B + C) – A = (2 – 1) = 1
4
A

53. (b) 1
(B + C) finish work in a day =
40
2
58. (d) Rama = 5 × 4 = 20 hr
5
Seema = 3 × 10 = 30 hr
1
2 Rama  20 3
Efficiency ratio  A : B : C 60
Seema  30 2
3 : 2 : 4
Total work = 3 × 20 = 60 unit They need to work together in a day to complete
A, C together can do the whole work the same work in 6 days
60 4 60 60
 8 hours =  = 2 hours
7 7 (3  2)  6 30

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs18


Join Telegram- Maths by Aditya Ranjan Time and work

59. (c) S × 1 = T × 4 5th day only B and 6th only A working


S 4 work done in 6 days = 4 × 2 + 1 + 1 =10
 Hence, work done in 18 days = 10 × 3 = 30
T 1
Work finished on 18 august.
Total work = (4 + 1) × 60 = 300
67. (c) A × 15 = A × 4 + B × 16
S alone takes to complete that work
A × 11 = B × 16
300
 = 75 days A 16
4 
B 11
60. (b) (4 m + 7 w) × 8 = (7 m + 4 w) × 5
Total work = 16 × 15 = 240
= 32 m + 56 w = 35 m + 20 w
= 36 w = 3 m 240 80
Time taken by A and B = 
27 9
m 12

w 1 68. (b) 1M+1W  : 1W +1B 

r
Total work = (4 × 12 + 7 × 1) × 8 Time  1 2
 55 × 8 = 440 effi.  2 1

si
= 8 women can finish the work 8 4

an by
440
= = 55 days
8 1

n
61. (d) Let no. of person = x
x × 90 = (x – 10) × 100
Man's efficiency = 8 – 1 = 7

ja
10x = 1000
x = 100
R s 60
Time taken by 4 men =  2.14 days
47
a th
20
62. (c) Time   100  25 69. (b) A  18 5
80
90
63. (c) Efficiency of A and B = 2 : 1 B  30 3
ty a

Total work = 2 × 8 × 12 = 192


2 50
Work done by B in 16 days = × 3 = 50
192 3 3
Time taken by B =  16 days
di M

12  1 Remaining work complete by A and B


64. (d) A × 4 + B × 4 = A × 32 90 – 50 40
A × 28 = B × 4 = = = 5 days
5+3 8
A 1 Hence, A working for 5 days
  eff  70. (d)
B 7
T.W = 32 × 1 = 32
32  7
B  32
7 Efficiency P = 2, Q = 3, R = 1
65. (d) (15m + 21w)56 = (12m + 24w) 64 Efficiency of X = 2 × 4 = 8
105m + 147w = 96m +192w
1
A

9m = 45w Efficiency of Y = 3   1.5


2
m 5 Efficiency of Z = 1 × 2.5 = 2.5

w 1 120
Total work = 96 × 56 = 5376 Time taken by (X + Y + Z) =  10 days
12
5376 3 71. (b) Let no. of Men = x
Time =  47 days
114 19 ATQ,

66. (d) 16
13x =  2x  16 – 1 (–9)
2 
3x = 8 × 15 × 9
First four day A and B both together work x = 360

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs19


Join Telegram- Maths by Aditya Ranjan Time and work

72. (d) 10w × 16 = 6m × 8 Total work = 3 × 150 = 450


w 3 450
 Time taken by man = = 450 days
m 10 1
Total work = 30 × 16 = 480 75. (a)
work done by 12 men in 2 days
= 12 × 2 × 10 = 240 M W: : B
Remaining work complete 6 men and 5 women 6 :
4 :
240 16 6 4
Time taken by them =  days 36 : 24 : 16
75 5
9 : 6 : 4
Total time = 2 + 16 = 26 days
5 5 Total work = 60 × 4 = 240
Time taken by man and woman
73. (a) (N  18)7.5  20 (N  12)6.5  30

r
 240 240
48% 52% =   16 days
96 15

si
(N + 18)5 = (N + 12)6
N = 90 – 72 = 18 76. (c) Let number of men = x

an by
74. (a) ATQ, 15
(20W + 15M)6 = 1W × 150 11x = [2x + (15 – 1)(–16)]
2

n
90M = 30W 22x = 30x – 3360
M 1 8x = 3360

ja

W 3
R s x = 420
a th
ty a
di M
A

Aditya Ranjan Sir (Excise Inspector) Selected gSSelection fnyk,axs20

You might also like