0% found this document useful (0 votes)
71 views3 pages

Final Project - Deployment Proposal (IT 235) - A

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views3 pages

Final Project - Deployment Proposal (IT 235) - A

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Final Project - Deployment Proposal (16 hours)

Overview
It’s time to combine everything you have learned in your lab simulations and
projects. The final project assesses how well you have learned the material taught,
including the hands-on projects throughout the semester. Additionally, this project
may appear ambiguous (open to more than one interpretation). You are free to be
creative and make assumptions. For each assumption made, please include your
reasoning. Have fun!

Scenario - Deployment Proposal for PromisedLand.com at Independence

PromisedLand.com has decided to open a new data center in Independence,


Missouri. The new space will occupy 15,000 square feet and will have 50
employees. It will serve as Information Technology's secondary data center facility
that will service the hybrid call centers throughout the United States and Canada.

Refer to the organizational chart below to assist in your Deployment Proposal.


Instructions
Review the scenario and create a deployment proposal with an embedded video
presenting your ideas for the new data center for PromisedLand. It should be
written as if you were addressing the stakeholders of PromisedLand and should
cover each aspect of the scenario. Be sure to carefully read the instructions and
make a note of any questions you may have for your instructor.

Part A - Please include a description of each of the following elements that will be
part of the deployment in your proposal. Make sure to use language appropriate to
the audience (the stakeholders at PromisedLand).

1. Managing Roles and Features 7. Users & Groups + Management


2. Cloud Concepts + Virtualization 8. Active Directory + Group Policy
3. Managing IP Addressing Objects
4. Files + Directories 9. Managing Servers in a Hybrid
5. Hardware + Software Installation Model
6. DNS Implementation + 10.Managing Storage Services + File
Management Services

Part B - Delete your old virtual machine and create a new one running Windows
Server 2022 Datacenter. Create an embedded video in your deployment proposal
that demonstrates you have installed and addressed (implemented) each of the
following elements:

1. File + Storage Services 5. PowerShell (User Account


2. Group Policy (Password & Audit Management & Remoting)
Policies) 6. Network Policy Server
3. Active Directory (Org. Chart) 7. Data Protection
4. DNS (Addresses, Zones, 8. Performance Monitoring
Forwarders, and Protection)

Grading
The instructor will grade the assignment using the criteria in the rubric.
CRITERIA RATINGS
The student includes an executive summary for the stakeholders of each of the 150
following elements that will be part of the deployment:
(15 points for each element)
1. Managing Roles and Features 7. Users & Groups + Management
2. Cloud Concepts + Virtualization 8. Active Directory + Group Policy
3. Managing IP Addressing Objects
4. Files + Directories 9. Managing Servers in a Hybrid
5. Hardware + Software Installation Model
6. DNS Implementation + 10. Managing Storage Services +
Management File Services

The student creates an embedded video in their deployment proposal that 135
demonstrates they have installed and addressed each of the following elements:
(15 points for each element)
1. File + Storage Services 6. PowerShell (User Account
2. Group Policy (Password & Audit Management & Remoting)
Policies) 7. Network Policy Server
3. Active Directory (Org. Chart) 8. Data Protection
4. DNS (Addresses, Zones, 9. Performance Monitoring
Forwarders, and Protection)
5. Virtualization

Exceeds Expectation Meets Expectation Approaches Below Expectation


Expectation
CWC SCORING 15-14 Points 13-12 Points 11-10 Points 9-0 Points
CWC 4 - SOLVE Reasoning is logical and Reasoning is mostly Reasoning contains Reasoning is
The reasoning in the creative, consistent, logical, complete, elements of logic illogical, simplistic,
proposal is logical, complete and often and consistent. and/or creative and inconsistent or
creative, consistent, unique. Demonstrates some insight, but not fully absent. Conclusion
complete and often
Conclusion is complex unique or creative resolved. May have is simplistic and
unique. The
conclusion is and/or detailed, well insight. minor stated as an
complex and/or supported, creative, Conclusion is inconsistencies or absolute, or
detailed, well complete and relevant. generally complete, omissions. inconsistent with
supported, creative, supported, and Conclusion is evidence or
complete and mostly consistent relevant but reasoning. Lack of
relevant. and relevant. abbreviated or coherent or clear
simplified, not fully conclusion.
supported, and/or
contains minor
inconsistencies.
TOTAL POINTS 300

You might also like