0% found this document useful (0 votes)
11 views18 pages

Test Name (Summary) Prerequisite Description (Test Scenario Name) Step No R1.0 Control Office Application Chief Cantroller Functionality

Uploaded by

rushimhetar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views18 pages

Test Name (Summary) Prerequisite Description (Test Scenario Name) Step No R1.0 Control Office Application Chief Cantroller Functionality

Uploaded by

rushimhetar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Test Name(Summary) Prerequisite Description(Test Scenario Name) Step No

R1.0 Control Office Application NA Chief Cantroller Functionality

User login

Order /Modify a new train

Add new Train


Design Steps(Test Case Design)
Verify that the Chief Controller can access and view the train movement information.
Confirm that the Chief Controller can initiate actions related to train movements, such as delaying or rescheduling trains
Ensure that the Chief Controller can communicate with other functionaries through the system.
Verify that the Chief Controller can generate reports related to train movements and activities.
Verify that updates or changes in one system are reflected in real-time across all integrated systems.
Assess the accuracy and reliability of automated processes.

The COA system is operational.


Open the COA system login screen.
user with incorrect user-id or password failed to log in
A user with a valid user-id and password is attempting successful to log in.
The system should authenticate the user and display the main menu with options enabled
To verify that a user can change their assigned section after logging into the system.
Navigate to the section change option within the system.
Select a different section from the available options.

verify that a new train can be ordered and entered into the system.
Navigate to the "Order a Train" function.

Provide all required details for a new train order (e.g., train number, schedule, route)
Verify that existing train details can be modified through the Order a Train use case.
Ensure user can Update the relevant details
verify how the system handles a train order with missing or incomplete information.
system should display an error message indicating that required information is missing or incomplete

User selects an existing train from the system.


User enters all necessary details for a new train (eg.,Train number/name, Train Type,destination station)
User can add a new passenger train
User adds a new goods train with Booked speed.
User enters a train with a Destination Station that is not in the referential table.
Ensure wrong Destination station shows Error.
User attempts to add a new train without providing all the required information display as Error.
Expected Results
Chief Controller have access about the movement Information
chief Controller can intiate actions in delays and reschedule.
System should have communication system which can access through system
Chief controller should be able to genrate the reports of gtrain movements and activities
Real time changes in system should be possible.
Automated Process of a system should be accurate.

COA must be operational.


Login Page Of COA should be clickable .
Error/invalid credential lead to Error
Valid Credential accepted by system to successful login.
After successful login sytem navigate to main menu.
User can access another section too.
System should allow to access other functionalities on the main menu.
User can able to select other functionalities of an a system.

New Train can be orderd within the system.

Navigate to the highlighted tab of order new train.


Required Details must be filled to Order a New Train.
Order a new train functionality can be modified as per requirements.
Relavant information should be updated.
Incomplete Information should be lead to Error/No results
System should indicate about the incomplete details or missing information.

User able to select a existing train option.


All the necessary details must be filled for the desired result.
User can add a new passenger in a Train.
user should adds a new goods train with Booked speed.
destination station must have in referential table/valid character.
wrong details about the destination should indicate/display No results Found.
All the details must be filled with valid information orelse system should show a Error>.
Test Data Assignee Priority Componants Sprint/Rel Fix Version
Control Office Application [email protected] Medium COA 10
Labels Comments Assigned Team Candidate for Regression Automation Status
R1.0 COA COA N Y
S.N Scenario Name
1 One way flight reservation booking for fare type Regular and travel class economy
2 One way flight reservation booking for fare type Regular and travel class Premium Economy
3 One way flight reservation booking for fare type Regular and travel class Business
4 One way flight reservation booking for fare type Regular and travel class First Class
5 One way flight reservation booking for fare type Armed Forces and travel class economy
6 One way flight reservation booking for fare type Armed Forces and travel class Premium economy
7
8
9
10
11
12
Test Cases User Stories
70 US2332
60 US2332
40
50
51
52
Test Name(Summary) Prerequisite Description(Test Scenario Name) Steps
One way flight reservation booking for
R1.0_TECHM_GOIBIBO Manual fare type Regular and travel class 1
economy
2
3

5
6
Design Steps(Test Steps)

Launch Webrowser and enter below URL


https://www.goibibo.com/
Enter Below User id and Passwrd and click on login button
Verify that Flights tab should be availble and One way radio
buttom should be autoselected.
Verify that below tabs should be present under one way option
From, to , departure,toggle button, retun, traveller & class, fare
type, trending search, search button

Click on From object and enter any alphabet.


Verify that suggestion list should be in below format.
Expected Results Test Data Assignee

Website should be launched https://www.goibibo.com/ [email protected]


Validate that user should be logged in

Validate that one way radio button is autoselected

Validate that all objects are present


Validate that user should able to see dropdown list
which shows City name, Aiport name in dropdown.
Priority Componants Sprint/Rel Fix Version Labels Comments Assigned Team

Very High Goibibo S1 Goibibo


Candidate for Regression Automation Status

Y Y
Sr.No Impacted Flow SC ID
1 Provide SC01
2 Modify SC02
3 Amend SC03
4 Cancel SC04
Scenario Name Status
Managed Connectivity (100 MBPS plan) with Equipment Modem and Router Completed
Upgrade bandwidth from 100 MBPS to 500 MBPS for EDI service with equipment switch Inprogress
Managed Connectivity (100 MBPS plan) with Equipment Modem and Router, before PoNR. Inprogress
Managed Connectivity (100 MBPS plan) with Equipment Modem and Router before PoNR Completed
Test Order
75849632
75849632
75849632
75849632
Issue ID
10015
10016
10017
10018
10019
Summary
Enterprise/Midmarket Solution || SP2 || SIT1 || SFDC ||SFDC application is not getting launch
Enterprise/Midmarket Solution || SP2 || SIT1 || SFDC || Login button is not functioning properly.
Enterprise/Midmarket Solution || SP2 || SIT1 || CRM || During launching CRM aplication, click button is not working.
Enterprise/Midmarket Solution || SP2 || SIT1 || CRM || Proposal ID is not visible in header of CRM application.
Enterprise/Midmarket Solution || SP2 || SIT1 || CRM || Customer ID is not getting generated
Assignee Reporter Application name Priority
Bhavna Tamara SFDC Critical
Bhavna Tamara SFDC High
Bhavna Tamara CRM High
Bhavna Tamara CRM High
Bhavna Tamara CRM Critical

You might also like