Report No 32
FAIAD BERGIN OIL SERVICE CO Date: 2 5 2023
Rig Name FBOS-B1 Conssion NC151 Type Objective: DEVELOPMENT Company ZALLAF
SPUD DATE 15-APPRIL-2023 WELL No F2-NC151 Days : 32 Days Since Last Injury: 18
Proposed TD R.O.P Depth FD of Today Total Footge Move From: Move To:
Rig
Move Distance: Time:
B
H
A
12.1/4 BIT&NEAR BIT &1*8'DC&12.1/4 STB&9*8'DC&12*5'HWDP
N
O
0
Hole Size
17.1/2 Casing Size 13.3/8 Casing Shoe 680 Mud Weight 9
BOP A-Date Last P/T: 1/5/2023 B - PRESSURE 2000 C -Date Last F/T: 2/5/2023
TON MILE 8 A-SINCE LAST CUT 37 B-Length of Rope Remaining: Safety Meeting date 2/5/2023 Supject FIRST AID DRILL
REPAIRS A-Last 24 Hrs 0 B-Month: 0 TOTAL PERSONNELS 42 SET CARD 2 TRIC CARD 2
From To OPERATIONS
00.00 12.00 CONT DRILL OUT OF CEMENT F/625' TO TOP OF FLOAT
12.00 12.30 P/T 1000 PSI FOR 15MIN HOLD OK
12.30 13.30 RESUME DRLG F/C AND F/S A TO 700'
13.30 14.30 STOP DRILLING &POOH TO CSG SHOE @625'
14.30 18.00 TOP JOB OF CEMENT BETWEEN 20' AND 13.3/8 BY FAIAD CREW
18.00 00.00 WAITING ON WATER TRUCKS
Drilling 3 Servise Fishing 2 GOT GAS BETWEEN 20' CASING AND 13.3/8 CASING WEEK GAS
Reaming Repair 17 3
Log Slip/Cut 4
CMT 3.1/2 NU Bop 5
C/Mud Test Bop 6
Coring NDBop 7