DAILY DRILLING REPORT

Report No 32
FAIAD BERGIN OIL SERVICE CO Date: 2 5 2023
Rig Name FBOS-B1 Conssion NC151 Type Objective: DEVELOPMENT Company ZALLAF

SPUD DATE 15-APPRIL-2023 WELL No F2-NC151 Days : 32 Days Since Last Injury: 18

Present Operation: W.O .WATER TRUKS


Next Operation: MIXING MUD AND RESUME DRILLING

Proposed TD R.O.P Depth FD of Today Total Footge Move From: Move To:
Rig
Move Distance: Time:
B
H
A
12.1/4 BIT&NEAR BIT &1*8'DC&12.1/4 STB&9*8'DC&12*5'HWDP
N
O
0

Bit No Type Size WOB RPM Pressure STg W Flow Rate

Pump No. 1: Liner Size: Pressure: T/Pressure SCR Toolpusher MOHAMMED


Mud
Pumps Pump No. 2: Liner Size: Pressure: T/Pressure SCR Company Man WALID

Hole Size
17.1/2 Casing Size 13.3/8 Casing Shoe 680 Mud Weight 9

BOP A-Date Last P/T: 1/5/2023 B - PRESSURE 2000 C -Date Last F/T: 2/5/2023

TON MILE 8 A-SINCE LAST CUT 37 B-Length of Rope Remaining: Safety Meeting date 2/5/2023 Supject FIRST AID DRILL

REPAIRS A-Last 24 Hrs 0 B-Month: 0 TOTAL PERSONNELS 42 SET CARD 2 TRIC CARD 2

From To OPERATIONS
00.00 12.00 CONT DRILL OUT OF CEMENT F/625' TO TOP OF FLOAT
12.00 12.30 P/T 1000 PSI FOR 15MIN HOLD OK
12.30 13.30 RESUME DRLG F/C AND F/S A TO 700'
13.30 14.30 STOP DRILLING &POOH TO CSG SHOE @625'
14.30 18.00 TOP JOB OF CEMENT BETWEEN 20' AND 13.3/8 BY FAIAD CREW
18.00 00.00 WAITING ON WATER TRUCKS

OPERATION F/00.00 TO 06.00


00.00 06.00 CONT W.O TRUCKS

Time Disribution - Hours NOTES for Operation


Rih Time for
Rig U/D Trips
Csg Safety 1/2 1 GOT LEAKING IN SHEACKER LINE .WELD THE PIPE AND SOLVE THE PROBLEM

Drilling 3 Servise Fishing 2 GOT GAS BETWEEN 20' CASING AND 13.3/8 CASING WEEK GAS
Reaming Repair 17 3
Log Slip/Cut 4
CMT 3.1/2 NU Bop 5
C/Mud Test Bop 6
Coring NDBop 7

Diesel Used 2380 Diesel Balance 36,270

Field Break : Received: Dispatchure Requirements:

KELLY SPINNER RIGHT SIDE TURN STARTER


NEED GUN AND COUNTER FOR DIESEL TANK
SEAL FOR SWEVIL
2.1/16 FLANG 5000PSI FOR CHECK VALVE
ACETYLENE

PERSONNEL In Rig Camp 31 Clinte 2 Well Service Visitor 4 Others 6 Note

No. of Vehicles/ Trucks : 9 Condition of Vehicles: Qty 9 Good 8 Bad 1

Crane PL Crane 2 Forklift 1 Truck 2 Water Truck Qty 1 Bulldozer 2

140 Wt.: 1 90 Wt.: 2 50/20 Wt.: 4 40wt 8 46wt 1 ATF 0

Oxygen: Full 7 Empty 3 Acetylene: Full 3 Empty 6 Nitrogen Full 3 Empty 3