0% found this document useful (0 votes)
30 views4 pages

BP Production Oct 2024 (11 Nov 2024)

Uploaded by

Jemmy Yonri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views4 pages

BP Production Oct 2024 (11 Nov 2024)

Uploaded by

Jemmy Yonri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

JOBMIX

JOBMIX

Additive Aru Crete G01

MUTU ( M3 )
No Date Pengecoran Activity
BO

1 10/2/2024 Pengecoran Lc Pendopo 4


2 10/3/2024 Pengecoran Lc Pendopo 4
Pengecoran Lc Boiler 18
3 10/4/2024 Trial Loading / trialmix
4 10/5/2024 Trialmix ( tanpa obat/addictive , buang ke ram Loader )
Pengcoran Lc Pendopo 3
5 10/6/2024 Pengecoran Lantai Coal Storage
6 10/7/2024 Pengecoran Lantai Coal Storage
7 10/8/2024 Pengecoran Lantai Coal Storage
8 10/9/2024 Pengecoran Lantai Coal Storage
9 10/10/2024 Pengecoran Lantai Coal Storage
10 10/12/2024 Pengecoran Kolom Boiler
Pengecoran Auto Clave
12 10/13/2024 Pengecoran Kolom Boiler
Pengcoran Lc Boiler 15
13 10/14/2024 Pengecoran Kolom Boiler
Pengecoran Lc Boiler 16
14 10/15/2024 Pengecoran kolom Boiler, plant, Auto clave
15 10/17/2024 Pengecoran Auto Clave
16 10/18/2024 Pengecoran Power house
Pengecoran Lc Office 5
17 10/19/2024 Pengecoran Lc Office 40
18 10/21/2024 Pengecoran Lantai Workshop
19 10/24/2024 Pengecoran pedestal Power House
20 10/25/2024 Pengecoran ERS
21 10/26/2024 Pengecoran LC Pabrik Kaleng 35
Pengecoran Pit ERS dan Auto Clave
22 10/27/2024 Pengecoran LC Pabrik Kaleng 60
23 10/28/2024 Pengecoran Pedestal Gudang Saprepart
Pengecoran LC Pabrik Kaleng, Pengecoran LC Pabrikasi Baja 150
24 10/29/2024 Pengecoran Auto Clave
Pengecoran Lc P kaleng, Pabrikasi Baja, Cp kodok 37
25 10/30/2024 Pengecoran Auto Clave, Boiler
10/31/2024 Lanjutan cor boiler, Cor Coal Storage, Gardu hubung
Mortar untuk pompa 1

Catatan :
Warna angka warna abu abu adalah catatan penggunaaan agregat menggunakan rumus job mix fromula (reco
Tanpa warna abu abu adalah catatan hasil print put dari BP-batching plant computer
SEMEN SPLIT 10/20 PASIR AIR ADDICTIVE
(KG) (KG) (KG) LITER LITER
B0 190 1110 830 165 0.91

K350 405 1080 660 175 1.95

Additive Aru Crete G01

MUTU ( M3 ) Job Mix Formula and BP Record


Cement Split 10/20 Sand Water Additive Total
K350
Kg Kg Kg Liter Kg Kg

760.0 4,440.0 3,320.0 660.0 4.4 9,184.4


760.0 4,440.0 3,320.0 660.0 4.4 9,184.4
3,420.0 19,980.0 14,940.0 2,970.0 19.7 41,329.7
4 1,620.0 4,320.0 2,640.0 700.0 9.4 9,289.4
2 810.0 2,160.0 1,320.0 350.0 4.7 4,644.7
570.0 3,330.0 2,490.0 495.0 3.3 6,888.3
202 81,810.0 218,160.0 133,320.0 35,350.0 472.7 469,112.7
282 114,210.0 304,560.0 186,120.0 49,350.0 659.9 654,899.9
94 38,070.0 101,520.0 62,040.0 16,450.0 220.0 218,300.0
162 65,610.0 174,960.0 106,920.0 28,350.0 379.1 376,219.1
222 89,910.0 239,760.0 146,520.0 38,850.0 519.5 515,559.5
9 3,651.0 9,860.0 5,948.0 1,575.0 21.1 21,055.1
67 27,135.0 72,360.0 44,220.0 11,725.0 156.8 155,596.8
9 3,651.0 9,739.0 5,948.0 1,575.0 21.1 20,934.1
2,863.0 16,665.0 12,519.0 2,625.0 35.1 34,707.1
21 8,500.0 22,702.0 13,846.0 3,933.0 41.2 49,022.2
3,013.0 17767 13322 2640 17.472 36,759.5
35 14,194.0 37,834.0 23,142.0 6,912.0 69.6 82,151.6
3 1,211.0 3,256.0 1,990.0 518.8 6.1 6,981.9
104 42,164.0 112,411.0 68,734.0 20,233.0 207.4 243,749.4
958.0 5,548.0 4,155.0 970.0 5.1 11,636.1
7,472.0 44,455.0 33,210.0 8,277.0 37.5 93,451.5
242 98,104.0 261,610.0 159,988.0 47,404.0 480.6 567,586.6
3 1,217.0 3,236.0 2,052.0 580.0 5.9 7,090.9
57 23,117.0 61,611.0 37,653.0 10,707.0 115.9 133,203.9
6,626.00 38,612.00 29,097.00 7,083.00 33.70 81,451.7
32 12,965.0 34,585.0 21,108.0 6,261.0 63.3 74,982.3
11,421.0 66,652.0 49,924.0 11,698.0 57.2 139,752.2
3 1,218.0 3,238.0 1,975.0 510.0 6.0 6,947.0
28,543.0 166,594.0 124,466.0 30,173.0 144.5 349,920.5
43 17,436.0 46,466.0 28,381.0 8,148.7 85.6 100,517.3
7,046.0 41,116.0 30,783.0 7,247.0 38.8 86,230.8
27 10,954.0 29,219.0 17,849.0 5,246.7 61.1 63,329.8
64 25,950.0 69,117.0 42,310.0 12,292.0 145.5 149,814.5
380.0 - 1,400.0 190.0 2.3 1,972.3
TOTAL 4,833,456.7

an rumus job mix fromula (recomendasi dari lab UNSRI)

You might also like