DL..
Concrete tiles=20*0.04=0.8kn/m2 6m
Soil=18*0.15=2.7kn/m2
Sand=16.5*0.03=0.5kn/m2
DL=7.84kn/m2 7m
LL==2kn/m2
Wu=1.4*7.84+1.7*2
=10.976+3.4=14.38kn/m2
Thick of slab=160mm
Design slab(1)
Lb
= ــــــــــــ7/6=1.167 2 m- M+dL M+LL W
Ca=0.072 Ca=0.028 Ca=0.032 Wa=0.72
La Cb=0.013 Cb=0.013 Cb=0.02 Wb=0.21
Design as two way slab
Short direction
Ma-=ca*wu*La2
=0.072*14.38*(6)2
=37kn.m
=(0.028*10.976+0.032*3.4)*(6)2
=15kn.m
M-=0.67*37=25KN.M
M+=.67*15=10KN.M
Long direction
Mb-=0.021*14.38*(7)2=14.8kn.m
Mb+=(0.013*10.796+0.02*3.4)*(7)2=10.32kn.m
M- at discontinuous end=1/3*M+
=.33*10.32=3.44Kn.m
=0.67*14.8=9.86kn.m
-9.86 -14.8 -9.86 -25 +10 -25
+6.88 +10.32 +6.88 -37 +15 -37
-2.3 -3.44 -2.3 -25 +10 -25
Short direction
da=160-20-12/2=134mm
Max moment=37kn.m
P=5.78*10-3 fc-=25mpa
b=1000mm d=134mm
.
.033
.75 ∗ 0.02
As=5.78*10-3*1000*134
As=774.52mm2
113
∗ 1000,2 ∗ 160,500
774.52
=MIN(150,320,500)
S=150mm
750.4
7 @ 1
113
Short direction
max moment=14.8KN.M
0.003
AS=3.3*10-3*1000*122=403MM2
S=280MM
No of bars=403/113=4bars @each(1m)
When fc-=50mpa
0.00267
0.033
AS=3.3*10-3*1000*122
=403mm2
S=min(113/403*1000,2*160,500)
=min(280,320,500)
S=280mm
CHECK SHEAR
W=wu*La*Lb
=14.38*6*7
W=604
Wa=W* wa
=604*0.79=477
Wb=W*w b
Wb=604*0.21
Wb=127
Va=Wa/2Lb=477/14
Va=34kn
Vb=Wb/2La=127/12=11kn
Fc`=50mpa
DESIGN SLAB(2)
Lb/La=7.25/6=1.3
M=La/Lb=6/7.25=0.75 6m
Short direction
Ma-=ca*wu*la2
7.75m
2
=0.078*14.38*(6) =40.38kn.m
=0.031*10.796+0.046*3.4]*(6)2=17.88kn.m
Mb-=cb*wu*Lb2
=0.014*14.38*(7.75)2=12kn.m
M+=0.67*7.27=4.85kn.m
short direction
da=160-20-12/2=134mm
-26.92 +11.92 -26.92
ا. max moment=40.38kn.
0.00635 -40.38 +17.88 -40.38
.0033
-26.92 +11.92 -26.92
. 0.02
∗ ∗
As=0.00635*1000*134
As=851mm2
S=min[113/851*1000,2*160,500]
S=130mm
Fc`=50mpa
Max moment=40.38kn.m
0.00613
0.0033
0.04
∗ ∗
As=0.00613*1000*134
As=821.42mm2
S=min[113*821.42*1000,2*160,500]
S=130mm
Long direction
db=122mm
max moment=12kn.m
` 25
0.00218
∗ ∗
As=0.0033*1000*122
As=403mm2
S=[113/403*1000,2*160,500]
S=280mm
Fc`=50mpa
0.0022
∗ ∗
As=.0033*1000*122
As=403mm2
S=[113/403*1000,2*160,500]
S=280mm
CHECK SHEAR
W=wu*La*Lb
W=14.38*6*7.75
W=668
Wa=W*wa=668*0.86=574
Wb=W*wb=668*0.14=94
Va=Wa/2Lb=574/2*7.75=37
Vb=Wb/2La=94/12=7.83
` 50
154 42 ………………….. 7m
DESIGN SLAB(3)
Lb/La=7/6=1.167
M- M+DL M+LL W Load
Design two way slab
Ca=0.065 Ca=0.036 Ca=0.043 Wa=0.66
M=La/Lb=6/7=0.85
Cb=0.034 Cb=0.019 Cb=0.023 Wb=0.34
Short direction
Ma-=ca*wu*La2=0.065*14.38*(6)2=33.65kn.m
Ma+=[0.036*10.976+0.043*3.4]*(62)=19.48kn.m
M- at discontinuous end=1/3*M+
=1/3*19.48=6.5kn.m
M-=2/3*6.5=4.33kn.m
M-=2/3*33.65=22.43kn.m
M+=2/3*19.48kn.m
Long direction
-16 -24 -16
- 2
Mb =0.034*14.38*(7) =24kn.m
+9.33 +14 +9.33
+ 2
Mb =[0.019*10.976+0.023*3.4]*(7) =14kn.m
-3 -4.67 -3
- +
M at discontinuous end=1/3*M
=1/3*14=4.67kn.m
M-=2/3*24=16kn.m
-33.65 +19.48 -6.5
M+=2/3*14=9.33kn.m
max moment=33.65kn.m
` 25
. 0.00523
∗ ∗
As=0.00523*1000*134=700
S=min[113/700* 1000,2*160,500]
S=160mm
` 50
33.65 .
0.0051
∗ ∗
As=0.0051*1000*134
As=683.4mm2
S=[1000*113/683.4,2*160,500]
S=160mm
Long direction
db=122mm
max moment=24kn.m
0.0045
∗ ∗
As=0.0045*1000*122
As=549mm2
S=[113/549*1000,2*160,500]
S=200mm
24 .
0.00436
∗ ∗
As=0.00436*1000*122
As=532mm2
S=[113/532*1000,2*160*500]
S=210mm
CHECK SHEAR
W=wu*La*Lb
W=14.38*6*7=604
Wa=W*wa
Wa=604*0.66=398.84
Wb=W*wb
Wb=604*0.34=205.36
Va=398.84/2*7=28
Vb=205.36/2*6=17
` 50
154 31 …….
DESIGN SLAB(4)
Lb/La=5.15/4=1.28
Short direction
Ma-=0.088*14.38*(4)2 5.15m
Ma-=20.24kn.m
Ma+=[0.048*10.976+0.055*3.4]*(4)2
Ma+=11.42kn.m
Long direction
Mb-=0.024*14.38*(5.15)2
Mb-=9.15kn.m
Mb+=[0.012*10.976+0.016*3.4]*(5.15)2
Mb+=5KN.M
Short direction
da=134mm
Max moment=20.24kn.m
` 25 M- M+ DL M+LL W load
0.0031
Ca=0.088 Ca=0.048 Ca=0.055 Wa=0.88
Cb=0.024 Cb=0.012 Cb=0.016 Wb=0.12
.0033
∗ ∗
AS=.0033*1000*134
AS=442.2mm2
S=[113/442.2*1000,2*160,500]
S=250mm
0.0031
∗ ∗
AS=0.0033*1000*134
AS=442.2mm2
S=[113/442.2*1000,2*160,500]
S=250mm
Long direction
db=122mm
max moment=5kn.m
` 25
0.00896
∗ ∗
AS=.0033*1000*122
AS=403mm2
S=[113/403*1000,2/160,500]
S=280mm
No of bars=403/113=4bars@each(1m)
CHECK SHEAR
W=wu*La*Lb
W=14.38*4*5.15
W=296
Wa=W*wa=296*0.88=260
Wb=W*wb=296*0.12=36
Va=Wa/2lb=260/2*5.15=25kn
Vb=Wb/2La=36/2*4=4.5kn
0.17 ∗ `∗ ∗
` 25
` 50
DESIGN SLAB(5)
Lb/La=4/3.25=1.2
4m
Design two way slab
M=3.25/4=0.8 3.25m
Short direction
Ma-=0.065*14.38*(3.25)2
Ma-=9.87kn.m
Ma+=[0.026*10.976+0.041*3.4]*(3.25)2
Ma+=4.5kn.m
M- M+ DL M+ LL W load
Ca=0.026 Ca=0.026 Ca=0.041 Wa=0.71
Cb=0.011 Cb=0.014 Cb=0.017 Wb=0.29
Long direction
-6.58 -9.87 -6.58
Mb-=0.026*14.38*(4)2
+0.75 +4.5 +0.75
Mb+=[0.011*10.976+0.017*3.4]*(4)2
-6.58 -9.87 -6.58
Mb+=2.9kn.m
Short direction
SHORT DIRECTION
da=134mm
max moment=9.87kn.m
` 25
0.00147
-4.13 +1.93 -4.13
S=[113/442.2*1000,2*160,500]
S=250mm
No of bars=442.2/113=4bars@ each(1m)
` 50
9.87 .
0.00146
∗ ∗
AS=0.0033*1000*134
AS=442.2mm2
S=min[113/442.2*1000,2*160,500]
S=250mm
LONG DIRECTION
db=122mm
max moment=6.2kn.m
` 25
0.0011
∗ ∗
AS=0.0033*1000*122
AS=403mm2
S=min[1000*113/403,2*160,500]
S=280mm
6.2 .
0.0011
∗ ∗
AS=0.0033*1000*122
AS=403mm2
S=min[1000*113/403,2*160,500]
S=280mm
CHECK SHEAR
W=wu*La*Lb
W=14.38*3.25*4
W=187
Wa=W*wa
Wa=187*0.71=133
Wb=W*wb
Wb=187*0.29=54
Va=Wa/2Lb
Va=133/2*4=17
Vb=Wb/2La
Vb=54/2*3.25=8.3
` 25
` 50
Lb/La=5.15/1.75=2.9>2
1.75m
Design one way slab
d=t-cover-12/2
d=160-20-6=134mm 5.15m
thickness of slab=160mm
2 1.75 2
∗ 14.38 ∗ 4.4 .
10 10
2 1.75 2
∗ 14.38 ∗ 4 .
11 11
2 1.75 2
∗ 14.38 ∗ 2.75
16 16
max 4.4 .
` 25
.00065
∗ ∗
As=0.0033*1000*134
AS=442.2mm2
اكتب المعادلة ھنا.
S=min[1000*113/442.2,2*160,500]
S=250mm
S=min[1000*113/288,5*160,500]
S=460mm
∗ ∗
As=0.0033*1000*134
AS=442.2mm2
S main=250mm
S shrinkage=460mm
Lb/La=6/3.25=1.8
6m
Design two way slab
3.25m
M=3.25/6=0.55
Short direction
Ma-=0.084*14.38*(3.25)2
Ma-=12.75kn.m
Ma+=[0.035*10.976+0.062*3.4]*(3.25)2
Ma+=6.3kn.m
Long direction
Mb-=0.007*14.38*(6)2
Mb-=3.6kn.m
Mb+=[0.003*10.976+0.006*3.4]*(6)2
Mb+=1.92kn.m
M- M+ DL M+ LL W load
S=250mm
12.76 .
0.00189
∗ ∗
As=0.0033*1000*134
As=442.2mm2
S=min[1000*113/442.2,2*160,500]
S=250mm
LONG DIRECTION
db=122mm
max moment=3.6kn.m
` 25
0.000644
∗ ∗
AS=0.003*1000*122
AS=403mm2
S=min[1000*113/403,2*160,500]
S=280mm
` 50
3.6 .
0.00064
∗ ∗
AS=0.003*1000*122
AS=403mm2
S=min[1000*113/403,2*160,500]
S=280mm
CHECK SHEAR
W=wu*La*Lb
W=14.38*6*3.25
W=280mm
Wa=W*wa
Wa=280*0.91=255
Wb=W*wb
Wb=280*0.08=22
Va=Wa/2Lb=255/2*6=21.3
Vb=Wb/2La=22/2*3.25=3.4
0.17 ∗ `∗ ∗
` 25
108.8 23 ……..,
` 50
154 23 ……….
Slab direct Mu AS AS S S
no Kn.m Fc`=25 Fc`=50 Fc`=25 Fc`=50 Fc`=25 Fc`=50
Wu=14.38kn.m
Weight of stem=(0.35-0.16)*0.25*25*1.4=1.67kn/m
Partition=1.5*0.25*20*1.4=10.5kn/m
Dimension of column=400mm*400mm
Weight of column=0.4*0.4*3.5*25*1.4=19.6kn/m
d`=40+10+25/2=62.5mm
DESIGN COL(1)
Fc`=25mpa
Pu=14.38(2.27*2.85)+(1.67*2.85)+(1.67*2.27)+19.6+10.5
Pu=131.6kn
Wu(y)36.4kn/m
Mu eq=76.25kn.m
400 2 ∗ 62.5
0.7
400
131.6
0.05
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
76.25
0.068
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
From chart………………… 0.01
∗ ∗
AS=1600mm2
Ab=490mm2
1600
3.2
490
4 25
Fc`=50mpa
Dimension of column=300mm*300mm
Weight of column=11.025kn/m
Weight of stem=1.67kn/m
Partition=10.5kn/m
Pu=123.11kn
Mu=76.25kn.m
76.25
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.08
123.1
0.04
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
0.011
As=0.011*300*300=990mm2
No of bars=990/490=2.02
3 25
DESIGN COL(2)
Fc`=25mpa
Pu=14.38(3.125*2.85)+1.67*2.85+1.67*3.125+19.6+10.5
Pu=168.6kn
14.38 ∗ 4.25
1.67 10.5 32.54
3
14.38 ∗ 5.4 3 0.78 14.38 ∗ 2
∗ 1.67 47
3 2 2
47 5.1
123.3 .
10
32.54 4.25 0.4
50.8 .
10
0.4 1 0.65
123.3 50.8 ∗ 149.65 .
0.4 0.65
0.7
168.6
0.06
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
149.65
0.134
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
0.018 … … … …
As=0.018*400*400=2880mm2
No of bars=2880/490=5.8
6 25
Fc`=50mpa
Pu=160.6kn
Mu=149.65kn.m
Kn=0.05
Rn=0.16
0.6
0.028 … … . . x
As=0.028*300*300=2520mm2
No of bars=2520/490=5.14
6 25
DESIGN COL(3)
Fc`=25mpa
Pu=14.38(4.125*3.78)+1.67*3.78+1.67*4.125+19.6
Pu=257kn
No of bars=7040/490=13.36
14 25
Fc`=50mpa
Pu=248.43kn
Mu eq=318.7kn.m
0.6
248.43
0.08
0.7 ∗ 50 ∗ .03 ∗ .03 ∗ 1000
318.7
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.33
From chart
0.062 … … .
AS=0.062*300*300=5580mm2
No of bars=5580/490=11.38
12 25
Fc`=25mpa
Pu=14.38(3.8*3.3)+1.67*3.3+1.67*3.8+19.6
Pu=211.8kn
Pu=203.2kn
Mu eq=223.56kn.m
0.6
203.2
0.06
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
223.56
0.24
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.045 … …
0.045 ∗ 300 ∗ 300 4050
4050
8.26
490
9 25
DESIGN COL(5)
Fc`=25mpa
Pu=14.38(5.5*6.25)+1.67*5.5+1.67*6.25+19.6
Pu=533.5kn
Pu=525kn
Mu=298.53kn.m
525
0.16
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
298.53
0.3
0.7 ∗ 50 ∗ .3 ∗ .3 ∗ .3 ∗ 1000
0.054
0.054 ∗ 300 ∗ 300 4860
4860
9.9
490
10 25
Pu=14.38(6.25*3.8)+1.67*6.25+1.67*3.8+19.6+10.5
Pu=107.78kn
Fc`=50mpa
Pu=99.2kn
Mu eq=401.6kn.m
0.6
99.2
0.03
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
401.6
0.42
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.08
0.08 ∗ 300 ∗ 300 7200
7200
14.69
490
15 25
DESIGN COL(7)
Pu=14.38(5.375*6.25)+1.67*5.375+1.67*6.25+19.6
Pu=522kn
14.38 ∗ 3.5
2 1.67 35.22 /
3
14.38 ∗ 6.25 3 0.86
∗ 1.67 35.52
3 2
35.5 ∗ 6.85 35.22 ∗ 3.1
135.4 .
10 10
14.38 ∗ 6.25
29.95 /
3
29.95 ∗ 5.85
106 .
10
106
0.78
135.4
0.4
106 1 065
135.4 0.4 192.47 .
0.65
0.7
522
0.19
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
192.47
0.18
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
0.021 … … .
As=0.021*400*400=3360mm2
3360
6.8
490
7 25
Fc`=50mpa
Pu=513.4kn
Mu eq=206.8kn.m
0.6
0.16
0.2
0.031 … . .
AS=0.031*300*300=2790mm2
No of bars=2790/490=5.6
6 25
DESIGN COL(8)
Fc`=25mpa
Pu=14.38(3.325*3.825)+1.67*3.325+1.67*3.825+19.6+10.5
Pu=225kn
Pu=216.4kn
Mu eq=188.36kn.m
Kn=0.07
Rn=0.2
0.6
0.036 … …
AS=0.036*300*300=3240mm2
Fc`=25mpa
Pu=14.38(5.25*3.8)+1.67*3.8+1.675.25+19.6+10.5
Pu=332kn
14.38 ∗ 6.25 3 0.86 14.38 ∗ 4.25 3 0.8
∗ ∗ 1.67
3 2 3 2
59.56
14.38 ∗ 6.25
1.67 10.5 42.13
3
59.56 ∗ 6.85
279.5 .
16
5.850
42.13 ∗ 180.3 .
16
180.3
0.65
279.5
Mu eq=352.35kn.m
0.7
0.12
0.31
0.051 … …
As=0.051*400*400=8160mm2
8160
14.6
490
15 25
Fc`=50mpa
Pu=323.4kn
Mu eq=385.3kn.m
Kn=0.1
Rn=0.4
0.6
0.08
AS=0.08*300*300=7200mm2
7200
13.06
490
14 25
DESIGN COL (10)
Fc`=25mpa
Pu=14.38(5.25*5.4)+1.67*5.25+1.67*5.4+19.6
Pu443.2kn
14.38 ∗ 4.25 3 0.8 14.38 ∗ 6.25 3 0.86
∗ ∗ 1.67
3 2 2 2
59.57
14.38 ∗ 3.5
2 1.67 35.22
3
59.57 ∗ 6.85 35.22 ∗ 3.1
245.86 .
10 10
14.38 ∗ 4.25
1.67 22
3
14.38 ∗ 6.25
1.67 31.63
3
31.63 ∗ 5.85 22 ∗ 3.85
75.6 .
10 10
75.6
0.3
245.86
0.4
75.6 1 0.65
245.86 0.4 286.56 .
0.65
0.7
0.16
0.26
0.036 … … .
AS=0.036*400*400=5760mm2
5760
11.7
490
12 25
Fc`=50mpa
Pu=434.6kn
Mu eq=297.36kn.m
Kn=0.14
Rn=0.3
0.6
0.053 … …
AS=0.053*300*300=4770m
m2
4770
9.7
490
10 25
Fc`=25mpa
Pu=14.38(5.25*5.75)+1.67*5.25+1.67*5.75+19.6
Pu=472kn
14.38 ∗ 0.75 14.38 ∗ 6.25 3 0.86
∗ 1.67 39.125
3 3 2
2 14.38 ∗ 3.5
33.55
3
39.125 ∗ 7.6 33.55 ∗ 3.1
193.75 .
10 10
14.38 ∗ 3.5 3 0.86 14.38 ∗ 6.25
∗ 1.67 54.16
3 2 3
14.38 ∗ 0.75 3 0.18 14.38 ∗ 3.5 3 0.8
∗ ∗ 1.67
3 2 3 2
23.67
54.16 ∗ 5.85 26.67 ∗ 3.85
10 10
145.8 .
145.8
0.75
193.75
0.4
145.8 1 0.65
193.75 0.4
0.65
266.65 .
0.16
0.23
.03
AS=0.031*400*400=4960mm2
4960
9.79
490
Fc`=50mpa
Pu=463.42kn
Mu eq=275.33kn
Kn=0.15
Rn=0.29
0.051
As=0.051*300*300=4590mm2
4590
9.63
490
10 25
DESIGN COL(12)
Fc`=25mpa
Pu=14.38(4*5.25)+1.67*4+1.67*5.25+19.6
Pu=337kn
47.3 ∗ 7.6
170.753 .
16
80.56
0.47
170.753
214.13 .
0.12
0.2
0.028
0.028 ∗ 400 ∗ 400 4480
4480
9.12
490
10 25
Fc`=50mpa
Pu=328.4kn
Mu eq=221.32kn.m
Kn=0.1
Rn=0.23
0.6
0.029 … … .
0.029 ∗ 300 ∗ 300 2160
2160
5.3
490
6 25
DESIGN COL(1)
Wu=15kn/m
Partition=3.5*0.25*20*1.4=24.5kn/m
Weight of stem=1.67kn/m
Dimension of column=(450mm*450mm)
Weight of column=(0.45*0.45*3.5*25*1.4)=23.8kn/m
Fc`25mpa
Pu=131.6+(15*2.27*2.85)+(1.67*2.27)+(1.67*2.85)+23.8+24.5
Pu=285.5kn
15 ∗ 4.25 3 0.78
∗ 1.67 24.5 51.46 /
3 2
15 ∗ 4.25
1.67 24.5 47.42
3
51.46 ∗ 4.25
160.8 .
16
47.42 ∗ 3.8
70.29 .
16
70.29
0.43
160.8
0.45
70.29 1 0.65
160.8 0.45 195.95 .
0.65
285.5
0.08
0.7 ∗ 25 ∗ 0.45 ∗ 0.45 ∗ 1000
195.95
0.12
0.7 ∗ 0.45 ∗ 0.45 ∗ 0.45 ∗ 25 ∗ 1000
0.7
0.015 … … .
AS=0.015*450*450=3038mm2
No of bars =3038/490=6.45
7 25
Fc`=50mpa
Dimension of column=400*400mm
Pu=281.3kn
Mu eq=195.95kn.m
Kn=0.05
Rn=0.09
0.7
0.01
As=0.01*400*400=1600mm2
1600
3.2
490
4 25
DESIGN COL(2)
Fc`=25mpa
Pu=168.6+(15*2.85*3.125)+(1.67*2.85)+(1.67*3.125)+23.8+24.5
Pu=360.47 kn
15 ∗ 4.25 3 0.78 15 ∗ 2
∗ 1.67 24.5 66.446
3 2 2
4.250
15 ∗ 1.67 24.5 47.42
3
66.46 ∗ 5
207.68 .
16
47.42 ∗ 3.8
70.29 .
10
70.29
0.338 1
207.68
0.45
70.29 1 0.65
207.68 0.45
0.65
242.8 .
0.7
0.1
Rn=0.15
0.02 … … .
As=0.02*450*450=4050mm2
4050
8.2
490
9 25
Fc`=50mpa
Pu=356.27kn
Mu eq=242.8kn.m
Kn=0.06
Rn=0.08
0.012 … …
As=0.012*400*400=1920mm2
1920
3.9
490
4 25
DESIGN COL(3)
Fc`=25mpa
Pu=257+(15*4.125*3.78)+1.67*4.125+1.67*3.787+23.8+24.5
Pu=552.38kn
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 76.48
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
76.48 ∗ 6.8
353.6 .
10
57.42 ∗ 5.8
193.16 .
10
193.16
0.55 1
353.6
0.45
193.16 1 0.65
353.6 0.45 455.97 .
0.65
Kn=0.15
Rn=0.28
0.7
0.042 … …
AS=0.042*450*450=8505mm2
8505
17.3
490
Fc`=50mpa
Pu=5480.18kn
Mu eq=457.11kn.m
Kn=0.09
Rn=0.02
0.7
0.031 … …
As=0.031*400*400=4960mm2
4960
10.12
490
11 25
DESIGN COL(4)
Fc`=25mpa
Pu=211.8+(15*3.8*3.5)+1.67*3.8+1.67*3.5+23.8+24.5
Pu=460kn
15 ∗ 6.25 3 .86
∗ 1.67 24.5 61.49
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
61.49 ∗ 6.8
177.7 .
16
57.42 ∗ 5.8
120.72 .
16
120.72
0.68 1
177.7
0.45
120.72 1 0.65
177.7 0.45 253.06 .
0.65
Kn=0.13
Rn=0.16
0.021 … …
AS=0.021*450*450=4252mm2
4252
8.6
490
9 25
Fc`=50mpa
Pu=455.08kn
Mu eq=245.42kn.m
Kn=0.08
Rn=0.1
0.012
AS=0.012*400*400=1920mm2
1920
3.9
490
4 25
DESIGN COL(5)
Fc`=25mpa
Pu=533.5+(15*5.5*6.25)+1.67*6.25+1.67*5.5+23.8+24.5
Pu=1117kn
15 ∗ 6.25 3 0.86
2 ∗ 1.67 24.5 96.8
3 2
15 ∗ 3.5
2 1.67 24.5 61.8
3
96.8 ∗ 6.8 61.17 ∗ 2.8
424.2 .
10 10
0
Kn=0.3
Rn=0.4
0.045
As=0.045*450*450=9112mm2
9112
18.6
490
19 25
Fc`=50mpa
Pu=1112.8kn
Mu eq=429.18kn.m
Kn=0.19
Rn=0.2
0.025
AS=0.025*400*400=4000mm2
4000
9.16
490
10 25
DESIGN COL(6)
Fc`=25mpa
Pu=107.8+(15*6.25*3.8)+1.67*3.8+1.67*6.25+23.8+24.5
Pu=529.11kn
15 ∗ 6.25 3 0.86 96.7
∗ 1.67 24.5
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
96.7 ∗ 6.8
279.5 .
16
57.42 ∗ 5.8
193.16 .
10
193.16
0.69 1
279.5
0.45
193.16 1 0.65
279.5 0.45 376 .
0.65
Kn=0.15
Rn=0.23
0.032
AS=0.032*450*450=6480mm2
6480
13.2
490
Fc`=50mpa
Pu=524.9kn
Mu eq=387.75kn.m
Kn=0.09
Rn=0.17
0.024 … …
AS=0.024*400*400=3840mm2
3840
7.8
490
8 25
DESIGN COL(7)
Fc`=25mpa
Pu=522+(15*5.375*6.25)+1.67*6.25+1.67*35.375+23.8+24.5
Pu=1093.4kn
2 15 ∗ 3.5
1.67 24.5 61.17
3
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 61.48
3 2
61.48 ∗ 6.8 61.17 ∗ 3.05
227.4 .
10 10
15 ∗ 6.25
1.67 24.5 57.42 /
3
57.42 ∗ 5.8
193.16 .
10
193.16
0.85 1
227.4
0.3
0.2
0.7
0.02
AS=0.02*450*450=4050mm2
4050
8.26
490
9 25
Fc`=50mpa
Pu=1089kn
Mu eq=333.85kn.m
Kn=0.19
Rn=0.15
Ρ g=0.015……ρ min<ρ<ρ max
AS=0.015*400*400=2400mm2
No of bars=2400/490=4.8
5 25
DESIGN COL(8)
Fc`=25mpa
Pu=225+(15*3.325*3.325)+1.67*3.325+1.67*3.325+23.8+24.5
Pu=476kn
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 61.5
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
61.5 ∗ 6.8
177.7 .
16
57.42 ∗ 5.8
120.72 .
16
120.72
0.68 1
177.7
0.45 0.650
177.7 120.72 1 238.06 .
0.45 0.65
Kn=0.13
Rn=0.15
0.019
AS=0.019*450*450=3847.5mm2
3847.5
7.85
490
8 25
Fc`=50mpa
Pu=471.8kn
Mu eq=245.45kn.m
Kn=0.08
Rn=0.1
0.012
AS=0.012*400*400=1920mm2
1920
3.9
490
4 25
DESIGN COL (9)
Pu=332+(15*5.75*3.8)+1.67*3.8+1.67*5.25+23.8+24.5
Pu=694.6kn
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 86.48
3 2
15 ∗ 6.25
∗ 1.67 24.5 57.42
3
57.42 ∗ 5.8
120.72 .
16
86.48 ∗ 6.8
249.93 .
16
120.72
0.48 1
249.93
0.45
120.72 1 0.65
249.9. 0.45 310.29 .
0.65
0.2
0.19
0.022 … … .
AS=0.022*450*450=4455mm2
4455
9.09
490
10 25
Fc`=50mpa
Pu=690.4kn
Mu eq=318.69kn.m
Kn=0.12
Rn=0.14
0.018 … …
AS=0.018*400*400=2880mm2
2880
5.8
490
6 25
DESIGN COL(10)
934.5
15 ∗ 3.5
2 1.67 24.5 61.17
3
15 ∗ 4.25 3 .45 15 ∗ 6.25 3 0.86
∗ ∗ 1.67
3 2 3 2
24.5
86.5 .
86.5 ∗ 6.8 61.17 ∗ 3.05
343 .
10 10
15 ∗ 6.25
1.67 24.5 57.42
3
15 ∗ 4.25
1.67 24.5 47.42
3
57.42 ∗ 5.8 47.42 ∗ 3.8
124.68 .
10 10
124.68
0.36 1
343
0.45 0.650
343 124.68 1 405.34 .
0.45 0.65
0.26
0.25
0.032 … … .
AS=0.032*450*450=6480mm2
6480
13.2
490
14 25
` 50
930.3
416.16 .
0.16
0.18
0.022
AS=0.022*400*400=3520mm2
3520
7.15
490
8 25
DESIGN COL(11)
Fc`=25mpa
Pu=472+(15*5.75*5.25)+1.67*5.75+1.67*5.25+23.8+24.5
Pu=998kn
Pu=982.8kn
Mu eq=422.15kn.m
Kn=0.17
Rn=0.18
.022
AS=0.022*400*400=3520mm2
3520
7.1
490
8 25
DESIGN COL(12)
Fc`=25mpa
Pu=337+(15*5.25*4)+1.67*5.25+1.67*4+24.5+23.8
Pu=715.7kn
15 ∗ 2.75 15 ∗ 6.25 3 0.86
∗ 1.67 24.5 75.22
3 3 2
75.22 ∗ 7.55
267.98 .
16
15 ∗ 2.75 3 0.64
∗ 1.67 24.5 43.9
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
57.42 ∗ 5.8 43.9 ∗ 3.8
129.77 .
10 10
129.77
0.48 1
267.98
0.45
129.77 1 0.65
267.98 0.45 332.86 .
0.65
Kn=0.2
Rn=0.2
0.024
AS=0.024*450*450=4860mm2
4860
9.9
490
10 25
Fc`=50mpa
Pu=711.5kn
Mu eq=342kn.m
Kn=0.13
Rn=.015
0.018
AS=0.018*400*400=2880mm2
2880
5.8
490
6 25
DESIGN SLAB(7)
La/Lb=6/3.25=1.8
6m
Design as two way slab 3.25m
M=0.55
m‐ M+ DL M+ LL W Load
Short direction
Ma-=0.084*15*(3.25)2
Ma-=13.3kn.m
Ma+=[0.035*8.2+0.062*6.8]*(3.25)2
Ma+=7.5kn.m
Long direction
Mb-=0.007*15*(6)2=3.78kn.m
Mb+=[0.003*8.2+0.006*6.8]*(6)2=2.35kn.m
Short direction
Fc`=25mpa
da=160-20-12/2=134mm
max moment=13.3kn.m
0.002
0.0033
0.02
0.0033
As=0.0033*1000*134
As=442.2mm2
Long direction
db=122mm
max moment=3.78kn.m
fc`=25mpa
0.00068
0.0033
0.0033 ∗ 1000 ∗ 122
403
113
min 1000 ∗ ,2 ∗ 160 ,500
403
280
403
4 @ 1
113
Fc`=50mpa
0.00674
W=wu*La*Lb
W=15*6*3.25=293
Wa=W*wa=293*0.92=270
Wb=W*wb=293*0.08=23
Va=23
Vb=4
23 15 ∗ 0.92 ∗ 0.134
25
0.85
0.17 ∗ `∗ ∗
` 25 …… 108.8 25 …….
` 50 ……. 154 25 …….
DESIGN SLAB(6) 1.75m
5.15
2.9 2
1.75 5.15m
12
160 20 134
2
∗ ln 2 15 ∗ 1.75
4.6 .
10 10
15 ∗ 1.75
4 .
11
15 ∗ 1.75
3 .
16
max 4.6 .
` 25
0.00068
No of bars=4@ each(1m)
DESIGN SLAB( ) 4.75m
Lb/La=4.75/3.25=1.46 3.25m
Design as two way slab
M=0.7
short direction
Ma-=0.068*15*(3.25)2=10.77kn.m
Ma+=[0.04*8.2+0.054*6.8]*(3.25)2=7.3kn.m
Long direction
Mb-=0.029*15*(4.75)2=9.8kn.m
Mb+=[0.011*8.2+0.014*6.8]*(4.75)2=4.2kn.m
Short direction
da=134mm
max moment=10.77kn.m
Fc`=25mpa
0.0016
0.0033
As=0.0033*1000*134=442.2mm2
113
min 1000 ∗ , 320 ,500
442.2
S=250mm
No of bars=4 bars @ (1m)
Long direction
db=122mm
max moment=9.8kn.m
0.0018
0.0033
AS=0.0033*1000*122=403mm2
113
min 1000 ∗ , 320 ,500
403
S=280mm
Fc`=50mpa
0.00175
0.0033
AS=0.0033*1000*122=403mm2
S=280mm
CHECK SHEAR
W=wu*La*Lb=15*4.75*3.25
W=232
Wa=232*0.68=158
Wb=232*0.32=72.24
va=17
vb=11
va>vb
∗ ∗ 17 15 ∗ 0.68 ∗ 0.134
0.85
18
Fc`=25mpa
108.8 18 …….
Fc`=50mpa
154 18 …….
VOLUME OF CONCRETE SLABS
Slab (1)=6.25*7.25*0.16=7.25m3
Slab (2)=6.25*8*0.16=8m3
Slab (3)=6.25*7.25*0.16=7.25m3
Slab (4)=5.4*4.25*0.16=3.672m3
Slab (5)=4.25*3.5*0.16=2.38m3
Slab (6)=2*5.4*0.16=1.728m3
Slab (7)=3.5*6.25*0.16=3.5m3
fc`=25mpa
Volume of beams=0.35*0.25*243.6=21.315m3
fc`=50mpa
Volume of beams=0.3*0.2*243.6=14.616m3
Ground plan
Fc`=25mpa
Volume of columns=0.45*0.45*3.5*32=22.68m3
Fc`=50mpa
Volume of columns=0.4*0.4*3.5*32=17.92m3
First story
Fc`=25mpa
Volume of columns=0.4*0.4*3.5*23=17.92m3
Fc`=50mpa
Volume of columns=0.3*0.3*3.5*32=10.08m3
Total volume=22.68+17.92=40.6m3
Total volume=17.92+10.08=28m3
cost of stabilizer=80000dinar/m3
Ground plan
Fc`=25mpa
Col 1=7*5.5*3.855=148.4kg
Col 2=9*5.5*3.855=190.822kg
Col 3=16*5.5*3.855=339.24kg
C0l 4=9*5.5*3.855=190.822kg
Col 5=18*5.5*3.855=381.645kg
Col 6=15*5.5*3.855=318.375kg
Col 7=9*5.5*3.855=190.822kg
Col 8=8*5.5*3.855=169.62kg
Col 9=10*5.5*3.855=212kg
Col 10=14*5.5*3.855=296.835kg
Col 11=14*5.5*3.855=296.835kg
Col 12=10*5.5*3.855=212kg
Fc`=50mpa
Col 1=4*5.5*3.855=84.81kg
Col 2=4*5.5*3.855=84.81kg
Col 3=11*5.5*3.855=233.2kg
Col 4=4*5.5*3.855=84.81kg
Col 5=10*5.5*3.855=212kg
Col 6=8*3.855*5.5=169.62kg
Col 7=5*3.855*5.5=106kg
Col 8=4*5.5*3.855=84.81kg
Col 9=6*3.855*5.5=127.2kg
Col 10=8*5.5*3.855=169.62kg
Col 11=8*3*5.5*3.855=169.62kg
Col 12=6*5.5*3.855=127.2kg
First plan
Fc`=25mpa
Col 1=4*5.5*3.855=84.81kg
Col 2=6*5.5*3.855=127.2kg
Col 3=14*5.5*3.85=296.8kg
Col 4=11*5.5*3.855=233.22kg
Col 5=12*5.5*3.855=254.43kg
Col 6=20*5.5*3.855=508.86kg
Col 7=7*5.5*3.855=148.4kg
Col 8=9*5.5*3.855=190.8kg
Col 9=15*5.5*3.855=318kg
Col 10=12*5.5*3.855=254.43kg
Col 11=10*5.5*3.855=212kg
Col 12=10*5.5*3.855=212kg
Fc`=50mpa
Col 1=3*5.5*3.855=63.6kg
Col 2=6*5.5*3.855=127.2kg
Col 3=12*5.5*3.855=254.4kg
Col 4=9*5.5*3.855=190.82kg
Col 5=10*5.5*3.855=212kg
Col 6=15*5.5*3.855=318kg
Col 7=6*5.5*3.855=127.2kg
Col 8=7*5.5*3.855=148.4kg
Col 9=14*5.5*3.855=296.8kg
Col 10=10*5.5*3.855=212kg
Col 11=10*5.5*3.855=212kg
Col 12=6*5.5*3.855=127.2kg