Wu= 1.4DL+1.7L.

DL..

Concrete slabs= 24*60=3.84 KN/m2

Concrete tiles=20*0.04=0.8kn/m2 6m

Soil=18*0.15=2.7kn/m2

Sand=16.5*0.03=0.5kn/m2

DL=7.84kn/m2 7m

LL==2kn/m2

Wu=1.4*7.84+1.7*2

=10.976+3.4=14.38kn/m2

Thick of slab=160mm

Design slab(1)

Lb
‫= ــــــــــــ‬7/6=1.167 2 m- M+dL M+LL W
Ca=0.072 Ca=0.028 Ca=0.032 Wa=0.72
La Cb=0.013 Cb=0.013 Cb=0.02 Wb=0.21
Design as two way slab

Short direction

Ma-=ca*wu*La2

=0.072*14.38*(6)2

=37kn.m

Ma+=(ca ,DL*wu ,DL+ca .LL*wu ,LL)*(La)2

=(0.028*10.976+0.032*3.4)*(6)2

=15kn.m

Moment in column strip=2/3*M middle

M-=0.67*37=25KN.M
M+=.67*15=10KN.M

Long direction

Mb-=0.021*14.38*(7)2=14.8kn.m

Mb+=(0.013*10.796+0.02*3.4)*(7)2=10.32kn.m

M- at discontinuous end=1/3*M+

=.33*10.32=3.44Kn.m

Moment in column strip=2/3*M middle

=0.67*14.8=9.86kn.m
-9.86 -14.8 -9.86 -25 +10 -25
+6.88 +10.32 +6.88 -37 +15 -37
-2.3 -3.44 -2.3 -25 +10 -25

Long direction short direction

Short direction
da=160-20-12/2=134mm

Max moment=37kn.m

P=5.78*10-3 fc-=25mpa

b=1000mm d=134mm
.
.033

.75 ∗ 0.02

As=5.78*10-3*1000*134

As=774.52mm2
113
∗ 1000,2 ∗ 160,500
774.52
=MIN(150,320,500)

S=150mm
750.4
7 @ 1
113
Short direction
max moment=14.8KN.M
0.003

AS=3.3*10-3*1000*122=403MM2

Middle strip space


113
∗ 1000,2 ∗ 160,500
403
S=MIN(280,320,500)

S=280MM
No of bars=403/113=4bars @each(1m)

When fc-=50mpa

0.00267

0.033

AS=3.3*10-3*1000*122

=403mm2

S=min(113/403*1000,2*160,500)

=min(280,320,500)

S=280mm

No of bars=403/113=4 bars@ each(1m)

CHECK SHEAR

W=wu*La*Lb

=14.38*6*7

W=604

Wa=W* wa

=604*0.79=477

Wb=W*w b
Wb=604*0.21

Wb=127

Va=Wa/2Lb=477/14

Va=34kn

Vb=Wb/2La=127/12=11kn

‫ھنا المعادلة اكتب‬. ∗ ∗ 34 14.38 ∗ 0.79 ∗ 0.134


∅ 0.85
38.2
0.17 ∗ ∗ ∗
Fc-=25mpa

Vc=108.8kn more than 38.2kn …..ok

Fc`=50mpa

VC=154kn more than 38.2kn …..ok

DESIGN SLAB(2)

Lb/La=7.25/6=1.3

Design two way slab

M=La/Lb=6/7.25=0.75 6m
Short direction

Ma-=ca*wu*la2
7.75m
2
=0.078*14.38*(6) =40.38kn.m

Ma+=[ca ,DL*wu ,DL+ca ,LL*wu ,LL]*(la)2

=0.031*10.796+0.046*3.4]*(6)2=17.88kn.m

Moment in column strip=2/3*M middle


- M- M+DL M+LL W load
M =2/3*40.38=26.92kn.m
Ca=0.073 Ca=0.031 Ca=0.046 Wa=0.86
+
M =2/3*17.88=11.92kn.m Cb=0.014 Cb=0.007 Cb=0.013 Wb=0.14
Long direction

Mb-=cb*wu*Lb2

=0.014*14.38*(7.75)2=12kn.m

Mb+=[0.007*10.976+0.013*3.4]*(7.75)2=7.27kn.m -1.16 -2.42 -1.16


M- at discontinuous end=1/3*M+
+4.85 +7.27 +4.85
=1/3*2.27[2.42kn.m

M in column strip=2/3*M middle -8 -12 -8


=0.67*2.42=1.61kn.m

M-=0.67*12=8kn.m Long direction

M+=0.67*7.27=4.85kn.m

short direction

da=160-20-12/2=134mm
-26.92 +11.92 -26.92
‫ا‬. max moment=40.38kn.
0.00635 -40.38 +17.88 -40.38

.0033
-26.92 +11.92 -26.92
. 0.02

∗ ∗
As=0.00635*1000*134

As=851mm2

S=min[113/851*1000,2*160,500]

S=130mm

No of bars=851/113=8 bars@ each(1m)

Fc`=50mpa

Max moment=40.38kn.m
0.00613

0.0033

0.04

∗ ∗
As=0.00613*1000*134

As=821.42mm2

S=min[113*821.42*1000,2*160,500]

S=130mm

No of bars=821.42/113=8 bars@ each(1m)

Long direction

db=122mm

max moment=12kn.m
` 25

0.00218

∗ ∗

As=0.0033*1000*122

As=403mm2

S=[113/403*1000,2*160,500]

S=280mm

No of bars=403/113=4 bars@ each (1m)

Fc`=50mpa
0.0022

∗ ∗
As=.0033*1000*122

As=403mm2

S=[113/403*1000,2*160,500]

S=280mm

No of bars=403/113=4 bars @ each(1m)

CHECK SHEAR

W=wu*La*Lb

W=14.38*6*7.75

W=668

Wa=W*wa=668*0.86=574

Wb=W*wb=668*0.14=94

Va=Wa/2Lb=574/2*7.75=37

Vb=Wb/2La=94/12=7.83

∗ ∗ 37 14.38 ∗ 0.86 ∗ 0.134


42
∅ 0.85
6m
0.17 ∗ `∗ ∗ 108.8 42 …………..

` 50

154 42 ………………….. 7m

DESIGN SLAB(3)

Lb/La=7/6=1.167
M- M+DL M+LL W Load
Design two way slab
Ca=0.065 Ca=0.036 Ca=0.043 Wa=0.66
M=La/Lb=6/7=0.85
Cb=0.034 Cb=0.019 Cb=0.023 Wb=0.34
Short direction

Ma-=ca*wu*La2=0.065*14.38*(6)2=33.65kn.m

Ma+=[0.036*10.976+0.043*3.4]*(62)=19.48kn.m

M- at discontinuous end=1/3*M+

=1/3*19.48=6.5kn.m

Moment in column strip=2/3*M middle

M-=2/3*6.5=4.33kn.m

M-=2/3*33.65=22.43kn.m

M+=2/3*19.48kn.m

Long direction
-16 -24 -16
- 2
Mb =0.034*14.38*(7) =24kn.m
+9.33 +14 +9.33
+ 2
Mb =[0.019*10.976+0.023*3.4]*(7) =14kn.m
-3 -4.67 -3
- +
M at discontinuous end=1/3*M

=1/3*14=4.67kn.m

Moment in column strip=2/3*M middle

M-=2/3*4.67=3kn.m -22043 +9.65 -4.33

M-=2/3*24=16kn.m
-33.65 +19.48 -6.5
M+=2/3*14=9.33kn.m

short direction -22.43 +9.65 -4.33


da=134mm

max moment=33.65kn.m
` 25

. 0.00523

∗ ∗
As=0.00523*1000*134=700

S=min[113/700* 1000,2*160,500]

S=160mm

No of bars=700/113=7 bars@ each (1m)

` 50

33.65 .

0.0051

∗ ∗
As=0.0051*1000*134

As=683.4mm2

S=[1000*113/683.4,2*160,500]

S=160mm

No of bars=683.4/113=7 bars @ each(1m)

Long direction

db=122mm

max moment=24kn.m
0.0045

∗ ∗

As=0.0045*1000*122

As=549mm2

S=[113/549*1000,2*160,500]

S=200mm

No of bars=549/113=5 bars @ each(1m)


` 50

24 .

0.00436

∗ ∗

As=0.00436*1000*122

As=532mm2

S=[113/532*1000,2*160*500]

S=210mm

No of bars=532/113=5 bars @ each (1m)

CHECK SHEAR

W=wu*La*Lb

W=14.38*6*7=604

Wa=W*wa

Wa=604*0.66=398.84

Wb=W*wb

Wb=604*0.34=205.36

Va=398.84/2*7=28

Vb=205.36/2*6=17

∗ ∗ 28 14.38 ∗ 0.66 ∗ 0.134


31
∅ 0.85

0.17√25 ∗ 1000 ∗ 128 108.8 31

` 50

154 31 …….
DESIGN SLAB(4)

Lb/La=5.15/4=1.28

Design two way slab


4m
M=La/Lb=4/5.15=0.75

Short direction

Ma-=0.088*14.38*(4)2 5.15m

Ma-=20.24kn.m

Ma+=[0.048*10.976+0.055*3.4]*(4)2

Ma+=11.42kn.m

Long direction

Mb-=0.024*14.38*(5.15)2

Mb-=9.15kn.m

Mb+=[0.012*10.976+0.016*3.4]*(5.15)2

Mb+=5KN.M

Short direction
da=134mm

Max moment=20.24kn.m
` 25 M- M+ DL M+LL W load
0.0031
Ca=0.088 Ca=0.048 Ca=0.055 Wa=0.88
Cb=0.024 Cb=0.012 Cb=0.016 Wb=0.12
.0033

∗ ∗

AS=.0033*1000*134

AS=442.2mm2
S=[113/442.2*1000,2*160,500]

S=250mm

No of bars=442.2/113=4 bars@ each(1m)


` 50

0.0031

∗ ∗

AS=0.0033*1000*134

AS=442.2mm2

S=[113/442.2*1000,2*160,500]

S=250mm

No of bars=442.2/113=4 bars@ each(1m)

Long direction

db=122mm

max moment=5kn.m
` 25

0.00896

∗ ∗

AS=.0033*1000*122

AS=403mm2

S=[113/403*1000,2/160,500]

S=280mm

No of bars=403/113=4bars@each(1m)

CHECK SHEAR
W=wu*La*Lb

W=14.38*4*5.15

W=296

Wa=W*wa=296*0.88=260

Wb=W*wb=296*0.12=36

Va=Wa/2lb=260/2*5.15=25kn

Vb=Wb/2La=36/2*4=4.5kn

∗ ∗ 25 14.38 ∗ 0.88 ∗ 0.134


27.42
∅ 0.85

0.17 ∗ `∗ ∗

` 25

108.8 27.42 ………

` 50

154 27.42 …………

DESIGN SLAB(5)

Lb/La=4/3.25=1.2
4m
Design two way slab

M=3.25/4=0.8 3.25m

Short direction

Ma-=0.065*14.38*(3.25)2

Ma-=9.87kn.m

Ma+=[0.026*10.976+0.041*3.4]*(3.25)2

Ma+=4.5kn.m
M- M+ DL M+ LL W load
Ca=0.026 Ca=0.026 Ca=0.041 Wa=0.71
Cb=0.011 Cb=0.014 Cb=0.017 Wb=0.29
Long direction
-6.58 -9.87 -6.58
Mb-=0.026*14.38*(4)2
+0.75 +4.5 +0.75
Mb+=[0.011*10.976+0.017*3.4]*(4)2
-6.58 -9.87 -6.58
Mb+=2.9kn.m
Short direction
SHORT DIRECTION

da=134mm

max moment=9.87kn.m
` 25

0.00147
-4.13 +1.93 -4.13

-6.2 +2.9 -6.2


∗ ∗
-4.13 +1.93 -4.13
AS=0.0033*1000*134
Long direction
AS=442.2mm2

S=[113/442.2*1000,2*160,500]

S=250mm

No of bars=442.2/113=4bars@ each(1m)
` 50

9.87 .

0.00146

∗ ∗

AS=0.0033*1000*134

AS=442.2mm2

S=min[113/442.2*1000,2*160,500]
S=250mm

No of bars=442.2/113=4 bars@ each(1m)

LONG DIRECTION

db=122mm

max moment=6.2kn.m
` 25

0.0011

∗ ∗

AS=0.0033*1000*122

AS=403mm2

S=min[1000*113/403,2*160,500]

S=280mm

No of bars=403/113=4 bars @ each(1m)


` 50

6.2 .

0.0011

∗ ∗

AS=0.0033*1000*122

AS=403mm2

S=min[1000*113/403,2*160,500]

S=280mm

No of bars=403/113=4 bars @ each(1m)

CHECK SHEAR
W=wu*La*Lb

W=14.38*3.25*4

W=187

Wa=W*wa

Wa=187*0.71=133

Wb=W*wb

Wb=187*0.29=54

Va=Wa/2Lb

Va=133/2*4=17

Vb=Wb/2La

Vb=54/2*3.25=8.3

∗ ∗ 17 14.38 ∗ 0.71 ∗ 0.134


∅ 0.85
18.4

‫ھنا المعادلة اكتب‬. 0.17 ∗ `∗ ∗

` 25

108.8 18.4 …….

` 50

154 18.4 ………


DESIGN SLAB(6)

Lb/La=5.15/1.75=2.9>2
1.75m
Design one way slab

d=t-cover-12/2

d=160-20-6=134mm 5.15m

thickness of slab=160mm
2 1.75 2
∗ 14.38 ∗ 4.4 .
10 10
2 1.75 2
∗ 14.38 ∗ 4 .
11 11
2 1.75 2
∗ 14.38 ∗ 2.75
16 16
max 4.4 .

` 25

.00065

∗ ∗
As=0.0033*1000*134

AS=442.2mm2
‫اكتب المعادلة ھنا‬.
S=min[1000*113/442.2,2*160,500]

S=250mm

Spacing for shrinkage and temperature

S=min[1000*113/288,5*160,500]

S=460mm

No of bars =442.2/113=4 bars @ each(1m)


` 50
0.00065

∗ ∗
As=0.0033*1000*134

AS=442.2mm2

S main=250mm

S shrinkage=460mm

No of bars=4 bars @ each (1m)

DESIGN SLAB (7)

Lb/La=6/3.25=1.8
6m
Design two way slab
3.25m
M=3.25/6=0.55

Short direction

Ma-=0.084*14.38*(3.25)2

Ma-=12.75kn.m

Ma+=[0.035*10.976+0.062*3.4]*(3.25)2

Ma+=6.3kn.m

Long direction

Mb-=0.007*14.38*(6)2

Mb-=3.6kn.m

Mb+=[0.003*10.976+0.006*3.4]*(6)2

Mb+=1.92kn.m

M- M+ DL M+ LL W load

Ca=0.084 Ca=0.035 Ca=0.062 Wa=0.92


Cb=0.007 Cb=0.003 Cb=0.006 Wb=0.08
-2.4 +1.28 -2.4
SHORT DIRECTION

da=134mm -3.6 +1.92 -3.6

max moment=12.76kn.m -2.4 +1.28 -2.4


` 25

0.00192 Long direction

-8.5 -12.76 -8.5


∗ ∗
+4.2 +6.3 +4.2
As=0.003*1000*134
-8.5 -12.76 -8.5
As=442.2mm2

S=min[1000*113/442.2,2*160,500] Short direction

S=250mm

No of bars=442.2/113=4 bars @ each (1m)


` 50

12.76 .

0.00189

∗ ∗

As=0.0033*1000*134

As=442.2mm2

S=min[1000*113/442.2,2*160,500]

S=250mm

No of bars=442.2/113=4 bars @ each(1m)

LONG DIRECTION

db=122mm

max moment=3.6kn.m
` 25

0.000644

∗ ∗

AS=0.003*1000*122

AS=403mm2

S=min[1000*113/403,2*160,500]

S=280mm

No of bars=403/113=4 bars @ each (1m)

` 50

3.6 .

0.00064

∗ ∗
AS=0.003*1000*122

AS=403mm2

S=min[1000*113/403,2*160,500]

S=280mm

No of bars=403/113=4 bars @ each (1m)

CHECK SHEAR

W=wu*La*Lb

W=14.38*6*3.25

W=280mm

Wa=W*wa

Wa=280*0.91=255
Wb=W*wb

Wb=280*0.08=22

Va=Wa/2Lb=255/2*6=21.3

Vb=Wb/2La=22/2*3.25=3.4

Va wu ∗ wa ∗ d 21.3 14.38 ∗ 0.92 ∗ 0.134


23kn
∅ 0.085

0.17 ∗ `∗ ∗

` 25

108.8 23 ……..,

` 50

154 23 ……….
Slab direct Mu AS AS S S
no Kn.m Fc`=25 Fc`=50 Fc`=25 Fc`=50 Fc`=25 Fc`=50

S1 Short 38.88 0.0061 0.006 817 804 130 140


Long 15.4 0.0033 0.003 403 403 280 280

S2 Short 42.12 0.0066 0.0064 884.4 858 120 130


Long 8.76 0.0016 0.0016 403 403 280 280

S3 Short 10.29 0.0015 0.0015 442.2 442.2 250 250


Long 6.48 0.0012 0.0012 403 403 280 280

S4 Short 35.64 0.0056 0.0054 750.4 724 150 150


Long 16.66 0.0031 0.0033 403 403 280 280

S5 Short 21.12 0.0032 0.0032 442.2 442.2 250 250


Long 5.5 0.0098 0.0098 403 403 280 280

S6 Short 4.6 0.0068 0.007 442.2 442.2 250 250


Long

S7 Short 13.3 0.002 0.00197 442.2 442.2 250 250


Long 3.78 0.0064 0.00674 403 403 280 280

For ground plan


Slab direct Mu AS AS S S
no Kn.m Mm2 Mm2 mm mm
Fc`=25 Fc`=25 Fc`=25 Fc`=50 Fc`=25 Fc`=50
S1 Short 37 0.0057 0.0056 774.5 750.4 140 150
Long 14.8 0.0033 0.0026 403 403 250 280

S2 Short 46.38 0.0063 0.0061 851 821.42 130 130


Long 12 0.0021 0.0022 403 403 260 280

S3 Short 9.87 0.0015 0.0015 442.2 442.2 250 250


Long 6.2

S4 Short 33.65 0.0052 0.0051 683.4 683.4 160 160


Long 24 0.0045 0.0045 532 532 200 280

S5 Short 20.24 0.0031 0.0031 442.2 442.2 250 250


Long 5 0.0089 0.0011 403 403 280 280

S6 Short 4.4 0.0065 0.0065 442.2 442.2 250 250


Long

S7 Short 12.76 0.0019 0.0019 442.2 442.2 250 250


Long 3.6 0.0064 0.0064 403 403 280 280

For first plane


DESIGN OF COLUMN

Wu=14.38kn.m

Weight of stem=(0.35-0.16)*0.25*25*1.4=1.67kn/m

Partition=1.5*0.25*20*1.4=10.5kn/m

Dimension of column=400mm*400mm

Weight of column=0.4*0.4*3.5*25*1.4=19.6kn/m

d`=40+10+25/2=62.5mm

DESIGN COL(1)

Fc`=25mpa

Pu=14.38(2.27*2.85)+(1.67*2.85)+(1.67*2.27)+19.6+10.5

Pu=131.6kn

Moment from both side………….biaxial


14.38 ∗ 4.25
1.67 10.5
3
Wu(x)=32.54kn/m
14.38 ∗ 4.25 3 0.78

3 2
1.67 10.5

Wu(y)36.4kn/m

36.4 5.4 0.4


59.17 .
16
32.54 4.25 0.4
13
31.73 .
31.73
0.54 1
59.14
Mu eq=59.17+31.73(0.4/0.4)*(1-0.65)/0.65

Mu eq=76.25kn.m
400 2 ∗ 62.5
0.7
400
131.6
0.05
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
76.25
0.068
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
From chart………………… 0.01

∗ ∗

0.01 ∗ 400 ∗ 400

AS=1600mm2

Ab=490mm2
1600
3.2
490
4 25

Fc`=50mpa

Dimension of column=300mm*300mm

Weight of column=11.025kn/m

Weight of stem=1.67kn/m

Partition=10.5kn/m

Pu=123.11kn

Mu=76.25kn.m
76.25
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.08
123.1
0.04
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
0.011
As=0.011*300*300=990mm2

No of bars=990/490=2.02
3 25

DESIGN COL(2)

Fc`=25mpa

Pu=14.38(3.125*2.85)+1.67*2.85+1.67*3.125+19.6+10.5

Pu=168.6kn
14.38 ∗ 4.25
1.67 10.5 32.54
3
14.38 ∗ 5.4 3 0.78 14.38 ∗ 2
∗ 1.67 47
3 2 2
47 5.1
123.3 .
10
32.54 4.25 0.4
50.8 .
10
0.4 1 0.65
123.3 50.8 ∗ 149.65 .
0.4 0.65
0.7
168.6
0.06
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
149.65
0.134
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
0.018 … … … …

As=0.018*400*400=2880mm2

No of bars=2880/490=5.8
6 25

Fc`=50mpa

Pu=160.6kn
Mu=149.65kn.m

Kn=0.05

Rn=0.16
0.6

0.028 … … . . x

As=0.028*300*300=2520mm2

No of bars=2520/490=5.14
6 25

DESIGN COL(3)

Fc`=25mpa

Pu=14.38(4.125*3.78)+1.67*3.78+1.67*4.125+19.6

Pu=257kn

14.38 ∗ 6.25 3 0.86 49.85


∗ 1.67
3 2
6.250 31.63
14.38 ∗ 1.67
3
49.85 7.5 0.4
258.4 .
10
31.63 6.25 0.4
111.97 .
10
111.97
0.45
258.4
0.4
111.97 1 0.65
258.4 0.4 318.7 .
0.65
257
0.1
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
318.7
0.28
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
0.044 … …
AS=0.044*400*400=7040mm2

No of bars=7040/490=13.36
14 25

Fc`=50mpa

Pu=248.43kn

Mu eq=318.7kn.m
0.6
248.43
0.08
0.7 ∗ 50 ∗ .03 ∗ .03 ∗ 1000
318.7
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.33
From chart
0.062 … … .
AS=0.062*300*300=5580mm2

No of bars=5580/490=11.38
12 25

DESIGN COL (4)

Fc`=25mpa

Pu=14.38(3.8*3.3)+1.67*3.3+1.67*3.8+19.6

Pu=211.8kn

14.38 ∗ 6.25 3 0.86


∗ 1.67 33.8 /
3 2
14.38 ∗ 6.25
1.67 31.63
3
33.8 ∗ 6.85
163.3 .
16
31.63 ∗ 5.85
111.9
0.68
163.3
0.4 1 0.65
163.3 111.9 ∗
0.4 0.65
223.56 .
0.7
211.8
0.08
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
223.56
0.2
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
0.032 … …
AS=0.032*400*400=5120mm
5120
10.4
490
11 25
Fc`=50mpa

Pu=203.2kn

Mu eq=223.56kn.m

0.6
203.2
0.06
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
223.56
0.24
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.045 … …
0.045 ∗ 300 ∗ 300 4050
4050
8.26
490
9 25
DESIGN COL(5)

Fc`=25mpa

Pu=14.38(5.5*6.25)+1.67*5.5+1.67*6.25+19.6

Pu=533.5kn

14.38 ∗ 6.25 3 0.86 69.27


2 ∗ 1.67
3 2
14.38 ∗ 3.5 35.22
2 1.67
3
69.27 ∗ 6.85 35.22 ∗ 3.1
298.53 .
10 10
0
0.7
533.5
0.19
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
298.53
0.26
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
0.037 … … .
0.037 ∗ 400 ∗ 400 5920
5920
11.9 12 25
490
Fc`=50mpa

Pu=525kn

Mu=298.53kn.m
525
0.16
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
298.53
0.3
0.7 ∗ 50 ∗ .3 ∗ .3 ∗ .3 ∗ 1000
0.054
0.054 ∗ 300 ∗ 300 4860
4860
9.9
490
10 25

DESIGN COL (6)

Pu=14.38(6.25*3.8)+1.67*6.25+1.67*3.8+19.6+10.5

Pu=107.78kn

14.38 ∗ 6.25 3 0.86 79.78


2 ∗ 1.67 10.5
3 2
14.38 ∗ 6.25 42.13
1.67 10.5
3
79.78 ∗ 6.85
333.96 .
16
42.13 ∗ 5.85
144.2 .
10
144.2
0.005
323.96
0.4 1 0.65
323.96 144.2 ∗ 401.6 .
0.4 0.65
0.7
107.78
0.04
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
401.6
0.35
0.7 ∗ 25 ∗ .4 ∗ .4 ∗ .4 ∗ 1000
0.062 … …
0.062 ∗ 400 ∗ 400 9920
9920
19.2
490
20 25

Fc`=50mpa

Pu=99.2kn

Mu eq=401.6kn.m
0.6
99.2
0.03
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 1000
401.6
0.42
0.7 ∗ 50 ∗ 0.3 ∗ 0.3 ∗ 0.3 ∗ 1000
0.08
0.08 ∗ 300 ∗ 300 7200
7200
14.69
490
15 25

DESIGN COL(7)

Pu=14.38(5.375*6.25)+1.67*5.375+1.67*6.25+19.6

Pu=522kn
14.38 ∗ 3.5
2 1.67 35.22 /
3
14.38 ∗ 6.25 3 0.86
∗ 1.67 35.52
3 2
35.5 ∗ 6.85 35.22 ∗ 3.1
135.4 .
10 10
14.38 ∗ 6.25
29.95 /
3
29.95 ∗ 5.85
106 .
10
106
0.78
135.4
0.4
106 1 065
135.4 0.4 192.47 .
0.65
0.7
522
0.19
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 1000
192.47
0.18
0.7 ∗ 25 ∗ 0.4 ∗ 0.4 ∗ 0.4 ∗ 1000
0.021 … … .
As=0.021*400*400=3360mm2
3360
6.8
490
7 25

Fc`=50mpa

Pu=513.4kn

Mu eq=206.8kn.m

0.6
0.16
0.2
0.031 … . .
AS=0.031*300*300=2790mm2
No of bars=2790/490=5.6
6 25
DESIGN COL(8)

Fc`=25mpa

Pu=14.38(3.325*3.825)+1.67*3.325+1.67*3.825+19.6+10.5

Pu=225kn

14.38 ∗ 6.25 3 .86


∗ 1.67 10.5 46.03
3 2
14.38 ∗ 6.25
1.67 10.5 42.13
3
46.036.85
134.9 .
16
42.13 ∗ 5.85
90.12 .
16
90.12
0.67
134.9
0.4
90.12 1 0.65
134.9 0.4 183.43 .
0.65
0.7
0.08
0.164
0.025 … …
AS=0.025*400*400=4000mm2
4000
8.16
490
9 25
Fc`=50mpa

Pu=216.4kn

Mu eq=188.36kn.m

Kn=0.07

Rn=0.2
0.6
0.036 … …
AS=0.036*300*300=3240mm2

6.6 …..use 7 bars

DESIGN COL (9)

Fc`=25mpa

Pu=14.38(5.25*3.8)+1.67*3.8+1.675.25+19.6+10.5

Pu=332kn
14.38 ∗ 6.25 3 0.86 14.38 ∗ 4.25 3 0.8
∗ ∗ 1.67
3 2 3 2

59.56

14.38 ∗ 6.25
1.67 10.5 42.13
3
59.56 ∗ 6.85
279.5 .
16
5.850
42.13 ∗ 180.3 .
16
180.3
0.65
279.5
Mu eq=352.35kn.m
0.7
0.12
0.31
0.051 … …
As=0.051*400*400=8160mm2
8160
14.6
490
15 25
Fc`=50mpa

Pu=323.4kn

Mu eq=385.3kn.m

Kn=0.1

Rn=0.4
0.6
0.08
AS=0.08*300*300=7200mm2
7200
13.06
490
14 25
DESIGN COL (10)

Fc`=25mpa

Pu=14.38(5.25*5.4)+1.67*5.25+1.67*5.4+19.6

Pu443.2kn
14.38 ∗ 4.25 3 0.8 14.38 ∗ 6.25 3 0.86
∗ ∗ 1.67
3 2 2 2
59.57

14.38 ∗ 3.5
2 1.67 35.22
3
59.57 ∗ 6.85 35.22 ∗ 3.1
245.86 .
10 10
14.38 ∗ 4.25
1.67 22
3
14.38 ∗ 6.25
1.67 31.63
3
31.63 ∗ 5.85 22 ∗ 3.85
75.6 .
10 10
75.6
0.3
245.86
0.4
75.6 1 0.65
245.86 0.4 286.56 .
0.65
0.7
0.16
0.26
0.036 … … .
AS=0.036*400*400=5760mm2
5760
11.7
490
12 25
Fc`=50mpa

Pu=434.6kn

Mu eq=297.36kn.m

Kn=0.14

Rn=0.3
0.6
0.053 … …

AS=0.053*300*300=4770m
m2
4770
9.7
490
10 25

DESIGN COL (11)

Fc`=25mpa

Pu=14.38(5.25*5.75)+1.67*5.25+1.67*5.75+19.6

Pu=472kn
14.38 ∗ 0.75 14.38 ∗ 6.25 3 0.86
∗ 1.67 39.125
3 3 2
2 14.38 ∗ 3.5
33.55
3
39.125 ∗ 7.6 33.55 ∗ 3.1
193.75 .
10 10
14.38 ∗ 3.5 3 0.86 14.38 ∗ 6.25
∗ 1.67 54.16
3 2 3
14.38 ∗ 0.75 3 0.18 14.38 ∗ 3.5 3 0.8
∗ ∗ 1.67
3 2 3 2
23.67
54.16 ∗ 5.85 26.67 ∗ 3.85
10 10
145.8 .
145.8
0.75
193.75
0.4
145.8 1 0.65
193.75 0.4
0.65
266.65 .
0.16
0.23
.03
AS=0.031*400*400=4960mm2
4960
9.79
490
Fc`=50mpa

Pu=463.42kn

Mu eq=275.33kn

Kn=0.15

Rn=0.29
0.051

As=0.051*300*300=4590mm2
4590
9.63
490
10 25
DESIGN COL(12)

Fc`=25mpa

Pu=14.38(4*5.25)+1.67*4+1.67*5.25+19.6

Pu=337kn

14.38 ∗ 2.75 3 0.64


∗ 1.67 18.68
3 2
14.38 ∗ 6.25
1.67 3163
3
31.63 ∗ 5.85 18.68 ∗ 3.85
80.56 .
10 10
14.38 ∗ 2.75 14.38 ∗ 6.25 3 0.78
∗ 1.67
3 3 2
47.3

47.3 ∗ 7.6
170.753 .
16
80.56
0.47
170.753
214.13 .
0.12
0.2
0.028
0.028 ∗ 400 ∗ 400 4480
4480
9.12
490
10 25
Fc`=50mpa
Pu=328.4kn

Mu eq=221.32kn.m

Kn=0.1

Rn=0.23

0.6
0.029 … … .
0.029 ∗ 300 ∗ 300 2160
2160
5.3
490
6 25
DESIGN COL(1)

Wu=15kn/m

Partition=3.5*0.25*20*1.4=24.5kn/m

Weight of stem=1.67kn/m

Dimension of column=(450mm*450mm)

Weight of column=(0.45*0.45*3.5*25*1.4)=23.8kn/m

Fc`25mpa

Pu=131.6+(15*2.27*2.85)+(1.67*2.27)+(1.67*2.85)+23.8+24.5

Pu=285.5kn
15 ∗ 4.25 3 0.78
∗ 1.67 24.5 51.46 /
3 2
15 ∗ 4.25
1.67 24.5 47.42
3
51.46 ∗ 4.25
160.8 .
16
47.42 ∗ 3.8
70.29 .
16
70.29
0.43
160.8
0.45
70.29 1 0.65
160.8 0.45 195.95 .
0.65
285.5
0.08
0.7 ∗ 25 ∗ 0.45 ∗ 0.45 ∗ 1000
195.95
0.12
0.7 ∗ 0.45 ∗ 0.45 ∗ 0.45 ∗ 25 ∗ 1000
0.7
0.015 … … .
AS=0.015*450*450=3038mm2
No of bars =3038/490=6.45
7 25
Fc`=50mpa

Dimension of column=400*400mm

Pu=281.3kn

Mu eq=195.95kn.m

Kn=0.05

Rn=0.09
0.7
0.01
As=0.01*400*400=1600mm2
1600
3.2
490
4 25
DESIGN COL(2)

Fc`=25mpa

Pu=168.6+(15*2.85*3.125)+(1.67*2.85)+(1.67*3.125)+23.8+24.5

Pu=360.47 kn
15 ∗ 4.25 3 0.78 15 ∗ 2
∗ 1.67 24.5 66.446
3 2 2
4.250
15 ∗ 1.67 24.5 47.42
3
66.46 ∗ 5
207.68 .
16
47.42 ∗ 3.8
70.29 .
10
70.29
0.338 1
207.68
0.45
70.29 1 0.65
207.68 0.45
0.65
242.8 .
0.7
0.1
Rn=0.15

0.02 … … .
As=0.02*450*450=4050mm2
4050
8.2
490
9 25
Fc`=50mpa
Pu=356.27kn

Mu eq=242.8kn.m

Kn=0.06

Rn=0.08
0.012 … …
As=0.012*400*400=1920mm2
1920
3.9
490
4 25
DESIGN COL(3)

Fc`=25mpa

Pu=257+(15*4.125*3.78)+1.67*4.125+1.67*3.787+23.8+24.5

Pu=552.38kn
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 76.48
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
76.48 ∗ 6.8
353.6 .
10
57.42 ∗ 5.8
193.16 .
10
193.16
0.55 1
353.6
0.45
193.16 1 0.65
353.6 0.45 455.97 .
0.65
Kn=0.15

Rn=0.28

0.7
0.042 … …
AS=0.042*450*450=8505mm2
8505
17.3
490

Fc`=50mpa

Pu=5480.18kn

Mu eq=457.11kn.m

Kn=0.09

Rn=0.02
0.7
0.031 … …
As=0.031*400*400=4960mm2
4960
10.12
490
11 25
DESIGN COL(4)

Fc`=25mpa

Pu=211.8+(15*3.8*3.5)+1.67*3.8+1.67*3.5+23.8+24.5

Pu=460kn
15 ∗ 6.25 3 .86
∗ 1.67 24.5 61.49
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
61.49 ∗ 6.8
177.7 .
16
57.42 ∗ 5.8
120.72 .
16
120.72
0.68 1
177.7
0.45
120.72 1 0.65
177.7 0.45 253.06 .
0.65
Kn=0.13

Rn=0.16

0.021 … …

AS=0.021*450*450=4252mm2
4252
8.6
490
9 25
Fc`=50mpa

Pu=455.08kn

Mu eq=245.42kn.m

Kn=0.08

Rn=0.1
0.012
AS=0.012*400*400=1920mm2
1920
3.9
490
4 25

DESIGN COL(5)

Fc`=25mpa

Pu=533.5+(15*5.5*6.25)+1.67*6.25+1.67*5.5+23.8+24.5

Pu=1117kn

15 ∗ 6.25 3 0.86
2 ∗ 1.67 24.5 96.8
3 2
15 ∗ 3.5
2 1.67 24.5 61.8
3
96.8 ∗ 6.8 61.17 ∗ 2.8
424.2 .
10 10
0
Kn=0.3

Rn=0.4
0.045
As=0.045*450*450=9112mm2
9112
18.6
490
19 25
Fc`=50mpa

Pu=1112.8kn

Mu eq=429.18kn.m

Kn=0.19

Rn=0.2
0.025
AS=0.025*400*400=4000mm2
4000
9.16
490
10 25

DESIGN COL(6)

Fc`=25mpa

Pu=107.8+(15*6.25*3.8)+1.67*3.8+1.67*6.25+23.8+24.5

Pu=529.11kn
15 ∗ 6.25 3 0.86 96.7
∗ 1.67 24.5
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
96.7 ∗ 6.8
279.5 .
16
57.42 ∗ 5.8
193.16 .
10
193.16
0.69 1
279.5
0.45
193.16 1 0.65
279.5 0.45 376 .
0.65
Kn=0.15

Rn=0.23

0.032
AS=0.032*450*450=6480mm2
6480
13.2
490
Fc`=50mpa

Pu=524.9kn

Mu eq=387.75kn.m

Kn=0.09

Rn=0.17
0.024 … …
AS=0.024*400*400=3840mm2
3840
7.8
490
8 25
DESIGN COL(7)

Fc`=25mpa

Pu=522+(15*5.375*6.25)+1.67*6.25+1.67*35.375+23.8+24.5

Pu=1093.4kn
2 15 ∗ 3.5
1.67 24.5 61.17
3
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 61.48
3 2
61.48 ∗ 6.8 61.17 ∗ 3.05
227.4 .
10 10
15 ∗ 6.25
1.67 24.5 57.42 /
3
57.42 ∗ 5.8
193.16 .
10
193.16
0.85 1
227.4
0.3
0.2
0.7
0.02
AS=0.02*450*450=4050mm2
4050
8.26
490
9 25

Fc`=50mpa

Pu=1089kn

Mu eq=333.85kn.m

Kn=0.19

Rn=0.15
Ρ g=0.015……ρ min<ρ<ρ max
AS=0.015*400*400=2400mm2

No of bars=2400/490=4.8
5 25
DESIGN COL(8)

Fc`=25mpa

Pu=225+(15*3.325*3.325)+1.67*3.325+1.67*3.325+23.8+24.5

Pu=476kn
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 61.5
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
61.5 ∗ 6.8
177.7 .
16
57.42 ∗ 5.8
120.72 .
16
120.72
0.68 1
177.7
0.45 0.650
177.7 120.72 1 238.06 .
0.45 0.65
Kn=0.13

Rn=0.15

0.019
AS=0.019*450*450=3847.5mm2
3847.5
7.85
490
8 25
Fc`=50mpa

Pu=471.8kn

Mu eq=245.45kn.m

Kn=0.08

Rn=0.1
0.012
AS=0.012*400*400=1920mm2
1920
3.9
490
4 25
DESIGN COL (9)

Pu=332+(15*5.75*3.8)+1.67*3.8+1.67*5.25+23.8+24.5

Pu=694.6kn
15 ∗ 6.25 3 0.86
∗ 1.67 24.5 86.48
3 2
15 ∗ 6.25
∗ 1.67 24.5 57.42
3
57.42 ∗ 5.8
120.72 .
16
86.48 ∗ 6.8
249.93 .
16
120.72
0.48 1
249.93
0.45
120.72 1 0.65
249.9. 0.45 310.29 .
0.65
0.2
0.19
0.022 … … .
AS=0.022*450*450=4455mm2
4455
9.09
490
10 25
Fc`=50mpa

Pu=690.4kn

Mu eq=318.69kn.m

Kn=0.12

Rn=0.14

0.018 … …
AS=0.018*400*400=2880mm2
2880
5.8
490
6 25

DESIGN COL(10)

934.5
15 ∗ 3.5
2 1.67 24.5 61.17
3
15 ∗ 4.25 3 .45 15 ∗ 6.25 3 0.86
∗ ∗ 1.67
3 2 3 2
24.5
86.5 .
86.5 ∗ 6.8 61.17 ∗ 3.05
343 .
10 10
15 ∗ 6.25
1.67 24.5 57.42
3
15 ∗ 4.25
1.67 24.5 47.42
3
57.42 ∗ 5.8 47.42 ∗ 3.8
124.68 .
10 10
124.68
0.36 1
343
0.45 0.650
343 124.68 1 405.34 .
0.45 0.65
0.26
0.25
0.032 … … .
AS=0.032*450*450=6480mm2
6480
13.2
490
14 25
` 50
930.3
416.16 .
0.16
0.18
0.022
AS=0.022*400*400=3520mm2
3520
7.15
490
8 25
DESIGN COL(11)

Fc`=25mpa

Pu=472+(15*5.75*5.25)+1.67*5.75+1.67*5.25+23.8+24.5

Pu=998kn

15 ∗ 0.75 15 ∗ 6.25 3 0.86


∗ 1.67 24.5 65.22
3 3 2
15 ∗ 3.5
2 1.67 24.5 61.17
3
65.22 ∗ 7.55 61.17 ∗ 2.8
314.8 .
10 10
15 ∗ 3.5 3 0.56 15 ∗ 6.25
∗ 1.67 24.5 80.92
3 2 3
15 ∗ 0.75 3 0.18 15 ∗∗ 3.5 3 0.8
∗ ∗ 1.67 24.5
3 2 3 2
52.38

80.92 ∗ 5.8 52.38 ∗ 3.8


196.56 .
10 10
196.56
0.62 1……. 413 .
314.8
0.28
0.26
0.028 … …
As=0.028*450*450=5670mm2
5670
11.57
490
12 25
Fc`=50mpa

Pu=982.8kn

Mu eq=422.15kn.m

Kn=0.17

Rn=0.18
.022
AS=0.022*400*400=3520mm2
3520
7.1
490
8 25

DESIGN COL(12)

Fc`=25mpa

Pu=337+(15*5.25*4)+1.67*5.25+1.67*4+24.5+23.8

Pu=715.7kn
15 ∗ 2.75 15 ∗ 6.25 3 0.86
∗ 1.67 24.5 75.22
3 3 2
75.22 ∗ 7.55
267.98 .
16
15 ∗ 2.75 3 0.64
∗ 1.67 24.5 43.9
3 2
15 ∗ 6.25
1.67 24.5 57.42
3
57.42 ∗ 5.8 43.9 ∗ 3.8
129.77 .
10 10
129.77
0.48 1
267.98
0.45
129.77 1 0.65
267.98 0.45 332.86 .
0.65
Kn=0.2

Rn=0.2
0.024
AS=0.024*450*450=4860mm2
4860
9.9
490
10 25

Fc`=50mpa

Pu=711.5kn

Mu eq=342kn.m

Kn=0.13

Rn=.015
0.018
AS=0.018*400*400=2880mm2
2880
5.8
490
6 25
DESIGN SLAB(7)

La/Lb=6/3.25=1.8
6m
Design as two way slab 3.25m
M=0.55

m‐ M+ DL M+ LL W Load

Ca=0.089 Ca=0.035 Ca=0.062 Wa=0.92


Cb=0.007 Cb=0.003 Cb=0.006 Wb=0.08

Short direction

Ma-=0.084*15*(3.25)2

Ma-=13.3kn.m

Ma+=[0.035*8.2+0.062*6.8]*(3.25)2

Ma+=7.5kn.m

Long direction

Mb-=0.007*15*(6)2=3.78kn.m

Mb+=[0.003*8.2+0.006*6.8]*(6)2=2.35kn.m

Short direction

Fc`=25mpa

da=160-20-12/2=134mm

max moment=13.3kn.m

0.002
0.0033
0.02
0.0033
As=0.0033*1000*134

As=442.2mm2

Long direction

db=122mm

max moment=3.78kn.m

fc`=25mpa

0.00068
0.0033
0.0033 ∗ 1000 ∗ 122
403
113
min 1000 ∗ ,2 ∗ 160 ,500
403
280
403
4 @ 1
113
Fc`=50mpa

0.00674

0.0033 ∗ 1000 ∗ 122 403


113
min 1000 ∗ , 320,500
403
280
403
4 @ 1
113
Check shear

W=wu*La*Lb

W=15*6*3.25=293

Wa=W*wa=293*0.92=270

Wb=W*wb=293*0.08=23

Va=23

Vb=4

23 15 ∗ 0.92 ∗ 0.134
25
0.85
0.17 ∗ `∗ ∗

` 25 …… 108.8 25 …….
` 50 ……. 154 25 …….
DESIGN SLAB(6) 1.75m

5.15
2.9 2
1.75 5.15m

12
160 20 134
2
∗ ln 2 15 ∗ 1.75
4.6 .
10 10
15 ∗ 1.75
4 .
11
15 ∗ 1.75
3 .
16
max 4.6 .
` 25

0.00068

0.0033 ∗ 1000 ∗ 134 442.2


As min=0.0018*1000*160=241.2mm2
113
min 1000 ∗ , 480 ,500
442.2
250
Spacing for shrinkage and temperature
113
min 1000 ∗ , 800 ,500
241.2
S=460mm
442.2
4@ 1
113
` 50
0.0033
∗ ∗
0.0033 ∗ 1000 ∗ 134
442.2
250
=460mm

No of bars=4@ each(1m)
DESIGN SLAB( ) 4.75m

Lb/La=4.75/3.25=1.46 3.25m
Design as two way slab

M=0.7

M‐ M+DL M+DL W Load

ca=0.068 Ca=0.04 Ca=0.054 Wa=0.68


cb=0.029 Cb=0.011 Cb=0.014 Wb=0.32

short direction

Ma-=0.068*15*(3.25)2=10.77kn.m

Ma+=[0.04*8.2+0.054*6.8]*(3.25)2=7.3kn.m

Long direction

Mb-=0.029*15*(4.75)2=9.8kn.m

Mb+=[0.011*8.2+0.014*6.8]*(4.75)2=4.2kn.m

Short direction

da=134mm

max moment=10.77kn.m
Fc`=25mpa

0.0016
0.0033
As=0.0033*1000*134=442.2mm2
113
min 1000 ∗ , 320 ,500
442.2
S=250mm
No of bars=4 bars @ (1m)

Long direction

db=122mm

max moment=9.8kn.m

0.0018
0.0033
AS=0.0033*1000*122=403mm2
113
min 1000 ∗ , 320 ,500
403
S=280mm

No of bars=4 bars @ (1m)

Fc`=50mpa

0.00175
0.0033
AS=0.0033*1000*122=403mm2

S=min[1000*113/403 ,320 ,500]

S=280mm

No of bars=4 bars @ (1m)

CHECK SHEAR

W=wu*La*Lb=15*4.75*3.25

W=232

Wa=232*0.68=158

Wb=232*0.32=72.24
va=17

vb=11

va>vb

∗ ∗ 17 15 ∗ 0.68 ∗ 0.134
0.85
18
Fc`=25mpa

108.8 18 …….
Fc`=50mpa

154 18 …….
VOLUME OF CONCRETE SLABS

Slab (1)=6.25*7.25*0.16=7.25m3

Slab (2)=6.25*8*0.16=8m3

Slab (3)=6.25*7.25*0.16=7.25m3

Slab (4)=5.4*4.25*0.16=3.672m3

Slab (5)=4.25*3.5*0.16=2.38m3

Slab (6)=2*5.4*0.16=1.728m3

Slab (7)=3.5*6.25*0.16=3.5m3

Total volume of concrete for one story=33.78m3

Total volume for two story=67.56m3

VOLUME OF BEAMS CONCRETE

fc`=25mpa

Volume of beams=0.35*0.25*243.6=21.315m3

Volume of beams for two story=42.63m3

fc`=50mpa

Volume of beams=0.3*0.2*243.6=14.616m3

Volume of beams for two story=29.232m3

VOLUME OF COLUMNS CONCRETE

Ground plan

Fc`=25mpa

Volume of columns=0.45*0.45*3.5*32=22.68m3

Fc`=50mpa

Volume of columns=0.4*0.4*3.5*32=17.92m3

First story

Fc`=25mpa
Volume of columns=0.4*0.4*3.5*23=17.92m3

Fc`=50mpa

Volume of columns=0.3*0.3*3.5*32=10.08m3

Total volume at fc`=25mpa

Total volume=22.68+17.92=40.6m3

Total volume at fc`=50mpa

Total volume=17.92+10.08=28m3

Type of Fc`=25mpa Fc`=50mpa


concrete
slabs 67.56m3 67.56m3

beams 42.63m3 29.232m3

columns 40.6m3 28m3

Total 150.79m3 124.792m3


volume of
concrete
Total cost=150.79*450000=70000000dinar …..fc`=25mpa

cost of stabilizer=80000dinar/m3

amount of stabilizer=18 liter/m3

Total cost=124.792*45000*18*80000=80*1010 ……fc`=50mpa


CALCULATION OF RIENFORCEMENT AMOUNT

Ground plan

Fc`=25mpa

Col 1=7*5.5*3.855=148.4kg

Col 2=9*5.5*3.855=190.822kg

Col 3=16*5.5*3.855=339.24kg

C0l 4=9*5.5*3.855=190.822kg

Col 5=18*5.5*3.855=381.645kg

Col 6=15*5.5*3.855=318.375kg

Col 7=9*5.5*3.855=190.822kg

Col 8=8*5.5*3.855=169.62kg

Col 9=10*5.5*3.855=212kg

Col 10=14*5.5*3.855=296.835kg

Col 11=14*5.5*3.855=296.835kg

Col 12=10*5.5*3.855=212kg

Total of reinforcement amount=2974.95*2=5949.9kg

Total of reinforcement amount=6ton

Fc`=50mpa

Col 1=4*5.5*3.855=84.81kg

Col 2=4*5.5*3.855=84.81kg

Col 3=11*5.5*3.855=233.2kg

Col 4=4*5.5*3.855=84.81kg

Col 5=10*5.5*3.855=212kg

Col 6=8*3.855*5.5=169.62kg

Col 7=5*3.855*5.5=106kg
Col 8=4*5.5*3.855=84.81kg

Col 9=6*3.855*5.5=127.2kg

Col 10=8*5.5*3.855=169.62kg

Col 11=8*3*5.5*3.855=169.62kg

Col 12=6*5.5*3.855=127.2kg

Total of reinforcement amount=1484.84*2=2969.68kg

Total of reinforcement amount=3ton

First plan

Fc`=25mpa

Col 1=4*5.5*3.855=84.81kg

Col 2=6*5.5*3.855=127.2kg

Col 3=14*5.5*3.85=296.8kg

Col 4=11*5.5*3.855=233.22kg

Col 5=12*5.5*3.855=254.43kg

Col 6=20*5.5*3.855=508.86kg

Col 7=7*5.5*3.855=148.4kg

Col 8=9*5.5*3.855=190.8kg

Col 9=15*5.5*3.855=318kg

Col 10=12*5.5*3.855=254.43kg

Col 11=10*5.5*3.855=212kg

Col 12=10*5.5*3.855=212kg

Total of reinforcement amount=2840.9*2=5721.1kg

Total of reinforcement amount=5.75ton

Fc`=50mpa

Col 1=3*5.5*3.855=63.6kg
Col 2=6*5.5*3.855=127.2kg

Col 3=12*5.5*3.855=254.4kg

Col 4=9*5.5*3.855=190.82kg

Col 5=10*5.5*3.855=212kg

Col 6=15*5.5*3.855=318kg

Col 7=6*5.5*3.855=127.2kg

Col 8=7*5.5*3.855=148.4kg

Col 9=14*5.5*3.855=296.8kg

Col 10=10*5.5*3.855=212kg

Col 11=10*5.5*3.855=212kg

Col 12=6*5.5*3.855=127.2kg

Total of reinforcement amount=2235.62*2=4471.24kg

Total of reinforcement amount=4.5ton

.TOTAL OF RIENFORCEMENT AMOUNT FOR TWO STORY

Total amount=6+5.75=11.75=12ton …..fc`=25mpa

Total cost=12*850000=10200000 dinar …..fc`=25mpa

Total amount=3+4.5=7.5=8ton …...fc`=50mpa

Total cost=8*850000=6800000 dinar ……fc`=50mpa

Total difference of reinforcement amount=12-8=4ton

Difference of total cost=4*850000=3500000 dinar

Cost of building=10200000+70000000=80200000 dinar …….fc`=25mpa

Cost of building=6800000+80*1010=800006800000 dinar ……fc`=50mpa