Paper 1
Paper 1
Status
Key Points:
Key Points:
Techniques:
Steps:
3. Role of PMS: Tools like Microsoft Project and Excel support tasks such
as estimation, scheduling, resource management, and communication,
improving planning and timeline management.
Key Points:
This study examines how SWM and SEM influence SP through technological
complexity (TC) and how project size impacts this relationship. The findings
aim to provide insights for improving SP in construction projects, while
comparing results with prior studies and suggesting future research
directions.
This study proposes a robust buffer allocation model using the Root Square
Error Method (RSEM) to address these gaps. It introduces new metrics for
non-critical chains and employs a risk quantification approach to assess
uncertainties. The paper presents a multi-objective optimization method for
better project schedule management.
Introduction:
Project scheduling is vital for construction success, with PDM widely used.
However, schedules often face issues like poor activity breakdowns, leading
to unreliability. A quality schedule must be comprehensive, well-constructed,
credible, and updated regularly.