Manual Projections: Najah Saeed Abdulridha
Manual Projections: Najah Saeed Abdulridha
Manual Projections
Prepared by
Najah Saeed Abdulridha [email protected]
Objectives
Upon completion of this section, you should be able to:
2-Survey Data
To manually project from the current bottomhole position, the directional driller also requires survey
data.
For example the like the table below:
Example-1
2-Survey Data
MPS-1-Change in azimuth
First, we calculate the target N/S and E/W coordinates. The N/S and E/W coordinates of the projected
target can be calculated from its polar coordinates. The azimuthal direction is converted to compass
quadrant. Then, using the polar distance, the rectangular coordinates are calculated. The N/S and E/W
coordinates have been updated to:
Inclination Projection
MPS-6-Measured depth
Manual Projections
Example-1
1- Well Plan Data
2-Survey Data
Example-2: Change in inclination
In the second part of this lesson, we will detect a required change in inclination using a different set of target and
survey data, as shown below. You will be required to step through the calculations, calculating the required inputs
as you go.
Well Target Data
Survey Data
Example-2: Change in inclination
Solution
1. Calculate N/S and E/W coordinates of the target.
2. Identify the target TVD.
3. Calculate the target vertical section.
4. Calculate the average azimuth angle.
5. Compare the average azimuth angle to AZ Survey 2.
6. If the average azimuth angle does NOT equal AZ Survey 2, calculate AZ Target.
7. Calculate the average inclination angle.
8. If the average inclination angle does NOT equal INC Survey 2, calculate INC
Target.
9. Calculate the target measured depth.
Example-2: Calculate the projected target inclination
Solution
When the average inclination angle does not equal the inclination at the current survey station, the directional
driller calculates the required target inclination. This is done by using the average angle formula and substituting
the values for the average inclination and INC Survey 2.
The projected target inclination of 16.20° is the inclination at which the directional driller must now steer toward to
hit the target.
Final Exam- First Try_4_3_2020: Q5: A: Given the well plan and survey data below,
perform a manual projection. Arrange your answers in the table?
Well Plan Data
Target polar coordinates = 314.21 ft. @ 233.01°
Target TVD = 5,253.13 ft.
Plane of proposal = 230°
Q1: Given the well plan and survey data below: Well Plan Data
Target polar coordinates = 608.10 ft @ 305°
Target TVD = 7,960 ft
Plane of proposal = 325°