SE to ENC examine ayacut
SE to ENC examine ayacut
SE to ENC examine ayacut
From: To:
Sri. G Ramesh, B.E, Engineer in Chief (projects),
The Superintending Engineer, LMD Colony,
SYP Circle, LMD Colony, Karimnagar. Karimnagar
* * *
Sripada Yellampally Project, Stage-II Phase-I consists of lifting 12 TMC of water from
the barrage across river Godavari near Yellampally (V) Ramagundam (M) to irrigate an
ayacut of 2.0 Lakhs Acres in the uplands of erstwhile Karimnagar (Dist) through the water
conductor system of 110 Kms by construction of 6 Nos of Pump Houses & Delivery Cisterns,
1 Formation of New Tank & remodeling of 15 Nos of existing Tanks and by excavation of
Gravity of 44.207 Kms to feed the Tanks, and work was entrusted to M/s IVRCL - Navayuga
- SEW (JV), Hyderabad.
For the creation of 1,51,400 acres, by utilizing the water from SYP stage-I, Phase-I
three packages Namely Canal Network package-I, Canal Network package-II and Canal
Network package-III were designed and works were grounded in a phased manner. Out of
these distributor packages Canal Network package-II was designed under Rudrangi tank
and the details of the package is as detailed below:
1. Construction of Pump House @ Dumpet (V), Kathalapur (M) to feed Rudrangi Tank from
FFC @ Ch 52.30 Km
2. Construction of Pump House at Ippapalli (V), Kathalapur (M) to feed Lakkakula Tank
from Suramma LMC @ Ch 6.40 Km
3. Construction of Pump House at fore shore of New tank 450, Chandurthi (V&M), to feed
Kothapet tank and Mothkuraopet Tank
4. Stage-I, Construction of Pump House @ Maddutla (V), Mallial (M) to feed Kotha Cheruvu
from FFC@ Ch: 76.22 Km & Stage-II, Construction of Pump House @ foreshore of Gudi
Cheruvu, Maddutla (V), Mallial (M) to feed Nallamattu tank
Further, on 29-12-2020 Sri. B Vinod Kumar, the Hon’ble Vice - Chairmen, planning
commission, has conducted a meeting on new LIS proposals and instructed to further
examine the feasibility for the creation of additional ayacut under Rudrangi tank, keeping
in view of the changed circumstances i.e. source of feeding the Rudranging tank from FFC
and other lift proposals.
Vide reference 6th cited, this office has requested the agency M/s Vensa-SEW (JV),
Hyd (which is only the agency under SYP), to give consent for examining the possibility for
creation of additional ayacut under Rudrangi tank and other new LIS proposals and the
agency M/s Vensa-SEW (JV), Hyd, has submitted their consent for reinvestigating the
creation of possible additional ayacut if any vide reference 7 th cited.
In this regard, I request the Engineer in Chief (Projects), LMD Colony, to give
necessary permission for conducting investigation work for the creation of possible
additional ayacut under Rudrangi & other newly proposed LISs by the existing agency.
Yours Faithfully,
Superintending Engineer,
SYP Circle, LMD Colony, Karimnagar.
1. Copy to the Executive Engineer, Division No.2 of SYP for favor of Information.
2. Copy to the VENSA- SEW (JV), HYD for favor of Information.
Superintending Engineer,
SYP Circle, LMD Colony, Karimnagar.