Government of Telangana

Irrigation & CAD Department

From: To:
Sri. G Ramesh, B.E, Engineer in Chief (projects),
The Superintending Engineer, LMD Colony,
SYP Circle, LMD Colony, Karimnagar. Karimnagar

Lr.No. SE /SYPC/LMD/KRMR/TS/T1/432/ Dated: .12.2020


Sir,

Sub:- I&Cad. Dept.- Sripada Yellampally Project – Canal Network Package-II


and New Lift Irrigation Scheme proposals to feed Rudrangi Tank
from FFC and to feed other Tanks & Gap Ayacut between FFC and
Kakatitya Canal – Permission for re-examining the possibility for
the creation of additional ayacut under Rudrangi tank and other
newly proposed LIS by the existing agency-Req- Reg.

Ref: - 1. Review meeting chaired by Hon’ble Chief Minister, Telangana Govt,


held on 12.07.2020 @ Pragathibhavan, on tanks feeding and ayacut
under Kathalapur and Medipally Mandals of Jagtial Dists
2. Inspection Notes of ENC (Projects), Karimnagar, Dt: 16-07-2020.
3. Lr. No. ENC/Projects/KRMR/TS/T7/F20/1164, Dt: 19.10.2020.
4. Meeting chaired by Sri. B Vinod Kumar, Hon’ble planning commission
chairmen, held on 29-12-2020 @ Rudrangi Tank.
5. Lr No. EE/Divn No.2/SYP/LMD/TS/399n , Dt: 30-12-2020.
6. T.O. Lr.No. SE/SYPC/LMD/KRMR/TS/T1/F432/239/M, Dt: 30.12.2020.
7. Vensa-Sew (JV), Hyd Lr No. –Nil-, Dt: 30-12-2020.

* * *
Sripada Yellampally Project, Stage-II Phase-I consists of lifting 12 TMC of water from
the barrage across river Godavari near Yellampally (V) Ramagundam (M) to irrigate an
ayacut of 2.0 Lakhs Acres in the uplands of erstwhile Karimnagar (Dist) through the water
conductor system of 110 Kms by construction of 6 Nos of Pump Houses & Delivery Cisterns,
1 Formation of New Tank & remodeling of 15 Nos of existing Tanks and by excavation of
Gravity of 44.207 Kms to feed the Tanks, and work was entrusted to M/s IVRCL - Navayuga
- SEW (JV), Hyderabad.

For the creation of 1,51,400 acres, by utilizing the water from SYP stage-I, Phase-I
three packages Namely Canal Network package-I, Canal Network package-II and Canal
Network package-III were designed and works were grounded in a phased manner. Out of
these distributor packages Canal Network package-II was designed under Rudrangi tank
and the details of the package is as detailed below:

Type of Agreement: - LS type of agreement was concluded, to create an ayacut 43100


Acres under Rudrangi and Nagaram Tanks.
Agency: - VENSA – SEW (JV), Hyderabad
Agreement No: - SE/SYPC/LMD/07/2017-18 Date: 22-01-2018.
Agreement Amount: - Rs. 173.26 crores. 2nd EOT Granted up to 21.1.2021.
Work Status: - The survey and investigation work for LMC and RMC of Kalikota
Cheruvu (Rudrangi Tank) is completed and HP’s also approved.
The survey and investigation work for Distributories and Minors
and CM & CD works are in progress.
Financial Status: - 0.70Crs (0.40%) Balance work: 172.59 Crs.
L.A STATUS: - Requisitioned: 521 Ac (For Main Canals), Acquired: 0 Ac, Balance:
1800 Ac (Jagityal Dist:- 1600 Acres Rajanna Siricilla -200 Acres)
Amount Required for LA: 180 Crs, for distributaries, minors and
sub-minors survey work is in progress;
During the review meeting chaired by Hon’ble Chief Minister, Telangana Govt, held
on 12.07.2020 @ Pragathibhavan, on tanks feeding and ayacut under Kathalapur and
MedipallyMandals of JagtialDists, the Hon’ble Chief Minister has instructed, to curtail the
ayacut under SYP, Stage-II, Phase-I to an extent of 90,000 Acres, as the system is designed
for a discharge of 1000 Cusecs. And also, in view of availability of water in Flood Flow Canal
the Government has decided and instructed, to submit the proposals to feed Rudrangi tank
from Flood Flow Canal, instead of SYP Stage-II Phase-I scheme, by constructing a new pump
house, for supplying water to ayacut under Rudrangi tank and, to feed the tanks & gap
ayacut between Kakatiya canal & FFC through lifts, vide reference 1 st cited.

In continuation, the Engineer in chief (Project), Karimnagar has inspected below


mentioned proposals and instructed to submit the proposals duly examining the feasibility
to feed gap ayacut and the Lift Irrigation Scheme estimates. Accordingly 5 No.s of LISs
estimates were prepared and submitted to accord sanction, vide references 2 nd & 3rd cited
as below:

1. Construction of Pump House @ Dumpet (V), Kathalapur (M) to feed Rudrangi Tank from
FFC @ Ch 52.30 Km
2. Construction of Pump House at Ippapalli (V), Kathalapur (M) to feed Lakkakula Tank
from Suramma LMC @ Ch 6.40 Km
3. Construction of Pump House at fore shore of New tank 450, Chandurthi (V&M), to feed
Kothapet tank and Mothkuraopet Tank
4. Stage-I, Construction of Pump House @ Maddutla (V), Mallial (M) to feed Kotha Cheruvu
from FFC@ Ch: 76.22 Km & Stage-II, Construction of Pump House @ foreshore of Gudi
Cheruvu, Maddutla (V), Mallial (M) to feed Nallamattu tank

Further, on 29-12-2020 Sri. B Vinod Kumar, the Hon’ble Vice - Chairmen, planning
commission, has conducted a meeting on new LIS proposals and instructed to further
examine the feasibility for the creation of additional ayacut under Rudrangi tank, keeping
in view of the changed circumstances i.e. source of feeding the Rudranging tank from FFC
and other lift proposals.

Vide reference 6th cited, this office has requested the agency M/s Vensa-SEW (JV),
Hyd (which is only the agency under SYP), to give consent for examining the possibility for
creation of additional ayacut under Rudrangi tank and other new LIS proposals and the
agency M/s Vensa-SEW (JV), Hyd, has submitted their consent for reinvestigating the
creation of possible additional ayacut if any vide reference 7 th cited.

In this regard, I request the Engineer in Chief (Projects), LMD Colony, to give
necessary permission for conducting investigation work for the creation of possible
additional ayacut under Rudrangi & other newly proposed LISs by the existing agency.

Yours Faithfully,

Superintending Engineer,
SYP Circle, LMD Colony, Karimnagar.

1. Copy to the Executive Engineer, Division No.2 of SYP for favor of Information.
2. Copy to the VENSA- SEW (JV), HYD for favor of Information.

Superintending Engineer,
SYP Circle, LMD Colony, Karimnagar.