Overview of Power Quality
PQ Regulation & Requirement
PQ Measurement & Monitoring
Case Study
CSI PQ
Unit PQ Operation, Asset Planning Operation
Ir. Mohd Azhan Mohd Khairul Arifin Ir. Mohd Aizzuddin Mohd Hafiz Mohd Sabhi
Kadir Mohd Sharim Md Muhsin Mohd Latif Mohd Ghani
Senior Engineer Senior Engineer Senior Engineer Technician (PQMS) Technician (PQMS)
(PQ-South) (PQ-North) (PQ-East)
Our Role & Responsibility :
33kv
11kv
Harmonic Distortion
Notches
Continuous
Voltage fluctuations voltage
disturbances
Frequency Deviations
Unbalance
Definitions of Power Quality
EMO shutdown
Unbalance sensor trip
Circuit breakers open
ACB or MCB nuisance tripping
Sensor faults or errors
Damaged to control cards
Damaged to capacitor banks
ASD shutdown
Computer system shutdown or re-boots
Loss of equipment’s internal communication network
Subsystems get out of synchronization
Others
Swell Overvoltage
110%
Normal operating voltage*
90%
Event Magnitude
Notch/transient
10%
Momentary Temporary Sustained interruption
Voltage Regulations
Voltage Level % Variation (Normal) % Variation (Contigency)
400 & 230 Volt - 6% to + 10% - 6% to + 10%
6.6, 11, 22 & 33 kV ± 5% ± 10%
132 & 275 kV - 5% to + 10% ± 10%
500 kV ± 5% - 5% to + 10%
LV Nominal Voltage
Range: Range:
1Φ - 216 ~ 252 V 1Φ - 216 ~ 253 V
3Φ - 373 ~ 435 V 3Φ - 376 ~ 440 V
REGULATORY & REQUIREMENTS
The Distributors
Investigate complaints
Make proposal to
reduce frequency &
magnitude of the events
Unaffected region
Misoperation region
20 ms 200 ms 500 ms
Class A (Advanced)
• Purpose: For precise measurement
• Application: Contractual applications, resolving disputes,
verifying compliance with standards, etc.
• Objective: All Class A instruments must produce
matching* results within the specified uncertainty for that
parameter when measuring the same signals.
* Condition: Class A measurements produce matching
results only if the user-selected parameters (threshold,
hysteresis, etc) match.
Class S (Surveys)
• Purpose: For statistical applications, with a limited subset
of parameters.
• Application: Surveys or power quality assessment. etc.
• Objective: Produce statistically useful but not necessarily
identical results.
PQ Measurement Method of Statement (MOS)
Case 1 : Water Treatment Plant
Complaint on voltage swell issues
Case 1 : Water Treatment Plant
Reference Nominal voltage of the PQ recorder was set at 10kV L-L instead of 11kV.
This may cause incorrect triggering of voltage swell event.
CASE 2 : Canned Food Factory
0.82
0 0.62
Power
PF
0.41
-50 0.21
0.00
07/ 26/ 19 12:00:00 07/ 27/ 19 0:00:00 07/ 27/ 19 12:00:00 07/ 28/ 19 0:00:00 07/ 28/ 19 12:00:00 07/ 29/ 19 0:00:00
Click on any axis and drag to scroll
kW Avg Total kvar Avg Total
• Solution?
CASE 3 : Hospital
PPU A
11kV
SSU A
PQR
PQR
CASE 3 : Hospital
Summary
1) Incoming 11kV
CASE 3 : Hospital
Summary
2) Low voltage 400V
CASE 3 : Hospital
Findings
There is THD exceeding 4% at HV.
THD at 11kV
THD at 400
V
CASE 3 : Hospital
Findings
Momentary interruption happen at LV side after the voltage
sag. 11kV
8:33:21 8:33:41
400V
MPPU ZZZ
33kV
11kV
Jetty
Site
2PQR Plant
NOP
Suapbalik bekalan dari
MPPU XXX
CASE 4 : Silica Plant
Result
1) Incoming 11kV
CASE 4 : Silica Plant
Result
2) Low voltage 400V
CASE 4 : Silica Plant
Findings
There is a voltage temporary interruption during
operation malfunction issues.
**Cause of this event is due to autorecloser operation at incoming line of MPPU Zzz.
CASE 4 : Silica Plant
Findings
Voltage THD level exceeding limit 4%@11kV & 5%
@ 400V. THD at
11kV
THD at 400
V
CASE 4 : Silica Plant
Findings
There is voltage variation issues at low voltage
exceeding +10% limit we monitor as per ST
requirement for LV at 230 V (+10% ,-6%)
CASE 4 : Silica Plant
Summary Findings
PQ
Standard /
No measurement Result Remark
Reference
& testing
1. Voltage sag IEC 61000- Voltage sag exposure 1 event at 11kV was below IEC
4-34 Class 3 of 40 events (39 61000-4-34 Class 3 curve- but
@11kV & 1 @400V) no misoperation reported.
240 300
Amps RMS
220
Volts RMS
200
200
180 100
160
03/ 23/ 19 0:00:00 03/ 26/ 19 12:00:00 03/ 30/ 19 0:00:00 04/ 02/ 19 12:00:00
Click on any axis and drag to scroll
A RMS Avg A A RMS Avg B A RMS Avg C A RMS Min A A RMS Min B A RMS Min C A RMS Max A A RMS Max B A RMS Max C
80.0 0.91
0.84
Power
60.0
PF
0.77
40.0
0.70
20.0
0.62
03/ 23/ 19 0:00:00 03/ 26/ 19 12:00:00 03/ 30/ 19 0:00:00 04/ 02/ 19 12:00:00
Click on any axis and drag to scroll
kW Avg Total PF Avg Total
CASE 5 : Mahkamah
Selected Recorded Event Zoomed Detail: - Phase A, B, C Event, Amplitude = 599.85
1500
300
1000
200
100 500
66.0 A
10:50:01.760
Amps
0
Volts
93.1 A
0
10:50:01.840
-100
-500
-200
-300 -1000
-400
-1500
10:50:01.750 10:50:01.760 10:50:01.770 10:50:01.780 10:50:01.790 10:50:01.800 10:50:01.810 10:50:01.820 10:50:01.830 10:50:01.840 10:50:01.850
HH:MM:SS.m m m
A Waveform Avg A A Waveform Avg B A Waveform Avg C
300
200
100 205.93 V
10:50:01.760
Volts
0 327.92 V
10:50:01.840
-100
-200
-300
-400
10:50:01.750 10:50:01.760 10:50:01.770 10:50:01.780 10:50:01.790 10:50:01.800 10:50:01.810 10:50:01.820 10:50:01.830 10:50:01.840 10:50:01.850
HH:MM:SS.m m m
V Waveform Avg AN V Waveform Avg BN V Waveform Avg CN
CASE 5 : Mahkamah
200
250.0
Amps RMS
150
Volts RMS
100
245.0
50
240.0
04/ 05/ 19 0:00:00 04/ 06/ 19 0:00:00 04/ 07/ 19 0:00:00 04/ 08/ 19 0:00:00 04/ 09/ 19 0:00:00 04/ 10/ 19 0:00:00 04/ 11/ 19 0:00:00
Click on any axis and drag to scroll
A RMS Avg A A RMS Avg B A RMS Avg C A RMS Min A A RMS Min B A RMS Min C A RMS Max A A RMS Max B A RMS Max C
80.0 0.91
0.88
Power
60.0
PF
0.86
40.0
0.83
20.0
0.80
04/ 05/ 19 0:00:00 04/ 06/ 19 0:00:00 04/ 07/ 19 0:00:00 04/ 08/ 19 0:00:00 04/ 09/ 19 0:00:00 04/ 10/ 19 0:00:00 04/ 11/ 19 0:00:00
Click on any axis and drag to scroll
kW Avg Total PF Avg Total
CASE 6 : Automated Vision Inspection Provider
Factory
CASE 6 : Automated Vision Inspection Provider
100% Limit
x% Limit
AN BN CN AN BN CN AN BN CN AN BN CN
Voltage Variations Unbalance Events
Frequency Voltage Harm onics Flicker
VOLTAGE
Recorded Volts/Amps/Hz Reference Timeplot: 18-11-2019 10:40:00 - 10-01-2020 11:55:44
250
200
Volts RMS
150
100
50
0
23-11-19 0:00:00 30-11-19 0:00:00 07-12-19 0:00:00 14-12-19 0:00:00 21-12-19 0:00:00 28-12-19 0:00:00 04-01-20 0:00:00
Click on any axis and drag to scroll
V RMS Avg AN V RMS Avg BN V RMS Avg CN V RMS Min AN V RMS Min BN V RMS Min CN V RMS Max AN V RMS Max BN V RMS Max CN
CURRENT
Recorded Volts/Amps/Hz Reference Timeplot: 18-11-2019 10:40:00 - 10-01-2020 11:55:44
245.0 500
240.0 400
Amps RMS
Volts RMS
235.0 300
230.0 200
225.0 100
23-11-19 0:00:00 30-11-19 0:00:00 07-12-19 0:00:00 14-12-19 0:00:00 21-12-19 0:00:00 28-12-19 0:00:00 04-01-20 0:00:00
Click on any axis and drag to scroll
A RMS Avg A A RMS Avg B A RMS Avg C A RMS Min A A RMS Min B A RMS Min C A RMS Max A A RMS Max B A RMS Max C
CASE 6 : Automated Vision Inspection Provider
THDv
Recorded THD Reference Timeplot: 18-11-2019 10:40:00 - 10-01-2020 11:55:44
3.00
2.50
% THD
2.00
1.50
23-11-19 0:00:00 30-11-19 0:00:00 07-12-19 0:00:00 14-12-19 0:00:00 21-12-19 0:00:00 28-12-19 0:00:00 04-01-20 0:00:00
Click on any axis and drag to scroll
V THD Avg AN V THD Avg BN V THD Avg CN
THDi
Recorded THD Reference Timeplot: 18-11-2019 10:40:00 - 10-01-2020 11:55:44
50.0
40.0
% THD
30.0
20.0
10.0
23-11-19 0:00:00 30-11-19 0:00:00 07-12-19 0:00:00 14-12-19 0:00:00 21-12-19 0:00:00 28-12-19 0:00:00 04-01-20 0:00:00
Click on any axis and drag to scroll
A THD Avg A A THD Avg B A THD Avg C
CASE 6 : Automated Vision Inspection Provider
Energy kW
Recorded Pow er Reference Timeplot: 18-11-2019 10:40:00 - 10-01-2020 11:55:44
1.10
300
0.88
200
0.66
Power
PF
100
0.44
0
0.22
-100
0.00
23-11-19 0:00:00 30-11-19 0:00:00 07-12-19 0:00:00 14-12-19 0:00:00 21-12-19 0:00:00 28-12-19 0:00:00 04-01-20 0:00:00
Click on any axis and drag to scroll
kW Avg Total
PF
Recorded Pow er Reference Timeplot: 18-11-2019 10:40:00 - 10-01-2020 11:55:44
1.02
300
0.82
200
0.61
Power
PF
100
0.41
0
0.20
-100
0.00
23-11-19 0:00:00 30-11-19 0:00:00 07-12-19 0:00:00 14-12-19 0:00:00 21-12-19 0:00:00 28-12-19 0:00:00 04-01-20 0:00:00
Click on any axis and drag to scroll
PF Avg Total
CASE 6 : Automated Vision Inspection Provider
PQ MEASUREMENT DEMO
• Phase difference between V & I in AC Power System (Resistive ”unity”,
Inductive ”lag” ,Capacitive ”lead”)
Power Factor / Displacement Power Factor
Overall score CSI TNB
Overall CSI Score vs PQ score
10.0
CSI TNB CSI PQ
8.6 8.7
9.0
8.0 8.1 8.1 8.1 8.1
8.0 7.5 7.6
7.0
6.0
5.0
2.0
1.0
0.0
2013 2014 2015 2016 2017 2018 2019 2020 2021
*Start from 2020,category for PQ related score had been change from Advisory Service on Power Quality to Power
Quality.
Score by area
CSI PQ ADVISORY Question
CSI PQ ADVISORY Question
CSI PQ Question (New-2020 Onward)
Questions