Aparna Serene Park Project- Billing checklist

MEP works
S No Description of activity Checklist Y N Remarks

1 Invoice with covering letter

2 PO/WO/BOQ (Revised PO/WO if any)

3 Abstract sheet, DC Summary sheet.

Delivery challan with gate entry/store entry and concerned


4 Supply of material engineer receiving sign & block name.
(No over writings are accepted)
5 Intermediate reconciliation sheet

6 Test certificate (not older than 3 months) with vendors name

Warranty/Guarantee certificate, Technical specification sheet,


7
User Manual (For White goods)
Soft copy in line BOQ series and with all the required quantity
8
backup

1 Invoice with covering letter

2 PO/WO/BOQ (Revised PO/WO if any)

3 Abstract sheet, Measurement sheet, DC Summary sheet.

Signed JMR's with flatwise/floor wise/tower wise summary


4 (which ever is applicable)

Latest drawings with area demarcation or highlighted


5 measurements
Installation claim
Signed Checklists (Flat wise/zone wise/phase wise/tower wise
6 (whichever is applicable)
7 Intermediate reconciliation sheet
8 ESI Challan
9 PF challan
10 CAR policy
11 Workmen Compensation policy
12 Muster Roll
13 Form V
14 Soft copy in line BOQ series and with all the required quantity
backup

1 Copy of Substantial Completion Certificate

Successful Testing certificates and Handing over certificates

For Final Bill Copy of technical documents handing over certificate of the
2
package
Reconciliation sheet
3 No Claim Certificate
4 No Objection Certificate from Store department
5 No due certificate or any debit note from client
Bill check list for MEP works

Project:

Client:

Vendor Name:

WO/PO No.:

Description of Work:

S No Description of Activity Checklist Yes NO NA Remarks

1 Invoice with covering letter

2 PO/WO/BOQ (Revised PO/WO if any)

Soft copy in line BOQ series and with all the required quantity
3
backup

4 Abstract sheet, Measurement sheet, DC Summary sheet.

Delivery challan with gate entry/store entry and concerned


5 engineer receiving sign & block name. (No over writings are
accepted)

6 Intermediate reconciliation sheet


Supply and Installation Works

7 Test certificate (not older than 3 months) with vendors name

Warranty/Guarantee certificate, Technical specification sheet,


8
User Manual (For White goods)

Signed JMR's with flatwise/floor wise/tower wise summary


9
(which ever is applicable)

Signed Checklists (Flat wise/zone wise/phase wise/tower wise


10
(whichever is applicable)

11 Reconciliation sheet

12 As built drawings

13 Substantial Completion Certificate

14 Successful Testing certificates and Handing over reports

15 Operational & Maintenance manual (Do's & Don’t / Catalogues)

Copy of technical documents handing over certificate of the


16
package

17 Equipment test certificates


Final Bills

18 List of Equipments & Makes

19 Inventory /Spare parts list

20 Training Schedule for handover

21 Contact list

22 No Claim Certificate

23 Relieving Letter

Contractor Client PMC

Signature & Stamp : Signature : Signature :

Date : Date : Date :