LOCATION OF KWHM: IN COMP.

WALL
PLANNED COMPLETION DATE:- DETAILS OF CONNECTED LOAD /MAX DEMAND
FACING ROAD SIDE
PROJ:-PROP. WAREHOUSE & OFFICE (G+M) OWNER:- M/S. LISBON INTERNATIONAL FZCO AREA :-JAFZA.
AS BUILT
SUMMARY SHEET CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT :- S 40111

CIRCUIT/ CIRCUIT PROTECTION FAULT CABLE TYPE ECC CONNECTED LOAD kWHr METER

FEEDER/ RATING (AMPS) DUTY PVC/SWA/PVC 2/3 4c 1c R Ph Y Ph B Ph TCL 1-PH 3-PH 3-PH CT REMARKS

DB No. SP TP F/S-ISO MCCB MCB KA XLPE/SWA/PVC mm^2 mm^2 kW kW kW KW (1) (2) (3) (4)
INCOMER BY DEWA 2X1C:150

OUTGOING:-
300A With
KWHM-1 * 35 BY DEWA 2X1C:95 60.33 58.98 60.48 179.78 1 300 / 5A CT METER
Pad Lock

400A With
KWHM-2 * 35 BY DEWA 2X1C:150 57.85 57.60 57.00 172.46 1 400 / 5A CT METER
Pad Lock

KWHM connected to TOTAL CONNECTED LOAD PER PHASE: 118.18 116.58 117.48 352.24 2

TRANSFORMER TOTAL CONNECTED LOAD: 352.24 kw (1)=UPTO 60A 1PH


DIVERSITY FACTOR APPLIED: 0.9 (2)=UPTO 100A 3PH
MAXIMUM DEMAND: 317.02 kw (3)=125-160 3PH

(4) LV CT METER 300/5A 3PH


ELECTRICAL CONTRACTOR :- SHAMA AL MADINA TECHNICAL SERVICES LLC
Tel No. 04 355 2456 , Email: [email protected]
PLANNED COMPLETION DATE:- DETAILS OF CONNECTED LOAD /MAX DEMAND LOCATION : COMP. WALL

PROJ:-PROP. WAREHOUSE & OFFICE (G+M) OWNER:- M/S. LISBON INTERNATIONAL FZCO AREA :-JAFZA.
AS BUILT
MDB - 1 CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT :- S 40111

CIRCUIT/ CIRCUIT PROTECTION FAULT CABLE TYPE ECC CONNECTED LOAD kWHr METER

FEEDER/ RATING (AMPS) DUTY PVC/SWA/PVC 2/3 4c 1c R Ph Y Ph B Ph TCL 1-PH 3-PH 3-PH CT REMARKS

DB No. SP TP F/S-ISO MCCB MCB KA XLPE/SWA/PVC mm^2 mm^2 kW kW kW KW (1) (2) (3) (4)

INCOMER * 300A XLPE/SWA/PVC 4CX185 1CX95 60.33 58.98 60.48 179.78

DB-WH * 63 25 XLPE/SWA/PVC 4C:16 1C:16 9.10 9.10 9.10 27.30

ENERGY METER FOR


DB - GF OFF * 40 25 XLPE/SWA/PVC 4C:10 1C:10 6.20 6.30 6.30 18.80
LIGHTS
ENERGY METER FOR
DB - MF OFF * 40 25 XLPE/SWA/PVC 4C:10 1C:10 5.20 5.25 6.75 17.20
LIGHTS
ENERGY METER FOR
DB - AC * 80 25 XLPE/SWA/PVC 4C:25 1C:16 13.50 12.00 12.00 37.49
AC

SPARE * 160 25 26.33 26.33 26.33 78.99 FUTURE LOAD

C.B. * 100 25 XLPE/SWA/PVC 4C:35 1C:16 50 KVAR 5 step

WE PROPOSED 5 STEP (10+10+10+10+10) 50 KVAR AUTOMATIC CAPACITOR BANK

MDB - 1 Connected To TOTAL CONNECTED LOAD PER PHASE: 60.33 58.98 60.48 179.78

TOTAL CONNECTED LOAD: 179.78 KW


KWHM - 1 (1)=UPTO 60A 1PH
DIVERSITY FACTOR APPLIED: 0.85 (2)=UPTO 100A 3PH
MAXIMUM DEMAND: 152.81 KW (3)=125-160 3PH
ELECTRICAL CONTRACTOR :- SHAMA AL MADINA TECHNICAL SERVICES LLC
Tel No. 04 355 2456 , Email: [email protected]
PLANNED COMPLETION DATE:- DETAILS OF CONNECTED LOAD /MAX DEMAND LOCATION : COMP. WALL

PROJ:-PROP. WAREHOUSE & OFFICE (G+M) OWNER:- M/S. LISBON INTERNATIONAL FZCO AREA :-JAFZA.
AS BUILT
MDB - 2 CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT :- S 40111

CIRCUIT/ CIRCUIT PROTECTION FAULT CABLE TYPE ECC CONNECTED LOAD kWHr METER

FEEDER/ RATING (AMPS) DUTY PVC/SWA/PVC 2/3 4c 1c R Ph Y Ph B Ph TCL 1-PH 3-PH 3-PH CT REMARKS

DB No. SP TP F/S-ISO MCCB MCB KA XLPE/SWA/PVC mm^2 mm^2 kW kW kW KW (1) (2) (3) (4)

INCOMER * 400 XLPE/SWA/PVC 4CX300 1CX150 57.85 57.60 57.00 172.46

STARTER INSIDE ELR+SH.TRIP+


FIRE PUMP * 400 25 XLPE/SWA/PVC 4CX300 1CX150 50.00 50.00 50.00 150.00
FIRE PUMP PANEL (ELS+ALARM)

DB-PR * 40 25 XLPE/SWA/PVC 4C:10 1C:10 3.18 2.93 2.33 8.45

SPARE * 40 25 4.67 4.67 4.67 14.01

C.B. * 125 25 XLPE/SWA/PVC 4C:50 1C:25 60 KVAR 5 Step

ASSUMING A P.F 0.78 FOR 197.45KW,TO ACHIEVE 0.9 P.F LAGGING WE REQUIRE 197.45 X 0.31 = 61.20 KVAR

WE PROPOSED 5 STEP (20+10+10+10+10) 60 KVAR AUTOMATIC CAPACITOR BANK

TOTAL CONNECTED LOAD PER PHASE: 57.85 57.60 57.00 172.46


MDB - 2 Connected To

TOTAL CONNECTED LOAD: 172.46 KW


KWHM - 2 (1)=UPTO 60A 1PH
DIVERSITY FACTOR APPLIED: 1 (2)=UPTO 100A 3PH
MAXIMUM DEMAND: 172.46 KW (3)=125-160 3PH

ELECTRICAL CONTRACTOR :- SHAMA AL MADINA TECHNICAL SERVICES LLC


Tel No. 04 355 2456 , Email: [email protected]
PROJECT:- PROPOSED WAREHOUSE & OFFICE (G+M) CLIENT : M/S. LISBON INTERNATIONAL FZCO BLOCK:- JAFZA

DB NO. DB-WH CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT NO:- S 40111


AS BUILT
FED FROM MDB-1 LOAD DISTRIBUTION SCHEDULE LOCATION:- WAREHOUSE
Rating Rating MCB CCT EEC CONNECTED LOADS/POINT WATT LOAD PER CIRCUIT-WATT REMARKS
of Inco- of SL CIR Rtg WIRE WIRE ROOM/AREA IND. EX 13A 13A S COO W WAT 15A R Y B
mer ELCB NO NO Amps IN MM2 IN MM2 LTG EX.FAN FAN S/O METAL H/D KER A/C PUMP SSO. ISO UNIT
1 R1 16 2.5 2.5 WAREHOUSE 4 250 1000

2 Y1 16 2.5 2.5 WAREHOUSE 4 250 1000


40A,4P
3 B1 16 2.5 2.5 WAREHOUSE 4 250 1000
100mA
ELCB
4 R2 16 2.5 2.5 WAREHOUSE 4 250 1000
1
5 Y2 16 2.5 2.5 WAREHOUSE 4 250 1000

6 B2 16 2.5 2.5 WAREHOUSE 4 250 1000

7 R3 16 2.5 2.5 WAREHOUSE 4 250 1000

8 Y3 16 2.5 2.5 WAREHOUSE 4 250 1000

40A,4P 9 B3 16 2.5 2.5 WAREHOUSE 4 250 1000


100mA
ELCB 10 R4 16 2.5 2.5 WAREHOUSE 4 250 1000
2
11 Y4 16 2.5 2.5 WAREHOUSE 4 250 1000

12 B4 16 2.5 2.5 WAREHOUSE 4 250 1000

13 R5 16 2.5 2.5 WAREHOUSE 6 100 600 BULK HEAD LIGHT

WAREHOUSE CONTROL
14 Y5 16 2.5 2.5 4 250 1000
FLOOD LIGHTS BY TIMER
40A,4P WAREHOUSE CONTROL
100mA 15 B5 16 2.5 2.5 4 250 1000
FLOOD LIGHTS BY TIMER
ELCB WAREHOUSE CONTROL
3 16 R6 16 2.5 2.5 2 250 500
FLOOD LIGHTS BY TIMER
17 Y6 16 SPARE 300 300

63 A TP 18 B6 16 2.5 2.5 WAREHOUSE 4 300 1200


ISO
19 R7 16 2.5 2.5 WAREHOUSE 4 300 1200

20 Y7 16 2.5 2.5 WAREHOUSE 4 300 1200


40A,4P
100mA 21 B7 16 2.5 2.5 EMERGENCY LIGHT 5 100 500
ELCB
4 22 R8 16 SPARE 100 800

23 Y8 16 2.5 2.5 WAREHOUSE 2 300 600

24 B8 16 2.5 2.5 FACP 500 500

25 R9 32 4 2.5 WAREHOUSE 5 200 1000 RING


40A,4P
30mA
ELCB 26 Y9 32 4 2.5 WAREHOUSE 5 200 1000 RING
5
27 B9 20 SPARE 900 900

28 R10 300
40A,4P
4X1C 1C
30mA 20A
29 Y10 X X RUD - 1 1 900 300
ELCB TP
4 2.5
6
30 B10 300

40A,4P 31 R11 300


4X1C 1C
30mA 20A
32 Y11 X X RUD - 2 1 900 300
ELCB TP
4 2.5
7
33 B11 300

40A,4P 34 R12 400


4C 1C
30mA 20A
35 Y12 X X FORK LIFT 1 1200 400
ELCB TP
4 4
8
36 B12 400

TOTAL 9100 9100 9100 27.3

CABLE SIZE IX4C:16 MM2 CU XLPE/SWA/PVC + 1X1C:16 MM2 CU. PVC ECC Y/G
PROJECT:- PROPOSED WAREHOUSE & OFFICE (G+M) CLIENT : M/S. LISBON INTERNATIONAL FZCO BLOCK:- JAFZA

DB - GF OFFICE (SHEET 1 OF 2) CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT NO:- S 40111


AS BUILT
FED FROM MDB-1 LOAD DISTRIBUTION SCHEDULE LOCATION:- OFFICE

LOAD PER CIRCUIT-


Rating Rating MCB CCT EEC CONNECTED LOADS/POINT WATT WATT REMARKS
of Inco- of SL CIR Rtg WIRE WIRE ROOM/AREA IND. EX 13A 13A SPLIT WAT 15A R Y B
FB
mer ELCB NO NO Amps IN MM2IN MM2 LTG EX FAN S/O H/D Twin A/C PUMP SSO. ISO UNIT
1 R1 16 2.5 2.5 OPEN OFFICE 12 100 1200

2 Y1 16 2.5 2.5 OPEN OFFICE 10 100 1000

3 B1 16 2.5 2.5 OFFICE TOILET+HANDICAP 6 2 100 800

40A, 4 R2 16 2.5 2.5 EMERGENCY LIGHT 5 100 500


4P
100mA 5 Y2 16 SPARE 500 500
ELCB
1 6 B2 16 2.5 2.5 WORKER TOILET 9 1 100 1000

7 R3 20 4 2.5 FIRE PANEL 200 200

8 Y3 16 2.5 2.5 PRAYER RM+PANTRY 11 1 100 1200

9 B3 16 SPARE 500 500

10 R4 32 4 2.5 OPEN OFFICE 4 1 200/400 1200 RING


40 A
TP ISO 11 Y4 32 4 2.5 OPEN OFFICE 4 400 1600 RING
40A,
4P 12 B4 20 SPARE 500 500
30mA
ELCB 13 R5 20 SPARE 100 100
2
14 Y5 20 4 2.5 PANTRY+PRAYER ROOM 4 200 800

15 B5 20 4 2.5 PANTRY 1 500 500

40A, 16 R6 20 4 2.5 OFF TOILET 1 2000 2000


4P
30mA 17 Y6 20 SPARE 200 200
ELCB
3 18 B6 20 4 2.5 WORKER TOILET 1 2000 2000
40A, 19 R7 666
4P 4C 1C
20A
30mA 20 Y7 X X TEL 1 2000 666 ISO FOR TEL
TP
ELCB 4 4 EQUIPMENTS
4 21 B7 666

CABLE SIZE IX4C:10 MM2 CU XLPE/SWA/PVC + 1X1C:10 MM2 CU. PVC ECC Y/G TOTAL 5866 5966 5966
PROJECT:- PROPOSED WAREHOUSE & OFFICE CLIENT : M/S. LISBON INTERNATIONAL FZCO BLOCK:- JAFZA

DB - GF OFFICE (SHEET 2 OF 2) CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT NO:- S 40111

FED FROM MDB-1 LOAD DISTRIBUTION SCHEDULE LOCATION:- OFFICE


Rating Rating MCB CCT EEC CONNECTED LOADS/POINT WATT LOAD PER CIRCUIT-WATT REMARKS
of Inco- of SL CIR Rtg WIRE WIRE ROOM/AREA IND. EX 13A COO DUCT FCU 15A R Y B
mer ELCB NO NO Amps IN MM2IN MM2 LTG EX FAN S/O W/H H/D KER A/C SSO. ISO UNIT
40A, 22 R8 233
4P
30mA 23 Y8 TP20 4CX4 1CX4 GATE1 1 700 233
ELCB
5 24 B8 233

40A, 25 R9 20 4 2.5 FCU - GF 1 1 50 50


40 A 4P
TP 100mA 26 Y9 20 4 2.5 FCU - GF 2 1 50 50
ISO ELCB
6 27 B9 20 4 2.5 FCU - GF 3 1 50 50

40A, 28 R10 20 4 2.5 FCU - GF 4 1 50 50


4P
100mA 29 Y10 20 4 2.5 FCU - GF 5 1 50 50
ELCB
7 30 B10 20 4 2.5 FCU - GF 6 1 50 50

NOTE:-
ENERGY CHECK METER INSIDE DB FOR LIGHT & AC
AS PER GREEN BUILDING REQUIREMENT

CABLE SIZE IX4C:10 MM2 CU XLPE/SWA/PVC + 1X1C:10 MM2 CU. PVC ECC Y/G TOTAL 6199 6299 6299 18.797
PROJECT:- PROPOSED WAREHOUSE & OFFICE (G+M) CLIENT : M/S. LISBON INTERNATIONAL FZCO BLOCK:- JAFZA

DB - MF OFFICE CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT NO:- S 40111


AS BUILT
FED FROM MDB-1 LOAD DISTRIBUTION SCHEDULE LOCATION:- OFFICE
Rating Rating MCB CCT EEC CONNECTED LOADS/POINT WATT LOAD PER CIRCUIT-WATT REMARKS
of Inco-of SL CIR Rtg WIRE WIRE ROOM/AREA FLR EX 13A SPLIT WAT 15A R Y B
FB 13A
mer ELCB NO NO Amps IN MM2 IN MM2 LTG BOX FAN S/O H/D Twin A/C PUMP SSO. ISO UNIT
1 R1 16 2.5 2.5 OPEN OFFICE 12 100 1200

2 Y1 16 2.5 2.5 OPEN OFFICE 10\1 100\250 1250


40A,
4P 3 B1 16 SPARE 500 500
100mA
ELCB 4 R2 16 2.5 2.5 TOILET+PANTRY 7 1 100 800
1
5 Y2 16 2.5 2.5 MANAGER RM+TOILET 8 1 100 900

6 B2 16 2.5 2.5 EMERGENCY LIGHT 4 100 400

7 R3 32 4 2.5 OPEN OFFICE 3 1 1 200\400 1400 RING

8 Y3 20 SPARE 500 500


40A,
4P 9 B3 32 4 2.5 OPEN OFFICE 4 400 1600 RING
30mA
ELCB 10 R4 32 4 2.5 MANAGER ROOM+PANTRY 4 1 200\400 1200 RING
2
11 Y4 20 SPARE 500 500

63 A 12 B4 20 6 4 SOLAR WATER HEATER 1 2000 2000


TP
40A, 13 R5 20 4 2.5 PANTRY 1 500 500
ISO
4P
30mA 14 Y5 20 4 2.5 SHE TOILET 1 2000 2000
ELCB
3 15 B5 20 4 2.5 HE TOILET 1 2000 2000

40A, 16 R6 20 4 2.5 FCU - MF 1 1 50 50


4P
100mA 17 Y6 20 4 2.5 FCU - MF 2 1 50 50
ELCB
4 18 B6 20 4 2.5 FCU - MF 3 1 50 50

40A, 19 R7 20 4 2.5 FCU - MF 4 1 50 50


4P
100mA 20 Y7 20 4 2.5 FCU - MF 5 1 50 50
ELCB
5
21 B7 20 SPARE 200 200

NOTE:-
ENERGY CHECK METER INSIDE DB FOR LIGHT
AS PER GREEN BUILDING REQUIREMENT

TOTAL 5200 5250 6750 17.2


CABLE SIZE IX4C:10 MM2 CU XLPE/SWA/PVC + 1X1C:16 MM2 CU. PVC ECC Y/G
PROJECT:- PROPOSED WAREHOUSE & OFFICE (G+M) CLIENT : M/S. LISBON INTERNATIONAL FZCO BLOCK:- JAFZA

DB NO. AC CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT NO:- S 40111


AS BUILT
FED FROM MDB-1 LOAD DISTRIBUTION SCHEDULE LOCATION:- FF OFFICE
Rating Rating MCB CCT EEC CONNECTED LOADS/POINT WATT LOAD PER CIRCUIT-WATT REMARKS
of Inco-of SL CIR Rtg WIRE WIRE ROOM/AREA IND. EX 13A COO SPLIT WAT 15A R Y B
mer ELCB NO NO Amps IN MM2 IN MM2 LTG EX FAN S/O W/H H/D KER A/C PUMP SSO. ISO UNIT

1 R1 1333
40A, 4P,
4C 1C GAC - 1
100mA 20A UVR+TIMER
2 Y1 X X (OPEN OFFICE) 1 4000 1333
ELCB TP +CONT
4 4
1
3 B1 1333

4 R2 1333
40A, 4P,
4C 1C GAC - 2
100mA 20A UVR+TIMER
5 Y2 X X (OPEN OFFICE) 1 4000 1333
ELCB TP +CONT
4 4
2
6 B2 1333

7 R3 1333
40A, 4P,
4C 1C GAC - 3
100mA 20A UVR+TIMER
8 Y3 X X (OPEN OFFICE) 1 4000 1333
ELCB TP +CONT
4 4
3
9 B3 1333

10 R4 25 6 4 GAC - 4 PRAYER ROOM 1 2500 2500


40A, 4P,
100mA UVR+TIMER
11 Y4 25 6 4 GAC - 5 PANTRY 1 2500 2500
ELCB +CONT
4
12 B4 25 SPARE 2000 2000

80A
13 R5 1333
TP 40A, 4P,
ISO. 100mA MAC - 1
UVR+TIMER
14 Y5 TP20 4CX4 1CX4 (OPEN OFFICE) 1 4000 1333
ELCB +CONT
5
15 B5 1333

16 R6 1333
40A, 4P,
100mA MAC - 2 UVR+TIMER
17 Y6 TP20 4CX4 1CX4 1 4000 1333
ELCB (OPEN OFFICE) +CONT
6
18 B6 1333

19 R7 1333
40A, 4P,
100mA MAC - 3 UVR+TIMER
20 Y7 TP20 4CX4 1CX4 1 4000 1333
ELCB (OPEN OFFICE) +CONT
7
21 B7 1333

MAC - 4 UVR+TIMER
22 R8 25 6 4 1 3000 3000
40A, 4P, (MANAGER ROOM) +CONT
100mA
23 Y8 25 SPARE 1500 1500
ELCB
8 MAC - 5 UVR+TIMER
24 B8 25 6 4 1 2000 2000
(PANTRY) +CONT
NOTE:-
ENERGY CHECK METER INSIDE DB FOR AC
AS PER GREEN BUILDING REQUIREMENT

CABLE SIZE IX4C:25 MM2 CU XLPE/SWA/PVC + 1X1C:16 MM2 CU. PVC ECC Y/G TOTAL 13498 11998 11998 37.494
PROJECT:- PROPOSED WAREHOUSE & OFFICE (G+M) CLIENT : M/S. LISBON INTERNATIONAL FZCO BLOCK:- JAFZA

DB NO. PR CONSULTANT:-S.J LEWIS ENGG.CONSULTANT PLOT NO:- S 40111


AS BUILT
FED FROM MDB-2 LOAD DISTRIBUTION SCHEDULE LOCATION:- PUMP ROOM
LOAD PER CIRCUIT-
Rating Rating MCB CCT EEC CONNECTED LOADS/POINT WATT REMARKS
WATT
of Inco- of SL CIR Rtg WIRE WIRE ROOM/AREA IND. EX 13A COO SPLIT WAT 15A R Y B
mer ELCB NO NO Amps IN MM2IN MM2 LTG EX FAN S/O W/H H/D KER A/C PUMP SSO. ISO UNIT

40A, 1 R1 16 2.5 2.5 PUMP ROOM 2\1 100\250 450


4P,
100mA 2 Y1 16 SPARE 800 800
ELCB
1 3 B1 16 2.5 2.5 PUMP ROOM 1 300 300

40A, 4 R2 20 6 4 DIESEL PUMP 1 1000 1000


4P,
30mA 5 Y2 20 4 2.5 PUMP ROOM 2 200 400
ELCB
2 6 B2 20 SPARE 300 300

40A, 7 R3 1000
40A TP 4P,
ISO. 30mA ELS+
8 Y3 TP20 4CX4 1CX4 J.PUMP 1 3000 1000
ALARM
ELCB
3 9 B3 1000
40A, 10 R4 500
4P,
30mA 11 Y4 TP20 4CX4 1CX4 BOOSTER PUMP 1 1500 500
ELCB
4 12 B4 500
40A, 13 R5 233
4P,
30mA 14 Y5 TP20 4CX4 1CX4 GATE 2 1 700 233
ELCB
5 15 B5 233

CABLE SIZE IX4C:10 MM2 CU XLPE/SWA/PVC + 1X1C:10 MM2 CU. PVC ECC Y/G TOTAL 3183 2933 2333 8.449