Differences Between Primavera P6 and MS Project in planning http://www.planningengineer.net/differences-between-primavera-p6-an...
Search
Differences Between Primavera P6 and MS Project in planning
Creat a Job Alerts
Keyword:
Easy-Forex™ Special Event
E-mail:
www.easy-forex.com/events
Join Our Free Seminar in Cairo and Learn To Trade The Forex Market!
Oracle Primavera P6 and MS Project are the
Keep in Touch
most popular software for project planning,
planning,
Follow @PlanningEnginee
reporting, progress updating and tracking. Both
Find us on Facebook
the software are used worldwide and they
Planning Engineer
have their own benefits.There are several
Like differences between MS Project and Primavera
1,058 people like Planning Engineer.
P6.. The following are the differences between
P6
Primavera P6 and MS Project:
We're on
+586
Differences Between Primavera P6 and MS Project in planning
Subscribe to our Newsletter
Subscribe to our newsletter to receive 1 email Unique ID:
daily includes the new posts, simply add your Microsoft Project, the first line is assigned ID 1, the second line ID 2 and so on. If you insert a new activity between 1 and 2,
email below. A confirmation email will be sent to the new activity becomes ID 2. Thus an activity’s ID is determined by its position in relation to the others.
you!
P6 is characterized by unique ID. For example, you can set the project to start from 1000 and increment by 10, so that the
First name
first activity entered will be assigned ID 1000, the second ID 1010 and so on. The activities keep their ID regardless of
changes in position (unless you decide to physically change them).
Last name
If you are working in a big project and using activity ID system/ Identification then Microsoft Project will not be the correct
choice.
Email
Activity Sorting:
Under the group bands in P6, you can tell it how to sort the activities. Sorting by date order, sort by Activity ID or any other
factor which make the sorting very durable and easy.
Microsoft Project offers a bit more discretionary control in that you can just move individual activities into the position you
New Posts want them to appear.
How to get connected to Planning
Engineer Website Baselines
We are in Planning Engineer In MS Project only 11 baselines can be created. In Primavera unlimited baselines can be created.
Website provide various methods
to our valuable visitors to
get connected with us. Select
Start and Finish Milestones
your favorite connection Method In Microsoft Project you can not define a milestone as either a Start or Finish milestone
/ Methods and Keep in...
Twelve-month profit and loss Multiple User Access
projection excel template
MS Project doesn’t allow multiple users to work on a single project at the same time, Primvera allows you to do that. In
Twelve-month profit and loss
Primavera you can even specify what features of Primavera a particular user can use , and which he can not.
projection excel template,
download this excel template and
read the following instructions. Issues & Risks
[cmamad id="1174" align="left"
MS Project lacks the feature of tracking project issues or risks. In Primavera, we can record issues and risks.
mobid="ad-off"] [caption
id="attachment_1751" align="aligncenter"
width="600"] Twelve-month profit and...
Web Support
1 of 4 11-Mar-13 11:32 AM
Differences Between Primavera P6 and MS Project in planning http://www.planningengineer.net/differences-between-primavera-p6-an...
Cost Engineers: Who are they and Primavera plan, documents and other information can be converted to HTML directly from the software. MS Project doesn’t
what do they do? have such option.
Cost Engineers: Who are they
and what do they do? So just Steps
what is cost engineering and who
are the people we call cost Steps in Primavera allows you to create sub-activities (steps) of an activity. Each step can have its own start and finish date,
engineers? The... and a completed step can be marked as completed. This useful feature is missing in MS Project.
MS Excel Functions and Formulas you Expenses
need to use regularly
Besides Costs, in Primavera project expenses e.g training, travel, etc can also be added, in MS Project we can not.
List of MS Excel Functions and
Formulas you need to use
regularly with photos and
Custom Fields
detailed explanation how to use Both MS Project and Primavera allows us to create custom fields. But MS Project even allows us to set complex formulas or
each Microsoft Excel formula.
use fields and add additional values to it, to use in the custom field. In Primavera we can create a blank custom field, but can
1- Date and time functions:
not set formulas to it, so users have to manually enter values in each in the field, for each column.
DATE(year,month,day):Returns the...
Human Resource Management Columns
Definitions
Human Resource Management Definitions: Primavera P6 has many useful columns. It comes installed with over 200 columns, each giving you different information.
[cmamad id="1174" align="left" Some column category to name include EVM, Budgeting, Costs, etc. On the other hand in MS Project, there are only around 40
mobid="ad-off"] • Concurrent Engineering: An columns.
approach to project staffing that, in its most
general form, calls for implementers to be... Multiple Activity Relationships
In Primavera P6, more than one type of relationship can be established between activities e.g we can have FF and SS between
Tags
the same two activities. In MS Project only one relationship can be made between two activities.
Activity Duration Actual % Complete Budget At Project Website
Completion Cash Flow Create detailed time The Primavera P6 software can create a comprehensive website comprising of complete project details including activities,
resources, reports, risks, issues, WBS, and everything that has been entered in the software. This website is very valuable
engineering
schedule feature and is not present in MS Project.
careers excel excel Multiple Project Creation, View and Tracking
In Primavera multiple projects can be created and viewed. This can be done in MS Project too but since MS Project is not
template free float job Kuwait management intended for multiple project use, it doesn’t allow us to do things like we can do in Primavera like multiple project tracking,
multiple project or WBS comparisons, cost and units calculations.
method of statement There are many more minor differences between Primavera P6 and and MS Project but above list is of major and prominent
differences between the two software.
method statement WBS
microsoft excel Oracle Primavera P6 Planned %
In Primavera P6 WBS is created separated from activities. Once WBS has been created, then we can add activities with each
Complete planned value planning WBS element. Whereas in MS Project, activities are indented to make them look like WBS.
planning engineer planning engineers Benefit for MS Project that work breakdown structure is generally implemented through the use of summaries. You can create
a new WBS level by indenting from the line above. This method allows you to create a system in the same screen that you
Planning Engineer enter activities.
Which one You Should Learn?
salary PMI PMP PMP PMBOK If you are heavily involved in a project or multiple projects, and you are requiring to computerize every detail of your project
you should go for Primavera P6. Or if you are working on a single project that doesn’t require you record details other than
Primavera primavera p6 project activity schedule, resource list, and assignment details, use MS Project as it is simpler
Project Management Tools
management project management plan
Inexpensive, Simple, Powerful Free 14-Day Trial
Project Management Professional project management
KPI.com
template project manager project planning
Share it with your friends!
template Qatar salary Saudi Arabia schedule
scheduler Shop Drawings tracking log time 72
schedule United Arab Emirates WBS work
breakdown structure working days Posts related to Differences Between Primavera P6 and MS Project in planning
This post is also available in: French, Arabic
2 of 4 11-Mar-13 11:32 AM
Differences Between Primavera P6 and MS Project in planning http://www.planningengineer.net/differences-between-primavera-p6-an...
Recent Jobs
Planning Engineer at FA Search Pte Ltd
Location: Singapore
Senior Planning Engineer at Oil and Gas
Location: Oslo, norway, United Kingdom
TRANSPORT PLANNING – LEADERSHIP POSITION at Banen Recruitment
Location: united arab emirates, United Arab Emirates
EPC Planner - Lead Planner - Process Planner - 12 Month Contract - Aberdeen at Confidential Company
Location: Aberdeen, United Kingdom
Attractive 6 Month Opportunity for Senior Planner in South Africa (8 weeks on, 2 weeks off) at Confidential Company
Location: south africa, South Africa
view all »
Subscribe to our Newsletter
Did you like this Post? Subscribe to our newsletter to receive 1 email daily includes the new posts, simply add your email
below. A confirmation email will be sent to you!
First name
Last name
Email
1 comment - What do you think? Tweet 3 2 Like 15
Posted by admin - December 26, 2012 at 11:49 am
Categories: Planning Using Primavera Tags: Differences Between Primavera P6 and MS Project, Microsoft Project, MS Project, primavera
p6, Primavera P6 and MS Project, software for project planning
Add a comment...
Post to Facebook Posting as M Sadek El-Tawansy (Not you?)
Taher Saeed · Follow · مھندس بمكتب اعمار لالستشارت العمرانيهat مدير شركة
شكرناااااااااااااااااااات
Reply · 1 · Like · Follow Post · February 1 at 12:51pm
Hasan Jlelaty
thank you
Reply · 1 · Like · Follow Post · December 28, 2012 at 8:11pm
Arsalan Pervez · Deputy Manager at KESC
Good One..
Reply · Like · Follow Post · February 5 at 11:16am
Izz ELdien Ibrahim · Bakhtalruda university at Development Manager
Thanks
Reply · Like · Follow Post · January 8 at 10:35am
Jam & Company
Thanx for your Updation.
Reply · Like · Follow Post · December 29, 2012 at 6:11pm
Facebook social plugin
Popular Search Terms Recent Posts Archives
salary How to get connected to Planning Engineer Website March 2013 (4)
earned value management Twelve-month profit and loss projection excel template February 2013 (17)
project management Cost Engineers: Who are they and what do they do? January 2013 (24)
project planning MS Excel Functions and Formulas you need to use December 2012 (18)
regularly
bill of quantities November 2012 (7)
Human Resource Management Definitions
www planningengineer net October 2012 (5)
project management plan Project Management from Directory
Planning Engineers Resumes and Planning Engineers Calendar
project management interview questions and answers
Jobs
primavera p6 download March 2013
Planning and scheduling procedures
planning engineer salary M T W T F S S
Which online management degree?
Excel master project resource planning 1 2 3
Team Development-Project Manager Power and XY
time schedule Theory 4 5 6 7 8 9 10
MANPOWER HISTOGRAM Construction Project Manager Job Description 11 12 13 14 15 16 17
primavera interview questions and answers Formwork,Scaffolding and Shoring Definition and 18 19 20 21 22 23 24
bill of quantities example productivity
25 26 27 28 29 30 31
bill of quantities sample Earth moving Equipment function and standard
Productivity « Feb
planning engineer interview questions and answers
how to create work breakdown structure WBS using
project manager interview questions and answers standard Division of work Search
manpower histogram template Top 10 Primavera Interview questions and Model
cash flow diagram excel Answers Search for:
3 of 4 11-Mar-13 11:32 AM
Differences Between Primavera P6 and MS Project in planning http://www.planningengineer.net/differences-between-primavera-p6-an...
English Français (French) ( العربيةArabic)
4 of 4 11-Mar-13 11:32 AM