Q1:What are the difference between free float, total float and what is different between Float and Slack?
Follow @PlanningEnginee
Float and slack are the two different words for the same meaning.
Free Float : amount of time , an activity can be delayed without
Find us on Facebook
delaying the successor activity
Planning Engineer Total Float : amount of time , an activity can be delayed without
delaying the project finish date.
Like
Q2:What is a constraint in primavera?
1,044 people like Planning Engineer.
Constrains in primavera is to fix the early or late start or finish date of
an activity as per following options:
1) Project Must Finish by
2) Mandatory Start / Mandatory Finish
3) Start / Finish On or After
4) Start / Finish On or Before
5) Start / Finish On
6) Expected Finish
Top 10 Primavera Interview questions and Model
Answers
Q3:How can you define the Critical Path in primavera?
The sequence of activities which describe the longest path from the data date to the end of the project. In a schedule without
any constraints, this will be all activities with zero total float.
(if you have constrains which force negative float, simply filtering on total float equal to or less than zero can bring up
activities which are not on the critical path)
We're on Q4:What is WBS?
WBS means Work Breakdown Structure. it represents a hierarchical breakdown of a Project into elements and deliverables.
Q5:What is an open end activity in primavera?
+584 The open end activity is the activity that does not have any successor. Normally open end activity is not accepted in schedule
because the total float will be calculate from the end of the project and these entire activities late dates gather at the end of
the project and can not be prepare a logical late start plan.
Q6:What is the difference between Retained Logic & Override Logic in progress update?
Subscribe to our Newsletter If a project is generally running according to plan and activities are not progressed out of sequence then there will be virtually
no difference between the two methods. BIG differences come when activities are progressed out of sequence.
Subscribe to our newsletter to receive 1 email I believe in retained logic. Invariably that will produce the longest critical path but if activities have been progressed out of
daily includes the new posts, simply add your sequence, there could be some resulting illogical dependencies remaining, in particular resulting from dependencies with
email below. A confirmation email will be sent to durations.
Progress override invariably produces a shorter critical path and again there could be some illogical lack of dependencies
you!
resulting from activities having been progressed out of sequence.
First name
Q7:How do u measure & compare the progress using primavera?
Progress is measured primarily against the baseline. If the baseline has been loaded with cost and/or resources, earned value
Last name
management can be used for this purpose. If not, progress is measured as variance to baseline dates.
Budget at Completion (BAC)
Email Planned Value (PV) = budget at Completion (BAC) x Planned % Complete
Earned Value (EV) = budget at Completion (BAC) x Actual% Complete
Actual Cost (AC) = No formula What you’ve actually spent on the project
Schedule Performance Index (SPl) =Earned Value (EV) / Planned Value (PV)
Schedule Variance (SV) =Earned Value (EV) – Planned Value (PV)
Cost Performance Index (CPI) =Earned Value (EV) / Actual Cost (AC)
New Posts To Complete Performance Index (TCPI) =(Budget at Completion (BAC) – Earned Value (EV) ) / (Budget at Completion (BAC)
-Actual Cost (AC) )
How to get connected to Planning
Cost Variance (CV) = Earned Value (EV) -Actual Cost (AC)
Engineer Website
For more information see this article:EVM earned value management
We are in Planning Engineer
Website provide various methods Q8:What is resource allocation and resource leveling?
to our valuable visitors to Resource allocation is assigning resources to activities,determine the amount of labor, equipment and money required for any
get connected with us. Select
activity.
your favorite connection Method
Resource leveling is Resource requirements of all scheduled activities are compared to the maximum quantity available at the
/ Methods and Keep in...
time of leveling.An activity is delayed if too few resources are available at any time during the activity’s duration.The
Twelve-month profit and loss maximum quantity for a resource is determined through the Max units/time for a particular resource in the Resources Tab.
projection excel template
Twelve-month profit and loss Q9:What is an S – Curve and how to create S Curve in primavera?
projection excel template,
An S-curve is a graph showing cumulative cost or value (measured in terms of money or manhours) against time. On a typical
download this excel template and
read the following instructions. project, these graphs follow an “S” shape, hence the name. Typical data to be plotted on an S-Curve includes:
[cmamad id="1174" align="left"
Actual Cost (ACWP)
mobid="ad-off"] [caption
id="attachment_1751" align="aligncenter" Planned Value (BCWS) –Early dates
width="600"] Twelve-month profit and...
Planned Value (BCWS) –Late dates
1 of 4 11-Mar-13 12:43 AM
Top 10 Primavera Interview questions and Model Answers http://www.planningengineer.net/top-10-primavera-interview-questions...
Cost Engineers: Who are they and Earned Value (BCWP)
what do they do?
Cost Engineers: Who are they Forecast Value –Early dates
and what do they do? So just
Forecast value –Late dates
what is cost engineering and who
are the people we call cost Forecast Cost –Early dates
engineers? The...
Forecast cost –Late dates
MS Excel Functions and Formulas you Q10:What are the difference between flag and milestone activity in primavera?
need to use regularly
Mile stone & flags both are events rather then activities. Some client likes to use flags rather than mile stone due the following
List of MS Excel Functions and
differences.
Formulas you need to use
regularly with photos and 1- With the use of flags the logic of main event can be easily tracked as these can not be created without predecessor as stand
detailed explanation how to use alone allocating the constraint.Where as mile stone can.
each Microsoft Excel formula. 2- Flags can not update manually as Primavera automatically update the status where as milestone can be update manually.
1- Date and time functions: 3- Flags can not be constraint only driven by predecessor where as milestone can.
DATE(year,month,day):Returns the...
Human Resource Management
Definitions Primavera Interview questions and Model Answers by site users
Human Resource Management Definitions:
[cmamad id="1174" align="left"
mobid="ad-off"] • Concurrent Engineering: An
approach to project staffing that, in its most
general form, calls for implementers to be...
موقع اعالنات مبوبة مجانية
Tags www.Avito.com
Activity Duration Actual % Complete Budget At أضف إعالنك مجانا في أكبر سوق في مصر بسھولة
Completion Cash Flow Create detailed time
وبسرعة ومجانا
engineering
schedule
careers excel excel
template free float job Kuwait management
What is What is your
method of statement Timestamp your proposed What is the Model Answer?
name question ?
method statement If you are heavily involved in a project or multiple
microsoft excel Oracle Primavera P6 Planned % projects, and you are requiring to computerize every
Which software
Complete planned value planning detail of your project you should go for Primavera
2/7/2013 John is better
1 P6. Or if you are working on a single project that
planning engineer planning engineers 11:50:53 Edward primavera or
doesn’t require you record details other than activity
MS project
Planning Engineer schedule, resource list, and assignment details, use
MS Project as it is simpler
salary PMI PMP PMP PMBOK
Primavera primavera p6 project
management project management plan
Project Management Professional project management
template project manager project planning
template Qatar salary Saudi Arabia schedule
time
scheduler Shop Drawings tracking log
schedule United Arab Emirates WBS work
breakdown structure working days
Do you want to add a question and answer for an planning primavera interview? please use the following form
and share us with your ideas.
2 of 4 11-Mar-13 12:43 AM
Top 10 Primavera Interview questions and Model Answers http://www.planningengineer.net/top-10-primavera-interview-questions...
Primavera Interview
questions and Model
Answers
Prepared by Planning Engineer website
www.planningengineer.net
* Required
What is your name *
Please type your name
What is your proposed question ? *
Please type the proposed question for an interview
What is the Model Answer? *
Please Type The Model Answer for your Question.
Never submit passwords through Google Forms.
Powered by
This content is neither created nor endorsed by Google.
Report Abuse - Terms of Service - Additional Terms
Share it with your friends!
71
Posts related to Top 10 Primavera Interview questions and Model Answers
3 of 4 11-Mar-13 12:43 AM
Top 10 Primavera Interview questions and Model Answers http://www.planningengineer.net/top-10-primavera-interview-questions...
Recent Jobs
Planning Engineer at FA Search Pte Ltd
Location: Singapore
Senior Planning Engineer at Oil and Gas
Location: Oslo, norway, United Kingdom
TRANSPORT PLANNING – LEADERSHIP POSITION at Banen Recruitment
Location: united arab emirates, United Arab Emirates
EPC Planner - Lead Planner - Process Planner - 12 Month Contract - Aberdeen at Confidential Company
Location: Aberdeen, United Kingdom
Attractive 6 Month Opportunity for Senior Planner in South Africa (8 weeks on, 2 weeks off) at Confidential Company
Location: south africa, South Africa
view all »
Subscribe to our Newsletter
Did you like this Post? Subscribe to our newsletter to receive 1 email daily includes the new posts, simply add your email
below. A confirmation email will be sent to you!
First name
Last name
Email
Be the first to comment - What do you think? Tweet 4 1 Like 18
Posted by admin - February 7, 2013 at 8:18 pm
Categories: Planning Using Primavera Tags: Interview Answers, interview planning engineer, interview primavera, Interview questions,
Interview questions and Answers, Interview questions and Model Answers, planning engineer interview, Primavera, primavera interview,
Primavera Interview questions, Primavera Interview questions and Answers, Primavera Interview questions and Model Answers
Add a comment...
Post to Facebook Posting as M Sadek El-Tawansy (Not you?)
Facebook social plugin
Popular Search Terms Recent Posts Archives
salary How to get connected to Planning Engineer Website March 2013 (4)
earned value management Twelve-month profit and loss projection excel template February 2013 (17)
project management Cost Engineers: Who are they and what do they do? January 2013 (24)
project planning MS Excel Functions and Formulas you need to use December 2012 (18)
regularly
bill of quantities November 2012 (7)
www planningengineer net Human Resource Management Definitions October 2012 (5)
project management plan Project Management from Directory
Planning Engineers Resumes and Planning Engineers Calendar
project management interview questions and answers
Jobs
primavera p6 download March 2013
Planning and scheduling procedures
planning engineer salary M T W T F S S
Which online management degree?
Excel master project resource planning 1 2 3
Team Development-Project Manager Power and XY
time schedule Theory 4 5 6 7 8 9 10
MANPOWER HISTOGRAM Construction Project Manager Job Description 11 12 13 14 15 16 17
bill of quantities example Formwork,Scaffolding and Shoring Definition and 18 19 20 21 22 23 24
bill of quantities sample productivity
25 26 27 28 29 30 31
primavera interview questions and answers Earth moving Equipment function and standard
Productivity « Feb
planning engineer interview questions and answers
how to create work breakdown structure WBS using
project manager interview questions and answers standard Division of work Search
manpower histogram template Top 10 Primavera Interview questions and Model
cash flow diagram excel Answers Search for:
English Français (French) ( العربيةArabic)
4 of 4 11-Mar-13 12:43 AM