2025 Irregular Sample Schedule
2025 Irregular Sample Schedule
ENO-657
Effluent
Parameter: Radium-226 Acute Toxicity Water Quality Sublethal Toxicity
Characterization
Change Notes:
Quarterly with Quarterly for
Frequency: Quarterly Quarterly 4 / Year
Sublethal test Ceriodaphnia dubia
January
February
March
April
May
June June 2, 2025 June 2, 2025 June 2, 2025 June 2, 2025 June 2, 2025
July July 7, 2025 July 7, 2025 July 7, 2025 July 7, 2025 July 7, 2025 Subject to change
September
October
November
December
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be collected on the following
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month / quarter for which
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Irregular Sampling Schedule Document No. ENO-657
Effluent
Parameter: Radium-226 Acute Toxicity Water Quality Sublethal Toxicity
Characterization
Quarterly for Lemna Change Notes:
Quarterly with
Frequency: Weekly Quarterly 4 / Year minor (frond
Sublethal test
production)
January
February
March
April
May
June
Collect with regular
Weekly Sample
July
August August 11, 2025 August 11, 2025 August 11, 2025 August 11, 2025
Subject to change
September September 15, 2025 September 15, 2025
October
November
December
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be collected on the following
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month / quarter for which
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Sampling
MDMER Section Requirement Frequency Spacing and additional requirements
Total cyanide as per
12 (3) Weekly Only required if if cyanide has never been used as a process reagent at the mine.
Schedule 4
All Schedule 4 weekly Not less than once per week
12 (1) Weekly
parameters Not less than 24 hours apart
Reg: Weekly
No scheduling required - collect as part of regular weekly sample as per reqs above
12 (1)
Radium-226 IF 12 consecutive samples are <0.037 Bq/L and notification has been sent to ECCC at least 30 days
13 (1)
Reduced: Quarterly before reduction
At least one month apart
All results must be <0.037 Bq/L otherwise samples must be taken weekly again
14 (1), 14 (2) Reg: Monthly Not less than 15 days apart
IF 12 consecutive months are not acutely lethal and notification has been sent to ECCC at least 30
16 (1) Reduced: Quarterly days before reduction
Not less than 45 days apart
Acute Toxicity IF any tests are acutely lethal, must test on INCREASED frequency as per section 15
(daphnia and trout)
For first 3 years: 2x / Collected at the FDP that has most adverse environmental impact
Schedule 5 year for all species Must be collected when effluent characterization is being collected
5 (1), 5 (3), 6 (1), Sublethal toxicity At least one month apart
6 (2), 6 (3) If effluent is discharged for 31 days or less, tests are permitted to be done only once in that year.
After 3 Years: For Collected at the FDP that has most adverse environmental impact
most sensitive species Must be collected when effluent characterization is being collected
only At least one month apart
Irregular Sampling Schedule Document No. ENO-657
Effluent
Parameter: Radium-226 Acute Toxicity Water Quality Sub-Lethal Toxicity
Characterization
Change Notes:
Weekly (MB EAL 3263) Weekly (MB EAL 3263) Quarterly with Quarterly for
Frequency: 4 / Year
Quarterly (MDMER) Monthly (MDMER) Sublethal test Ceriodaphnia dubia
January
February
March
April
May
August August 11, 2024 August 11, 2024 August 11, 2024
September
October
November
December
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be collected on the following
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month / quarter for which
the sample is required. In that event, collect the sample immediately upon resuming discharge.
12 (1) All Schedule 4 weekly Weekly Not less than once per week
parameters Not less than 24 hours apart
Reg: Weekly
No scheduling required - collect as part of regular weekly sample as per reqs above
12 (1)
Radium-226 IF 12 consecutive samples are <0.037 Bq/L and notification has been sent to ECCC at least 30 days
13 (1)
Reduced: Quarterly before reduction
At least one month apart
All results must be <0.037 Bq/L otherwise samples must be taken weekly again
14 (1), 14 (2) Reg: Monthly Not less than 15 days apart
IF 12 consecutive months are not acutely lethal and notification has been sent to ECCC at least 30 days
16 (1) Reduced: Quarterly before reduction
Acute Toxicity (daphnia Not less than 45 days apart
and trout) IF any tests are acutely lethal, must test on INCREASED frequency as per section 15
For first 3 years: 2x / Collected at the FDP that has most adverse environmental impact
Schedule 5 year for all species Must be collected when effluent characterization is being collected
5 (1), 5 (3), 6 (1), Sub-lethal toxicity At least one month apart
6 (2), 6 (3) If effluent is discharged for 31 days or less, tests are permitted to be done only once in that year.
After 3 Years: For most Collected at the FDP that has most adverse environmental impact
sensitive species only Must be collected when effluent characterization is being collected
At least one month apart
Irregular Sampling Schedule Document No.
Effluent
Parameter: Radium-226 Acute Toxicity Water Quality Sub-lethal toxicity Chisel Lake Survey
Characterization
Quarterly for Lemna Change Notes:
Quarterly with 3 / year
Frequency: Weekly Quarterly 4 / Year minor (frond
Sublethal test (MB EAL 2648)
production)
January January 13, 2025 January 13, 2025 January 13, 2025
February
March
May May 12, 2025 May 12, 2025 May 27, 2025 Depending on freshet
June
Collect with regular
Weekly Sample
July July 7, 2025 July 7, 2025 July 7, 2025 July 7, 2025 July 15, 2025
September September 15, 2025 September 15, 2025 September 16, 2025
November
December
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be collected on the following
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month / quarter for which
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Sampling
MDMER Section Requirement Frequency Spacing and additional requirements
Total cyanide as per
12 (3) Weekly Only required if if cyanide has never been used as a process reagent at the mine.
Schedule 4
All Schedule 4 weekly Not less than once per week
12 (1) Weekly
parameters Not less than 24 hours apart
Reg: Weekly No scheduling required - collect as part of regular weekly sample as per reqs above
12 (1) IF 12 consecutive samples are <0.037 Bq/L and notification has been sent to ECCC at least 30 days before
Radium-226 reduction
13 (1) Reduced: Quarterly
At least one month apart
All results must be <0.037 Bq/L otherwise samples must be taken weekly again
14 (1), 14 (2) Reg: Monthly Not less than 15 days apart
IF 12 consecutive months are not acutely lethal and notification has been sent to ECCC at least 30 days before
16 (1) Reduced: Quarterly reduction
Not less than 45 days apart
Acute Toxicity
IF any tests are acutely lethal, must test on INCREASED frequency as per section 15
(daphnia and trout)
IF sample (monthly or quarterly) is acutely lethal, sample twice a month
15 (1) Increased: Bi-Monthly Must include effluent characterizations
Not less than 7 days apart
Can resume normal (monthly) frequency once 3 consecutive tests are not acutely lethal
For first 3 years: 2x / Collected at the FDP that has most adverse environmental impact
Schedule 5 year for all species Must be collected when effluent characterization is being collected
5 (1), 5 (3), 6 (1), Sub-lethal toxicity At least one month apart
6 (2), 6 (3) If effluent is discharged for 31 days or less, tests are permitted to be done only once in that year.
After 3 Years: For Collected at the FDP that has most adverse environmental impact
most sensitive species Must be collected when effluent characterization is being collected
only At least one month apart
Irregular Sampling Schedule Document No. ENO-657
February
No Sampling No Sampling No Sampling
March
April
May May 13, 2025 May 13, 2025 May 13, 2025
June June 17, 2025 June 17, 2025 June 17, 2025
RPSS
decommissioned; no
sampling in 2018
July July 8, 2025
August August 12, 2025 August 12, 2025 August 12, 2025
September September 16, 2025 September 16, 2025 September 16, 2025
December No Sampling
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be collected on the following
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month / quarter for which
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Sampling
MDMER Section Requirement Frequency Spacing and additional requirements
Schedule 5 FDP, Exposure, Reference sites
Water Quality 4x / Year
7 (2) At least one month apart
NOTE: Reed Mine is not regulated by ECCC. MDMER timing and sampling requirements are followed as a guide to meet the MB EAL Downstream WQ Program.
Irregular Sampling Schedule
New Britannia Mine
January
February
March
April
August August 11, 2025 August 11, 2025 August 11, 2025
September September 15, 2025 September 15, 2025 September 15, 2025
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be collec
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month /
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Sampling
MDMER Section Requirement Frequency Spacing and additional requirements
Total cyanide as per
12 (3) Weekly Only required if if cyanide has never been used as a pro
Schedule 4
All Schedule 4 weekly Not less than once per week
12 (1) Weekly
parameters Not less than 24 hours apart
Reg: Weekly No scheduling required - collect as part of regular weekl
Effluent
Sub-Lethal Toxicity
Characterization Change Notes:
Quarterly NONE
June 2, 2025
Collect at SWM03
ONLY!!
July 7, 2025
October 6, 2025
November 3, 2025
December 1, 2025
ecutive samples are <0.037 Bq/L and notification has been sent to ECCC at least 30 days
ction
e month apart
must be <0.037 Bq/L otherwise samples must be taken weekly again
an 15 days apart
ecutive months are not acutely lethal and notification has been sent to ECCC at least 30
e reduction
an 45 days apart
are acutely lethal, must test on INCREASED frequency as per section 15
monthly or quarterly) is acutely lethal, sample twice a month
e effluent characterizations
an 7 days apart
e normal (monthly) frequency once 3 consecutive tests are not acutely lethal
sure, Reference sites
e month apart
e time as EEM samples are taken
lected with a scheduled/reported weekly sample
e month after previous EC was collected
Effluent
Parameter: Radium-226 Acute Toxicity Water Quality Sub-Lethal Toxicity
Characterization Change Notes:
Frequency: Quarterly Monthly 4 / Year Quarterly NONE
January
February
March
April
May
June
Collect at SWM03
No Discharge No Discharge No Discharge No Discharge
ONLY!!
July
August
September
October
November
December
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be collected on the following
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month / quarter for which
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Sampling
MDMER Section Requirement Frequency Spacing and additional requirements
Total cyanide as per
12 (3) Weekly Only required if if cyanide has never been used as a process reagent at the mine.
Schedule 4
All Schedule 4 weekly Not less than once per week
12 (1) Weekly
parameters Not less than 24 hours apart
Reg: Weekly No scheduling required - collect as part of regular weekly sample as per reqs above
12 (1) IF 12 consecutive samples are <0.037 Bq/L and notification has been sent to ECCC at least 30 days
Radium-226 before reduction
13 (1) Reduced: Quarterly
At least one month apart
All results must be <0.037 Bq/L otherwise samples must be taken weekly again
14 (1), 14 (2) Reg: Monthly Not less than 15 days apart
IF 12 consecutive months are not acutely lethal and notification has been sent to ECCC at least 30
16 (1) Reduced: Quarterly days before reduction
Acute Toxicity Not less than 45 days apart
(daphnia and trout) IF any tests are acutely lethal, must test on INCREASED frequency as per section 15
January
February
March
April
May
September
October
November
December
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be colle
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Sampling
MDMER Section Requirement Frequency Spacing and additional requirements
Total cyanide as per
12 (3) Weekly Only required if if cyanide has never been used as a p
Schedule 4
All Schedule 4 weekly Not less than once per week
12 (1) Weekly
parameters Not less than 24 hours apart
Reg: Weekly No scheduling required - collect as part of regular wee
Effluent
Sub-Lethal Toxicity
Characterization
Change Notes:
Quarterly with Quarterly for
Sublethal test Ceriodaphnia dubia
nt early June
nd additional requirements
ecutive samples are <0.037 Bq/L and notification has been sent to ECCC at least 30 days before
e month apart
must be <0.037 Bq/L otherwise samples must be taken weekly again
an 15 days apart
ecutive months are not acutely lethal and notification has been sent to ECCC at least 30 days before
an 45 days apart
are acutely lethal, must test on INCREASED frequency as per section 15
January
February
March
April
August August 11, 2025 August 11, 2025 August 11, 2025
September September 15, 2025 September 15, 2025 September 15, 2025
No Discharge Rule: If a discharge point is shut down on the scheduled sampling date, the irregular samples are to be colle
weekly sample date. UNLESS the following weekly sample date is outside the calendar week / month
the sample is required. In that event, collect the sample immediately upon resuming discharge.
Sampling
MDMER Section Requirement Frequency Spacing and additional requirements
Total cyanide as per
12 (3) Weekly Only required if if cyanide has never been used as a p
Schedule 4
All Schedule 4 weekly Not less than once per week
12 (1) Weekly
parameters Not less than 24 hours apart
Reg: Weekly No scheduling required - collect as part of regular wee
Effluent
Sub-Lethal Toxicity
Characterization Change Notes:
Quarterly NONE
June 2, 2025
Collect at SWM03
ONLY!!
July 7, 2025
October 6, 2025
November 3, 2025
December 1, 2025
ecutive samples are <0.037 Bq/L and notification has been sent to ECCC at least 30 days
ction
e month apart
must be <0.037 Bq/L otherwise samples must be taken weekly again
an 15 days apart
ecutive months are not acutely lethal and notification has been sent to ECCC at least 30
e reduction
an 45 days apart
are acutely lethal, must test on INCREASED frequency as per section 15
Sampling Requirement: FFTIS GW Namew Fraser Creek Kink Lake (Konuto) ANB SL WDG GW SL WDG Surface Water
Reg/License: SK PO20-194 MB EAL 1488 MB Correspondance SK PO20-181 MB EAL 3263 MB EAL 3393 MB EAL 3393
30 days prior to
Frequency: 2 / Year 1 / Year 1 / Year 2 / Year discharge / monthly 2 / Year (spring/fall) 2 / Year (spring/fall)
during / 30 days after
January
December
Sampling Requirement: ATIA Samples ATIA ATIA FFTIS BLTDF Gil Lake Survey
Reason for sample: WQ Monitoring SLMRW Seep Sumps WQ Monitoring WQ Monitoring TLSS + WTP Operation Change Notes:
February
March
April
May
June
July
August
September
October
November
December