Cap Planning
Cap Planning
2
CAPACITY PLANNING AND PROCESS PLANNING
Bottleneck
3
CAPACITY PLANNING AND PROCESS PLANNING
4
CAPACITY PLANNING AND PROCESS PLANNING
• Efficiency/Utilization
Design capacity = 50 trucks/day
Effective capacity = 40 trucks/day
Actual output = 36 units/day
5
CAPACITY PLANNING AND PROCESS PLANNING
6
CAPACITY PLANNING AND PROCESS PLANNING
(ii) If the time required to produce each part is 100 seconds and the
machine works for 2000 hours per year. If the utilization of the
machine is 60% and the efficiency of the machine is 90%, compute
the output of the machine.
60 ×60 sec
Capacity per hour = = 36 units
100 sec per unit
Output per hour = unit capacity × % utilization × efficiency
Output per hour = 36 × 0.6 × 0.9 = 19.44 units ≈ 20 units
(iii) Calculate the number of machines required?
System capacity 100
Number of machines req. = = = 5 machines
Output per hour 20
7
CAPACITY PLANNING AND PROCESS PLANNING
9
CAPACITY PLANNING AND PROCESS PLANNING
Increase the batch, decrease the batch, but how much? Remember EPQ
Can we be more specific? (EBQ) + Material
Handling + ABC
Classification
System
10
CAPACITY PLANNING AND PROCESS PLANNING
11
CAPACITY PLANNING AND PROCESS PLANNING
Consider machine efficiency of 85% and operator efficiency of 75%, the factory
operates for 8 hour shift and 26 days per month.
(i) Find the total time
(ii) Theoretical output obtained from the machine.
(iii) Calculate the number of machines required to produce the three components from the
information given below
12
CAPACITY PLANNING AND PROCESS PLANNING
(i) Total cycle time (T) = 0.25 + 0.35 + 0.40 + 0.90 = 1.90 min.
60
(ii) Output per hour = = 31.5 ≈ 31 units
1.9
Production quantity
= × setup time (hrs) + Operation time
Batch size
13
CAPACITY PLANNING AND PROCESS PLANNING
14
CAPACITY PLANNING AND PROCESS PLANNING
Thank You
15