Pile Cutting Hacking
Pile Cutting Hacking
REV.
Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
Hacking (Sub-Structure Work)
Date: Date:
Excavation Work
Physical (5) Machine operated by competent operator.
Excavator moving - Serious injury
1 Struck by moving part of 2 4 8 - Workers stay away from moving machine.
into the excavation -Damage to property (6) To provide appropriate PPE.
machine
area.
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
(4) Cover long expose slope with plastic sheet to avoid Project Manager
Physical -Serious injury erosion during heavy rain. Site Manager
2 4 8 (5) To provide two access as escape road.
Soil erosion / slope failure -Damage to property
Cutting / Hacking (6) To provide appropriate PPE. Site Agent
3 Pile Hack pile to Site Engineer
expose steel bar Site Supervisor
-Minor injury
(5) Work carry out by skill workers. SHO / SSS
Noise exposure (long term can impair 2 3 6 (6) To provide appropriate PPE.
workers hearing) EO
Work Leader
Machinery opr
(4) Flask back arrestor to be used. Signal /
Cutting pile using oxy Physical
4 -Minor injury 2 3 6 (5) Oxy cylinder shall be secure up right. banksman
cutter Skin burn (6) To provide appropriate PPE. Worker
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)