Kumbh Specials long distance dt 6-12-24 Revised Proposals

Download as pdf or txt
Download as pdf or txt
You are on page 1of 27

File No.

WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 282


I/649533/2024
WESTERN RAILWAY

No.T96/5/5 (Kumbh Mela -25) (Composition Revised )


Headquarter office
Churchgate,
Mumbai-20 Date:-
06/12/2024

To,
PED (Chg) NDRB
C/- CPTM- WCR NCR NER NR, ECR, ER

Sub:-Revised Running of Special trains by WR during KUMBH


MELA- 2025 ( corrected as per revised concurrence of NER)

Ref:- 1) NER COIS message No. M.No.T/194/KUMBH – MELA/2025(corrected) dated


14/11/2024
2) WCR COIS message No. WCR/JBP/T-802/Kumbh mela/Ald- 2025 dated 13/11/2024
3) ECR COIS message No. ECR/OPT/510/Special/WR/Pt-XVI dated 13/11/2024
4) NR COIS message No.63-TT/1338/Kumbh Mela/ALD/Spl/24-25 dated 14/11/2024
5) This office letter of even no. dated 05/11/2024, 18/11/2024 & 22/11/2024.

With reference to this office letters referred above at Sr. no. 5, proposal was sent by
Western Railway to run special trains during Kumbh Mela-2025 to clear extra rush
of passenger traffic.
As per instructions of Railway Board , Train between VRL-BSBS-SUNR is proposed
with LHB rake and it will run between VRL-BSBS-VRL.
Details are as under: -

1) T.No.09371/09372 DADN-BUI-DADN MAHA KUMBH MELA Special


a Frequency Date wise
b Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.
c Maintenance: - Primary Maintenance: - DADN with RBPC
Terminating Examination BUI
d Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
e STR & Watering: -UJN, BINA, VGLJ, PRYJ & BSB in both directions.

Concerned Zonal Railways may kindly ensure full watering and STR on their en-route
Stations.
f CTS:- PRYJ & BSB in both directions
g Train Manager working over WR DADN-BINA-DADN=RTM DIV

Month-wise total trips are as under: -


Month 09371 Ex. DADN Total Trips 09372 Ex. BUI Total Trips

Jan-2025 22, 25 02 23,26 02


Feb-2025 08, 22 02 09,23 02
TOTAL TRIPS 04 TOTAL TRIPS 04
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 283
I/649533/2024

Detailed timings are as under: -

09371 DADN-BUI KUMBH SPL 09372 BUI-DADN KUMBH SPL

DAY PTT DAY


ARR
. PTT DEP. STATION PTT ARR. PTT DEP.

I **** 13.45 DADN 05.30 **** III

14.30 14.40 INDB 04.50 05.00

Via FTD

15.55 16.05 UJN 03.40 03.50

17.58 18.00 SJP 01.27 01.29

19.10 19.15 SHRN 00.15 00.20 III

20.40 20.42 BHS 23.06 23.08

21.10 21.12 BAQ 22.36 22.38

23.05 23.10 BINA 21.55 22.00

II 00.08 00.10 LAR 19.20 19.22

02.10 02.20 VGLJ 17.30 17.40

03.40 03.42 ORAI 15.40 15.42

06.50 06.55 GOY 13.45 13.50

07.58 08.00 FTP 11.58 12.00

10.10 10.20 PRYJ 10.20 10.30

11.48 11.50 MZP 08.28 08.30

12.18 12.20 CAR 08.05 08.07

PASS 13.30 VHK PASS 07.45

14.05 14.15 BSB 06.00 06.10

15.50 16.00 JNU 02.50 03.00


File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 284
I/649533/2024

17.10 17.15 ARJ 01.30 01.35

18.05 18.10 GCT 00.40 00.45

II 19.15 **** BUI **** 23.45 II

1276 DISTANCE 1276


File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 285
I/649533/2024

2) T.No.09031/09032 Udhna-Ballia-Udhna MAHA KUMBH MELA Special


a Frequency Date wise
b Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.
c Maintenance: - Primary Maintenance: - UDN with RBPC
Terminating Examination BUI
d Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
e STR & Watering: -BRC, RTM, UJN, BINA,,PRYJ& BSB in both directions.

Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
f CTS:- RTM,PRYJ& BSB in both directions.
g Train Manager working over WR UDN-BRC-UDN= BCT DIV, BRC-UJN-BRC=RTM DIV,
UJN-BINA- UJN=RTM DIV.

Month-wise total trips are as under: -


Month 09031 Ex. UDN Total 09032 Ex. BUI Total
Trips Trips
Jan-2025 17 01 18 01
Feb- 16 01 17 01
2025
TOTAL TRIPS 02 TOTAL TRIPS 02

Detailed timings are as under: -

09031 UDN-BUI KUMBH SPL 09032 BUI-UDN KUMBH SPL


DAY PTT DAY
ARR
. PTT DEP. STATION PTT ARR. PTT DEP.

I *** 06.40 UDN 12.45 *** IV

07.00 07.05 ST 12.15 12.20

07.45 07.47 BH 11.10 11.15

08.33 08.35 VS 10.05 10.07

08.50 09.00 BRC PASS 09.55

11.08 11.10 GDA 08.30 08.32

12.12 12.14 DHD 07.01 07.03


File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 286
I/649533/2024
13.35 13.45 RTM 05.20 05.30

14.38 14.40 NAD 04.40 04.42

15.55 16.05 UJN 03.40 03.50

17.58 18.00 SJP 01.27 01.29

I 19.10 19.15 SHRN 00.15 00.20 IV

20.40 20.42 BHS 23.06 23.08

21.10 21.12 BAQ 22.36 22.38

23.05 23.10 BINA 21.55 22.00

00.08 00.10 LAR 19.20 19.22

II 02.10 02.20 VGLJ 17.30 17.40

03.40 03.42 ORAI 15.40 15.42

06.50 06.55 GOY 13.45 13.50

07.58 08.00 FTP 11.58 12.00

10.10 10.20 PRYJ 10.20 10.30

11.48 11.50 MZP 08.28 08.30

12.18 12.20 CAR 08.05 08.07

PASS 13.30 VHK PASS 07.45

14.05 14.15 BSB 06.00 06.10

15.50 16.00 JNU 02.50 03.00

17.00 17.02 ARJ 01.35 01.40

18.05 18.10 GCT 00.25 00.30 III

II 19.00 *** BUI *** 23.30 II

1683 DISTANCE 1683


File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 287
I/649533/2024
3) T.No.09029/09030 Vishvamitri- Ballia- Vishvamitri MAHA KUMBH MELA Special
a Frequency Date wise
b Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.

c Maintenance: - Primary Maintenance: - UDN/PRTN with RBPC


Terminating Examination BUI
d Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
e STR /CTS & Watering: - RTM UJN, BINA, VGLJ, and PRYJ& BSB in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
f CTS:-RTM, PRYJ& BSB in both directions.
g Train Manager working over WR BRC UJN BRC = RTM DIV, UJN-BINA-UJN=RTM DIV.

Month-wise total trips are as under: -


Month 09029 Ex. VS Total 09030 Ex. BUI Total
Trips Trips
Feb-2025 17 01 18 01
TOTAL TRIPS 01 TOTAL TRIPS 01

Detailed timings are as under: -

09029 VS-BUI KUMBH SPL 09030 BUI-VS KUMBH SPL

DAY PTT DAY


ARR
. PTT DEP. STATION PTT ARR. PTT DEP.

I *** 08.35 VS 10.05 *** IV

08.50 09.00 BRC PASS 09.55

11.08 11.10 GDA 08.30 08.32

12.12 12.14 DHD 07.01 07.03

13.35 13.45 RTM 05.20 05.30

14.38 14.40 NAD 04.40 04.42

15.55 16.05 UJN 03.40 03.50

17.58 18.00 SJP 01.27 01.29

I 19.10 19.15 SHRN 00.15 00.20 IV

20.40 20.42 BHS 23.06 23.08


File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 288
I/649533/2024
21.10 21.12 BAQ 22.36 22.38

23.05 23.10 BINA 21.55 22.00


File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 289
I/649533/2024
II 00.08 00.10 LAR 19.20 19.22

02.10 02.20 VGLJ 17.30 17.40

03.40 03.42 ORAI 15.40 15.42

06.50 06.55 GOY 13.45 13.50

07.58 08.00 FTP 11.58 12.00

10.10 10.20 PRYJ 10.20 10.30

11.48 11.50 MZP 08.28 08.30

12.18 12.20 CAR 08.05 08.07

PASS 13.30 VHK PASS 07.45

14.05 14.15 BSB 06.00 06.10

15.50 16.00 JNU 02.50 03.00

17.00 17.02 ARJ 01.35 01.40

18.05 18.10 GCT 00.25 00.30 III

II 19.00 *** BUI *** 23.30 II

1553 DISTANCE 1553

4) T.No.09019/09020 BL-DNR-BL MAHA KUMBH MELA Special


a Frequency Date wise
b Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.
c Maintenance: - Primary Maintenance: - BL/UDN with
RBPC
Terminating Examination – DNR
d Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
e STR & Watering: - NDB, BSL, ET, JBP, STA, PCOI, DDU in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
f CTS:-ET & DDU in both directions
g Train Manager working over WR – BL-BSL-BL= BCT DIV.
Month-wise total trips are as under: -
Month 09019 Ex.BL Total Trips 09020 Ex.DNR Total Trips
Jan-2025 08,17,21, 25 04 09,18,22,26 04
Feb-2025 08,15,19,26 04 09,16,20,27 04
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 290
I/649533/2024
TOTAL TRIPS 08 TOTAL TRIPS 08
Details are as under: -

09019 VALSAD -DANAPUR KUMBH


SPL 09020 DANAPUR- VALSAD KUMBH
SPL
DAY PTT PTT PTT PTT DAY
ARR. DEP. STATION ARR. DEP.
I **** 08.40 BL 09.30 **** III

09.2 09.2 NVS 08.2 08.2


0 2 5 7

09.4 09.4 BHET 08.0 08.1


0 5 0 0

11.5 12.0 NDB 06.1 06.2


0 0 0 0

**** 15.1 PLD **** 04.0


5 5

16.1 16.2 BSL 03.1 03.2


5 0 5 0
18.3 18.4 KNW 01.0 01.0 III
8 0 5 7

22.5 23.0 ET 20.5 21.0


5 5 0 0
II 02.3 02.4 JBP 15.4 15.5
0 0 0 0

03.5 03.5 KTE 13.4 13.4


0 5 0 5
04.3 04.4 MYR 12.5 12.5
8 0 3 5
06.2 06.2 STA 12.2 12.2
0 5 0 5

08.4 08.4 MKP 08.5 08.5


0 2 5 7

10.2 10.3 PCOI 05.5 06.0


5 5 0 0
11.3 11.3 MZP 04.4 04.4
5 7 3 5
12.1 12.2 CAR 04.1 04.1
8 0 0 2

**** 14.1 NEWC **** 03.4


0 5
14.2 14.3 DDU 03.1 03.2
0 0 5 5
15.4 15.4 BXR 01.3 01.3
5 7 0 2
17.0 17.0 ARA 00.2 00.3
0 2 8 0
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 291
I/649533/2024
II 18.0 *** DNR *** 23.3 II
0 0
1650 1650
km’s DISTANCE km’s

5) T.No.09021/09022 VAPI-GAYA-VAPI MAHA KUMBH MELA Special


a Frequency Date
wise
b Composition: -ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF
Scratch Rake.
c Maintenance: - Primary Maintenance: - BL/UDN with RBPC
Terminating Examination – GAYA
d Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
e STR & Watering: - NDB,BSL, ET, JBP, STA,PCOI, DDU in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
f CTS:-ET & DDU in both directions

g Train Manager working over WR – BL-BSL-BL= BCT DIV.

Month-wise total trips are as under: -

Month 09021 Ex.VAPI Total Trips 09022 Ex.GAYA Total


Trips
Jan-2025 09,16, 06 10,17,19,21,23, 06
18,20,22,24 25
Feb-2025 07,14,18,22 04 08,15,19,23 04
TOTAL TRIPS 10 TOTAL TRIPS 10
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 292
I/649533/2024

09021 VAPI - GAYA KUMBH SPL

09022 GAYA- VAPI KUMBH SPL


DAY PTT PTT PTT PTT DAY
ARR. DEP. STATION ARR. DEP.
I *** 08.20 VAPI 10.00 *** IV

08.4 08.4 BL 09.1 09.1


0 2 0 2

09.2 09.2 NVS 08.2 08.2


0 2 5 7

09.4 09.4 BHET 08.0 08.1


0 5 0 0

11.5 12.0 NDB 06.1 06.2


0 0 0 0

**** 15.1 PLD **** 04.0


5 5

16.1 16.2 BSL 03.1 03.2


5 0 5 0
18.3 18.4 KNW 01.0 01.0 IV
8 0 5 7

22.5 23.0 ET 20.5 21.0


5 5 0 0
II 02.3 02.4 JBP 15.4 15.5
0 0 0 0

03.5 03.5 KTE 13.4 13.4


0 5 0 5
04.3 04.4 MYR 12.5 12.5
8 0 3 5
06.2 06.2 STA 12.2 12.2
0 5 0 5

08.4 08.4 MKP 08.5 08.5


0 2 5 7

10.2 10.3 PCOI 05.5 06.0


5 5 0 0
11.3 11.3 MZP 04.4 04.4
5 7 3 5
12.1 12.2 CAR 04.1 04.1
8 0 0 2

**** 14.1 NEWC **** 03.4


0 5
14.2 14.3 DDU 03.1 03.2
0 0 5 5
15.3 15.3 BBU 01.2 01.2
0 2 0 2
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 293
I/649533/2024
16.1 16.1 SSM 00.3 00.3
0 2 0 2
16.3 16.3 DOS 00.0 00.0
2 4 2 4
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 294
I/649533/2024
16.54 16.5 AUBR 23.3 23.32
6 0
II 19.00 **** GAYA **** 22.00 II
1675 1675
km’s DISTANCE km’s

6) T.No.09403/09404 ADI-JNH-ADI MAHA KUMBH MELA Special


a Frequency Date wise
b Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.
c Maintenance: - Primary Maintenance: - ADI with RBPC
Terminating Examination – JNH
d Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
e STR & Watering: - RTM, KOTA, AF, GOY, FTP, PRYJ in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
f. CTS:- RTM & PRYJ in both directions.
g. Train Manager working over WR – ADI-RTM-ADI=ADI DIV. RTM-KOTA-RTM=RTM DIV.

Month-wise total trips are as under: -

Month 09403 Ex. ADI Total 09404 Ex JNH Total


Trips Trips
Jan-2025 09,16,21 03 11,18,23 03
Feb-2025 05, 06 07,16,17,20,21, 06
14,15,18,19,26, 28
TOTAL TRIPS 09 TOTAL TRIPS 09
Detailed timings are as under:-

09403 ADI-JNH KUMBH SPL

09404 JNH-ADI KUMBH SPL


DAY PTT PTT PTT PTT DAY
ARR. DEP. STATION ARR. DEP.
I *** 22.4 ADI 18.00 *** IV
0
Pass 23.0 GER pass 17.30
5
23.2 23.3 ANND 16.00 16.0
8 0 2
II 00.2 00.2 CYI 14.50 14.5
0 5 5
01.4 01.4 GDA 13.50 13.5
4 6 2
02.2 02.2 DHD 11.45 11.4
6 8 7

04.3 04.4 RTM 10.00 10.1


0 0 0
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 295
I/649533/2024
05.4 05.4 NAD 08.15 08.1
3 5 7

07.1 07.1 BWM 05.51 05.5


2 4 3

07.3 07.3 RMA 05.08 05.1


5 7 0
08.4 08.5 KOTA 03.25 03.3
5 5 5
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 296
I/649533/2024
10.13 10.1 SWM 01.13 01.15
5

11.10 11.1 GGC 00.20 00.22 IV


5

12.58 13.0 BXN 23.10 23.15


0

14.30 14.3 AF 20.25 20.30


5

16.25 16.3 TDL 19.10 19.15


0
17.48 17.5 ETW 16.03 16.05
0
20.00 20.0 GOY 13.50 13.55
5
21.05 21.1 FTP 11.58 12.00
0
III 01.00 01.1 PRYJ 10.20 10.30
0
VIA PRG
III 03.00 **** JNH *** 08.30 III
1455 1455
km’s DISTANCE km’s

7) T.No. 09413/09414 SBIB-BSBS-SBIB MAHA KUMBH MELA Special


a Frequency Date wise
b Day of Ex. SBIB on Mentioned date
Service Ex BSBS on on Mentioned date
c Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF
Scratch Rake.
d Maintenance: - Primary Maintenance: - SBIB with RBPC
Terminating Examination – BSBS
e Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
f STR & Watering: - MSH,ABR,AII, JP, AF, & PRYJ in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their
enroute Stations.
g. CTS:- JP & PRYJ in both directions.
h Train Manager working over WR – SBIB-ABR-SBIB – ADI Division

Month-wise total trips are as under: -

Month 09413 Ex.SBIB Total 09414 Ex. BSBS Total


Trips Trips
Jan-2025 16 01 17 01
Feb-2025 5,9,14,18 04 06,10,15,19 04
TOTAL TRIPS 05 TOTAL TRIPS 05

Detailed timings are as under: -


File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 297
I/649533/2024
09413/09414 SBIB-BSBS-SBIB KUMBH MELA SPL
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 298
I/649533/2024

I Dep.11.00 SBIB Arr.00.30 IV


11.50/11.52 MSH 22.40/22.42

14.35/14.40 PNU 21.50/21.52 III


15.20/15.30 ABR 20.40/20.50

16.05/16.07 PDWA 19.52/19.54

16.55/16.57 FA 19.11/19.13

17.10/17.12 RANI 18.56/18.58

18.05/18.07 MJ 18.15/18.20

19.38/19.40 BER 16.42/16.44

21.00/21.10 AII 15.45/16.00

P/21.25 MDJN P/15.30

21.37/21.39 KSG 14.38/14.40

23.10/23.20 JP 13.15/13.20

II 00.53/00.55 BKI 11.58/12.00

02.00/02.05 BTE 09.55/10.00

03.50/03.55 AF 07.20/07.25

05.05/05.10 TDL 06.30/0635

06.15/06.17 ETW 04.28/04.30

08.20/08.25 GOY 02.00/02.05

09.25/09.27 FTP 00.38/00.40 III

11.00/11.10 PRYJ(Via PRRB) 23.10/23.20

12.40/12.42 GYN 22.22/22.24

II Arr 14.45 BSBS Dep 19.30 II


1428.01 KM Distance 1428.01 KM

8) T.No. 09537/09538 RJT-BSBS-RJT MAHA KUMBH MELA Special


a Frequency Date wise
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 299
I/649533/2024
b Day of Ex. RJT on Mentioned date
Service Ex BSBS on Mentioned date
Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.
d Maintenance: - Primary Maintenance: - RJT with RBPC
Terminating Examination – BSBS
e Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
f STR & Watering: - MSH,ABR,AII, JP, AF, & PRYJ in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
g. CTS:- JP & PRYJ in both directions.
h. Train Manager working over WR – RJT-ABR-RJT – RJT Division
Month-wise total trips are as under: -

Month 09537 Ex.RJT Total 09538 Ex. BSBS Total


Trips Trips
Feb-2025 06,15,19 03 07,16,20 03
TOTAL TRIPS 03 TOTAL TRIPS 03
Detailed timings are as under: -
09537/09538 RJT-BSBS-RJT KUMBH MELA SPL

I Dep 06.05 RJT Arr 04.10 IV

06.48/06.5 WKR 03.18/03.20


0

08.13/08.1 SUNR 02.08/02.10


5

P/09.15 VGDC P/00.25

09.20/09.2 VG 00.05/00.07
2
11.50/11.5 MSH 22.40/22.42
2
14.35/14.4 PNU 21.50/21.52 III
0
15.20/15.3 ABR 20.40/20.50
0
16.05/16.0 PDWA 19.52/19.54
7
16.55/16.5 FA 19.11/19.13
7
17.10/17.1 RANI 18.56/18.58
2
18.05/18.0 MJ 18.15/18.20
7
19.38/19.4 BER 16.42/16.44
0
21.00/21.1 AII 15.45/16.00
0
P/21.25 MDJN P/15.30
21.37/21.3 KSG 14.38/14.40
9
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 300
I/649533/2024
23.10/23.2 JP 13.15/13.20
0
II 00.53/00.5 BKI 11.58/12.00
5
02.00/02.0 BTE 09.55/10.00
5
03.50/03.5 AF 07.20/07.25
5
05.05/05.1 TDL 06.30/0635
0
06.15/06.1 ETW 04.28/04.30
7
08.20/08.2 GOY 02.00/02.05
5
09.25/09.2 FTP 00.38/00.40 III
7
11.00/11.1 PRYJ(Via PRRB) 23.10/23.20
0
12.40/12.4 GYN 22.22/22.24
2
II Arr 14.45 BSBS Dep 19.30 II

1610.84 Distance 1610.84 KM


KM
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 301
I/649533/2024

9) T.No. 09555/09556 BVC-BSBS-BVC MAHA KUMBH MELA Special


a Frequency Date wise
b Day of Ex. BVC on Mentioned date
Service Ex BSBS on Mentioned date
c Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.
d Maintenance: - Primary Maintenance: - BVC with RBPC
Terminating Examination – BSBS
e Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
f STR & Watering: - MSH,ABR,AII, JP, AF, & PRYJ in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
g CTS:- JP & PRYJ in both directions.

h Train Manager working over WR – BVC-MSH-BVC– BVP Division, MSH-ABR-MSH -ADI


Division
Month-wise total trips are as under: -

Month 09555 Ex.BVC Total Trips 09556 Ex. BSBS Total Trips
Jan-2025 22 01 23 01
Feb-2025 16,20 02 17,21 02
TOTAL TRIPS 03 TOTAL TRIPS 03
Detailed timings are as under: -

09555/09556 BVC-BSBS-BVC KUMBH MELA SPL


I Dep 05.00 BVC Arr .05.00 IV
08.13/08.15 SUNN 01.25/01.3
0
P/09.15 VGDC P/00.25
09.20/09.22 VG 00.05/00.0 IV
7
11.50/11.52 MSH 22.40/22.4
2
14.35/14.40 PNU 21.50/21.5
2
15.20/15.30 ABR 20.40/20.5
0
16.05/16.07 PDWA 19.52/19.5
4
16.55/16.57 FA 19.11/19.1
3
17.10/17.12 RANI 18.56/18.5
8
18.05/18.07 MJ 18.15/18.2
0
19.38/19.40 BER 16.42/16.4
4
21.00/21.10 AII 15.45/16.0
0
P/21.25 MDJN P/15.30
21.37/21.39 KSG 14.38/14.4
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 302
I/649533/2024
0
23.10/23.20 JP 13.15/13.2
0
II 00.53/00.55 BKI 11.58/12.0
0
02.00/02.05 BTE 09.55/10.0
0
03.50/03.55 AF 07.20/07.2
5
05.05/05.10 TDL 06.30/0635
06.15/06.17 ETW 04.28/04.3
0
08.20/08.25 GOY 02.00/02.0
5
09.25/09.27 FTP 00.38/00.4 III
0
11.00/11.10 PRYJ(Via 23.10/23.2
0
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 303
I/649533/2024
PRRB)
12.40/12.4 GYN 22.22/22.2
2 4
II Arr 14.45 BSBS Dep 19.30 II
1663.68 Distance 1663.68
KM KM

10) T.No. 09421/09422 SBIB-BSBS-SBIB (Via GNC) MAHA KUMBH MELA Special
a Frequency Date wise
b Day of Ex. SBIB on Mentioned date
Service Ex BSBS on Mentioned date
c Composition: - ACCW-1, ACCN-03, GSCN-12, GS-02, SLR/D-02 = TL- 20 CHS ICF Scratch
Rake.
d Maintenance: - Primary Maintenance: - SBIB with RBPC
Terminating Examination – BSBS
e Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
f STR & Watering: - MSH,ABR,AII, JP, AF, & PRYJ in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
g CTS:- JP & PRYJ in both directions.
h Train Manager working over WR – SBIB-ABR-SBIB=ADI Division

Month-wise total trips are as under: -


Month Ex.SBIB Total Trips Ex. BSBS Total Trips
Jan-2025 19,23,26 03 20,24,27 03
TOTAL TRIPS 03 TOTAL TRIPS 03
Detailed timings are as under: -
09421/09422 SBIB-BSBS-SBIB(Via GNC)
KUMBH MELA SPL

I Dep.10.25 SBIB Arr.01.25 IV

10.55/10.5 GNC 23.42/23.4


7 4
11.50/11.5 MSH 22.40/22.4
2 2
14.35/14.4 PNU 21.50/21.5
0 2
15.20/15.3 ABR 20.40/20.5
0 0
16.05/16.0 PDWA 19.52/19.5
7 4
16.55/16.5 FA 19.11/19.1
7 3
17.10/17.1 RANI 18.56/18.5
2 8
18.05/18.0 MJ 18.15/18.2
7 0
19.38/19.4 BER 16.42/16.4
0 4
21.00/21.1 AII 15.45/16.0
0 0
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 304
I/649533/2024
P/21.25 MDJN P/15.30
21.37/21.3 KSG 14.38/14.4
9 0
23.10/23.2 JP 13.15/13.2
0 0
00.53/00.5 BKI 11.58/12.0
5 0
02.00/02.0 BTE 09.55/10.0
5 0
03.50/03.5 AF 07.20/07.2
5 5
05.05/05.1 TDL 06.30/0635
0
06.15/06.1 ETW 04.28/04.3
7 0
08.20/08.2 GOY 02.00/02.0
5 5
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 305
I/649533/2024
09.25/09.2 FTP 00.38/00.4
7 0
11.00/11.1 PRYJ(Via PRRB) 23.10/23.2
0 0
12.40/12.4 GYN 22.22/22.2
2 4
Arr 14.45 BSBS Dep 19.30
1450.71 Distance 1450.71
KM KM

11) T.No. 09591/09592 VRL-BSBS- VRL MAHA KUMBH MELA Special


a Frequency Date wise
b Day of Ex. VRL on Mentioned date
Service Ex BSBS on Mentioned date
c Composition: - LACCW-2, LACCN-08, LCN-6, LS-02, SLR/D-01, LWLRRM-01 = TL- 20 CHS LHB
Scratch Rake.
d Maintenance: - Primary Maintenance: - RJT with RBPC
Terminating Examination – BSBS
e Traction: - Electric end to end
(NOTE-TRAIN WILL RUN WITH PASSENGER LOCO ONLY)
f STR & Watering: - MSH,RJT,ABR,AII, JP, AF, & PRYJ in both directions.
Concerned Zonal Railways may kindly ensure full watering and STR on their enroute
Stations.
g CTS: - JP & PRYJ in both directions.
h Train Manager working over WR – VRL-RJT-VRL= BVP Div., RJT-MSH -RJT Div. MSH-ABR-
MSH=ADI DIV.

Month-wise total trips are as under: -

Month Ex. VRL Total Ex. BSBS Total


Trips Trips
Feb-2025 22 01 24 01
TOTAL TRIPS 01 TOTAL TRIPS 01

Detailed timings are as under: -

09591/09592 VRL-BSBS-VRL KUMBH MELA SPL

I Dep. 22.20 VRL Arr. 09.00

II P/05.15 BKNG P/04.40

05.55/06.0 RJT 03.47/03.5


5 7

06.48/06.5 WKR 02.48/02.5


0 0

08.13/08.1 SUNR 01.35/01.3 V


5 7

P/09.15 VGDC P/00.25

09.20/09.2 VG 00.05/00.0 V
2 7
11.50/11.5 MSH 22.40/22.4
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 306
I/649533/2024
2 2
14.35/14.4 PNU 21.50/21.5
0 2
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 307
I/649533/2024
15.20/15.3 ABR 20.40/20.50
0
16.05/16.0 PDWA 19.52/19.54
7
16.55/16.5 FA 19.11/19.13
7
17.10/17.1 RANI 18.56/18.58
2
18.05/18.0 MJ 18.15/18.20
7
19.38/19.4 BER 16.42/16.44
0
21.00/21.1 AII 15.45/16.00
0
P/21.25 MDJN P/15.30
21.37/21.3 KSG 14.38/14.40
9
23.10/23.2 JP 13.15/13.20
0
III 00.53/00.5 BKI 11.58/12.00
5
02.00/02.0 BTE 09.55/10.00
5
03.50/03.5 AF 07.20/07.25
5
05.05/05.1 TDL 06.30/0635
0
06.15/06.1 ETW 04.28/04.30
7
08.20/08.2 GOY 02.00/02.05
5
09.25/09.2 FTP 00.38/00.40 IV
7
11.00/11.1 PRYJ (Via PRRB) 23.10/23.20
0
12.40/12.4 GYN 22.22/22.24
2
III Arr 14.45 BSBS Dep 19.30 III
1795 KM Distance 1795 KM

Board may kindly accord permission for running the above Kumbh Mela Special- 2025
trains to clear extra passenger traffic.

For CPTM-WR
File No.WR-HQRS0OPTG(OKML)/1/2024-O/o DY COM/CHG/HQ/WR 308
I/649533/2024
CRSE (CHG) CRSE (F&O) CELE-CCG for kind information
please. C/-CTNL (E)-CCG for necessary action