Unit - III (Part - I) (Detailed Estimate)

Uploaded by

Inferno Kid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views12 pages

Unit - III (Part - I) (Detailed Estimate)

Uploaded by

Inferno Kid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

UNIT – III DETAILED ESTIMATE (5th Semester)

Method of Measurement of Brickwork [IS: 1200 (Part III)]

Unit of Brickwork
a) For Traditional Brick
1. If the thickness of the brickwork is 250 mm or more than 250 mm, then Unit of Brickwork is Cu.m (m 3)
2. If the thickness of the brickwork is less than 250 mm (means thickness is 125 mm or 75 mm), then Unit
of Brickwork is Sq.m (m2)

b) For Modular Brick


3. If the thickness of the brickwork is 200 mm or more than 200 mm, then Unit of Brickwork is Cu.m (m3)
4. If the thickness of the brickwork is less than 200 mm (means thickness is 100 mm), then Unit of
Brickwork is Sq.m (m2)

No Deductions shall be made for the Brickwork


Case – I
Ends of dissimilar materials (means R.C.C Beams, Joists, Lintels, Post, Columns, Girders, Rafters, Purlins,
Trusses, etc.) upto 0.10 m2 in section.

Case – II
Opening upto 0.01 m2 in area.

Case - III
Cement Concrete Blocks as for Hold fast and Holding down bolts.

Method of Measurement of Plastering and Pointing [IS: 1200 (Part XII)]

Unit of Plastering
All plastering shall be measured in Sq.m (m2)

Deductions for Plastering Work


Case – I
No deduction shall be made for opening not exceeding 0.50 m2 each and no addition shall be made for reveals,
Jambs, Soffits, sills, etc.

Case – II
Deductions for opening in between 0.50 m2 to 3.0 m2 (means opening more than 0.50 m2 and less than 3.0 m2)
each, shall be 50% of the area of opening on each face made from the areas of Plastering.
No addition shall be made for reveals, Jambs, Soffits, sills, etc. of these opening.

Case - III
In case, the opening of area more than 3.0 m 2, deduction shall be made for whole area on each face but
Jambs, Soffits, sills shall be measured.

1 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

Estimate for One Room (Fig – 2) [Long wall & Short Wall Method]

Sl. Description of Item No Length Breadth Height Quantity Explanatory


No ( in M) (in M) (in M) Note
1 Earthwork in excavation of
foundation trenches in all sorts of
soil including removing, spreading
or stacking the soils within a lead
of 75 m as per direction of Site
Engineer.
a). For Long Wall 2 5.15 0.90 0.90 8.34 m3 5.15 = 4.25 +
0.90
( )𝑥 2
2
0.90 = 0.800 +
0.100 (P.C.C)
b). For Short wall 2 2.35 0.90 0.90 3.81 m3 2.35 = 3.25 -
0.90
( )𝑥 2
2
2
Sub-Total of It. No. 1 12.15 m
2. Plain Cement Concrete (1:3:6)
with 20 mm down graded stone
chips excluding shuttering.
a). For Long wall 2 5.15 0.90 0.10 0.93 m3
b). For Short wall 2 2.35 0.90 0.10 0.42 m3
Sub-Total of It. No. 2 1.35 m3
3. Brickwork with 1st class bricks
with 1:6 cement sand mortar in
Sub-Structure.
a). 1st Footing OR 750 mm wide
Footing

i). For Long wall 2 5.00 0.75 0.25 1.88 m3 5.00 = 4.25 +
0.75
( )x2
2
ii). For Short wall 2 2.50 0.75 0.25 0.94 m3 2.50 = 3.25 -
0.75
( )x2
2
b). 2nd Footing OR 500 mm wide
Footing
i). For Long wall 2 4.75 0.50 0.25 0.34 m3 4.75 = 4.25 +
0.50
( )x2
2
ii). For Short wall 2 2.75 0.50 0.25 0.23 m3 2.75 = 3.25 -
0.50
( )x2
2

2 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

c). 3rd Footing OR 375 mm wide


Footing
i). For Long wall 2 4.625 0.375 0.30 0.52 m3 4.525 = 4.25 +
0.375
( )x2
2
ii). For Short wall 2 2.875 0.375 0.30 0.32 m3 2.875 = 3.25 -
0.375
( )x2
2

d). G.L to Plinth Level


i). For Long wall 2 4.625 0.375 0.60 1.04 m3
ii). For Short wall 2 2.875 0.375 0.60 0.64 m3

Sub-Total of It. No. 3 7.22 m3


4. 25 mm thick Damp Proof Coarse
(D.P.C) with cement concrete
(1:1.5:3) with stone chips 10mm
nominal size and admixture of
water proofing compound as per
manufacturer’s specification.
i). For Long wall 2 4.50 0.25 - 2.25 m2 4.50 = 4.00 +
0.25
( )𝑥 2
2
2
ii). For Short wall 2 3.00 0.25 - 1.50 m
Less for Door Portion 1 1.00 0.25 - (-) 0.25m2
Sub-Total of It. No. 4 3.50 m2

5. Brickwork with 1st class bricks


with 1:6 cement sand mortar in
Super-Structure.
a). For Long wall 2 4.50 0.25 2.575 5.79 m3 2.575 = 3.10 –
0.35(Roof
Beam) – 0.15
(Lintel) – 0.025
(D.P.C)
b). For Short wall 2 3.00 0.25 2.575 3.86 m3
Less for Door 1 1.00 0.25 2.10 (-) 0.53m3
Less for Window 1 1.50 0.25 1.20 (-) 0.45 m3
Sub-Total of It. No. 5 8.68 m3

3 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

Sl. Description of Item No Length Breadth Height Quantity Explanatory


No (in M) (in M) (in M) Note
6 Plastering to wall on brickwork
surface with 1:6 cement and sand
mortar (25 mm thick).
Inside the room walls
a). For Long wall 2 4.00 - 2.975 23.80 m2 2.975 = 3.10 –
0.10 (roof slab)
– 0.025 (DPC)
b). For Short wall 2 3.00 - 2.975 17.85 m2
Less for Door ( - ) 0.5 1.00 - 2.10 (-) 1.05 m2
Less for Window ( - ) 0.5 1.20 - 1.50 (-) 0.90 m2
Sub-Total of It. No. 6 39.70 m2
7. Plastering to wall on brickwork
surface with 1:6 cement and sand
mortar (20 mm thick).
Outside the room walls
a). For Long wall 2 4.50 - 3.10 27.90 m2
b). For Short wall 2 3.50 - 3.105 21.70 m2
Less for Door ( - ) 0.5 1.00 - 2.10 (-) 1.05 m2
Less for Window ( - ) 0.5 1.20 - 1.50 (-) 0.90 m2
Sub-Total of It. No. 7 47.65 m2

8. Plastering to cincrete surface with


1:4 cement and sand mortar (10
mm thick).
Ceiling of the rooms
1 4.00 3.00 12.00 m2

9. Indian Pattern Stone (IPS) flooring


with Cement Concrete (1:2:4)
with stone chips including
topping made with ordinary or
White cement.
Room Inside 1 4.00 3.00 12.00 m2

10. Earth work in back filling in


foundation trenches with earth in
layers not excluding 150 mm
thick each layers including
watering and ramming etc. layer
by layer all complete.
Qty. of Earth work in excavation 12.15 m2
(Item No. 1)

4 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

Less for P.C.C qty. (Item No. 2) (-)1.35 m3


Less for Brickwork in Sub- (-) 4.23 m3
Structure (Sub-Total of Item No.
3(a) +(b) + (c)
Sub-Total of It. No. 6.57m3
10
11. Painting of Insides walls and
ceiling.
Same as Plastering Qty. of Item 51.70 m2 51.70 = 39.70
No. 6 & 8 + 12.00

12. Painting of all outside walls.


Same as Plastering Qty. of Item 47.65 m2
No. 7

Estimate for One Room (Fig – 3) [ Centre Line Method ]


0.250 0.250 0.25 0.25
Centre Line Length = 2( + 4.00 + 0.250 + 4.00 + ) + 3( + 3.00 + ) = 26.75 m
2 2 2 2

Sl. Description of Item No Length Breadth Height Quantity Explanatory Note


No ( in M) (in M) (in M)
1 Earthwork in excavation of
foundation trenches in all sorts of
soil including removing, spreading
or stacking the soils within a lead 25.85 = 26.75 –
of 75 m as per direction of Site 1 25.85 0.90 0.90 20.94 m 3 0.90
2x( )
Engineer. 2

2. Plain Cement Concrete (1:3:6)


with 20 mm down graded stone 1 25.85 0.90 0.10 2.33 m3
chips excluding shuttering.

3. Brickwork with 1st class bricks


with 1:6 cement sand mortar in
Sub-Structure.
a). 1st Footing OR 750 mm wide 1 26.00 0.75 0.25 4.88 m3 26.00 = 26.75 – 2
0.75
Footing x( 2 )

b). 2nd Footing OR 500 mm wide 1 26.25 0.50 0.25 3.28 m3 26.25 = 26.75 – 2
0.50
Footing x( 2 )

5 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

c). 3rd Footing OR 375 mm wide 1 26.375 0.375 0.30 2.97 m3 26.375 = 26.75 –
0.375
Footing 2x( 2 )
Sub-total of It. No. 11.12 m3
3(a) + (b) + (C)

d). G.L to Plinth Level 1 26.375 0.375 0.60 5.93 m3

4. 25mm thick Damp proof Course


(D.P.C) with Cement concrete 26.50 = 26.75 – 2
(1:1.5:3) with Stone chips with 10 0.250
x( 2 )
mm nominal size and admixture 1 26.50 0.250 - 6.63 m2
of water proofing compound as
per manufacture’s specification.
Less for Door Portion 2 1.00 0.25 - (-)
0.50m2
Sub-total of It. No. 6.13 m2
4

5. Brickwork with 1st class bricks


with 1:6 cement sand mortar in
Super-Structure.
Walls 1 26.50 0.25 2.575 17.06 m3
1 2.00 0.25 1.50 0.75 m3
Less for Door 2 1.00 0.25 2.10 (-)1.05m3
Less for Window 2 1.50 0.25 1.20 (-)0.90m3
Sub-total of It. No. 15.11m3
5

6 Plastering to wall on brickwork


surface with 1:6 cement and sand
mortar (25 mm thick)
Inside the walls 4 4.00 - 3.00 48.00m2 3.00 = 3.10 – 0.10
(Roof Slab)
Inside the walls 4 3.00 - 3.00 36.00m2
1
Less for Door ( - ) 2x2 1.00 - 2.10 (-) 2.10
m2
1
Less for Window ( - ) 2x2 1.50 - 1.20 (-) 1.80
m2
Sub-Total of Item 80.10 m2
No. 6
7. Plastering to wall on brickwork
surface with 1:6 cement and sand
mortar (20 mm thick)
Outside Walls 2 8.75 - 3.10 54.25 m2 8.75 = 0.25 + 4.00
+ 0.25 + 4.00 +

6 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

0.25
2
Outside Walls 2 3.50 - 3.10 21.70 m 3.50 = 0.25 + 3.00
+ 0.25
1
Less for Door ( - ) 2x2 1.00 - 2.10 (-) 2.10
m2
1
Less for Window ( - ) 2x2 1.50 - 1.20 (-) 1.80
m2
Sub-Total of Item 72.05 m2
No. 7
9. Plastering to wall on brickwork
surface with 1:4 cement and sand
mortar (10 mm thick)
Ceiling of Rooms 2 4.00 3.00 24.00 m2

10. Earth work in back filling in


foundation trenches with earth in
layers not excluding 150 mm thick
each layers including watering
and ramming etc. layer by layer
all complete.
Qty. of Earth work in excavation 20.94 m3
(Item No. 1)
Less for P.C.C qty. (Item No. 2) (-)2.33m3

Less for Brickwork in Sub- (-)11.12


Structure (Sub-Total of Item No. m3
3(a)+(b)+(c)
Sub-Total of Item 7.49 m3
No. 10

7 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

Estimate for One Room (Fig – 3) [Long wall & Short Wall Method]

Sl. Description of Item No Length Breadth Height Quantity Explanatory


No ( in M) (in M) (in M) Note
1 Earthwork in excavation of
foundation trenches in all sorts of
soil including removing, spreading
or stacking the soils within a lead
of 75 m as per direction of Site
Engineer.
a). For Long Wall 2 9.40 0.90 0.90 15.23 m3 9.40 = 2 x 4.25
0.90
+( )𝑥 2
2
0.90 = 0.800 +
0.100 (P.C.C)
b). For Short wall 3 2.35 0.90 0.90 5.71 m3 2.35 = 3.25 -
0.90
( )𝑥 2
2
2
Sub-Total of It. No. 1 20.94 m
2. Plain Cement Concrete (1:3:6)
with 20 mm down graded stone
chips excluding shuttering.
a). For Long wall 2 9.40 0.90 0.10 1.69 m3
b). For Short wall 3 2.35 0.90 0.10 0.63 m3
Sub-Total of It. No. 2 2.32 m3
3. Brickwork with 1st class bricks
with 1:6 cement sand mortar in
Sub-Structure.
a). 1st Footing OR 750 mm wide
Footing

i). For Long wall 2 9.25 0.75 0.25 3.47 m3 9.25 = 2x4.25 +
0.75
( )x2
2
ii). For Short wall 3 2.50 0.75 0.25 1.41 m3 2.50 = 3.25 -
0.75
( )x2
2
b). 2nd Footing OR 500 mm wide
Footing
i). For Long wall 2 9.00 0.50 0.25 2.25 m3 4.75 = 2x4.25 +
0.50
( )x2
2
ii). For Short wall 3 2.75 0.50 0.25 1.03 m3 2.75 = 3.25 -
0.50
( )x2
2

8 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

c). 3rd Footing OR 375 mm wide


Footing
i). For Long wall 2 8.875 0.375 0.30 1.99 m3 4.525 =2x 4.25
+
0.375
( )x2
2
ii). For Short wall 3 2.875 0.375 0.30 0.97 m3 2.875 = 3.25 -
0.375
( )x2
2
Sub-Total of It. No. 11.12 m3
3(a)+(b)+(c)

d). G.L to Plinth Level


i). For Long wall 2 8.875 0.375 0.60 3.99 m3
ii). For Short wall 3 2.875 0.375 0.60 1.94 m3

4. 25 mm thick Damp Proof Coarse


(D.P.C) with cement concrete
(1:1.5:3) with stone chips 10mm
nominal size and admixture of
water proofing compound as per
manufacturer’s specification.
i). For Long wall 2 8.75 0.25 - 4.38 m2 8.75 = 2x4.25 +
0.25
( )𝑥 2
2
ii). For Short wall 3 3.00 0.25 - 2.25 m2
Less for Door Portion 2 1.00 0.25 - (-) 0.50m2
Sub-Total of It. No. 4 6.13 m2

5. Brickwork with 1st class bricks


with 1:6 cement sand mortar in
Super-Structure.
a). For Long wall 2 8.75 0.25 2.575 11.26 m3 2.575 = 3.10 –
0.35(Roof
Beam) – 0.15
(Lintel) – 0.025
(D.P.C)
b). For Short wall 3 3.00 0.25 2.575 5.79 m3
Less for Door 2 1.00 0.25 2.10 (-) 1.05m3
Less for Window 2 1.50 0.25 1.20 (-) 0.90 m3
Sub-Total of It. No. 5 15.10 m3

9 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

Sl. Description of Item No Length Breadth Height Quantity Explanatory


No (in M) (in M) (in M) Note
6 Plastering to wall on brickwork
surface with 1:6 cement and sand
mortar (25 mm thick).
Inside the room walls
a). For Long wall 4 4.00 - 2.975 47.60 m2 2.975 = 3.10 –
0.10 (roof slab)
– 0.025 (DPC)
b). For Short wall 4 3.00 - 2.975 35.70 m2
1
Less for Door ( - ) 2x2 1.00 - 2.10 (-) 2.10 m2
1
Less for Window ( - ) 2x2 1.20 - 1.50 (-) 1.80 m2
Sub-Total of It. No. 6 79.40 m2
7. Plastering to wall on brickwork
surface with 1:6 cement and sand
mortar (20 mm thick).
Outside the room walls
a). For Long wall 2 8.75 - 3.10 54.25 m2
b). For Short wall 2 3.50 - 3.10 21.70 m2
1
Less for Door ( - ) 2x2 1.00 - 2.10 (-) 2.10 m2
1
Less for Window ( - ) 2x2 1.20 - 1.50 (-) 1.80 m2
Sub-Total of It. No. 7 72.05 m2

8. Plastering to cincrete surface with


1:4 cement and sand mortar (10
mm thick).
Ceiling of the rooms
2 4.00 3.00 24.00 m2

9. Indian Pattern Stone (IPS) flooring


with Cement Concrete (1:2:4)
with stone chips including
topping made with ordinary or
White cement.
Room Inside 2 4.00 3.00 24.00 m2

10 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

11 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation

12 AROOP SIR