Unit - III (Part - I) (Detailed Estimate)
Unit - III (Part - I) (Detailed Estimate)
Unit of Brickwork
a) For Traditional Brick
1. If the thickness of the brickwork is 250 mm or more than 250 mm, then Unit of Brickwork is Cu.m (m 3)
2. If the thickness of the brickwork is less than 250 mm (means thickness is 125 mm or 75 mm), then Unit
of Brickwork is Sq.m (m2)
Case – II
Opening upto 0.01 m2 in area.
Case - III
Cement Concrete Blocks as for Hold fast and Holding down bolts.
Unit of Plastering
All plastering shall be measured in Sq.m (m2)
Case – II
Deductions for opening in between 0.50 m2 to 3.0 m2 (means opening more than 0.50 m2 and less than 3.0 m2)
each, shall be 50% of the area of opening on each face made from the areas of Plastering.
No addition shall be made for reveals, Jambs, Soffits, sills, etc. of these opening.
Case - III
In case, the opening of area more than 3.0 m 2, deduction shall be made for whole area on each face but
Jambs, Soffits, sills shall be measured.
1 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
Estimate for One Room (Fig – 2) [Long wall & Short Wall Method]
i). For Long wall 2 5.00 0.75 0.25 1.88 m3 5.00 = 4.25 +
0.75
( )x2
2
ii). For Short wall 2 2.50 0.75 0.25 0.94 m3 2.50 = 3.25 -
0.75
( )x2
2
b). 2nd Footing OR 500 mm wide
Footing
i). For Long wall 2 4.75 0.50 0.25 0.34 m3 4.75 = 4.25 +
0.50
( )x2
2
ii). For Short wall 2 2.75 0.50 0.25 0.23 m3 2.75 = 3.25 -
0.50
( )x2
2
2 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
3 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
4 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
b). 2nd Footing OR 500 mm wide 1 26.25 0.50 0.25 3.28 m3 26.25 = 26.75 – 2
0.50
Footing x( 2 )
5 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
c). 3rd Footing OR 375 mm wide 1 26.375 0.375 0.30 2.97 m3 26.375 = 26.75 –
0.375
Footing 2x( 2 )
Sub-total of It. No. 11.12 m3
3(a) + (b) + (C)
6 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
0.25
2
Outside Walls 2 3.50 - 3.10 21.70 m 3.50 = 0.25 + 3.00
+ 0.25
1
Less for Door ( - ) 2x2 1.00 - 2.10 (-) 2.10
m2
1
Less for Window ( - ) 2x2 1.50 - 1.20 (-) 1.80
m2
Sub-Total of Item 72.05 m2
No. 7
9. Plastering to wall on brickwork
surface with 1:4 cement and sand
mortar (10 mm thick)
Ceiling of Rooms 2 4.00 3.00 24.00 m2
7 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
Estimate for One Room (Fig – 3) [Long wall & Short Wall Method]
i). For Long wall 2 9.25 0.75 0.25 3.47 m3 9.25 = 2x4.25 +
0.75
( )x2
2
ii). For Short wall 3 2.50 0.75 0.25 1.41 m3 2.50 = 3.25 -
0.75
( )x2
2
b). 2nd Footing OR 500 mm wide
Footing
i). For Long wall 2 9.00 0.50 0.25 2.25 m3 4.75 = 2x4.25 +
0.50
( )x2
2
ii). For Short wall 3 2.75 0.50 0.25 1.03 m3 2.75 = 3.25 -
0.50
( )x2
2
8 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
9 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
10 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
11 AROOP SIR
[UNIT – III DETAILED ESTIMATE] Estimating, Costing and Valuation
12 AROOP SIR