Assignment II Construction and Resource Management
Assignment II Construction and Resource Management
Group 2:
From the given articles, summarize on how Zanzibar construction sites can improve labour
productivity. When giving summary also make reference to other authors on the same topic and
your personal views should strongly be reflected in your presentation.
Group 3:
Practitioners defined safety as “A thing is provisionally categorized as safe if its risks are
deemed known and, in the light of knowledge judge to be acceptable” also due to accidents
there is a loss of reputation of the contractors. You as the site technician one of your main duties
is to always keep site in a safety mode. Give a brief presentation to unskilled and skilled labour
on types and sources of accidents, measures on how to minimize accidents in construction sites,
safety and health welfare at construction site and application of safety gears, safety rules and
regulation and construction sites.
Group 4:
Construction projects suffers alot upon the issue of controlling cost in construction, most of the
project exceed the planned cost of the project. Give us highlight on how you can control cost
as a professional. Your presentation should give an overview on cost control in building and
civil works.
Group 5:
Your organization has set aside funds to construct 100 simple residential buildings. You, as a
site technician, have been selected to be give an insight on budgeting and different types of
budgeting on construction project also, managing director of your office has approached you
to prepare the project budget.