Risk Assessment For Control and Protection Relay System Installation Work
Risk Assessment For Control and Protection Relay System Installation Work
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 1 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
RISK ASSESSMENT
FOR
1
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 2 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
Risk Matrices
(1) Risk probability is defined as the likelihood that an unsafe event or condition might occur. The likelihood or accident frequency resulting from the
identified hazards or safety deficiencies shall be estimated using Table 1 below.
Probability of Occurrence
2
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 3 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
(2) Risk severity is defined as the potential consequences of an unsafe event or condition, taking as reference the worst foreseeable situation. The severity of
accidents resulting from the identified hazards or safety deficiencies shall be estimated using the definitions in Table 2 taking into account a pessimistic but
reasonable assessment of their consequences.
Severity of Occurrence
Injury requiring medical treatment or ill health leading to disability (includes lacerations, burns, sprains, minor 3
Moderate
fractures, dermatitis, deafness, work related upper limb disorders).
Injury or ill-health requiring first aid only (includes minor cuts and bruises, irritation, ill health with temporary 2
Minor
discomfort).
1
Negligible Not likely to cause injury or ill health.
3
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 4 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
(3) The risk category of the identified hazard or safety deficiency shall be assessed using Table 3 below by cross-referencing estimated risk probability
with the risk severity.
Frequent (D) D5 D4 D3 D2 D1
Occasional (C) C5 C4 C3 C2 C1
Remote (B) B5 B4 B3 B2 B1
Rare (A) A5 A4 A3 A2 A1
4
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 5 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
(4) The risk tolerability determined from Table 3 is presented in Table 4 below.
No additional risk control measures may be needed. However, frequent review may be needed to ensure that the risk level
Low Risk Acceptable
assigned is accurate and does not increase over time.
A careful evaluation of the hazards should be carried out to ensure that the risk level is reduced to as low as is practicable
Medium Risk Moderately Acceptable within a defined time period. Interim risk control measures, such as administrative controls, may be implemented.
Management attention is required.
High Risk level must be reduced to at least Medium Risk before work commences. There should not be any interim risk
High Risk
control measures and risk control measures should not be overly dependent on personal protective equipment or
Not Acceptable
appliances. If need be, the hazard should be eliminated before work commences. Immediate management intervention is
High Risk
required before work commences.
5
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 6 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
Risk Control
Hierarchy of Control
The control of hazards and reduction of risks can be accomplished by following the Hierarchy of Control (Elimination, Substitution, Engineering, Administration,
and PPE). These control measures are not usually mutually exclusive. Generally, it may be more effective to use multiple control measures, for example, engineering
controls work better with administrative controls like training and Safe Work Procedures.
6
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 7 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
7
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 8 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
protection Mechanical hazard - Machine breakdown - If there unloading work with truck crane, must
relay system / Physical hazard - Unsafe lifting procedure have Lifting work permit at working place. Supervisor
materials and Falling drop C 4 C4 - Body injuries - The access way must be cleared and firmed. and Safety B 4 B4
using by truck objects hazard - Damage to property. - Site Supervisor shall be closely supervision on Inspector
Forklift and - Provide the safety barrier and display the warning
8
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 9 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
9
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 10 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
10
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 11 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
11
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 12 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
12
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 13 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
13
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 14 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
14
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 15 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
(7) Emergency - Fire - All workers to be briefed the shortest escape route Supervisor /
Electrical hazard/
preparedness B 5 B5 - Serious injuries to the rest shelter. Safety A 5 A5
Fire hazard
- Damage to property - Shut down the electrical equipment such as personnel
welding machine, electrical breakers...
- Must have emergency vehicle at site.
- Must have first aider and first aid box at work
place.
- Wait for further instruction for clearance to re-
enter the workplace.
-
15
HSE Form 00-0
Revision: 00
Barons & Fujikura EPC Co., Ltd. Sheet: Page 16 of 16
Dated: 13.January.2024
Company Name: Barons & Fujikura EPC Co., Ltd.
Risk Assessment for Control And Protection Relay System Installation Work
Construction Work Undertaken by (Barons & Fujikura EPC Co., Ltd.)
Reviewed By:
Prepared By: Approved By:
Risk Management Team (RMT)
Contractor Senior Management Status*: (Acp / Acp w/c / Not Acp)
Contractor RAT Leader (Name) Date of Review: 13.January.2024
(Name)
Mr. Htet Naing Aung Name Designation Signature
Mr. Kumara Erantha
Designation: HSE Officer Designation: Project Manager (Acting) 1) Mr. Phyo Min Htet CM
Signature: Signature:
2) Mr. Zaw Zaw Tun CM
Acp Accepted
16
17