Example On Seepage Analysis by Khola's Metod#t4
Example On Seepage Analysis by Khola's Metod#t4
1258.5m
1256m
1255m
0.5m
0.5m
1250m
1248m 1248m
Solution:
Total length of floor = 35.5m
Depth of U/S pile = 1256-1250 = 6m
Depth of intermediate pile = 1255-1248 = 7m
Depth of D/S pile = 1255-1248 = 7m
H = 1260-1256 = 4m
Elementary profile
b= 35.5m
U/S pile: d1 = 6m
α = b/d = 35.5/6 =5.917
λ=
Assignment, Q5 Page 1
d2 = 7m
α1 = b1/d = , α2 = b2/d =
λ1 =
λ=
b = 35.5m
D/S pile: d3 = 7m
α = b/d = 35.5/7 = 5.071
λ= = = 3.085
a. U/S pile: 1m
d = 6m
Assignment, Q5 Page 2
b. Intermediate pile:
2m
d= 7m
c. D/S pile:
2m
1258.5
1256m
1255m
(+)
(-) (+) (-)
D12= 3m
d1= 5m D21= 7m D23= 5m D32= 5m
1250m d2 = 5m d2 = 5m d3 = 5m
1248m 1248m
20.5m 15m
Assignment, Q5 Page 3
Effect of P2 on P1.
C = +19
Effect of P1 on P2.
C = -19
Effect of P3 on P2.
C = +19
Effect of P2on P3.
C = -19
Correction factor for 1:3 slope from table is C' = 4.5, sloping is located b' = 20.5m
bs = Horizontal length of sloping floor = 10.5m
► Corrected values:
Φ = φ + correction due to thickness + correction due to M. interference + correction due to slope.
For U/S pile,
Φc' =
ΦE' =
Φc' =
ΦE'=
► Residual pressure:
Total seepage head (H) = 1260m-1255m = 5m
Φ is defined as the ratio of residual head (h or p) to the total seepage head (H).
U/S pile:
Assignment, Q5 Page 4
Intermediate pile:
D/S pile:
► Uplift pressure:
Q
3.486m 2.739m 1.998m 1.6m
11.5m 1.32m
3.766m 2.287m
► Exit gradient
λ=
Assignment, Q5 Page 5