Since the completion of the first large-scale U.S. high-voltage direct-current (HVDC)
transmission line (the Pacific Intertie) in 1970, HVDC technology has evolved dramatically.
Today, HVDC transmission is playing a critical role in grid modernization efforts around the
world. However, the U.S. is lagging behind in deploying HVDC lines, despite the need to
dramatically expand the nation’s grid to efficiently move low-cost power long distances to meet
increased demand and ensure reliable power supply.
This new report (1) explains and summarizes the capabilities of HVDC transmission
technologies, (2) reviews the operational experience that has already been gained with modern
HVDC technologies, and (3) summarizes the planning, operational, and market benefits that
these technologies now offer to regional power system operators. System operators new to
HVDC transmission are able to take advantage of this substantial body of planning, project
development, and operating experience. The information provided is meant to facilitate
unbiased consideration of modern HVDC technology whenever it can address transmission
needs more effectively, avoiding the often implicit preferences for “traditional” but less
effective transmission solutions. Yet, to facilitate the adoption and full utilization of modern
HVDC transmission technology, a number of misconceptions and challenges must be addressed.
HVDC transmission provides substantial benefits and unique grid management capabilities. It is
a proven, cost-effective solution for many bulk-power transmission needs that offers important
advantages compared to the conventional high-voltage and extra-high-voltage alternating
current (HV-AC and EHV-AC) technologies:
1
• High-capacity (2-5 GW) long-distance overhead, underground, and submarine transmission
is capable of providing transmission capabilities both between and within synchronous grids
and balancing areas;
• Lower environmental and community impacts through: (a) less right of way for overhead
lines; (b) more cost-effective undergrounding options; and (c) the ability to expand grid
capacity and double or triple the capacity of existing alternating current (AC) overhead
rights of way by converting to HVDC;
• Power flow control and AC grid congestion management, including through mitigation of
AC contingency and stability constraints (thereby increasing the transfer capability of the
existing AC grid, particularly in systems with high numbers of inverter-based generating
resources);
• Ability to support weak AC grids (e.g., through grid forming operations) and high-density
load centers (through attractive undergrounding options and fault current mitigation);
• A wide range of other AC grid support functions to improve reliability, resilience, and power
quality—such as (1) dynamic voltage control; (2) fault recovery; (3) AC grid oscillation
dampening, grid harmonics filtering, and phase balancing; as well as (4) frequency
regulation, black start, and system restoration in coordination with neighboring power
systems or connected resources.
In summary, modern HVDC technology can enhance the AC grid by allowing it to run more
efficiently, better control power flows, address grid stability and flexibility challenges, and
increase grid resilience.
Numerous individual case studies show that most of the unique capabilities of modern HVDC
transmission technology are already utilized successfully by grid operators. This is particularly
true for HVDC systems based on “voltage-source converters” (VSC), which is quickly replacing
the line-commutated converter (LCC) technology that account for nearly all of North American
HVDC projects. These legacy LLC systems, while successful in their own ways, offer few of the
VSC-based grid support capabilities.
European grid operators in particular have taken advantage of advanced VSC capabilities.
Internationally, VSC-based HVDC technology has become the dominant HVDC choice over the
last 5–10 years, with approximately 50 GW of VSC-based HVDC transmission projects in
operation today and approximately 130 GW planned or under development through the end
2
of the decade. Of these, North America accounts for only 3% of all VSC-based HVDC systems in
operation worldwide and—almost exclusively due to efforts by merchant transmission
developers—for approximately 30% of planned and proposed VSC systems.
The already-available significant operational and planning experience with modern HVDC
transmission includes:
• Experience with planning and procuring HVDC transmission overlays: such as Germany’s 10
GW of new HVDC backbone transmission projects, TenneT’s “Target Grid” project for which
procurement contracts for €23 billion HVDC equipment have recently been signed, Scottish
& Southern Electricity Network’s (SSEN’s) five sets of 2 GW HVDC backbone equipment
orders, and Terna’s proposed €11 billion “Hyper Grid” HVDC transmission overlay project.
• Experience with HVDC Transmission Planning in North America: The California Independent
System Operator’s (CAISO’s) planning process considers a wide range of HVDC-related
benefits. CAISO recently evaluated a dozen HVDC projects, and approved two.
• Experience with regional and interregional HVDC line optimization: such as market-to-
market optimization of HVDC and AC interconnectors in Europe and the CAISO’s market-
based nodal co-optimization of HVDC transmission with generation commitment and
dispatch.
The extensive planning and operational experience with modern HVDC transmission technology
gained in recent years provides a substantial resource for North American grid operators who
are seeking cost-effective solutions to address projected future transmission and grid
operational needs.
Despite the substantial and rapidly growing planning and operational experience, deploying
modern HVDC transmission technology is still challenging for a number of important reasons:
• Some grid operators do not yet have the experience, planning tools, and grid codes
necessary to evaluate and select HVDC transmission projects even when they offer a
superior solution from a technology and economic perspective—though a substantial
amount of experience and resources are available to address this challenge.
3
• Grid operators can be hesitant to deploy VSC HVDC systems due to familiarity and comfort
with conventional transmission technologies, outdated information, and a number of
misconceptions about the capabilities and commercial readiness of modern HVDC
technology.
• Incomplete technology standardization and vendor compatibility efforts still require extra
care in the design and selection of technologies and vendors, although some regions in
North America already take advantage of the substantial progress being made in Europe.
• The success and attractiveness of HVDC systems has created supply chain challenges that
will only be resolved as increasing commitments to HVDC solutions motivate HVDC vendors
to increase their manufacturing capabilities and new HVDC vendors to enter the market.
• And, finally, there are a number of regulatory, operational, and market design challenges
that need to be addressed—such as: (a) implementing proactive, multi-value planning
processes that are able to capture HVDC-related values, (b) updating grid codes so system
operators are able to take advantage of the technology’s grid-supporting capabilities, and
(c) upgrading market-clearing software to be able to co-optimize generation and
controllable transmission facilities.
RECOMMENDATIONS
To address these challenges, we recommend that grid planning authorities collaborate with
transmission owners, HVDC equipment manufacturers, the North American Electric Reliability
Corporation (NERC), industry groups, regulators, states, and the U.S. Department of Energy
(DOE) and its National Labs to:
1. Develop and implement “grid codes” for interconnecting and embedding HVDC
transmission (as ENTSO-E has already done) that can allow grid operators to take full
advantage of modern HVDC capabilities;
2. Adapt grid planning tools and multi-value transmission planning frameworks to take full
account of modern HVDC capabilities;
3. Provide training for planning, engineering, and grid operations staff so they are able to take
advantage of modern HVDC capabilities (rather than being focused solely on preventing
problems that might be encountered);
4. Address current supply chain challenges by building manufacturing capability through clear
long-term commitments (as European grid operators have done in collaboration with their
governments for both onshore and offshore HVDC systems);
4
5. Develop standardized HVDC functional and interface requirements, and vendor
compatibility standards, taking advantage of experience gained in similar European efforts;
6. Develop new regulatory and cost-recovery paradigms that can take advantage of the
controllable nature of HVDC technology (both regionally and interregionally), including
merchant transmissions to permit greater competition and allow for more financial risk
sharing with transmission owners;
7. Update grid operations to be able to take advantage of HVDC capability (learn from CAISO,
NYISO, Canadian, and European grid operators);
8. Update market designs so system operators can co-optimize controllable embedded
transmission with generation (as CAISO has implanted in 2013 and as NYISO is
implementing now); and
9. Implement optimization of interregional transmission capabilities that can accommodate
merchant HVDC transmission.
These recommendations are ordered roughly by priority and time sensitivity, recognizing that
the first six recommendations significantly affect the planning and development of HVDC
systems, while the last three recommendations are focused on their operations and market
integration necessary once the HVDC facilities are placed in service. As permitting authorities
and users of transmission to achieve public policy goals, states will have a critical role in
facilitating HVDC investments and implementing some of these recommendations, including
through multi-state collaborations.
* * *
In sum, while challenges to the deployment of HVDC technology exist, they can be addressed.
Given its attractive capabilities and increasing value as the industry transitions to higher shares
of inverter-based resources and a need for broader geographic diversification, modern HVDC
transmission technology must serve as a key tool in the belt of every transmission grid
operator. This will require changes to system planning processes and gaining familiarity with
the characteristics, planning methods, and advantages of modern HVDC systems. Given recent
technological advances and rapidly growing operational experience, remaining barriers to
adoption of HVDC need to be addressed proactively to unlock the more cost effective, stable,
and scalable solutions offered by HVDC transmission.