BOQ For Check
BOQ For Check
No 187/19
Testing: Pond testing for at least 24 hours should be done after the
contractor has accomplished the water proofing work. The surface
should be re-treated if leakage observed, and the test should be done
on the repaired surface.
-
The warranty period for the water proof work shall be 5 years from
the final acceptance date.
-
M2 110.00 -
3. Finishing Works -
Supply & apply Ceramic tile: 60cm x 60cm - 10mm thick ceramic
3.1 tiles in cement sand mix (1:3) on the top of water proofing
membrane. M2 110.00 -
Page 1 of 1