0% found this document useful (0 votes)
198 views2 pages

The Difference betweenCSI, POMI, NRM2

Csi

Uploaded by

Farhan Yazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views2 pages

The Difference betweenCSI, POMI, NRM2

Csi

Uploaded by

Farhan Yazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

CSI Masterformat POMI NRM2

Division 00 — Procurement and Contracting


Requirements
Division 01 — General Requirements Division 01 — General Requirement 1 Preliminaries
Division 02 — Existing Conditions Division 02 — Site Construction 2 Off-
site manufactured materials, components and buildings

Division 03 — Concrete Division 03 — Concrete 3 Demolitions


Division 04 — Masonry Division 04 — Masonry 4 Alterations, repairs and conservation

Division 05 — Metals Division 05 — Metals 5 Excavating and filling


Division 06 — Wood, Plastics, and Division 06 — Wood and Plastics 6 Ground remediation and soil stabilisation
Composites
Division 07 — Thermal and Moisture Division 07 — Thermal and Moisture 7 Piling
Protection Protection
Division 08 — Openings Division 08 — Doors and Windows 8 Underpinning
Division 09 — Finishes Division 09 — Finishes 9 Diaphragm walls and embedded retaining walls

Division 10 — Specialties Division 10 — Specialties 10 Crib walls, gabions and reinforced earth

Division 11 — Equipment Division 11 — Equipment 11 In-situ concrete works


Division 12 — Furnishings Division 12 — Furnishings 12 Precast/composite concrete
Division 13 — Special Construction Division 13 — Special Construction 13 Precast concrete
Division 14 — Conveying Equipment Division 14 — Conveying Systems 14 Masonry
Division 21 — Fire Suppression Division 15 — Mechanical/Plumbing 15 Structural metalwork
Division 22 — Plumbing Division 16 — Electrical 16 Carpentry
Division 23 — Heating, Ventilating, and Air 17 Sheet roof coverings
Conditioning (HVAC)
Division 25 — Integrated Automation 18 Tile and slate roof and wall coverings

Division 26 — Electrical 19 Waterproofing


Division 27 — Communications 20 Proprietary linings and partitions
Division 28 — Electronic Safety and Security 21 Cladding and covering
Division 31 — Earthwork 22 General joinery
Division 32 — Exterior Improvements 23 Windows, screens and lights
Division 33 — Utilities 24 Doors, shutters and hatches
Division 34 — Transportation 25 Stairs, walkways and balustrades
Division 35 — Waterway and Marine 26 Metalwork
Construction
Division 40 — Process Interconnections 27 Glazing

Division 41 — Material Processing and 28 Floor, wall, ceiling and roof finishings
Handling Equipment
Division 42 — Process Heating, Cooling, and 29 Decoration
Drying Equipment
Division 43 — Process Gas and Liquid 30 Suspended ceilings
Handling, Purification and Storage
Equipment
Division 44 — Pollution and Waste Control 31 Insulation, fire stopping and fire protection
Equipment
Division 45 — Industry-Specific 32 Furniture, fittings and equipment
Manufacturing Equipment
Division 46 — Water and Wastewater 33 Drainage above ground
Equipment
Division 48 — Electrical Power Generation 34 Drainage below ground

35 Site works
36 Fencing
37 Soft landscaping
38 Mechanical services
39 Electrical services
40 Transportation
41 Builder’s work in
connection with mechanical, electrical and transportation i
nstallations