Calculation Months .................................... Jan to Dec Zone CFM Sizing .................... Peak zone sensible load
Sizing Data ................................................ Calculated Space CFM Sizing ............ Individual peak space loads
Total coil load ........................................................ 5.6 Tons Load occurs at .................................................. Jul 1500
Total coil load ....................................................... 67.0 MBH OA DB / WB .................................................. 109.4 / 71.6 °F
Sensible coil load .................................................. 56.5 MBH Entering DB / WB ........................................... 87.5 / 65.7 °F
Coil CFM at Jul 1500 ........................................... 1469 CFM Leaving DB / WB ........................................... 51.4 / 49.5 °F
Max block CFM at Aug 1500 ................................ 1683 CFM Coil ADP .................................................................. 47.4 °F
Sum of peak zone CFM ....................................... 1706 CFM Bypass Factor ........................................................ 0.100
Sensible heat ratio .............................................. 0.844 Resulting RH .............................................................. 42 %
ft²/Ton ................................................................. 152.4 Design supply temp. ................................................ 53.6 °F
BTU/(hr-ft²) ........................................................... 78.7 Zone T-stat Check ................................................. 3 of 3 OK
Water flow @ 18.0 °F rise ..................................... 7.44 gpm Max zone temperature deviation ................................ 0.0 °F
Actual max CFM at Aug 1500 .............................. 1683 CFM Fan motor BHP ........................................................ 0.65 BHP
Standard CFM ..................................................... 1660 CFM Fan motor kW .......................................................... 0.51 kW
Actual max CFM/ft² ............................................... 1.98 CFM/ft² Fan static ................................................................. 1.41 in wg
Calculation Months .................................... Jan to Dec Zone CFM Sizing .................... Peak zone sensible load
Sizing Data ................................................ Calculated Space CFM Sizing ............ Individual peak space loads
1. Summary
Ventilation Sizing Method ................................... Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................. 162 CFM
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.065 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4681.7 BTU/(hr-CFM)
Site Altitude = 380.6 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.065 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4681.7 BTU/(hr-CFM)
Site Altitude = 380.6 ft
0.012
0.010
6 8 72
1
34 5 0.008
0.006
0.004
0.002
0.000
30 40 50 60 70 80 90 100 110
Temperature ( °F )