The PMP® Exam Preparation process is crucial for candidates aiming to pass the Project
Management Professional, an exam conducted by the Project Management Institute (PM I)®, a
globally recognized certification. The exam consists of 200 multiple-choice questions that outline
the five process groups (Initiation, Planning, Executing, Monitoring and Controlling, and Closing)
and nine knowledge areas (Integration, Scope, Time, Cost, Quality, Human Resource,
Communication, Risk, and Procurement).
The PMP exam consists of 200 multiple-choice questions. Of the 200 questions, 25 of them are
pretest questions. Pretest questions appear randomly durtng the exam, do not affect the
candidate's score, and are used In examinations as an effective way to Increase the number of
examination questions that can be used In future PMP exams. The passing score for the ex¥'! IS
almost 61 percent (1 06 questions correct out of 175 scored questlons).The questions are 'I'
categorized Into five process groups: Initiating, Planning, Executing, Monitoring and Controlling,
11/12/24, 2:32PM Top 50+ PMP Exam Questions and Answers for 2025
and Closing. The questions test the candidate's knowledge, comprehension, application, analysis,
and synthesis of project management principles and practices. Some questions may include
scenario-based or situational questions, and some may require calculations or interpretation of
data.
Interested in learning more? View Simplilearn's video on "Introduction to PMP Certification
Training" to understand the requirements and guidelines for the PMP examination.
Learn for free! Subscribe to our You Tube Channel & Be a Part of
a~ Get Started
400k+ Happy Learners Community.
1. A project has a 60% chance of a $1 00,000 profit and a 40 percent of a US $1 00,000 loss. The
Expected Monetary Value for the project is:
1. $1 00,000 prof1t
2. $60,000 loss
3. $ 20,000 profit
4. $40,000 loss
Compute both positive and negative values and then add them:
0.6 x $1 00,000 =$60,000 0.4 x $1 00,000 =$40,000 EMV =$60,000 - $40,000 =$20,000 profit
6%
Growth In Jobs Of Project Management Profiles By 2024
22 Million Jobs
Estimated For Project Management Professionals By 2027
simplilearn
PMP® Certification Training Post Graduate Program in Project
Management
v Access to Digital Materials from PMI
V' Earn a certificate of completion from iHUB DivyaSampark, liT
v 12 Full-Length Simulation Test Papers (180 Questions Each)
Roorkee
V' Earn 146 PDUs for PMI related certifications with 35 contact
hours and 14 simulation examinations to ace the PMP exam
El 3 months months
View Program View Program
- ===>
The interactive sessions make a huge difference as I'm able Burnt out from my previous role, I joined Simplilearn's
to ask for further clarifications. The training sessions are Project Management program t o transition into a new
more engaging than the self-paced modules, it's easier now career. The blend of live classes, expert instructors, and
that i f1rst decided to take up the online classroom training, hands-on labs prepared me well. I now work as an IT Project
and then followed it up with the self-paced learning (online Manager, with plans to pursue PMP certification and
and readings). increase my salary
- ~-~
https://www.simplilearn.com/pmp-sample-questions-and-answers-article 4/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
2. Assuming that the ends of a range of estimates are+/- 3 sigma from the mean, which of the
following range estimates involves the LEAST risk?
2. 22 - 30 days
3. Optimistic =26 days, most likely =30 days, pessimistic =33 days
4. Mean of 28 days
3. If a risk has a 20 percent chance of happening in a given month, and the project is expected to
last five months, what is the probability that the risk event will occur during the fourth month of
the project?
2. 20 percent
3. 60 percent
4. 80 percent
4. An accepted deadline for project approaches. However, the project manager realizes only 75%
percent of the work has been completed. The project manager then issues a change request.
What should the change request authorize?
4. Identify Risks
Reference: The PMBOK® Guide, 5th Edition, Page 312, Figure 11.1
The RACI chart is an example of the Responsibility Assignment Matrix {RAM), which shows the
relationship between activities and the team members.
8. The project manager meets with the project team to review lessons learned from previous
projects. In what activity is the team involved?
1. Performance management
https://www.simplileam.com/pmp-sample-questions-and-answers-article 6/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
2. Scope identification
3. Risk identification
9. During a bidder conference, you see that one bidder is your close friend. What should your
next step be?
4. You will try not to give the contract to him to prove your integrity
There is a conflict of interest in this situation. You must inform your boss about this relationship.
10. If a risk event has a 90 percent chance of occurring, and the consequences will be the US $
1 0,000, what does the US $9,000 represent?
1. Risk value
2. Present value
4. Contingency budget
11. An earthquake damaged your construction project. Your contractor says that he cannot fulfill
the terms of the contract due to a specific clause you both had signed the contract. He is
referring to the:
12. All of the following are ALWAYS inputs to the risk management process EXCEPT:
1. Historical information
2. Lessons learned
Project Status report can be an input to risk management. However, when completing risk
management for the f1rst time, you wouldn't have the project status report yet. Therefore, the
project status report is not always an input to risk management.
1. Use the best guess and estimate all activities since there will be changes as the project
progresses and more information becomes available
3. Estimate for what the cost will allow and include buffers
If you know the tolerance of the stakeholders, you can predict how they might react to differJf!t
situations and risk events. This information can help assign levels of risk on each work package
activity.
https://www.simplileam.com/pmp-sample-questions-and-answers-article 8/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
15. You are running a project to engineer and implement a set of business processes and a
software solution for customer relationship management. The project involves a large number
of organizations-a major corporation and many suppliers of different sizes. During the project,
you observe the effects of the differences between the companies' corporate cultures. This
leads to different expectations on how the project should be handled-as well as to frequent
misunderstandings between stakeholders. Another effect is a growing degree of distrust and
skepticism. What should you try first to integrate the diverse stakeholder groups?
1. Focus on project work. As a project manager, you should not get distracted by big egos.
2. Let the problems grow further until they are obvious for all. Then escalate them.
3. Develop a joint quality policy for the project and seek a commitment by all organizations.
4. Analyze the probability and impact of the risks linked with the situation and plan how to
respond to them.
16. You are finding it difficult to evaluate the exact cost impact of risk. You should evaluate on
a(n):
1. Quantitative basis
2. Numerical basis
3. Qualitative basis
4. Economic basis
If you cannot determine an exact cost impact to the event, use qualitative estimates such as Low,
Medium, and High.
6%
Growth In Jobs Of Project Management Profiles By 2024
22 Million Jobs
Estimated For Project Management Professionals By 2027
https://www.simplileam.com/pmp-sample-questions-and-answers-article 9/29
11/12/24, 2:32PM Top 50+ PMP Exam Questions and Answers for 2025
simplilearn
PMP® Certification Training Post Graduate Program in Project
Management
v Access to Digital Materials from PMI
v 12 Full-Length Simulation Test Papers (180 Questions Each)
v Earn a certificate of completion from iHUB DivyaSampark, liT
Roorkee
v Earn 146 PDUs for PMI related certifications with 35 contact
hours and 14 simulation examinations to ace the PMP exam
El 3 months months
View Program View Program
- ===>
The interactive sessions make a huge difference as I'm able Burnt out from my previous role, I joined Simplilearn's
to ask for further clarifications. The training sessions are Project Management program t o transition into a new
more engaging than the self-paced modules, it's easier now career. The blend of live classes, expert instructors, and
that i first decided to take up the online classroom training, hands-on labs prepared me well. I now work as an IT Project
and then followed it up with the self-paced learning (online Manager, with plans to pursue PMP certification and
and readings). increase my salary
- ===>
17. A project manager is quantifying risk for her project. Several of her experts are offsite but
wish to be included. How can this be done?
https://www.simplilearn.com/pmp-sample-questions-and-answers-article 10/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
The Delphi technique is commonly used to obtain expert opinions on technical issues, the
necessary project, or product scope.
18. Being assigned as a project manager, you noticed during project execution that conflicts
arise in the team on both technical and interpersonal levels. What is an appropriate way of
handling conflicts?
1. Conflicts distract the team and disrupt the work rhythm. You should always smooth them
when they surface.
2. A conflict should be handled in a meeting so that the entire team can participate in finding a
solution.
3. Conflicts should be addressed early and usually in private, using a direct, collaborative
approach.
4. You should use your coercive power to quickly resolve conflicts and then focus on goal
achievement.
PMP Certification in Delhi PMP Certification in Los Angeles PMP Certification in Cain
19. During which risk management process is a determination to transfer a risk made?
1. Identify Risks
https://www.simplileam.com/pmp-sample-questions-and-answers-article 11/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
1. Singular measurements outside the bandwidth between an upper and lower control limit.
2. A typical result of a rare random cause which is difficult to replicate and to verify.
3. Insignificant results, often measurement errors, the causes of which should not be further
investigated.
4. Measurements are inconsistent with a run of 7 results over or under a mean value.
1. Initiation
2. Planning
3. Execution
4. Closing
The output of the monitoring and controlling process is the project management plan.
23. Which of the following is not an input to the developing project management plan procefs?
The input to the developing project management plan process is the stakeholder register.
26. Alpha and Beta are two projects considered by a company. $50 million net profit is expected
of Alpha and $45 million from Beta. Both are lucrative and rewarding projects, but the company
can only invest in one of the projects. If Alpha is chosen, calculate the opportunity cost?
1. $45 million
2. $95 million
3. $5 million
4. $50 million
$45 million. The value of the alternative not chosen is called opportunity cost.
https://www.simplileam.com/pmp-sample-questions-and-answers-article 13129
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
27. You are the manager of a project which involves constructing five bridges. The project
comprises five sequential phases with each phase completing one bridge. After the first phase
of the project is complete, which process group of the second phase should follow?
1. Executing
2. Closing
3. Initiating
4. Planning
Initiating. A new project or new phase of an existing project is def1ned by the Initiating Process
Group.
28. The aim of a project is to investigate the technical, economic and social feasibility of
constructing a hydroelectric dam. The project charter is approved by the project sponsor. What
is the next step to be performed?
1. Identify Risks
4. Identify Stakeholders'
Identify Stakeholders
After developing and approving the project charter, Identifying the stakeholders process is done
next.
29. While managing a software upgrade project for your company you realize that your sponsor
has high authority in decisions but low interest. What stakeholder management strategy should
you employ to ensure the sponsor's continued support?
30. The project sponsor asks for a copy of the document that contains the description, owner,
source, priority, and status of product requirements. Which project document is the question?
31. Development is a critical aspect in a project with large size and regulatory and environmental
considerations. What is the first thing you should do as a starting point for initial project
planning?
1. Start identifying stakeholders so that you can engage them as required for project planning
2. Hold a project kick-off meeting with the aim to inform and engage stakeholders and obtain
commitment
3. Review the project charter to get high-level information about the project
4. Share project scope with the involved team to establish common understanding about project
deliverables
Review the project charter to get high-level information about the project
32. While monitoring the baseline cost of a project, it is noted that the project expenses are
higher than expected at this point. What is the most likely cause of this?
4. Excess inventory
Excess inventory- Failing to manage and control resources efficiently can be a source of
increased costs in a project.
33. Recently, you promoted your star programmer, Pam, to lead the agile development team.
https://www.simplileam.com/pmp-sample-questions-and-answers-article 15129
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
Pam was a fantastic software coder, and you thought the promotion would mean that she could
now share her expertise with the other development team members. But, you observe that Pam's
performance in her new role is underwhelming and not at par with your expectations. Which
empirical rule have you ignored or forgotten while considering Pam's promotion?
1. Pareto concept
2. Murphy's law
3. Expectancy theory
4. Halo effect
Halo Effect
34. While reviewing a requirements management plan of a project, you notice that one of the
components does not belong there. Which among these is the odd one?
3. The metrics that will be used and the rationale for using them
35. As part of a process improvement project for a factory operation, the project and team are
performing the process of monitoring and controlling project work. Which of the following is
done during this process?
1. Drawing an actual comparison of project performance against the project management plan
Drawing an actual comparison of project performance against the project management plan
36. A company sets up a change control board (CCB} dedicated to the purpose of reviewin¥ nd
evaluating the changes submitted for all projects. Which of the following best describes an
individual or group that can request a change on a project in a situation where the project
https://www.simplileam.com/pmp-sample-questions-and-answers-article 16129
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
1. Project sponsor
2. Project team
3. Project manager
4. Any stakeholder
Any stakeholder
37. You want to replace a contractor because they are not performing to the agreed-upon
standards and engage another contractor for the same job. You need to determine the specific
legal procedure for the early termination of the contract. What should you do?
38. In a project divided into four phases in sequence, what should the project manager do when
the second phase is over and the third one is about to begin?
39. The project management office {PMO) of an organization ensures all project management
processes and all relevant project documents conform to the established best practices. What is
the first thing that the project manager should review to identify stakeholders for a new project?
1. The stakeholder engagement plan to identify what management strategies and actions c'tn
work best to effectively engage the stakeholders
https://www.simplileam.com/pmp-sample-questions-and-answers-article 17/29
11/12/24, 2:32PM Top 50+ PMP Exam Questions and Answers for 2025
6%
Growth In Jobs Of Project Management Profiles By 2024
22 Million Jobs
Estimated For Project Management Professionals By 2027
simplilearn
PMP® Certification Training Post Graduate Program in Project
Management
v Access to Digital Materials from PMI
v 12 Full-Length Simulation Test Papers (180 Questions Each) v Earn a certificate of completion from iHUB DivyaSampark, liT
Roorkee
v Earn 146 PDUs for PMI related certifications with 35 contact
hours and 14 simulation examinations to ace the PMP exam
E1 3 months months
View Program View Program
---~
The interactive sessions make a huge difference as I'm able Burnt out from my previous role, I joined Simplilearn's
to ask for further clarifications. The training sessions are Project Management program to transition into a new
more engaging than the self-paced modules, it's easier now career. The blend of live classes, expert instructors, and
that i f1rst decided to take up the online classroom training, hands-on labs prepared me well. I now work as an IT Project
and then followed it up with the self-paced learning (online Manager, with plans to pursue PMP certification and
and readings). increase my salary
https://www.simplilearn.com/pmp-sample-questions-and-answers-article 18/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
40. Using an agile framework, you are to lead a product development project. You want to bring
together stakeholders and SMEs to discuss risk, success criteria and other topics. What is the
best way for you to accomplish this objective?
41. As part of preparing the communications management plan for a project in construction, you
want to determine the needs of the project stakeholders with respect to information. Your focus
is on the type and format of information required to pass on to them. What is your best course of
action?
42. To reduce the defect rate of a manufacturing process, a project is carried out. The project
team is carrying out QA activities to analyze and improve the process. Which of the following
would be the most beneficial for this project?
43. You are the head of a software development project where the developers involved are
working within a rented office space. It's taking longer than anticipated to write the code. You
have requested the landlord to rent the office for another week. Unfortunately, the landlord
informs you that the office is booked for that period. You capture the problem in the project
documents. What should you do next?
44. You are part of a project team that's designing a new type of vehicle. You are on the brink of
getting started with working on a set of tasks (work package) for the braking system of the
vehicle. You would like to assess the acceptance criteria before beginning the work. Where
should you look in order to find this information?
1. Requirements documentation
4. Activity attributes
45. A project to construct an assembly line is nearly complete. The project manager has closed
procurements, submitted the final project report, updated the lessons learned register, and
acquired feedback from the relevant stakeholders. What should be the next step of the project
manager?
1. Send a summary of how the f1nal product fulfilled the business needs
https://www.simplileam.com/pmp-sample-questions-and-answers-article 20/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
3. Send formal writing to the vendors notifying them that the contracts have been completed
46. A project team is weighing two risk responses to include in the risk register. The first risk
response must meet two criteria and costs $5,000. The second risk response must meet four
criteria, but only costs $2,000. Which action is least likely to be taken by the project team to
select the best risk response?
47. Your project team members are writing code in pairs and assessing each other's work to
review and determine if the code follows the requirements documentation. Which of the
following results will be obtained from this process?
2. Verified deliverable
3. Accepted deliverable
4. Acceptance criteria
Verified Deliverable
48. The construction project has many people and specialized teams at the work site every day.
Frequent and seamless communication between the team leads is vital to ensure safe and
efficient progress. Which agile ceremony can be incorporated in this project to boost timely
cross-functional communication?
1. Retrospectives
2. Daily standups
https://www.simplileam.com/pmp-sample-questions-and-answers-article 21/29
11/12/24, 2:32PM Top 50+ PMP Exam Questions and Answers for 2025
3. Iteration reviews
4. Risk-based spikes
Daily stand ups. Daily stand ups refer to time-boxed meetings of short duration that the project
team and relevant stakeholders attend.
49. The organization's leadership wants to include more agile methodologies in their projects.
Before starting to take any agile approaches in a project, what is the f1rst thing to be done?
3. Conduct agile training for those in the team assembled for the pilot project
4. Put current projects on hold to readjust them to the new agile cadence
6%
Growth In Jobs Of Project Management Profiles By 2024
22 Million Jobs
Estimated For Project Management Professionals By 2027
simplilearn
PMP® Certification Training Post Graduate Program in Project
Management
v Access to Digital Materials from PMI
v 12 Full-Length Simulation Test Papers (180 Questions Each) v Earn a certificate of completion from iHUB DivyaSampark, liT
Roorkee
E1 3 months months
View Program View Program
---~
The interactive sessions make a huge difference as I'm able Burnt out from my previous role, I joined Simplilearn's
to ask for further clarifications. The training sessions are Project Management program to transition into a new
more engaging than the self-paced modules, it's easier now career. The blend of live classes, expert instructors, and
that i first decided to take up the online classroom training, hands-on labs prepared me well. I now work as an IT Project
and then followed it up with the self-paced learning (online Manager, with plans to pursue PMP certification and
and readings). increase my salary
---~
50. You need to establish the relative priorities of risks recognized in a project. Which of the
following tasks is the most likely to not affect this prioritization?
51. The following table is an activity list that includes the duration and predecessor for a series
of project activities. What is the duration of the critical path?
A 2 Start
I
B 4 A, IE
c 6 A
https://www.simplilearn.com/pmp-sample-questions-and-answers-article 23/29
1111212', 2:112 PM
D 3 B,C
E 7 Start
F 2 E
End - D,F
1.14
2.11
3.13
4. 9
14
52. A project manager, while developing the atakeholder rqiater; liats down 1he potential
stakeholder. and chooses to uae a data ga1herttg meUtod known u brain wrftlng. Wha11a the
finrt thing to do when using this method?
1. Share a set of questiOns with participating members ahead of the 1tte creativity session
53. A project manager communicates primarily through email with her team members, internal
and external project stakeholders. Certain techniques are incorporated to ensure there are no
misunderstandings. Which of the following is not considered one of these techniques?
2. Concise expression
4. Communications register
Communication register
Here are some strategies to choose the best answer on PMP exam questions:
3. Look for clues in the question stem or other options that may help you narrow down the
correct answer.
5. Consider the context of the question and the project management principles involved.
6. If the question involves calculations, double-check your work and ensure that the answer
makes sense.
7. Don't spend too much time on any one question; move on if you're unsure and come back to it
later.
8. Trust your instincts and make your best educated guess if you're unsure of the answer. 1'
Remember, you don't lose points for wrong answers, so it's better to answer every question
than leave any blank.
https://www.simplileam.com/pmp-sample-questions-and-answers-article 25129
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
Are you looking to take your project management skills to the next level? Look no further than
Simplilearn's comprehensive project management courses!
Our courses are designed to help professionals at every level of experience to develop and
enhance their project management skills, whether you're just starting out in the f1eld or looking to
advance your career. With our courses, you'll gain practical, hands-on experience in managing
projects from start to finish, and learn best practices and industry standards that will set you
apart from the competition.
https://www.simplileam.com/pmp-sample-questions-and-answers-article 26129
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
AUUILIUrlal Dtmelll::> t;a::>e ::HUUie::> -\:JIUUal I eat;riHlY J.JrUUielll::> -LI.fX/ Lei:UIIIriY
Cost $$ $$$$
Conclusion
If you are considering working toward your PMP exam, Simplilearn offers a variety of project
management courses that will help you pass, including the PMP Certification training course. Our
PMP training courses are conducted by certified, highly experienced professionals with at least
10 years of experience.
PM I, PMP, and PMBOK have registered marks of the Project Management Institute, Inc.
FAQs
Create a daily study plan for the next 30 days. You should study at least 2-3 hours per day, with
more time on weekends. Stick to the plan.
Yes, the PMP exam is particularly challenging because it calls for the use of knowledge and
analytical abilities rather than just memorization. Situational questions ask the project manager
what to do in particular circumstances. The PMP examination is challenging for people who are
new to the field because it demands substantial project management experience.
The PMP exam is composed of various types of questions like multiple-choice questions 1'
(MCQs), multiple Responses, fill in the blank, matching questions, drag and drop, hotspot.
https://www.simplileam.com/pmp-sample-questions-and-answers-article 27/29
11/12/24, 2:32PM Top 50+ PMP Exam Questions and Answers for 2025
10 weeks $2,000
PMP® Plus
7 weeks $749
3 weeks $499
Recommended Reads
How to Pass the PMP Exam on PMP Exam Preparation: Top 7 Tips for PMP Exam
Your 1st Attempt? Prerequisites and Syllabus Preparation
0 32153 0 101268
2 Jul, 2024 22 Oct, 2024 17 Sep, 2024
- ==:::o
https://www.simplilearn.com/pmp-sample-questions-and-answers-article 28/29
11/12124, 2:32 PM Top 50+ PMP Exam Questions and Answers for 2025
https://www.simplileam.com/pmp-sample-questions-and-answers-article 29/29