0% found this document useful (0 votes)
18 views11 pages

Preguntas para Certificacion de ScrumMaster

Uploaded by

Luis Azurdia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views11 pages

Preguntas para Certificacion de ScrumMaster

Uploaded by

Luis Azurdia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 11

Questions

What enhances the transparency of an Increment?


- Doing all work needed to meet the Definition of Done

How do you know that a Scrum Team is cross-functional?


- The Scrum Team has all the skills to create an Increment by the end of every
Sprint

Developers are self-managing, which of the following do they manage?


- Sprint Backlog

When multiple Scrum Teams are working on the same product, should all of their
Increments be integrated every Sprint?
- Yes, but only for Scrum Teams whose work has dependencies

What is the timebox for the Sprint Planning event?


- 8 hours for a one-month Sprint

What is the timebox for the Sprint Review?


- 4 hours for a one-month Sprint

What is the role of management in Scrum?


- To present the Scrum Teams with insights and resources that help them improve

Which two things should the Scrum Team do during the first Sprint?
- Build at least one piece of valuable functionality
- Create at least one valuable, useful Increment

The Scrum Team should have all the skills needed to:
- Turn Product Backlog items into a valuable, useful Increment

Every Scrum Team must have a Product Owner and Scrum Master.
- True. Outcome are affected by their participation and availability

Who starts the Daily Scrum?


- Whoever the developers decide should start

Which of the following are true about the Product Owner?


- The product owner is one person
- The product owner is accountable for ordering the Product Backlog

Which statement best describes the Sprint Review?


- It is when the Scrum Team and stakeholders inspect the outcome of a Sprint and
figure out what to do next

Which of the following might the Scrum Team discuss during a Sprint Retrospective?
- All of the above

Which statement best describes Scrum?


- A framework to generate value through adaptive solutions for complex problems

How is management that is external to the Scrum Team involved in the Daily Scrum?
- Managers are not required at the Daily Scrum

How much time is required after a Sprint to prepare for the next Sprint?
- None. A new Sprint starts immediately following the end of the previous Sprint.

When must the Product Owner be present at the Daily Scrum? (MILO y 1 EXAMEN)
- When the Product Owner is actively working on items from the Sprint Backlog

For the purpose of transparency, when does Scrum say a valuable and useful
increment must be available? (MILO y FERNANDO)
- At the end of every Sprint

Which outcome is expected as a Scrum Team matures?


- They will improve their Definition of Done to include more stringent criteria

Which three of the following are timeboxed events in Scrum?


- Sprint Retrospective
- Sprint Planning
- Daily Scrum

What are two responsabilities of testers in a Scrum Team?


- Scrum has not "tester" role
- The developers are responsible for quality

The Sprint Backlog is a result of Sprint Planning and it includes the Sprint Goal.
(MILO Y FER)
True

You are the Scrum Master for four Scrum Teams working from the same Product
Backlog. Several of the developers come to you complaining that work identified for
the upcoming two Sprints will require full-time commitment from a specialist who is
external to the teams. What should the Scrum Master consider in this situation?
- The benefit of Developers figuring out a solution for themserves.
- The ability of the Scrum Teams to produce integrated Incremets.

A high-performance Scrum Team ensures that each Increments is complete by running a


Release Sprint.
- False

A Scrum Master is working with a Scrum Team that has Developers in different
physical locations. The developerts meet in a variety of meeting rooms and have
much to do logistically (for example: reserve meeting rooms and set up conference
calls) before the Daily Scrum. What action should the Scrum Master take? (MILO Y
FERNANDO IGUAL)
- Set up the meeting and tell the Scrum Team that is how it will be done (parece
que no)
PERO EN 2 PAGINAS EN LINEA ESTA
- Allow the Development Team to self-manage and determinate for itself what to do.

For which of the following is the Scrum Master responsible? (MILO, FER E INTERNET)
- Property adopting and using the Scrum framework

What are two effective ways for a Scrum Team to ensure security concerns are
satisfied? (MILO Y FER IGUAL)
- Have the Scrum Team crete Product Backlog items for each concern.
- Add security concerns to the Definition of Done.

The IT manager asks a Scrum Team for a status report describing the progress
throughout the Sprint. The Scrum Team asks the Scrum Master for advice. The Scrum
Master should:
- Talk to the IT manager and explain that progress in Scrum comes from inspecting
an Increment at the Sprint Review

What are three benefits of self-management?


- Increased commitment
- Increased self-accountability
- Increased creativity

One of the Scrum events is the Daily Scrum. What are two intended outcomes of the
Daily Scrum?
- Identification of impediments that may prevent the developers from achieving the
Sprint Goal (solo milo) (fer confirmo que si)
- A status report for the upper management indicating what each individual has
done, will be doing, and what is impeding him/her. (NO)
- A shared understanding of the most important work to be undertaken next to
achieve the best possible progress toward the Sprint goal (si)

Which of the following is required by Scrum?


- Sprint Retrospective

The Definition of Done serves which three purposes? (MILO Y FERNANDO IGUAL)
- Increase transparency
- Create a shared understanding of when work is complete
- Guide the developers on how many Product Backlog items to select for the Sprint
(DEL DE CAMARA YES)

What is the purpose of a Sprint Review?


- To inspect the product increment with the stackeholders and collect feedback on
next steps

Which of the following are appropiate topics for discussion during a Sprint
Retrospective? (MILO Y FER IGUAL)
- Identify high priority process improvements for the next Sprint.
- How the team collaborates

What happens if the Scrum Team cannot complete its work by the end of the Sprint?
- The Sprint length is unchanged and the Scrum Team continously learns and adapts.

When is the Sprint Backlog created?


- During Sprint Planning

Which of the following services are appropiate for a Scrum Master in regard to the
Daily Scrum?
- Teach the developers to keep the Daily Scrum within 15 minutes

The timebox for a Daily Scrum is?


- 15 minutes

A Scrum Master is introducing Scrum to a new Team. The Team has decided that a
Sprint Retrospective is unnecessary. What action should the Scrum Master take?
- Begin facilitating productive and useful Sprint Retrospective

Why does the Product Owner want the Developers to adhere to its Definition of Done?
(MILO Y FER IGUAL)
- To have complete transparency into what has been done at the end of each Sprint

If burndown charts are used to visualize progress, what do they track?


- Work remaining across time

User documentation is part of your Definition of Done. However, there are not
enough technical writers for all teams. Your Scrum Team does not have a technical
writer. What should the Scrum Team do?
***** The Developers on the Scrum Team should write the user documentation.
What are the two primary ways a Scrum Master helps a Scrum Team work at its highest
level of productivity?
- By removing impediments that hinder the Scrum Team
- By facilitating Scrum Team decisions

When does a Developer become accountable for an item in the Sprint Backlog? (MILO y
1 EXAMEN)
- Never. All Developers on the Scrum Team share accountability for items in the
Sprint Backlog.

When Developers are having trouble delivering an Increment because they do not
understand a functional requirement, what should they do?
- Collaborate with the Product Owner to determinate what is possible and
acceptable.

Developers do not meet with stakeholders; only the product owner meets with
stackeholders (MILO TIENE TRUE Y FERNANDO FALSE)
- True

The Product Backlog is ordered by:


- The Product Owner with the most valuable items placed at the top.

Which Scrum Value is affected by a lack of trust in the Scrum Team?


- All of the above

In accordance with Scrum theory, how should a group of 100 people be divided into
multiple Scrum Teams?
- Understanding the product, the product vision and the rules of the Scrum
framework, the people divide themselves into teams.

As the Sprint Planning progresses, the Developers realize that the workload may be
greater than their capacity to complete the work. Which two are valid actions?
- Remove or change selected product Backlog items.
- The Developers ensure that the Scrum Team is aware, start the Sprint, and monitor
progress.

When is a Product Backlog item considered complete? (MILO Y FER IGUAL)


- When the item meets the Definition of Done.

During a Sprint, when is new work or further decomposition of work added to the
Sprint Backlog?
- As soon as possible after it is identified

A Scrum Master fulfills the same role as a traditional Project Manager.


- False

When must a Scrum Team release each Increment? (MILO Y FER)


- When it makes sense to release it

The Daily Scrum is an event that happens every day. What would be three key
concerns if the frequency were to be lowered to every two or three days? (MILO
EXAMEN)
- Opportunities to inspect and adapt the Sprint Backlog are lost
- The Sprint Backlog may become inaccurate
- Impediments are raised and resolved more slowly
PERO EN ESTE LINK ESTA OTRA : https://vceguide.com/what-would-be-three-key-
concerns-if-the-frequency-were-to-be-lowered-to-every-two-or-three-days/

During the Sprint, the Scrum Master's role is to do which two of the following:
- Facilitate inspection and adaptation opportunities as requested or needed
- Coaching the team members in self-management

Multiple Scrum Teams working on the same product or system all select work from the
same Product Backlog
- True

Which approach is best for Scrum Teams in order to produce valuable Increments?
- Each developer works on the component where they feel that they can contribute

Who is responsible for collaboration with stakeholders?


- The Scrum Team

A Product Owner wants advice from the Scrum Master about estimating work in Scrum.
What guidance should a Scrum Master give?
- Estimates are made by the people doing the work

Which of the following is an example of an Increment?


- A valuable, useful set of product features
PARECE QUE ES: All of the above

You are the Scrum Master of a new, to be developed Product. Development is going to
require 45 people. What is a good first question for you to suggest the group
things about when forming into teams?
- How will we make sure all teams have the right amount of expertise?

Which Scrum Values are exhibited by not building Product Backlog items that have
low business value?
- Respect
- Focus
- Courage

An increment must be released to customers or users at the end of each Sprint


- False

What is the main reason for the Scrum Master to be at the Daily Scrum?
- They do not have to be there, they only need to ensure the Developers have a
Daily Scrum

Which best describes the Product Backlog?


- It is allowed to grow and change as more is learned about the product and its
customers

What are two ways that regulatory compliance issues are dealt with in Scrum? (MILO
Y FER IGUAL)
- They are addressed along with functional development of the product
- They are added to the Product Backlog and addressed in early Sprints, while
always requiring at least some business functionality, no matter how small.

What techniques could the Scrum Master use when the Scrum Team gets caught in an
internal disagreement about which agile practices to apply?
- Use coaching techniquies, such as open questions and active listening
- Involve the complete Scrum Team in making a decision

Who is accountable for clearly expressing Product Backlog items? (MILO y PRIMER
EXAMEN IGUAL)
- The Product Owner

What does it mean to say that an event has a timebox? (MILO Y FER IGUAL)
- The event can take no more than a maximum amount of time

How should Product Backlog items be chosen when multiple Scrum Teams work from the
same Product Backlog? (MILO Y FER IGUAL)
- The developers pull in work in agreement with the Product Owner

The lenght of a Sprint should be:


- All of the above

How often should Scrum Team membership change?


- As needed, while taking into account a short-term reduction in productivity

Which of these may a Scrum Team deliver at the end of a Sprint?


- A valuable, useful Increment that meets the Definition of Done

A developer takes the Scrum Master aside to express his concerns about data
security issues. What should the Scrum Master do?
- Ask the developer to share the concern with the team as soon as possible.

Which output from Sprint Planning provides the Scrum Team with a target and
overarching direction for the Sprint?
- The Sprint Goal

Who determinates how many Product Backlogs items the Developers select for a
Sprint?
- The Developers

What is the recommended size for a Scrum Team?


- 10 or fewer

Why is the Daily Scrum held at the same time and same place?
- The consistency reduces complexity

Which of the following are the Developers accountable for?


- Organizing the work required to meet the Sprint Goal
- Creating a plan for the Sprint, the Sprint Backlog

Who creates a Product Backlog item's estimate?


- The Developers after clarifying requirements with the Product Owner

When can Developers cancel a Sprint?


- They cannot. Only Product Owners can cancel Sprints

What are three ways Scrum promotes self-management?


- By having the Scrum Master protect the Scrum Team from interruptions
- By being a lightweight framework
- By the Scrum Team deciding what work to do in a Sprint

Which two of the following are true about the Scrum Master?
- The Scrum Master helps those outside the team interact with the Scrum Team
- The Scrum Master teaches the Scrum Team to use timeboxes

Which are appropiate topics for discussion in a Sprint Retrospective?


- How the Scrum Team does its work
- Team relations
- Definition of Done

Which of the following activities will a Product Owner engage in during a Sprint?
- Answer questions from the Developers about items in the current Sprint
What is the Product Owner responsible for during the Sprint Retrospective?
- Participating as a Scrum Team member.

How should a Scrum Team deal with non-functional requirements?(EXAMEN DE FERNANDO y


1 EXAMEN)
- Ensure every Increment meets them

Who owns the Sprint Backlog? (EXAMEN DE FERNANDO)


- The Developers

who creates the definition of done?


scrum team (en vivo)

Which two things are appropriate for a Scrum Master to do if the Development Team
doesn’t have the engineering tools and infrastructure to completely finish each
selected Product Backlog item? (EXAMEN FER y 1 EXAMEN)
- Coach the Development Team to improve its skills, tools, and infrastructure over
time and adjust the Definition of "Done" accordingly.
- Have the Development Team establish a Definition of "Done" that is actually
possible to achieve given current circumstances.

As the Developers start work during the Sprint, they realize they have selected too
much work to finish in the Sprint. What should they do? (EXAMEN FERNANDO)
- As soon as possible in the Sprint, work with the Product Owner to remove some
work or Product Backlog item

Who determines when it is appropiate to update the Sprint Backlog during a Sprint?
(EXAMEN FERNANDO)
- The Developers

Which Scrum Values are violated by building Product Backlog items that have low
business value? (EXAMEN FERNANDO)
- Focus
- Courage
- Respect

An organization has decided to adopt Scrum, but management wants to change the
terminology to fit with terminology already used. what will lokely happen if this
is done? (EXAMEN FERNANDO Y SI BUENA)
- All answers apply

A Sprint Retrospective should be held: (EXAMEN FERNANDO)


- At the end of each Sprint

Which of the following is an example of an Increment? (EXAMEN FERNANDO)


- A valuable, useful set of product features
PERO EN INTERNET DICE
- All of the above

Who can cancel a Sprint? (EXAMEN FERNANDO)


- The Product Owner

Who is on the Scrum Team? (EXAMEN FERNANDO)


- Scrum Master
- Product Owner
- Developers

During the Sprint Retrospective a Scrum Team has identified several high priority
process improvements. Which of the following statements is most accurate? (EXAMEN
FERNAN e INTERNET OK)
- The Scrum Team may add the items to the Sprint Backlog for the next Sprint

Scrum has a role called "Project Manager"


- False

The product owner is not collaborating with the developers during the Sprint. What
are two valuable actions for a Scrum Master to take? (EXAMEN FER e INTERNET OK)
- Bring up the problem in the Sprint Retrospective
- Coach the Product Owner in the values of Scrum and incremental delivery

When does the second Sprint start? (EXAMEN FER y 1 EXAMEN)


- Immediately after the first Sprint

When de developers determine that they will not be able to finish the complete
forecast, who has to be present when reviewing and adjusting the Sprint work
selected? (EXAMEN FER)
- The Product Owner and the Developers

During a Sprint Retrospective, the Developers propose moving the Daily Scrum to
only occur on Tuesday and Thursday. Which two are the most appropiate responses for
the Scrum Master to recommended? (EXAMEN FER e INTERNET OK : )
- Coach the team on why the Daily Scrum is important as an opportunity to update
the plan
- Learn why the Developers want this and work with them to improve the outcome of
the Daily Scrum

When is it most appropiate for a scrum team to change the Definition of Done?
(EXAMEN FER y 1 EXAMEN)
- During the Sprint Retrospective

Who does the work to make sure Product Backlog items conform to the Definition of
Done? (EXAMEN FER e INTERNET: https://vceguide.com/who-must-ensure-that-the-work-
done-for-a-product-backlog-item-conforms-to-the-definition-of-done/)
- The Developers

When might a Sprint be cancelled? (EXAMEN FER)


- When the Sprint Goal becomes obsolete

The CEO asks the Developers to add a "very important" item to a Sprint that is in
progress. What should the Developers do? (EXAMEN FER)
- Inform the Product Owner so they can work with the CEO.

Cross-Functional teams are optimized to work on one component or layer of a system


only. (EXAMEN FER)
- False

You have just been hired by a company new to Scrum. Your management has assigned
you to be the Scrum Master of six new Scrum Teams. These teams will build one
product. Select two conditions you should strive for in this scenario. (EXAMEN
FERNANDO)
- There should be only one Product Owner.
- The product has one Product Backlog

Every Scrum Team should have: (EXAMEN FER y 1 EXAMEN)


- The competencies and skills needed to deliver an incremenet in a sprint.

The Developers ask their Product Owner to re-order the Product Backlog. The team is
waiting for an external supplier to deliver a component. Without that component
there will not be enough work in the next Sprint to occupy the full team. As the
Scrum Master, what advice would you give the Product Owner? (FERNANDO EXAMEN pero
AQUI OTRA RESPUESTA: https://vceguide.com/what-would-be-good-advice-to-give-the-
product-owner/)
- Tell the Product OWner that the Product Backlog should be ordered to maximize
utilization of the Developers

To get stared in items of what to build, Scrum requires no more than a Product
Owner with enough ideas for a first Sprint, Developers to implements those ideas,
and a SCrum Maser to help guide the process.
- True

At the seventh Sprint Review, the stakeholders are disappointed and angry. They
have determined that the product or system being built will not meet their needs
and will cost more than they are willing to spend. What factors likely led to this?
(CORRECT https://quizform.net/exam/39/learning/35)
- The Product Owner has not been keeping the stakeholdrs aware of the progress of
the project.
- The Stakeholders have not been using the Sprint Reviews to inspect and evaluate
progress

Why do the Developers need a Sprint Goal? (PERO AQUI OTRA


https://www.programsbuzz.com/interview-question/why-does-development-team-need-
sprint-goal)
- A Sprint Goal ensures that all of the Product Backlog items selected for the
Sprint are implemented.(1 EXAMEN)
PERO
- The Developers are more focused with a common yet specific goal (SEGUN INTERNET,
MUCHA DUDA)

During Sprint Planning the Product Owner and the Developers are unable to reach an
understanding about the highest....... (1 EXAMEN WORD)
- Forecast the Product Backlog..
- During the next Sprint Retrospective..

What is the Scrum Master responsible for during the Sprint Retrospective? (1 EXAMEN
WORD e INTERNET IGUAL https://vceguide.com/what-is-the-scrum-master-responsible/)
- Participating as a Scrum Team member and facilitating as requested or needed.

What factor should be considered when establishing the Sprint lenght? (1 EXAMEN
WORD pero INTERNET: https://vceguide.com/what-two-factors-are-best-considered-when-
establishing-the-sprint-length/)
- The need for the team to learn based on doing work and measuring results.

Which statement best describes the Sprint Backlog as the output of the Sprint
Planning? (1 EXAMEN WORD)
- It is the SCrum Team's plan for the Sprint.

A Scrum Team has been working on a product for nine Sprints. A new Product Owner
comes in, understanding she is accountable for the Product Backlog. However... (1
EXAMEN y https://vceguide.com/a-scrum-team-has-been-working-on-a-product-for-nine-
sprints-a-new-product-owner-comes-in-understanding-he-is-accountable-for-the-
product-backlog/)
- Ensuring that the most valuable functionality is produced first, at all times
- Interacting with stakeholders

The Scrum Master observes the Product Owner struggling with ordering the Product
Backlog. What is an appropiate action for the Scrum Master to take? (1 EXAMEN e
INTERNET OK: https://quizform.net/exam/8/learning/157)
- Suggest that the Developers order the Prodct Backlog to be sure...

Which statement best describes a Product Owner's responsibility?


1 EXAMEN ESCRIBIO
- keep stakeholders from distracting the devs
PERO INTERNET (https://quizlet.com/398772672/product-owner-flash-cards/) CREO QUE
ES CORRECTA
- Optimizing the value of the work the Development Team does

Which topics should be discussed in the Sprint Review? (1 EXAMEN pero INTERNT:
https://www.freecram.net/question/GAQM.CSM-001.v2018-03-11.q109/which-topics-
should-be-discussed-in-the-sprint-review)
- All of the above (internet dice Sprint results)

A Scrum TEam is required to deliver a done Increment by the end of a Sprint. Select
two statements that explain what done means. (1 EXAMEN -
- Ready to be released to end users
- Ready for integration
Pero INTERNET (https://vceguide.com/what-done-means-choose-two/)
- No work left from the definition of "Done".
- All work to create software that is ready to be released to end users.

When the Developers determine that they not be able to finish the complete
forecast, who has to be present when reviewing and adjusting the Sprint work
selected? (1 EXAMEN e internet OK : https://vceguide.com/who-should-be-present-to-
review-and-adjust-the-selected-sprint-work-if-the-development-team-determines-that-
it-will-not-be-able-to-finish-the-complete-forecast/)
- The product owner and the developers

What does it mean for a Scrum Team to be cross-functional? (1 EXAMEN)


- The Scrum Team includes cross-skilled....

What is the key concern when multiple Scrum Teams are working from the same Product
Backlog? (1 EXAMEN e INTERNET: https://vceguide.com/what-is-the-key-concern-when-
multiple-development-teams-are-working-from-the-same-product-backlog/)
- Clear definition of requirements

Which of the following are true about the length of the Sprint? (1 EXAMEN y digo
que si xd)
- All Sprints must be one month or less

Who must attend the Daily Scrum? (1 EXAMEN)


- The Developers

Multiple Scrum Teams working on the same product must have the same Sprint start
date. (1 EXAMEN)
- False

Which of the following are topics for the Developers to discuss at the Daily...
- Are there any decisions that need..
- Are there any impediments blocking..
- What have we learned since yesterday..

Commitment is essential to archieve the benefits of Scrum. What actions demostrate


the commitment of Scrum Team members? (1 EXAMEN)
- Help your fellow...
- Always deliver the items...