Item Schedule For SP, SSP
Item Schedule For SP, SSP
81.56
104.27
117.30 5,865.00 5,865.00
Ä,709.12 1,553.94 1,88,364.80 ô1,757.60 2,50,122.40
1,859.52 2,053.95
5,718.52 1,159.11 1179.B30.00 2.89,777.50 1À,69,À07.50
33,8B06244 B9,435.54
1,88,115.58 3,857.53 34,55,497.98
EQUIPMENTS
Supply Erection, testing and commissioning of 8 NVA, 54 KV/27KV50 Hz
AutoTransformer with bushing CT oil and other equipmentas per RDS0
1 each
specification suitable for 2x25KV AT feeding system.
OTHER ITEM
1 38.25 mm dia(865 mm2) AAC Bull conductor meter 50
2 Supply and erection of 50 kV termination with adjuster complete with disc insulators. each 2
1,41,60,000.00 1,07,609.00
1,36,553.70 3,332.00
7 Supply installation of PVC insulated and sheathed copper unarmoured Ntr. 500
cable size 7 core 2.5 sqmm.
8 Supply installation of PVC insulated and sheathed copper unarmoured Mtr. 400
cable size 2x4 sqmm.
Supply installation of PVC insulated and sheathed copper unarmoured Mtr. 500
cable size 2x2.5 sqmm.
1› Supply Laying , testing and commissioning of Al. XLPE Cable 2 core 70 Ivitr. 100
Sq.mm
11 Supply & erection of earth electrode as per IS 3043 or RDS0 specification. each 20
12 Supply and erection of earth bus 75x8 mm. MS strip laid in the ground. Mtr.
13 Supply and erection of earth bus 5Dx6 mm laid in the ground. Mtr. 250
14 Supply and erection of earth bus 50x6 mm.MS strip laid exposed. Mtr. 250
room each
Supply, laying and fixing of heavy duty ISI marked 'B' class GI pipe of 3.65mm
wall thickness and 50mm dia to be laid along the wall or floor with proper
23 galvanized clamps/ through the wall or undernaeth the floor in cement concrete Ntr. 24
as per explanatory note.
Qty Scott
Connected
Sr. No. Description of Work Unit
28 Supply and Erection of copper cross feeder wires (37/2.25 mm HDBC) km 0.1
across the track at SP/SSP/FP/BT locations
29 Supply and erection of large copper jumper 160 sqmm cross feeder/isolator No. 12
and OHE.
30 Supply , erection , testing and commissioning of Burried Earth Rail LS 1
3A Supply and erection of C6R panel incorporating Numericla type protective relay for each
SP suitable for 2x25 kV system
35 supply without insulator and erection of 9 Tonne Suspension insulator . Porclain each
38 Supply and erection of 6 SWG GI wire for fencing bonding mete 230
2D.00 480.00
JE/TRD/CN/UBL JE/DRG/ELE/CN/BNC
GUDURU Digitally signed by GUDURU LAKSHMI NARASIMHULU
LAKSHMI
Ppty
Su
Erection Supply+Erection
- 1,08,066.6 1,08,067
- 81.56
- 104.27
- 117.30 4,692.0 4,692
STEEL
Supply & erection of galvanization steel structure including
Traction mast, main masts, fabricated steel other than mast
MT 16
, SPS , Tower gantries ,portal, suppoting structures & small Dart steel
work.
2 Supply and erection fancing panel at substation for SSP Mtr. 150
EQUIPMENT
Supply Erection, testing and commissioning of 8 MVA, 54 each 2
KV/27KV50 Hz AutoTransformer with bushing CT oil and other
1 equipmentas per RDS0 specification suitable for
2x25KV AT feeding system.
2,01,65,218
1,41,b0,000.0 1,07,609.00
1,27,508.1 2,65,828
Uit Qty
Scott connected SSP
Sr. No. Description of Work
13 Supply and erection of earth bus 50x6 mm laid in the ground. Mtr. 270
t Supply and erection of earth bus 50x6 mm.MS strip ’‘id Mtr. 270
exposed.
15 8 SWG GI wire for earthing. Mtr. 58
16 Supply and erection of 6 SWG GI wire for fencing bonding Mtr. 230
18 Supply & erection of earth screen wire of size 19/2.5mm. Mtr. 100
30 Supply and erection of large copper jumper 160 sqmm cross No. 24
feeder/isolator and OHE.
1 Supply , erection , testing and commissioning of Burried Earth Rail La 1
1,218.0
b4.9l 60,901.8 3,245.5 64,147
2,11,504
14,06,297.5 3,726.03 2,10,944.b 558.9
JE/TRD/CN/UBL JE/DRG/ELE/CN/BNC
Unit Rates Cost of Scott Connected SSP