Cebu City Permit Forms
Cebu City Permit Forms
A-04
Republic of the Philippines
City of Cebu
Province of Cebu
sCOPE OF wORK
RAISING
CONSTRUCTION RENOVATION
ONEW ODEMOLITON
UERECTION cONVERSION.
DaCCESSORY BUILDINGSTRUCTURE
ADDITION REPAIR
OOTHERS (Specify).
UALTER ATION MOVING-
BOX 2TO BE ACCOMPLISHED BY THE DESIGN PROFESSiONAL)
PREPAREDBY
BOX3 BOX 4
DESIGN PROFESSIONAL. PLANS AND SPECIFICATION SUPERVISOR/ IN-CHARGE OF MECHANICAL WORKS
PROFESSIONAL MECHANICAL ENGINEER MECHANICAL ENGINEER
Date:
Date:
(Signed and Sealed Over Printed Name)
PROFESSIONAL MECHANICAL ENGINEER
Signed and Sealed Over Printed Name)
Address Address
PRC. No. Validity PRC. No. Validity
Date: Dale
Address Address
BOX7
RECEIVED BY DATE:
FIVE (5)
SETSs
OF MECHANICAL DOCUMENTS
-
BILL OF MATERIALS OTHERS (5pecity)
BOX8
PROGRESS FLOW
IN DUT PROCESSED BY:
BOX 9
ACTION TAKEN:
. That the proposed mechanical works shall be in accordance with the mechanical plans filed with this Office and in conformity with
the latest Philippine Mechanical Code, the National Building Code and its IRR.
2. That prior to any Mechanical installation, a duly accomplished prescribed "NOTICE OF CONSTRUCTION"shall be
3. That upon completion of the mechanical works. the licensed supervisor/in-charge shall submit the entry to the logbook duly
signed and sealed to the building official including as-built plans and other documents and shall also accomplish the
Cerificate of Completion stating that the mechanical works conform to the provision of the Philippine Mechanical Code. the National
4. That this permit is null and void unless accompanied by the building permit.
5. That a Certificate of Operation shall be issued for the continuous use of mechanical installations.
DATE: DATE:
scOPE OF WORK
NEW CONSTRUCTION RENOVATION RAISING
DEMOLITION,
ERECTION cONVERSION
(Specily)
SLOP SINK
URINAL
AR CONDITIONING UNIT
WATER TANKRESERVOIR
TOTAL TOTAL
SYSTEM SYSTEM
WATER DISTRIBUTION SEWAGE SYSTEM SEPTIC TANK STORM DRAINAGE
PREPARED
BY
BOX3 BOX4
SUPERVISOR/ IN-CHARGE OF PLUMBING WORKS
DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS
Date Date
MASTER PLUMBER MASTER PLUMBER
(Signed and Sealed OverPrinted Name) (Signed and Sealed Over Printed Name)
Address Address
PRC. No. Validity PRC.No. Validity
Address Address
CT.C. No. Date Issued Place Issued C.T.C. No. Date lssued ace bsued
BOX7 TO BE ACCOMPLISHEDBY THE PROCESSING & EVALUATiON DVISION
RECEVED BY DATE:
BLL OF
MATERIALS oTHERS (Sspeily)
BOX8
PROGRESS FLOW
IN OUT
PROCESSEDBY
DATE TIME DATE TIME
RECEIVING ANDRECORDING
PLUMBING
OTHERS (Specify)
BOX9
ACTION TAKEN:
1 That the proposed plumbing works shall be in accordance with the plumbing plans filed with
this Office and in conformity with the Revised Plumbing Code of the Philippines, the Nationat
3. That upon completion of the plumbing works, the licensed supervisor/in-charge shalt submit
the entry to the logbook duly signed and sealed to the building official including as-built
plans and other documents and shall also accomplish the Certificate of Completion stating
that the plumbing works of the building conform to the provision of the Revised Plumbing9
That this permit is null and void unless accompanied by the building permit.
PERMITISsUED BY:
BUILDING OFFICIAL
Over Printed Name)
(Signature
Date