Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Loading...
User Settings
close menu
Welcome to Scribd!
Upload
Read for free
FAQ and support
Language (EN)
Sign in
0 ratings
0% found this document useful (0 votes)
0 views
VO01_replacement_Glass_rev00_091724
Uploaded by
NS De'villa
Copyright:
© All Rights Reserved
Available Formats
Download
as PDF, TXT or read online from Scribd
Download
Save
Save VO01_replacement_Glass_rev00_091724 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
VO01_replacement_Glass_rev00_091724
Uploaded by
NS De'villa
0 ratings
0% found this document useful (0 votes)
0 views
1 page
Document Information
click to expand document information
Copyright
© © All Rights Reserved
Available Formats
PDF, TXT or read online from Scribd
Share this document
Share or Embed Document
Sharing Options
Share on Facebook, opens a new window
Facebook
Share on Twitter, opens a new window
Twitter
Share on LinkedIn, opens a new window
LinkedIn
Share with Email, opens mail client
Email
Copy link
Copy link
Did you find this document useful?
0%
0% found this document useful, Mark this document as useful
0%
0% found this document not useful, Mark this document as not useful
Is this content inappropriate?
Report
Copyright:
© All Rights Reserved
Available Formats
Download
as PDF, TXT or read online from Scribd
Download now
Download as pdf or txt
Save
Save VO01_replacement_Glass_rev00_091724 For Later
0 ratings
0% found this document useful (0 votes)
0 views
1 page
VO01_replacement_Glass_rev00_091724
Uploaded by
NS De'villa
Copyright:
© All Rights Reserved
Available Formats
Download
as PDF, TXT or read online from Scribd
Save
Save VO01_replacement_Glass_rev00_091724 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download as pdf or txt
Jump to Page
You are on page 1
of 1
Search inside document
TITLE:
ESTIMATED MARK-UPS TOTAL MARK-UP TOTAL
ITEM NO. DESCRIPTION Qty Unit Material Labor + Equipment VAT TOTAL COST UNIT COST
DIRECT COST OCM PROFIT % VALUE INDIRECT
(10) (11) (12) (13)
(1) (2) (3) (4) unit cost cost unit cost cost (5) (6) (7) (9) (13)/(3)
(5)x(9) (5%[(5)+(10)]) (10)+(11) (5)+(12)
I GENERAL REQUIREMENTS
Scaffolding (Rentals) 1.00 ls - - 10,000.00 10,000.00 10,000.00 12.00% 8.00% 20.00% 2,000.00 600.00 2,600.00 12,600.00 12,600.00
Delivery Charge 1.00 ls 110,000.00 110,000.00 - - 110,000.00 12.00% 8.00% 20.00% 22,000.00 6,600.00 28,600.00 138,600.00 138,600.00
TOTAL OF GENERAL REQUIREMENTS 151,200.00
II ARCHITECTURAL WORKS
1.0 Front Elevation -
GP-1: 1.995mH x 1.442mW, 8mm thk. Tempered Low-E Glass 1.00 set 49,121.65 49,121.65 14,736.49 14,736.49 63,858.14 12.00% 8.00% 20.00% 12,771.63 3,831.49 16,603.12 80,461.26 80,461.26
2.0 Rear Elevation
0.995mH x 1.96mW, 8mm thk. Tempered Low-E Glass 1.00 set 39,699.34 39,699.34 11,909.80 11,909.80 51,609.14 12.00% 8.00% 20.00% 10,321.83 3,096.55 13,418.38 65,027.52 65,027.52
0.991mH x 1.885mW, 8mm thk. Tempered Low-E Glass 1.00 set 39,699.34 39,699.34 11,909.80 11,909.80 51,609.14 12.00% 8.00% 20.00% 10,321.83 3,096.55 13,418.38 65,027.52 65,027.52
0.978mH x 0.978mW, 8mm thk. Tempered Low-E Glass 1.00 set 21,333.95 21,333.95 6,400.19 6,400.19 27,734.14 12.00% 8.00% 20.00% 5,546.83 1,664.05 7,210.88 34,945.02 34,945.02
TOTAL OF ARCHITECTURAL WORKS 245,461.31
IV GRAND TOTAL I+II 396,661.306
5,218.14
You might also like
Intake Fraud
Document
105 pages
Intake Fraud
Alberto Ego-Aguirre
No ratings yet
Mini Case
Document
5 pages
Mini Case
anon_468658595
100% (2)
Pow 17J00016
Document
48 pages
Pow 17J00016
amroussy
No ratings yet
Pow 17J00072
Document
47 pages
Pow 17J00072
Joseph Montales
No ratings yet
POW - Road Concreting1
Document
3 pages
POW - Road Concreting1
Joseph Montales
100% (1)
Soal Job Costing 14 Maret 2021
Document
5 pages
Soal Job Costing 14 Maret 2021
Sugata S
No ratings yet
SHRM Henkel Group2
Document
16 pages
SHRM Henkel Group2
ssagr123
100% (2)
Pow 17J00009
Document
3 pages
Pow 17J00009
amroussy
No ratings yet
Pow 17J00012
Document
41 pages
Pow 17J00012
amroussy
No ratings yet
Accomp and Cost Monitoring CCT Dimayuga Residence CSA 11.23.2022
Document
2 pages
Accomp and Cost Monitoring CCT Dimayuga Residence CSA 11.23.2022
Julius Dean Dumaguing
No ratings yet
Slaughter Compound 1.98M
Document
2 pages
Slaughter Compound 1.98M
rodelbaon010824
No ratings yet
BOQ - Construction of Power Transmission - Distribution Line
Document
14 pages
BOQ - Construction of Power Transmission - Distribution Line
Dexter Québec
No ratings yet
Gantry Crane-2 (Pyramid Steel Structures Factory) Cost Sheet
Document
15 pages
Gantry Crane-2 (Pyramid Steel Structures Factory) Cost Sheet
Adeeb Shahzada
No ratings yet
Instructor: Assumptions / Inputs
Document
17 pages
Instructor: Assumptions / Inputs
JoAnna Monfils
No ratings yet
Blank Estimates Const of PSHSS Multipurpose Auditorium (20230824)
Document
12 pages
Blank Estimates Const of PSHSS Multipurpose Auditorium (20230824)
Amielle Buhat
No ratings yet
Approved Budget For The Contract: Nueva Ecija By-Pass Road Project
Document
2 pages
Approved Budget For The Contract: Nueva Ecija By-Pass Road Project
Zoilo Paynor
No ratings yet
ASPHALT ROAD Only
Document
1 page
ASPHALT ROAD Only
Benjamin Asuncion
No ratings yet
Supply of Power Cable
Document
7 pages
Supply of Power Cable
Arshad Ali Anjum
No ratings yet
Propose One Story Commercial Building (Warehouse Estimate)
Document
30 pages
Propose One Story Commercial Building (Warehouse Estimate)
anon_499209161
100% (1)
Itemized
Document
1 page
Itemized
fjbalugo19
No ratings yet
SWA MCP Voucher FrontSheet 24D00124
Document
9 pages
SWA MCP Voucher FrontSheet 24D00124
Joshua Edward Laque
No ratings yet
9 10. Man Power Equipment Schedule
Document
117 pages
9 10. Man Power Equipment Schedule
Angie Lee Romanillos
No ratings yet
Prolongation Cost Revised
Document
2 pages
Prolongation Cost Revised
Svh Kamesh
No ratings yet
Pangibitan, Geojanni R. - Activity 3 - A5
Document
4 pages
Pangibitan, Geojanni R. - Activity 3 - A5
Geojanni Pangibitan
No ratings yet
2020-11-28 Pid117 Swa
Document
37 pages
2020-11-28 Pid117 Swa
Dennis Sagao
No ratings yet
Boq 32
Document
2 pages
Boq 32
roy zonthara simbolon
No ratings yet
Summary
Document
1 page
Summary
Kezx
No ratings yet
Scribd
Document
13 pages
Scribd
dieeegoix09
No ratings yet
Rent 1,000,000: S/N Particular UOM Rate Loading Value EMI Cost
Document
7 pages
Rent 1,000,000: S/N Particular UOM Rate Loading Value EMI Cost
Abhimanyu Arjun
No ratings yet
Asphalt Pavement Itemized Breakdown - Rev1
Document
1 page
Asphalt Pavement Itemized Breakdown - Rev1
jmc builders
No ratings yet
Chrome Books
Document
77 pages
Chrome Books
Ramon Alexander De La Cruz Martinez
No ratings yet
PFin-TEV-27 12 10
Document
49 pages
PFin-TEV-27 12 10
Asit Kumar Roy
No ratings yet
EC (A) .XLS: Model Facts
Document
2 pages
EC (A) .XLS: Model Facts
Enrique
No ratings yet
Completion of Third Floor With Elevated Parking
Document
29 pages
Completion of Third Floor With Elevated Parking
Franc Anthony Galao
No ratings yet
Attachment To Evaluation Region 8
Document
15 pages
Attachment To Evaluation Region 8
Queena Nasinopa
No ratings yet
Jollibee Estimate For Bidding
Document
15 pages
Jollibee Estimate For Bidding
nhel
No ratings yet
For Bidding Det Est GV Go
Document
16 pages
For Bidding Det Est GV Go
Cres Mer
No ratings yet
Cost Effectiveness Analysis 05-06 11-05 2014
Document
41 pages
Cost Effectiveness Analysis 05-06 11-05 2014
Tewodros Tadesse
No ratings yet
Cost Estimate Sheet: TECO Industrial Park, Mabalacat, Pampanga
Document
5 pages
Cost Estimate Sheet: TECO Industrial Park, Mabalacat, Pampanga
Civil Design Engineer
No ratings yet
Adn RNR
Document
78 pages
Adn RNR
Ramon Alexander De La Cruz Martinez
No ratings yet
Chapter 7 Cost
Document
7 pages
Chapter 7 Cost
Sachikanta Pradhan
No ratings yet
Index
Document
29 pages
Index
Bình Quốc
No ratings yet
SFC Service Area
Document
3 pages
SFC Service Area
jimenezanamaehnkl03
No ratings yet
Rkv302 Test 2 Suggested Solution - 2023
Document
3 pages
Rkv302 Test 2 Suggested Solution - 2023
sibambonothetelelo
No ratings yet
Kourba Costing Sheet - V11 - Q 3 - 300619
Document
13 pages
Kourba Costing Sheet - V11 - Q 3 - 300619
Haneen Joseph
No ratings yet
Boq Bny Jeans
Document
10 pages
Boq Bny Jeans
Krizzia Jeawel Caprangca
No ratings yet
Detailed Estimation Roof PDF
Document
7 pages
Detailed Estimation Roof PDF
Franzer Balbin
No ratings yet
FAMA '22 Solution
Document
4 pages
FAMA '22 Solution
Rushil Joshi
No ratings yet
MIT2 96F12 Assn05
Document
3 pages
MIT2 96F12 Assn05
bazezew alebel
No ratings yet
Cost and Management Accounting II
Document
42 pages
Cost and Management Accounting II
JUN XIANG NG
No ratings yet
Final Estimate
Document
52 pages
Final Estimate
2213644
No ratings yet
Project at A Glace
Document
20 pages
Project at A Glace
Rajat Naidu
No ratings yet
Pyrolysis Project Industries - PROJECT REPORT
Document
19 pages
Pyrolysis Project Industries - PROJECT REPORT
Ajinkya Bhujbal
No ratings yet
Cost Modelling
Document
10 pages
Cost Modelling
RESMITA DAS
No ratings yet
Exhibit 2 Runcorn Chemicals DCF Analysis of Merseyside Project
Document
1 page
Exhibit 2 Runcorn Chemicals DCF Analysis of Merseyside Project
Batool Hamza
No ratings yet
CMAC Mid Term Solution
Document
8 pages
CMAC Mid Term Solution
Waseim khan Barik zai
No ratings yet
Training Business Case Day 2
Document
13 pages
Training Business Case Day 2
amritakiranaa
No ratings yet
Sample Abc Document
Document
1 page
Sample Abc Document
Rose Patricia Forlales Tria
No ratings yet
EVM Template Example
Document
5 pages
EVM Template Example
Eusebio Navarro
No ratings yet
Costing For Proposed Retaining Wall Cross Area Length Total Volume
Document
28 pages
Costing For Proposed Retaining Wall Cross Area Length Total Volume
Joella Madera
No ratings yet
GSF Project Closing Report
Document
5 pages
GSF Project Closing Report
con.sup.amchfc
No ratings yet
Island Power (IPWR) Incremental Earning Forecast For The Project (Purchasing Machine Outright) From The Year 2017-2022
Document
4 pages
Island Power (IPWR) Incremental Earning Forecast For The Project (Purchasing Machine Outright) From The Year 2017-2022
Ruma Rashyd
No ratings yet
Phase III Variation Caliber
Document
14 pages
Phase III Variation Caliber
rheyjc09
No ratings yet
Power Markets and Economics: Energy Costs, Trading, Emissions
From Everand
Power Markets and Economics: Energy Costs, Trading, Emissions
Barrie Murray
No ratings yet
Combined Mech ASTB 241209-Black
Document
1 page
Combined Mech ASTB 241209-Black
NS De'villa
No ratings yet
COMMENT ARCHITECTURAL
Document
1 page
COMMENT ARCHITECTURAL
NS De'villa
No ratings yet
CURTAIN WALL FOR QUOTE
Document
1 page
CURTAIN WALL FOR QUOTE
NS De'villa
No ratings yet
Laushan
Document
2 pages
Laushan
NS De'villa
No ratings yet
Technical Aspects: Experience On Completed Name of Consultant: As Of: 2012-Present
Document
2 pages
Technical Aspects: Experience On Completed Name of Consultant: As Of: 2012-Present
NS De'villa
No ratings yet
Grade Grade Code Standard
Document
18 pages
Grade Grade Code Standard
Omkar Nikam
No ratings yet
Embraer Legacy 600 v3-2013
Document
2 pages
Embraer Legacy 600 v3-2013
Kelefa Sebidi
No ratings yet
Chap 003
Document
31 pages
Chap 003
Magix Smith
No ratings yet
Fundraiser Proposal Form
Document
4 pages
Fundraiser Proposal Form
Uzoamaka Ezenwukwa
No ratings yet
Arcline® PP.: TIG Quality at MIG Productivity in Aluminium Welding
Document
12 pages
Arcline® PP.: TIG Quality at MIG Productivity in Aluminium Welding
Raaj
No ratings yet
Cost Break Down and Cost Reduction Strategies For PEM Water Electrolysis Systems
Document
16 pages
Cost Break Down and Cost Reduction Strategies For PEM Water Electrolysis Systems
Chaeeon Lim
No ratings yet
Lesson 3
Document
25 pages
Lesson 3
zeezien9
No ratings yet
Al Balagh (Apr) Invoice RA Bill 02 - Rev 000
Document
17 pages
Al Balagh (Apr) Invoice RA Bill 02 - Rev 000
praveenraj murugadass
No ratings yet
OpTransactionHistory18 06 2024
Document
16 pages
OpTransactionHistory18 06 2024
shubham61000
No ratings yet
83075bos67152-4
Document
40 pages
83075bos67152-4
nogob28178
No ratings yet
Intermediate Microeconomics 1608331642
Document
432 pages
Intermediate Microeconomics 1608331642
DORO Beans
No ratings yet
Engineering Office
Document
24 pages
Engineering Office
actabanggay.qscs
No ratings yet
Assignment1 Questions
Document
4 pages
Assignment1 Questions
Ujjwal Marahatta
No ratings yet
6 NOTES-economic Systems
Document
32 pages
6 NOTES-economic Systems
Dilip Pasari
No ratings yet
SV-C26-Saving-Investment and The Financial System
Document
10 pages
SV-C26-Saving-Investment and The Financial System
phương
No ratings yet
2023 Improving Forecast Stability Using Deep Learning
Document
18 pages
2023 Improving Forecast Stability Using Deep Learning
Lee Hung
No ratings yet
Hubungan Antara Tayangan Iklan Energen Dengan Kesadaran Khalayak Untuk Sarapan Sehat Di Pagi Hari
Document
8 pages
Hubungan Antara Tayangan Iklan Energen Dengan Kesadaran Khalayak Untuk Sarapan Sehat Di Pagi Hari
amar muammar
No ratings yet
PFE Taara Zakaria
Document
48 pages
PFE Taara Zakaria
omrzakaria742
No ratings yet
Rolling Window Functions With Pandas
Document
37 pages
Rolling Window Functions With Pandas
Vadim Yermolenko
No ratings yet
3a Notices Ysk Amar Sub
Document
1,066 pages
3a Notices Ysk Amar Sub
Krishna Reddy
No ratings yet
MODULE 3 - Needs and Wants
Document
8 pages
MODULE 3 - Needs and Wants
Wincy Rose PASQUIL
No ratings yet
Unit 3: Managerial Economics
Document
29 pages
Unit 3: Managerial Economics
arjun singh
100% (1)
07 Polar High Speed Cutter 92 Producsheet
Document
2 pages
07 Polar High Speed Cutter 92 Producsheet
hamidhosseini13766
No ratings yet
The Power Game and Players
Document
3 pages
The Power Game and Players
Charie Espiritu
No ratings yet
Tutorial 1 GROUP 3 FDM2311
Document
7 pages
Tutorial 1 GROUP 3 FDM2311
SYVESTER ANDI ANAK JEKI / UPM
No ratings yet
Free Access to Test Bank for Textiles, 11/E 11th Edition Sara J. Kadolph Chapter Answers
Document
40 pages
Free Access to Test Bank for Textiles, 11/E 11th Edition Sara J. Kadolph Chapter Answers
hydenhoyastp
100% (7)