0% found this document useful (0 votes)
38 views6 pages

5th Module Assessment - AMIGO

Uploaded by

pravinkumar4
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views6 pages

5th Module Assessment - AMIGO

Uploaded by

pravinkumar4
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

5th Module Assessment | AMIGO https://amigo.amityonline.com/mod/quiz/attempt.php?attempt=2667772...

Time left 2�59�41 Hide

Question 1

Not yet answered

Marked out of 1.00

The principal users of SCM System are:

Select one:

a. Sales, marketing, customer service


'
b. Accounting, finance, logistics, and production
'
c. Customers, resellers, partners, suppliers, and distributors
'
d. All of the above
'

Question 2

Not yet answered

Marked out of 1.00

Post implemenattion, the software maintenance could be done for :

Select one:

a. minor changes in the processing logic


'
b. Errors detected during the processing
'
c. Revision of the formats of the reports
'
d. All of the above
'

Question 3

Not yet answered

Marked out of 1.00

ERP software handles _________________ business functinalities.

Select one:

a. one
'
b. two
'
c. three
'
d. all
'

1 of 6 12/11/2024, 22:17
5th Module Assessment | AMIGO https://amigo.amityonline.com/mod/quiz/attempt.php?attempt=2667772...

Question 4

Not yet answered

Marked out of 1.00

The modifications in the operations of the organization by means of system results in :

Select one:

a. Re-execution
'
b. re-planning
'
c. maintenance
'
d. all of the above
'

Question 5

Not yet answered

Marked out of 1.00

The cenral point of ERP system is :

Select one:

a. information
'
b. employees
'
c. customers
'
d. database
'

Question 6

Not yet answered

Marked out of 1.00

Software Maintenance considers :

Select one:

a. error corrections
'
b. enhancements of capabilities
'
c. deletion of obsolete capabilities
'
d. All of the mentioned
'

2 of 6 12/11/2024, 22:17
5th Module Assessment | AMIGO https://amigo.amityonline.com/mod/quiz/attempt.php?attempt=2667772...

Question 7

Not yet answered

Marked out of 1.00

Which of the following is a cause for ERPs unstable growth?

Select one:

a. ERP is a logical solution to the mess of incompatible applications


'
b. ERP addresses the need for global information sharing and reporting
'
c. ERP is used to avoid the pain and expense of fixing legacy systems
'
d. All of the above
'

Question 8

Not yet answered

Marked out of 1.00

Various software whch are needed in the middle to connect two or more software applications:

Select one:

a. Middleware
'
b. Enterprise application integration middleware
'
c. Automated business process
'
d. e-business infrastructure
'

Question 9

Not yet answered

Marked out of 1.00

The types of maintenance classification are:

Select one:

a. two
'
b. three
'
c. four
'
d. five
'

3 of 6 12/11/2024, 22:17
5th Module Assessment | AMIGO https://amigo.amityonline.com/mod/quiz/attempt.php?attempt=2667772...

Question 10

Not yet answered

Marked out of 1.00

Software testing is applied in Software Maintenance:

Select one:

a. Regression Testing
'
b. System Testing
'
c. Integration Testing
'
d. Unit Testing
'

Question 11

Not yet answered

Marked out of 2.00

System maintenance receives inputs from :

Select one:

a. SRS
'
b. Customer feedback report
'
c. SDD
'
d. all of the above
;
Clear my choice

Question 12

Not yet answered

Marked out of 2.00

Unit implementation of system does not include:

Select one:

a. source code and compiling


'
b. lining and creation of machine code files
'
c. writing program code for interface and compilation
'
d. all of the above
;
Clear my choice

4 of 6 12/11/2024, 22:17
5th Module Assessment | AMIGO https://amigo.amityonline.com/mod/quiz/attempt.php?attempt=2667772...

Question 13

Not yet answered

Marked out of 2.00

The cost of maintenance is as high as _______ of the cost of entire software process cycle.

Select one:

a. 0.61
'
b. 0.63
'
c. 0.67
;
d. 0.71
'
Clear my choice

Question 14

Not yet answered

Marked out of 2.00

In system implementation, which of the following is included:

Select one:

a. parallel run
'
b. sizing
'
c. specifiaction freeze
'
d. all of the above
;
Clear my choice

Question 15

Not yet answered

Marked out of 4.00

Which regression test selection technique exposes faults caused by modifications?

Select one:

a. Precision
'
b. Efficiency
'
c. Inclusiveness
'
d. Generality
'

5 of 6 12/11/2024, 22:17
5th Module Assessment | AMIGO https://amigo.amityonline.com/mod/quiz/attempt.php?attempt=2667772...

Question 16

Not yet answered

Marked out of 4.00

Which process is used to achieve system specification by thoroughly analyzing, understanding the existing system?

Select one:

a. Program Restructuring
'
b. Reverse Engineering
'
c. Forward Engineering
'
d. None of the above
'

Question 17

Not yet answered

Marked out of 4.00

System implemnttaion is required as :

Select one:

a. human never gets it right first time


'
b. The deployement may change over atime
'
c. The user needs may change over a time
'
d. All of the above
'

Jump to...

t Previous Activity

Next Activity #

6 of 6 12/11/2024, 22:17

You might also like