Papatapalli Cste-C P61
Papatapalli Cste-C P61
CH:470019.8
F 830
260
RL:133.217
CH :309.8m
F 830 1. IN CASE OF NEW OHE MAST/SIGNAL POSTS ARE REQUIRED TO BE PROVIDED IN BETWEEN
DN MAINLINE &
R
(1st PORTION)
LEVEL 1. PROPOSALS ARE SHOWN IN RED CE/PND/SC
DN MAINLINE &
DN LONGER
TRACKS, THE CENTRE TO CENTRE DISTANCE BETWEEN THE TRACKS SHALL NOT BE LESS
CH :382.35m
CH:469327.65
(1st PORTION)
RL:133.737
DN MAINLINE &
LOOP LINE
CH:469759.25
2. EXISTING WORKS SHOWN IN BLACK
RL:133.217
(1st PORTION)
CH :49.25m
DN LONGER
THAN 5.30M PLUS WIDTH OF SUCH STRUCTURE/FOUNDATION AS THE CASE MAY BE TO
LOOP LINE
DN LONGER
0 F 830 3. DISMANTLING WORKS SHOWN IN YELLOW.
R 26
LOOP LINE
DYCE/PND/SC
CH :317.78m
CH:469392.22
UP MAINLINE &
(2nd PORTION)
RL:133.470
0 4. EXG. RAILWAY BOUNDARY SHOWN IN BLACK.
R 20
UP LONGER
LOOP LINE
RL:131.771
F 830 CURVE NO:10D(RHS) PRIOR TO THE COMMENCEMENT OF EXECUTION OF PROPOSED WORKS. SSE-YARDS
DN LINE
LEVEL LEVEL F 29 R=3500M(0.5) 6. THE EXISTING GRADES,C.L OF STATION BUILDING,BRIDGES ARE MARKED AS PER SITE SURVEY
1
CH:470019.8
3. NO SIGNAL POST/OHE MAST SHALL BE PROVIDED BETWEEN THE PROPOSED TRACKS
RL:133.217
UP MAINLINE &
Δ=0°19'38.66''
(2nd PORTION)
CL OF PAPATAPALLI STN
CH :309.8m
UP MAINLINE &
(2nd PORTION)
DETAILS.
RL:133.217
CH :108.0m
CURVE NO:9D(LHS)
CH:469602
TL=10.00M BUILDING AT KM.469.71 CTPM
UP LONGER
OTHER THAN APPROVED WORKS IN THE ESP.
UP LONGER
LOOP LINE
R=3500M(0.5) F 291 CH:0.00 7. ALL ESSENTIAL PASSENGER AMENITIES ARE TO BE PROVIDED AS PER RAILWAY BOARD
LOOP LINE
CL=20.04M CL OF EXG.LC.NO.95 AT
Δ=0°9'49.33'' F 10 4. AFTER EXECUTION OF THE PROPOSED WORKS, COMPLETION PLAN IS TO BE PREPARED
TRL=80M 7 CH:470065.044 M (KM: 470/2-4),CLASS- A
INSTRUCTIONS.
CH :588.00m
RL:132.261
PRO.TO BE EXTENDED
CH:470298
TL=5.0M RAILWAY BOUNDARY
DN MAINLINE &
SE=40MM CEE-C-SC
(2nd PORTION)
SUPERSEDING EARLIER APPROVED ESPS.
DN LONGER
EXG. BR.NO.644 SPAN 1X1.22M. RCC SLAB, AT
LOOP LINE
TRL=80M CL OF EXG.BR.NO.644 AT
CL OF FOB AT 9. CHAINAGES ARE RECKONED FROM C L OF WARDHA STATION BUILDING CH: 0.00m
CH:469418.193 M
SRJ AT CH:470121.3M(CH:411.30m)
(CH:32.00m)
STATION BUILDING
10. (A) PRO. THIRD MAIN LINE IS TO BE PROVIDED WITH PSC SLEEPERS OF 1660NOS. PER KM.
SH AT CH:470119.90M (CH:409.9m)
TS/FM AT CH:469315.80m (CH :394.20m)
RCC SLAB
PF END CH:469410.90m(CH:299.10m)
PRO. AS DN LONGER LOOP LINE (FIRST PORTION) ROAD-1
SRJ/FM AT CH :469170.0m(ROAD-5&6)
PF END CH:469350.00m(CH:360.00m)
m
CAL - 811.70M (TS TO FM) -120
BHARTESH KUMAR JAIN Digitally signed by BHARTESH KUMAR
TP1 AT CH:470020.70M(CH:310.70m)
FM AT CH:469254.00m (CH :456.00m)
18A
(B) PSC SLEEPERS ARE TO BE PROVIDED
CH :838.00m
R 260 F 107 12
TO FM)
C-1.5°
12
OSL
7.58 m
(CH :588.00m)
00
RL:132.261
12 12B ROAD-3
0 DN UP MAIN LINE CAL- 635.5M (FM TO FM) PRO. CAL-1004.11M (FM TO FM) 19B
(II) ON MAIN LINE BEYOND 400M FROM TOP POINT ON EITHER END.
LEVEL R 10
UP MAINLINE &
CH:470298
12 12 12
(1st PORTION)
11B
RL:131.342
CH :871.0m
12A 12 PRO
CH:469316.9, KM:469/14-15
C-1.5°
CH:468839
E ROAD-4 12
SRDOM-SC
UP LONGER
LIN UP L
m P LINE(FIRST POR
(III) ON LOOP LINES TO SUIT PROVISION OF TRACK CIRCUIT.
UP LINE
OSL
LOOP LINE
8.5
13.36m 14.20 HL PLATFORM 650.0 X 10.84 m LONG GOODS LOOP LINE
CAL=937.50m (FM
TO FM)
AWTALA Date:2024.04.13 12:41:55 +05'30'
RL:130.152
(CH :16.50m)
(CH : 179.50m)
CH :990.0m
HL PLATFORM 414.2 X 10 m LONG 14A 8.5 ROAD-5 BS 12 12
CH:468720
OSL-120m STABLING LINE OSL-120m OSL-1
SRJ AT CH:470014.90M
FM AT CH:470040.65M
20m
TP1 CH:470443.88m(CH:733.88m)
6.00m PRO. BI-DIRECTIONAL LOOP LINE CAL-925.0M (FM TO FM)
1IN 12
C-0.875° C-1.5°
E 12 5.75m PRO. BI-DIRECTIONAL 3RD LINE CAL-925.0M (FM TO FM) 12
1IN 12
ROAD - 4 & 5
LIN 12 ROAD-7 12 PRO
3RD
CURVE NO:11 DN(RHS) NA
L PRO. GOODS BD LOOP LINE CAL-969.0M (FM TO FM) 3
BI-D RD LIN EXISTING TRACK AS PER ENGINEERING ORDER No.23 CIRCULATED VIDE Lr. NO.W/T-5/Vol.XI of PRIYA AGRAWAL Digitally signed by PRIYA AGRAWAL
e
PRO
TP1 AT CH:468872.0(DN)
TIO IRE E
illag
EC ROAD BS
SRDSTE-SC
li V
ROAD
Δ=13°14'46.5'' TS
ROAD - 2 & 3
(CH :540.0m)
1 IN 12
INT. STATION DIST. :5.39KM
12. LAND BOUNDARIES INDICATED IN THE DRAWING MAY NOT REFLECT THE ACTUAL RAILWAY
(CH :521.70m)
(CH:304.90m)
a
TL=135.504M DORNAKAL(461.320 KM)
tap
MOTUMARI Jn.(522.720)
INT. STATION DIST. :8.390KM
BOUNDARY AND FOR RECKONING ACTUAL RAILWAY LAND, THE CERTIFIED LAND PLANS AS KADAGALA SRINIVAS Digitally signed by KADAGALA SRINIVAS
TP1 CH:470471.73m(CH:761.73m)
1 IN 8.5 SS
CL=269.80M INT. STATION DIST. :53.01KM
SRDME-CORD-SC
apa
RAILWAY BOUNDARY
TRL=130M AVAILABLE IN HQ (OR) DIVISION OFFICE ONLY ARE THE FINAL AUTHORITY. THE LAND BOUNDARY Date:2023.10.26 03:22:13 +05'30'
Railway Boundary
P
SE=120MM SHOWN IN THE PLAN CANNOT BE AUTHORITY FOR THE PURPOSE.
To
Railway Boundary
BS AT CH :470302.50m
CURVE NO:8 DN (RHS)
(ROAD-1&2)(CH:417.50M)
O :7 DN 17.90 MATTAPARTHI Date:2023.11.07 04:52:19 +05'30'
(CH:520.50m)
(CH:558.00m)
(CH:592.50m)
1 CL=40.0M PRO. ROAD CL=334.21M
TL=1 0.00 DN LONGER LOOP LINE (FIRST PORTION) CAL - 811.70M(TS TO FM) PASHA Date:2023.11.01 03:59:44 +05'30'
CH:470940
RL:126.261
(CH :1230.00m)
DN MAINLINE &
(2nd PORTION)
2 TRL=90M H.L PASSENGER PLATFORM 100.00x10.80M 6.83 TRL=130M
CL=2 0M DN LOOP LINE CAL - 724.85M(FM TO FM)
0m
DN LONGER
= 8 SE=100MM ROAD-1 SE=120MM
LOOP LINE
T RL
D S RAMA RAO Digitally signed by D S RAMA RAO
98.0
00MM 6.83
SE=1 H.L PASSENGER PLATFORM 650.0x19.66M 36,5 SRDEN-CORD-SC
Date:2024.04.25 04:34:44 +05'30'
5.75
688
23.02
M-469/15 H.L PASSENGER PLATFORM 414.40x19.66M E=120m
OVERSHOOT LIN
4
M-469/22 M-469/24 M-469/28 1 IN 12
P-470/04 1 IN 12
:
M-469/18 M-469/20 M-469/32 M-470/02 M-470/12 M-470/16 M-470/18 M-470/20 PRO. DN
DINAKAR PRANEETH KORRAPATI Digitally signed by DINAKAR
H
M-469/14 LONGER
STATION BUILDING
M-469/26 M-469/34 cabin 1 IN 12 P-470/10 1 IN 12 F+M M-470/22
TC
DN MAIN LINE CAL - 724.85M (FM TO FM) PRO. CAL - 824.7M (FM TO FM) M-469/36 M-470/06
F+M M-470/24 LOOP LIN SRDEN/SOUTH/SC
ROAD-2 F+M
M-470/08 E (SECO PRANEETH KORRAPATI Date:2024.04.23 12:01:19 +05'30'
TP2 CH:470892.852m(CH:1182.852m)
M-470/26 ND PORT F 107
YAWHTAP .ORP
IT A
4.72
LIM )
F+M UP MAIN LINE CAL- 635.5M (FM TO FM) PRO. CAL-1004.11M (FM TO FM) ROAD-3 4.72 7.58 M-470/28 ION) CAL
YAR 12.00m
F+M =97 5.00m(FM Railw F 735
ay B
M-469/12 UP LOOP LINE CAL - 577.7M(FM TO FM) UP LONGER LOOP LINE (SECOND PORTION) CAL 984.75M (FM TO FM) 4.72 F+M
ROAD-4 1 IN 12
M-470/01 1 IN 12 TO FM)
UP MAINLINE &
1 IN 12 F+M 7,87 ound
1 IN 12
(CH :1230.00m)
RL:126.261
M-470/07 M-47 SUDHIR KUMAR SHARMA Digitally signed by SUDHIR KUMAR
(1st PORTION)
M-470/05 F+M
P-470/09 M-470/15 M-470/17
CH:470940
M-470/13 M-470/19 ary
M-469/10 M-469/17 M-469/19 M-469/21 M-469/23 5.33 1 IN 8.5 M-469/33 M-469/35 F+M M-470/21 0/30 CE-C-IV-SC
UP LONGER
M-469/15 M-469/25 F+M M-469/29 M-469/31 1 IN 12
:8
F+M 0m M-470/23 SHARMA Date:2024.05.16 11:01:35 +05'30'
D
=12
LOOP LINE
H.L PASSENGER PLATFORM 414.20x10.00M 13.36 10.00 LINE
8m)
14.20 P-470/03 OVERSHOOT
(CH
M-469/06 1 IN 12 EXG. GOODS SIDING CAL- 455.85M(TS TO SRJ) H.L PASSENGER PLATFORM 650.0x10.84M POINTS MAN ROOM M-469/27 M-470/25
PRO. UP M-470/3
62.3
2
M-470/34
TS PRO. BIDIRECTIONAL LOOP LINE CAL-925.0M(FM TO FM) ROAD-5 1 IN 8.5
4.43 OVERSHOOT LINE=120m LONGER
TS EXG.STABLING LINE CSR-266.044M 36.70 LOO M-470/27 NAVYA SREE VARRI Digitally signed by NAVYA SREE VARRI
M-469/0
4 M-469/13 1 IN 12 P LINE(F
: 13
PRO. BIDIRECTIONAL 3rd LINE CAL-925.0M (FM TO FM) ROAD-6 6.00 F+M 1 IN 12 IRST PO DYCE/C/Plg/SC
F+M M-469/11 RTIO M-47
20,09 /02 F+M1 IN 12 1 IN 12 N) CAL= 0/29 Date:2024.05.17 11:27:43 +05'30'
(CH
5
PRO. GOODS LOOP LINE CAL-969.0M (TS TO FM) 5.75
M-469 937.50m
F+M 1 IN 8. 9 ROAD-7
M-469/0
/36
(FM TO
, AT
FM)
M-470
AB ,
PRO. OVER SHOOT - 120 m (SRJ TO BS)
M-470/33
69M M-470/3
RR-361.5 BS Canugovi Ramesh Digitally signed by Canugovi Ramesh
TO BS)
S
8.5 S
1
m (SRJ 1 IN 12 SSE/DRG/CE-IV/SC
AB
F+M
C SL
/36 ROAD
M-468 SHOO T - 120 Date:2024.05.15 01:57:35 +05'30'
9/07 GATE LODGE
F+M
ary 9/05
C SL
TRACK MACHINE SIDING CAL-324m (TS TO BS)
und M-46 M-46 PRO. OVER ROAD
., PS
5
y Bo 1 IN 12
M-470/3
a F+M
/38
Railw -566.34M RATNAKAR GADDAM Digitally signed by RATNAKAR GADDAM
. RC
3 2 RR 24.60
0
4 M-469/0 1 IN 1 DYCSTE-C-GNT@BZA
.1 M
68/3
M-47
M-4 UMP TS PRO. ROAD Date:2023.03.17 09:47:04 +05'30'
.1 M
ND H
5,75
ROAD
1X6
SA SRINIVASA VARA PRASAD RAO SUGGUNA Digitally signed by
1 IN 12
F+M 1 IN 12 PRO. ROAD
1X6
9/01 Railway Boundary
PF END CH:469654.61m(CH:37.01m)
Railway Boundary
M-46
ma
PRO. RL PATHWAY OF 1.50m WIDE Dy.CEE/C/OHE/SC SRINIVASA VARA PRASAD RAO SUGGUNA
SRJ AT CH :469840.68m
(CH:130.68m)
0/37
LEVEL F 40
PAN
2
AT
68/3
4M
RR-566.3 1 IN 12 0 Rai
am
lwa
M-47
CH:470019.8
RL:133.217
BS AT CH :470215m (CH:505m)
CH :309.8m
0/40
SRJ AT CH :470153m (CH:443m)
AB ,
SRJ AT CH :470256m (CH:546m)
BS AT CH :470273m (CH:563m)
oun
HS
16,4
Kh
DN LONGER LOOP CURVE NO:221(RHS) dar
PSC
AMIT AGARWAL Digitally signed by AMIT AGARWAL
M-47
S) CURVE NO:221(RHS) y
5S
69M
J TO B
C SL
WIT
To
RR-361.5
DED 3
F 400
TP1 CH:470472.45m(CH:762.45m)
SRJ & FM AT CH :470095m(CH:385m)
m (SR R=1167M(1.5°) UP LONGER LOOP
(CH :202.00m)
2 Date:2023.03.17 05:58:12 +05'30'
1 IN 1
O B 2.38, K .NO-64
0 R=1166.67M(1.5°)
T - 12 F 107
5M
8/35 SHOO R=1167M(1.5°)
LOOP LINE
Δ=20°40'53.70''
. RC
(CH :596.00m)
TP1 AT CH : 469131.438m (CH :578.562m)
R
M-46 Δ=19°42'0.38''
X3.0
O
RL:132.502
O. Δ=20°27'1''
CH:470306
68 PR Railway Boundary TL=212.877M
M-4
0/39
M
R 426 LEVEL
.0 M
TL=202.568M
R
CL=421.122M TL=210.506M AXEN-C-III-KZJ THAKKELLAPATI SURYANARAYANA
M-47
N 6
3rd LINE, BD LOOP
LINE & GOODS BD
CL=401.137M
CH:469601.812
0/42
RL:133.217
6X3
TRL=20M CL=416.532M Date:2023.03.14 02:05:54 +05'30'
E EX
FM AT CH :469170.0m (ROAD-7)
SPA
)
8
M-47
68/2 TRL=80M
m
3 TRL=20M
68/3
C OF E
SE-20MM
7
M-4
5.50
M-4
SRJ/FM AT CH :469051.0m(ROAD-6&7)
PAN
36.02 SE-20MM SE-110MM MARREY SRINIVAS Digitally signed by MARREY SRINIVAS
ITH
LOOP LINE
BS AT CH : 469508.00m
SPEED-130KMPH
149
C.L
0/41
Date:2023.03.14 10:38:34 +05'30'
P. T
64m DED W
LIN CURVE:3(RH)
M-47
1
68/3
H : 1 EXTEN 1/4-6
CH:
R=1167M(1.5°)
.00m
M-4
1/02
Δ = 14°21'55"
BS CH:470032.044m(CH:322.044m)
Δ=21°6'41.5''
0m(
M-47
7
PRO471163. . BR.NO
)
TL=217.466 R = 2000m (0.875°) F 400
05.5
CL=430.00 F 400
(CH :762.0
CH:470215.00
m)
TL = 252.044m
BD LOOP LINE
(CH :505.00m)
(CH :540.0m)
453.
RL: 132.729
TRL=80M
CH:470273.00
(CH :779.0
712
16.90
(CH :563.00m)
CL = 501.443 m
/01
CH: F EXG
E
6
R 426
RL: 132.584
SE=100MM
1
R 400
GOODS BD LOOP
M-47
H :4
TRL = 20m 12.00 5.75
m)
9
CH:469392.22
1/04
B ,(C
LIN
RL:132.725
O
M-4
(CH :659.0m)
CH :317.78m
TC
UP
LINE, GOODS BD
8.50
LOOP LINE & TM
.86)
6.25
M-47
(CH: 596.00m)
:468948.0m
:469
C.L
MA
KM 98.05M
m)
R 426
6
159
:468931.0m
6
12
5.50
6
M:361.320)
CH :202.000m
INE )
CH: TO
&F
DL
TM SIDING
RL: 133.022
CH:469508.000
CH:
L
1/03
.3R TIONA
K BZA
LINE
O
(
:161
PR REC
SIDING
SRJ
M-47
KZJAL Jn. @ (
TM SIDING:
0m(
D I F 163 R 400 3rd Line CURVE-3(RH)
/06
I -
4 (B
(KM
(CH
1
Δ = 5°25'3.69" MO
M-47
C
Δ = 20°39'56.62"
08.5
TODORNAK
m
TUM
:586
(BD LINE)
BS AT CH
T
) R 400
8.50
RL:131.342
.320 F 10
CH:468839
3rd LINE
.50m
A
7 F7
.50)
713
461 9 Kms Jn.
CH :871.0m
BI DIRECTIONAL
84
CH:469050.000
@(
J
F+M
1/05
m
135
TL = 364.647 m TL = 82.799m 1 IN PRO. MAL
SR
K 3
RL: 131.869
( 8. 522
H :4
KAL CE :
325
L
INT EMAD .
M-47
720
(CH :1230.00m)
12 OV
RNA ISTAN
CH:470940
RL:126.577
CH :660.0m
CL = 165.474 m
m) CH :47
CL = 721.370 m E RS ERD )
U
LOOP LINE
O ISTA GU (K
:471
C
INFRINGEMENT TABLE HO
3rd LINE
D ER D NON-TRANSITION OT
TRL = 80.000 m
/08
R 400
AT
INT - 12 NCE m 47
1
0m : 5.3 5.10
M-47
CH
LINE & TM SIDING
GOODS BD LOOP
TCL = 801.370 m PRSCRIBEDmAXIMUM AND EXISTING (SR
T
PARTICULAR OF SANCTION 9 Km 0)
SRJ
LOCATION
CH:468931.0
AMOUNT OF J TO
:164 IT A
RL: 131.572
NAME OF STRUCTURE MINIMUM DIMENSIONS ACTUAL F+M s
AT
SE = 75 mm SL.NO INFRINGEMENT TO INFRINGEMENT& 1 IN BS)
CH :779.0m
8.50
DIVISION AND KILOMETER/ WHERE INFRINGING 12
1/07
DIMENSION
(CH D LIM
SPEED = 155 KMPH MAXIMUM & REMARKS
BS
SECTION CHAPTER/ITEM
M-47
CHAINAGE MINIMUM 1 IN
12
YAR
R 1 IN 260 PRO
1/10
1 CH:468963.22 TO 469327.65 DN LONGER LOOP LINE (FIRST PORTION) & 0.135% . OV
(0.385% )
M-47
)
DN MAIN LINE ER
.50m
AS PER ACS NO.2 DT: SHO
STEEPER THAN OT
- 12
CH:468963.22 TO 469392.22 UP MAIN LINE & 27.02.2023 OF NOTE (d) R 1 IN 260
:1495
2 1 IN 400 0.135% 0m
1/09
(SR 1 IN
SECUNDERABAD DIVISION UP LONGER LOOP LINE (SECOND PORTION) (i) OF PARA-2 OF (0.385% ) GM/SCR CONDONATION 12
M-47
(0.25%) AND J TO
KZJ - KI SECTION CHAPTER-II OF TO BE OBTAINED BS)
(CH
PAPATAPALLI STATION DN LONGER LOOP LINE (FIRST PORTION), SCHEDULE-I OF IRSOD
UP TO 1 IN 100 F 1 IN 291 0.094%
2
(1.00%)
.50m
3 CH:470019.80 TO 470298.00 DN MAIN LINE, UP MAIN LINE & (0.344% )
71/1
YARD (BG) REVISED - 2022
UP LONGER LOOP LINE (SECOND PORTION)
M-4
1205
B
B
BO AB
DN LONGER LOOP LINE (SECOND PORTION),
A
F 1 IN 107
A
0.685%
SL
CH:470298.00 TO 470940.00
T
4
SL
CC SL
H :47
/11
.,
X
A
C
B,
71
B,
.R C
PS
6
PS
A
M-4
M , PS
A
84
CC
TE
CC
SL
m)
SL
.,
CC
)
1.
AT C
,
4
M
.
m
3. M.
.R
CC
)
M
71/1
5X
3m
.R
CC
CC
5.50
.R
-1 PL
5
8.50
M
5
CH .N WI -27 X3 3.05
7 R
15
0
2.
X
M
M-4
0
.R
m 35 S 5 M
.R
/5 M
3
6.
X
BO
18 ) TH 6-2 M.
3.
13 .2
7
6m
)
IR F 9 T M A S 25 0
1X 7m
m
6
1
3 14 H -1 .2
& FM
0
2X
M
2- 4
)
:161
G L O .7 X , K 41 TH 24- 3.7
98 1m)
)
6
68 3
DN
9
W :467 X3 6m)
m
) 61
8m
/1 3X
H . TO 78 BR ED M N 1 .19 )
84
59 N
)
10 9m W 5/ .44
:1
) 15
X
84 : IT 14 4
)
ED 7/2 AN 1
CC
)
.
A
,(C OP :46 G. ) ND 7, K PA 007 38m
N
:15
8
5
m
91
60 N
05
)
. LIN
2. H W 8/ 3X
m
PA
I / X
8m
N
7m P 7.
)
m
CH
)
3m M 1
W 19 3.0
.5
PA
30
18 68 A )
N
68 X
7
N
81
m
3m
.2 PA
66 .81 ED :46 X2
27
K 3X S E
,R
A
0.
.7
SP 6m
43
.9
)
3
34
)
)
35 ,(C D 46 1X
5
A
00
:4 1
D E 4m EN : S PA
24
43
H HS
(CH
m
1
8-
(
1
.8 15
(CH
m
9.
- X
2
SP
1X
.9
6
H ER
S
13
(C 025
4
1
,
4.
SP
PR C E 3m T .6 1 S : 2 8.
3m 5.
M N
7.
8.
65
m
51
3
62 :
/2
7, N
.0
60
ED 8 2
SRJ
5
.2
: T
2
H
4
91 D KM N
71/1
N
.0 I
T F .32 EX 56 64 H 00
K PA
:
23
IT 4.5
,(C IT
1.
73
7.
3 3
TH
EXISTING
84 A
W IRD
66
96
7
D /1 N
PRSCRIBEDmAXIMUM AND
N
7 H
:1
:3
H
:
CH : 3 TEN 1, PA
PARTICULAR OF SANCTION
N , K PA
5
:9
.4 5 3
32
39
ER X ) D 46 P
LOCATION
42
:
H
, A .L O53BE 677 O- ,(C : 2
:2 AMOUNT OF
3. SP
) EN 466 PA
:1
X W
NAME OF
., TE -2 A
,(C
6
:2 :2
44 A S
IT
:4
:1
:2
.50m
5X W 151
M-4
H
30
H
H
,(C
m
73
H
:
m X /1 P
:2
ED P.G
A (CH EX 7.1 39 S
:2
TE .74 3 S
MINIMUM DIMENSIONS
M
H
M
5. ACTUAL
,(C
3,
BO D
,(C
,(C
6m T M: S
H
04 2
7 E 65 8 S
8 CH H H TO INFRINGEMENT&
:4
CH D
.50
STRUCTURE
5. 42
,(C
INFRINGEMENT UP
68 64
:
H
57
m
H
K
C :1 O : R. 4m C
:2
C DE
(C
32 X K 40
,(C
T
D
CH
, (C
EX 74 64
1X E
5m
,( LIN
m
m
,
3m
DIVISION AND
(C
KILOMETER/
H . T CH . B .80 m ,(
,
,(C
A
N OM
, E 79 -6
64 E :4 3
0.
19 -6
D CH
:4 O-
.
m,
T 7,
84 DIMENSION
8
0M
m
m
2. E E 4, -6
MAXIMUM &
D
1. B M -6
325
-
2
RC N
REMARKS
55
E 7
WHERE INFRINGE
C. 89 BE .20 O-
CH
308
B,
B 65 O
TE ,C
29
BE 68 O
,
T
68 O
m
)
IS .56
29
EN ,(
)
4
m
8. m
7m
7m
07
00
m
.3
19 B 67 O
CHAPTER/ITEM
,(C P T G 02 62
A
0X TO , K O
m
52 93
,A
T
73
TO :4 .N
.2
SECTION
A
CHAINAGE
N
4 N
(
12 .N
82
28 90
0
A
33
5
: 3 O 7. .N
A
3.
41
73
2
2. P. 16 R.N
0.
B MINIMUM
E,
8
4.
X
T BR
1
SL
EX 79
T
75
75
.6 9
4.
.
:4
.
11
P
O AT G AB
)
TC
4.
R
TO H: R
PR , E 467 01.
0X
R
6
:471
.1
67 1.8
19
PR
6
2
E M A
B,
CH PIP
5
51
471
75
H . T 51 BR
,S EX
81
CH
8
7m
8.
47
.
P. CH B
P. C . B
N 68
(BI- O.3RD
CH B
0.
57
47
37
99
SL
S
7
.F
A
6
BE 18.
5
1X O 6.4 . B
77
66
, A G.
: 4 713
38
PR , EX SL
IR
68
68
69
84
0A 98
46
.
68
O T G.
68
4.
SL
T G.
IO 46
39
69
4
66 67
E
DIR
4
E
T
M
R 1 IN 400
.
ECT LINE
BO .L O CH: 46
1X
:4
,(CRO :46 G
:3
:4
M
:
1X
PR 511 XG
:4
:4
:4
4
,A
:
0.167%
H:
PR A X
:
B
:4
46
CH 46
:4
:4 :4
.
, A EX
:
91
IS H:
C
TO 3X 1
X
H X
CC
-6 PS 22
P CH EX
CH
U
:4
CH
H
ION
B, E
TC
CH
TO
0.
(0.250% )
H
CH
CH
CH
CH
.H
O TC
T :
,(C
N
:4
6 E
66
CH
O CH CH P. 53+ ., AL)
6
.R
A F
X F
CH
A H
CH
1X
TC
(
X F
A
2 C
X
F
,
T OF
.F
C T
:4 F
3.
SL L O
.N
M
BO .L O
2 C
SP
A
X
C M.
) SP
SL 4/0 M
BO
9
TP AT
M
A
T
O .
CH .L O
P
PR )A
1X
T T
AT
:1
,(C
X
1M
GOODS LOOP LINE
BO
T
TP AT
2
A
C 47 .1
BR PR X17 05
A
A A O
H
A
BO
L
M -8 76
A
P
5m H
A
JA
C.
V
B
05
PS 9- 6
X
1
2
1 1
PR 3.
C
CC
9
) T
SP
C.
2
89 IT
1
., 3/ 1X
TP
65 7 0.
U
C
TP
C
0.
TP TP
2
I
TP
TP
A
3.
0m W
C
TP
TP
TP
RC
B
1. W
1. 3/ X
TP
TP
TP
TP
(R
BS
X
X
TP
47
R
SP
A
RC
M 47 N
SR
R 1 IN 400
A
1X
X 47 1
1
1
65 D
07 D
0.167%
-6
A
5
20 : N
.,
N
4-
7. E
2
46
: 2 DE
4M
6. M SP
.,
O
1. KM PA
F 235 CH:469184.00 TO 469392.22
A
PRO. TM SIDING
68 ND
(0.250% ) /
480 00
.N
-6
71
SP
H N
LEVEL R 2 It is not feasible to provide the
1X , A
01
F 68 F 680
1X 3, S
R1
O
0 LEVEL
:
TO -2 BR
: 3 TE
F 110 :4
(C TE
S 987 49
S .63 649
0
2.
48
148
(CH :2640.00m)
RL:131.285
F 160 F 160
K
H X
CH:467070
. A 30. O.6
R.
X
B, X
RL:131.158
RL:131.158
P. 24 .
6
(CH :2320.00m)
O 3/ XG
(CH :1810.88m)
(CH :1016.00m)
RL:130.814
. A 09 O.
,(C E E
CH:467390
R K
50
DN LINE
DN LINE
A E
. A /5-6 O.
.B
5
(CH :4380.00m)
,
CH:467899.12
CH:468694.00
1
CH:465330
TD 39 .N
DN LINE
TD 737 R.N
(CH :3170.00m)
FL:141.103
SL BE
95
1.
TD 73 .N
PR :47 F E
RL:133.540
G
CH:466540
B
DN LINE
DN LINE
EX :47 . BR
1X
due to continuous falling .8
R
EX
STEEPER THAN F 1 IN 830
C O
EX H:4 . B
K .L O
EXM:4 . B
CH:469327.65 TO 469759.25 0.037% 81 X
PS T
CH XG
DN MAIN LINE
C XG
3 17
K G
BO
., P.
O
(0.120% ) gradients. It requires a lifting of
C
SECUNDERABAD DIVISION 1 IN 1200
EX
M
7
M O
E
E
L
:4 C
PR
C.
KZJ - KI SECTION CHAPTER-II ITEM NO.2 OF approximately 0.200m to provide CH RC
IRSOD-2022 (0.083%) AND
PAPATAPALLI STATION UP MAIN LINE & UP TO 1 IN 400 F 1 IN 830 1 in 1200 grade in the yard which R 380 R 380 F 110
F 300 F CH:469392.22 TO 469602.00 0.037% R 175 R 205
R 205 F 110 F 1255 R 185
RL:133.21
700 F7 YARD
(CH :3070.00m)
UP LONGER LOOP LINE (SECOND PORTION) F 1255
RL:132.789
DN LINE
(0.120% ) 5
(CH :2910.00m)
4 0
DN LINE
0 causes disruption of the running
CH:472780
000 R 17
(CH :2240.00m)
(0.25%)
RL:126.847
344
RL:130.158
CH:472620
(CH :4290.00m)
(CH :3740.00m)
RL:127.119
RL:126.389
CH:473450
CH:467470
LEVEL
CH:474000
RL:128.789
(CH :1670.00m)
DN LINE
(CH :2090.00m)
DN LINE
UP LINE
DN LINE
CH:471800
CH:471380
(CH :1810.00m)
RL:130.152
UP LINE
DN LINE
F 110 F 15
PRO. BI-DIRECTIONAL LOOP LINE, R 1 IN 426 0.152% & crossings and exg platforms.
F 150 0 F3 LEVEL F 163 CH:469392.22 TO 469601.812 PRO. BI-DIRECTIONAL 3RD LINE & (0.235% )
00
118 LEVEL 5
(CH :4400.0m)
(CH :3220.00m)
CH:466490
(CH:1304.25m)
UP LINE
CH:465310
CH:468405.75
RL:133.425
Δ=1°31'27.39''
(CH :1786.64m)
UP LINE
500
UP LINE
RL:134.00
UP LINE
F 73 LEVEL F 100
5 R1 R 107 LEVEL F 800
PRO. GP
F 80
PRO. GP
Radius:3500 (0.5°)
R 107 LEVEL
(CH :2240.00m)
R 1 IN 426 0
(CH :3740.00m)
(CH :3070.00m)
RL:133.591
RL:133.587
(CH :2910.00m)
RL:126.897
CH:473450
00
CH:472780
RL:130.158
RL:125.662
UP LINE
0.152%
UP LINE
CH:472620
TL:46.560m
UP LINE
(CH :3930.00m)
(CH :1670.00m)
RL:126.597
CH:469392.22 TO 469508.00 PRO. TM SIDING
CH:473690
15
CH:471380
UP LINE
RL:125.947
UP LINE
UP LINE
(0.235% )
CH:467470
(CH :2090.00m)
CL -93.113 R
6
UP LINE
PRO. GP
CH:471800
SE :40mm.
TRL:40m
DN LINE DN LINE CH:470019.80 TO 470215.00 PRO. BI-DIRECTIONAL LOOP LINE F 1 IN 400 0.167%
7 (0.250% )
4.72 M. 16.76 M. 36.02 M.
UP LINE C.NO-2D UP LINE DN LINE DN LINE
7.80 M. 7.80 M. 20.00M. C.NO-2I
CH:470019.80 TO 470306.00 PRO. BI-DIRECTIONAL 3RD LINE F 1 IN 400 0.167% 16.90 M.
DIVERTED UP LINE 16.90M.
PRO.3RD LINE C.NO-2E
C.NO-2F
6.00 M. C.NO-2H PRO.3RD LINE 8 (0.250% ) UP LINE UP LINE
TL=163.936M TL=163.936M
Δ=2°40'59.4'' Δ=2°33'46.05'' TL = 90.544 m
CURVE:(RH)
Δ = 20°39'56.62" 9 (0.250% ) Hqrs. Drg. No. GM(W)SC/YARDS/SC/PPY/ -2024 Alt. No
TL=163.936M TL=156.579M 3rd L CURVE: (LH) CL = 180.997 m R = 2000m (0.875°)
CL=327.811M CL=327.811M
TRL=50M TRL=50M
CL=327.811M CL=313.105M
Δ = 4°26'40.8"
R = 1750 m (1.0°)
U/L CURVE:2H (LH)
Δ = 4°26'40.8"
TRL = 80.000 m
TCL = 260.997m
TL = 364.647 m
CL = 721.370 m PSR LOCATION IN PAPATAPALLI YARD LIMIT UP MAIN LINE & R 107 F 100
F 80
0
SE-35MM SE-35MM
TRL=50M TRL=50M TL = 67.911 m R = 1750 m (1.0°) SE = 80 mm TRL = 80.000 m
CH:470940.00 TO 471358.50 F 1 IN 735 0.053% F 784 LEVEL 07 LEVEL LEVEL F 10
0 F 80
0
LEVEL
Division Secunderabad Section KZJ-KI
R1
SPEED = 160 KMPH
CL = 135.755 m
UP LONGER LOOP LINE
(CH :3980.00m)
SE-35MM TL = 67.911 m
10 LEVEL
(CH :3740.00m)
TCL = 801.370 m
(CH :3070.00m)
(0.136% )
(CH :2090.00m)
SE-35MM
(CH :2910.00m)
SPEED-160KMPH SPEED-160KMPH TRL = 90.000 m
PRO.TRACK STRUCTURE:
RL:126.679
RL:126.016
RL:133.679
RL:133.679
CH:472620
(CH :1670.00m)
CL = 135.755 m
CH:473690
SE = 75 mm
CH:473450
RL:126.979
CH:471380
SPEED-160KMPH
CH:472780
SPEED-160KMPH TCL = 225.755m
(FIRST PORTION)
3rd LINE
TRL = 90.000 m
KILOMETRE
CH:471800
3d LINE
SPEED = 155 KMPH
F 110
3rd LINE
RL:126.016
3rd LINE
F 146 PSR(KmPH)
F 300 R 118 SE = 100 mm TCL = 225.755m
SL. NO. EXG. /PRO. REMARKS CAO. Drg. No.
3rd LINE
F 146 LEVEL
F 300
R 118 SPEED = 160 KMPH
FROM-TO CAO/C/TR/YARDS/SC/PPY/ 104 - 2024
3rd LINE
SE = 100 mm
(CH :3220.00m)
(CH :4400.00m)
LEVEL F 163
& UP LINE
RL:134.000
RL:141.516
(CH :2240.00m)
3rd LINE
(CH :1786.64m)
CH:467923.36
CH:465308.70
RL:133.425
CH:466490
3rd LINE
3rd LINE
CH:468405.75