0% found this document useful (0 votes)
9 views1 page

Papatapalli Cste-C P61

Uploaded by

naveen kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views1 page

Papatapalli Cste-C P61

Uploaded by

naveen kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LEVEL F 2

9 SPECIAL NOTE: SIGNATURE BLOCK


1 NOTE:

CH:470019.8
F 830
260

RL:133.217
CH :309.8m
F 830 1. IN CASE OF NEW OHE MAST/SIGNAL POSTS ARE REQUIRED TO BE PROVIDED IN BETWEEN

DN MAINLINE &
R

(1st PORTION)
LEVEL 1. PROPOSALS ARE SHOWN IN RED CE/PND/SC

DN MAINLINE &

DN LONGER
TRACKS, THE CENTRE TO CENTRE DISTANCE BETWEEN THE TRACKS SHALL NOT BE LESS

CH :382.35m
CH:469327.65

(1st PORTION)
RL:133.737

DN MAINLINE &

LOOP LINE
CH:469759.25
2. EXISTING WORKS SHOWN IN BLACK

RL:133.217

(1st PORTION)
CH :49.25m
DN LONGER
THAN 5.30M PLUS WIDTH OF SUCH STRUCTURE/FOUNDATION AS THE CASE MAY BE TO

LOOP LINE

DN LONGER
0 F 830 3. DISMANTLING WORKS SHOWN IN YELLOW.
R 26

LOOP LINE
DYCE/PND/SC

PRO. STATION BUILDING WITH RBG ROOMS AT CH:469693.50m


R 260 COMPLY IRSOD-2022 .

CH :317.78m
CH:469392.22

UP MAINLINE &

(2nd PORTION)
RL:133.470
0 4. EXG. RAILWAY BOUNDARY SHOWN IN BLACK.
R 20

'A'-CLASS MANNED PRO. TO BE EXTENDED, CH :355.00m


2. GM/SCR SANCTION SHALL BE OBTAINED FOR ALL THE INFRINGEMENTS OF IRSOD 2022

UP LONGER

EXG. LC.NO.95 , AT CH:470065.00, KM:470/2-4,TVU-46724,


CH:468816.60
CH :893.40m
5. THIS DRAWING IS PREPARED BASED ON EXG. SITE SURVEY DETAILS

LOOP LINE
RL:131.771
F 830 CURVE NO:10D(RHS) PRIOR TO THE COMMENCEMENT OF EXECUTION OF PROPOSED WORKS. SSE-YARDS

DN LINE
LEVEL LEVEL F 29 R=3500M(0.5) 6. THE EXISTING GRADES,C.L OF STATION BUILDING,BRIDGES ARE MARKED AS PER SITE SURVEY
1

CH:470019.8
3. NO SIGNAL POST/OHE MAST SHALL BE PROVIDED BETWEEN THE PROPOSED TRACKS

RL:133.217
UP MAINLINE &
Δ=0°19'38.66''

(2nd PORTION)
CL OF PAPATAPALLI STN

CH :309.8m

UP MAINLINE &

(2nd PORTION)
DETAILS.

RL:133.217
CH :108.0m
CURVE NO:9D(LHS)

CH:469602
TL=10.00M BUILDING AT KM.469.71 CTPM

UP LONGER
OTHER THAN APPROVED WORKS IN THE ESP.

UP LONGER
LOOP LINE
R=3500M(0.5) F 291 CH:0.00 7. ALL ESSENTIAL PASSENGER AMENITIES ARE TO BE PROVIDED AS PER RAILWAY BOARD

LOOP LINE
CL=20.04M CL OF EXG.LC.NO.95 AT
Δ=0°9'49.33'' F 10 4. AFTER EXECUTION OF THE PROPOSED WORKS, COMPLETION PLAN IS TO BE PREPARED
TRL=80M 7 CH:470065.044 M (KM: 470/2-4),CLASS- A
INSTRUCTIONS.

CH :588.00m
RL:132.261
PRO.TO BE EXTENDED

CH:470298
TL=5.0M RAILWAY BOUNDARY

DN MAINLINE &
SE=40MM CEE-C-SC

(2nd PORTION)
SUPERSEDING EARLIER APPROVED ESPS.

EXTD. AS 1X1.50X1.79M., RCC SLAB (CH :393.1m)


CL OF STN. BUILDING

CL OF FOB AT CH:469742.00m(CH :32.00m)


CL=10.02M AT CH:469693.50m 8. EXTRA CLEARANCES DUE TO CURVES TO BE ENSURED.

DN LONGER
EXG. BR.NO.644 SPAN 1X1.22M. RCC SLAB, AT

TS & FM AT CH:469766.00m (CH :56.00m)


(CH:16.50m)

FM AT CH:469889.50m (ROAD - 3 & 4)


5. EXTRA CLEARANCES BETWEEN TRACKS ON CURVES AND BETWEEN PLATFORMS AND

LOOP LINE
TRL=80M CL OF EXG.BR.NO.644 AT
CL OF FOB AT 9. CHAINAGES ARE RECKONED FROM C L OF WARDHA STATION BUILDING CH: 0.00m
CH:469418.193 M

TP1 AT CH:470120.45M (CH:410.45m)


CH:469742.00m

SRJ AT CH:469821.45m (CH : 111.45m)


SE=40MM

TS AT CH:469881.70m (CH :171.70m)

TP2 AT CH:470150.45M (CH:440.45m)


ADJACENT TRACKS TO BE PROVIDED AS PER IRSOD (469/14-15),SPAN: 1 X 1.22 M CSTE/C

SRJ AT CH:470121.3M(CH:411.30m)
(CH:32.00m)
STATION BUILDING
10. (A) PRO. THIRD MAIN LINE IS TO BE PROVIDED WITH PSC SLEEPERS OF 1660NOS. PER KM.

SH AT CH:470119.90M (CH:409.9m)
TS/FM AT CH:469315.80m (CH :394.20m)
RCC SLAB

TP 2 AT CH:469447.68(UP) (CH :262.32m)


PRO.TO BE EXTENTED WITH ROAD PRO. ROAD
KZJ Jn.
PROPOSED POINTS AND CROSSINGS ARE TO BE PROVIDED WITH PSC SLEEPERS

TP1 AT CH:469355.0(DN) (CH :355.0m)


SPAN: 1 X 1.50X1.79 RCC BOX

PF END CH:469825.30 M (CH:115.30m)

PF END CH:470000.00 M (CH:290.00m)


DN LOOP LINE CAL - 724.85M(FM TO FM)

SRJ AT CH:469966.70m (CH : 265.70m)


TP2 AT CH:469395.0(DN) (CH :315.0m)
HL PLATFORM 100.0m X10.8 m LONG

SRJ/FM AT CH:469173.25m (CH :536.75m)

FM AT CH:469302.80m (CH :407.20m)

PF END CH:469410.90m(CH:299.10m)
PRO. AS DN LONGER LOOP LINE (FIRST PORTION) ROAD-1

TP2 AT CH:469314.5(DN) (CH :395.50m)


CL OF PAPATAPALLI STATION

SRJ/FM AT CH :469170.0m(ROAD-5&6)

PF END CH:469350.00m(CH:360.00m)
m
CAL - 811.70M (TS TO FM) -120
BHARTESH KUMAR JAIN Digitally signed by BHARTESH KUMAR

TP2 AT CH:470030.72M (CH:320.72m)


OSL

TP1 AT CH:470020.70M(CH:310.70m)
FM AT CH:469254.00m (CH :456.00m)
18A
(B) PSC SLEEPERS ARE TO BE PROVIDED

TS AT CH:469263.65m (CH :446.35m)


TO BZA END
F 16 DRM-SC

SRJ AT CH:469186.65m (CH :525.35m)


12 PRO. DN LONGER
(KM:469.710) Ch: 469710.000m 23.20m HL PLATFORM 650.0m X 19.66 m LONG

FM AT CH:469188.3m (ROAD - 3 & 4)


13A 12 LOOP LINE (SEC
3 F 291 12

SRJ AT CH:469222.85m (CH :487.15m)


OND PORTION)
HL PLATFORM 413.85m X 19.66 m LONG 18B
JAIN Date:2024.05.10 17:55:36 +05'30'

TP1 AT CH:470524.70(DN) (CH :814.70m)


SRJ AT CH:469210.08m (CH :499.92m)
12 12 CAL=975.00m (FM

TP 1 AT CH:470490.60(UP) (CH :780.60m)


13B ROAD-2
CH:0.00 11A DN MAIN LINE CAL - 724.85M (FM TO FM) PRO. CAL - 824.7M (FM TO FM)
(I) MAIN LINE BETWEEN HOME TO HOME SIGNAL POST .

CH :838.00m
R 260 F 107 12
TO FM)
C-1.5°
12
OSL
7.58 m

(CH :588.00m)
00

SRJ & FM AT CH :470177.36m (ROAD-3&4) (CH:467.36m)


TP2 AT CH:469092.0(DN) (CH :618.0m)
4.72 m C-1.5° DN -1

FM AT CH:469089.30m (CH :620.70m)


E C-1.4° LINE 20m
R1 LIN

RL:132.261
12 12B ROAD-3
0 DN UP MAIN LINE CAL- 635.5M (FM TO FM) PRO. CAL-1004.11M (FM TO FM) 19B
(II) ON MAIN LINE BEYOND 400M FROM TOP POINT ON EITHER END.
LEVEL R 10

UP MAINLINE &
CH:470298
12 12 12

(1st PORTION)
11B

SRJ AT CH:469079.78m (CH :630.22m)


12 UP LOOP LINE CAL - 577.7M(FM TO FM)
SURESH REDDY AWTALA Digitally signed by SURESH REDDY

RL:131.342

SH AT CH:469068.25m (CH :641.75m)


C-1.4° 4.72 m

CH :871.0m
12A 12 PRO

CH:469316.9, KM:469/14-15
C-1.5°

(ROAD - 1 & 2)(CH:330.65m)


14B PRO. AS UP LONGER LOOP LINE (SECOND PORTION) CAL 984.75M (FM TO FM) . UP LONGER LOO

CH:468839
E ROAD-4 12
SRDOM-SC

UP LONGER
LIN UP L
m P LINE(FIRST POR
(III) ON LOOP LINES TO SUIT PROVISION OF TRACK CIRCUIT.

SRJ AT CH :470182.50m (ROAD-1) (CH:472.50m)


UP 8.5 8.5 16KL -120 12 TION) INE

UP LINE
OSL

LOOP LINE
8.5
13.36m 14.20 HL PLATFORM 650.0 X 10.84 m LONG GOODS LOOP LINE
CAL=937.50m (FM
TO FM)
AWTALA Date:2024.04.13 12:41:55 +05'30'

RL:130.152

(CH :16.50m)

(CH : 179.50m)
CH :990.0m
HL PLATFORM 414.2 X 10 m LONG 14A 8.5 ROAD-5 BS 12 12

CH:468720
OSL-120m STABLING LINE OSL-120m OSL-1

TP1 AT CH:469017.68(UP) CH :692.32m


14A
11. DURING THE EXECUTION OF WORK SAFETY BARRICADING IS TO BE PROVIDED ALONG THE

SRJ AT CH:470014.90M

FM AT CH:470040.65M
20m

SRJ AT CH:469013.22m (CH :696.78m)

TP1 CH:470443.88m(CH:733.88m)
6.00m PRO. BI-DIRECTIONAL LOOP LINE CAL-925.0M (FM TO FM)

FM AT CH :470158.00m (ROAD-4) (CH:448.00m)


UP LINE
12 12 12 ROAD-6 12 12

1IN 12
C-0.875° C-1.5°
E 12 5.75m PRO. BI-DIRECTIONAL 3RD LINE CAL-925.0M (FM TO FM) 12

1IN 12

ROAD - 4 & 5
LIN 12 ROAD-7 12 PRO
3RD
CURVE NO:11 DN(RHS) NA
L PRO. GOODS BD LOOP LINE CAL-969.0M (FM TO FM) 3
BI-D RD LIN EXISTING TRACK AS PER ENGINEERING ORDER No.23 CIRCULATED VIDE Lr. NO.W/T-5/Vol.XI of PRIYA AGRAWAL Digitally signed by PRIYA AGRAWAL

e
PRO

ROAD NOS. 1& 2


OSL-120m OSL-120m

TP1 AT CH:468872.0(DN)
TIO IRE E

illag
EC ROAD BS
SRDSTE-SC

SRJ & FM AT CH :470230.50m(ROAD-1&2)

SRJ & FM AT CH :470268.00m(ROAD-3&4)


BS RL GOODS PLATFORM 750.0 X 11.64m LONG C
D IR PRO. ROAD TIO
R=1167M(1.5°) BI- PRO. TM SIDING CAL-324M (TS TO BS) NAL
16.10.2006 AND THE SAME WILL BE REMOVED AFTER COMPLETION OF WORK. Date:2023.10.25 06:27:44 +05'30'

SRJ AT CH :470213.00m (CH:503.00m)


UP DN
MALLEMADUGU(475100.0)

li V
ROAD
Δ=13°14'46.5'' TS

ROAD - 2 & 3

(CH :540.0m)
1 IN 12
INT. STATION DIST. :5.39KM
12. LAND BOUNDARIES INDICATED IN THE DRAWING MAY NOT REFLECT THE ACTUAL RAILWAY

(CH :521.70m)

(CH:304.90m)

a
TL=135.504M DORNAKAL(461.320 KM)

tap
MOTUMARI Jn.(522.720)
INT. STATION DIST. :8.390KM
BOUNDARY AND FOR RECKONING ACTUAL RAILWAY LAND, THE CERTIFIED LAND PLANS AS KADAGALA SRINIVAS Digitally signed by KADAGALA SRINIVAS

TP1 CH:470471.73m(CH:761.73m)
1 IN 8.5 SS
CL=269.80M INT. STATION DIST. :53.01KM
SRDME-CORD-SC

apa
RAILWAY BOUNDARY
TRL=130M AVAILABLE IN HQ (OR) DIVISION OFFICE ONLY ARE THE FINAL AUTHORITY. THE LAND BOUNDARY Date:2023.10.26 03:22:13 +05'30'
Railway Boundary

P
SE=120MM SHOWN IN THE PLAN CANNOT BE AUTHORITY FOR THE PURPOSE.

To
Railway Boundary

SRJ & FM AT CH :470127.50m


PRASADARAO MATTAPARTHI Digitally signed by PRASADARAO
(RHS
) Damage Quarters SRDEE/M/SC

BS AT CH :470302.50m
CURVE NO:8 DN (RHS)

TP 2 AT CH:470794.50(DN) (CH :1084.50m)


CURVE NO:221UP(RHS)

(ROAD-1&2)(CH:417.50M)
O :7 DN 17.90 MATTAPARTHI Date:2023.11.07 04:52:19 +05'30'

TP2 AT CH:470824.81(UP) (CH :1114.81m)


E N Limit R=1167M(1.5°) R=1167M(1.50°)
CURV M(1.5) Boundary Quarters
67 Δ=1°57'50'' PRO. STATION BUILDING Δ=16°24'30.8''
R=11 8'4.5'' TL=20.003m WITH RBG ROOMS F 107 SYED WASEEM PASHA Digitally signed by SYED WASEEM
4 TL=168.257M
Δ=10° 0.327 R 3440 SRDEE/TRD/SC

(CH:520.50m)

(CH:558.00m)

(CH:592.50m)
1 CL=40.0M PRO. ROAD CL=334.21M
TL=1 0.00 DN LONGER LOOP LINE (FIRST PORTION) CAL - 811.70M(TS TO FM) PASHA Date:2023.11.01 03:59:44 +05'30'

CH:470940

RL:126.261
(CH :1230.00m)

DN MAINLINE &

(2nd PORTION)
2 TRL=90M H.L PASSENGER PLATFORM 100.00x10.80M 6.83 TRL=130M
CL=2 0M DN LOOP LINE CAL - 724.85M(FM TO FM)

0m

DN LONGER
= 8 SE=100MM ROAD-1 SE=120MM

LOOP LINE
T RL
D S RAMA RAO Digitally signed by D S RAMA RAO

98.0
00MM 6.83
SE=1 H.L PASSENGER PLATFORM 650.0x19.66M 36,5 SRDEN-CORD-SC
Date:2024.04.25 04:34:44 +05'30'

5.75
688

23.02
M-469/15 H.L PASSENGER PLATFORM 414.40x19.66M E=120m
OVERSHOOT LIN

4
M-469/22 M-469/24 M-469/28 1 IN 12
P-470/04 1 IN 12

:
M-469/18 M-469/20 M-469/32 M-470/02 M-470/12 M-470/16 M-470/18 M-470/20 PRO. DN
DINAKAR PRANEETH KORRAPATI Digitally signed by DINAKAR

H
M-469/14 LONGER
STATION BUILDING
M-469/26 M-469/34 cabin 1 IN 12 P-470/10 1 IN 12 F+M M-470/22

TC
DN MAIN LINE CAL - 724.85M (FM TO FM) PRO. CAL - 824.7M (FM TO FM) M-469/36 M-470/06
F+M M-470/24 LOOP LIN SRDEN/SOUTH/SC
ROAD-2 F+M
M-470/08 E (SECO PRANEETH KORRAPATI Date:2024.04.23 12:01:19 +05'30'

TP2 CH:470892.852m(CH:1182.852m)
M-470/26 ND PORT F 107

YAWHTAP .ORP
IT A
4.72

LIM )
F+M UP MAIN LINE CAL- 635.5M (FM TO FM) PRO. CAL-1004.11M (FM TO FM) ROAD-3 4.72 7.58 M-470/28 ION) CAL

YAR 12.00m
F+M =97 5.00m(FM Railw F 735
ay B
M-469/12 UP LOOP LINE CAL - 577.7M(FM TO FM) UP LONGER LOOP LINE (SECOND PORTION) CAL 984.75M (FM TO FM) 4.72 F+M
ROAD-4 1 IN 12
M-470/01 1 IN 12 TO FM)

UP MAINLINE &
1 IN 12 F+M 7,87 ound
1 IN 12

(CH :1230.00m)
RL:126.261
M-470/07 M-47 SUDHIR KUMAR SHARMA Digitally signed by SUDHIR KUMAR

(1st PORTION)
M-470/05 F+M
P-470/09 M-470/15 M-470/17

CH:470940
M-470/13 M-470/19 ary
M-469/10 M-469/17 M-469/19 M-469/21 M-469/23 5.33 1 IN 8.5 M-469/33 M-469/35 F+M M-470/21 0/30 CE-C-IV-SC

UP LONGER
M-469/15 M-469/25 F+M M-469/29 M-469/31 1 IN 12

:8
F+M 0m M-470/23 SHARMA Date:2024.05.16 11:01:35 +05'30'

D
=12

LOOP LINE
H.L PASSENGER PLATFORM 414.20x10.00M 13.36 10.00 LINE

8m)
14.20 P-470/03 OVERSHOOT

(CH
M-469/06 1 IN 12 EXG. GOODS SIDING CAL- 455.85M(TS TO SRJ) H.L PASSENGER PLATFORM 650.0x10.84M POINTS MAN ROOM M-469/27 M-470/25
PRO. UP M-470/3

62.3
2

M-470/34
TS PRO. BIDIRECTIONAL LOOP LINE CAL-925.0M(FM TO FM) ROAD-5 1 IN 8.5
4.43 OVERSHOOT LINE=120m LONGER
TS EXG.STABLING LINE CSR-266.044M 36.70 LOO M-470/27 NAVYA SREE VARRI Digitally signed by NAVYA SREE VARRI
M-469/0
4 M-469/13 1 IN 12 P LINE(F

: 13
PRO. BIDIRECTIONAL 3rd LINE CAL-925.0M (FM TO FM) ROAD-6 6.00 F+M 1 IN 12 IRST PO DYCE/C/Plg/SC
F+M M-469/11 RTIO M-47
20,09 /02 F+M1 IN 12 1 IN 12 N) CAL= 0/29 Date:2024.05.17 11:27:43 +05'30'

(CH
5
PRO. GOODS LOOP LINE CAL-969.0M (TS TO FM) 5.75
M-469 937.50m
F+M 1 IN 8. 9 ROAD-7
M-469/0

/36
(FM TO

, AT
FM)

M-470

AB ,
PRO. OVER SHOOT - 120 m (SRJ TO BS)

M-470/33
69M M-470/3
RR-361.5 BS Canugovi Ramesh Digitally signed by Canugovi Ramesh
TO BS)
S
8.5 S
1
m (SRJ 1 IN 12 SSE/DRG/CE-IV/SC

AB
F+M

C SL
/36 ROAD
M-468 SHOO T - 120 Date:2024.05.15 01:57:35 +05'30'
9/07 GATE LODGE
F+M
ary 9/05

C SL
TRACK MACHINE SIDING CAL-324m (TS TO BS)
und M-46 M-46 PRO. OVER ROAD

., PS
5
y Bo 1 IN 12

M-470/3
a F+M

/38
Railw -566.34M RATNAKAR GADDAM Digitally signed by RATNAKAR GADDAM

. RC
3 2 RR 24.60

0
4 M-469/0 1 IN 1 DYCSTE-C-GNT@BZA

.1 M
68/3

M-47
M-4 UMP TS PRO. ROAD Date:2023.03.17 09:47:04 +05'30'

.1 M
ND H

5,75
ROAD

1X6
SA SRINIVASA VARA PRASAD RAO SUGGUNA Digitally signed by
1 IN 12
F+M 1 IN 12 PRO. ROAD

1X6
9/01 Railway Boundary

PF END CH:469654.61m(CH:37.01m)
Railway Boundary
M-46

ma
PRO. RL PATHWAY OF 1.50m WIDE Dy.CEE/C/OHE/SC SRINIVASA VARA PRASAD RAO SUGGUNA

SRJ AT CH :469840.68m
(CH:130.68m)

0/37
LEVEL F 40

PAN
2

AT
68/3
4M
RR-566.3 1 IN 12 0 Rai

SRJ AT CH:469700.50m (CH :9.50m)


M-4

am
lwa

M-47
CH:470019.8

RL:133.217

SRJ AT CH :470201m (CH:491m)


HYDRAULIC BS AT CH :470093m (CH:383m)

BS AT CH :470215m (CH:505m)

TEN :471/1- PAN


32,08

PF END AT CH :469385.00m(CH: 325.0m)


Date:2023.03.15 05:15:58 +05'30'

TP2 AT CH : 469296.912m (CH :413.088m)


CURVE NO:221(RHS) yB

CH :309.8m

3rd LINE, BD LOOP


LINE & GOODS BD

0/40
SRJ AT CH :470153m (CH:443m)

AB ,
SRJ AT CH :470256m (CH:546m)

BS AT CH :470273m (CH:563m)
oun

HS
16,4

PF END CH:469240.42m (CH:469.58m)

Kh
DN LONGER LOOP CURVE NO:221(RHS) dar

PSC
AMIT AGARWAL Digitally signed by AMIT AGARWAL

M-47
S) CURVE NO:221(RHS) y

5S
69M
J TO B

C SL
WIT
To
RR-361.5

TP2 AT CH : 469432.443m (CH :277.557m)


DYCE/C-III/SC

DED 3
F 400

TP1 CH:470472.45m(CH:762.45m)
SRJ & FM AT CH :470095m(CH:385m)
m (SR R=1167M(1.5°) UP LONGER LOOP

(CH :202.00m)
2 Date:2023.03.17 05:58:12 +05'30'
1 IN 1

O B 2.38, K .NO-64
0 R=1166.67M(1.5°)
T - 12 F 107

5M
8/35 SHOO R=1167M(1.5°)

LOOP LINE
Δ=20°40'53.70''

. RC
(CH :596.00m)
TP1 AT CH : 469131.438m (CH :578.562m)
R
M-46 Δ=19°42'0.38''

TS AT CH : 469184.00m (CH :526.00m)


E

3rd LINE ( BD LINE)


/30 V THAKKELLAPATI SURYANARAYANA Digitally signed by

X3.0
O

RL:132.502
O. Δ=20°27'1''

CH:470306
68 PR Railway Boundary TL=212.877M
M-4

0/39

M
R 426 LEVEL

.0 M
TL=202.568M

R
CL=421.122M TL=210.506M AXEN-C-III-KZJ THAKKELLAPATI SURYANARAYANA

PRO H:4710 XG. B


CH :108.188m

M-47

N 6
3rd LINE, BD LOOP
LINE & GOODS BD
CL=401.137M

CH:469601.812

0/42
RL:133.217

6X3
TRL=20M CL=416.532M Date:2023.03.14 02:05:54 +05'30'

E EX
FM AT CH :469170.0m (ROAD-7)

SPA

)
8

M-47
68/2 TRL=80M

m
3 TRL=20M
68/3

C OF E
SE-20MM

7
M-4

BS AT CH :469050.0m (CH :660.0m)

SRJ AT CH :469064.0m (CH :646.0m)

5.50
M-4

SRJ/FM AT CH :469051.0m(ROAD-6&7)

PF END AT CH :470035.00m (CH:325.00m)


PF END AT CH :470022.00m (CH :312.0m)

PAN
36.02 SE-20MM SE-110MM MARREY SRINIVAS Digitally signed by MARREY SRINIVAS

ITH
LOOP LINE

TP2 AT CH :470860.412 m (CH :1150.412m)


LOOP LINE SSE/C-III/DRG/SC

BS AT CH : 469508.00m
SPEED-130KMPH

149
C.L
0/41
Date:2023.03.14 10:38:34 +05'30'

P. T

SLA P. TO B 5, KM:4 -645A S


E CURVE NO:3UP(RHS)

64m DED W
LIN CURVE:3(RH)

TP2 AT CH :470873.587 m (CH :1163.587m)


DN

M-47
1
68/3

H : 1 EXTEN 1/4-6

CH:
R=1167M(1.5°)

.00m
M-4

1/02
Δ = 14°21'55"

BS CH:470032.044m(CH:322.044m)
Δ=21°6'41.5''

0m(
M-47

7
PRO471163. . BR.NO

)
TL=217.466 R = 2000m (0.875°) F 400

YARD LIMIT AT CH :470306


m)

05.5
CL=430.00 F 400

(CH :762.0

CH:470215.00
m)
TL = 252.044m

BD LOOP LINE
(CH :505.00m)
(CH :540.0m)

453.
RL: 132.729
TRL=80M

CH:470273.00
(CH :779.0

712
16.90

(CH :563.00m)
CL = 501.443 m

/01

CH: F EXG

E
6
R 426

RL: 132.584
SE=100MM

1
R 400

GOODS BD LOOP

M-47

H :4
TRL = 20m 12.00 5.75

m)
9

CH:469392.22

3rd LINE, BD LOOP


68/2
E

1/04

B ,(C
LIN

RL:132.725

O
M-4

(CH :659.0m)

CH :317.78m

TC
UP

LINE, GOODS BD

8.50
LOOP LINE & TM
.86)
6.25

M-47
(CH: 596.00m)
:468948.0m
:469

C.L

MA
KM 98.05M

m)
R 426
6

159
:468931.0m
6

12

5.50
6
M:361.320)

CH :202.000m
INE )
CH: TO

&F
DL

TM SIDING
RL: 133.022
CH:469508.000

CH:
L

1/03
.3R TIONA
K BZA

LINE
O
(

:161
PR REC

SIDING

SRJ
M-47
KZJAL Jn. @ (
TM SIDING:

0m(
D I F 163 R 400 3rd Line CURVE-3(RH)

/06
I -
4 (B
(KM

(CH
1
Δ = 5°25'3.69" MO

M-47
C
Δ = 20°39'56.62"

08.5
TODORNAK

m
TUM
:586
(BD LINE)

BS AT CH

T
) R 400

8.50
RL:131.342

.320 F 10
CH:468839

3rd LINE

R = 2000m (0.875°) R = 1750m (1.00°) ARI

.50m
A
7 F7
.50)

713
461 9 Kms Jn.
CH :871.0m

BI DIRECTIONAL
84

CH:469050.000
@(

J
F+M

1/05
m

135
TL = 364.647 m TL = 82.799m 1 IN PRO. MAL

SR
K 3

RL: 131.869
( 8. 522

H :4
KAL CE :

325
L
INT EMAD .

M-47
720

(CH :1230.00m)
12 OV
RNA ISTAN

CH:470940

RL:126.577
CH :660.0m
CL = 165.474 m

m) CH :47
CL = 721.370 m E RS ERD )
U

LOOP LINE
O ISTA GU (K

:471
C
INFRINGEMENT TABLE HO

3rd LINE
D ER D NON-TRANSITION OT
TRL = 80.000 m

/08
R 400

AT
INT - 12 NCE m 47

1
0m : 5.3 5.10

M-47

CH
LINE & TM SIDING
GOODS BD LOOP
TCL = 801.370 m PRSCRIBEDmAXIMUM AND EXISTING (SR

T
PARTICULAR OF SANCTION 9 Km 0)

SRJ
LOCATION
CH:468931.0
AMOUNT OF J TO

:164 IT A
RL: 131.572
NAME OF STRUCTURE MINIMUM DIMENSIONS ACTUAL F+M s

AT
SE = 75 mm SL.NO INFRINGEMENT TO INFRINGEMENT& 1 IN BS)
CH :779.0m

8.50
DIVISION AND KILOMETER/ WHERE INFRINGING 12

1/07
DIMENSION

(CH D LIM
SPEED = 155 KMPH MAXIMUM & REMARKS

BS
SECTION CHAPTER/ITEM

M-47
CHAINAGE MINIMUM 1 IN
12

YAR
R 1 IN 260 PRO

1/10
1 CH:468963.22 TO 469327.65 DN LONGER LOOP LINE (FIRST PORTION) & 0.135% . OV
(0.385% )

M-47
)
DN MAIN LINE ER

.50m
AS PER ACS NO.2 DT: SHO
STEEPER THAN OT
- 12
CH:468963.22 TO 469392.22 UP MAIN LINE & 27.02.2023 OF NOTE (d) R 1 IN 260

:1495
2 1 IN 400 0.135% 0m

1/09
(SR 1 IN
SECUNDERABAD DIVISION UP LONGER LOOP LINE (SECOND PORTION) (i) OF PARA-2 OF (0.385% ) GM/SCR CONDONATION 12

M-47
(0.25%) AND J TO
KZJ - KI SECTION CHAPTER-II OF TO BE OBTAINED BS)

(CH
PAPATAPALLI STATION DN LONGER LOOP LINE (FIRST PORTION), SCHEDULE-I OF IRSOD
UP TO 1 IN 100 F 1 IN 291 0.094%

2
(1.00%)

.50m
3 CH:470019.80 TO 470298.00 DN MAIN LINE, UP MAIN LINE & (0.344% )

71/1
YARD (BG) REVISED - 2022
UP LONGER LOOP LINE (SECOND PORTION)

M-4
1205
B
B

BO AB
DN LONGER LOOP LINE (SECOND PORTION),

A
F 1 IN 107
A

0.685%

SL
CH:470298.00 TO 470940.00
T

4
SL

CC SL

H :47

/11
.,

X
A

DN MAIN LINE, UP MAIN LINE & (0.935% )


M

C
B,

71
B,

.R C

PS
6

PS
A

M-4
M , PS
A

84

UP LONGER LOOP LINE (FIRST PORTION)

CC
TE
CC
SL

m)
SL

.,

CC

)
1.

AT C
,

4
M
.

m
3. M.

.R
CC

)
M

71/1
5X

3m
.R
CC
CC

5.50
.R
-1 PL
5

8.50
M
5

CH .N WI -27 X3 3.05
7 R

15
0
2.

X
M

M-4
0
.R

m 35 S 5 M
.R

/5 M
3

6.
X

BO
18 ) TH 6-2 M.

3.

13 .2
7
6m
)

IR F 9 T M A S 25 0

1X 7m
m

6
1

3 14 H -1 .2

& FM
0
2X
M

2- 4
)

:161
G L O .7 X , K 41 TH 24- 3.7

98 1m)
)

6
68 3
DN

9
W :467 X3 6m)
m

) 61
8m

/1 3X
H . TO 78 BR ED M N 1 .19 )
84
59 N

)
10 9m W 5/ .44

:1
) 15
X

84 : IT 14 4
)
ED 7/2 AN 1

CC

)
.
A
,(C OP :46 G. ) ND 7, K PA 007 38m
N

:15
8
5

m
91

60 N
05

)
. LIN

2. H W 8/ 3X
m
PA

I / X

8m
N

7m P 7.
)

(GRADE STEEPER THAN 1 IN 1200 AND UPTO 400)

m
CH
)

3m M 1
W 19 3.0
.5

PA

30

18 68 A )
N

68 X

7
N
81

m
3m

.2 PA
66 .81 ED :46 X2

27
K 3X S E
,R
A
0.

.7

SP 6m

43

.9
)
3

34

)
)

35 ,(C D 46 1X
5
A

00

:4 1
D E 4m EN : S PA

24
43
H HS

(CH
m
1
8-

(
1

.8 15

(CH
m
9.

- X
2

SP
1X

.9
6

H ER
S

13

(C 025
4
1

,
4.
SP

PR C E 3m T .6 1 S : 2 8.

3m 5.

M N

7.
8.

65
m
51

3
62 :
/2

7, N

.0
60

ED 8 2

SRJ
5
.2

: T
2

H
4

91 D KM N

71/1
N
.0 I
T F .32 EX 56 64 H 00

K PA
:

23
IT 4.5
,(C IT

1.

73

7.
3 3
TH

EXISTING
84 A

W IRD
66

96
7
D /1 N

PRSCRIBEDmAXIMUM AND
N

7 H

:1
:3

H
:

CH : 3 TEN 1, PA

PARTICULAR OF SANCTION

N , K PA
5

:9
.4 5 3
32

39
ER X ) D 46 P

LOCATION
42
:

H
, A .L O53BE 677 O- ,(C : 2

:2 AMOUNT OF
3. SP
) EN 466 PA

:1
X W

NAME OF
., TE -2 A

,(C
6

:2 :2

44 A S
IT

:4

:1
:2

.50m
5X W 151

M-4
H

30

H
H

,(C

m
73
H
:
m X /1 P

:2

ED P.G
A (CH EX 7.1 39 S

:2

TE .74 3 S
MINIMUM DIMENSIONS
M

H
M
5. ACTUAL
,(C

3,
BO D

,(C
,(C

6m T M: S

H
04 2
7 E 65 8 S

8 CH H H TO INFRINGEMENT&

:4
CH D

.50
STRUCTURE

5. 42

,(C
INFRINGEMENT UP
68 64

:
H

57
m
H
K

C :1 O : R. 4m C

:2
C DE

(C
32 X K 40

,(C

T
D

CH
, (C

EX 74 64
1X E
5m

,( LIN
m

m
,

3m
DIVISION AND
(C

KILOMETER/
H . T CH . B .80 m ,(

,
,(C

A
N OM
, E 79 -6
64 E :4 3

0.
19 -6
D CH
:4 O-

.
m,
T 7,

84 DIMENSION
8

0M
m

m
2. E E 4, -6

MAXIMUM &

D
1. B M -6

325
-
2
RC N

REMARKS

55
E 7

WHERE INFRINGE
C. 89 BE .20 O-

CH

308
B,
B 65 O

TE ,C

29
BE 68 O
,

T
68 O
m

)
IS .56
29

EN ,(

)
4
m

8. m
7m

7m

07

00

m
.3
19 B 67 O

CHAPTER/ITEM
,(C P T G 02 62

A
0X TO , K O

m
52 93

,A

T
73
TO :4 .N

.2
SECTION

A
CHAINAGE
N
4 N

(
12 .N
82

28 90

0
A

33
5
: 3 O 7. .N

A
3.

41

73
2
2. P. 16 R.N

0.

B MINIMUM

E,
8

4.
X
T BR

1
SL
EX 79

T
75

75

.6 9

4.
.

:4
.

11
P

O AT G AB
)

TC
4.
R

TO H: R
PR , E 467 01.

0X
R
6

:471
.1

67 1.8
19

PR

6
2
E M A

B,
CH PIP
5
51

471
75
H . T 51 BR

,S EX
81

CH
8
7m
8.

47

.
P. CH B

P. C . B
N 68

(BI- O.3RD
CH B

0.
57
47

37

99
SL

S
7

.F

A
6
BE 18.

5
1X O 6.4 . B

77
66

, A G.
: 4 713

38

PR , EX SL

IR
68

68

69

84
0A 98
46

.
68
O T G.

68

4.

SL
T G.
IO 46

39
69

4
66 67

E
DIR
4
E

T
M
R 1 IN 400
.

ECT LINE
BO .L O CH: 46

PRO. BI-DIRECTIONAL LOOP LINE, 0.


67

1X
:4

,(CRO :46 G

:3
:4

M
:

1X
PR 511 XG

:4

:4

:4
4

,A
:

0.167%

H:
PR A X

:
B

:4
46

CH 46

:4
:4 :4

.
, A EX
:

91
IS H:

C
TO 3X 1
X

H X

CC
-6 PS 22
P CH EX

CH

U
:4

CH
H
ION
B, E

BO .L O, PS CH:468898.00 TO 469392.22 PRO. BI-DIRECTIONAL 3RD LINE, PRO.

TC
CH

TO

0.
(0.250% )
H

CH

CH

CH

CH

.H
O TC

T :

,(C
N
:4
6 E

66
CH
O CH CH P. 53+ ., AL)
6

.R
A F

X F
CH

A H

CH

1X

TC
(
X F

A
2 C

X
F

,
T OF

.F
C T
:4 F

3.
SL L O

.N

M
BO .L O
2 C

SP
A

X
C M.

) SP

SL 4/0 M
BO
9
TP AT

M
A
T

O .
CH .L O

P
PR )A

1X
T T

AT
:1

,(C

X
1M
GOODS LOOP LINE

BO
T

TP AT

2
A

C 47 .1
BR PR X17 05

A
A A O

H
A

BO
L

M -8 76
A
P

5m H
A

JA
C.

V
B

05

PS 9- 6
X

1
2

1 1
PR 3.
C

CC

9
) T
SP
C.
2

89 IT
1

., 3/ 1X
TP

65 7 0.
U

C
TP
C

0.
TP TP
2

I
TP
TP

A
3.

0m W

C
TP

TP

TP

RC

B
1. W

1. 3/ X
TP

TP

TP

TP
(R

BS
X
X

TP

47
R

SP
A

RC

M 47 N

SR
R 1 IN 400

A
1X

X 47 1
1

1
65 D
07 D
0.167%

-6

A
5

20 : N
.,
N
4-

7. E
2

46

: 2 DE

4M

6. M SP
.,
O

1. KM PA
F 235 CH:469184.00 TO 469392.22

A
PRO. TM SIDING

68 ND
(0.250% ) /
480 00

.N
-6
71

SP
H N
LEVEL R 2 It is not feasible to provide the

1X , A
01
F 68 F 680

1X 3, S
R1

O
0 LEVEL

:
TO -2 BR

: 3 TE
F 110 :4

(C TE

S 987 49
S .63 649
0

2.
48
148
(CH :2640.00m)
RL:131.285

F 160 F 160

K
H X
CH:467070

. A 30. O.6
R.

X
B, X
RL:131.158

RL:131.158

P. 24 .

6
(CH :2320.00m)

F 235 recommended grade of 1 in 1200


DN LINE

O 3/ XG
(CH :1810.88m)

(CH :1016.00m)
RL:130.814

. A 09 O.
,(C E E
CH:467390

R K

50
DN LINE

DN LINE

A E

. A /5-6 O.
.B

5
(CH :4380.00m)

,
CH:467899.12

CH:468694.00

1
CH:465330

TD 39 .N
DN LINE

TD 737 R.N
(CH :3170.00m)
FL:141.103

SL BE
95

1.
TD 73 .N
PR :47 F E
RL:133.540

G
CH:466540

B
DN LINE

DN LINE

DN LONGER LOOP LINE (FIRST PORTION) &

EX :47 . BR
1X
due to continuous falling .8

R
EX
STEEPER THAN F 1 IN 830

C O

EX H:4 . B
K .L O

EXM:4 . B
CH:469327.65 TO 469759.25 0.037% 81 X

PS T

CH XG
DN MAIN LINE

C XG
3 17

K G
BO

., P.
O
(0.120% ) gradients. It requires a lifting of

C
SECUNDERABAD DIVISION 1 IN 1200

EX
M
7

M O

E
E
L
:4 C

PR
C.
KZJ - KI SECTION CHAPTER-II ITEM NO.2 OF approximately 0.200m to provide CH RC
IRSOD-2022 (0.083%) AND
PAPATAPALLI STATION UP MAIN LINE & UP TO 1 IN 400 F 1 IN 830 1 in 1200 grade in the yard which R 380 R 380 F 110
F 300 F CH:469392.22 TO 469602.00 0.037% R 175 R 205
R 205 F 110 F 1255 R 185

RL:133.21
700 F7 YARD

(CH :3070.00m)
UP LONGER LOOP LINE (SECOND PORTION) F 1255

RL:132.789

DN LINE
(0.120% ) 5

(CH :2910.00m)
4 0

DN LINE
0 causes disruption of the running

CH:472780
000 R 17
(CH :2240.00m)

(0.25%)

RL:126.847
344
RL:130.158

CH:472620

(CH :4290.00m)
(CH :3740.00m)
RL:127.119
RL:126.389

CH:473450
CH:467470

LEVEL

CH:474000
RL:128.789
(CH :1670.00m)

DN LINE

(CH :2090.00m)

DN LINE
UP LINE

DN LINE
CH:471800
CH:471380
(CH :1810.00m)
RL:130.152

traffic, dismantling of exg. points


CH:467900

UP LINE

DN LINE
F 110 F 15
PRO. BI-DIRECTIONAL LOOP LINE, R 1 IN 426 0.152% & crossings and exg platforms.
F 150 0 F3 LEVEL F 163 CH:469392.22 TO 469601.812 PRO. BI-DIRECTIONAL 3RD LINE & (0.235% )
00
118 LEVEL 5
(CH :4400.0m)

Curve No-6DN (LHS)


RL:141.292

(CH :3220.00m)
CH:466490

(CH:1304.25m)
UP LINE
CH:465310

CH:468405.75
RL:133.425

R PRO. GOODS BD LOOP LINE


RL:134.00

Δ=1°31'27.39''
(CH :1786.64m)
UP LINE

500
UP LINE

F 300 R 118 F 100


CH:467923.36

RL:134.00
UP LINE

F 73 LEVEL F 100
5 R1 R 107 LEVEL F 800
PRO. GP

F 80
PRO. GP

Radius:3500 (0.5°)
R 107 LEVEL
(CH :2240.00m)

R 1 IN 426 0

(CH :3740.00m)
(CH :3070.00m)
RL:133.591

RL:133.587
(CH :2910.00m)

RL:126.897
CH:473450
00

CH:472780
RL:130.158

RL:125.662
UP LINE
0.152%

UP LINE
CH:472620
TL:46.560m

UP LINE

(CH :3930.00m)
(CH :1670.00m)

RL:126.597
CH:469392.22 TO 469508.00 PRO. TM SIDING

CH:473690
15

CH:471380

UP LINE
RL:125.947
UP LINE

UP LINE
(0.235% )
CH:467470

(CH :2090.00m)
CL -93.113 R
6

UP LINE
PRO. GP

CH:471800
SE :40mm.
TRL:40m

DN LINE DN LINE CH:470019.80 TO 470215.00 PRO. BI-DIRECTIONAL LOOP LINE F 1 IN 400 0.167%
7 (0.250% )
4.72 M. 16.76 M. 36.02 M.
UP LINE C.NO-2D UP LINE DN LINE DN LINE
7.80 M. 7.80 M. 20.00M. C.NO-2I
CH:470019.80 TO 470306.00 PRO. BI-DIRECTIONAL 3RD LINE F 1 IN 400 0.167% 16.90 M.
DIVERTED UP LINE 16.90M.
PRO.3RD LINE C.NO-2E
C.NO-2F
6.00 M. C.NO-2H PRO.3RD LINE 8 (0.250% ) UP LINE UP LINE

(BI-DIRECTIONAL) C.NO-2G (BI-DIRECTIONAL)


PRO.3RD LINE 12.00 M. 12.00 M. PRO.3RD LINE
CURVE NO: 2D(RHS)
R=7000M(0.25)
CURVE NO: 2E(RHS)
R=7000M(0.25)
CURVE NO: 2F(LHS)
R=7000M(0.25)
CURVE NO: 2G(LHS)
R=7000M(0.25)
U/L CURVE:2I (RH)
Δ = 4°26'40.8" 3rd Line CH:470019.80 TO 470273.00 PRO. GOODS BD LOOP LINE F 1 IN 400 0.167%
(BI-DIRECTIONAL) (BI-DIRECTIONAL)
SOUTH CENTRAL RAILWAY
Δ=2°40'59.4'' Δ=2°40'59.4'' R = 2333.219m (.75°)

TL=163.936M TL=163.936M
Δ=2°40'59.4'' Δ=2°33'46.05'' TL = 90.544 m
CURVE:(RH)
Δ = 20°39'56.62" 9 (0.250% ) Hqrs. Drg. No. GM(W)SC/YARDS/SC/PPY/ -2024 Alt. No
TL=163.936M TL=156.579M 3rd L CURVE: (LH) CL = 180.997 m R = 2000m (0.875°)
CL=327.811M CL=327.811M
TRL=50M TRL=50M
CL=327.811M CL=313.105M
Δ = 4°26'40.8"
R = 1750 m (1.0°)
U/L CURVE:2H (LH)
Δ = 4°26'40.8"
TRL = 80.000 m
TCL = 260.997m
TL = 364.647 m
CL = 721.370 m PSR LOCATION IN PAPATAPALLI YARD LIMIT UP MAIN LINE & R 107 F 100
F 80
0
SE-35MM SE-35MM
TRL=50M TRL=50M TL = 67.911 m R = 1750 m (1.0°) SE = 80 mm TRL = 80.000 m
CH:470940.00 TO 471358.50 F 1 IN 735 0.053% F 784 LEVEL 07 LEVEL LEVEL F 10
0 F 80
0
LEVEL
Division Secunderabad Section KZJ-KI
R1
SPEED = 160 KMPH
CL = 135.755 m
UP LONGER LOOP LINE

(CH :3980.00m)
SE-35MM TL = 67.911 m
10 LEVEL

(CH :3740.00m)
TCL = 801.370 m

(CH :3070.00m)
(0.136% )

(CH :2090.00m)
SE-35MM

(CH :2910.00m)
SPEED-160KMPH SPEED-160KMPH TRL = 90.000 m
PRO.TRACK STRUCTURE:

RL:126.679
RL:126.016

RL:133.679

RL:133.679
CH:472620
(CH :1670.00m)
CL = 135.755 m

CH:473690
SE = 75 mm

CH:473450

RL:126.979
CH:471380
SPEED-160KMPH

CH:472780
SPEED-160KMPH TCL = 225.755m
(FIRST PORTION)

3rd LINE
TRL = 90.000 m
KILOMETRE

CH:471800

3d LINE
SPEED = 155 KMPH
F 110

3rd LINE
RL:126.016

3rd LINE
F 146 PSR(KmPH)
F 300 R 118 SE = 100 mm TCL = 225.755m
SL. NO. EXG. /PRO. REMARKS CAO. Drg. No.

3rd LINE
F 146 LEVEL
F 300
R 118 SPEED = 160 KMPH
FROM-TO CAO/C/TR/YARDS/SC/PPY/ 104 - 2024

3rd LINE
SE = 100 mm
(CH :3220.00m)
(CH :4400.00m)

LEVEL F 163
& UP LINE

RL:134.000
RL:141.516

(CH :2240.00m)
3rd LINE

RAILS : MAIN LINE 60 KG CL-I , 60 E 1 (R260)


RL:130.158

(CH :1786.64m)

SPEED = 160 KMPH


CH:467470

CH:467923.36
CH:465308.70

RL:133.425
CH:466490

3rd LINE
3rd LINE

EXG. TRACK STRUCTURE:


(CH:1304.25m)
3rd LINE

CH:468405.75

LOOP LINE & OTHER LINES 60 KG CL-II ,90UTS Station PAPATAPALLI


RL:134.00

1. EXG. UP LINE KM:468/35 TO KM:469/5 90 DUE TO POINT ON 1.5° CURVE


3rd LINE

SLEEPERS : MAIN LINE 60 KG PSC WIDE BASED MONO


RAILS : MAIN LINE 60 KG ,90 UTS BLOCK SLEEPERS WITH 1660 NOS/KM DENSITY PROPOSED CONSTRUCTION OF 3rd LINE BETWEEN
LOOP LINE & OTHER LINES 52 KG , 90UTS
SLEEPERS : MAIN LINE PSC6 WITH M+7 2. EXG. DN LINE KM:469/8 TO KM:469/14 90 DUE TO POINT ON 1.5° CURVE Name of work DORNAKAL AND ERUPALEM STATIONS.
LOOP LINES AND OTHER LINES 60 KG PSC
LOOP LINES AND OTHER LINES PSC 5 WIDE BASED MONO BLOCK SLEEPERS WITH
PROPOSED YARD ARRANGEMENTS AT
KM:466 KM:465 KM:467 KM:468
WITH M+4 DENSITY 1540 NOS/KM DENSITY PAPATAPALLI
BALLAST: MAIN LINE STONE BALLAST - 350 MM BALLAST: MAIN LINE STONE BALLAST - 350 MM
LOOP LINES & OTHER LINES - 250 MM AUTHORITY ITEM No. PB No.36 OF 2018-19
LOOP LINES & OTHER LINES - 250 MM
DETAILS FOR 3.00 Km. AT KZJ END (Not To Scale) TURNOUTS: 1 IN12 PSC THICK WEB SWITCHES SLEEPER (FSL) DETAILS FOR 3.00 Km. AT BZA END (Not To Scale) IRPSM ID.11.00.15.12.1.30.001
TURNOUTS: 1 IN12 / 1 IN 8.5 PSC SLEEPER (FSL) WITH 60 KG RAILS
WITH 60/52 KG RAILS
SCALE 1CM = 10M