Electrical post Structural Estimates for Request
Electrical post Structural Estimates for Request
Electrical post Structural Estimates for Request
270.00 193,590.00
1,800.00 128,934.00
1,300.00 46,559.50
146.00 76,796.00
75.00 1,630.50
140.00 3,500.00
74.00 275.28
Project Title : Proposed One Storey Building (Structurally Prepared for 2nd Flr Extension)
Owner : Local Superior of the Franciscan Missionary Sisters of the Sacred Heart, Inc.
Location : Brgy. Guin-on, Calbayog City, Samar
Floor Area : 1,251.98 sq.m. (Roof Slab included)
BILL OF MATERIALS
Materials + Labor
Contigencies (10%)
Grand Total
Prepared by:
Noted by:
Approved by:
18,719,467.00 19,275,767.00
Flr Area 1,251.98 556,300.00
Cost/Sq.m. 14,951.89
Amount
60,000.00
-
-
394,000.00
42,000.00
24,000.00
520,000.00
Amount
-
-
37,040.00
280,579.44
317,619.44
Amount
901,403.84
1,475,201.97
2,466,396.64
37,381.20
241,280.72
722,056.45
1,845,803.28
53,771.17
7,743,295.26
Amount
6,299.20
16,944.80
29,760.00
53,004.00
Amount
833,512.00
360,320.00
43,732.00
96,561.20
121,860.80
111,320.40
1,567,306.40
Amount
411,840.00
49,017.60
460,857.60
Amount
1,167,708.80
1,167,708.80
Amount
762,534.40
147,448.00
909,982.40
Amount
638,697.50
316,625.00
955,322.50
Amount
238,728.00
43,208.00
222,560.00
-
763,184.00
340,121.60
1,607,801.60
Amount
233,856.00
554,360.00
134,208.00
922,424.00
Amount
-
-
Amount
792,374.40
792,374.40
17,017,696.40
1,701,769.64
18,719,467.00
FOOTING
Details Rebars
Length: 0.60 m. No of Bars (Lx) 5 pcs
Width: 0.60 m. Cutting Length 0.70 m.
Depth: 0.200 m. No of Bars (Ly) 5 pcs
Rebar Size: 0.02 m. Cutting Length 1.05 m.
Rebar Length: 6.00 m. Total Cut Bars 130 pcs
Spacing: 0.15 m. If 6m, Wastage: 0.40 m.
Clear Cover: 0.075 m. If 6m, Nb pos: 5 pcs.
No of Footing 13 pcs If 9m, Wastage: 0.60 m.
Volume: 1.87 cum If 9m, Nb pos: 8 pcs.
Thickness: 0.40 m.
COLUMN
Details Rebars
Length: 0.25 m. No of Bars 6 pcs
Width: 0.25 m. Cut Length 1 3.50 m.
Neck Height 0.45 m. Cut Length 2 0.00 m.
GF Height 1.20 m. Total Cut Length 3.50 m.
Rebar Size: 0.01 m. Total Cut Bars 78.00 pcs
Rebar Length: 6.00 m. If 6m, Wastage: 2.50
Nb (Main Bar) 6 pcs If 6m, Nb pos: 1 pcs.
No of Columns 13 pcs If 9m, Wastage: 2.00 m.
Clear Cover 0.04 m. If 9m, Nb pos: 2 pcs.
Volume 1 0.37 cum
Volume 2 0.98 cum Hoops 1 GF COL
No of Hoops 31 pcs.
Bar Stirrups/Cbar 0.01 Cutting Length 3.25 m.
Short Face: 0.25 Total Cut Bars 403 pcs.
Long Face: 0.25 If 6m, Wastage: 2.75 m.
Clear Span Height 1.20 If 6m, Nb pos: 1 pcs.
If
If 9m, Wastage: 2.50 m.
1
HOOPS - COLUMN - If 9m, Nb pos: 2 pcs.
Pieces Clear Span5 Lo (Long Face): 0.25
31.0 1.20 0 Lo (Clear Span/6 0.20
2 0.05 0.10 If Lo (18"): 0.46
12 0.1 1.20 ###
-18 0.15 -2.7 ### Hoops 2 NECK
17.0 0.15 2.600### No of Hoops 14 pcs.
2.300 Re Cutting Length 3.25 m.
Total Cut Bars 182 pcs.
HOOPS - NECK If
If 6m, Wastage: 2.75 m.
1
Pieces Clear Span- If 6m, Nb pos: 1 pcs.
14.0 0.60 5 If 9m, Wastage: 2.50 m.
2 0.05 0.10 0 If 9m, Nb pos: 2 pcs.
8 0.1 0.80 If 6-100
-4 0.15 -0.6 ###C-Bar Neck
4.0 0.15 0.6 No of Cbar 28.00 pcs.
-0.30 -0.300 Re Cutting Length 0.50 m.
Total Cut Bars 364 pcs.
TIE BEAM
Details Frame 1 1 26
Length: 0.40 m. 2 36
Width: 0.20 m. 3 50
Length: 125.16 m. 4 21
GF Height m. 5 38
Rebar Size: 0.12 m. Frame 2 1 29
Rebar Length: 6.00 m. 2 33
Nb (Main Bar) 6 pcs 3 50
No of Columns pcs 4 33
Clear Cover 0.04 m. 5 26
Volume 1 10.01 cum Frame 3 1 26
Volume 2 0.00 cum 2 36
2 57
3 32
4 29
5 40
6 30
7 33
Frame C 1 46
2 31
3 28
4 40
5 36
6 26
7 36
Frame E 1 49
2 31
3 33
4 36
5 33
6 29
7 33
Frame F-F' 1 49
2 28
3 33
4 36
5 26
6 36
Frame G 1 49
2 31
3 33
4 36
5 33
6 29
7 33
2,654.00
ROOF BEAM
Frame 1 1 26
Details 2 36
Length: 0.40 m. 3 50
Width: 0.35 m. 4 21
Length 1: 279.80 m. 5 38
Rebar Size 1: 0.016 m. Frame 2 1 29
Rebar Length: 9.00 m. 2 33
Nb (Main Bar) 8 pcs 3 50
Volume 1 39.17 pcs 4 33
Length 2: 66.80 m. 5 26
Rebar Size 2: 0.02 m. Frame 3 1 26
Rebar Length: 9.00 m. 2 36
Nb (Main Bar) 8 pcs 3 25
Volume 1 9.35 pcs 4 28
Clear Cover 0.04 m. 5 30
Total Volume 48.52 cum 6 29
Frame 4 1 26
2 33
3 29
4 26
Frame 5-6 1 26
2 33
3 29
4 26
Frame 7 1 31
2 27
3 21
4 35
Frame 8 1 31
2 30
3 25
4 28
5 29
6 29
Frame 9 1 34
2 27
3 28
4 25
5 32
6 26
Frame A 1 46
2 31
3 28
4 40
5 36
6 26
7 36
Frame B 1 49
2 57
3 32
4 29
5 40
6 30
7 33
Frame C 1 46
2 31
3 28
4 40
5 36
6 26
7 36
Frame E 1 49
2 31
3 33
4 36
5 33
6 29
7 33
Frame F-F' 1 49
2 28
3 33
4 36
5 26
6 36
Frame G 1 49
2 31
3 33
4 36
5 33
6 29
7 33
2,654.00
Concrete 0 Details: REMAINING FOOTING
Cement 17 bag Cement 17 bag
Sand 2 cum Sand 2 cum 66.00
Gravel 3 cum Gravel 3 cum 90.00
Tie Wire 2 kg Tie Wire 2 kg
Tie Wire kg Main Bar 16 pcs
Cut 1.05 m.
Cut Qty 130 pcs
Plywood 57 pcs
G60-20mm Lumber 2x3x16 156 pcs
Total Nb-6m (Main) 26 pcs
Total Nb-9m (Main) 16 pcs
G60-10mm NECK
Total Nb-6m (Stirrups 182 pcs Details: REMAINING GF COL
Cement 9 bag
Sand 1 pcs
G60-10mm GF COL Gravel 2 pcs
Total Nb-6m (Stirrups 403 pcs Tie Wire 41 kg
Main Bar 78 0
Cut 3.50 m.
Cut Qty 78 pcs.
G60-10mm GF COL 10mm (Stirrups) 403 pcs
Total Nb-6m (Cbar) 67 pcs Cut 3.25 m.
Cut Qty 403 pcs.
10mm (Cbar) 67 m.
Cut 0.50 pcs.
G60-10mm NECK Cut Qty 806 m.
Total Nb-6m (Cbar) 30 pcs Plywood 144 pcs
Lumber 2x2x16 549 pcs
55 49,437.85 20MM
20 5,072.66 CEMENT FOOTING & NECK
3 3,900.00 SAND FOOTING & NECK
4 7,200.00 GRAVEL FOOTING & NECK
1.07
FOUNDATION 226,253.06
FTG REBAR 14,222.08
COL REBAR 34,666.32
CEMENT FTG 4,250.00
SAND FTG 2,600.00
GRAVEL FTG 5,400.00
STIRRUPS NECK 7,392.00
CEMENT NECK 822.66
SAND NECK 1,300.00
GRAVEL NECK 1,800.00
BACKHOE 28,800.00
LABOR 120,000.00
SNACKS 5,000.00
MOBILIZATION 10,000.00
FORMWORKS
Bending Allowance
90deg 135deg
10mm 0.3273 0.491
12mm 0.2396 0.3594
16mm 0.1755 0.2633
20mm 0.05 0.075
90.1152 378
5.46152727273 21
12.01536 50
#DIV/0! #DIV/0!
10.70161290323
176
Main Bar 20mm 0 pcs
248
Cut 1.40 m.
Cut Qty 2654 pcs.
Cut 1.40 m.
Cut Qty 2654 pcs.
Deformed Bar - 20.00 mm x 9.0m (Grade 60) 16 115 pcs Footing - Reinforcement
ENGR. JADA JOYCE S. OSTAYA FOREMAN ZALDY U. MONARES ENGR. JASON P. ERROJO
Site Engineer General Foreman Site Operations Manager