Proposed Center Line
20,000
Earthen Paved Paved Earthen
Shoulder Shoulder Median Shoulder Shoulder
Varies 1,000 1,500 Carriageway 1,000 Carriageway 1,500 1,000 Varies
7,000 7,000
Building Line
Building Line
Granular
2.5% New Jersey Barrier 2.5% Material
3.0 % 3.0 %
2 2
1 1
GL GL
Bituminous concrete 40mm
Dense Bituminous concrete 100mm
Wet Mix Macadam 250mm
Granular Sub Base 200mm
Sub Grade 500mm
Type I - Four Lane Divided Carriageway with Paved Shoulder - Rural Area