0% found this document useful (0 votes)
11 views

Learn 2

Uploaded by

shantanukk0108
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Learn 2

Uploaded by

shantanukk0108
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Classical Waterfall Model (PYQ)

Classical Waterfall Model: Key Phases


1. Feasibility Study:
o This phase evaluates whether the project is technically and financially
viable.
o It involves analyzing whether the project can be completed within
budget, time, and available resources.
2. Requirement Analysis:
o All functional and non-functional requirements are gathered from the
stakeholders.
o The output is a Requirements Specification Document which serves as the
foundation for the subsequent phases.
3. Design:
o The system design is formulated based on the requirements.
o It includes High-Level Design (HLD), which outlines system architecture, and Low-Level Design (LLD), detailing component-
level designs.
4. Coding:
o The design is converted into source code.
o Developers write code for the system's modules, integrating them later into a full system.
5. Testing:
o The system is tested for defects and errors.
o Unit testing (for individual modules) and system testing (for the complete software) are performed to ensure that the
software works as expected.
6. Maintenance:
o After deployment, the software enters the maintenance phase.
o Issues such as bug fixes, performance improvements, and adaptation to new environments are addressed over time.
Problems Encountered in the Waterfall Model
1. Inflexibility to Changes:
o Once a phase is completed, it is difficult to revisit earlier phases. This makes adapting to changing requirements costly and
time-consuming.
2. Late Testing:
o Testing occurs after the coding phase, so any major issues found at this stage can lead to significant rework, increasing the
overall cost and time.
3. Delayed Feedback:
o Users or stakeholders may not see a working version of the product until late in the process, which could lead to a final
product that doesn’t fully meet their needs.
4. Poor for Uncertain Requirements:
o The model assumes that all requirements are known upfront, which is rarely the case. If requirements evolve, the Waterfall
model struggles to accommodate changes efficiently.
5. Lack of Overlap Between Phases:
o The strict separation of phases can lead to communication gaps and misunderstandings, especially when handing over
between teams (e.g., from design to coding).
6. Higher Risk for Large Projects:
o For complex or large projects, the rigidity of the Waterfall model increases the risk of failure due to unforeseen
complications.
Spiral Model (PYQ)
The Spiral Model is a risk-driven software development process model that combines the
iterative nature of prototyping with the controlled aspects of the Waterfall Model. The
development process spirals through repeated cycles (iterations), each one going through
several key phases.
Key Phases in the Spiral Model
1. Planning:
o In this phase, objectives, alternatives, and constraints for each iteration (or
spiral) are identified.
o Tasks include gathering requirements, defining milestones, and estimating
resources.
o Task Region: The task here is to understand and define what needs to be
achieved in this iteration and how to allocate time and resources effectively.
2. Risk Analysis:
o This phase identifies potential risks that might affect the success of the project.
o Risks are assessed, and mitigation strategies are formulated.
o Task Region: Critical activities include evaluating technical risks, budget constraints, and timeline feasibility to minimize
uncertainty in the project.
3. Engineering:
o The actual development of the product occurs during this phase, including design, coding, and testing.
o The focus is on building and validating the system or its components based on the planning and risk analysis.
o Task Region: Here, the task involves executing development activities such as prototyping, coding, and integration based
on previously established plans.
4. Evaluation:
o At the end of each spiral, the product is evaluated by stakeholders.
o Feedback is collected, and the product is assessed against objectives and risks identified in earlier phases.
o Task Region: The evaluation task involves reviewing progress, refining requirements based on feedback, and preparing for
the next iteration of the spiral.

Task Region Explanation:


In the Spiral Model, a task region refers to the collection of specific tasks and activities performed within each phase of the model during
an iteration. Each task region focuses on a distinct aspect of the project—planning, analyzing risks, building the system, and evaluating the
progress.

Customer and Developer Wins:


• Customer Wins:
o The customer gets involved at every iteration of the spiral, allowing them to review the system as it evolves.
o Each cycle incorporates feedback from the customer, ensuring that the majority of the customer's needs are met over
time.
o Since risks are analyzed and managed early in each spiral, it reduces the chances of delivering an unsatisfactory product,
leading to higher customer satisfaction.
• Developer Wins:
o Developers benefit by working within realistic budgets and timelines, as risks and scope are continuously evaluated.
o Since the process is iterative, they can develop the system in manageable chunks rather than committing to rigid schedules
that might fail.
o By focusing on high-risk areas early on, developers can address major challenges upfront, improving the likelihood of
success and reducing costly rework.
Agile Software Development (PYQ)
1. Satisfy the Customer:
o The primary goal is to meet customer needs through
early and continuous delivery of valuable software.
2. Welcome Changing Requirements:
o Agile embraces changes, even late in development, to
ensure the software meets evolving customer needs.
3. Deliver Working Software Frequently:
o Software is delivered in small, usable increments regularly, ensuring continuous feedback from customers.
4. Motivate Individuals:
o Build projects around motivated individuals and provide the environment and support they need to succeed.
5. Interact Frequently with Stakeholders:
o Continuous collaboration between developers and stakeholders ensures that the product aligns with business objectives.
6. Communicate Face-to-Face:
o Face-to-face communication is preferred as the most effective way to convey information.
7. Measure by Working Software:
o Progress is measured by working, functional software, not by documentation or plans.
8. Maintain Constant Pace:
o Agile promotes sustainable development, where developers, sponsors, and users can maintain a constant pace indefinitely.
9. Sustain Technical Excellence and Good Design:
o Continuous attention to technical excellence and good design enhances agility and product quality.
10. Keep it Simple:
o Simplicity, or maximizing the amount of work not done, is essential in agile development.
11. Empower Self-Organizing Teams:
o Agile teams are self-organizing, meaning they determine the best way to accomplish their tasks.
12. Reflect and Adjust Continuously:
o Teams regularly reflect on how to become more effective and adjust their behavior accordingly.

Problems with Agile Methods:


1. Lack of Documentation:
o Agile emphasizes working software over comprehensive documentation, which can cause issues in maintaining or scaling
the system.
2. Scope Creep:
o The flexibility in welcoming changes can lead to scope creep, making it difficult to control project boundaries.
3. Inconsistent Output:
o Delivering working software in small increments can sometimes result in inconsistent or partial features, especially if
iterations are rushed.
4. Limited Long-Term Planning:
o Agile focuses on short-term goals, which may result in a lack of long-term project vision and planning.
5. Requires Experienced Teams:
o Agile methods rely on self-organizing, highly skilled teams. Inexperienced teams may struggle with the autonomy and
decision-making required.
6. Poor Fit for Large Teams:
o Scaling agile methods to large teams or large projects can be challenging due to coordination and communication issues.
7. Customer Availability:
o Agile requires frequent interaction with stakeholders, and if the customer is unavailable or unresponsive, it can hinder
progress.
1 mark question PYQs
a) Merits of the Incremental Model:
1. Early Product Delivery: Delivers a working product early in the development process.
2. Flexibility: Easier to accommodate changes after each increment.
3. Risk Management: Risks are identified and mitigated with each increment.
4. Customer Feedback: Customer feedback is obtained early, allowing for adjustments.
5. Parallel Development: Different parts of the system can be developed in parallel.

b) Software and Software Engineering:


• Software: A collection of instructions, data, and programs used to operate computers and execute specific tasks.
• Software Engineering: The systematic, disciplined, and quantifiable approach to the design, development,
maintenance, and testing of software systems.

c) Advantages of Adhering to Life Cycle Models for Software:


1. Structured Development: Provides a clear roadmap and sequence of phases.
2. Better Planning: Helps in planning and estimating resources, time, and costs.
3. Risk Management: Allows for early risk identification and mitigation.
4. Control and Monitoring: Makes it easier to track progress and manage deviations.
5. Quality Assurance: Ensures that quality checkpoints are established at each phase.

d) What is Scrum?
Scrum is an agile framework used for managing and completing complex projects. It breaks down work into sprints (short
iterations) and involves a Scrum team, which includes a Product Owner, Scrum Master, and Development Team. Scrum
emphasizes continuous feedback, collaboration, and adaptive planning.

e) What is Extreme Programming (XP)?


Extreme Programming (XP) is an agile software development methodology that focuses on improving software quality and
responsiveness to changing requirements. Key practices include pair programming, test-driven development (TDD),
continuous integration, and frequent releases. XP aims to deliver high-quality software quickly.
Software Quality Assurance (IMP)
Software Quality Assurance (SQA) is a systematic process that ensures the quality of software products through various
activities and techniques. It aims to confirm that the software meets defined standards and requirements during its
development lifecycle. SQA is not just limited to testing but involves planning, monitoring, and continuously improving the
development process to ensure high-quality deliverables.
Key Aspects of SQA:
1. Planned and Systematic Process:
SQA is an organized activity that is built into the development process. It doesn't happen by chance; it requires a well-
defined approach that includes steps such as testing, reviews, and continuous feedback to improve the quality of the
product.
2. Continuous Improvement:
A primary goal of SQA is continuous improvement. This involves tracking and measuring quality metrics throughout
the software's development, allowing teams to use the feedback for refining both the product and future projects.
3. SQA as an Umbrella Activity:
SQA covers a wide range of activities:
o Standards and Procedures: Ensures consistency by adhering to predefined guidelines for software development.
o Metrics and Measurement: Helps quantify software quality, focusing on attributes like complexity, usability, and
maintainability.
o Testing and Formal Technical Reviews: Reviews and testing ensure that defects are caught and addressed early,
saving both time and costs.
o Software Configuration Management (SCM): Controls changes in software, ensuring that each version is
managed and reviewed properly.
4. Cost-Effectiveness of SQA:
SQA ensures that defects are detected early in the process, particularly in the design or requirement stages, where
they are cheaper to fix. Addressing defects later in the development or after release can be significantly more costly.
5. Software Quality Attributes:
Quality is evaluated through both internal and external attributes:
o From a customer’s perspective, the software must meet functional and performance specifications.
o From a developer’s perspective, the software should be easy to maintain, test, and extend. Key quality attributes
include reliability, usability, security, portability, and efficiency.
6. Principles of SQA:
o Standards and Measurability: Software must meet specific standards, and its quality should be measurable
using defined metrics.
o Feedback and Improvement: SQA activities generate valuable feedback to improve the development process,
leading to higher-quality products in future projects.
Importance of SQA:
SQA plays a crucial role in ensuring software reliability and customer satisfaction. By integrating systematic checks, metrics, and
reviews, SQA helps produce software that not only meets functional requirements but is also easier to maintain, more secure,
and more efficient over time
IA Questions
1. Prime Objective of Software Engineering (CO1):
The prime objective of software engineering is to produce high-quality software that is reliable, maintainable, and meets
the needs of its users while being developed within budget and time constraints.
2. Software Engineering Paradigm (CO1):
A software engineering paradigm is a model or approach that defines the structure, techniques, and methods used for
developing software. Examples include the Waterfall Model, Spiral Model, and Agile methodologies.
3. Spiral Model (CO1):
The spiral model is a risk-driven software development process model that combines elements of both design and
prototyping. It allows for iterative development through repeated cycles, with each iteration designed to refine and
expand on the product based on feedback and risk assessment.
4. Waterfall Model (CO1):
The Waterfall model is a linear, sequential approach to software development where each phase (Requirements, Design,
Implementation, Testing, and Maintenance) must be completed before the next begins. It is simple to understand but
lacks flexibility for changes.
5. Distinguish Between Process and Methods (CO1):
• Process: A series of steps followed in the development of software, defining what needs to be done.
• Methods: Specific techniques used to carry out the steps in the process, defining how to do it.
6. Importance of Software Engineering (CO1):
Software engineering is important because it provides systematic, disciplined approaches to developing software,
ensuring that projects are completed on time, within budget, and meet quality standards. It reduces complexity, improves
quality, and ensures maintainability.
7. Software Process and Its Important Features (CO2):
A software process is a structured set of activities involved in developing software, including requirements analysis,
design, implementation, testing, and maintenance. Important features include:
• Repeatability
• Measurability
• Predictability
• Scalability
8. Two Characteristics of Software as a Product (CO2):
• Intangibility: Software cannot be physically touched or seen.
• Flexibility: Software can be modified and updated to meet new requirements.
9. Process Maturity Levels in SEI's CMM (CO5):
The SEI Capability Maturity Model (CMM) defines five maturity levels:
• Initial: Ad hoc, chaotic processes.
• Repeatable: Basic project management processes are established.
• Defined: Standardized processes across the organization.
• Managed: Processes are measured and controlled.
• Optimizing: Continuous process improvement.
10. Distinguish Between Verification & Validation (CO5):
• Verification: Ensures the product is built correctly according to the specifications (e.g., reviews, walkthroughs,
inspections).
• Validation: Ensures the product meets the user's needs and requirements (e.g., testing, user acceptance).
11. Functions of Data Architecture (CO2):
Data architecture defines how data is collected, stored, managed, and used in an information system. Its functions
include:
• Structuring and organizing data.
• Ensuring data availability, reliability, and integrity.
12. System Modeling (CO3):
System modeling is the process of creating abstract representations (models) of a system to understand, analyze, and
communicate the system's structure and behavior. It often includes diagrams like flowcharts, data flow diagrams, and
state diagrams.
13. System Engineering Hierarchy (CO2):
The system engineering hierarchy defines the decomposition of a system into levels, typically:
• System Level
• Subsystem Level
• Component Level
• Unit Level
14. Factors to Consider During System Modeling (CO3):
Some important factors to consider during system modeling include:
• System requirements and specifications.
• System complexity.
• Integration and interaction between components.
• Scalability and future growth.
15. Verification & Validation (CO5):
• Verification: Checking that the product complies with its specifications (e.g., design verification).
• Validation: Ensuring that the product satisfies its intended use and requirements (e.g., system testing).
Iterative Waterfall Model
The Iterative Waterfall Model is a variation of the classical Waterfall model that allows for revisiting previous phases after a
cycle is completed, offering a bit more flexibility. Here's a breakdown of its phases:
1. Feasibility Study:
o Analyzes the project's viability in terms of budget, time, and technical resources.
2. Requirement Analysis:
o Gathers detailed system requirements and documents them to form the basis for system design.
3. Design:
o The system architecture is designed, covering both high-level and low-level design elements.
4. Coding:
o The design is implemented by writing code for the system, followed by integration of various modules.
5. Testing:
o The developed system undergoes rigorous testing to ensure it meets the specified requirements and functions
correctly.
6. Maintenance:
o After deployment, ongoing maintenance is performed to fix issues, enhance functionality, and adapt to changing
needs.
Unlike the classic model, this version allows for iteration, meaning you can revisit earlier phases based on feedback or issues
discovered during testing.
V-Mode
V-Model (Verification and Validation Model)
The V-Model is a software development model that emphasizes the parallel execution of development and testing activities,
aligning each development phase with its corresponding testing phase.
Key Phases:
1. Business Requirements ↔ Acceptance Testing
• Ensure that the final product meets the business needs and fulfills the client's requirements.
2. System Requirements ↔ System Testing
• Validate the complete system functionality according to the defined system requirements.
3. High-Level Design ↔ Integration Testing
• Check the interaction between integrated modules to ensure they work together as intended.
4. Detailed Design ↔ Unit Testing
• Test individual components or units based on the detailed design specifications to ensure they function correctly.
5. Coding ↔ Unit Testing
• Code implementation is directly verified through unit tests to ensure the smallest pieces of the system work as
expected.
Prototyping Model
The Prototyping Model is a software development approach where a prototype (a preliminary version of the system) is built,
tested, and refined through multiple iterations based on user feedback.
Key Phases:
1. Requirement Gathering:
o Initial requirements are gathered, but they are not fully defined.
2. Quick Design:
o A quick and rough design of the system is created to build a prototype.
3. Prototyping:
o A prototype is developed to understand the system's functionality and gather user feedback.
4. User Evaluation:
o The prototype is evaluated by the users, and feedback is collected to refine the requirements.
5. Refinement:
o Based on feedback, the prototype is refined and reworked in iterations until the final system meets the users’
needs.
6. Final Product Development:
o Once the prototype is approved, the final system is developed with fully defined requirements.
The model helps in better understanding user requirements and reducing risks, but can lead to scope creep if not managed
carefully.
Evolutionary Model
This model is an incremental development approach where the software is developed and refined through multiple cycles, or
iterations. Here’s a brief explanation:
1. Initial Rough Requirements: The process starts with gathering initial requirements, which are not detailed or
complete.
2. Specification: Based on the initial requirements, a specification of the system is created.
3. Development: The system is then developed into an initial version.
4. Validation: Each version undergoes validation to ensure it meets the requirements.
5. Iterations: After validation, further refinements are made, leading to intermediate versions. This process repeats until
the final version is developed.
In summary, the evolutionary model allows continuous refinement of the product through several iterations, leading to
gradual improvement.
RAD Model
The Rapid Application Development (RAD) model is a type of software development methodology that emphasizes quick
development and iteration of prototypes. It focuses on user feedback and involves the following key phases
1. Business Modelling: This phase identifies the information flow between various business functions, outlining how
data is processed and shared.
2. Data Modelling: The information from the business modelling phase is refined to define the data objects necessary
for the system.
3. Process Modelling: This phase focuses on creating the flow of data and specifying the transformations the data must
undergo to meet business needs.
4. Application Generation: The actual coding and software development occur here, where the system is built based on
the models created in earlier phases.
5. Testing & Turnover: Finally, the developed software is tested and deployed. Any necessary changes are made,
ensuring the system is functional and meets user expectations.
Each module (1, 2, 3) goes through the same iterative process, allowing for rapid prototyping and faster delivery of the
system in segments. This modularity speeds up development and facilitates continuous user feedback.
Unified Model
The Unified Model, also known as the Unified Process (UP) or Rational Unified Process (RUP), is an iterative and incremental
software development framework. It focuses on addressing risks early in the development process and follows a phased
approach with multiple iterations. Here’s a brief explanation:
1. Inception: The project's initial phase, where the scope, requirements, and high-level architecture are defined. The
focus is on understanding what to build`.
2. Elaboration: In this phase, detailed analysis, design, and risk assessment occur. Key architecture decisions are made,
and any high-risk areas are addressed.
3. Construction: The actual development of the system happens here. Iterative coding, testing, and integration lead to
working software being incrementally produced.
4. Transition: The final phase, focusing on user training, deployment, and bug fixes. The system is fine-tuned based on
user feedback and prepared for full release.
The Unified Model emphasizes use-case driven, architecture-centric, and iterative development, making it highly adaptable
to changing requirements and focusing on delivering a reliable, well-structured system.

You might also like